Wood reviewed the geologic and resource models that supported the Donlin Gold project 2011 Mining Study, including comparing them to data from recent drilling programs, and determined that they continue to be adequate and suitable to be used for a Mineral Resource estimation. Using updated cost inputs from the first calendar quarter of 2020, a gold price of $1,500 per ounce, and the geologic and resource models utilized in support of the 2011 Mining Study, the contents within an updated optimized pit shell did not show a material change to the Mineral Resources stated in the 2011 Mining Study. Therefore, the Mineral Resources are considered current as of November 30, 2021, and are unchanged. They continue to have an effective date of July 11, 2011.
 
Similarly, using updated cost inputs, a gold price of $1,200 per ounce, and the geologic and resource models utilized in support of the 2011 Mining Study with appropriate modifying factors applied for Mineral Reserve estimation, the previous Mineral Reserve ultimate pit was contained within an updated optimized pit shell. Therefore, the Mineral Reserves remain current as of November 30, 2021, and are unchanged. Because the Mineral Reserves are supported by an updated economic analysis they have an effective date of April 27, 2021.
 
Outside of verifying the Mineral Resource and Mineral Reserve estimates, the primary efforts in the 2021 Technical Report and S-K 1300 Report were financial and permitting updates. This includes updates to estimated capital costs, operating costs, reclamation and closure costs, royalties, taxes, and economic analysis, as well as current status of the permits.
 
Updated capital costs are based on first calendar quarter 2020 pricing (cost indices and current commodity pricing and equipment quotes) applied to the engineering designs and material take-offs from the 2011 Mining Study, except for minor changes made during permitting in the operations water treatment plant and the natural gas pipeline.
 
As a result of the content updates, the total initial capital cost estimate is $7,402 million, which is an increase of 10.8% or $723 million compared to the 2011 Mining Study total initial capital cost estimate. Likewise, the total sustaining capital estimate is $1,723 million, which is an increase of 14.6% or $219 million compared to the 2011 Mining Study total sustaining capital estimate.
 
The 2011 Mining Study operating costs were updated to first calendar quarter 2020 by updating key cost drivers like energy, labor, consumables, and freight. No material changes to project designs, schedules, or productivities were made; consequently, the manning schedules and consumables remain unchanged. The updated estimated LOM operating costs total $19,289 million, which is $5.90/t mined, $38.21/t processed, or $635/oz gold sold.
 
The economic evaluation of the Donlin Gold project in both the 2021 Technical Report and the S-K 1300 Report was updated using the following inputs:
 
 
●
A production plan based on the 2011 Mining Study of 53,500 t/d open pit gold mine with ore processing by means of flotation, pressure oxidation, and cyanidation. The pit designs and Mineral Reserves were based on the Measured and Indicated Mineral Resource estimates that were verified as remaining current. Annual LOM gold production averages 1.13 million ounces per year over a production life of 27 years, including 1.46 million ounces per year for the first five full years of production.
 
 
●
$1,500/oz gold price
 
 
●
Current land and royalty agreements
 
 
●
Initial and sustaining capital costs, and operating costs updated to first calendar quarter 2020
 
 
●
Tax payments in accordance with the TCJA enacted in December 2017 and effective January 1, 2018
 
 
●
$292 million LOM contributions for reclamation, closure, and financial assurance
 
 
●
Financing has been assumed on a 100%, all equity, stand-alone basis
 
 
●
Escalation/inflation has been excluded
 
 
●
No salvage is assumed at the end of operations
 
Based on the economic evaluation, the Donlin Gold project generates positive before and after-tax economic results. Total after-tax cash flow is $13,145 million, after-tax NPV at a 5% discount rate is $3,040 million, and the after-tax internal rate of return is 9.2%. After-tax payback is achieved 7.3 years following the start of production.
 
The following descriptions summarize selected information about the Company’s 50% interest in the Donlin Gold project located in Alaska, USA. Except for subsequent events or as otherwise noted, the disclosure in this Annual Report on Form 10-K of a scientific or technical nature for the Donlin Gold project is based on both the 2021 Technical Report and S-K 1300 Report, as of November 30, 2021. The S-K 1300 Report meets at least a pre-feasibility level. The 2021 Technical  Report and the S-K 1300 Report do not incorporate the latest Donlin Gold optimization work on the geologic modeling concepts or other optimization work since these assessments are still underway.
 
25
NOVAGOLD RESOURCES INC.
 
 
The 2021 Technical Report was filed on EDGAR and SEDAR on August 31, 2021. The S-K 1300 Report is filed on EDGAR and SEDAR on January 26, 2022. The 2021 Technical Report and S-K 1300 Report was prepared by Wood and the following contributors, each of whom is an independent Qualified Person under NI 43-101: Henry Kim, P.Geo., Senior Resource Geologist, Wood Canada Limited; Mike Woloschuk, P.Eng., VP Global Business Development & Consulting, Wood Group USA, Inc.; and Kirk Hanson, MBA, P.E., Technical Director, Open Pit Mining, Wood Group USA, Inc.
 
The 2021 Technical Report and S-K 1300 Report have been filed with securities regulatory authorities in each province of Canada and with the SEC. Portions of the following information are based on assumptions, qualifications and procedures that are not fully described herein. Reference should be made to the full text of both reports which are available for review on EDGAR at www.sec.gov and on SEDAR at www.sedar.com.
 
Kirk Hanson, MBA, P.E., an independent Qualified Person, has approved the mineral reserves and Henry Kim, P.Geo, an independent Qualified Person has approved the mineral resources included in this Annual Report on Form 10-K related to the 2021 Technical Report and the S-K 1300 Report.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
26
NOVAGOLD RESOURCES INC.
 
 
Donlin Gold Project, Alaska, USA
 
The Donlin Gold project is a development-stage gold project held by Donlin Gold LLC (“Donlin Gold”), a limited liability company that is owned 50% by the Company’s wholly-owned subsidiary, NOVAGOLD Resources Alaska Inc., and 50% by Barrick’s wholly-owned subsidiary, Barrick Gold U.S. Inc. The Company’s book value of its investment in the Donlin Gold project is $3,576,000 as of November 30, 2021.
 
The Company entered into the limited liability company agreement with Barrick (“LLC Agreement”) dated December 1, 2007, which provided for the creation of Donlin Gold, that is jointly owned by the Company and Barrick on a 50/50 basis. Pursuant to the LLC Agreement, the Company agreed to reimburse Barrick out of future mine production cash flow for a portion of Barrick’s prior expenditures on the Donlin Gold project. As of November 30, 2021, the promissory note, including accrued interest, amounted to approximately $115.7 million. Funding for the project is currently shared by both parties on a 50/50 basis.
 
Except for events subsequent to the reports, or as otherwise stated or implied, the scientific and technical information regarding the Donlin Gold project in this Annual Report on Form 10-K is based on both the 2021 Technical Report and the S-K 1300 Report.
 
Property Description and Location
 
27
NOVAGOLD RESOURCES INC.
 
 
 
The Donlin deposits are situated approximately 62°North latitude and 158°West longitude, which is 450 km west of Anchorage and 250 km northeast of Bethel up the Kuskokwim River. The closest village is the community of Crooked Creek, approximately 20 km to the south, on the Kuskokwim River.
 
The resource areas are within T. 23 N., R. 49. W., Seward Meridian, Kuskokwim and Mt. McKinley Recording Districts, Crooked Creek Mining District, Iditarod A-5 USGS 1:63,360 topography map. The mineralization is centered on approximately 540222.50 east and 6878534.36 north, using the NAD 83 datum.
 
The Donlin Gold property is located in the Kuskokwim region of southwestern Alaska on private, Alaska Native-owned mineral and surface land and Alaska state mining claims. The property is under lease (the Calista Lease) for subsurface rights and some surface rights from Calista and surface rights (the SUA) from TKC, two Alaska Native corporations. Calista is one of 13 regional Alaska Native corporations established as part of the Alaska Native Claims Settlement Act of 1971 (ANCSA) and under ANCSA has title to the subsurface estate and some surface rights in the region. TKC was formed in 1977 when the ANCSA village corporations of Lower Kalskag, Upper Kalskag, Aniak, Chuathbaluk, Napaimute, Crooked Creek, Red Devil, Georgetown, Sleetmute and Stony River, which are located along the middle region of the Kuskokwim River, merged. Under ANCSA, TKC has title to extensive surface estate in the region, including most of the project lands. The property hosts a gold deposit currently estimated at 33.8 million ounces of proven and probable mineral reserves averaging 2.09 grams per tonne. The Company believes that significant exploration potential remains in the Donlin Gold district, with prospects to increase mine life and/or justify future production expansions. See Mineral Reserve and Mineral Resource Estimate , below.
 
Other lands required for offsite infrastructure, such as the Jungjuk port site, the road from the port site to the mine site, and natural gas pipeline are categorized as Native, State of Alaska conveyed, or Bureau of Land Management (BLM) lands. Rights-of-way are required from other Alaska Native corporations, the State of Alaska and BLM for the road and pipeline alignments that cross Native corporation, state, and federal lands.
 
Permits
 
Donlin Gold obtained the necessary permits and certifications that allowed for the exploration, associated at least pre-feasibility study level test work, environmental monitoring, and Environmental Impact Study (EIS) baseline data collection efforts. The current status of these permits is in line with the termination of the baseline data collection effort, temporary closure of the camp in May 2015, and the seasonal reopening of the site for the geological drill program from July to November 2017, the geotechnical drill program in 2019 for the issuance of the Dam Safety Certifications, and the latest geological drill programs in 2020, 2021, and proposed in 2022. The active permits include Alaska Department of Natural Resources (ADNR) temporary use of water; ADNR Application for Permit to Mine in Alaska (approval for the 2020, 2021 and 2022 drill programs), the U.S. Army Corps of Engineering (individual 404 and nationwide 26 permits); Alaska Department of Environmental Conservation (ADEC) authorizations (septic system, multisector stormwater general permit – sector G, owners requested limit [air]); and Federal Aviation Administration approval (Landing Area). Other permits were either put on hold, closed, or allowed to expire.
 
28
NOVAGOLD RESOURCES INC.
 
 
On August 7, 2012, we announced that Donlin Gold commenced permitting of the project by submitting a draft Plan of Operations and Section 404 Clean Water Act (CWA) draft permit application to federal and state regulators. The Section 404 permit application initiated the environmental review process under the National Environmental Policy Act (NEPA) which involves preparation of an EIS. The Corps selected AECOM, formerly URS, an independent contractor, to prepare the EIS. The Notice of Intent for the EIS was published in the Federal Register on December 14, 2012, and the NEPA public scoping process was completed on March 29, 2013. During the remainder of 2013 and through 2014 and 2015, Donlin Gold worked to address the remaining data needs for the draft EIS. Donlin Gold also continued to provide application materials and maintained ongoing dialogue with the key permitting agencies. The Corps addressed the cooperating agency comments on the preliminary draft and filed the Notice of Availability for public release of the draft EIS in the Federal Register in November 2015. After the filing of the draft EIS, the Corps issued a schedule for public meetings on the Donlin Gold draft EIS in the Y-K region and Anchorage, Alaska. The Corps conducted, and at the end of May 2016 completed, a six-month public comment period for the draft EIS, including 17 public comment meetings in communities across the Y-K region and in Anchorage. The Corps received comments from federal and state agencies, local and tribal governments, Alaska Native organizations, businesses, special interest groups/NGOs, and individuals.
 
On April 27, 2018, the Notice of Availability of the Donlin Gold final EIS was published in the Federal Register . On August 13, 2018, the Corps and the BLM issued a joint Federal Record of Decision (ROD) for the Donlin Gold project. Along with the ROD, the Corps issued a combined permit under CWA Section 404 and Section 10 of the Rivers and Harbors Act. Additionally, the BLM issued the Offer to Lease for the right-of-way for those portions of the natural gas pipeline that would cross federal lands. The Pipeline and Hazardous Materials Safety Administration previously issued a special permit for the natural gas pipeline on June 5, 2018.
 
Several major State of Alaska permits were also issued and advanced during 2018 through 2021. After a public notice and comment period, ADEC issued a Certificate of Reasonable Assurance under CWA Section 401 on August 10, 2018, indicating that the CWA 404 permit complies with the State’s water quality standards. The Alaska Pollutant Discharge Elimination System (APDES) water discharge permit was issued by ADEC on May 24, 2018 and became effective on July 1, 2018. The State of Alaska Department of Fish and Game (ADFG) issued Title 16 Fish Habitat permits for the mine area and transportation corridor on August 30, 2018. In December 2021 ADEC approved a third extension of the date by which construction of the Donlin Gold project as authorized by the Prevention of Significant Deterioration air quality permit must begin until June 30, 2023. The final approvals of the Donlin Gold Reclamation Plan and the Waste Management Permit were issued on January 18, 2019. ADNR issued the easement, land leases, land use permits, and material site authorizations for the proposed transportation facilities, and easement for the fiber optic cable on State lands on January 2, 2020. On November 1, 2021, ADFG issued two Special Area Permits required for pipeline facilities located within the Susitna Flats State Game Refuge (“Refuge”). One permit authorizes the compressor station and the other permit authorizes the section of the pipeline right-of-way (“ROW”) in the Refuge.
 
On November 30, 2020, ADNR issued a public notice for comment on Donlin Gold’s 12 water rights applications for the mine site and transportation corridor, which closed on December 15, 2020. Water rights are for local surface water sources and groundwater to be used for process water, dust control, fire protection, and potable water. In March 2021, the ADNR held a second two-week public notice period, which closed on March 26, 2021. All the final Water Rights were issued on June 29, 2021 by ADNR’s Division of Mining Land and Water. In July, they were administratively appealed to the ADNR Commissioner by Earthjustice, Orutsararmuit Native Council (ONC), and five villages. We expect a decision on the appeal by the Commissioner in 2022.
 
The Alaska Dam Safety certifications require additional fieldwork and more detailed engineering which commenced in 2019 and require a multi-year commitment. The fieldwork was temporarily paused to concentrate on the 2020 and 2021 geological drill programs.
 
On February 7, 2019, Earthjustice requested, and ADEC subsequently granted a request for informal review of the Waste Management Permit issuance. ADEC completed this review and affirmed its decision to issue this permit on July 25, 2019. There were no further appeals of the Waste Management Permit. On February 7, 2019, Earthjustice also appealed the Reclamation Plan approval. On December 31, 2019, ADNR after careful review, denied the appeal and affirmed the decision to approve the Reclamation Plan.
 
On January 28, 2019, ADNR’s State Pipeline Coordinator Services (SPCS) issued a preliminary decision to grant the State Right-of-Way (“ROW”) agreement and lease authorization for the natural gas pipeline. The public comment period began on January 28, 2019 and ended on March 22, 2019. The final offer to lease was issued on January 17, 2020 and was accepted by Donlin Gold in February 2020. On February 6, 2020, Cook Inletkeeper, on behalf of the Susitna River Coalition and three Native village organizations requested that the ADNR Commissioner reconsider issuance of the ROW. The ADNR Commissioner denied the request for reconsideration on February 18, 2020. After Earthjustice filed a court appeal of the lease issuance and reconsideration denial, ADNR changed its position and accepted the reconsideration request on April 30, 2020, specifically to address cumulative effects. On September 10, 2020, ADNR issued a revised Consideration of Comments document, which specifically addresses the potential cumulative effects of the pipeline. The comment period on the revised document ended on November 9, 2020. On July 19, 2021, the ADNR Commissioner completed the reconsideration and upheld the ROW agreement and lease authorization. On August 9, 2021, two parties requested that the Commissioner conduct a further reconsideration. The first party was Earthjustice representing ONC, Cook Inletkeeper, and three villages. The second party was an individual who operates an outdoor guiding business around the pipeline route. The Commissioner rejected both further reconsideration requests on August 19, 2021. On September 20, 2021, Earthjustice, representing ONC, Cook Inletkeeper, and three villages, filed an appeal of the State ROW in Alaska Superior Court. An appeal was also filed by the second party on September 20, 2021. The two appeals have been consolidated into a single case that is pending before the Alaska Superior Court based in Anchorage, Alaska. ADNR is currently finalizing the Administrative Record for the ROW issuance for submittal to the Court after which the Court will establish a briefing schedule. We expect a decision on the appeal in the second half of 2022 or the first half of 2023.
 
29
NOVAGOLD RESOURCES INC.
 
 
In 2018, Earthjustice, on behalf of ONC, Akiak Native Community IRA Council, Organized Village of Kwethluk, Native Village of Kwigillingok, Chuloonawick Tribal Council, and Yukon-Kuskokwim River Alliance, requested an informal review of the State of Alaska’s 401 certification. The request was granted and on April 4, 2019, ADEC completed the informal review and reissued the certification. On April 24, 2019, Earthjustice requested that ADEC vacate the reissued certification and conduct a second informal review of it. On May 8, 2019, ADEC denied the request to vacate the certification but granted the second informal review request. On May 7, 2020, ADEC sent a letter to Earthjustice indicating it had completed the second informal review and left the certification in place. On June 3, 2020, Earthjustice joined by ONC, Chevak, Kasigluk, Eek, Kwinhagak, Marshall, Nightmute, Tununak, Kwethluk, Kotlik, SalmonState, and the Alaska Community Action on Toxics filed a formal appeal with the ADEC Commissioner. The appeal process consists of an Administrative Hearing in front of an Administrative Law Judge (ALJ) appointed by the ADEC Commissioner. The ALJ was subsequently appointed. On July 31, 2020, based on the recommendations of the ALJ, the ADEC Commissioner determined that only ONC could join with Earthjustice in the appeal because the other parties had not participated in earlier stages of public comment and the informal reviews The appeal focused on three narrow issues related to compliance with the State’s water quality standards near the mine site. On April 12, 2021, the Administrative Law Judge issued his opinion for the Commissioner’s consideration recommending the 401 Certification be vacated. The Commissioner issued his decision to uphold the 401 Certification on May 27, 2021. The decision was appealed on June 28, 2021 in Alaska’s Superior Court by Earthjustice, on behalf of ONC. On December 29, 2021, the Court issued an order remanding the 401 Certification to ADEC for consideration of additional technical information provided by Donlin Gold and dismissing the appeal in Alaska Superior Court without prejudice. The existing 401 Certification remains in effect during the remand period. Based on the remand schedule established by the Court order, ADEC’s decision is expected in the second quarter of 2022.
 
Thirteen of the 56 village councils in the Calista Region (Native Village of Kasigluk, ONC, Native Village of Eek, Tuluksak Native Community, Tununak Council, Native Village of Nunapitchuk, Chuloonawick Tribal Council, Native Village of Kwigillingok, Native Village of Kongiganak, Chefornak Traditional Council, Chevak Native Village, Native Village of Napakiak and Quinhagak) have adopted resolutions opposing development of the Donlin Gold project.
 
Mineral Tenure
 
The 2011 Restated Exploration and Lode Mining Lease (“Calista Lease”) between Calista and Donlin Gold, includes subsurface (mineral) rights leased from Calista. Calista also owns the corresponding surface estate on a portion of these lands, the rights to which are also included in the Calista Lease. The Calista Lease provides Donlin Gold with rights to approximately 19,988 hectares of Calista-owned land. The Calista Lease was restated on February 11, 2011, to reflect all assignments and amendments made between its original execution on May 1, 1995 and February 11, 2011. The Calista Lease was amended once again effective June 6, 2014 (the “2014 Amendment”). The 2014 Amendment did not affect the lands subject to the Calista Lease as restated on February 11, 2011.
 
On June 9, 2014, the Company announced that Donlin Gold and TKC reached an updated long-term Surface Use Agreement (SUA) for the Donlin Gold project. The SUA with TKC grants non-exclusive surface use rights to Donlin Gold for mining activities. TKC owns and contributed to the SUA the corresponding surface estate over most of Calista’s subsurface estate included in the Calista Lease as well as some additional surface estate. The SUA with TKC provides Donlin Gold with rights to approximately 16,923 hectares of TKC-owned land.
 
Lyman Resources in Alaska, Inc. (Lyman Resources) has an existing placer mining lease covering approximately four-square miles (partially covering six sections) within the Calista Lease area. The Lyman family also has title to approximately 14 acres of surface estate within the Snow Gulch area. The Calista Lease grants priority to extraction of the lode mineralization in the event of a conflict of use between lode and placer mining operations, provided that a two-year notice period is provided to Lyman Resources. Lyman Resources, the Lyman family, and Donlin Gold executed a Surface Lease and Assignment of Mining Lease effective May 9, 2012, leasing the Lyman surface estate and assigning the Lyman placer lease within the Calista Lease area to Donlin for Project mining use (the “Lyman Lease”).
 
30
NOVAGOLD RESOURCES INC.
 
 
In addition to the leased land, Donlin Gold holds 493 State of Alaska mining claims comprising approximately 29,008 hectares in the Kuskokwim and Mt. McKinley Recording Districts. The mining claims abut and largely surround northern and western boundaries of the lands subject to the Calista Lease and TKC SUA. The mining claims are located on lands that are owned by the State of Alaska (409) and on State-selected lands from the BLM (84). All claims are approximately either 16.2 hectares or 64.8 hectares in size.
 
The terms for the Calista Lease and TKC SUA include various royalty and other payment provisions and considerations such as shareholder employment and contracting opportunities. The Lyman Lease provides for rent and certain other payments.
 
Royalty Terms of the Calista Lease include:
 
 
●
Annual advance minimum royalty (variable) to 2030;
 
●
All advance minimum payments are recoverable as a credit against the net smelter return royalty and net proceeds payment;
 
●
Net smelter return of 1.5% for the earlier of the first five years following commencement of commercial production or until initial capital payback;
 
●
Conversion to 4.5% net smelter return after the earlier of five years or initial capital payback; and
 
●
Net proceeds royalty of 8% of the net proceeds realized by Donlin Gold LLC commencing with the first quarter in which net proceeds are first realized.
 
Payment Terms of the TKC SUA include:
 
 
●
Annual advance minimum payment (variable per milestones);
 
●
All advance minimum payments are recoverable as a credit against the milled tonnage fee and net proceeds payment;
 
●
Milled tonnage fee of $0.40 per tonne processed for the first 10 years of production;
 
●
Conversion of the milled tonnage fee to $0.50 per tonne processed for all production after 10 years;
 
●
Net proceeds payment of 3% of the net proceeds realized by Donlin Gold LLC commencing with the first quarter in which net proceeds are first realized.
 
The term of the Calista Lease is to April 30, 2031 and extends automatically year to year thereafter, so long as either mining or processing operations are carried out on or with respect to the property in good faith on a continuous basis in such year, or Donlin Gold pays to Calista an advanced minimum royalty of US$3,000,000 (subject to adjustment for increases in the Consumer Price Index) for such year. The TKC SUA remains in effect through April 30, 2031 and on a year-to-year basis thereafter, so long as the Calista Mining Lease remains in effect. The Lyman Lease has an initial term of 20 years, but shall be extended while Donlin Gold conducts operations on the property.
 
Additional estimated costs associated with various landowner and lease agreements, not already covered in initial capital or G&A operating costs, average approximate $8.6 million per year during the six pre-production years and $2.5 million per year during the 27 operating years.  Annual rent, labor expenditures and filings are required to maintain Alaska State mining claims on State land.  Mining license tax payments may also apply.
 
Accessibility and Climate
 
The Kuskokwim River is a regional transportation route and is serviced by commercial barge lines. A 25-kilometer winter road, designated as an Alaska State Highway route and transportation corridor, accesses the property from the barge landing at the village of Crooked Creek. The Donlin Gold project currently has an all-season, soft-sided camp. An adjacent 1,500-meter airstrip is capable of handling aircraft as large as L-100 Hercules (approximate cargo capacity of 19,050 kilograms), allowing efficient shipment of personnel, some heavy equipment, and supplies. The Donlin Gold project can be reached directly by charter air facilities out of Anchorage and Aniak, 80 kilometers to the west.
 
The project area is one of low topographic relief on the western flank of the Kuskokwim Mountains. Elevations range from 150 meters to 640 meters. Ridges are well rounded and easily accessible by all-terrain vehicle. Hillsides are forested with black spruce, tamarack, alder, birch and larch. Soft muskeg and discontinuous permafrost are common in poorly drained areas at lower elevations. The area has a relatively dry interior continental climate with typically less than 500 millimeters total annual precipitation. Summer temperatures are relatively warm and may exceed 30°C. Minimum temperatures may fall to well below -42°C during the cold winter months.
 
Exploration History
 
Approximately 1,678 exploration and development drill holes totaling 367,886 meters, were completed from 1988 through 2007 in at least six separately managed campaigns. Another 108 core holes totaling 33,425 meters were added in 2008 to explore near-pit expansions and satellite deposits, and for facility-related condemnation and geotechnical studies. In 2010, 6 core holes totaling 2,090 meters were drilled for additional pit slope geotechnical drilling. In 2017, 16 core holes totaling 7,040 meters were drilled; in 2020, 85 core holes totaling 23,361 meters were drilled; and in 2021, 79 core holes totaling 24,264 meters were drilled.
 
31
NOVAGOLD RESOURCES INC.
 
 
Approximately 1,396 holes, totaling 339,733 meters, supported the resource model used in the 2011 Mining Study. The remaining holes were either drilled after the completion of the 2011 Mining Study (2017, 2020 and 2021 drill programs) or were utilized for other purposes, such as district exploration, carbonate resource, facilities condemnation, hydrology, geotechnical, and infrastructure engineering.
 
Year
Company
Work Performed
Results
1909 to 1956
Various prospectors and placer miners
Gold discovered in 1909. Placer mining by hand, underground, and hydraulic methods.
Total placer gold production of approximately 30,000 ounces.
1970s to 2015
Robert Lyman and heirs
Resumed sluice mining in Donlin Gold area and placer mined Snow Gulch.
First year of mining Snow Gulch produced best results, with 800 ounces of gold recovered. Donlin Gold has obtained an agreement with the Lyman family to consolidate the land package around the proposed mine.
1974, 1975
Resource Associates of Alaska (RAA)
Regional mineral potential evaluation for Calista. Soil grid and three bulldozer trenches dug in Snow Gulch area.
Soil, rock, and vein samples have anomalous gold values. Trench rock sample results range from 2 to 20 grams per tonne gold.
1984 to 1987
Calista Corporation
Minor work. Geologists from various mining companies, including Cominco and Kennecott, visit the property.
 
1986
Lyman Resources
Auger drilling for placer evaluation finds abundant gray, sulfide rich clay near Quartz Gulch.
Assays of cuttings average over 7 grams per tonne gold. Initial discovery of Far Side (“Carolyn”) prospect.
1987
Calista Corporation
Rock sampling of ridge tops and auger drill sampling of Far Side prospect.
Anomalous gold values from auger holes: best result = 9.7 grams per tonne gold.
1988 to 1989
Western Gold Exploration and Mining Co.
Airborne geophysics, geological mapping, and soil sampling over most of the project area. Total of 13,525 meters of D9 Cat trenching at all prospects. Over 15,000 soil, rock chip, and auger samples collected. Drilling included 3,106 feet of AX core drilling, 404 meters in 239 auger holes, and 10,423 meters of RC drilling (125 holes). First metallurgical tests and petrographic work.
Initial work identified eight prospects with encouraging geology (Snow, Dome, Quartz, Carolyn, Queen, Upper Lewis, Lower Lewis, and Rochelieu). Drilling at most of these prospects led to identification of the Lewis areas as having the best bulk-mineable potential. Mineral resource estimate completed.
1993
Teck Exploration Ltd.
D-9 Cat trenching (1,400 meters) and two 500-meter soil lines in Lewis area. Petrographic, fluid inclusion, and metallurgical work.
Identified new mineralized areas, updated Mineral resource estimate.
1995 to 2000
Placer Dome
87,383 meters of core, 11,909 meters of RC drilling and 8,493 meters of trenching. Environmental monitoring and assessment.
Drilled the American Creek magnetic anomaly (ACMA), discovered the ACMA deposit. Numerous mineral resource estimation iterations.
2001 to 2002
NOVAGOLD
46,495 meters of core, 38,022 meters of RC drilling, 89.5 meters of geotechnical drilling, and 268 meters of water monitoring holes.
Filed a preliminary assessment report on the project. Updated resource estimate.
2003 to 2005
Donlin Gold Joint Venture
25,448 meters of core and 5,979 meters of RC drilling. Calcium carbonate exploration drilling; IP lines for facility condemnation studies.
Infill drilled throughout the resource area. Discovered a calcium carbonate resource. Poor quality IP data.
 
 
32
NOVAGOLD RESOURCES INC.
 
 
Year
Company
Work Performed
Results
2006
Donlin Gold Joint Venture
92,804 meters of core drilling to support mineral resource classification conversion, slope stability, metallurgy, waste rock, carbonate exploration, facilities and port road studies.
Geological model and mineral resource update.
2007
Donlin Gold Joint Venture
Core drilling totaled 75,257 meters and included resource delineation, geotechnical and engineering, and carbonate exploration. 13 RC holes for monitor wells and pit pump tests totaled 1,043 meters.
Improved pit slope parameters, positive hydrogeological results. Carbonate exploration was negative. Updated mineral resource estimate. Completed feasibility study with positive results.
2008
Donlin Gold LLC
108 core holes totaling 33,425 meters for exploration and facility related geotechnical and condemnation studies. Updated resource models. Metallurgical test work: flotation variability and CN leach. 54 test pits and 37 auger holes were also completed for overburden characterization.
Resource expansion indicated for East ACMA. CN leach resource potential indicated for the main resource area, Snow, and Dome prospects. Facility sites successfully condemned. Updated resource estimates utilizing applicable data through 2007.
2009
Donlin Gold LLC
19 geotechnical core holes totaling 950 meters in facility sites and to address hydrology.
 
2010
Donlin Gold LLC
Six geotechnical core holes totaling 2,090 meters to evaluate slope stability of expanded pit. Also drilled 90 auger holes totaling 585 meters and dug 59 test pits to further evaluate overburden conditions and gravel supplies within tailings storage facility (TSF) area.
Pit slope stability of new pit design remained acceptable. Construction suitability of surficial materials in TSF is evaluated.
2017
Donlin Gold LLC
16 core holes totaling 7,040 meters to test targeted mineralized zones, collect structural data related to mineralization, and collect geotechnical data.
Results not included in resource model used in the 2011 Mining Study
2019
Donlin Gold LLC
30 geotechnical core holes totaling 1,060 meters were drilled as part of a site investigation program in support of detailed dam design.
Results not included in resource model used in the 2011 Mining Study
2020
Donlin Gold LLC
85 core holes totaling 23,361 meters in both the ACMA and Lewis deposits to validate recent geologic modeling concepts and test for extensions of high-grade zones.
Results not included in resource model used in the 2011 Mining Study
2021
Donlin Gold LLC
79 core holes totaling 24,264 meters in both the ACMA and Lewis deposits to validate recent geologic modeling concepts and test for extensions of high-grade zones.
Results still pending and not included in resource model used in the 2011 Mining Study
 
Geology
 
Regional Geology
 
The Kuskokwim region of southwestern Alaska is predominately underlain by rocks of the Upper Cretaceous Kuskokwim Group that filled a subsided northeast-trending strike-slip basin between a series of amalgamated terranes. Intermediate composition volcano-plutonic complexes intrude and overlie Kuskokwim Group rocks throughout the region.
 
Local Geology
 
The Donlin Gold deposits lie between two regional, northeast-trending, right lateral fault systems: the Denali-Farewell fault system to the south and the Iditarod-Nixon Fork fault system to the north. Undivided Kuskokwim Group sedimentary rocks and granite porphyry complexes are the main rock units.
 
 
33
NOVAGOLD RESOURCES INC.
 
 
Property Geology
 
Greywacke is dominant in the northern part of the area (“northern resource area” comprising Lewis, Queen, Rochelieu, and Akivik), while shale-rich units are common in the southern part of the area (“southern resource area” comprising South Lewis and ACMA).
 
Gold deposits are associated with an extensive Late Cretaceous–Early Tertiary gold–arsenic–antimony–mercury hydrothermal system. Gold-bearing zones exhibit strong structural and host rock control along north–northeast-trending fracture zones and are best developed where those zones intersect relatively competent host rocks. Mineralized material is most abundant in intrusive dikes and sills, but sedimentary rocks are also mineralized within strong fracture zones.
 
Geotechnical and Hydrology
 
A number of geotechnical and hydrological studies have been completed in support of at least pre-feasibility and environmental reports for Donlin Gold.
 
Rowland Engineering Consultants performed the geotechnical assessments for the engineering to support design of the port site, airstrip, plant site and interconnecting roads. BGC, Inc (BGC). performed geotechnical analyses for the design of the pit, waste rock facility (WRF), and tailings storage facility (TSF).
 
The site-wide hydrological and hydrologic models developed by BGC, are based on extensive drill data and climatic information for the area. BGC, CEMI, Hatch Ltd., and SRK, Inc. provided hydrologic studies, design criteria and associated test work for the water treatment plant requirements during construction, operations, and closure. Lorax Environmental performed water quality modeling for the post closure pit lake.
 
Exploration Potential
 
The mineral resource defined in the S-K 1300 Report is confined to a portion of the property. We believe there is considerable potential to increase the mineral resources at the Donlin Gold project. Numerous other targets have been identified along the 8-kilometer mineralized gold trend and are defined by surface sampling and various historical drill holes containing significant gold values.
 
Exploration potential in the vicinity of the open pit design in the S-K 1300 Report includes extensions along strike to the East ACMA, Lewis, and Crooked Creek areas. Mineralization remains open at depth under the current pit limits. Mineralization also remains open to the north of the planned pit and has been tested by shallow trenching and soil sampling, with limited drilling undertaken to date.
 
Exploration potential at the Donlin Gold project also exists outside the areas that have been the subject of the mine design in the S-K 1300 Report. Gold mineralization is associated with an overall north–northeasterly-trending high level dike/sill complex that has been outlined in the regional aero-magnetics as a magnetic low. The zone, approximately 8 kilometers long, and 4 kilometers wide, consists of a northern, dike-dominated area, and a southern, more sill-dominated area.
 
Mineralization
 
Southeast-dipping north-northeast-oriented fracture zones are the primary control on gold-bearing vein distribution within the north-northeast mineralized corridors. Composite vein zones or mineralized corridors range up to 30 meters in width and extend for hundreds of meters along strike. Intrusive rocks and to a lesser extent competent massive greywacke are the most favored host rocks, and act as a secondary control on the mineralization. Gold distribution in the deposit closely mimics the intrusive rocks, which contain about 74% of the mineral resource identified in the S-K 1300 Report. Structural zones in competent sedimentary units account for the remaining 26%.
 
Gold-bearing sulfides occur in both veins and disseminated zones in mafic igneous bodies, rhyodacite dikes and sills, and sedimentary rocks. Quartz-carbonate-sulfide (pyrite, stibnite, and arsenopyrite) veins are the primary mineralized features, but gold also occurs in thin, discontinuous sulfide fracture fillings.
 
Minor Elements and Deleterious Materials
 
The most abundant minor elements associated with gold-bearing material are iron, arsenic, antimony, and sulfur. They are contained primarily in the mineral suite associated with hydrothermal deposition of gold, including pyrite, arsenopyrite, realgar, native arsenic, and stibnite. Minor hydrothermal pyrrhotite, marcasite and syngenetic or sedimentary pyrite, also account for some of the iron and sulfur.
 
 
34
NOVAGOLD RESOURCES INC.
 
 
Three elements that have processing significance are mercury, chlorine, and fluorine. Graphitic carbon and carbonate minerals also would negatively affect the metallurgical process.
 
Metallurgy
 
Sufficient metallurgical test work was completed under the direction of Barrick personnel to support the S-K 1300 Report. Gold is mainly carried by arsenopyrite. Variation is observed in processing behavior between intrusive rocks and sedimentary rocks, but less so between the geographical sources.
 
Process testing generated development of the following conceptual flowsheet:
 
 
●
conventional crushing and grinding;
 
 
●
concentration by flotation;
 
 
●
pressure oxidation of the concentrate in an autoclave;
 
 
●
carbon-in-leach (“CIL”) cyanidation of the oxidized concentrate;
 
 
●
carbon strip and regeneration circuits;
 
 
●
gold electrowinning; and
 
 
●
refining and production of doré bars.
 
This processing concept incorporates proven commercial unit operations.
 
Mineral Reserve and Mineral Resource Estimates
 
The mineral reserves for the Donlin Gold project were classified using criteria appropriate under the mining disclosure definitions and standards of NI 43-101 and S-K 1300 with an effective date of April 27, 2021 and are current as of November 30, 2021. The mineral reserves are summarized in the table below.
 
Proven and Probable Mineral Reserve Estimate, Effective Date April 27, 2021 and current as of November 30, 2021, based on $1,200 per ounce gold price
 
 
 
 
 
 
 
 
 
 
 
Contained Gold
(thousands of ounces)
 
Reserve Category
 
Tonnes
(thousands)
 
 
Gold Grade
(grams/tonne)
 
 
 
100%
 
 
Attributable to
NOVAGOLD
50%
 
Proven
 
 
7,683
 
 
 
2.32
 
 
 
573
 
 
 
287
 
Probable
 
 
497,128
 
 
 
2.08
 
 
 
33,276
 
 
 
16,638
 
Proven and probable
 
 
504,811
 
 
 
2.09
 
 
 
33,849
 
 
 
16,925
 
 
Notes:
 
 
(1)
Mineral reserves are reported within the pre-feasibility pit designs, and supported by a mine schedule, featuring variable throughput rates, stockpiling and cut-off optimization. The point of reference for Mineral Reserves estimates is where the reserves are delivered to the mill. The pit designs are contained within an optimized pit shell based on the following economic and technical parameters: Metal price for gold of $1,200 per ounce; reference mining cost of $2.16 per tonne incremented $0.0033 per tonne per meter with depth from the 220 meter elevation (equates to an average mining cost of $2.64 per tonne), fixed processing cost of $13.78/t processed; sustaining capital of $1.54/t processed; general and administrative cost of $3.66/t processed; stockpile rehandle costs of $0.24/t processed assuming that 45% of mill feed is rehandled; variable metallurgical recoveries by rock type, ranging from 86.7% in shale to 94.2% in intrusive rocks in the Akivik domain; refining and freight charges of $1.21/oz Au; royalty considerations of 4.5% NSR and $0.50/t processed; and variable pit slope angles, ranging from 23° to 43°. See “ Section 12: Mineral Reserve Estimates ” of the S-K 1300 Report.
 
 
(2)
Mineral reserves are reported using an optimized block value (BV) based on the following equation: BV = Gold grade * Recovery – royalties & refining costs – process operating costs – G&A cost reported in $ per tonne. Assuming an average gold recovery of 89.5% the marginal gold cut-off grade would be approximately 0.57 grams per tonne, or the gold grade that would equate to a $0.001 BV cut-off at these same values.
 
 
(3)
The life of mine strip ratio is 5.48:1. The assumed life-of-mine throughput rate is 53,500 tonnes per day.
 
 
(4)
Rounding may result in apparent summation differences between tonnes, grade and contained metal content.
 
 
(5)
Mineral reserves are reported on a 100% ownership basis and a 50% ownership basis. The 50% basis is attributable to NOVAGOLD through their 50% ownership interest in the joint venture that owns the mineral rights and manages the Donlin Gold project. Tonnage and grade measurements are in metric units. Contained gold ounces are reported as troy ounces.
 
Mineral reserves have been estimated using a long-term gold price assumption of $1,200 per ounce. Mineral resources are based on a Whittle™ pit optimized for all measured, indicated, and inferred blocks assuming a gold selling price of $1,200 per ounce and are inclusive of reserves.
 
 
35
NOVAGOLD RESOURCES INC.
 
 
Mineral resources were classified using criteria appropriate under the mining disclosure standards of S-K 1300 by application of the NSR-based cut-off that incorporated mining and recovery parameters, and constraint of the mineral resources to a pit shell based on commodity prices. The mineral resources (exclusive of mineral reserves) are summarized in the table below.
 
Mineral Resources Estimate (exclusive of reserves), Effective Date July 11, 2011 and current as of November 30, 2021, based on $1,200 per ounce gold price  
 
 
 
 
 
 
 
 
 
 
 
Contained Gold
(thousands of ounces)
 
Resource Category
 
Tonnes
(thousands)
 
 
Gold Grade
(grams/tonne)
 
 
 
100%
 
 
Attributable to
NOVAGOLD
50%
 
Measured
 
 
869
 
 
 
2.23
 
 
 
62
 
 
 
31
 
Indicated
 
 
69,402
 
 
 
2.44
 
 
 
5,435
 
 
 
2,718
 
Measured and indicated
 
 
70,271
 
 
 
2.43
 
 
 
5,497
 
 
 
2,749
 
Inferred
 
 
92,216
 
 
 
2.02
 
 
 
5,993
 
 
 
2,997
 
 
Notes:
 
 
(1)
Mineral resources are reported exclusive of mineral reserves. Mineral resources are reported on a 100% ownership basis and a 50% ownership basis. The 50% basis is attributable to NOVAGOLD through their 50% ownership interest in the joint venture that owns the mineral rights and manages the Donlin Gold project property.
 
 
(2)
Mineral resources that are not mineral reserves do not have demonstrated economic viability.
 
 
(3)
The cut-off date for the sample database used in the resource estimate is November 1, 2009. However, more recent drilling data was used to validate the resource model as remaining current.
 
 
(4)
Mineral resources are reported in-place (point of reference) and contained within a conceptual measured, indicated and inferred optimized pit shell using the following assumptions: gold price of $1,200 per ounce; variable process cost based on 2.1874 * (sulfur grade) + 10.65; administration cost of $2.29 per tonne; refining, freight & marketing (selling costs) of $1.85 per ounce recovered; stockpile re-handle costs of $0.20 per tonne processed assuming that 45% of mill feed is re-handled; variable royalty rate, based on royalty of 4.5% * (Gold price – selling cost), and a variable metallurgical recovery depending on the host rock type ranging from 86 to 94%. Assuming an average recovery of 89.5% and average S% grade of 1.07, the marginal gold cut-off grade is 0.47 g/t. These technical and economic parameters are those that were used in the 2011 Mining Study to establish reasonable prospects of eventual economic extraction. Based on the QP’s review of the estimate, there would be no material change to the Mineral Resources if a gold price of $1,500/oz was used and other economic parameters were updated to the 2020 parameters used in the Mineral Reserve estimate. Therefore the 2011 Mineral Resource statement is considered current and is presented unchanged. See “ Section 11: Mineral Resource Estimates ” of the S-K 1300 Report.
 
 
(5)
Rounding may result in apparent summation differences between tonnes, grade and contained metal content.
 
 
(6)
Tonnage and grade measurements are in metric units. Contained gold ounces are reported as troy ounces.
 
Mineral Resources Estimate (inclusive of reserves)
 
 
 
 
 
 
 
 
 
 
 
Contained Gold
(thousands of ounces)
 
Resource Category
 
Tonnes
(thousands)
 
 
Gold Grade
(grams/tonne)
 
 
 
100
%
 
Attributable to NOVAGOLD 50%
 
Measured
 
 
7,731
 
 
 
2.52
 
 
 
626
 
 
 
313
 
Indicated
 
 
533,607
 
 
 
2.24
 
 
 
38,380
 
 
 
19,190
 
Measured and indicated
 
 
541,337
 
 
 
2.24
 
 
 
39,007
 
 
 
19,503
 
Inferred
 
 
92,216
 
 
 
2.02
 
 
 
5,993
 
 
 
2,996
 
 
 
(1)
Mineral resources are reported inclusive of mineral reserves. Mineral resources are reported on a 100% ownership basis and a 50% ownership basis. The 50% basis is attributable to NOVAGOLD through their 50% ownership interest in the joint venture that owns the mineral rights and manages the Donlin Gold project property.
 
 
(2)
Mineral resources that are not mineral reserves do not have demonstrated economic viability.
 
 
(3)
The cut-off date for the sample database used in the resource estimate is November 1, 2009. However, more recent drilling data was used to validate the resource model as remaining current.
 
36
NOVAGOLD RESOURCES INC.
 
 
 
(4)
Mineral resources are reported in-place (point of reference) and contained within a conceptual measured, indicated and inferred optimized pit shell using the following assumptions: gold price of $1,200 per ounce; variable process cost based on 2.1874 * (sulfur grade) + 10.65; administration cost of $2.29 per tonne; refining, freight & marketing (selling costs) of $1.85 per ounce recovered; stockpile re-handle costs of $0.20 per tonne processed assuming that 45% of mill feed is re-handled; variable royalty rate, based on royalty of 4.5% * (Gold price – selling cost), and a variable metallurgical recovery depending on the host rock type ranging from 86 to 94%. Assuming an average recovery of 89.5% and average S% grade of 1.07, the marginal gold cut-off grade is 0.47 g/t. These technical and economic parameters are those that were used in the 2011 Mining Study to establish reasonable prospects of eventual economic extraction. Based on the QP’s review of the estimate, there would be no material change to the Mineral Resources if a gold price of $1,500/oz was used and other economic parameters were updated to the 2020 parameters used in the Mineral Reserve estimate. Therefore the 2011 Mineral Resource statement is considered current and is presented unchanged.
 
 
(5)
Rounding may result in apparent summation differences between tonnes, grade and contained metal content.
 
 
(6)
Tonnage and grade measurements are in metric units. Contained gold ounces are reported as troy ounces.
 
 
(7)
Due to modifying factors applied to the Mineral Resource model to estimate Mineral Reserves, notably planned dilution and loss, the sum of Mineral Reserves and Mineral Resources excluding Mineral Reserves reported above will not equal Mineral Resources inclusive of Mineral Reserves in this table. Proven and Probable Mineral Reserves include planned dilution of 33,745 kt grading 0.31 g/t Au and planned loss of 6,016 kt grading 1.33 g/t Au.
 
Financial model parameters
 
The estimated mine life is 27 years based on a nominal processing rate of 53,500 tonnes per day. Annual gold production over the projected mine life averages 1.13 million ounces per year, including 1.46 million ounces per year for the first five full years of production. The total initial capital cost estimate is approximately $7.4 billion. The project’s estimated after-tax net present value at a 5% discount rate (“NPV 5%”) is $3.0 billion using the base case gold price of $1,500 per ounce. The internal rate of return (IRR) at the same gold price is 9.2%.
 
Base Case Project Sensitivity to Gold Price
 
Gold price
($ per ounce)
 
 
After-tax
cash flow
($ million)
 
 
After-tax NPV 5%
($ million)
 
 
After-tax IRR
(%)
 
 
Payback
(years)
 
1,200
 
 
 
6,556
 
 
 
202
 
 
 
5.3
 
 
 
10.3
 
1,300
 
 
 
8,773
 
 
 
1,161
 
 
 
6.8
 
 
 
9.2
 
1,400
 
 
 
10,974
 
 
 
2,109
 
 
 
8.1
 
 
 
8.1
 
1,500
 
 
 
13,145
 
 
 
3,040
 
 
 
9.2
 
 
 
7.3
 
1,600
 
 
 
15,308
 
 
 
3,967
 
 
 
10.4
 
 
 
6.7
 
1,700
 
 
 
17,455
 
 
 
4,887
 
 
 
11.4
 
 
 
6.2
 
1,800
 
 
 
19,125
 
 
 
5,696
 
 
 
12.4
 
 
 
5.9
 
 
Summary of Key Evaluation Metrics (Base Case at $1,500 per ounce gold)
 
Total tonnes mined (million)
 
 
3,270
 
Ore tonnes treated (million)
 
 
505
 
Strip ratio (waste tonnes per ore tonne)
 
 
5.5 to 1
 
Gold ounces recovered (million)
 
 
30.4
 
Gold recovery (%)
 
 
89.8
%
 
 
 
$ million
 
Net revenue
 
 
45,519
 
Total operating costs
 
 
(19,289
)
Operating cash flow before tax
 
 
26,230
 
Income and mining taxes
 
 
(3,668
)
Operating cash flow after tax
 
 
22,562
 
Initial capital
 
 
(7,402
)
Sustaining capital
 
 
(1,723
)
Closure costs - trust fund
 
 
(292
)
Total costs
 
 
(30,248
)
Net after-tax cash flow
 
 
13,145
 
 
 
 
 
 
Payback period (years)
 
 
7.3
 
Operation life (years)
 
 
27
 
After-tax NPV 5% ($ million)
 
 
3,040
 
After-tax IRR
 
 
9.2
%
 
 
37
NOVAGOLD RESOURCES INC.
 
 
Operating Cost Estimates
 
 
 
$ million
 
 
$ per tonne processed
 
 
$ per tonne mined
 
 
$ per gold ounce sold
 
Mine operations
 
 
8,430
 
 
 
16.70
 
 
 
2.58
 
 
 
278
 
Processing operations
 
 
6,916
 
 
 
13.70
 
 
 
2.12
 
 
 
228
 
Administration
 
 
1,761
 
 
 
3.49
 
 
 
0.54
 
 
 
58
 
Land and royalty payments
 
 
2,182
 
 
 
4.32
 
 
 
0.67
 
 
 
72
 
 
 
 
19,289
 
 
 
38.21
 
 
 
5.90
 
 
 
635
 
 
Capital Cost Estimates
 
Initial capital costs are estimated at $7,402 million and sustaining capital costs are estimated at $1,723 million over the LOM.
 
Planned Mining Operations
 
The Donlin Gold project will be mined by a conventional truck-and-shovel operation. Initial pioneering and pit development will be undertaken to remove overburden, develop mine access roads suitable for large mining equipment, and “face-up” the initial pit for the large shovel and mining equipment.
 
Primary loading units for both bulk and selective mining in ore and waste will be large electric-hydraulic shovels, with large front-end loaders as secondary units. Large 360 tonne capacity haul trucks will be used for transporting both ore and waste out of the pit.
 
Blast hole drilling will be performed by medium-sized rotary and down-the-hole hammer drills with various hole diameters depending on bench height and desired mining selectivity. Reverse circulation (RC) drilling is planned for detailed geologic definition and grade control.
 
Support equipment will be used for road, bench, and dump maintenance and miscellaneous projects.
 
Planned Processing Operations
 
The Donlin Gold project ore will be processed by crushing and grinding, sulfide flotation concentration, concentrate treatment by pressure oxidation (POX) in an autoclave, carbon-in-leach (CIL) cyanide leaching of the oxidized concentrate, electrowinning, and refining to produce doré bars on site.
 
Due to gold being associated with sulfide mineralization, primarily arsenopyrite and pyrite, the ore is considered refractory and requires POX pre-treatment to liberate the gold prior to CIL leaching. Sulfide flotation concentration is required prior to POX to concentrate the sulfide content to a level sufficient to fuel the POX operation.
 
Concentrate is recovered from the primary rougher flotation followed by regrinding of the tailings prior to secondary rougher flotation. The secondary rougher concentrate is processed through a cleaner scavenger circuit producing a concentrate which is combined with the primary rougher concentrate for treatment by POX. The final tailings from the secondary rougher flotation tailings is thickened, and due to their neutralizing potential, is then utilized to modify the pH of the POX discharge solution prior to being transported to the TSF.
 
The oxidized concentrate from the POX operation would then be cyanide leached in a conventional CIL circuit to produce a pregnant (gold-bearing) solution. Gold from the solution is adsorbed onto activated carbon, which is later stripped (gold desorbed from carbon) in an elution circuit. The pregnant solution after elution is fed through electrowinning (EW) cells, where cathodes are plated with gold-bearing materials, which are periodically removed, dried in a retort, and melted in an induction furnace to produce doré bars.
 
Tailings from the CIL circuit would be treated in a cyanide detoxification process using SO2/air technology prior to being recombined with the flotation tailings and transported to the TSF.
 
Mercury naturally occurs in the Donlin Gold project ores and mercury abatement controls will be installed in six areas of the process facilities including POX, hot cure, EW, retort, refinery furnace, and carbon regeneration kiln. In these control systems, mercury will be collected for off-site shipment and management. Chemicals will be added to tailings to limit the potential for mercury releases from the TSF.
 
 
38
NOVAGOLD RESOURCES INC.
 
 
Proposed Production Plan and Schedule
 
Based on the S-K 1300 Report, the operating mine life is estimated to be 27 years with the nominal processing rate of 53,500 tonnes per day. Commercial gold production is expected after a period of approximately 6 years for basic and detailed engineering, and construction. In addition, the Donlin Gold board must approve a construction program and budget before construction of the Donlin Gold project can begin. The timing of the initiation of the required engineering work, of the Donlin Gold board’s approval of a construction program and budget, market conditions, and receipt of all required governmental permits and approvals will determine whether and when construction of the Donlin Gold project will begin.
 
Preproduction covers the first 15 months of the mine plan, when mining activities will focus on providing sufficient ore exposure for plant start-up. Ore mined during preproduction will be stockpiled and rehandled to the process during operations. Average mine production increases progressively in the initial years until the peak rate of 425,000 tonnes per day is reached in Year 6.
 
Proposed Waste Rock Facility (WRF)
 
Waste rock from open pit mining will be placed in an ex-pit WRF in the American Creek Valley, east of the pit area, or in a backfill dump in the ACMA pit. The ultimate footprint of the WRF covers an area of approximately 9 square kilometers. Approximately 2,232 million tonnes of waste rock and overburden will be placed in the WRF, and 423 million tonnes will be placed in the ACMA pit backfill dump. Approximately 103 million tonnes of waste rock will be used for construction purposes, and 17 million tonnes of overburden will be stockpiled and used later for reclamation purposes.
 
The potential magnitude of flow in the American Creek drainage, as well as discharge from springs in the valley floors, warrants the construction of an engineered rock drain system below the waste rock facility, including connecting secondary rock (finger) drains in the smaller contributing drainages.
 
Waste rock will be characterized by its potential for acid generation and assigned reactivity categories. Non-acid-generating (NAG) rock will be placed directly in the WRF, along with less reactive potentially acid-generating (PAG) rock, PAG5. Some of the more reactive PAG rock, PAG6, will be encapsulated in cells in the WRF to prevent water infiltration through them. The most reactive PAG rock, PAG7, will be backfilled in the ACMA pit beneath the ultimate pit lake water level.
 
Concurrent reclamation of the waste rock facility will be undertaken during operations.
 
Proposed Tailings Storage Facility (TSF)
 
The TSF in the Anaconda Creek basin will be a fully lined impoundment with a cross valley dam downstream (“main dam”) in the valley. The tailings dam will be constructed of compacted rock fill using the downstream method with a composite liner on the upstream face. The tailings impoundment footprint will be lined with a linear low-density polyethylene liner over a layer of broadly graded silty sand and gravel acting as low permeability bedding material and providing secondary containment. Material for construction will be sourced from the plant site and fuel farm during initial construction and from the open pit for the later raises during operations.
 
Water Diversion Dams
 
Water dams are required during the construction period and initial years of operation to protect the lined upstream face of the tailings-starter dam from a significant flood event, to provide a reliable source of fresh water during operation of the process plant, and to minimize runoff into the TSF.
 
Current and Planned On-Site Infrastructure
 
Current site infrastructure comprises an all-season, soft-sided camp with facilities consisting of kitchen, living quarters, equipment shop, drill shack and other buildings required for support of year-round exploration activities.
 
There is sufficient area within the project area to host an open pit mining operation, including the proposed open pit, waste rock facility, TSF and process facilities (primary and pebble crushers, coarse ore conveyor and coarse ore stockpile, concentrator, flotation, water treatment plants, POX, oxygen plant, boiler house, utility corridors, leach, refinery, cyanide destruct, and access walkways). Other planned site infrastructure is comprised of access roads, airstrip, accommodation camp, fuel tank farm, and dual-fueled power plant, truck shop, truck wash, workshops and vehicle repair facilities, assay laboratory, administration facilities and change rooms. Donlin Gold has secured the surface rights for the areas that may host these facilities.
 
In the nearby villages, Crooked Creek has approximately 105 residents and Aniak has a population of approximately 500. The workforce for the project would be sourced from the local area, from Alaskan regional centers and from other sources as required.
 
 
39
NOVAGOLD RESOURCES INC.
 
 
The project is a greenfield site. The on-site infrastructure for the project includes three main development sites in remote locations: the mine and plant site area (including the power plant), the permanent camp, and the airstrip. The plant site, power plant and fuel tank farm will be on a ridge above the proposed TSF. The layout of the plant site was designed to take maximum advantage of the natural topography. The layout also provides for efficient movement of equipment and material products around the site.
 
Planned Off-site Infrastructure
 
The off-site infrastructure for the project includes three main development sites in remote locations: the Jungjuk Port site and mine access road; the natural gas pipeline; and the Bethel Port facilities. The Jungjuk Port site is situated upriver from Bethel on the Kuskokwim River near the mouth of Jungjuk Creek. A port-to-mine access road (Jungjuk Road), approximately 30 miles (48 kilometers) long, will traverse varied terrain from the Jungjuk Port site to the mine site. A spur road, approximately 3 miles (4.8 kilometers) long, will serve the proposed project airstrip. The primary purpose of the Jungjuk Road is to transport freight and diesel from the Jungjuk Port site to the mine site, mostly by conventional highway tractors, tankers, and trailers. The natural gas pipeline is described under the Power heading below. The proposed Bethel Port will be situated near the town of Bethel, a community of approximately 6,080 residents, that is the main existing port on the Kuskokwim River and is an administrative and transportation hub for the 56 villages in the Y-K region. The existing Port of Bethel is the northernmost medium-draft port in the United States and is served by ocean-going barges. The proposed port would serve as a trans-shipment point from ocean barges to river barges to supply the project during the summer ice-free period.
 
Power
 
Natural gas will be delivered to site by an approximately 507-kilometer, 356-millimeter (14 inch) diameter pipeline to supply an on-site power generation facility. The S-K 1300 Report contemplates that the electric power for the site will be generated from a dual-fueled (natural gas and diesel), reciprocating engine power plant with a steam turbine utilizing waste heat recovery from the engines. The power plant consists of two equal halves, each consisting of six reciprocating engines, and a separate steam turbine. The total generation facility is nominally rated at 182 MW initially and will increase to 215 MW after four years with the addition of two more generators (one in each half) to allow for N+2 redundancy, thus allowing planned maintenance and predicted outages without cutting back production.
 
Operating costs are based on importing liquefied natural gas (LNG) by ship to Anchorage and total delivery cost to site which includes regasification of the LNG and delivery from Anchorage to the Donlin Gold project via the pipeline.
 
The pipeline would commence at the west end of the Beluga Gas Field, approximately 48 kilometers northwest of Anchorage at a tie-in near Beluga located in the Matanuska-Susitna Borough and would run to the mine site. The pipeline would receive booster compression supplied by one compressor station. No additional compression along the pipeline route would be required. The pipeline would have capacity to transport approximately 2 million cubic meters per day of natural gas.
 
Water
 
Water requirements for the proposed project have been summarized in a Water Resources Management Plan, which has been subject to review by state and federal agencies. Water primarily will be sourced from the two drainages (American and Anaconda Creeks) within the mine footprint and pit dewatering. In some years, the water supply from these sources may not be able to meet the makeup water requirements for the plant. In these circumstances, additional water will be obtained primarily from a proposed reservoir in Snow Gulch.
 
The source of water supply for the construction camp and, later, the plant site potable water systems is an array of eight deep wells south of Omega Gulch, near Crooked Creek. Water supply will be pumped to freshwater storage tanks and will be treated prior to consumption.
 
Markets
 
The marketing plan is for the owners of Donlin Gold to take in-kind their respective shares of the gold production, which they can then sell for their own benefit. Under the LLC Agreement, the manager shall give the members prompt notice in advance of the delivery date upon which their respective shares of gold production will be available.
 
Since there are a large number of available gold purchasers, the members should not be dependent upon the sale of gold to any one customer. Gold can be sold to various gold bullion dealers or smelters on a competitive basis at spot prices.
 
It is expected that selling contracts for NOVAGOLD’s share of the gold production will be typical of, and consistent with, standard industry practice, and be similar to contracts for the supply of doré elsewhere in the world.
 
 
40
NOVAGOLD RESOURCES INC.
 
 
Taxation
 
The S-K 1300 Report contemplates that the following taxes may be levied on the project:
 
 
●
Federal income tax – 21%.
 
 
●
Alaska state income tax – 9.4% of net income.
 
 
●
Alaska state mining license tax – 7% of taxable mining income. There is a tax holiday applied for the first 3.5 years from the start of production.
 
Income tax becomes payable after deductions for capital allowances.
 
Financial results
 
The total initial capital cost estimate for the Donlin Gold project is $7.4 billion. The project’s estimated after-tax NPV at a 5% discount rate is $3,040 million with an IRR after-tax at 9.2% using the base case gold price of $1,500 per ounce. The undiscounted break-even gold price is $930 per ounce and at a 5% discount rate is $1,180 per ounce. In the S-K 1300 Report, the overall economic viability of the project was evaluated by both discounted and undiscounted cash flow analyses, based on the engineering studies and cost estimates discussed in the S-K 1300 Report.
 
Assumptions in the model comprised:
 
 
●
Costs prior to project Year -6, the start of basic and detailed engineering, are considered sunk. For discounted cash flow (or NPV) purposes, the model commences in Year -6. Estimates were prepared for all the individual elements of cash revenue and cash expenditures for ongoing operations.
 
 
●
Estimated cash flows from revenue are based on a gold price of $1,500 per ounce. The pit has been optimized at a gold price of $1,200 per ounce.
 
 
●
Gold recovery is estimated to average 89.8% over the LOM based on work and testing performed for at least pre-feasibility study purposes.
 
 
●
Doré refining and shipping charges were estimated at $1.21 per ounce based on escalating to 2020 the actual refining charges for Barrick’s Goldstrike operations and a quotation for transportation and insurance costs from the Donlin Gold project site to a U.S.-based refinery utilized in 2011. In addition, 0.1% of gold produced from the mine is deducted as a cost of refining.
 
 
●
The current hydrometallurgical process selection renders any contained silver into a greater refractory state, which provides less than 10% silver recovery through standard metal leaching. As a consequence, silver is not included in the Mineral Resource and Mineral Reserve estimates, and no silver credit has been applied to the project.
 
 
●
To fund the $1,361 million reclamation and closure costs, the Project provides $412 million at closure by contributing to a Trust Fund commencing in Year -5 and continuing through the end of operations with annual contributions of $7.8 million. In addition to the Trust Fund, financial assurance in the form of letters of credit and/or surety bonds is required to construct and operate the mine. Per the Donlin Gold Project Reclamation Plan Approval from ADNR, financial assurance in the amount of approximately $322 million must be submitted in a form and substance approved by ADNR. The cost to maintain this financial assurance is assumed to be 0.4% of the total assured amount, annually. This equates to approximately $1.3 million per year, paid from the start of construction through the end of operations.
 
 
●
No salvage is assumed at the end of operations.
 
Current Activities
 
For information on current activities, see section Item 7, Management ’ s Discussion and Analysis of Financial Condition and Results of Operations , below.
 
Change in Mineral Resources and Reserves from 2020 to 2021
 
There were no changes in reported mineral resources and reserves reported for the years ended November 30, 2020 and 2021.
 
Mineral Resource and Reserve Internal Controls
 
Sample collection, preparation, analysis and security for all Donlin Gold core drill programs are in line with industry-standard methods for gold deposits. 
 
 
●
Drill programs included insertion of blank, duplicate and SRM samples
 
●
Quality Assurance/Quality Control program results do not indicate any problems with the analytical programs
 
41
NOVAGOLD RESOURCES INC.
 
 
 
●
Data is subject to validation, which includes checks on surveys, collar coordinates, lithology data, and assay data. The checks are appropriate, and consistent with industry standards
 
●
Independent data audits have been conducted and indicate that the sample collection and database entry procedures are acceptable
 
●
All core has been catalogued and stored in designated areas.
 
Mineral resources and mineral reserves are estimates that are imprecise and depend upon geologic interpretation and statistical inferences drawn from drilling and sampling analysis, which may prove to be unreliable.  See Risk Factors   – “ The quantities for our mineral resources and mineral reserves are estimates based on interpretation and assumptions and may yield less mineral production under actual conditions than is currently estimated. ”
 
 
 
 
 
 
42
NOVAGOLD RESOURCES INC.