Max pain // Cboe delayed data · as of Oct 25, 3:09 AM ET

NVDL max pain

Spot (delayed)$31.02
Max pain · Fri, Oct 30$34.5+11.2% vs spot
Expected move (ATM straddle)±$2.55±8.2% by Fri, Oct 30
Put/Call OI0.748K puts / 11K calls
Call wall$40largest call OI
Put wall$35largest put OI
IV3083.0%30-day implied vol
Net GEX−$212Kper 1% move · flip ≈ $25

Event risk before this expiration: FOMC decision Wed, Oct 28 — macro releases historically overwhelm pinning effects; max pain reads weakest in event weeks.

Max pain levels

ExpiryMax painvs spotDTE
Fri, Oct 30$34.5+11.2%5d
Fri, Nov 6$35.5+14.4%12d
Fri, Nov 13$33+6.4%19d
Fri, Nov 20$35+12.8%26d
Fri, Nov 27$34+9.6%33d
Fri, Dec 4$34.5+11.2%40d
Fri, Dec 18$30-3.3%54d
Fri, Jan 15$17.67-43.0%82d
Fri, Mar 19$35+12.8%145d

The writer-loss curve — where max pain comes from

spot34.5202632384450$15M$0
■ put-side pain■ call-side painTotal payout option writers would owe at each settle price (both sides, all open interest, ×100 shares) — low settles hurt put writers, high settles hurt call writers. The minimum — 34.5 — is the max pain price.

Open interest by strike · Fri, Oct 30

spot34.5202831.53538.5431K1K
■ calls (up)■ puts (down)NVDL open contracts per strike for Fri, Oct 30.

Open-interest change: building vs unwinding

Needs two observed snapshot days for this expiration; the comparison appears automatically once the next weekday snapshot lands. We diff real observations only; nothing is estimated.

Volume by strike · Fri, Oct 30

spot34.5202831.53538.543807807
■ calls (up)■ puts (down)Today's traded contracts per strike (delayed).

Implied volatility by strike · Fri, Oct 30

spot202632384450246%54%
— call IV— put IVATM ≈ 74.3% · Quoted strikes only; illiquid wings with junk fits are dropped, not smoothed.

Gamma exposure by strike · Fri, Oct 30

spotflip 252028.53235.53944+$62K−$62K
Net dealer gamma per strike, in dollars per 1% move, assuming the standard convention (dealers long calls, short puts) — an assumption, not an observation. Above the amber flip level hedging tends to dampen moves; below it, to amplify them.

Greeks by strike · Fri, Oct 30

Call ΔCall ΘStrikeΓVegaPut ΘPut Δ
0.85-0.0627.50.06310.01-0.06-0.15
0.82-0.07280.07380.01-0.07-0.18
0.78-0.0728.50.08490.01-0.07-0.22
0.74-0.08290.09580.01-0.08-0.26
0.69-0.0929.50.10600.01-0.09-0.31
0.63-0.09300.11460.02-0.09-0.37
0.57-0.0930.50.12100.02-0.09-0.43
0.51-0.09310.12460.02-0.09-0.49
0.45-0.0931.50.12500.02-0.09-0.55
0.39-0.09320.12200.02-0.09-0.61
0.33-0.0832.50.11610.02-0.08-0.67
0.27-0.07330.10770.01-0.07-0.73
0.23-0.0733.50.09740.01-0.07-0.78
0.18-0.06340.08610.01-0.06-0.82
0.14-0.0534.50.07450.01-0.05-0.86

Quoted contract greeks from the delayed feed (not modeled here); the highlighted row is nearest to spot. Showing 15 strikes around the money — all 40 are in the CSV. Δ per $1 of underlying · Θ per day · vega per IV point.

Stacked — layer the expirations

spot202932.53639.5452K0
Call open interest per strike, stacked across the checked expirations — each color is one expiry. Strikes are pruned to the liquid center of each chain.

All expirations combined — total open interest

spot516.6726.33313646.6726K26K
■ calls (up)■ puts (down)Every expiration combined: 219K call contracts, 101K put contracts open.

Reading this honestly

Max pain is arithmetic, not prophecy: the settle price that would minimize what option writers pay out at expiration, computed from open interest alone. Prices sometimes gravitate toward heavy strikes into expiry — dealer hedging is a real flow — but the evidence that max pain predicts settlement better than chance is mixed, and we are not going to pretend otherwise. Use it as a map of where positioning is stacked, next to the fundamentals and the earnings calendar, not as a target.

Data: Cboe delayed public feed (~15 minutes), refreshed here about every 15 minutes. Open interest itself updates once daily, before the open. Educational information, not investment advice.

Keep going: NVDL workspace · max pain, explained in full · options profit calculator · iron condor and credit spread calculator · GEX, defined · pin risk