Item 2. Properties
Item 2. Properties.
Our facilities consist primarily of our corporate headquarters facility, chemical plants, processing plants and distribution facilities. We believe our facilities are adequate for our present needs. We also hold brine leases on
22
acreage which contains bromine and lithium. The following information describes facilities that we (i) leased or owned and (ii) leased acreage as of December 31, 2022.
Facilities
Completion Fluids & Products Division
Our Completion Fluids & Products Division facilities include six operating chemical production plants located in the states of Arkansas, California, Louisiana, and West Virginia, and the country of Finland, having a total production capacity of more than 1.1 million equivalent liquid tons per year. The two California locations consist of 29 square miles of leased mineral acreage and solar evaporation ponds, and related owned production and storage facilities.
In April 2020, in response to market conditions, we began the process of discontinuing chemical production operations at our El Dorado calcium chloride facility in Arkansas. We continued to manufacture and deliver products through early June 2020, at which time we began a sequenced shutdown of the manufacturing facility. As of December 31, 2020 and continuing through December 31, 2022, the plant was no longer operational.
In addition to the production facilities described above, the Completion Fluids & Products Division owns or leases multiple service center facilities in the United States and in other countries. The Completion Fluids & Products Division also leases several offices and numerous terminal locations in the United States and in other countries.
Water & Flowback Services Division
The Water & Flowback Services Division conducts its operations through production testing and water management service centers (most of which are leased) in the United States, located in Louisiana, New Mexico, Oklahoma, Pennsylvania and Texas. In addition, the Water & Flowback Services Division has leased facilities in certain countries in Latin America, Europe, and the Middle East.
Corporate
Our headquarters is located in The Woodlands, Texas, in a 153,000 square foot office building, which is located on 2.6 acres of land, under a lease that expires in 2027. In addition, we own a 28,000 square foot technical facility in The Woodlands, Texas, to service our Completion Fluids & Products and Water & Flowback Services Divisions’ operations.
Bromine and Lithium Inferred Resources
Our Completion Fluids & Products Division leases approximately 40,000 gross acres of brine leases in Magnolia, Arkansas, which contain bromine and lithium. This acreage is leased for possible future development and as a source of supply for our bromine and other raw materials. In August 2021, we announced the completion of a technical report for exploration results by an independent geological consulting firm, APEX Geoscience Ltd. to assess existing sampling results regarding lithium and bromine exploration targets in our approximately 40,000 gross acres of brine leases in the Smackover Formation in Southwest Arkansas. We have rights to the brine, including rights to the bromine and lithium contained in the brine underlying this acreage, pursuant to certain brine leases and brine deeds with various landowners. With respect to approximately 35,000 acres of that total acreage, we had previously entered into an agreement granting Standard Lithium an option to acquire the lithium rights. The agreements governing this option contemplate a 2.5% royalty that Standard Lithium would pay us based on gross lithium revenues.
23
During 2022, we completed the drilling of our Arkansas exploration well, obtained and analyzed fluid samples for multiple Smackover formation brine zones, and began a bromine front-end engineering design study and bromine initial assessment. During the third quarter of 2022, the maiden inferred bromine and lithium brine resource estimation report for our leased acreage in the Smackover Formation in Southwest Arkansas was completed. The report indicates the brine resource underlying the approximately 40,000 gross acres where we hold bromine mineral rights is estimated to contain an inferred resource of 5.25 million short tons of elemental bromine; and the brine resource underlying the approximately 5,000 gross acres where we hold dedicated lithium mineral rights is estimated to contain an inferred resource of 44,000 short tons of elemental lithium. Using an elemental to Lithium Carbonate Equivalent (“LCE”) conversion ratio of 5.323, which is accepted in the industry, the acreage is estimated to contain an inferred resource of 234,000 short tons of LCE. We do not currently consider our current development efforts with regard to our inferred resources to be material mining operations within the meaning of SK1300 at this time. As of January 2023, the market price for lithium is approximately $71,000 per ton and the market price for bromine is approximately $3,800 per metric ton.
The basis for the lithium and bromine inferred resource is that hypersaline formation water, or brine, associated with some of the world’s oilfields and/or geothermal fields contains confined reservoirs, or aquifers, that are known to contain anomalous concentrations of lithium, bromine and other elements of interest. We propose to assess stratigraphically deep (more than 2,250 meters or 7,450 feet below surface) brine from oil and gas aquifers associated with the Late Jurassic Smackover Formation. The brine is currently pumped from the aquifer to the earth’s surface as a wastewater product associated with hydrocarbon production (e.g., oil, gas, and condensate). We expect that we will be able to develop or utilize evolving commercial technologies to economically remove the bromine and lithium from the brine underlying our acreage before the brine is reinjected back down into the subsurface aquifer.
Even if we are able to determine that some of these resources meet the definition of an “indicated or measured resource,” the extraction of lithium and bromine from these brine leases would likely require a significant amount of time and capital, which we are not able to estimate at this time. We completed an initial preliminary economic assessment in early 2023 for a bromine extraction plant. We expect an initial economic assessment to follow in late 2023 for a lithium extraction plant, subject to the progress of early engineering. Only upon completion of an indicated resources study, pre-feasibility and/or feasibility study and attainment of capital commitment from either a joint venture partner, governments grants or loans, or other cost-effective sources of capital that will not over-lever TETRA, in addition to confirmation of a successful recapitalization of the long-duration zinc-bromide battery storage manufacturers, would we proceed to a final investment decision.