Introduction
We are an integrated solar and renewable energy company. A solar energy system retains the direct current (DC) electricity from the sun and converts it to alternating current (AC) electricity that can be used to power residential homes and commercial businesses. The solar business is based on the ability of the users of solar energy systems to save on energy costs and reduce their carbon imprint as compared with power purchased from the local electricity utility company. We were founded in 2008 to engage in the solar business in the United States, where our business is primarily conducted. Our primary business consists of the sale and installation of photovoltaic and battery backup systems for residential and commercial customers sales of LED systems and services to government and commercial users. We also generate revenue from financing the sale of our photovoltaic and battery backup systems. Since early 2020, because we did not have the capital to support such operations, we suspended making loans to our solar customers, and we are not currently financing the purchase of solar systems and we do not anticipate engaging in such activities in the near future, if at all. Our finance revenue reflects revenue earned on our current portfolio, with no new loans having been added since early 2020.
In 2015, we commenced operations in the PRC with the acquisition of two subsidiaries –Chengdu Zhonghong Tianhao Technology Co., Ltd. ("Chengdu ZHTH”), which is a subsidiary of SolarMax Technology (Shanghai) Co. Ltd. (together with its subsidiaries thereunder, "ZHTH”), and Jiangsu Zhonghong Photovoltaic Electric Co., Ltd. ("ZHPV”). We did has not generate any revenue from our China segment subsequent to 2021, and the China segment does not have any projects or agreements as of the date of this report. All of our revenue the year ended December 31, 2022, 2023 and 2024 was generated by our United States segment, and our cost of revenue related to our United States segment.
We are seeking to offset our decline in residential solar sales in California for the year ended December 31, 2024 as compared with the 2023 by marketing sales of larger systems to commercial users both in California and in other states; however, we cannot assure you that we will be successful in marketing to commercial users. As of the date of this annual report, we do not have any contracts for major commercial solar projects. Although we have non-binding memoranda of understanding, letter of intent or term sheets with respect to four proposed projects, all of which are subject to the negotiation of definitive agreements, and some of the projects require the identification of a financing source to provide the full financing for the project. We cannot assure you that any of these projects or any other projects will be completed, that we will generate a gross profit from any commercial projects or that we will be successful in developing our commercial business as planned if at all.
Prior to 2022, ZHTH was engaged in project development. ZHPV’s core business was to provide engineering, procurement and construction (“EPC”) services. In order to build a solar farm in China it is first necessary to obtain a permit, which covers a specific location. ZHTH and ZHPV establish special subsidiaries to own and acquire a permit for a solar farm. We refer to these subsidiaries as project subsidiaries. When a buyer of a project is identified, we sell to the buyer the equity in the project subsidiary that holds the permit for that specific solar farm project, and the buyer of the project engages ZHPV for the EPC work. The purchase price for the project subsidiary is an amount approximating the project subsidiary’s net assets. Accordingly, we do not generate a material gain or loss from the sale of the project subsidiaries and our revenue is primarily generated by our EPC services. The sale of the equity in the project subsidiaries is part of the normal course of our operations in China. Because Chinese government regulations prohibit the sale of the permit relating to a solar farm, it is necessary for us to sell the equity in the project subsidiary to effectuate the transfer of the ownership of the solar farm and the permit to the buyer. From mid 2019 to 2021, our China segment was dependent upon one customer, SPIC, a state-owned enterprise. We have not generated any revenue from our China segment since mid-2021. At December 31, 2024, we had an outstanding receivable from SPIC of approximately $6.8 million which relates to projects completed prior to 2022. Although we believe the receivable will be substantially collected, we can give no assurance as to when or whether we will collect the full amount. At December 31, 2024, we increased our bad debt reserve relating to this receivable as a result of initial arbitration meetings during 2024. Further, as a result of a decrease in China’s tax revenue and other sources of funds, we cannot assure you that SPIC will pay the amount due to us or enter into any future agreements with us.
Although we intend to seek to negotiate contracts with SPIC and other Chinese entities, our ability to obtain contracts may be dependent upon China’s priorities, our status as a United States company and trade relations between the United States and China may affect our ability to generate business for SPIC or other Chinese companies and we cannot assure you that we will be able to negotiate any such contracts, in which event it may be necessary for us to discontinue our Chinese segment.
Initial Public Offering
In March 2024, we issued 5,039,950 shares of common stock in our initial public offering at a public offering price of $4.00 per share less a 6% underwriting discount pursuant to an underwriting agreement (the “Underwriting Agreement”) with Kingswood, a division of Kingswood Capital Partners, LLC (the “Representative”), as representative of the underwriters. The shares issued include the partial exercise of the underwriters’ overallotment option. Pursuant to the Underwriting Agreement, we paid the Representative a 1% non-accountable expense allowance and reimbursed the Representative for certain accountable expenses of $175,000. The aggregate gross proceeds from the offering was approximately $20.2 million, prior to deducting the underwriting discounts, commissions and offering expenses payable by us. Net proceeds from our initial public offering of approximately $18.6 million reflects the gross proceeds net of underwriting discounts, the non-accountable expense allowance, accountable expenses of the underwriters that were paid by the Company and other expenses that were deducted from gross proceeds at the closing.
5
Table of Contents
Pursuant to the Underwriting Agreement, we issued to the Representative warrants (the “Representative’s Warrants”) to purchase 403,196 shares of common stock at an exercise price of $4.80 per share, the Representative’s Warrants were fully exercised on a cashless basis. Based on the formula for cashless exercise, the Company issued a total of 207,311 shares of common stock, and, as a result of the exercise, no Representative’s Warrants remained outstanding.
The net proceeds of $18.6 million from our public offering were used as follows:
·
approximately $800,000 to make payments due to our former executive vice president and $100,000 million to a former employee pursuant to our agreements with them;
·
$7.0 million invested in an 8% promissory note issued by a Hong Kong based social media company; and RMB 5,000,000, or approximately $688,000, in a 5% note issued by a PRC-based company;
·
and the balance used for working capital, which included $5.5 million principal payments on convertible notes and $276,000 payment on legal settlement with former EB-5 noteholders.
Our Corporate Structure
We are a Nevada corporation formed in January 2008. We have four wholly-owned subsidiaries in the United States: SolarMax Renewable Energy Provider, Inc., SolarMax Financial, Inc. ("SolarMax Financial”), SolarMax LED, Inc. ("LED”) and SMX Capital, Inc. ("SMX Capital”).
Our wholly-owned subsidiaries outside the United States are Accumulate Investment Co. Ltd. (BVI), a British Virgin Islands corporation ("Accumulate’), SolarMax Technology Holdings (Hong Kong) Limited, a Hong Kong corporation ("SolarMax Hong Kong”), Golden SolarMax Finance Co., Ltd, a Chinese corporation ("Golden SolarMax”) which was liquidated in June 2024, and SolarMax Technology Holdings (Cayman) Limited, a Cayman Islands corporation ("SolarMax Cayman”).
Accumulate has one wholly-owned subsidiary, Accumulate Investment Hong Kong, a Hong Kong corporation, which has one wholly-owned subsidiary, ZHPV.
SolarMax Hong Kong has one wholly-owned subsidiary, SolarMax Shanghai. SolarMax Shanghai is a wholly foreign-owned entity, which is referred to as a WFOE. SolarMax Shanghai currently no significant subsidiaries. We refer to SolarMax Shanghai and its subsidiaries collectively as ZHTH.
The following charts show our corporate structure for our United States and China segments. The chart for the China segment does not include the subsidiaries of ZHPV, which are either project subsidiaries or subsidiaries which are formed to perform services for a specific contract; or subsidiaries of SolarMax Shanghai.
6
Table of Contents
Our principal executive offices are located at 3080 12 th Street, Riverside, California 92507. Our telephone number is (951) 300-0788. Our website is http://www.solarmaxtech.com. Any information contained on, or that can be accessed through, our website or any other website or any social media is not a part of this annual report.
United States Operations
Solar Energy Systems
The photovoltaic market in the United States has experienced significant growth with the help of the Inflation Reduction Act, with solar accounting for approximately 16% of the country’s electricity generation. Solar remains the fastest-growing renewable energy source in the U.S., with projections estimating that total installed solar capacity will exceed 250 GW by 2030, contributing substantially to the nation’s clean energy goals. The U.S. solar market is expected to be valued at over $125 billion by 2030 as investment in large-scale utility projects and distributed generation continues to expand. However, the market for solar energy may be affected by federal and state regulations and policies, including state regulations such as California’s NEM 3.0, which has resulted in reduced solar energy sales since its introduction in 2024, and any federal policies that favor petroleum-based energy and nuclear energy at the expense of renewable energy such as solar and wind.
California remains the leading state for installed solar capacity, currently accounting for more than 26% of the net generation for solar installations in the United States for 2024 based on United States Energy Information Administration statistics. The state has set ambitious renewable energy targets, with legislation requiring 100% clean electricity by 2045, far surpassing its previous 50% renewable energy goal by 2050. 1
We design, install and sell high performance photovoltaic solar energy systems and battery systems, and we have installations at more than 12,000 homes and businesses. A photovoltaic system generates electricity directly from sunlight via an electric process that occurs naturally in certain types of materials. A system consists of one or more photovoltaic modules and an inverter. Photovoltaic modules, which are manufactured in different sizes and shapes, generate direct current (DC) electricity. The electricity current is then fed through an inverter to produce the alternating current (AC) electricity that can be used to power residences and commercial businesses. The major components of our solar energy systems include solar panels that convert sunlight into electrical current, inverters that convert the DC electrical output from the panels to AC current compatible with the electric grid, racking that attaches the solar panels to the roof or ground and electrical hardware that connects the solar energy system to the electric grid. The battery systems we sell are rechargeable and can be used not only to store solar energy for backup protection when the power grid goes down, but also to reduce the reliance on the electrical grid by storing solar energy to be used when the sun in not shining or when power costs are the highest during the day. We currently install solar systems only in California. Although we are negotiating for the installation of commercial in other states, as of the date of this annual report we do not have any contracts for these commercial installations and we cannot assure you that we will be successful in marketing commercial installations or that we will be able to price any such installations at a price at which we can generate a profit.
___________________________
1 https://www.theverge.com/news/628369/solar-wind-beat-coal-us-ember-report
https://seia.org/research-resources/us-solar-market-insight/
Senate Bill (SB) 1020—the Clean Energy, Jobs, and Affordability Act of 2022
7
Table of Contents
We provide and install both grid-tied and off-grid systems. Grid-tied systems remain connected to the electric grid, so that the energy generated by the system is sent back to the grid during the day and power is drawn back at night. The electric grid thus serves as a "storage device” for photovoltaic-generated power. If consumers use more power than is generated by their solar energy system, they can purchase power from the regional utility company. If consumers use less power than the system generates, they can sell the electricity back to their local utility companies and receive a credit on their electric bills. In order to sell power back to the utility company, the owners need to make an application to the utility company and the utility company then gives the owners a standard agreement covering the purchase of the excess power. Grid-tied systems generally represent the most common, affordable and feasible option for urban and suburban residences.
Off-grid systems are not connected to the utility grid and therefore require battery backup. Off-grid solutions are less common and are mostly employed for residences that do not have the option of connecting to the utility grid. Almost all of our installations are grid-tied systems.
Sale and Installation Process
Our system sale and installation process consists of five stages – feasibility, design, permitting, procurement and installation. In addition, when a customer requests additional services, we will enter into post-installation maintenance agreements with customers who own the systems. We have a dedicated team to handle every detail of the customer’s solar panel, battery or LED installation.
We market to our customers using print ad, internet, radio and television advertising along with customer referrals. We are in the process of shifting our focus from traditional radio advertisements to sponsorships and other public relation initiatives. After the initial contact with a prospective customer, our construction and solar engineers visit the customer to conduct an on-site evaluation and assess the customer’s electricity needs. The site assessment includes a shading analysis, roof inspection and review of any existing mechanical systems. Additionally, we review the customer’s recent utility bills so that we can present a proposal designed to meet the customer’s energy requirements and answer the customer’s questions. At this stage, the customer has not made any commitment to purchase a system from us.
8
Table of Contents
At the design stage, we analyze the information obtained during the feasibility stage to design a proposed solar energy solution, based on the customer’s stated energy needs, financial means and the specifics of the building location. Upon completion of the design stage, we present the customer with a detailed written proposal outlining the components of the system, the proposed timeline of the system implementation, the estimated price and estimated energy savings as well as the expected return on the investment based on existing rate information. Approved customers who purchase our systems sign a purchase agreement and tender to us a down payment equal to the lesser of 10% of the overall cost or $1,000, which can be refunded within three days.
The period of time between the initial customer contact at the feasibility stage and the signing of the contract upon the completion of the design stage (the negotiation period) may range from less than a month to more than a year, with six to twelve months being the average negotiation period for larger commercial projects.
Before installing any solar or backup battery system, we must obtain required permits and approvals from the local fire department and the department of building and safety and other applicable state and local agencies, as well as from utility companies. We prepare a full permitting package and apply for these permits on behalf of the customer. We may also assist the customer with necessary paperwork to apply for and obtain the tax rebates and incentives. The permitting process typically takes four to eight weeks. Upon completion of this stage, we require customers to pay 40% of the total purchase price.
Once the customer orders the system, we order products, parts and materials necessary to implement the project. Upon delivery of the materials to the customer’s site, we require an additional 40% of the purchase price.
Finally, we assemble and install the system at the customer’s site. Once installation is complete, we meet with the customer to conduct a final walk-through of the system and review its components. Upon the final walk-through and sign-off by the city inspector, the system becomes fully operational, and we require the remaining 20% of the purchase price. The payment schedules do not apply to customers for whom we are providing financing. We provide end-to-end customer service during the lifetime of the product.
Source of Supply
We do not have a supply agreement with any supplier. We purchase solar panels from a number of suppliers. Battery systems are available from a number of suppliers, including Tesla, Enphase and LG.
Two suppliers accounted for 10% or more of our purchases for the years ended December 31, 2024 and 2023. Consolidated Electrical Distributors accounted for purchases of approximately $4.0 million, or 12% of our purchases, for the year ended December 31, 2024, and $4.9 million, or 12% of our purchases, for the year ended December 31, 2023. CDH Trading, Inc., accounted for 10% or more of our purchases of approximately $4.0 million, or 12% of our purchases, for the year ended December 31, 2024. We did not make any purchases from this supplier for the year ended December 31, 2023.
Warranty Obligations; Production Guarantee
All parts of the system provided by us are under manufacturers’ warranties, typically for 25 years for the panels and inverters. The manufacturer’s warranty on the solar energy systems’ components, which is typically passed through to the customers, ranges from one to ten years. We provide a limited installation services warranty that warrants the installation services related to the system owner’s photovoltaic modules and inverters to be free from defects in the installation services under normal application, use and service conditions for a period of ten years from the date of the original installation services. Our agreement with our customers provides that we are not responsible for damage resulting from natural disasters, such as hurricanes, floods or other weather conditions. For leased systems we require the customer to maintain insurance covering these risks.
Prior to 2015, we entered into power purchase agreements that have a term of up to 20 years. We own and maintain the systems and sell the power generated by the systems to commercial customers pursuant to the power purchase agreement. Revenue from power purchase agreements is not material.
Commencing in 2015, our standard contract for residential systems provides for a production guarantee, which means that we guarantee that the system will generate a specified minimum solar energy during a given year. The agreements generally have a ten-year term. In the standard form of contract, we specify a minimum annual production and provide that if the power generated by the system is less than 95% of the estimate, we will reimburse the owner for the cost of the shortfall. Because our obligations are not contingent upon external factors, such as sunlight, changes in weather patterns, forest fires, or increases in air pollution, these factors could affect the amount of solar power that is generated and could increase our exposure under the production guarantee. The contract also provides that the purchasers of these systems are not entitled to reimbursement for shortfalls caused by overshadowing, shading or other interference not attributable to the design of the system and the accompanying equipment. Our only production guarantees are pursuant to agreements with our customers.
9
Table of Contents
In 2017, we incurred unanticipated liability based on the failure to of our systems to meet the production guarantee or otherwise perform in accordance with our warranty. Our only production guarantees are pursuant to agreements with our customers. Although we believe we have taken steps designed to prevent a misalignment of system designs and production guarantees which affected us in 2017, we cannot assure you that we will not be subject to unanticipated liability based on the failure of our systems to meet production guarantees or otherwise perform in accordance with our warranty.
With respect to leases with a leasing company, the leasing company establishes its own production guarantees, conducts its own review of those guarantees in conjunction with system design, and is responsible for any necessary modification in its contracts.
Our warranty for the LED products sold and services rendered ranges from one year for labor and up to seven years for certain products sold to governmental municipalities,
Leasing Agreements with us as the Lessor
Prior to 2014, we leased systems primarily to commercial and not-for-profit customers through our subsidiaries and three entities in which we have a 30% interest. These leases are operating leases and we own the systems, which we lease to the customers. Although we no longer lease new systems, we continue to own the equipment subject to the existing leases. The leases do not include a production guarantee. At the end of the lease, the customer has an option to purchase the equipment at its then fair market value for commercial customers. For not-for-profit customers, we generally have agreed up front to donate the system to the customers at the end of the lease. We have not leased systems for our account after 2014.
Power Purchase Agreements
We entered into solar power purchase agreements in our United States segment with some commercial customers, and many of these agreements remain in effect. Pursuant to these agreements, we are responsible for the design, permitting, financing and installation of a solar energy system on a customer’s property after which we sell the power generated by the system to the customer at an agreed upon rate. To the extent that the system does not generate sufficient power to meet its obligations, we may have to purchase power from a local utility company, which will be a cost of revenues. We receive the income from the sales of electricity pursuant to these agreements as well as any tax credits and other incentives generated from the system, and we are responsible for the operation and maintenance of the system for the duration of the agreement. At the end of the term, a customer may extend the agreement, have us remove the system or buy the solar energy system from us. We have generated nominal revenue from power purchase agreements.
Seasonality
Since the inception of our business in 2008, we have experienced different levels of seasonality for our residential sales, small commercial and large commercial projects.
Our residential sales are prone to seasonal fluctuations. It has been our experience that we generate a larger percentage of sales in March and April, when residential customers focus on possible tax advantages of solar energy, and in the summer months of July and August, when utility rates and bills typically increase. We believe that the increase in residential sales during March and April results from consumers’ increased awareness of the tax benefits of solar energy system systems. We believe that the higher volume of sales in the summer months results from typically higher electrical bills in the summer, when electricity use is highest, which we think heightens consumers’ awareness of the opportunity to reduce their energy costs in the future through the use of solar energy. However, our increased revenues in 2023 and significant reduction in revenues in 2024 was affected by the introduction of NEM 3.0 rather than seasonality.
We have historically experienced a slight increase for small commercial projects during the summer season. As with residential sales, we attribute higher volume in small commercial sales to small business owners’ reaction to the generally higher electricity bills during the summer months.
We have generally not experienced any significant seasonal fluctuations for our large commercial projects in the United States. We believe that customers committing to large commercial purchases or leases of solar energy systems have generally made more studied decisions and are therefore less sensitive to seasonal variations or immediate market conditions. The negotiation period for larger projects may range from a couple of months to a year or more. We therefore believe that the timing of the execution of large commercial deals depends largely on the progress of contract negotiations.
10
Table of Contents
Financing Activities
Because we believe the high cost of buying and installing solar energy systems remains a major barrier for a typical residential customer, we had developed financing programs to enable customers who meet our credit standards to finance the purchase of our solar energy systems through SolarMax Financial. Since early 2020, because we did not have the capital to support such operations, we suspended making loans to our solar customers, and we have no present plans to re-commence financing operations. Our finance revenue reflects revenue earned on our current portfolio, with no new loans having been added since early 2020.
The following table sets forth customer loan receivables at December 31, 2024 and December 31, 2023:
December 31,
2024
December 31,
2023
Customer loans receivable, gross
$ 4,644
$ 6,795
Less: unamortized loan discounts
-
(2 )
Allowance for loan losses
(280 )
(257 )
Customer loans receivable, net
4,364
6,536
Less: Current portion
1,287
2,213
Non-current portion
$ 3,076
$ 4,323
Financing Program
We have financing programs with third-party financing companies, the most significant of which is a home improvement financing program agreement executed on February 28, 2019, with Dividend, a division of Fifth Third Bank (“Dividend”), pursuant to which Dividend provides financing to our customers who meet Dividend’s credit criteria. We sell the systems to our customers, and Dividend pays us the purchase price, less a program fee. The financing agreement is between the customer and Dividend, and we are not a party to the finance agreement.
LED Projects
We provide LED products that help commercial customers save money by lowering electricity costs through the advanced technology of LED light bulbs. The energy-saving incandescent bulbs use approximately 25% less energy than traditional varieties, while the LED light bulbs use approximately 75% less energy, last 40 times longer, and are considered safer to use.
We have relationships with a number of LED system manufacturers that provide us with access to a variety of high-performance products and ultimately enables us to meet customers’ energy needs and budgets. Our LED streetlight system has an exclusive ETL Mark under our company name, which is evidence that our product complies with North American safety standards and is a requirement for contracts with municipal customers.
There are several steps to completing an LED installation with a customer. The first step is to review the customer’s previous year’s power bill and to look at its financial statements for the last three years. The next step is to conduct a lighting survey to effectively present an energy saving proposal to the potential customer. We typically offer financing services similar to our solar system financing. Some commercial projects require us to engage a third-party vendor to help install the LED lighting systems for our clients while other projects customers choose to be responsible for the installation of the system.
Marketing
We have an in-house sales and marketing staff of 21, of whom 16 market solar and battery backup projects and five market LED products and systems. While we use a variety of marketing and advertising tools, we believe that word of mouth is one of our most effective marketing strategies. We estimate that approximately 30% of our sales are generated through referrals by our customers.
11
Table of Contents
We also participate in industry trade shows, use telemarketing, radio, television, Internet advertising and social media as well as participating in local community events such as local festivals and door-to-door sales.
Personal meetings with prospective customers and site visits at the feasibility stage are also part of our advertising budget. In our experience, on average, we make three to four visits at the feasibility stage before we can generate a contract from the customer. As we expand the breadth of our operations, we plan to hire additional professionals and general sales personnel to market our systems to a larger number of prospective customers.
Our marketing effort includes our ability to offer financing in connection with purchases of our systems through third-party equipment leasing companies.
Competition
Solar energy systems in general compete with both the local and regional providers of electricity as well as a number of independent companies that offer to provide electricity at prices that are lower than the regional utility company. Our primary competition is with the local utility companies that supply power to our potential customers.
Within the solar energy industry, we face intense and increasing competition from other solar energy system providers. The solar energy industry is highly fragmented, consisting of many small, privately-held companies with limited resources and operating histories, and we believe that no solar energy provider has a significant percentage of the California market. We also compete with major companies, as well as a large number of smaller companies. We have experienced price erosion as a result of increased competition which has affected our gross margin. Because California has much sun and little rain, solar power companies seek to market in California rather than in states with less sun and more rain. We cannot estimate the effects of the recent increased wildfires, rain and flooding in Southern California on our business and the solar market in general. We believe that the number of new solar energy installation companies that have entered the industry in California has increased significantly since 2008 when we commenced business, and the increased competition is reflected in lower margins as we may have to reduce our prices to generate business. We expect additional companies to enter the business in the future, considering that the entry barrier in this industry is relatively low and the government incentives currently remain high although we cannot give assurance that changes in government policy will not negatively impact our business and the solar industry in general. In seeking to generate business from commercial customers for major projects, we will compete with both national and regional companies that offer solar systems.
We believe that competition is primarily based on price and, if financing is required, the availability and terms of financing, and, to a lesser extent, the ability to schedule installation to meet the customer’s schedule. Some of our competitors may offer financing terms with payments over a longer period and with either a lower down payment or no down payments than are available with third party lessors with whom we work, which may make them more attractive to potential customers.
Government Regulation
Although we are not a regulated utility company, our operations are subject to regulation, supervision and licensing under various federal, state and local statutes, regulations and ordinances. Additionally, our business is materially affected by federal and state programs and policies related to financial incentives for solar energy users and providers. Local utility companies work with all solar companies to connect their systems to the grid. Title 24 of the California Code of Regulations governs energy savings and efficiency standards for new and remodelled construction for indoor and outdoor lighting requirements.
Construction Licenses and Permits
As a company performing general contractor and design work, we must take steps such that we obtain and timely renew appropriate general contractor and other required licenses. In connection with each installation, we are required to obtain building permits and comply with all applicable local ordinances and building codes. Our operations are also subject to generally applicable laws and regulations relating to discharge of materials into the environment and protection of the environment. We are also subject to federal and state occupational health and safety regulations. We may also be subject to federal or state wage requirements, at least in connection with any solar projects on government land or buildings or other public works projects.
Consumer Protection Laws
In negotiating and entering into contracts with our residential customers, we must comply with state and federal consumer protection laws. In conducting our marketing campaigns, we must comply with the federal Telemarketing and Consumer Fraud and Abuse Prevention Act, and Telemarketing Sales Rule promulgated by the Federal Trade Commission, as well as state regulations governing telemarketing and door-to-door sales practices. In negotiating and entering into contracts with our residential customers, we must comply with a number of state regulations governing home solicitation sales, home improvement contracts and installment sales contracts.
12
Table of Contents
Consumer Financing Regulations
In the event that we recommence financing operations in California, our finance subsidiary, SolarMax Financial, will have to be registered as a California finance lender pursuant to a license issued by the California Department of Corporations, which regulates and enforces laws relating to consumer finance companies, and SolarMax Financial would be required to comply with regulations pertaining to consumer financing. Such rules and regulations generally provide for licensing of consumer finance companies, limitations on the amount of financing provided, duration and charges, including finance charge rates, for various categories of contracts, requirements as to the form and content of the loans and other documentation, and restrictions on collection practices and creditors’ rights. As a licensed finance lender, SolarMax Financial will be subject to periodic examination by state regulatory authorities.
SolarMax Financial would also be subject to extensive federal regulation, including the Truth in Lending Act, the Equal Credit Opportunity Act, Fair Debt Collection Practices Act and the Fair Credit Reporting Act and other laws. These laws would require SolarMax Financial to provide certain disclosures to prospective customers and protect against discriminatory lending practices and unfair credit practices. The principal disclosures required under the Truth in Lending Act include the terms of repayment, the total finance charge and the annual percentage rate charged on each contract. The Equal Credit Opportunity Act prohibits creditors from discriminating against loan applicants on the basis of race, color, sex, age, or marital status, among other things. Pursuant to Regulation B promulgated under the Equal Credit Opportunity Act, lenders are required to make certain disclosures regarding consumer rights and advise consumers whose credit applications are not approved of the reasons for the rejection. The Fair Credit Reporting Act requires SolarMax Financial to provide certain information to consumers whose applications were not approved or were conditionally approved on terms materially less favorable than the most favorable terms normally offered on the basis of a report obtained from a consumer-reporting agency.
In addition, SolarMax Financial would be subject to the provisions of the federal Gramm-Leach-Bliley financial reform legislation, which imposes additional privacy obligations on SolarMax Financial with respect to our applicants and our customers. SolarMax Financial has appropriate policies in place to comply with these additional obligations. SolarMax Financial does not presently engage, and has not since early 2020, engaged, in lending activities, and has no present plans to do so since we do not have the capital to enable us to engage in these activities.
Government Subsidies and Incentives
The solar energy industry depends on the continued effectiveness of various government subsidies and tax incentive programs existing at the federal and state level to encourage the adoption of solar power. Government policies, in the form of both regulation and incentives, have accelerated the adoption of solar technologies by businesses and consumers. We and our customers benefit from these regulations in the form of federal tax incentives, state utility rebates and depreciation. Because of the high cost of installing solar energy systems, the existence of tax incentives as well as regulations requiring utility companies to purchase excess power from solar energy systems connected to the grid are important incentives to the installation of a solar energy system.
Federal Tax Incentive . Solar PV systems installed in 2020 and 2021 are eligible for a 26% tax credit. The Inflation Reduction Act has made changes to the existing tax credit and extends the provisions of the Solar Investment Tax Credit so owners who install designated solar energy systems between January 1, 2022 through the end of 2032 will receive a tax credit of 30% of the cost of the solar energy system from their federal income taxes. Owners who owe less federal income tax than the 30% tax credit can carry over any unused credit until January 1, 2032. After 2032, the residential investment tax credit will be reduced to 26% for installations completed in 2033 and to 22% for -installations completed in 2034, and tax credit will no longer be available for installations completed after December 31, 2034.
State Incentives and Utility Company Rebates. In addition to federal income tax credit, utility companies in California and other states offer various incentives and rebate programs. Capital cost rebates provide funds to customers based on the cost and size of a customer’s solar energy system. The value of the rebate is subtracted from the total purchase price, resulting in a net adjusted cost for the purpose of determining the value of the federal tax credit. Performance-based rebates provide funding to customers based on the energy produced by their systems. Under a feed-in tariff subsidy, the government sets prices that regulated utility companies are required to pay for renewable electricity generated by end-users. Under that subsidy program, prices are set above market rates and may be differentiated based on system size or application.
13
Table of Contents
The building standard approved by the California Energy Commission in May 2018 mandates the installation of solar arrays on new single-family residences and on multi-family buildings of up to three stories starting in 2020. The Building Standards Commission has adopted these recommendations without change, and we cannot assure you that the Building Standards Commission will not change this standard or that the standard will survive any legal challenges which may be brought in opposition to the standard.
The California Public Utilities Commission may consider a proposal to significantly reduce the incentives homeowners receive for installing rooftop solar systems. If such a change or any significant change in the benefits provided to homeowners for installing rooftop solar systems, our U.S. business will be materially impaired. We cannot assure you that the present benefits provided to homeowners for installing solar systems will not be adopted.
Depreciation . Certain qualified clean energy facilities, property and technology placed in service after 2024 may be classified as 5-year property under the modified accelerated cost recovery system (MACRS) under Inflation Reduction Act of 2022. Under Internal Revenue Code Section 168(e)(3)(B), qualified facilities, qualified property and energy storage technology are considered 5-year property. These types of property are recoverable under the MACRS. A business with a solar PV system placed in service between January 1, 2018 and December 31, 2022 can elect to claim a 100% bonus depreciation. Starting in 2023, the percentage of capital equipment that can be expensed immediately drops 20% per year (e.g., 80% in 2023 and 60% in 2024) until the provision drops to 0% in 2027.
Tariffs and Trade Policies . The solar energy industry has recently experienced decreasing prices in solar panels, a principal component in any solar energy system. Most solar panels are imported and the price of the solar panels is impacted by trade policies, such as tariffs and quotas. The U.S. government has imposed tariffs on solar cells, solar panels and aluminum that is used in solar panels manufactured overseas. Based on determinations by the U.S. government under the 2012 solar trade case, the anti-dumping and countervailing tariff rates range from approximately 33%-255%. Such anti-dumping and countervailing tariffs are subject to annual review and may be increased or decreased. These tariffs have increased the price of solar panels containing China-manufactured solar cells. We do not purchase panels from China or Taiwan for our United States operations. The purchase price of solar panels containing solar cells manufactured in China reflects these tariff penalties. While solar panels containing solar cells manufactured outside of China are not subject to these tariffs, the prices of these solar panels are, and may continue to be, more expensive than panels produced using Chinese solar cells, before giving effect to the tariff penalties.
On January 23, 2018, the United States placed tariffs on imported solar cells and modules for a period of four years with an effective date of February 7, 2018. The tariff level was set at 30%, with a 5% declining rate per year for the four- year term of the tariff. The tariff includes a 2.5 GW exemption for cells per year, which does not include any sub quotas for individual countries. Additionally, the only countries excluded from the tariff are those that the U.S. government deems as developing nations, with the exception of the Philippines and Thailand that are eligible for the U.S. Generalized System of Preferences program.
While the state and federal incentives benefit the industry by making solar energy systems more affordable and attractive to consumers, they also expose the industry to the risk of negative consequences should these incentives be discontinued or reduced. The market for solar energy products is, and will continue to be, heavily dependent on public policies that support growth of solar energy. There can be no assurances that such policies will continue. Decreases in the level of rebates, incentives or other governmental support for solar energy would materially and adversely affect the demand for solar energy products, including our business.
Net Metering . Net metering is a billing mechanism that credits solar energy system owners for the electricity that they add to the electricity grid. If the owner of a solar system generates more electricity than it consumes, the excess electricity is sold back to the grid.
The California Public Utilities Commission (CPUC) introduced "Net Metering 3.0” (NEM 3.0) as the latest iteration of net metering policies. Under NEM 3.0, customers continue to receive credit for the electricity they produce; however, the calculation of this credit is based on avoided cost rates. These rates align more closely with wholesale rates for electricity, reflecting what utilities themselves pay for electricity rather than the conventional rates paid by customers.
Under NEM 3.0 the economic viability of combining solar panel systems with battery storage is enhanced. As a result, the payback period for the combined installations has accelerated, surpassing that of solar-only installations. We may need to revise our pricing metrics to reflect this change in order for the purchase of a solar system to be economically attractive to the customer, which may result in lower prices and reduced margins.
To the extent that utility companies are not required to purchase excess electricity from owners of solar systems or are permitted to lower the amounts paid, the market for solar systems may be impaired. Because net metering can enable the solar system owner to further reduce the cost of electricity by selling excess electricity to the utility company, any elimination or reduction of this benefit would reduce the cost savings from solar energy. The recent changes in California’s net metering payments may have reduced the market for residential solar installations to the extent that the installation of the homeowner’s decision to install a solar system is based on the benefits of the net metering structure, which has been modified to reduce the benefits to the homeowner. We cannot assure you that net metering will not be eliminated or the benefits significantly reduced for future solar systems, which may dampen the market for solar energy.
14
Table of Contents
California Consumer Privacy Act
In June 2018, California passed the CCPA, which became effective in 2020. As a practical matter, companies needed to have their data tracking systems in place by the start of 2019, since the law gives consumers the right to request all the data a company has collected on them over the previous 12 months. This law covers all companies that serve California residents and have at least $25 million in annual revenue. Under the law, any California consumer has a right to demand to see all the information a company has saved on the consumer, as well as a full list of all the third parties that data is shared with. The consumer also has the right to request that the company delete the information it has on the resident. The CCPA broadly defined broadly defines "protected data.” The CCPA also has specific requirements for companies subject to the law. For example, the law specifies that companies must have a clear and conspicuous link on their websites to a page from which consumers may exercise their right to opt out of data sharing. The CCPA provides for a private right of action for unauthorized access, theft or disclosure of personal information in certain situations, with possible damage awards of $100 to $750 per consumer per incident, or actual damages, whichever is greater. The CCPA also permits class action lawsuits. Because the law was recently adopted, we have not been able to determine the extent to which the law applies to us, our website and our privacy policies.
Employment Regulations
California labor law is more pro-employee than the laws of other states, and the damages and penalties an employee can recover are higher under California labor law than under federal labor law. California has numerous laws and regulations relating to the relationship between an employer and our employees, including wage and hour laws, laws relating to anti-discrimination, and laws mandating expanded training to employees to prevent sexual harassment. In 2004, California passed a law requiring employers with 50 or more employees to provide two hours of sexual-harassment-prevention training to supervisors every two years. A recently passed law requires that by January 1, 2020, employers with five or more employees provide at least two hours of sexual-harassment-prevention training to supervisory employees and one hour of training to nonsupervisory employees. The law also requires that, beginning January 1, 2020, seasonal, temporary and other employees hired to work for less than six months need to be trained within the earlier of 30 calendar days of hire or within 100 hours worked. Our professional employer organization has implemented our sexual harassment prevention program.
Intellectual Property
We do not have any intellectual property that is material to our business.
Artificial Intelligence
Our business does not use and is not dependent upon artificial intelligence.
Operations in China
General
The photovoltaic market in China was the largest in the world in 2021, reaching a cumulative total installed capacity of 253 GW in 2020, which accounted for more than one-third of the world’s cumulative total installed capacity. China’s photovoltaic market has been projected to grow at a compound annual growth rate of 14.1% between 2021 and 2025.The ground-market segment (i.e., solar farm installations) is expected to dominate the market during this forecast period. The China market is projected to reach $137 billion by 2030. The growth is driven by increasing government support and the continued decline in the cost of solar energy generation. 2
Our business in China has been conducted through ZHTH and ZHPV and their subsidiaries. Unlike systems that we sell in the United States, which are installations for residential and small business users, the projects in China have generally been solar farms, which are constructed on large land areas where multiple ground-mount solar tracking towers are installed. While a typical residential or small business installation in the United States generally generates between 6.5KW and 0.2MW of power, the solar farms can generate in the range of 30MW to more than 100MW of power. To comply with the local requirements to own and operate the EPC business in China, ZHTH and ZHPV establish subsidiaries for different purposes. These special purpose subsidiaries include project subsidiaries which were formed by ZHTH or ZHPV to own the solar farms and the permits to construct and operate solar farms and the equity in the subsidiaries, or, in the case of the agreements with SPIC, are sold to the buyer of the projects upon completion. ZHTH was primarily engaged in the business of identifying and procuring solar system projects for resale to third party developers and related services in China. ZHPV’s core business has been to provide EPC services. We have not generated any revenue from our China segment during 2022, 2023 and 2024. We do not have any contracts for any projects in China and we are not engaged in any negotiations with respect to new projects. We cannot assure you that we will generate any revenue from China or that we will not discontinue our China segment. The description of regulations relating to our business in China generally apply if and to the extent that we are engaged in business in China.
________________________
2 IHS Markit; International Energy Agency; GlobalData; mordorintelligence.com; Wikipedia, Solar power by country, April 2023; National Renewable Energy Laboratory; PV Magazine;
BNEF (https://about.bnef,com); Bloomberg (https://www.bloomberg.com)
15
Table of Contents
Our business in China initially consisted primarily of identifying and procuring solar farm system projects for resale to third party developers and related services in China, identifying potential buyers of solar farms, and providing engineering, procuring and construction services, which are referred to in the industry as EPC services, for solar farms and, to a significantly lesser extent, rooftop solar systems in China. Approximately 95% of our China revenue in 2019 was generated from Changzhou Almaden Co., Ltd., which is a related party that we refer to in this annual report as AMD. We have not generated any revenue from AMD since 2019. Substantially all of our China revenues for 2021 and 2020 were generated from projects for SPIC. During 2022, 2023 and 2024 through the date of this annual report, we did not generate revenues in the China segment. For the EPC services in the PRC, we generally provided a one-year quality warranty on our EPC services from the date of completion of the EPC work. See “Business– Agreements with SPIC.”
ZHPV holds a construction enterprise qualification certificate for Level III of general contractor for power engineering constructor issued on December 18, 2022, which permits ZHPV to conduct business as a contractor in power engineering construction. The qualification certificate expires on May 9, 2025. If we are to engage in business in China, we will need to have this permit renewed. The certificate is granted by the local government and enables ZHPV to perform its services throughout China. We engaged local licensed engineering firms to perform the initial design work through a bidding process. When the engineering firm completes its design proposal, we obtained owner approval prior to procurement and construction.
Seasonal weather patterns affect our PRC subsidiaries’ construction of large-scale solar projects. Northern provinces often experience below zero temperatures along with snowstorms which could cause a closure of transportation options along with frozen ground which needs to be cleared for solar equipment, all of which can cause slowdowns in construction and increase our cost. Our EPC contracts were in the southern provinces where cold weather does not have the same effect although the southern provinces may be subject to other adverse weather conditions.
In connection with our acquisition of ZHPV, ZHPV entered into a debt settlement agreement with Uonone Group Co., Ltd. (“Uonone”), one of the former owners of ZHPV. Pursuant to the debt settlement agreement, ZHPV and Uonone agreed to settle a list of pending business transactions entered by them during the period from December 31, 2012 to December 31, 2015. As of December 31, 2023, Uonone has repaid all amounts agreed to under the debt settlement agreement except for a RMB 3.0 million contingent receivable, which does not arise until and unless we become obligated under a contingent liability. The contingent liability is a potential obligation of ZHPV which existed at the time of our acquisition of ZHPV and related to the estimated costs of a project ZHPV had completed, and we cannot estimate whether or when ZHPV may have any obligation under the contract. However, in the event ZHPV becomes liable, it has an offsetting receivable from Uonone. As of the date of this annual report, no claim and no indication of any claim have been made against ZHPV. Additionally, under the debt settlement agreement, to the extent ZHPV receives settlement proceeds on matters that relate to events prior to the acquisition, ZHPV shall repay to Uonone the amount received less taxes, fees and expenses in connection with such settlement. During the year ended December 31, 2023, we received additional legal settlement proceeds of $6.6 million and paid Uonone and expenses on behalf of Uonone $6.9 million. There were no additional proceeds received or payments made during the year ended December 31, 2024.
16
Table of Contents
Agreements with SPIC
We have not generated any revenue from our China operations during 2022, 2023 and 2024 through the date of this annual report. Substantially all of our China revenue for the year ended December 31, 2021 of $7.8 million and for the year ended December 31, 2020, of $96.1 million, was generated from four contracts with SPIC, and included revenue from SPIC and revenue from the sale of power by the project subsidiaries for the projects prior to the transfer of control to SPIC. As of December 31, 2024, we had a net receivable from SPIC in the amount of RMB 24,685,000 ($6.8 million at December 31, 2024), which is net of a reserve of RMB 4.7 million (approximately $659,000) based on an initial arbitration hearing. See Item 3. Legal Proceedings. Although we expect to collect this receivable during 2025, we had previously anticipated that we would collect the receivable in 2024. Although we are negotiating with SPIC for additional projects, we cannot give any assurance that we will be successful in our negotiations or that, if we enter into any agreements with SPIC, such agreements will be profitable to us. The COVID-19 restrictions and the residual effects of the COVID-19 restrictions impaired our ability to obtain payment of the receivable from SPIC and to negotiate contracts with SPIC. Further, China is currently experiencing a decline in tax revenue and other sources of funds, which may affect both SPIC’s payment of the money it owes us and its willingness or ability to enter into new agreements with us.
Source of Supply
Our PRC subsidiaries purchased the equipment for the project from local suppliers pursuant to a bidding process. The construction team remained on site to perform the EPC services, using local licensed subcontractors as needed. The EPC services included continuing negotiations with local government and utility companies to resolve any issues that may occur on-site until the project is fully connected to the grid.
Solar panels and other components are available from a number of suppliers. We did not make any purchases during the years ended December 31, 2024 and 2023 because we did not have any new projects during these periods and through the date of this annual report.
Competition
Within the solar farm industry in China, if we recommence operations in China, we would face increasing competition from other project developers and EPC companies. The solar energy industry is very competitive, consisting of state-owned enterprises and a large number of private companies. Because China’s central government has announced a policy in favor of renewable energy sources, solar companies worldwide seek to develop and expand their business in China. We believe the number of new solar farm installation companies entering the industry in China has increased significantly since 2015 when we commenced business through our PRC subsidiaries in China. This increased competition has caused some price erosion, which affected our margins and, if we negotiate contract in the future, could result in further reductions in our margins as our PRC subsidiaries may reduce prices to generate new business and could impair their ability to enter into EPC agreements with non-related parties. As the interest in solar farms in China increases, there is increased competition for permits, and the government entities that issue the permits may prefer Chinese companies over companies that are owned by a United State company. Further trade relations between China and the United States may affect our ability to generate business in China. Since our only customer in China since 2019 was SPIC, if we seek additional contracts with SPIC, our PRC subsidiaries would be dependent upon SPIC’s policies in engaging contractors for the development of solar farm projects. Since SPIC is state-owned enterprise, our procurement policies may be subject to government policies which may favor a Chinese company rather than a subsidiary of a United States company.
Government Subsidies
The solar investment and the development of the solar industry in China depend on continued government subsidies. Government policies have, and will continue to have, a significant impact on the solar industry in general. Government agencies set the rates that the utility company pays the solar farm owner. In general, the rate set at the beginning of the contract period remains the same during the period, although there is a risk that the rate will be changed. The rate varies from province to province. The government has announced that there will be a yearly decrease in the payment. After 2016, all the solar projects in China are required to be involved with the local government to help alleviate poverty in the region. In addition, solar farm construction needs to be integrated with local agriculture, tourism or animal husbandry, which leads to increases in the cost of our EPC services.
PRC Government Regulations
Renewable Energy Law and Other Government Directive
The Renewable Energy Law of PRC, which originally became effective on January 1, 2006 and was amended on December 26, 2009, sets forth policies to encourage the development and on-grid application of renewable energy, including solar energy. Renewable energy under this law refers to non-fossil fuel energy, including wind energy, solar energy, water energy, biomass energy, geothermal energy, ocean energy and other forms of renewable energy. The law also sets forth a national policy to encourage the installation and use of solar energy water heating systems, solar energy heating and cooling systems, photovoltaic systems and other systems that use solar energy. It also provides economic incentives, such as the establishment of national funding, preferential loans provided by financial institutions with financial interest subsidies to certain renewable energy development and utilization projects, and tax preferential treatment for the development of certain renewable energy projects.
17
Table of Contents
The PRC Energy Conservation Law, which was amended on October 28, 2007, July 2, 2016 and October 26, 2018, encourages utilization of energy-saving building materials like new wall materials and energy-saving equipment, and encourage the installation and application of renewable energy use systems such as solar energy. The law also encourages and supports the vigorous development of methane in rural areas, promotes the utilization of renewable energy resources such as biomass energy, solar energy and wind power, develops small-scale hydropower generation based on the principles of scientific planning and orderly development, promotes energy-saving-type rural houses and furnaces, encourages the utilization of non-cultivated lands for energy plants, and energetically develops energy forests such as firewood forests.
On September 4, 2006, the Ministry of Finance, or MOF, and Ministry of Construction jointly promulgated the Interim Measures for Administration of Special Funds for Application of Renewable Energy in Building Construction, pursuant to which the MOF will arrange special funds to support the application of Building Integrated Photovoltaics systems, or BIPV applications, to enhance building energy efficiency, protect the environment and reduce consumption of fossil fuel energy. Under these measures, applications to provide hot water supply, refrigeration, heating and lighting are eligible for such special funds.
On October 10, 2010, the State Council of the PRC promulgated a decision to accelerate the development of seven strategic new industries. Pursuant to this decision, the PRC government will promote the popularization and application of solar thermal technologies by increasing tax and financial policy support, encouraging investment and providing other forms of beneficial support.
In March 2011, the National People’s Congress approved the Outline of the Twelfth Five-Year Plan for National Economic and Social Development of the PRC, which includes a national commitment to promoting the development of renewable energy and enhancing the competitiveness of the renewable energy industry. Accordingly, in January 2012, the Ministry of Industry and Information Technology and the Ministry of Science and Technology respectively promulgated the Twelfth Five-Year Special Plans Regarding the New Materials Industry and the High-tech Industrialization to support the development of the PRC solar power industry.
On March 8, 2011, the MOF and the Ministry of Housing and Urban-Rural Development jointly promulgated the Circular on Further Application of Renewable Energy in Building Construction to increase the utilization of renewable energy in buildings.
On March 27, 2011, the NDRC promulgated the revised Guideline Catalogue for Industrial Restructuring which categorizes the solar power industry as an encouraged item. This Guideline Catalogue was revised on February 16, 2013 (effective on May 1, 2013), on October 30, 2019 (effective on January 1, 2020), and on December 27, 2023 (effective on February 1, 2024). The solar power industry is still categorized as an encouraged item.
In March 2016, the National People’s Congress approved the Outline of the Thirteenth Five-Year Plan for National Economic and Social Development of the PRC, which mentions a national commitment to continuing to support the development of PV generation industry.
On February 14, 2019, the NDRC issued the Green Industry Guidance Catalogue (2019 Edition) to include solar power equipment manufacturing into the green industry guidance catalogue, to further encourage the development of solar industry.
On January 20, 2020, the NEA, the NDRC, and the Ministry of Finance jointly issued Opinions on Promoting the Healthy Development of Non-hydroelectric Renewable Energy Power Generation, aiming at (i) improving the current subsidy method, (ii) improving market allocation of resources and subsidy decline mechanism, and (iii) optimizing subsidy redemption process.
On March 5, 2020, the NEA issued Notice on Matters Related to the Construction of Wind Power and Photovoltaic Power Generation Projects in 2020, in order to adjust and improve the specific plans for the construction and management of wind power and photovoltaic power generation projects.
On September 29, 2020, the NDRC, the NEA and the MOF jointly issued Supplementary Notice on Matters Relating to Several Opinions on Promoting the Sound Development of Non-Hydro-Renewable Energy Power Generation, in order to further clarify relevant policies of additional subsidy funds for renewable energy electricity prices and stabilize industry expectations.
18
Table of Contents
On February 2, 2021, the State Council issued Guiding Opinions on Accelerating the Establishment and Improvement of the Green and Low-Carbon Circular Development Economic System, in order to accelerate the establishment of a robust economic system of green and low-carbon circular development.
On February 24, 2021, the NDRC, the MOF, the People’s Bank of China, the China Banking and Insurance Regulatory Commission and the NEA issued Notice on Guiding to Increase Financial Support to Promote the Healthy and Orderly Development of Wind Power and Photovoltaic Power Generation Industries, in order to help solving the problems of renewable energy companies such as tight cash flow and difficulties in production and operation.
On January 30, 2022, the NDRC and NEA jointly released the Opinions on Improving Institutional Mechanisms and Measures for Green and Low-carbon Energy Transition. The Opinions systematically propose institutional mechanisms and measures to support the green and low-carbon transformation of the energy supply side, request to promote the construction of clean, low-carbon energy as the main energy supply system and to promote the construction of energy infrastructure to adapt to the green and low-carbon transition.
On March 17, 2022, the NEA released the Guidance on Energy Work in 2022, one of the primary targets of this Guidance was to increase the share of non-fossil fuels in primary energy consumption to around 17.3% in 2022 and increase the share of wind and solar power in total power consumption to around 12.2%.
Laws and Regulations Concerning the Electric Power Industry
The regulatory framework of the PRC power industry consists primarily of the Electric Power Law of the PRC, which became effective on April 1, 1996, and was most recently amended on December 29, 2018, and the Electric Power Regulatory Ordinance, which became effective on May 1, 2005. One of the stated purposes of the Electric Power Law is to protect the legitimate interests of investors, operators and users and to ensure the safety of power operations. According to the Electric Power Law, the PRC government encourages PRC and foreign investment in the power industry. The Electric Power Regulatory Ordinance sets forth regulatory requirements for many aspects of the power industry, including, among others, the issuance of electric power business permits, the regulatory inspections of power generators and grid companies and the legal liabilities for violations of the regulatory requirements.
Electric Power Business Permit
On January 5, 2006, the NDRC promulgated the Administrative Provisions on Renewable Energy Power Generation which set forth specific measures for setting the price of electricity generated from renewable energy sources, including solar, and for allocating the costs associated with renewable power generation. The Administrative Provisions on Renewable Energy Power Generation also delegate administrative and supervisory authority among government agencies at the national and provincial levels and assign partial responsibility to electricity grid companies and power generation companies for implementing the Renewable Energy Law.
Pursuant to the Provisions on the Administration of the Electric Power Business Permit, which were issued by the State Electricity Regulatory Commission, known as SERC, and became effective on December 1, 2005 (subsequently revised on May 30, 2015), unless otherwise provided by the SERC, no company or individual in the PRC may engage in any aspect of electric power business (including power generation, transmission, dispatch and sales) without first obtaining an electric power business permit from the SERC. These provisions also require that if an applicant seeks an electric power business permit to engage in power generation, it must also obtain in advance all relevant government approvals for the project including construction, generation capacity and environmental compliance.
However, there are exceptions pursuant to which certain of our photovoltaic power generation projects may not need to obtain an electric power business permit from the SERC. On July 18, 2013, the NDRC issued the Interim Measures for the Administration of Distributed PV Power Generation, which waived the previous requirement to obtain an Electric Power Business Permit for distributed generation projects. On April 9, 2014, the NEA issued the Circular on Clarifying Issues concerning the Administration of Electric Power Business Permit, which was replaced by Circular on Improving the Administration of Electric Power Business Permit by Implementing the Inspiration of the Reforms on Administration, Delegate Powers, and Services issued by NEA on March 23, 2020, which waived requirement to obtain an Electric Power Business Permit for those solar power generation projects with installed capacity less than 6MW and any distributed generation projects approved by or filed with the NDRC or its local branches, and required the local NEA to simplify the Electric Power Business Permit application procedure for the solar power generation companies.
19
Table of Contents
Grid Connection and Dispatchment
All electric power generated in China is distributed through power grids, except for electric power generated by facilities not connected to a grid. The distribution of power to each grid is administered by dispatch centers, which administer and dispatch planned output by power plants connected to the grid. The Regulations on the Administration of Electric Power Dispatch to Networks and Grids, promulgated by the State Council and the former Ministry of Electric Power Industry, effective on November 1, 1993, as amended on January 8, 2011, and its implementation measures, regulate the operation of dispatch centers.
Feed-in Tariff (FIT) Payments
The Renewable Energy Law of the PRC, as amended on December 26, 2009 and effective on April 1, 2010, sets forth policies to encourage the development and utilization of solar power and other renewable energy. The Renewable Energy Law authorizes the relevant pricing authorities to set favorable prices for electricity generated from solar and other renewable energy sources.
The NDRC further issued the Circular on Promoting the Healthy Development of PV Industry by Price Leverage on August 26, 2013, or the 2013 Circular. Under this circular, the feed-in tariff ("FIT”) (including VAT) for solar power projects approved or filed after September 1, 2013 or beginning operation after January 1, 2014 would be RMB0.90 per kilowatt hour ("kWh”), RMB0.95 per kWh or RMB1.00 per kWh, depending on the locations of the projects (excluding on-grid solar power projects located in Tibet).
In addition, the 2013 Circular sets forth special rules that entitle distributed generation projects (excluding the projects that have received an investment subsidy from the central budget) to a national subsidy of RMB0.42 per kWh. According to the Circular on Further Implementing Polices Relating to Distributed Generation issued by the NEA on September 2, 2014 and the Circular on Implementation Plans of PV Generation Construction for 2015 issued by the NEA on March 16, 2015, rooftop distributed generation projects that sell electricity directly to consumers or to both consumers and grid enterprises receive a national subsidy of RMB0.42 per kWh plus the local desulphurized coal benchmark electricity price for the electricity sold to the State Grid or a negotiated electricity purchase price for electricity sold directly to consumers. Ground-mounted projects and rooftop distributed generation projects which sell all electricity to grid enterprises are entitled to the FIT of RMB0.90 per kWh, RMB0.95 per kWh or RMB1.00 per kWh, depending on where the project is located (excluding on-grid solar power projects located in Tibet).
On December 22, 2015, the NDRC issued the Circular on Improving the Policies on the On-grid Tariffs of Onshore Wind Power Generation and PV Generation, effective on January 1, 2016, which provides that ground mounted projects, as well as rooftop distributed generation projects that sell all electricity generated to the local grid companies, are entitled to FIT of RMB0.80 per kWh, RMB0.88 per kWh or RMB0.98 per kWh, depending on where the project is located (excluding on grid solar power projects located in Tibet), provided that these projects are filed after January 1, 2016 and fall within the regional scale index of the year, or these projects are filed prior to January 1, 2016 and fall within regional scale index of the year, but do not commence operations prior to June 30, 2016.
The difference between the FIT for solar power projects and the desulphurized coal benchmark electricity price, or the subsidies paid to distributed generation projects, are funded by the renewable energy development funds. The above FIT and subsidy policies are valid for 20 years for each power generation project since its formal operation, in principle.
On December 30, 2016, the MIIT, NDRC, the Ministry of Science and Technology and MOF jointly promulgated the Development Guide Regarding the New Materials Industry to support and provide details for the development of the PRC solar power industry.
On February 10, 2017, the NEA promulgated the Circular on Printing and Distributing the Guidance on Energy Work in 2017, which promotes the construction of PV and thermal power projects. According to this circular, the PRC government planned to add the new construction scale of 20 million kilowatts and the new installed capacity of 18 million kilowatts in 2017. Although it is the PRC government’s policy to encourage such construction, it is not clear what specific targets have been fulfilled.
On May 31, 2018, the NEA, Ministry of Finance and NDRC of the PRC jointly promulgated a Notice regarding the Matters of Photovoltaic Power Generation in 2018 ("2018 PV Power Generation Notice”). The 2018 PV Power Generation Notice set forth new policies on general and distributed PV power stations. For example, based on the industry practice, no scale for the construction of general photovoltaic power station will be arranged in 2018. Before the issuance of any new rules in respect of the construction of general photovoltaic power stations, no national government subsidies were provided to general photovoltaic power station. There will be a scale of 10 gigawatts for the construction of distributed photovoltaic power station. In general, the feed-in tariff for general photovoltaic power stations will be reduced by RMB 0.05 per kWh.
20
Table of Contents
On April 28, 2019, the NDRC issued a Notice Regarding Issues of Improvement on Mechanism for Grid Price of Photovoltaic Power Generation, effective on July 1, 2019. The benchmark solar PV tariff has been changed into guiding solar PV tariff. For utility-scale solar PV projects that fully feed electricity into grids after July 1, 2019, the FIT will be RMB 0.4 per kWh, RMB 0.45 per kWh, or RMB 0.55 per kWh depending on where the project is located. Commercial and industrial distributed PV that deliver 100% of output to the grid will apply utility-scale PV FITs, others can receive a subsidy of RMB 0.1/kWh.
On January 7, 2019, NDRC and the NEA jointly promulgated the Circular on Actively Promoting Subsidy-free Grid Price Parity for Wind Power and PV Power, which set forth several measures regarding project organization, construction, operation and supervision to promote PV power generation power projects with grid price equivalent to or below the benchmark grid price of coal-fired power units.
On March 31, 2020, NDRC issued Notice Regarding Issues of Grid Price of Photovoltaic Power Generation in 2020, effective on June 1, 2020, pursuant to which the guidance price of the new centralized photovoltaic power station in the I~III resource area, which will be included in the scope of state financial subsidy, is 0.35 per kWh (including tax, the same below), RMB 0.4 per kWh and RMB 0.49 per kWh, respectively. In principle, the feed-in electricity price of the new centralized photovoltaic power station shall be determined by means of market competition and shall not exceed the guidance price in the resource area where it is located. The Circular also makes it clear that commercial and industrial distributed PV that deliver 100% of output to the grid will apply utility-scale PV FITs, others can receive a subsidy of RMB 0.05/kWh.
On June 7, 2021, NDRC issued Notice Regarding Issues of Grid Price of New Energy Generation in 2021, effective on August 1, 2021, pursuant to which no subsidy will be provided to the new centralized photovoltaic power station and distributed PV project and onshore wind power project from central government budget in 2021 and achieve grid parity.
We have been advised by AllBright Law Offices, our PRC counsel, that, based on their review of our operations material provided by us and their review of PRC laws and regulations, our operations in the PRC, as presently conducted, based on our approved qualifications, comply in all material respects with applicable PRC laws and regulations.
Subsidy Catalog
On November 29, 2011, the MOF, NDRC and NEA jointly issued the Interim Measures for the Administration of Levy and Use of Renewable Energy Development Fund, which provides that development funds for renewable energy include designated funds arranged by the public budget of national finance, and renewable energy tariff surcharge collected from electricity consumers. Solar power projects can only receive government subsidies after completing certain administrative and perfunctory procedures with the relevant authorities of finance, price and energy to be listed in the Subsidy Catalog issued by the MOF, NDRC and NEA. These subsidies represent the difference between the FIT for solar power projects and the desulphurized coal benchmark electricity price. In January 2016, the NEA announced that there would be a nation-wide inspection on all solar power projects in operation and under construction, and that fall within the regional scale index of the year would be included in and managed via the Platform for Renewable Energy Power Generation Projects for the purpose of government subsidies application and payment.
In order to be listed in the Subsidy Catalog, ground-mounted projects submit applications to the relevant provincial authorities; and in accordance with the Circular on Issues Concerning Implementing Electric Quantity-based Subsidy Policy for Distributed Generation Projects issued by the MOF on July 24, 2013, rooftop distributed generation projects submit applications to the grid enterprises in the area where the projects are located. After preliminary review of the applications, the provincial authorities will jointly report to the MOF, NDRC and NEA, and the MOF, NDRC and NEA has final review of such applications to decide whether to list in the Subsidy Catalog.
Development Funds of Renewable Energy
The Renewable Energy Law provides financial incentives, including national funding for the development of renewable energy projects.
21
Table of Contents
Pursuant to the Interim Measures for the Administration of Designated Funds for the Development of Clean Energy issued by the MOF and effective on June 12, 2020, the MOF sets up designated funds to support the development and utilization of clean energy in accordance with the national fiscal budget.
According to the Implementing Measures for the Administration of Price of Renewable Energy and Cost Sharing Program and the Interim Measures for Adjustment to Additional On-grid Tariff for Renewable Energy issued by the NDRC, the gap between the FIT for solar power projects and the desulphurized coal benchmark electricity price is subsidized by collecting tariff surcharge from the electricity consumers within the service coverage of grid enterprises at or above provincial level.
Mandatory Purchase of Renewable Energy
The Renewable Energy Law, which was most recently revised by the Standing Committee of the NPC on December 26, 2009, imposes mandatory obligations on grid enterprises to purchase the full amount of on-grid electricity generated by approved renewable energy plants whose power generation projects meet the grid connection technical standards in the areas covered by the grid enterprises’ power grids. Grid enterprises must improve the power grid construction in order to better absorb electricity generated from renewable energy.
Pursuant to the Measures for the Supervision and the Administration of Purchase of Full Amount of Renewable Energy by Grid Companies issued by the SERC in July 2007, the SERC and its local branches supervise the purchase of the full amount of renewable energy by the grid enterprises. If the grid enterprises do not purchase the full volume of the electricity generated from the renewable energy due to the circumstances such as force majeure or any other circumstance endangering the safety and stability of the power grids, the grid enterprises must promptly notify the renewable energy power generation companies of the details in writing and also submit detailed facts to the competent local branches of the SERC.
The Several Opinions on Promoting the Healthy Development of PV Industry also requires the grid enterprises to ensure PV power generation projects’ timely connection to the power grid and purchase the full amount of electricity generated by the PV power generation projects.
On March 20, 2015, the NDRC and NEA issued the Guidance Opinion on Improvement of Electric Power Operation and Adjustment and Promotion of Full Utilization of Clean Energy that emphasizes that the competent provincial authorities must strengthen the implementation of the provisions with regard to the purchase of the full amount of electricity generated by renewable energy and avoid any curtailment of solar power projects. In addition, it also stated that electricity generated by clean energy is encouraged to be sold directly to the consumers in the regions where there is an ample supply of clean energy, and the relevant parities must coordinate the trans-provincial supply of electricity and power transmission capability, in order to maximize the utilization of clean energy. Local governments also announced their intentions to efficiently implement the system regarding the purchase of the full amount of renewable energy, such as the Inner Mongolian Autonomous Government.
On March 24, 2016, the NDRC issued the Measures for the Administration of Guaranteed Purchase of Full Amount of Renewable Energy, to strengthen the administration of, and provide details for, the implementation of the purchase of the full amount of renewable energy by the grid enterprises.
On May 10, 2019, NDRC and NEA jointly released Notice on Establishing a Mandatory Renewable Electricity Consumption Mechanism, pursuant to which, the government will set renewable electricity consumption quotas in electricity power consumption. The renewable consumption quotas will be determined at the provincial level and the provincial energy administrations will lead the implementation process.
Environmental Protection
The construction processes of the solar power projects may generate noise, waste water, gaseous emissions and other industrial wastes. Therefore, we are subject to a variety of government regulations related to the storage, use and disposal of hazardous materials and to the protection of the environment of the community. The major environmental regulations applicable to our business activities in the PRC include the Environmental Protection Law of the PRC, the Law on the Prevention and Control of Noise Pollution, the Law on the Prevention and Control of Air Pollution, the Law on the Prevention and Control of Water Pollution, the Law on the Prevention and Control of Solid Waste Pollution, the Environmental Impact Evaluation of Law, and the Regulations on the Administration of Environmental Protection in Construction Projects.
22
Table of Contents
Foreign Investment in Solar Power Business
The principal regulation governing foreign ownership of solar power businesses in the PRC was the Foreign Investment Industrial Guidance Catalog. Under the most recent catalog, which was amended in 2017 and effective on July 28, 2017, the construction and operation of new energy power stations (including solar power, wind power, etc.) is classified as an "encouraged foreign investment.” Foreign-invested enterprises in the encouraged foreign investment industry might be entitled to certain preferential treatment, such as exemption from tariffs on equipment imported for their operations, after obtaining approval from the PRC government authorities.
On March 15, 2019, the National People’s Congress adopted the Foreign Investment Law, or new FIL which became effective on January 1, 2020, and replaced the previous fragmented foreign investment regime: three separate foreign investment laws previously enacted, which are the Wholly Foreign-Owned Enterprises Law, the Chinese-Foreign Equity Joint Ventures Law, and the Chinese-Foreign Contractual Joint Ventures Law. On December 26, 2019, State Counsel of PRC issued Regulation on the Implementation of the Foreign Investment Law of PRC, or Implementation of new FIL, effective on January 1, 2020. The new FIL sets forth a few definitions and guiding principles vis-à-vis foreign investment. It defines "foreign investors” as any "natural person, enterprise, or other organization of a foreign country” and "foreign-invested enterprises” as any enterprise established under Chinese law that is wholly or partially invested by foreign investors. The new FIL further defines "foreign investment” as any foreign investor’s direct or indirect investment in mainland China, including (a) establishing FIEs either individually or jointly with other investors; (b) acquiring shares, equity, property shares, other similar rights and interests in Chinese domestic enterprises; (c) investing in new projects either individually or jointly with other investors; and (d) making investments through other means provided by laws, administrative regulations, or the State Council. In addition, pursuant to Foreign Investment Law, the existing foreign invested enterprises established prior to the effective date of the Foreign Investment Law may keep their corporate organization forms within five years after the effective date of the Foreign Investment Law before such existing foreign invested enterprise change their organization forms, organization structures, and their activities of foreign-invested enterprises in accordance with the PRC Company Law, the Partnership Enterprise Law and other laws. PRC Company Law was adopted by Standing Committee of the People’s Congress on December 29, 1993 and recently amended on December 29, 2023, to be effective on July 1, 2024. The new amendment of PRC Company law requires registered capital subscribed for by all the shareholders shall, according to the articles of association, be fully paid up by the shareholders within 5 years as of the date of establishment. The government authorities are working on rules for transition period regarding the existing companies. According to State Administration for Market Regulation Announcement on Seeking Public Comments for the Provisions of the State Council on Implementation of the Registration Administration System for Registered Capital under the PRC Company Law (Draft for Comment), there will be a three-year transitional period from July 1, 2024 to June 30, 2027, and for limited liability company established before the effectiveness of the PRC Company Law, if the remaining term of capital contribution is less than five years as of July 1, 2027, the term of capital contribution is not required to be adjusted; if the remaining term of capital contribution exceeds five years, the remaining term of capital contribution shall be adjusted to be within five years during the transitional period. The new FIL also reaffirms that the State supports the policy of opening up and encourages foreign investment made by foreign investors in mainland China and implements policies in high level freedom and convenience in investment to build a market environment of stability, transparency, predictability, and fair competition. In addition, the State established pre-establishment national treatment plus negative list. National treatment means foreign investment will be treated no less favorably than domestic investment during the investment access stage unless otherwise stipulated under negative list which impose special administrative measures in foreign investment access. The negative list will be approved or published by the State Council. The new FIL also sets out a list of policy measures for promoting foreign investment, such as equal treatment of foreign and domestic with respect to the application of business development policies, formulation of standards and application of compulsory standards, and government procurement. Furthermore, the new FIL lists protective measures and regulating provisions foreign investment. For example, in general foreign investors’ investments are not subject to governmental expropriation; forced technology transfer by administrative measures will be prohibited; the laws including the Company Law and the Partnership Enterprise will govern FIEs’ organizational forms, institutional frameworks and standard of conduct. The new FIL sets forth certain legal responsibilities. For example, if a foreign investor invests in a prohibited industry, it will be ordered to cease investment activities, restore the conditions that existed prior to the activities by, for instance, disposing of its shares or assets, and forfeiting any illegal proceeds. If a foreign investor investing in a restricted industry violates the conditions specified by the negative list, it will be ordered to make corrections to satisfy the conditions within a certain period. As a matching regulation to new FIL, the regulation highlights the promotion and protection of foreign investment and details measures to ensure the effective implementation of new FIL.
On June 23, 2020, the NDRC and the MOFCOM jointly issued the Special Administrative Measures for the Access of Foreign Investment (2020 Edition) (the "Negative List”), which came into force on July 23, 2019. In December 2021, the MOFCOM and the NDRC promulgated the Special Administrative Measures for Foreign Investment Access (2021 Version) , which became effective on January 1, 2022. The 2021 version of the Negative list replaced the 2020 version of the Negative list. "Negative list” means a special administrative measure for access of foreign investment in specific fields as imposed by the PRC. Foreign investors are not allowed to invest in the forbidden investment as specified in the negative list. Foreign investors must comply with the special equity management requirements, senior management requirements and other restrictive access special management measures when making investments in the restricted investments as specified in the negative list. The Negative List provides that sectors that are not specified in the Negative List shall be subject to administration under the principle of treating domestic investments and foreign investments equally. The NDRC and the MOFCOM jointly also issued the Industrial Catalogue to Encourage Foreign Investment, or the Encourage Catalogue, which sets forth the industries and economic activities that foreign investment in China is encouraged to be engaged in. According to the Encouraged Catalogue amended on June 30, 2019 and subsequently amended on October 26, 2022, which became effective on January 1, 2023, the construction and operation of new energy power stations (including solar power, wind power, etc.) is within the scope of industries that encourage foreign investment.
23
Table of Contents
Work Safety
The Work Safety Law of the PRC, which became effective on November 1, 2002 and was amended on August 31, 2014 and June 10, 2021 is the principal law governing the supervision and administration of work safety for solar power projects. In accordance with the Measures for the Supervision and the Administration of Work Safety of Electricity Industry promulgated by the NDRC, which became effective on March 1, 2015, power plants are responsible for maintaining their safety operations in accordance with the relevant laws, regulations, rules and standards regarding the work safety. The NEA and its local branches supervise and administer the work safety of electricity industry at the national and local level. On April 20, 2015, the NEA and the State Administration of Work Safety jointly promulgated the Circular on Standardizing Safe Production Process for PV Generation Enterprises, which detailed the standards of production process for PV generation enterprises for work safety purpose.
Labor Laws and Social Insurance
Pursuant to the PRC Labor Law, which first took effect on January 1, 1995 and was most recently amended on December 29, 2018 (also the effective date), a written labor contract is required when an employment relationship is established between an employer and an employee. On June 29, 2007, the Standing Committee of the National People’s Congress, or the SCNPC, promulgated the Labor Contract Law, as amended on December 28, 2012 (effective as of July 1, 2013), which formalizes employees’ rights concerning employment contracts, overtime hours, layoffs and the role of trade unions and provides for specific standards and procedures for the termination of an employment contract. In addition, the Labor Contract Law requires the payment of a statutory severance payment upon the termination of an employment contract in most cases, including in cases of the expiration of a fixed-term employment contract. In addition, under the Regulations on Paid Annual Leave for Employees and its implementation rules, which became effective on January 1, 2008 and on September 18, 2008 respectively, employees are entitled to a paid vacation ranging from 5 to 15 days, depending on their length of service and to enjoy compensation of three times their regular salaries for each such vacation day in case such vacation days are deprived by employers, unless the employees waive such vacation days in writing. Although we are currently in compliance with the relevant legal requirements for terminating employment contracts with employees in our business operation, in the event that we decide to lay off a large number of employees or otherwise change its employment or labor practices, provisions of the Labor Contract Law may limit its ability to effect these changes in a manner that we believe to be cost-effective or desirable, which could adversely affect our business and results of operations.
Enterprises in China are required by PRC laws and regulations to participate in certain employee benefit plans, including social insurance funds, namely a pension plan, a medical insurance plan, an unemployment insurance plan, a work-related injury insurance plan, a maternity insurance plan and a housing provident fund, and contribute to the plans or funds in amounts equal to certain percentages of salaries, including bonuses and allowances, of the employees as specified by the local government from time to time at locations where they operate their businesses or where they are located. According to the Social Insurance Law, without force majeure reasons, employers must not suspend or reduce their payment of social insurance for employees, otherwise the employer may be ordered to pay the required contributions within a stipulated deadline and be subject to a late fee of 0.05% of the amount overdue per day from the original due date by the relevant authority. If the employer still fails to rectify the failure to make social insurance contributions within such stipulated deadline, it may be subject to a fine ranging from one to three times the amount overdue. According to Regulations on Management of Housing Fund, employers must not suspend or reduce the payment of house provident funds for their employees. Under the circumstances where financial difficulties do exist due to which an employer is unable to pay or pay up house provident funds, permission of labor union of the employer and approval of the local house provident funds commission must first be obtained before the employer can suspend or reduce their payment of house provident funds. An enterprise that fails to make housing fund contributions may be ordered to rectify the noncompliance and pay the required contributions within a stipulated deadline; otherwise, a fine of over RMB 10,000 and up to RMB 50,000 may be imposed on the employer, and an application may be made to a local court for compulsory enforcement.
24
Table of Contents
Taxation
PRC Enterprise Income Tax
The PRC enterprise income tax is calculated based on the taxable income determined under PRC laws and accounting standards. On March 16, 2007, the National People’s Congress of China enacted a new PRC Enterprise Income Tax Law, which became effective on January 1, 2008 and was later amended on February 24, 2017 and December 29, 2018. On December 6, 2007, the State Council promulgated the Implementation Rules to the PRC Enterprise Income Tax Law, or the Implementation Rules, which also became effective on January 1, 2008 and was later amended on April 23, 2019 and December 6, 2024 . On December 26, 2007, the State Council issued the Notice on Implementation of Enterprise Income Tax Transition Preferential Policy under the PRC Enterprise Income Tax Law, or the Transition Preferential Policy Circular, which became effective simultaneously with the PRC Enterprise Income Tax Law. The PRC Enterprise Income Tax Law imposes a uniform enterprise income tax rate of 25% on all domestic enterprises, including foreign-invested enterprises unless they qualify for certain exceptions, and terminates most of the tax exemptions, reductions and preferential treatments available under previous tax laws and regulations.
Moreover, under the PRC Enterprise Income Tax Law, enterprises organized under the laws of jurisdictions outside China with their "de facto management bodies” located within China may be considered PRC resident enterprises and therefore subject to PRC enterprise income tax at the rate of 25% on their worldwide income. The Implementation Rules define the term "de facto management body” as the management body that exercises full and substantial control and overall management over the business, productions, personnel, accounts and properties of an enterprise. In addition, the Circular Related to Relevant Issues on the Identification of a Chinese holding Company Incorporated Overseas as a Residential Enterprise under the Criterion of De Facto Management Bodies Recognizing issued by the State Administration of Taxation (Circular 82) promulgated by the State Administration of Taxation on April 22, 2009 provides that a foreign enterprise controlled by a PRC company or a PRC company group will be classified as a "resident enterprise” with its "de facto management bodies” located within China if the following requirements are satisfied: (i) the senior management and core management departments in charge of its daily operations function mainly in China; (ii) its financial and human resources decisions are subject to determination or approval by persons or bodies in China; (iii) its major assets, accounting books, company seals and minutes and files of its board and shareholders’ meetings are located or kept in China; and (iv) at least half of the enterprise’s directors or senior management with voting rights reside in China. Although the circular only applies to offshore enterprises controlled by PRC enterprises and not those controlled by PRC individuals or foreigners, the determining criteria set forth in the circular may reflect the State Administration of Taxation’s general position on how the "de facto management body” test should be applied in determining the tax resident status of offshore enterprises, regardless of whether they are controlled by PRC enterprises, individuals or foreigners.
PRC VAT and Business Tax
Pursuant to the Interim Regulation of the People’s Republic of China on Value-Added Tax (the "VAT Regulation”), which was amended on November 10, 2008, February 6, 2016 and November 19, 2017 and its implementation rules, any entity or individual engaged in the sales of goods, provision of specified services and importation of goods into China is generally required to pay a VAT, at the rate of 17% of the gross sales proceeds received, less any deductible VAT already paid or borne by such entity.
Pursuant to the PRC Provisional Regulations on Business Tax, which was eliminated on November 9, 2017, taxpayers falling under the category of service industry in China are required to pay a business tax at a normal tax rate of 5% of their revenues. In November 2011, the MOF and the State Administration of Taxation promulgated the Pilot Plan for Imposition of Value-Added Tax to Replace Business Tax. Pursuant to this plan and relevant notices, from January 1, 2012, the value-added tax has been imposed to replace the business tax in the transport and shipping industry and some of the modern service industries in certain pilot regions, of which Shanghai is the first one. A VAT rate of 6% applies to revenue derived from the provision of some modern services.
On December 12, 2013, the MOF and SAT issued Notice of the Ministry of Finance and the State Administration of Taxation on Including the Railway Transportation and Postal Industries in the Pilot Program of Replacing Business Tax with Value-Added Tax (2013 Amendment), which was most recently amended in May 2016, along with Pilot Implemental Rules of Replacing Business Tax with VAT, which was effective on January 1, 2014 and was most recently revised on March 23, 2016 ("Pilot Rules”). Pursuant to the Pilot Rules, the entity and individual who provide service in transportation, postal and other modern service industrial shall be obligated to pay VAT. Taxpayers who provide taxable service shall pay VAT instead of the Business Tax. The tax rate for provision of modern service industry (exclusive of leasing of tangible chattel) is 6%.
In March 2016, the MOF and the SAT jointly issued the Circular on the Pilot Program for Overall Implementation of the Collection of Value Added Tax Instead of Business Tax, or Circular 36, which took effect in May 2016. Pursuant to the Circular 36, all of the companies operating in construction, real estate, finance, modern service or other sectors which were required to pay business tax are required to pay VAT, in lieu of business tax. In November 2017, PRC State Counsel issued the amendment to Interim Regulations of PRC Value Added Taxes, or the VAT Regulation, pursuant to which entities and individuals that sell goods or labor services of processing, repair or replacement, sell services, intangible assets, or immovables, or import goods within the territory of the PRC are taxpayers of VAT, and shall pay VAT. The tax rate for VAT shall be, among others, (1) 17% for taxpayers engaged in sale of goods, services, lease of tangible movables or importation of goods, unless otherwise stipulated in VAT Regulation; (2) 11% for taxpayers engaged in sale of transportation, postal, basic telecommunications, construction, lease of immovables, sale of immovable, transfer of land use rights, sale or importation of certain types of goods; (3) 6% for taxpayers engaged in sale of services and intangible assets, unless otherwise stipulated in VAT Regulation. Pursuant to the Circular of the Ministry of Finance and the State Administration of Taxation on Adjusting Value-added Tax Rates promulgated on April 4, 2018 and effective on May 1, 2018, by the Ministry of Finance and State Administration of Taxation, where a taxpayer engages in a taxable sales activity for the value-added tax purpose or imports goods, the previous applicable 17% and 11% tax rates are adjusted to 16% and 10%, respectively. Pursuant to Announcement on Policies for Deepening the VAT Reform issued by the PRC Ministry of Finance, PRC State Taxation Administration and the General Administration of Customs on May 20, 2019 and effective on April 1, 2019, the previous rate of 16% or 10% are adjusted to be 13% or 9%, respectively, for taxpayer’s general sale activities or imports.
25
Table of Contents
Dividend Withholding Tax
Pursuant to the PRC Enterprise Income Tax Law and the Implementation Rules, dividends generated after January 1, 2008 and payable by a foreign-invested enterprise in China to its foreign investors are subject to a 10% withholding tax, unless any such foreign investor’s jurisdiction of incorporation has a tax treaty with China that provides for a different withholding arrangement.
Foreign Currency Exchange
Foreign currency exchange regulation in the PRC is primarily governed by the Regulations on the Administration of Foreign Exchange, most recently revised by the State Council on August 5, 2008, Notice on Further Simplifying and Improving Policies of Foreign Exchange Administration Regarding Direct Investment issued by SAFE on February 13, 2015, and the Provisions on the Administration of Settlement, Sale and Payment of Foreign Exchange promulgated by People’s Bank of China on June 20, 1996. Currently, RMB is convertible for current account items, including the distribution of dividends, interest payments, trade and service related foreign exchange transactions. Conversion of RMB for most capital account items, such as direct investment, security investment and repatriation of investment, however, is still subject to registration with the SAFE. Foreign-invested enterprises may buy, sell and remit foreign currencies at financial institutions engaged in foreign currency settlement and sale after providing valid commercial documents and, in the case of most capital account item transactions, obtaining approval from the SAFE. Capital investments by foreign enterprises are also subject to limitations, which include approvals by the NDRC, the Ministry of Construction, and registration with the SAFE.
In August 2008, the SAFE issued the Circular on the Relevant Operating Issues Concerning the Improvement of the Administration of Payment and Settlement of Foreign Currency Capital of Foreign-Invested Enterprises, or the SAFE Circular No. 142, regulating the conversion by a foreign invested enterprise of foreign currency-registered capital into RMB by restricting how the converted RMB may be used. Pursuant to the SAFE Circular No. 142, the RMB capital converted from foreign currency registered capital of a foreign-invested enterprise may only be used for purposes within the business scope approved by the applicable government authority and may not be used for equity investments within the PRC. In addition, the SAFE strengthened its oversight of the flow and use of the RMB capital converted from foreign currency registered capital of foreign-invested enterprises. The use of such RMB capital may not be changed without the SAFE’s approval, and such RMB capital may not in any case be used to repay RMB-denominated loans if the proceeds of such loans have not been used. Violations may result in severe monetary or other penalties. Furthermore, on March 30, 2015, the SAFE issued the Circular on Reforming the Administration Approach Regarding the Foreign Exchange Capital Settlement of Foreign-invested Enterprises, or SAFE Circular No. 19, which became effective on June 1, 2015 and replaced Circular 142. SAFE Circular No. 19 provides that, the conversion from foreign currency registered capital of foreign-invested enterprises into the Renminbi capital may be at foreign-invested enterprises’ discretion, which means that the foreign currency registered capital of foreign-invested enterprises for which the rights and interests of monetary contribution has been confirmed by the local foreign exchange bureau (or the book-entry of monetary contribution has been registered) can be settled at the banks based on the actual operational needs of the enterprises. However, SAFE Circular No. 19 does not materially change the restrictions on the use of foreign currency registered capital of foreign-invested enterprises. For instance, it still prohibits foreign-invested enterprises from, among other things, spending RMB capital converted from its foreign currency registered capital on expenditures beyond its business scope.
In February 2012, the SAFE promulgated the Notice on the Administration of Foreign Exchange Matters for Domestic Individuals Participating in the Stock Incentive Plans of Overseas Listed Companies, or the Stock Option Notice. Under the Stock Option Notice, domestic individuals who participate in equity incentive plans of an overseas listed company are required, through a PRC agent or PRC subsidiary of such listed company, to register with SAFE and complete certain other bank and reporting procedures. The Stock Option Notice simplifies the requirements and procedures for the registration of stock incentive plan participants, especially in respect of the required application documents and the absence of strict requirements on offshore and onshore custodian banks.
26
Table of Contents
The Circular of Further Improving and Adjusting Foreign Exchange Administration Policies on Foreign Direct Investment issued by the SAFE on November 19, 2012 and amended on May 4, 2015 substantially amends and simplifies the foreign exchange procedure. Pursuant to this circular, the opening of various special purpose foreign exchange accounts (e.g. pre-establishment expense accounts, foreign exchange capital accounts, guarantee accounts), the reinvestment of lawful incomes derived by foreign investors in the PRC (e.g. profit, proceeds of equity transfer, capital reduction, liquidation and early repatriation of investment), and purchase and remittance of foreign exchange as a result of capital reduction, liquidation, early repatriation or share transfer in a foreign-invested enterprise no longer require the SAFE’s approval, and multiple capital accounts for the same entity may be opened in different provinces, which was not possible before. In addition, the SAFE promulgated the Circular on Printing and Distributing the Provisions on Foreign Exchange Administration over Domestic Direct Investment by Foreign Investors and the Supporting Documents in May 2013, which specifies that the administration by the SAFE or its local branches over direct investment by foreign investors in the PRC must be conducted by way of registration and banks shall process foreign exchange business relating to the direct investment in the PRC based on the registration information provided by the SAFE and its branches.
On February 13, 2015, the SAFE promulgated the Circular on Further Simplification and Improvement of Foreign Currency Administration Policies on Direct Investment, which became effective on June 1, 2015. This circular aims to further remove or simplify the approval requirements of SAFE upon the direct investment by foreign investors.
Dividend Distribution
The principal regulations governing dividend distributions of wholly foreign-owned enterprises include:
·
the Company Law (2023 Revision) became effective on July 1, 2024;
·
the Foreign Investment Law
·
the Regulations on the Implementation of Foreign Investment Law
Under these regulations, wholly foreign-owned enterprises in the PRC may pay dividends only out of their accumulated profits as determined in accordance with PRC accounting standards and regulations. In addition, each of our wholly foreign-owned enterprises is required to set aside at least 10% of its accumulated after-tax profits each year, if any, to fund certain statutory reserve funds, until the aggregate amount of such fund reaches 50% of its registered capital.
Regulations Relating to Internet Information Security and Privacy Protection
Internet information in China is regulated from a national security standpoint. The National People’s Congress, or the NPC, enacted the Decisions on Preserving Internet Security in December 2000, as amended in August 2009, which subject violators to potential criminal punishment in China for any attempt to: (i) gain improper entry into a computer or system of strategic importance; (ii) disseminate politically disruptive information; (iii) leak state secrets; (iv) spread false commercial information; or (v) infringe intellectual property rights. The Ministry of Public Security of the PRC, or the MPS, has promulgated measures that prohibit use of the internet in ways which, among other things, result in a leak of state secrets or a spread of socially destabilizing content. If an internet information service provider violates these measures, the MPS and its local branches may revoke its operating license and shut down its websites.
The Standing Committee of China’s National People’s Congress passed the Cybersecurity Law (the "CSL”), China’s first cybersecurity law, in November 2016, which took effect in June 2017. The CSL is the first Chinese law that systematically lays out the regulatory requirements for cybersecurity and data protection, and any individual or organization using the network must comply with the PRC constitution and applicable laws, follow the public order and respect social moralities, and must not endanger cyber security, or engage in activities by making use of the network that endanger the national security, honor and interests, or infringe on the fame, privacy, intellectual property and other legitimate rights and interests of others. Usually, a network is broadly defined and includes, but is not limited to, the Internet. The legal consequences of violation of the CSL include penalties of warning, confiscation of illegal income, suspension of related business, winding up for rectification, shutting down the websites, and revocation of business license or relevant permits. The costs of compliance with, and other burdens imposed by, CSL may limit the use and adoption of our products and services and could have an adverse impact on our business.
27
Table of Contents
On July 10, 2021, CAC published the Cybersecurity Review Measures (Revised Draft for Public Comments), or the "Review Measures (Draft)”, and on December 28, 2021, the CAC and other ministries and commissions jointly promulgated the Cybersecurity Review Measures, which came into effect on February 15, 2022, targeting to further restate and expand the applicable scope of the cybersecurity review. Pursuant to the Cybersecurity Review Measures, Critical Information Infrastructure Operators ("CIIO”) that intend to purchase Internet products and services and online platform operators engaging in data processing activities that affect or may affect national security must be subject to cybersecurity review. Cybersecurity Review Measures further stipulate that if a network platform operator possesses the personal information of more than one million users and intends to list in a foreign country, it shall apply to CAC for cybersecurity review. Because our PRC subsidiaries do not deal with the public and do not possess personal data of at least 1,000,000 users, we do not believe that we are required to apply for review by the Cybersecurity Review Office. In the event that, in the future, we possess such data or if the requirements for review are changed, we may be required to obtain such approval, the failure of which could affect our ability to have our common stock traded on Nasdaq.
PRC Civil Code passed by China’s National People’s Congress on May 22, 2020, effective on January 1, 2021, also stipulates that the personal information of a natural person shall be protected by the law. Furthermore, the Data Security Law of the PRC was published on June 10, 2021 by the National People’s Congress and came into effect on September 1, 2021. Such law consists of seven chapters, namely General Provisions, Data Security and Development, Data Security System, Data Security Protection Obligation, Security and Openness of Government Data, Legal Liability and Supplementary Provisions. However, the relationship between the Data Security Law of the PRC and the implemented National Security Law of the PRC, the Cyber Security Law of the PRC, PRC Civil Code, the Confidentiality Law of the PRC and the ongoing Personal Information Protection Law of the PRC needs to be carefully clarified.
Qualification of Construction Enterprise
According to the Construction Law of the PRC issued by the Standing Committee of the National People’s Congress on November 1, 1997, effective on March 1, 1998, and as amended on April 22, 2011 and most recently on April 23, 2019 (effective on the same day), building construction enterprises, survey enterprises, design enterprises and construction supervision enterprises that engage in construction activities shall meet the following conditions: (1) having registered capital conforming to state provisions; (2) having specialized technical personnel with legally required qualifications who are commensurate with the construction activities being engaged in; (3) having technical equipment for engaging in related construction activities; and (4) other conditions as may be prescribed by laws and administrative regulations. In addition, building construction enterprises, survey enterprises, design enterprises and project supervision enterprises that engage in construction activities shall be classified into different grades of qualifications in accordance with their registered capital, specialized technical personnel, technical equipment in their possession and previous performance in construction projects completed, and may engage in construction activities within the scope permitted under their respective qualifications only after acquirement of the corresponding grade of qualification certificates upon passing qualification examination. Under circumstances where a construction enterprise undertakes projects out of the scope permitted under its level of qualification, the relevant governing authorities will have the power to demand such enterprise to cease its illegal conduct and impose on such enterprise administrative penalties which include fines, suspension of operation for rectification, lowering its grade of qualification, revocation of qualification certificates and confiscation of illegal income.
Pursuant to the Administration Rules Regarding Qualification of Construction Enterprise issued by the Ministry of Housing and Urban-Rural Development of the PRC on September 13, 2016, which was most recently modified by the Decisions of the Ministry of Housing and Urban-Rural Development on the Modification of the Administration Rules Regarding Qualification of Construction Enterprise and Other Regulations on December 22, 2018 (effective on the same day), a construction enterprise may conduct its construction business after the receipt of a qualification which is classified into three categories, named as General Construction Contractor Qualification, Professional Contractor Qualification, and Construction Labor Service Qualification, with each category having several grades. In addition, construction enterprises must maintain their assets, major personnel, technical equipment, etc., at the level required by their respective grades of construction qualifications, otherwise, the relevant local authorities will have the power to demand the enterprises to rectify within a prescribed time limit, the longest of which shall not exceed three months. During the period in which the enterprises are rectifying in regard to its qualifications, the enterprises cannot apply to upgrade their construction qualifications or add items into their current construction qualifications and cannot undertake new construction projects. Provided that the enterprises have failed to rectify to reach the standards of their construction qualifications within the prescribed time limit, the authorities which grant such enterprises the qualifications will have the power to revoke the qualification certificates.
Regulations on Overseas Listing
On December 24, 2021, the CSRC issued Provisions of the State Council on the Administration of Overseas Securities Offering and Listing by Domestic Companies (Draft for Comments) (the "Administration Provisions”), and the Provisions of the State Council on the Administration of Overseas Securities Offering and Listing by Domestic Companies (Draft for Comments) (the "Measures”).
28
Table of Contents
The Administration Provisions and Measures for overseas listings lay out requirements for filing documents and include unified regulation management, strengthening regulatory coordination, and cross-border regulatory cooperation. Domestic companies seeking to list abroad must carry out relevant security screening procedures if their businesses involve such supervision. Companies endangering national security are among those off-limits for overseas listings.
In August 2006, six PRC regulatory agencies jointly adopted the Provisions on the Merger and Acquisition of Domestic Enterprises by Foreign Investors, or the M&A Rule. As amended in 2009, this rule requires that, if an overseas company established or controlled by PRC domestic companies or citizens intends to acquire equity interests or assets of any other PRC domestic company affiliated with the PRC domestic companies or citizens, such acquisition must be submitted to the Ministry of Commerce, rather than local regulators, for approval. In addition, this regulation requires that an overseas company controlled directly or indirectly by PRC companies or citizens and holding equity interests of PRC domestic companies needs to obtain the approval of the CSRC prior to listing its securities on an overseas stock exchange.
While the application of the M&A Rule remains unclear, based on our understanding of current PRC laws, regulations, and the Provisions on Indirect Issuance of Securities Overseas by a Domestic Enterprise or Overseas Listing of Its Securities for Trading announced by the CSRC on September 21, 2006 (effective the same day), we believe it is not applicable to us since we are not an overseas company controlled by PRC domestic companies or natural persons.
On December 24, 2021, the China Securities Regulatory Commission, or the CSRC, issued Provisions of the State Council on the Administration of Overseas Securities Offering and Listing by Domestic Companies (Draft for Comments) (the "Administration Provisions”), and the Provisions of the State Council on the Administration of Overseas Securities Offering and Listing by Domestic Companies. On February 17, 2023, the CSRC released the "Trial Administrative Measures of Overseas Securities Offering and Listing by Domestic Companies” (the "Trial Measures”) and five supporting guidelines. The new regulations require PRC companies that are listed or in the process of being listed on foreign exchanges ("PRC Companies”) to make certain filings with the CSRC. The new regulations authorize the CSRC to review such fillings, penalize relevant PRC Companies or people in charge, or report to overseas securities regulatory institutions in case of violation of the Trial Measures, in order to ensure PRC Companies are in compliance with PRC regulations and policies. The new regulations became effective on March 31, 2023. Failure to file as required could subject us or our controlling stockholders to fines and penalties, which may be significant. As of the date of this annual report, the CSRC has not published any additional supplemental regulations or guidelines as to PRC Companies. Based on our audited financial statements for 2023, which show that a majority of our income is derived from our United States operations and a majority of our assets are located in the United States and the fact that our management is located in the United States, we believe that we are not an issuer that is required to make a filing with the CSRC, and, accordingly, we did not make such a filing in connection with our initial public offering in February 2024. In the event that the CSRC disagrees with this opinion, we and our controlling stockholders may be subject to fines and penalties, which may be significant.
If, conversely, it is determined that CSRC approval was required for our initial public offering, we may face sanctions by the CSRC or other PRC regulatory agencies for failure to seek CSRC approval for our initial public offering. These sanctions may include fines and penalties on our operations in the PRC, delays or restrictions on the repatriation into the PRC of the proceeds from our initial public offering, restrictions on or prohibition of the payments or remittance of dividends by our PRC subsidiaries, or other actions that could have a material adverse effect on our business, financial condition, results of operations, reputation and prospects, as well as the trading price of our common stock. If we determine to raise funds in a subsequent public offering, we will need to determine whether a filing with the CSRC is required in order for us to complete the offering.
Regulations on Stock Incentive Plans
On December 25, 2006, the People’s Bank of China promulgated the Administrative Measures of Foreign Exchange Matters for Individuals, setting forth the respective requirements for foreign exchange transactions by individuals (both PRC or non-PRC citizens) under either the current account or the capital account. Additionally, individuals shall not evade foreign exchange supervisions by partitioning the intended amount of foreign exchange into separate transactions.
On February 15, 2012, SAFE issued the Notices on Issues concerning the Foreign Exchange Administration for Domestic Individuals Participating in Stock Incentive Plan of Overseas Publicly-Listed Company, or the Stock Incentive Plan Rules. The purpose of the Stock Incentive Plan Rules is to regulate foreign exchange administration of PRC domestic individuals who participate in employee stock holding plans and stock option plans of overseas listed companies. According to the Stock Incentive Plan Rules, if PRC "domestic individuals” (both PRC residents and non-PRC residents who reside in China for a continuous period of not less than one year, excluding the foreign diplomatic personnel and representatives of international organizations) that participate in any stock incentive plan of an overseas listed company, a PRC domestic qualified agent, which could be the PRC subsidiary of such overseas listed company, shall, among others things, file, on behalf of such individual, an application with SAFE to conduct the SAFE registration with respect to such stock incentive plan, and obtain approval for an annual allowance with respect to the purchase of foreign exchange in connection with stock holding or stock option exercises. In addition, the Circular on Relevant Issues Concerning Foreign Exchange Control on Domestic Residents’ Offshore Investment and Financing and Roundtrip Investment Through Special Purpose Vehicles promulgated by SAFE in July 2014 (SAFE Circular No. 37) also provides certain requirements and procedures for foreign exchange registration in relation to an equity incentive plan of a special purpose vehicle before listing. In this regard, if a non-listed special purpose vehicle grants equity incentives to its directors, supervisors, senior officers and employees in its domestic subsidiaries, the relevant domestic individual residents may register with SAFE before exercising their rights.
29
Table of Contents
The Stock Incentive Plan Rules and SAFE Circular 37 were promulgated only recently and many issues require further interpretation. Although, based on advice of AllBright Law offices, our PRC counsel, we do not believe that we are subject to these rules, we cannot assure you that SAFE will not come to a different conclusion. If we are subject to these rules and we or our PRC employees fail to comply with the Stock Incentive Plan Rules, we and our PRC employees may be subject to fines and other legal sanctions. In addition, the General Administration of Taxation has issued several circulars concerning employee stock options, and, under these circulars, our employees working in China who exercise stock options would be subject to PRC individual income tax. Our PRC subsidiary would have obligations to file documents related to employee stock options with relevant tax authorities and withhold individual income taxes of those employees who exercise their stock options. If our employees fail to pay and we fail to withhold their income taxes, we may face sanctions imposed by tax authorities or other PRC government authorities.
Employees
On March 15, 2025, we had 76 employees in the United States, of which five were executives, 21 were in sales and marketing, 39 were in operations and installation and eleven were in accounting and administrative, and we had six employees in China, of which one was an executive, and five were in accounting and administrative. None of our employees are represented by a labor union. We consider our employee relations to be good. We have agreements with a professional employer organization, Insperity PEO Services, L.P., under which the professional employer organization administers our human resources, payroll and employee benefits functions for our United States employees, who are co-employed by us or one of our subsidiaries and Insperity. We have a 401(k) plan through Insperity PEO Services, L.P.