Item 7. Management’s Discussion and Analysis
Item 7. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS
The following discussion of the financial condition and results of our operations should be read in conjunction with the financial statements and the notes to those statements appearing elsewhere in this Annual Report. Some of the information contained in this discussion and analysis or set forth elsewhere in this Annual Report, including information with respect to our plans and strategy for our business, includes forward-looking statements that involve risks and uncertainties. You should read the risk factors set forth in Item 1A of this Annual Report for a discussion of important factors that could cause actual results to differ materially from the results described in or implied by the forward-looking statements contained in the following discussion and analysis.
108
Table of Contents
Overview
We are a deep seabed minerals developer focused on the collection, processing and refining of polymetallic nodules found on the seafloor in international waters of the Clarion Clipperton Zone (“CCZ”), with NORI Area D located about 1,500 miles (or 2,400 kilometers) south-west of San Diego, California. The CCZ is a geological submarine fracture zone of abyssal plains and other formations in the Eastern Pacific Ocean, with a length of around 7,240 kilometers (4,500 miles) that spans approximately 4,500,000 square kilometers (1,737,000 square miles). Polymetallic nodules are discrete rocks that sit unattached to the seafloor, occur in significant quantities in the CCZ and have high concentrations of nickel, copper, cobalt and manganese, alongside meaningful concentrations of rare earth elements (REEs) in a single rock.
Our mission is to build a carefully managed shared stock of metal (a “metal commons”) that can be used, recovered and reused for generations to come. We believe significant quantities of newly mined metal are required because existing metal stocks are insufficient to meet rapidly rising demand.
The four metals and REEs contained in the polymetallic nodules are on the U.S. Department of Interior’s “2025 List of Critical Minerals”, with end-uses in strategic sectors including semiconductors and AI data centers, steel manufacturing, the defense and marine industrial base. Nickel was included on the list of 13 minerals selected by the U.S. Department of War in March 2026 for targeted procurement efforts through the Defense Industrial Base Consortium. Our resource definition work to date shows that nodules in our contract areas represent the world’s largest estimated undeveloped resource of several of these critical metals. If we are able to collect polymetallic nodules from the seafloor on a commercial scale, we plan to use such nodules to initially produce nickel, cobalt and copper-bearing intermediate and metal cathode products as well as a manganese silicate product of approximately 40% manganese comparable to medium-grade manganese ore. Once in production, we may explore expanding into other product formats including silicomanganese alloy, battery-grade sulfates and precursor Cathode Active Materials (pCAM), as well as extracting REEs contained in nodules.
We are now in the development stage following the release of the results of a pre-feasibility study on one of our development areas in a report titled S-K 1300 Prefeasibility Study for NORI Area D Technical Report Summary , dated August 4, 2025, prepared by AMC Consultants Pty Ltd. and other qualified persons (the “NORI-D PFS”), which declared the world’s first mineral reserves for a seafloor polymetallic nodule project demonstrating the project’s economic viability. We also recently released an initial assessment of certain of our other development areas in a report titled S-K 1300 Technical Report Summary—Initial Assessment of TOML and NORI Properties , Clarion-Clipperton Zone, dated August 4, 2025, prepared by AMC Consultants Pty Lt. and other qualified persons (the “TOML and NORI IA” together with the NORI-D PFS, the “Technical Reports”). We have yet to obtain a commercial recovery permit or other related offshore and onshore permits from the regulators. Additionally, we do not yet hold the environmental or other permits required to construct and operate commercial-scale polymetallic nodule processing and refining facilities on land.
Two parallel regulatory regimes exist to regulate deep seabed exploration and extraction activities in the high seas. The United States adopted the Deep Seabed Hard Mineral Resources Act of 1980 (“DSHMRA”), a U.S. domestic statute administered by the U.S. Department of Commerce through the National Oceanic and Atmospheric Administration (“NOAA”) to regulate deep-sea mining activities of its citizens in the high seas. NOAA implemented regulations for exploration licenses in 1981 and for commercial recovery permits in 1989 and amended these regulations introducing a consolidated exploration license and commercial recovery permit application process in 2026. In parallel, the International Seabed Authority (“ISA”), comprised today of 171 countries and the European Union was established in 1994, pursuant to the United Nations Convention on the Law of the Sea (“UNCLOS”) to regulate deep seabed exploration and exploitation activities of the nationals of Member States. The ISA has adopted exploration regulations in 2000 (amended in 2013 and 2014) and issued 19 polymetallic nodule exploration contracts (17 of which are located in the CCZ) but has been unable to adopt the final exploitation regulations, standards and guidelines despite initiating work in 2014. Almost 30 countries, including the United States, have not ratified UNCLOS and are not Member States of the ISA. The United States has remained a persistent objector to UNCLOS ratification, primarily due to its Part XI seabed mining provisions.
109
Table of Contents
We continue focusing on advancing our commercial production strategy under the DSHMRA regime. In April 2025, our wholly owned subsidiary, The Metals Company USA, LLC (“ TMC USA”), submitted two exploration license applications (covering 187,017 square kilometers in the CCZ referred to as TMC USA-A and TMC USA-B) and one commercial recovery permit application (covering 25,160 square kilometers in the CCZ referred to as TMC USA-A) to NOAA. Following the introduction of the consolidated application process by NOAA in January 2026, TMC USA submitted a consolidated exploration license and commercial recovery permit application covering a subset of TMC USA-A area previously applied over in April 2025. The application areas in total are estimated to hold approximately 1.639 billion wet tonnes of measured, indicated and inferred mineral resources. Together, the mineral resources are estimated to contain approximately 15.5 million tonnes of nickel, 12.8 million tonnes of copper, 2.0 million tonnes of cobalt, and 345 million tonnes of manganese.
We believe that DSHMRA provides a viable and robust regulatory path to commercial production, distinct from the ISA regime under UNCLOS, which despite expectations to the contrary, has repeatedly failed to adopt the Regulations and Standards and Guidelines on the Exploitation of Mineral Resources in the Area. On April 24, 2025, the Executive Order 14825, titled “Unleashing America’s Offshore Critical Minerals and Resources” directed the Commerce Secretary to implement an expedited permitting process under DSHMRA. In addition to directing the International Development Finance Corporation, Export-Import Bank and Trade and Development Agency to identify tools to support this new industry, the Executive Order instructed the Departments of War and Energy to assess the use of the National Defense Stockpile for nodule-derived minerals and of entering into offtake agreements for the procurement of these minerals. These departments were also directed to review and support domestic processing capabilities for seabed mineral resources.
At the same time as we pursue the U.S. regulatory pathway, we continue to maintain our ISA contracts and comply with all of our contractual obligations under the ISA system. While the ISA does not have jurisdiction over activities conducted under the regulatory authority of the United States, we maintain two ISA exploration contracts in the CCZ, one held by our subsidiary Nauru Ocean Resources Inc. (“NORI”), sponsored by the Republic of Nauru (“Nauru”), and another held by Tonga Offshore Mining Limited (“TOML”), sponsored by the Kingdom of Tonga (“Tonga”). Operations of NORI and TOML in the CCZ are being conducted under our ISA exploration contracts and will be conducted under these contracts until TMC USA receives an exploration license or commercial recovery permit under DSHMRA from NOAA.
We have key strategic partnerships with (i) Allseas, a leading global offshore engineering contractor, which developed and tested a pilot collection system, and is now modifying it into the first commercial production system, (ii) Pacific Metals Co. Ltd. (“PAMCO”), an experienced Japanese ferronickel producer, which is responsible for pre-feasibility and feasibility studies on nodule processing at their smelting facilities in Hachinohe, Japan, (iii) Korea Zinc, a world leader in non-ferrous metal refining and precursor Cathode Active Material (“pCAM”) technology, partnering to advance development in the U.S. and (iv) Mariana Minerals, a software-first mineral developer and operator working as part of TMC USA’s owners’ team to accelerate the development of potential domestic onshore processing and refining facilities (“Mariana”) and (v) Glencore International AG (“Glencore”) which holds offtake rights to 50% of the NORI nickel and copper production if produced from a TMC-owned or controlled facility. In addition, we are working with engineering firm Hatch Ltd. (“Hatch”) and consultants Kingston Process Metallurgy Inc. (“KPM”) to develop, test and engineer a near-zero solid waste flowsheet. The primary processing stages of the flowsheet from nodule to NiCuCo matte intermediate were demonstrated as part of our pilot plant program at FLSmidth facilities in Pennsuylvania, USA and XPS’ (Glencore subsidiary) facilities in Ontario, Canada; and later at industrial scale at PAMCO’s facilities in Hachinohe, Japan. The matte refining stages have been tested at an SGS facility in Lakefield Canada with positive results. The near-zero solid waste flowsheet provides a design that is expected to serve as the basis for our onshore processing facilities. On March 19, 2026, we signed a Strategic Partnership Agreement with Mariana focusing on the potential development of a nodule processing and refining facility in the Port of Brownsville, Texas as part of our owner’s team.
110
Table of Contents
To reach our objective and initiate commercial production, we are working to: (i) further refine our project economics, (ii) completed the development and commision a commercial offshore nodule collection system, (iii) continue to assess the environmental, social and cultural impacts of offshore nodule collection, and (iv) secure existing foreign and/or develop new domestic U.S. onshore facilities to process collected polymetallic nodules into a manganese silicate product, an intermediate nickel-copper-cobalt matte product and end-products of nickel, cobalt and copper metal.
2025 Highlights
Below are a few of the developments that occurred in 2025.
Developments with our Projects
Publication of Technical Reports Prepared under Subpart 1300 of Regulation S-K
On August 4, 2025, we released (i) the NORI-D PFS, which declared the world’s first mineral reserves for a seafloor polymetallic nodule project demonstrating the project’s economic viability, and the TOML and NORI IA, which provided a concept level valuation for the resources outside of NORI Area D. The NORI-D PFS covers a portion of the area that is included in NORI’s ISA exploration contract and in TMC USA’s consolidated application for exploration license and commercial recovery permit (TMC USA-A) under DSHMRA. The TOML and NORI IA covers the remaining areas held under NORI’s and TOML’s ISA exploration contracts and portions of the areas covered under TMC USA’s applications for exploration license and commercial recovery permits under DSHMRA.
TMC USA Submits Applications for Commercial Recovery of Deep-Sea Minerals Under U.S. Seabed Mining Code
On April 29, 2025, we announced that TMC USA had submitted the first-ever application for a commercial recovery permit and two exploration licenses under DSHMRA. The application area for the commercial recovery permit, TMC USA-A, covers a total combined area of 25,160 square kilometers in the CCZ which includes areas that contain the Company’s already indicated and measured resources. TMC USA also submitted two exploration license applications: TMC USA-A and TMC USA-B with a total combined area of 187,017 square kilometers. The Company believes the TMC USA-A and USA-B exploration areas contain 1.635 billion wet tonnes of polymetallic nodules, with an additional potential exploration upside. The resources are estimated to contain approximately 15.5 million tonnes of nickel, 12.8 million tonnes of copper, 2.0 million tonnes of cobalt, and 345 million tonnes of manganese.
NOAA Confirms Full Compliance of TMC USA’s Exploration License Applications
On August 11, 2025, TMC USA received notice of full compliance from NOAA on its exploration applications, and confirmation that TMC USA has priority right over both exploration areas. Both applications entered the certification stage in late July 2025. The news follows earlier determinations by NOAA in May 2025 that the applications were in substantial compliance, which we believe demonstrates a systematic regulatory process under DSHMRA as we target a fourth quarter 2027 commissioning, subject to timely obtaining all necessary regulatory approvals.
TMC Pioneers Process to Produce High-Purity Manganese Sulfate from Seafloor Nodules
In November 2025, we announced that we had successfully produced battery-grade, high-purity manganese sulfate from our nodule-derived manganese silicate product during bench scale trials at our partner KPM’s operating facility in Ontario. North America is largely reliant on foreign sources of manganese. As the planet’s largest source of manganese, nodules hold significant potential to supply a range of key industries from steelmaking and infrastructure to energy, defense and automotive manufacturing, with automakers increasingly turning toward manganese-rich cathode chemistries for their next-generation electric vehicles.
111
Table of Contents
TMC and PAMCO Achieve Nodule Processing Milestone
On February 18, 2025, we announced that PAMCO had successfully smelted 450 tonnes of calcine into 35 tonnes of NiCuCo alloy and 320 tonnes of Mn silicate products, during a campaign to process a 2,000-tonne sample of deep-seafloor polymetallic nodules at our partner PAMCO’s Hachinohe Rotary Kiln Electric-Arc Furnace facility in Hachinohe, Japan, demonstrating the process at scale. The process data and operational experience gathered during the processing trial was used by PAMCO to complete a feasibility study in June 2025 which will inform expected definitive processing agreements between the parties.
U.S. Regulatory Developments
TMC Welcomes U.S. Executive Order to Expedite Permitting and Evaluate Offtake of Critical Minerals from Nodules in the High Seas
On April 25, 2025, we welcomed an Executive Order signed by President Trump to create a robust domestic supply for critical minerals derived from seabed resources. The Executive Order, ‘Unleashing America’s Offshore Critical Minerals and Resources’, directs the Commerce Secretary to implement an expedited permitting process under the DSHMRA, a statute passed by Congress in 1980. In addition to directing the International Development Finance Corporation, Export-Import Bank and Trade and Development Agency to identify tools to support this new industry, the order instructs the Departments of War and Energy to assess the use of the National Defense Stockpile for nodule-derived minerals and entering into offtake agreements for the procurement of these minerals. These departments are also directed to review and support domestic processing capabilities for seabed mineral resources and Defense Production Act authorities. The executive order also issued a directive for a joint assessment, led by the Secretaries of Commerce, State, Interior, and Energy in coordination with U.S. partners and allies, on the feasibility of an international seabed benefit-sharing mechanism.
Corporate Developments
TMC and Nauru Announce Updated Sponsorship Agreement for Nauru Ocean Resources Inc. (NORI)
On June 4, 2025, we announced the signing of a revised Sponsorship Agreement (Agreement), updating the terms of the Agreement signed between the parties in 2017. The Agreement guarantees that Nauru will continue to receive existing financial benefits, training and capacity building programs and in-country community and social programs it receives today, while ensuring that, in consideration for its continued sponsorship of NORI, Nauru will receive continuity benefits upon the commencement of commercial production by any subsidiary of TMC, other than NORI, under the U.S. regulatory regime.
TMC and Tonga Announce Updated Sponsorship Agreement for Tonga Offshore Mining Ltd. (TOML)
On August 4, 2025, we announced the signing of a revised Sponsorship Agreement (Agreement), updating the terms of the Agreement signed between the parties in 2021. The Agreement guarantees that Tonga will continue to receive existing financial benefits, training and capacity building programs and in-country community and social programs it receives today, while ensuring that, in consideration for its continued sponsorship of TOML, Tonga will receive continuity benefits upon the commencement of commercial production by any subsidiary of TMC, other than TOML, under the U.S. regulatory regime.
Rutger Bosland, Pioneering Engineer and Technical Lead on Development of TMC’s Nodule Collection System, Joins TMC to Drive Commercial Readiness
On April 15, 2025, we announced that Rutger Bosland, the engineer and technical lead who oversaw the design, build, and successful test deployment of Allseas’ integrated nodule collection system, had joined the Company as Chief Innovation and Offshore Technology Officer (CIOTO). Rutger will lead offshore innovation and efforts to scale our technologies for commercial production. He brings world-class expertise in deep-sea mining, naval architecture, and offshore operations to TMC, having led a team of 80+ engineers in developing TMC’s nodule collection system, and Allseas’ program to scale-up nodule collection technology in preparation for TMC’s planned commercial operations.
112
Table of Contents
Industry Developments
TMC CEO Testifies to U.S. House of Representatives on Benefits of Nodules
On April 29, 2025, our CEO Gerard Barron gave testimony during a meeting of the U.S. House Natural Resources Subcommittee on Oversight and Investigations at a hearing titled, “ Exploring the Potential of Deep-Sea Mining to Expand American Mineral Production ”. In his remarks as an expert witness, Mr Barron highlighted the abundant, unattached polymetallic nodule resource as a platform to secure new supplies of critical minerals essential for U.S. infrastructure, defense, energy and technology. Another expert witness, Dr. Thomas Peacock of MIT — one of the world’s leading experts on deep-sea sediment plume dynamics — asked the Committee to be wary of misinformation, stating “unfortunately it’s not the case” that the latest scientific findings are being used to drive decisions and discussions about deep-sea mining.
Peer-reviewed Rebuttal to Publication
On December 19, 2025, a peer-reviewed rebuttal was published in Frontiers in Marine Science refuting earlier claims in a paper published by Nature Geoscience that purported that seafloor nodules produce oxygen in the absence of sunlight. The rebuttal argues that the dark oxygen hypothesis is incompatible with decades of established evidence, and far better explained by the deliberate omission of contradictory data and improper equipment use. The peer-reviewed rebuttal follows the earlier submission of multiple rebuttals to Nature warning of serious flaws with the paper’s methodology and claims, including selective reporting of data and omission of key evidence which showed oxygen levels increasing without nodules, directly contradicting the authors’ claims.
Peer-reviewed Nature Study
On December 5, 2025, a peer-reviewed study published in Nature Ecology & Evolution , based on data collected two months after TMC’s test mining, confirmed that biodiversity impacts were confined to the directly mined areas, with no significant changes in plume-affected zones. Independent researchers observed 37% fewer organisms and a 32% reduction in species richness within collector tracks—impacts that were expected and less severe than anticipated. There will likely have been recolonization of mined areas over time, increasing species richness as has been observed with other size classes of sedimentary benthic biota.
Peer-reviewed Nature study demonstrates seafloor plume stays low, settles fast
On November 27, 2025, a peer-reviewed study published in Nature based upon in-field data gathered from TMC’s test mining using innovative thorium-tracing techniques shows the plume stays low, settles fast, with concentrations returning to background levels within just 1-2 kilometers.
Financing
TMC Announces Registered Direct Offering for $37 million
On May 12, 2025, we entered into a securities purchase agreement with certain new and existing investors, including an existing strategic investor, for the sale of an aggregate of 12,333,333 common shares (the “Shares”) and accompanying Class C warrants (the “Class C Warrants”), in a registered direct offering. The offering price was $3.00 per Share, resulting in gross proceeds of $37.0 million ($36.75 million after associated fees), with each Share including an accompanying Class C Warrant to purchase one common share. The Class C Warrants are exercisable immediately upon issuance at a price of $4.50 per share and expire three years from issuance. The Class C Warrants include customary anti-dilution protections and a repurchase feature, permitting the Company to repurchase the warrants for $0.0001 per Common Share underlying the Class C Warrants if the volume-weighted average price of the Company’s common shares exceeds $7.00 per share for each trading day in a consecutive 20-trading-day period.
113
Table of Contents
Strategic Investment from Korea Zinc — a World-Leader in Non-Ferrous Metal Refining and pCAM Technology
On June 16, 2025, we announced that Korea Zinc, a world leader in non-ferrous metal refining and precursor Cathode Active Material (pCAM) technology, had agreed to make a strategic investment of approximately $85.2 million in us through the purchase of common shares and warrants in a private placement. Under the terms of the agreement, Korea Zinc purchased 19.6 million common shares at the last market closing price of $4.34 per share and received a three-year warrant to purchase 6.9 million common shares (0.35 warrant shares for every 1 initial common share for no additional consideration) with an exercise price of $7.00 per share, subject to call exercise provisions at our option should our common shares trade above $10.00 for 20 consecutive days. Upon closing on June 26, 2025, Korea Zinc became one of our largest strategic shareholders with ownership of approximately 5% of our outstanding common shares. As part of this investment, in July 2025, Yun B. Choi, the Chief Executive Officer of Korea Zinc became a non-voting observer to our board of directors.
TMC Board Appointments
Appointment of Michael Hess and Alex Spiro to our Board of Directors
On June 16, 2025, we announced the appointment of Michael Hess and Alex Spiro to our Board of Directors strengthening our board as we execute on our U.S. strategy and accelerate progress toward commercial recovery of polymetallic nodules in international waters under the existing U.S. seabed mining code. Mr. Hess brings deep operational and investment experience in the U.S. energy sector, along with a strong network and strategic perspective that will support our path toward commercial operations under U.S. law. Mr. Spiro adds significant legal and capital markets expertise, and his counsel is already proving valuable as we work closely with NOAA and engage with the new Administration to advance our application.
Developments Subsequent to December 31, 2025
TMC Welcomes NOAA Rule Modernizing Deep-Seabed Mining Permits for U.S. Companies in the High Seas
On January 21, 2026, we welcomed the new rule issued by the National Oceanic and Atmospheric Administration (NOAA) updating regulations governing deep seabed mineral exploration and commercial recovery under DSHMRA. Final rule establishes a consolidated application and review process under DSHMRA, allowing companies that have completed the necessary exploration, environmental, and technological development work to rely on exploration-phase data in commercial recovery permit applications, reducing duplication and improving regulatory efficiency.
TMC USA Files First Consolidated Deep-Seabed Mining Application, Increasing Expected Commercial Recovery Permit Area to 65,000 km 2
On January 22, 2026, we announced that TMC USA had submitted a consolidated application to NOAA for an exploration license and a commercial recovery permit for polymetallic nodules in international waters of the CCZ. The application represents the first consolidated exploration license and commercial recovery permit application submitted under NOAA’s new consolidated application and review process and increases the applied for commercial recovery area from ~25,000 to ~65,000 km2, with an estimated resource of 619 million tonnes (Mt) of wet nodules and a potential exploration upside. TMC USA was able to apply under NOAA’s new consolidated process because it can demonstrate the scientific, technical and financial capability to pursue commercial recovery activities expeditiously.
NOAA Determines TMC USA’s Consolidated Deep-Seabed Mining Application is in Substantial Compliance
On March 9, 2026, we announced that NOAA determined that the consolidated application submitted by TMC USA for an exploration license and commercial recovery permit is in substantial compliance with the applicable requirements under DSHMRA and its implementing regulations. This determination marks a key step in the U.S. regulatory process for exploration and commercial recovery of polymetallic nodules in the CCZ under NOAA’s new rule establishing a consolidated application and review process. The process enables a more efficient regulatory timeline by allowing exploration-phase environmental, geological, and engineering data to be incorporated directly into the commercial recovery review.
114
Table of Contents
Strategic Partnership with Mariana Minerals
On March 19, 2026, we signed a Strategic Partnership Agreement with Mariana Minerals (“Mariana”) focusing on the potential development of a nodule processing and refining facility in the Port of Brownsville, Texas as part of our owner’s team. Mariana brings an AI, software-first approach to the permitting, construction and operation of critical mineral projects: fast-tracked capital project execution, which enabled Tesla to build its Lithium plant in Texas in less than 20 months and is core to how SpaceX and other cutting edge businesses operate, can be even further accelerated via a software-first approach and offers a faster, more modern pathway to re-industrialization.
Exclusivity on Lease Option for Site in Brownsville, Texas
On March 27, 2026, we announced that TMC USA currently holds an exclusive right of negotiation with the Port of Brownsville, Texas on a lease and / or lease option for land sufficient to develop a domestic nodule processing and refining ecosystem for TMC USA and other American nodule developers, with the ultimate decision conditional on U.S. government support. The option on a 50-year lease covers a total of 1,466 acres of land at the Port of Brownsville, Texas, in two separate land parcels (735 acres on the Brownsville Texas Shipping Channel and an adjacent 731 acres). There is currently no financial commitment required of TMC USA.
Regulation of Mining of Deep-Sea Polymetallic Nodules by the United States
The Deep Seabed Hard Mineral Resources Act
DSHMRA establishes a domestic legal regime for U.S. citizens to explore for and commercially recover hard mineral resources from the seabed in areas beyond U.S. national jurisdiction. DSHMRA affirms that deep-sea mining is a lawful freedom of the high seas, subject to a duty of reasonable regard to the interests of other states in their exercise of those and other freedoms recognized by the general principles of international law, and provides a regulatory structure administered by NOAA, an agency under the U.S. Department of Commerce. NOAA’s implementing regulations detail the criteria and conditions for issuance of deep seabed exploration licenses and commercial recovery permits to U.S. citizens, including any individual, corporation, or other entity organized under the laws of a U.S. state or territory.
The purpose of DSHMRA is to promote the development of seabed minerals by U.S. citizens while ensuring environmental protection, avoidance of conflict with other high seas uses, and consistency with international law. Before any license or permit is issued, NOAA must determine that the proposed activities meet a series of statutory requirements, including that the activity: (i) will not unreasonably interfere with the lawful use of the high seas by other states; (ii) is consistent with U.S. foreign policy and international obligations; (iii) does not create a risk to international peace and security; (iv) is not expected to result in significant adverse environmental effects; and (v) does not pose undue risk to life or property at sea. These findings reflect NOAA’s mandate of advancing U.S. commercial interests in seabed minerals while minimizing environmental and diplomatic risk.
We believe NOAA has historically adopted a cautious and science-based regulatory posture under DSHMRA, coordinating with other U.S. federal agencies and supporting environmental studies to inform future decisions. In the 1980s and 1990s, the United States entered into reciprocal recognition arrangements with other nations with similar domestic seabed mining laws, helping avoid overlapping claims prior to the establishment of the ISA. Once the ISA became operational in the 1990s, most reciprocating states transitioned to the UNCLOS/ISA system. The United States, however, remains outside that framework. NOAA is not restricted under DSHMRA from issuing licenses or permits over areas that are also subject to ISA exploration or exploitation contracts.
Exploration licenses under DSHMRA grant exclusive rights to conduct technical studies in a defined area and are issued for ten-year terms, subject to extension. Commercial recovery permits authorize full-scale extraction for a period of 20 years subject to extension and are subject to enhanced environmental and operational requirements. To date, NOAA has issued exploration licenses over four areas. Two of these licenses (USA-1 and USA-4) remain active and are currently held by Lockheed Martin. These licenses have been renewed until 2027 in accordance with DSHMRA’s statutory provisions, which require NOAA to grant extensions if the licensee has substantially complied with license terms. NOAA has not issued any commercial recovery permits under DSHMRA as no U.S. citizen had applied for a commercial recovery permit prior to TMC USA.
115
Table of Contents
The certification process includes an interagency consultation with other U.S. government departments (including the Department of State, the Department of War, and the Environmental Protection Agency). Following certification, an Environmental Impact Statement, or EIS, is expected to be prepared under NEPA, and a public comment period will be provided. Following the public comment period, NOAA will determine whether to issue the requested licenses and permit, and if so, under what terms and conditions. All licenses and permits issued under DSHMRA are subject to oversight, periodic reporting, and potential suspension or revocation for noncompliance or unforeseen environmental harm.
DSHMRA and its implementing regulations do not include a statutory deadline for application review. However, the Executive Order signed by President Trump on April 24, 2025, directs the Commerce Secretary to implement an expedited permitting process under DSHMRA.
DSHMRA requires that all mining vessels and at least one transport vessel are U.S. flagged. TMC USA will ensure all vessels contracted for commercial recovery comply with relevant laws pertaining to vessel standards and crew safety. DSHMRA also requires that recovered minerals be processed in the United States unless a waiver is granted, in which case the permittee is required to provide assurances that processed materials are returned to the United States. We are currently evaluating U.S.-based vessel and processing options to satisfy this requirement as well as working with Japan and South Korea-based supply chain to ensure processed materials can be returned to the United States in the event the permit to process outside the United States is granted for an initial period. If necessary, we expect to seek a waiver based on the statutory criteria and applicable regulations.
We expect to become subject to additional U.S. laws and regulations as development progresses and are in the early stages of analyzing their applicability and potential impact on our operations.
Existing ISA Exploration Contracts
We currently hold exploration rights to certain polymetallic nodule areas in the CCZ through our subsidiaries NORI and TOML, sponsored by the Republic of Nauru and the Kingdom of Tonga, respectively.
NORI, our wholly-owned subsidiary, holds exploration rights to four blocks (NORI Area A, B, C, and D, the “NORI Contract Area”) covering 74,830 square kilometers in the CCZ that were granted by the ISA in July 2011. NORI is sponsored by Nauru pursuant to a certificate of sponsorship signed by the Government of Nauru on April 11, 2011. In September 2017, Nauru and NORI entered into a sponsorship agreement formalizing certain obligations of the parties in relation to NORI’s exploration and potential collection of nodules in the NORI Contract Area, which was revised in May 2025.
TOML, our wholly-owned subsidiary which we acquired in March 2020, holds exploration rights to an area covering 74,713 square kilometers in the CCZ that were granted by the ISA in January 2012 (the “TOML Contract Area”). On March 8, 2008, Tonga and TOML entered into a sponsorship agreement formalizing certain obligations of the parties in relation to TOML’s exploration and potential collection of nodules in the TOML Contract Area, which was most recently revised in August 2025.
Key Trends, Opportunities and Uncertainties
We are currently a pre-revenue company, and we do not anticipate earning revenues (other than potential service revenue) until one of our wholly-owned subsidiaries receives an exploitation contract or commercial recovery permit and we are able to successfully collect and process polymetallic nodules into saleable products on a commercial scale. We believe that our performance and future success pose risks and challenges, including those related to the approval of an application for a commercial recovery permit, development of environmental terms, conditions and restrictions associated with our application and development of our technologies to collect and process polymetallic nodules. The timing of NOAA’s review and decision on our exploration license and commercial recovery permit applications under DSHMRA remains uncertain and is outside the Company’s control. Actual timelines for certification, environmental review, and potential issuance of licenses or permits may differ materially from management’s expectations. These risks, as well as other risks, are discussed in Item 7A entitled “ Quantitative and Qualitative Disclosures About Market Risk ” and Item 1A entitled “ Risk Factors ” included in this Annual Report.
116
Table of Contents
Impact of Climate Change
We are committed to adopting the Task Force on Climate-Related Financial Disclosures recommendations. In our Impact Report, we provided climate-related disclosure and shared how our vision is aligned with supporting the global energy transition and contributing to a circular metals economy. We recognize that climate change may have a meaningful impact on our financial performance over time, and we continue the process of assessing key risks and corresponding action plans to mitigate their negative impact of climate change on our operations.
Our climate related transition risks and opportunities are likely to be driven by changes in regulation, public policy, and technology as well as risk of business disruptions due to climate related events.
Regulatory risks
Regulations related to emissions limits, such as cap-and-trade schemes and carbon taxes, would likely increase our future cost of operations, energy purchase, and equipment selection in addition to costs associated with potential carbon tax and/or purchase of carbon offsets. It is difficult to estimate the impact of potential future regulations on future operations.
We are working on a plan for continuous reduction of emissions and aiming to develop operations with near zero emissions. When selecting the location of our onshore plant, one of our requirements is access to renewable energy as our metallurgical process will be the most energy intensive step in our operations. In addition, we are seeking to replace metallurgical coal used as reductant during calcining of nodules and have tested potential renewable alternatives. We are also identifying the best approach for decarbonizing our offshore operations. To date, we have not experienced any material impact to our business related to potential regulations but will continue to evaluate and monitor future developments.
Public policy risks
We are seeking to close the emerging supply gap of the critical metals contained in nodules needed for the transition to renewable energy and adoption of EVs and other critical and/or emerging applications. We plan to take advantage of this opportunity to supply these potentially lower carbon critical metals, avoid deforestation, and help reduce the cost of batteries.
Technology risks
The timing and deployment of technologies to support the transition to a lower carbon economy can be uncertain. Investments in assets with long lifespans require the selection of not only the proper technology, but also the proper timing to retain the ability to adapt to future developments. There are also risks associated with the additional costs of lower emissions technology and transition to renewables. To mitigate this risk, we based our flowsheet development on existing proven technology, while retaining sufficient flexibility to be able to retrofit processes with new lower carbon technology as they become available.
Physical risks
Our main activity currently consists of offshore exploration campaigns for research and testing purposes, and technology development at partner facilities. However, once a location is selected for our onshore metallurgical plant, we will assess the risks associated with hurricanes, floods, and extreme weather.
Impact of Global Inflation
The global inflation rate stayed relatively high in 2025 and over the past several years, marine fuel prices and vessel day rates remained high and have increased our exploration expenses beyond what was originally expected. Additionally, we are experiencing higher offshore labor costs through our contractors.
As a pre-revenue company, persistent inflation may affect our ultimate cash requirements prior to our ability to begin commercial production.
117
Table of Contents
Basis of Presentation
We currently conduct our business through one operating segment. As a pre-revenue company with no commercial operations, our activities to date have been limited. Our results are reported under Generally Accepted Accounting Principles in the United States (“U.S. GAAP”) and in U.S. dollars.
Components of Results of Operations
We are in the development stage with no revenue to date and a net loss of $319.8 million for the year ended December 31, 2025, compared to a net loss of $81.9 million in the prior year. We have an accumulated deficit of approximately $951.3 million from inception through December 31, 2025.
Our historical results may not be indicative of our future results for reasons that may be difficult to anticipate. Accordingly, the drivers of our future financial results, as well as the components of such results, may not be comparable to our historical or projected results of operations.
We align our operating expenses based on activity performed by our personnel which allocates these costs under Exploration and Evaluation expenses and General and Administrative expenses. This alignment is adjusted throughout the year to reflect changes in business activities.
Revenue
To date, we have not generated any revenue. We expect to generate revenue once we receive a commercial recovery permit, and we are able to successfully collect and process polymetallic nodules into saleable products on a commercial scale. Any revenue from initial production is difficult to predict.
Exploration and Evaluation Expenses
We expense all costs relating to exploration and development of mineral claims. Such exploration and development costs include, but are not limited to, regulatory approvals, exploration mineral title management, geological, geochemical and geophysical studies, environmental baseline studies and process development activities. Our exploration expenses are impacted by the amount of exploration work conducted during each period. The acquisition cost of polymetallic nodule mineral title will be charged to operations as amortization expense on a unit-of-production method based on proven and probable reserves should commercial production commence in the future.
General and Administrative Expenses
General and administrative (“G&A”) expenses consist primarily of compensation for employees, consultants and directors, including wages and salaries, share-based compensation, consulting fees, investor relations expenses, expenses related to advertising and marketing functions, insurance costs, office and sundry expenses, professional fees (including legal, audit and tax fees), travel expenses and transfer and filing fees.
Share-based compensation costs from the issuance of stock options and restricted share units (“RSUs”) are measured at the grant date based on the fair value of the award and are recognized over the related service period. Share-based compensation costs are charged to exploration expenses and general and administrative expenses depending on the function fulfilled by the holder of the award. In instances where an award is issued for financing related services, the costs are included within equity as part of the financing costs. We recognize forfeiture of any awards as they occur.
Nauru and Tonga Warrant costs
The Nauru and Tonga Warrant costs represent the fair value of the warrants issued as part of the revised sponsorship agreement with the Government of the Republic of Nauru signed on May 29, 2025 and the revised sponsorship agreement with the Tonga Seabed Minerals Authority signed on August 4, 2025. As the warrants did not contain complex features, the fair value was calculated using a Black-Scholes valuation model.
118
Table of Contents
Interest Income/Expense
Interest income consists primarily of interest earned on our cash balance.
Fees and Interest on Borrowings and Credit Facilities
Fees and interest on borrowings and credit facilities represent interest charged on our short-term debt and interest and underutilization fees associated with our credit facilities.
Foreign Exchange Loss
The foreign exchange income or loss for the periods reported primarily relates to unrealized gain or loss due to revaluation of foreign denominated accounts payable and accrued liabilities.
Change in Fair Value of Warrants Liability
The change in fair value of warrants liabilities primarily consists of the change in the fair value of the 9,500,000 Private Warrants issued to Sustainable Opportunities Holdings LLC concurrently with Sustainable Opportunities Acquisition Corp.’s (“SOAC”) initial public offering (the “Private Warrants”). For accounting purposes, we were considered to have issued the Private Warrants as part of the Business Combination, and we are required to re-measure the fair value of our Private Warrants at the end of each reporting period.
Results of Operations
The following is a discussion of our results of operations for the years ended December 31, 2025 and 2024. Our accounting policies are described in Note 3 “Significant Accounting Policies” in our annual financial statements herein.
Comparison of the periods ended December 31, 2025 and 2024
For the Three Months Ended
For the Year Ended
(Dollar amounts in thousands,
December 31,
December 31,
except as noted)
2025
2024
% Change
2025
2024
% Change
Exploration and evaluation expenses
$
10,638
$
8,304
28
%
$
40,282
$
50,643
(20)
%
General and administrative expenses
34,067
8,044
324
%
99,772
30,644
226
%
Nauru and Tonga warrant cost
—
—
N/A
38,056
—
100
%
Change in fair value of royalty liability
—
—
N/A
131,000
—
100
%
Equity-accounted investment loss (gain)
(725)
29
(2,600)
%
(287)
226
(227)
%
Gain on dilution of investment
(2,682)
—
100
%
(5,649)
—
100
%
Loss on termination of contract
—
199
(100)
%
—
199
(100)
%
Change in fair value of warrants liability
(379)
46
(924)
%
12,439
(1,057)
(1,277)
%
Foreign exchange (loss) gain
66
(1,782)
(104)
%
3,665
(1,186)
(409)
%
Interest income
(1,288)
(51)
2,426
%
(2,793)
(176)
1,487
%
Fees and interest on borrowings and credit facilities
680
1,224
(44)
%
3,215
2,602
24
%
Tax expense
21
48
(56)
%
144
48
200
%
Loss for the year, after tax
$
40,398
$
16,061
152
%
$
319,844
$
81,943
290
%
Full Year 2025 compared to Full Year 2024
Exploration and Evaluation Expenses
Exploration and evaluation expenses for the year ended December 31, 2025 were $40.3 million, compared to $50.6 million incurred in 2024. The decrease of $10.3 million was primarily due to a decrease of $14.8 million in mining, technological and process development cost due to costs incurred in 2024 for Campaign 8 resource definition work, Allseas vessel transit cost and transportation of nodules to PAMCO’s facility in Japan, decrease in ISA permitting application cost in 2025, partially offset by an increase in share-based compensation of $4.9 million on the amortization of the fair value of retention grants, RSUs and options granted to officers in 2025.
119
Table of Contents
General and Administrative (“G&A”) Expenses
G&A expenses for the year ended December 31, 2025 were $99.8 million compared to $30.6 million for the same period in 2024. The increase of $69.2 million in G&A expenses was mainly the result of an increase in share-based compensation of $63.7 million due to the amortization of the fair value of retention grants, RSUs and options granted to directors and consultants in the third quarter of 2025, and higher consulting and advisory fees of $5.4 million. This increase was partially offset by decreased travel and insurance costs incurred in 2025 compared to the same period in 2024.
Nauru and Tonga Warrant costs
As part of the signing of a revised Sponsorship Agreement with Nauru on May 29, 2025, we issued 9,146,268 warrants to Nauru to purchase common shares. The fair value of the Nauru Warrants, calculated using a Black-Scholes valuation model, valued each warrant at $3.62 for a total value of $33.1 million.
As part of the signing of a revised Sponsorship Agreement with the Tonga Seabed Minerals Authority (the “State”) on August 4, 2025, we issued 1,000,000 warrants to the State to purchase common shares of the Company. The fair value of the Tonga Warrants, calculated using a Black-Scholes valuation model, valued each warrant at $5.00 for a total value of $5 million.
For further details on this non-recurring item, refer to Note 16 “Warrants” in our annual financial statements herein.
Gain on Dilution of Investment
In 2025, Low Carbon Royalties issued 8,013,469 common shares through a private placement and option exercises, raising $25.1 million of gross proceeds. We did not participate in the offering, which reduced our ownership interest in Low Carbon Royalties from 32.27% to 27.19% (December 31, 2024: 32.27%). As the common shares were issued in the financing at a price higher than Low Carbon Royalties’ book value per share, we recorded a dilution gain of $5.6 million.
Change in Fair Value of Royalty Liability
The fair value of the royalty liability as at December 31, 2025 was valued using a market approach for NORI Areas A to C, while for Area D an income approach was used following the release of the NORI-D PFS in August 2025. The resulting royalty liability fair value of NORI Areas A to D totaled $145 million, an increase of $131 million in 2025.
Interest Income
During 2025, we earned interest of $2.8 million, as compared to $0.2 million in 2024, mainly from the investment of our higher cash balance in 2025.
Change in Fair Value of Warrants Liability
The change in fair value of warrants liability primarily consists of the change in the fair value of the 9,500,000 Private Warrants. The debit recorded in 2025 reflects the increase in the fair value price of our Private Warrants due to the increase in the market price of our common shares and Public Warrants.
Fees and Interest on Borrowings and Credit Facilities
The interest charged on our short-term debt borrowings was $0.3 million in the year ended December 31, 2025 ($0.2 million for the same period of 2024), while interest on drawn amounts on our credit facilities was $0.1 million and underutilization fees on these same facilities was $2.8 million in the year ended December 31, 2025 ($0.3 million and $2.1 million over the same period in 2024, respectively).
120
Table of Contents
Liquidity and Capital Resources
Our primary sources of financing have come from private placements and public offerings of Common Shares and warrants, and the issuance of convertible debentures. As of December 31, 2025, we had cash on hand of $117.6 million.
In light of the significant deficit in expected funding following the closing of the Business Combination in September 2021, we adopted what we call a “capital-light” strategy whereby we removed any allocation of funds to capital expenditures that were not deemed necessary to support the submission of an application for an exploitation contract for the NORI Area D and then the applications of exploration licenses and commercial recovery permits with NOAA under DHMRA, and by negotiating the settlement of program expenditures with our equity whenever possible, and by utilizing existing assets for offshore and onshore production.
We have yet to generate any revenue from our business operations. We are a development company and the recovery of our investment in mineral exploration contracts and attainment of profitable operations is dependent upon many factors including, among other things, the development of a commercial production system for collecting polymetallic nodules from the seafloor as well as the development of our processing technology for the metallurgical treatment of such nodules, the establishment of additional mineable reserves, the demonstration of commercial and technical feasibility of seafloor polymetallic nodule collection and processing systems, metal prices, and securing approvals under the U.S. regulatory regime or ISA exploitation contracts or provisional approvals. While we have obtained financing in the past, there is no assurance that such financing will continue to be available on favorable terms, in sufficient amounts, or at all.
We expect to incur significant expenses and operating losses for the foreseeable future, particularly as we advance our application to NOAA for a commercial recovery permit and preparation for potential commercialization. Based on our cash balance and availability of borrowing under our credit facility with ERAS Capital LLC and Gerard Barron, when compared with our forecasted cash expenditures, we believe we will have sufficient funds to meet our obligations that become due within the next twelve months. Our estimates used in reaching this conclusion are based on information available as at the date of filing this Annual Report. Accordingly, actual results could differ from these estimates and resulting variances may result in our need for additional funding in an amount greater or earlier than expected, due to changes in business conditions or other developments, including, but not limited to, deferral of approvals, capital and operating cost escalation, currently unrecognized technical and development challenges, our ability to pay certain vendors or suppliers in our Common Shares or changes in external business environment.
In addition, we will however need and are seeking additional financing to fund our continued operations over time. These financings could include additional public or private equity, debt financings, equity-linked financings or other sources of financing, including through government-based funding, non-dilutive asset, royalty or project-based and/or asset-based financings. If these financing or other financing sources are not available, or if the terms of financing are less desirable than we expect, or if in insufficient amounts, we may be forced to delay our exploration and/or exploitation activities or further scale back our operations, which could have a material adverse impact on our business and financial prospects.
On September 16, 2022, we filed a registration statement on Form S-3 with the SEC, which the SEC declared effective on October 14, 2022, to sell up to $100 million of securities. In addition, on November 30, 2023, we filed an additional registration statement on Form S-3 with the SEC, which the SEC declared effective on December 8, 2023, to sell up to an additional $100 million of securities. As previously disclosed in 2025, remaining capacity on the two previously filed Form S-3s has been nearly extinguished following various equity and warrant transactions, and we expect to file a new registration statement on Form S-3 following the filing of this Annual Report. Securities that may be sold under the registration statements include common shares, preferred shares, debt securities, warrants and units. Any such offering, if it does occur, may happen in one or more transactions. Specific terms of any securities to be sold will be described in supplemental filings with the SEC.
On December 22, 2022, we entered into an At-the-Market Equity Distribution Agreement (the “Sales Agreement”) with Stifel, Nicolaus & Company, Incorporated (“Stifel”) and Wedbush Securities Inc., as sales agents, allowing us, from time to time, to issue and sell common shares with an aggregate offering price of up to $30 million. In 2025, we issued 7,542,996 common shares at an average share price of $2.02, for net proceeds of $14.8 million under the Sale Agreement. The Sales Agreement expired in October 2025.
121
Table of Contents
On March 22, 2023, we entered into the 2023 Credit Facility with Argentum Cedit Virtuti GCV, the parent of Allseas Investments S.A. and an affiliate of Allseas, which was amended on July 31, 2023 and March 22, 2024, pursuant to which, we were able to borrow from the Lender up to $25 million in the aggregate, from time to time, subject to certain conditions. All amounts drawn under the 2023 Credit Facility bore interest at the 6-month SOFR, 180-day average plus 4.0% per annum payable in cash semi-annually (or plus 5% if paid-in-kind at maturity, our election) on the first business day of each of June and January. We agreed to pay an underutilization fee equal to 4.0% per annum payable semi-annually for any amounts that remain undrawn under the 2023 Credit Facility. We had the right to pre-pay the entire amount outstanding under the 2023 Credit Facility at any time, before the 2023 Credit Facility’s stated maturity of August 31, 2025. The 2023 Credit Facility also contained customary events of default. No amounts had been drawn under the 2023 Credit Facility. Pursuant to the Letter Agreement we entered into on March 24, 2025, we and Argentum Cedit Virtuti GCV agreed to cancel the 2023 Credit Facility with no outstanding amounts remaining, other than our obligation to pay the underutilization fee thereunder.
On March 22, 2024, we entered into the 2024 Credit Facility with Gerard Barron, our Chief Executive Officer and Chairman, and ERAS Capital LLC, the family fund of our director, Andrei Karkar (the “2024 Credit Facility”), pursuant to which, we may borrow from the 2024 Lenders up to $25 million in the aggregate ($12.5 million from each of the 2024 Lenders), from time to time (was initially $20 million in the aggregate ($10 million from each of the 2024 Lenders), subject to certain conditions. All amounts drawn under the 2024 Credit Facility will bear interest at the 6-month SOFR, 180-day average plus 4.0% per annum payable in cash semi-annually (or plus 5% if paid-in-kind at maturity, at our election) on the first business day of each of June and January. We will pay an underutilization fee equal to 4.0% per annum payable semi-annually for any amounts that remain undrawn under the 2024 Credit Facility. We have the right to pre-pay the entire amount outstanding under the 2024 Credit Facility at any time, before the 2024 Credit Facility’s maturity of December 31, 2025. The 2024 Credit Facility also contains customary events of default. The 2024 Credit Facility will terminate automatically if we or any of our subsidiaries raise at least $50 million in the aggregate (i) through the issuance of any of our or our subsidiaries’ debt or equity securities, or (ii) in prepayments under an off-take agreement or similar commercial agreement. On August 13, 2024, we entered into the First Amendment to the 2024 Credit Facility to increase the borrowing limit to $25 million in the aggregate ($12.5 million from each of the 2024 Lenders). Under the terms of the First Amendment, the borrowing limit was due to return to the initial $20 million in the aggregate ($10 million from each of the 2024 Lenders) upon certain financing events. On November 14, 2024, we entered into the Second Amendment to the 2024 Credit Facility with ERAS Capital LLC and Gerard Barron, to increase the borrowing limit to $38 million in the aggregate ($19 million from each of the 2024 Lenders) and to extend the maturity of the 2024 Credit Facility to December 31, 2025. As per the Second Amendment, the rate of underutilization fee was retroactively increased from 4% to 6.5% on any undrawn amounts under the 2024 Credit Facility. On January 30, 2025, we repaid $1.8 million from the drawn amount, leaving a balance of $2.5 million drawn under the 2024 Credit Facility, as of the date of this Annual Report. With the January 2025 repayment, the borrowing limit on the 2024 Credit Facility was reduced to $36.2 million ($17.2 million from Gerard Barron and $19 million from ERAS Capital LLC). On March 26, 2025, we entered into the Third Amendment to the 2024 Credit Facility with the 2024 Lenders, to, among other things, increase the borrowing limit to $44 million in the aggregate ($22 million from each of the 2024 Lenders) and extend the maturity of the 2024 Credit Facility to June 30, 2026.
On September 9, 2024, we entered into a Working Capital Loan Agreement with Allseas Investments, a company related to Allseas. In accordance with the Working Capital Loan Agreement, Allseas Investments provided a loan to us amounting to $5 million (the “Working Capital Loan”) on September 10, 2024, to be used towards general corporate purposes and the repayment of all outstanding amounts under the short-term loan between us and the Lender. The Working Capital Loan was payable to the Lender on or before the earlier of (i) the occurrence of certain financing events and (ii) April 1, 2025 (the “Repayment Date”). The Working Capital Loan bore interest based on the 6-month Secured Overnight Financing Rate, 180-day average plus a margin of 4.0% per annum payable in two installments on January 2, 2025, and the Repayment Date (or plus a margin of 5.0% if we deferred all interest payments to the Repayment Date). On October 18, 2024, we entered into the First Amendment to the Working Capital Loan Agreement with Allseas Investments, resulting in a further draw of $2.5 million by us and a total Working Capital Loan drawn amount of $7.5 million. On March 24, 2025, we entered into the Letter Agreement with Allseas Investments and Argentum Cedit Virtuti GCV, pursuant to which the repayment date under the Working Capital Loan Agreement was extended to September 30, 2025. In the second quarter of 2025, the entire Working Capital Loan amount along with the interest payable was repaid and the facility was cancelled.
122
Table of Contents
On November 14, 2024, we entered into a securities purchase agreement (the “2024 Purchase Agreement”) with certain new and existing institutional investors for the sale of an aggregate of 17,500,000 common shares (the “Shares”) and accompanying Class B warrants (the “Class B Warrants”), in a registered direct offering. The offering price was $1.00 per common share, with each common share including an accompanying Class B Warrant to purchase 0.5 common shares. The Class B Warrants are exercisable immediately upon issuance at a price of $2.00 per share and expire five years from issuance. On November 26, 2024, we entered into the First Amendment to the 2024 Purchase Agreement, pursuant to which we agreed to sell and issue an additional 2,400,000 common shares and accompanying Class B Warrants to purchase 1,200,000 common shares to new investors on the same terms and conditions as initially offered. Including the First Amendment to the 2024 Purchase Agreement, we agreed to sell and issue in aggregate 19,900,000 common shares and Class B Warrants to purchase 9,950,000 common shares. We received gross proceeds in the offering, exclusive of warrant exercises, of $19.9 million (net proceeds of $14.2 million, after offering expenses), of which $5 million was received on February 6, 2025.
On May 12, 2025, we entered into a securities purchase agreement with certain new and existing investors, including an existing strategic investor, for the sale of an aggregate of 12,333,333 common shares and accompanying Class C Warrants, in a registered direct offering, for gross proceeds, exclusive of warrant exercises, of $37 million (net proceeds of $36.7 million, after offering expenses). The offering price was $3.00 per common share, with each common share including an accompanying Class C Warrant to purchase one common share. The Class C Warrants are exercisable immediately upon issuance at a price of $4.50 per share and expire three years from issuance.
On June 16, 2025, we entered into a Securities Purchase Agreement with Korea Zinc, pursuant to which in consideration of gross cash receipt of $85.2 million, we agreed to issue and sell to Korea Zinc 19,623,376 of our common shares and accompanying warrants to purchase an aggregate of 6,868,181 common shares. The purchase price per share and accompanying warrant was set at $4.34. The Korea Zinc Warrant is exercisable at an exercise price of $7.00 per share and expires on June 25, 2028. Pursuant to this Securities Purchase Agreement, subject to certain exceptions, Korea Zinc will have a right to participate in any public offering or private placement of any of our common shares or common share equivalents primarily for capital raising purposes (each a “Proposed Offering”) up to such amount of securities to maintain its percentage ownership at the time of such Proposed Offering. Such right to participate in future financings will expire upon the earlier to occur of (i) June 16, 2030, (ii) the date on which Korea Zinc owns less than all of the common shares it purchased and subscribed pursuant to this Securities Purchase Agreement and (iii) immediately after a closing of a Proposed Offering where Korea Zinc does not exercise its participation right in full. The funds raised under this Securities Purchase Agreement are to be used for general corporate purposes.
We may receive up to approximately $432.5 million in aggregate gross proceeds from cash exercises of the Public Warrants, the Private Warrants, the Class A Warrants, the Class B Warrants, Class C Warrants, and Warrants issued to Korea Zinc, Nauru and Tonga based on the per share exercise price of such warrants. However, the exercise price for the outstanding Public Warrants and Private Warrants is $11.50 per common share and there can be no assurance that such warrants will be in the money prior to their expiration, and as such, such warrants may expire in September 2026 worthless. In certain circumstances, the Public Warrants and Private Warrants, Class A Warrants, Class B Warrants and Class C Warrants may be exercised on a cashless basis and the proceeds from the exercise of such warrants will decrease. Furthermore, even if the warrants will be in the money, the holders of the warrants are not obligated to exercise their warrants, and we cannot predict whether holders of the warrants will choose to exercise all or any of their warrants. The warrants issued to the Republic of Nauru and Kingdom of Tonga can only be exercised after the commercial recovery permit is received and commercial production commences and there can be no assurance that the exercise conditions will be met prior to their expiration. In addition, the exercise price to purchase one common share under the outstanding Class A Warrants and Class B Warrants is $2.00 each, Class C Warrants is $4.5, warrants issued to Korea Zinc is $7.00, warrants issued to Republic of Nauru is $4.72 and warrants issued to Tonga is $5.87 (subject to customary adjustments) and there can be no assurance that such warrants will be exercised prior to their expiration, and as such, such warrants may expire, and we will not receive any proceeds from the exercise thereof.
123
Table of Contents
Cash Flows Summary
Comparison of the Periods Ended December 31, 2025 and December 31, 2024
The following table summarizes our sources and uses of cash for the three and twelve months ended December 31, 2025 and December 31, 2024.
Presented below is a summary of our operating, investing and financing cash flows:
For the Three Months Ended
For the Year Ended
(thousands)
December 31,
December 31,
2025
2024
2025
2024
Net cash (used in) operating activities
$
(11,355)
$
(13,718)
$
(42,851)
$
(43,468)
Net cash (used in) investing activities
$
241
$
(50)
$
447
(515)
Net cash (used in) provided by financing activities
$
13,110
$
17,300
$
156,585
$
40,686
Increase (decrease) in cash
$
1,996
$
3,532
$
114,181
$
(3,297)
Full Year 2025 compared to Full Year 2024
Cash flows used in Operating Activities
For the year ended December 31, 2025, major operating activities over this period involved advanced work on pre-feasibility studies and work to advance our permit applications with NOAA resulting in net cash used in operating activities of $42.9 million. This mainly consisted of $11.1 million on payroll costs, $8.1 million on various environmental work, $7.5 million on legal and consulting fees, $3.7 million on stakeholder engagement, $3.7 million on interest and underutilization fees paid on the 2024 Credit Facility and working capital loan, $3.3 million on business development, investor relations and communications, $1.4 million on mining technological and process development and $4.1 million for various expenses, partially offset by interest income receipts of $2.4 million.
For the year ended December 31, 2024, major operating activities over this period involved Campaign 8, as well as advanced work on engineering and pre-feasibility studies as we advance towards our application to the ISA for a NORI exploitation contract and prepare for potential future commercial production. Net cash used in operating activities in the year ended December 31, 2024, amounted to $43.5 million, and consisted mainly of $14.7 million on Campaign 8 and various environmental work, $11.7 million on personnel costs, $9.2 million on legal, advisory and consulting, $2.4 million for sponsorship, training and stakeholder engagement support, $1.9 million spent on engineering and pre-feasibility studies, $1.7 million on communication and business development expenses, $0.9 million on and additional payments of $1.8 million for various expenses.
Cash flows used in/provided by Investing Activities
Net cash generated by investing activities 2025 was $0.4 million which included proceeds from the return of capital from Investee offset by the purchase of equipment and software development. In the comparative period of 2024, $0.5 million was spent on acquisition of equipment and software development.
Cash flows provided by Financing Activities
Net cash provided by financing activities for 2025 was $156.6 million, which comprised of net cash proceeds received from the Korea Zinc investment of $85.2 million, net proceeds from the 2025 Registered Direct Offering of $36.7 million, the remaining net proceeds from the 2024 Registered Direct Offerings of $4.5 million, proceeds from common shares sold under the Sales Agreement of $14.8 million and proceeds from the exercise of stock options and warrants of $27.2 million. This increase was partially offset by repayments totaling $11.8 million on our credit facilities and on the Allseas Working Capital loan.
Net cash provided by financing activities for the year ended December 31, 2024 was $40.7 million, which comprised of net proceeds received from the 2024 Registered Direct Offering of $14.7 million, net proceeds of $8.8 million from the 2023 Offering, proceeds from short-term debt and credit facilities of $11.8 million, proceeds from common shares sold under the Sales Agreement of $4.9 million and proceeds from the exercise of stock options and employee stock plans of $0.5 million.
124
Table of Contents
Contractual Obligations and Commitments
NORI Exploration Contract
As part of the NORI Exploration Contract with the ISA, NORI submitted a periodic review report to the ISA which included a five-year plan covering 2022 to 2026: NORI is currently implementing its approved five-year plan. NORI’s exploration contract expires on July 21, 2026. NORI submitted an application to the ISA for a five-year extension of the contract that is currently under review. The cost of the proposed five-year plan of work include in NORI’s extension application is dependent on the ISA’s approval of the NORI extension Work plans are reviewed annually by NORI, agreed with the ISA and may be subject to change depending on their progress to date.
TOML Exploration Contract
As part of the TOML Exploration Contract with the ISA, TOML submitted a periodic review report to the ISA which included a five-year plan covering 2022 to 2026. TOML is currently implementing its approved plan, which included an estimated five-year expenditure of up to $44 million. The five-year estimated expenditure is indicative and subject to change, TOML will review the program regularly and TOML will inform the ISA of any changes through its annual reports. TOML’s exploration contract expires on January 10, 2027. TOML is required to submit an application for extension no later than six months before the expiration of the contract. TOML intends to submit an application for a five-year extension in 2026.
Regulatory Obligations Relating to Exploration Contracts
Both TOML and NORI require sponsorship from their host sponsoring States, Tonga and Nauru, respectively. Each company has been registered and incorporated within the applicable host State’s jurisdiction. The ISA requires that a contractor must obtain and maintain sponsorship by a host state that is a member of the ISA, and such state must maintain effective supervision and regulatory control over such sponsored contractor. Each of TOML and NORI is subject to the registration and incorporation requirements of these nations. In the event the sponsorship is otherwise terminated, such subsidiary will be required to obtain new sponsorship from another state that is a member of the ISA. Failure to obtain such new sponsorship would have a material impact on the operations of such subsidiary and us.
Sponsorship Agreements
NORI is sponsored by Nauru pursuant to a certificate of sponsorship signed by the Government of Nauru on April 11, 2011. NORI is a Nauruan incorporated entity and is subject to applicable Nauruan legislation and regulations. In 2015, the Nauruan government established the Nauru Seabed Minerals Authority to regulate activities carried out by companies sponsored by Nauru.
Throughout the period of the NORI Exploration Contract, NORI must be sponsored by a State that is party to UNCLOS. If the nationality or control of NORI changes or NORI’s sponsoring State, as defined in the ISA Regulations, terminates its sponsorship, NORI must promptly notify the ISA. In either event, if NORI does not obtain another sponsor meeting the requirements prescribed in the ISA Regulations and fails to submit to the ISA a certificate of sponsorship for NORI in the prescribed form within six months, the NORI Exploration Contract will terminate.
On July 5, 2017, Nauru, the Nauru Seabed Minerals Authority and NORI entered into a sponsorship agreement (the “NORI Sponsorship Agreement”) formalizing certain obligations of the parties in relation to NORI’s exploration and potential collection of nodules within the NORI Contract Area of the CCZ. On May 29, 2025 the Republic of Nauru and NORI signed a revised Sponsorship Agreement, updating the terms of the Agreement signed between the parties in 2017.
125
Table of Contents
The revised Sponsorship Agreement will remain in force unless terminated by mutual agreement of the parties or earlier terminated in accordance with its terms, including in the event of a material breach by either party or upon the assignment of NORI’s rights and the transfer of sponsorship to another sponsoring State. Under the agreement, NORI will pay Nauru a seabed mineral recovery payment of $2 per tonne of polymetallic nodules recovered under an ISA contract, subject to annual inflation adjustment. In addition, NORI will pay an annual administration fee, initially capped at $500,000, to support Nauru’s administration of its sponsorship and regulatory oversight. The agreement also provides for potential continuity payments to Nauru if a subsidiary other than NORI develops nodules in the NORI Contract Area under the U.S. regulatory regime with the applicable payment amounts and schedule to be determined in accordance with the terms of the agreement. During any period in which such continuity payments are made, NORI has agreed to maintain an office in Nauru and make annual investments in local presence, community initiatives and training and capacity-building programs for Nauruan nationals. In connection with the Sponsorship Agreement, Nauru holds warrants to purchase 9,146,268 of our common shares at an exercise price of $4.72. In connection with the revised Sponsorship Agreement, we also executed a Deed of Guarantee and Indemnity in favor of Nauru, under which we guarantee certain financial obligations of NORI under Nauruan law and the Sponsorship Agreement and provides limited indemnification.
On March 8, 2008, Tonga and TOML entered into the TOML Sponsorship Agreement formalizing certain obligations of the parties in relation to TOML’s exploration and potential exploitation of a proposed application to the ISA (subsequently granted) known as the TOML Area. TOML updated the sponsorship agreement with Tonga in September 2021 and again on August 4, 2025.
The revised Sponsorship Agreement between Tonga and TOML will remain in force unless terminated by mutual agreement of the parties or earlier terminated in accordance with its terms, including in the event of a material breach by either party. Under the agreement, Tonga will continue to sponsor TOML’s seabed mineral activities in the ISA contract area. Upon commencement of commercial recovery of polymetallic nodules under an ISA contract, TOML will pay the Tonga Seabed Minerals Authority a commercial recovery payment of $2 per tonne of polymetallic nodules recovered from the contract area, subject to annual inflation adjustment. In addition, TOML will pay an annual administration fee of $90,000, which may increase by up to 5% annually, to support the administration of Tonga’s sponsorship and regulatory oversight. The agreement also provides for potential continuity benefit payments to Tonga if a subsidiary other than TOML develops nodules in the TOML Contract Area under the U.S. regulatory regime. The applicable payment amounts and schedule will be determined in accordance with the terms of the agreement. During any period in which such continuity benefits are provided, TOML has agreed to maintain an office in Tonga and make annual investments in local presence, community initiatives and training and capacity-building programs for Tongan nationals. In connection with the Sponsorship Agreement, Tonga holds warrants to purchase 1,000,000 of our common shares at an exercise price of $5.87. In connection with the revised Sponsorship Agreement, we also executed a Deed of Guarantee and Indemnity in favor of Tonga, under which we guarantee certain financial obligations of TOML under Tongan law and the Sponsorship Agreement and provides limited indemnification.
Allseas Agreements
On March 29, 2019, we entered into a strategic alliance with Allseas to develop a system to collect, lift and transport nodules from the seafloor to shore and agreed to enter into a nodule collection and shipping agreement whereby Allseas would provide commercial services for the collection of the first 200 million metric tonnes of polymetallic nodules on a cost plus 50% profit basis. In furtherance of this agreement, on July 8, 2019, we entered into a Pilot Mining Test Agreement with Allseas (“PMTA”), which was amended on five occasions through February 2023, to develop and deploy a PMTS, successful completion of which is a prerequisite for our application for an exploitation contract with the ISA. Under the PMTA, Allseas agreed to cover the development cost of the project in exchange for a payment from us upon successful completion of the pilot trial of the PMTS in NORI Area D.
On March 16, 2022, NORI and Allseas entered into a non-binding term sheet for the development and operation of a commercial nodule collection system. The pilot nodule collection system developed and tested by Allseas is expected to be upgraded to a commercial system with an expanded targeted production capacity of up to an estimated 3.0 million tonnes of wet nodules per year, to be delivered in stepped increments. NORI and Allseas intend to equally finance all costs related to developing and getting the first commercial system into production. Once in production, NORI is expected to pay Allseas a nodule collection and transshipment fee and, as Allseas scales up production to up to an estimated 3.0 million wet tonnes of nodules per year, it is expected that unit costs will be reduced. Following the successful completion of the NORI Area D pilot collection system trials in November 2022 and subsequent analysis of pilot data, the parties are reviewing a commercial nodule collection system production targets, system design and cost estimates and intend to enter into a binding Heads of Terms by the end of 2024. There can be no assurances, however, that we will enter into definitive agreements with Allseas contemplated by the non-binding term sheet in a particular time period, or at all, or on terms similar to those set forth in the non-binding term sheet, or that if such definitive agreements are entered into by us that the proposed commercial systems and second production vessel will be successfully developed or operated in a particular time period, or at all.
126
Table of Contents
Through December 31, 2025, we have made the following payments to Allseas under the PMTA: (a) $10 million in cash in February 2020, (b) $10 million through the issuance of 3.2 million Common Shares valued at $3.11 per share in February 2020, (c) issued Allseas a warrant to purchase 11.6 million Common Shares at a nominal exercise price per share in March 2021, (d) $10 million in cash in October 2021, following the closing of the Business Combination and meeting certain progress targets on the PMTS and (e) on February 23, 2023 issued 10.85 million Common Shares to Allseas. On August 9, 2023, 11,578,620 common shares were issued to Allseas upon the exercise of the warrant that was granted to Allseas in March 2021, and receipt of the exercise fee of $115.8 thousand. The warrant vested and became exercisable on successful completion of the PMTS in November 2022.
On November 11, 2022, our board of directors approved the successful completion and testing of the PMTS in the NORI Area D and payment of the third milestone amounting to $10 million and additional costs owed to Allseas under the PMTA by issuing 10.85 million Common Shares to Allseas priced at $1.00 per share on February 23, 2023.
On August 1, 2023, we entered into an Exclusive Vessel Use Agreement with Allseas pursuant to which Allseas will give us exclusive use of the vessel (“ Hidden Gem ”) in support of the development of the Project Zero Offshore Nodule Collection System until the system is completed or December 31, 2026, whichever is earlier. In consideration of the exclusivity term, on August 14, 2023, we issued 4.15 million Common Shares to Allseas.
Offtake Agreement
On May 25, 2012, DGE and Glencore entered into a copper offtake agreement and a nickel offtake agreement. DGE has agreed to deliver to Glencore 50% of the annual quantity of copper and nickel produced by a DGE-owned facility from nodules derived from the NORI Area at London Metal Exchange referenced market pricing with allowances for product quality and delivery location. Either party may terminate the agreement upon a material breach or insolvency of the other party. Glencore may also terminate the agreement by giving twelve months’ notice.
Borrowing with Company Related to Allseas
2023 Credit Facility
As described above, on March 22, 2023, we entered into the 2023 Credit Facility with Argentum Cedit Virtuti GCV, an affiliate of Allseas, under which we may borrow up to $25.0 million pursuant to the terms and conditions of the 2023 Credit Facility, as amended, which has a maturity date of August 31, 2025. On August 16, 2024, we entered into the Third Amendment to the 2023 Credit Facility, to increase the borrowing limit of the 2023 Credit Facility to $27.5 million. Under the terms of the Third Amendment, upon closing of the November 2024 Registered Direct Offering discussed above, the borrowing limit returned to $25 million. There was no outstanding balance under the 2023 Credit Facility as at December 31, 2025. Pursuant to the Letter Agreement entered into on March 24, 2025, we agreed to cancel the 2023 Credit Facility with no outstanding amounts remaining, other than our obligation to pay Argentum Cedit Virtuti GCV the underutilization fee thereunder.
2024 Short-Term Loan and Working Capital Loan
On May 27, 2024, we entered into a short-term loan agreement with Argentum Cedit Virtuti GCV whereby we borrowed $2 million (the “Loan”) on May 30, 2024. The Loan matured on September 10, 2024 (maturity date) and accrued interest at a rate of 8% per annum. On the maturity date, we repaid the entire Loan amounting to $2 million and the accrued interest.
127
Table of Contents
On September 9, 2024, we entered into a working capital loan agreement (the “Working Capital Loan Agreement”) with Allseas Investments, a company related to Allseas. In accordance with the Working Capital Loan Agreement, Allseas Investments provided a loan to us amounting to $5 million (the “Working Capital Loan”) on September 10, 2024, to be used towards general corporate purposes and the repayment of all outstanding amounts under the Short-Term Loan between us and the Lender. The Working Capital Loan is payable to the Lender on or before the earlier of (i) the occurrence of certain financing events and (ii) April 1, 2025 (the “Original Repayment Date”). The Working Capital Loan will bear interest based on the 6-month Secured Overnight Financing Rate, 180-day average plus a margin of 4.0% per annum and is payable in two installments on January 2, 2025, and the Original Repayment Date (or plus a margin of 5.0% if all interest payments are deferred to the Original Repayment Date, at our election). On October 18, 2024, we entered into the First Amendment to the Working Capital Loan Agreement with Allseas Investments, resulting in a further draw of $2.5 million by us and a total Working Capital Loan drawn amount of $7.5 million. On March 24, 2025, we entered into a Letter Agreement with Allseas Investments and Argentum Cedit Virtuti GCV, pursuant to which the Original Repayment Date under the Working Capital Loan Agreement was extended to September 30, 2025, with principal and interest now repayable on that date. During the second quarter of 2025, we repaid the entire outstanding loan and interest, amounting to $7.5 million and $0.5 million, respectively, and cancelled the Working Capital Loan Agreement.
2024 Credit Facility with ERAS Capital LLC and Gerard Barron
Under the 2024 Credit Facility wit ERAS Capital LLC and Gerard Barron we may borrow up to $44 million in the aggregate ($22 million from each of the 2024 Lenders). The Maturity Date for any borrowings under the 2024 Credit Facility is June 30, 2026. See above for a further description of the 2024 Credit Facility. As of December 31, 2025, we had no borrowing under the 2024 Credit Facility and are only incurring the underutilization fee.
Off-balance sheet arrangements
We are not party to any off-balance sheet arrangements.
Critical Accounting Policies and Significant Judgments and Estimates
Our financial statements have been prepared in accordance with U.S. GAAP. In the preparation of these financial statements, we are required to use judgment in making estimates and assumptions that affect the reported amounts of assets and liabilities and the disclosure of contingent assets and liabilities as of the date of the financial statements, as well as the reported expenses incurred during the reporting periods.
We consider an accounting judgment, estimate or assumption to be critical when (1) the estimate or assumption is complex in nature or requires a high degree of judgment and (2) the use of different judgments, estimates and assumptions could have a material impact on the consolidated financial statements. Our significant accounting policies are described in Note 2 “Basis of Presentation” to our audited consolidated financial statements included in this Annual Report. We have the critical accounting policies and estimates which are described below.
Value of Common Share-Based Payments
We recognize the cost of share-based awards granted to employees, directors and non-employees based on the estimated grant-date fair value of the awards. We determine the fair value of stock options using the Black-Scholes option pricing model, which is impacted by the following assumptions:
● Fair Value of common shares on the Date of the Grant — We used the price of the most recent offerings of our Common Shares to assess the value of our shares on the date of the grant of incentive stock options.
● Expected Term — We used the term of the award when calculating the expected term due to insufficient historical exercise data.
● Expected Volatility — As our common shares were not actively traded, the volatility is based on a benchmark of comparable companies within the mining industry.
128
Table of Contents
● Expected Dividend Yield — The dividend rate used is zero as we have never paid any cash dividends on our common shares and do not anticipate doing so in the foreseeable future.
● Risk-Free Interest Rate — The interest rates used are based on the implied yield available on Canadian Treasury zero-coupon issues with an equivalent remaining term equal to the expected life of the award.
This valuation approach involves the use of estimates, judgments and assumptions that are subjective, such as those regarding the probability of future events. Changes in these estimates and assumptions impact our valuation as of the valuation date and may have a material impact on the valuation of our common shares. Changes in these assumptions used to determine the fair value of incentive stock options, including the vesting timeline of granted stock options, could have a material impact on our loss and comprehensive loss.
Valuation of Warrants Liability
We re-measure the fair value of the Private Warrants at the end of each reporting period. The fair value of the Private Warrants is estimated using a Black-Scholes option pricing model whereby the expected volatility is estimated by using a blended volatility calculated by assigning equal weights to both implied volatility of our Public Warrants and the historical volatility of our common share price. The expected volatility was estimated using a binomial model based on consideration of the implied volatility from our Public Warrants, adjusted to account for the call feature of the Public Warrants at prices above $18.00 during 20 trading days within any 30-trading-day period and historical volatility of the share price of our Common Shares.
Evaluation of Going Concern
We assess quarterly whether we have the ability to meet our committed cash requirements for the next twelve months and continue to operate as a going concern. This assessment requires the use of forecasts of our business activities and related estimates of future cost obligations which can be subject to change. Changes in these assumptions could have a material impact on our assessment and related disclosures.
Recent Accounting Pronouncements
See Note 5 “Recent Accounting Pronouncements Issued and Adopted” to the audited consolidated financial statements included in this Annual Report for more information about recent accounting pronouncements, the timing of their adoption, and our assessment, to the extent we have made one, of their potential impact on our financial condition and our results of operations and cash flows.