Item 1. Business
Item 1.
Business
 
Overview
 
We operate in the gold mining industry, primarily focused on advancing the Donlin Gold project in Alaska. The Donlin Gold project is held by Donlin Gold LLC (“Donlin Gold”), a limited liability company owned equally by wholly-owned subsidiaries of NOVAGOLD and Barrick Gold Corporation (“Barrick”).
 
We do not produce gold or any other minerals, and do not currently generate operating earnings. Funding to explore our mineral properties and to operate the Company was acquired primarily through previous equity financings consisting of public offerings of our common shares and warrants and through debt financing consisting of convertible notes, and the sale of assets. We expect to continue to raise capital through additional equity and/or debt financings, through the exercise of stock options, and otherwise.
 
We were incorporated by memorandum of association on December 5, 1984, under the Companies Act (Nova Scotia) as 1562756 Nova Scotia Limited. On January 14, 1985, we changed our name to NovaCan Mining Resources (l985) Limited and on March 20, 1987, we changed our name to NOVAGOLD RESOURCES INC. On May 29, 2013, our shareholders approved the continuance of the corporation into British Columbia. Subsequently, we filed the necessary documents in Nova Scotia and British Columbia, and we continued under the Business Corporations Act (British Columbia) effective as of June 10, 2013. The current addresses, telephone and facsimile numbers of our offices are:
 
Executive office
Corporate office
201 South Main Street, Suite 400
400 Burrard Street, Suite 1860
Salt Lake City, UT, USA 84111
Vancouver, BC, Canada V6C 3A6
Telephone (801) 639-0511
Toll free (866) 669-6227
Facsimile (801) 649-0509
Facsimile (604) 669-6272
 
 
 
 
 
 
 
 
 
 
 
 
 
 
8
NOVAGOLD RESOURCES INC.
 
 
Corporate Structure
 
As of November 30, 2021, we had the following material, direct and indirect, wholly-owned subsidiaries: NOVAGOLD Resources Alaska, Inc., NOVAGOLD US Holdings Inc., NOVAGOLD USA, Inc., AGC Resources Inc, NOVAGOLD (Bermuda) Alaska Limited and NOVAGOLD Resources (Bermuda) Limited.
 
The following chart depicts the corporate structure of the Company together with the jurisdiction of incorporation of each of our material subsidiaries and related holding companies. All ownership is 100% unless otherwise indicated.
 
 
 
9
NOVAGOLD RESOURCES INC.
 
 
Human Capital Resources
 
On November 30, 2021, we had 14 full-time employees, of which four are located in Canada and ten are located in the United States. We also use consultants with specific skills to assist with various aspects of project evaluation, engineering, and corporate governance.
 
Company Values
 
Our company culture is the cornerstone of all our human capital programs. Empowering every employee to be their best, affording every employee the opportunity to make a difference, and giving every employee a chance to be heard are core Company values. Our values extend to the communities in which we work. We have adopted a Human Rights Policy focused on our commitment to having a positive influence in the communities where we operate which includes ensuring that we respect human rights.
 
Diversity
 
As of the end of fiscal year 2021, 43% of our total workforce were women. Selection of individuals for executive and other positions with the Company is guided by the Company’s policy which “prohibits discrimination in any aspect of employment based on race, color, religion, sex, national origin, disability or age.” Our Board and management acknowledge the importance of all aspects of diversity including gender, ethnic origin, business skills and experience, because it is right to do so and because it is good for our business. When considering candidates for executive positions, the Board’s evaluation considers the broadest possible assessment of each candidate’s skills and background with the overriding objective of ensuring that we have the appropriate balance of skills, experience, and capacity that the Company needs to be successful. In the context of this overriding objective, we have determined not to set targets for the percentage of women, or other aspects of diversity, in executive officer positions.
 
NOVAGOLD is committed to fostering, cultivating, and preserving a culture of diversity, equity and inclusion. Our employees are one of the most valuable assets we have. The collective sum of the individual differences, life experiences, knowledge, inventiveness, innovation, self-expression, unique capabilities, and talent that our employees invest in their work represents a significant part of our culture, reputation, and NOVAGOLD’s achievements.
 
NOVAGOLD is dedicated to creating an inclusive work environment for everyone. We embrace and celebrate the unique experiences, perspectives, and cultural backgrounds that each employee brings to our workplace. NOVAGOLD strives to foster an environment where our employees feel respected, valued and empowered, and our team members are at the forefront in helping us promote and sustain an inclusive workplace.
 
NOVAGOLD’s diversity initiatives are applicable—but not limited—to our practices and policies on recruitment and selection; compensation and benefits; professional development and training; promotions; and the ongoing development of a work environment built on the premise of gender and diversity equity. To that end, we seek out qualified diverse candidates to encourage them to apply for open positions, either from within or outside of the company. We also seek out opportunities to develop a pipeline of qualified diverse candidates in a particular profession when we are unable to find them ourselves.
 
We encourage:
 
 
●
Respectful communication and cooperation among all employees.
 
 
●
Teamwork and employee participation, fostering the representation of all employee perspectives.
 
 
●
Work/life balance through flexible work schedules to accommodate employees’ varying needs.
 
 
●
Learning about and, where appropriate, providing assistance in the communities near NOVAGOLD’s projects to promote a greater understanding and respect for diversity in those communities.
 
In 2021, the Company established and funded the NOVAGOLD Mining and Geological Engineering Scholarship at the University of Alaska to help support and encourage undergraduate students seeking bachelor’s degrees in Mining or Geological Engineering, with a focus on supporting underrepresented students.
 
Safety and Health
 
NOVAGOLD’s primary objective is to ensure the health and safety of its employees, partners, and contractors, and is reflected in its Health and Safety Policy. The Company has implemented COVID-19 policies at its offices in Salt Lake City and Vancouver designed to ensure the safety and well-being of all employees and the people associated with them. As a result of the COVID-19 pandemic, to reduce risk, our employees have been encouraged to be fully vaccinated against COVID-19, have been asked to work remotely, avoid all non-essential travel, adhere to good hygiene practices, and engage in physical distancing. Our focus on safety is also reflected at Donlin Gold where a wide-ranging set of policies were implemented at the Donlin Gold project site and Anchorage office to mitigate the spread of COVID-19. Also see section Item 7, Management ’ s Discussion and Analysis of Financial Condition and Results of Operations , below.
 
 
10
NOVAGOLD RESOURCES INC.
 
 
Recent Developments
 
The Company has elected to early adopt the mining disclosure standards of Subpart 229.1300 of Regulation S-K – Disclosure by Registrants Engaged in Mining Operations (“S-K 1300”). The Company will be subject to and required to disclose mineral resources and mineral reserves in accordance with S-K 1300. While the S-K 1300 rules are similar to National Instrument 43-101 Standards of Disclosure for Mineral Projects (“NI 43-101”) rules in Canada, they are not identical and therefore two reports have been produced for the Donlin Gold project. The information in Item 2, Properties, below is common to both reports and contains pertinent information required under S-K 1300.
 
Donlin Gold Technical Report (NI 43-101)
 
The Company retained Wood Canada Limited (“Wood”) to update content in its previously filed “ Donlin Creek Gold Project, Alaska, USA, NI 43-101 Technical Report on the Second Updated Feasibility Study ,” effective November 18, 2011, and amended January 20, 2012 (“2011 Mining Study”). Wood completed an exercise to verify which content in the 2011 Mining Study remains current, and what was required to update the report content with the latest information. Updated content includes operating costs, capital costs, tax rates, long term gold price, and the economic analysis. Additionally, work done on the property since 2011 with respect to exploration, drilling, permitting, and minor mine design changes as a result of recent permitting activities are summarized in the updated content. A data verification exercise was completed by each Wood Qualified Person (“QP”) co-authoring the report. This included a September 2020 site visit by two of the report QPs; review of the geologic data, geologic model, and resource model; review of metallurgical test work; review of designs for mining, processing, and infrastructure, including minor design updates; update of capital and operating cost estimates utilizing a combination of cost indices and vendor quotations; and an updated economic analysis. Canadian NI 43-101 Definitions and CIM Definition Standards for Mineral Resources and Mineral Reserves (“CIM Definition Standards”), adopted by CIM Council on May 10, 2014 apply for this exercise.
 
The Wood review determined that the report updating exercise resulted in no material change to the Mineral Resources or Mineral Reserves. On August 31, 2021, the Company voluntarily filed an updated NI 43-101 technical report for the Donlin Gold project in Alaska, USA, and titled “ NI 43-101 Technical Report on the Donlin Gold Project, Alaska, USA ,” with an effective date of June 1, 2021 (“2021 Technical Report”) reflecting the results of the above exercise. The 2021 Technical Report was prepared by Wood and the following contributors, each of whom is a QP under NI 43-101: Henry Kim, P.Geo., Senior Resource Geologist, Wood Canada Limited; Mike Woloschuk, P.Eng., VP Global Business Development & Consulting, Wood Group USA, Inc.; and Kirk Hanson, MBA, P.E., Technical Director, Open Pit Mining, Wood Group USA, Inc. The 2021 Technical Report is available on the Company’s website and on EDGAR at www.sec.gov and on SEDAR at www.sedar.com.
 
Donlin Gold Technical Report Summary (S-K 1300)
 
The Company is a registrant with the SEC and is reporting its exploration results, Mineral Resources, and Mineral Reserves using the mining disclosure standards of S-K 1300. The Company requested that Wood Canada Limited (“Wood”) prepare a Technical Report Summary of the Donlin Gold project, Alaska, USA using the standards of S-K 1300 and it is titled “ S-K 1300 Technical Report Summary on the Donlin Gold Project, Alaska, USA ” (“S-K 1300 Report”), current as of November 30, 2021, with a report date of November 30, 2021. Wood prepared the S-K 1300 Report from the 2011 Mining Study of the Donlin deposits that was completed to at least pre-feasibility level, as defined by S-K 1300, at the time of the study. Material aspects of the 2011 Mining Study were updated by Wood in 2020 and made current. As part of the update process, Wood’s subject matter experts completed an exercise to verify and update the content of the 2011 Mining Study with the latest information under the supervision of Wood’s independent QP co-authors of the S-K 1300 Report. Updated content includes operating costs, capital costs, taxes, forecast long term gold price and the economic analysis. Additionally, work done since 2011 on the property with respect to exploration, drilling, permitting and minor project design changes as a result of recent permitting activities are summarized in the S-K 1300 Report. A data verification exercise was completed by each Wood QP co-authoring the S-K 1300 Report. Wood QPs verified that the updated content of the 2011 Mining Study met at least pre-feasibility level of study as defined in S-K 1300, and it supports the disclosure of exploration results, Mineral Resources, and Mineral Reserves using S-K 1300 standards.
 
Results of the Donlin Gold Technical Report (NI 43-101) and Donlin Gold Technical Report Summary (S-K 1300)
 
Wood reviewed the geologic and resource models that supported the 2011 Mining Study, including comparing them to data from recent drilling programs, and determined that they continue to be adequate and suitable to be used for a Mineral Resource estimation. Using updated cost inputs from the first calendar quarter of 2020, a gold price of $1,500 per ounce, and the geologic and resource models utilized in support of the 2011 Mining Study, the contents within an updated optimized pit shell did not show a material change to the Mineral Resources stated in the 2011 Mining Study. Therefore, the Mineral Resources are considered current as of November 30, 2021 and are unchanged. They continue to have an effective date of July 11, 2011.
 
11
NOVAGOLD RESOURCES INC.
 
 
Similarly, using updated cost inputs, a gold price of $1,200 per ounce, and the geologic and resource models utilized in support of the 2011 Mining Study with appropriate modifying factors applied for Mineral Reserve estimation, the previous Mineral Reserve ultimate pit was contained within an updated optimized pit shell. Therefore, the Mineral Reserves remain current as of November 30, 2021 and are unchanged. Because the Mineral Reserves are supported by an updated economic analysis they have an effective date of April 27, 2021.
 
Outside of verifying the Mineral Resource and Mineral Reserve estimates, the primary efforts in the 2021 Technical Report and the S-K 1300 Report were financial and permitting updates. This includes updates to estimated capital costs, operating costs, reclamation and closure costs, royalties, taxes, and economic analysis, as well as current status of the permits. Updated capital costs are based on first calendar quarter 2020 pricing (cost indices and current commodity pricing and equipment quotes) applied to the engineering designs and material take-offs from the 2011 Mining Study, except for minor changes made during permitting in the operations water treatment plant and the natural gas pipeline. As a result of the content updates, the total initial capital cost estimate is $7,402 million, which is an increase of 10.8% or $723 million compared to the 2011 Mining Study total initial capital cost estimate. Likewise, the total sustaining capital estimate is $1,723 million, which is an increase of 14.6% or $219 million compared to the 2011 Mining Study total sustaining capital estimate. The 2011 Mining Study operating costs were updated to first calendar quarter 2020 by updating key cost drivers like energy, labor, consumables, and freight. No material changes to project designs, schedules, or productivities were made; consequently, the manning schedules and consumables remain unchanged. The updated estimated LOM operating costs total $19,289 million, which is $5.90/t mined, $38.21/t processed, or $635/oz gold sold.
 
The economic evaluation of the Donlin Gold project in both the 2021 Technical Report and the S-K 1300 Report was updated using the following inputs:
 
 
●
A production plan based on the 2011 Mining Study of 53,500 t/d open pit gold mine with ore processing by means of flotation, pressure oxidation, and cyanidation. The pit designs and Mineral Reserves were based on the Measured and Indicated Mineral Resource estimates that were verified as remaining current. Annual LOM gold production averages 1.13 million ounces per year over a production life of 27 years, including 1.46 million ounces per year for the first five full years of production.
 
 
●
$1,500/oz gold price
 
 
●
Current land and royalty agreements
 
 
●
Initial and sustaining capital costs, and operating costs updated to first calendar quarter 2020
 
 
●
Tax payments in accordance with the Tax Cuts and Jobs Act (“TCJA”) enacted in December 2017 and effective January 1, 2018
 
 
●
$292 million LOM contributions for reclamation, closure, and financial assurance
 
 
●
Financing has been assumed on a 100%, all equity, stand-alone basis
 
 
●
Escalation/inflation has been excluded
 
 
●
No salvage is assumed at the end of operations
 
Based on the economic evaluation, the Donlin Gold project generates positive before and after-tax economic results. Total after-tax cash flow is $13,145 million, after-tax NPV at a 5% discount rate is $3,040 million, and the after-tax internal rate of return is 9.2%. After-tax payback is achieved 7.3 years following the start of production.
 
Donlin Gold project
 
In 2021, Donlin Gold completed a 79-hole drilling program totaling approximately 24,264 meters in both the ACMA and Lewis deposit areas. The primary objective of the program was to validate recent geologic modeling concepts and test for extensions of high-grade zones in both intrusive (igneous) and sedimentary rocks. Assays are pending and will be disclosed in 2022.
 
For further information, see section Item 7, Management ’ s Discussion and Analysis of Financial Condition and Results of Operations , below.
 
Reclamation
 
We will generally be required to mitigate long-term environmental impacts by stabilizing, contouring, re-sloping and re-vegetating various portions of a site after mining and mineral processing operations are completed. These reclamation efforts will be conducted in accordance with detailed plans, which are approved by the appropriate regulatory agencies. In addition, financial assurance acceptable to the regulatory authority with jurisdiction over reclamation must be provided in an amount that the authority determines to be sufficient to allow the authority to implement the approved reclamation plan in the event that the project owners fail to complete the work as provided in the plan.
 
12
NOVAGOLD RESOURCES INC.
 
 
Government and Environmental Regulations
 
Our exploration and development activities are subject to various national, state, and local laws and regulations in the United States, which govern prospecting, development, mining, production, exports, taxes, labor standards, occupational health, waste disposal, protection of the environment, mine safety, hazardous substances, disclosure requirements and other matters. We have obtained or have pending applications for those licenses, permits or other authorizations currently required to conduct our exploration and development programs. We believe that we are in compliance in all material respects with applicable mining, health, safety and environmental statutes and regulations in the United States. There are no current orders or directions relating to us with respect to the foregoing laws and regulations. For a more detailed discussion of the various government laws and regulations applicable to our operations and potential negative effects of these laws and regulations, see section Item 1A, Risk Factors , below.
 
Competition
 
We compete with other mineral resource exploration and development companies for financing, technical expertise, and the acquisition of mineral properties. Many of the companies with whom we compete have greater financial and technical resources. Accordingly, these competitors may be able to spend greater amounts on the acquisition, exploration, and development of mineral properties. This competition could adversely impact our ability to finance further exploration and to obtain the financing necessary for us to develop the Donlin Gold project.
 
 
Availability of Raw Materials and Skilled Employees
 
Most aspects of our business require specialized skills and knowledge. Such skills and knowledge include the areas of geology, drilling, resource estimating, metallurgy, mine planning, logistical planning, preparation of pre-feasibility and feasibility studies, permitting, engineering, construction and operation of a mine, financing, legal, accounting, investor relations, and community relations. Historically, we have found that we can locate and retain appropriate employees and consultants and we believe we will continue to be able to do so.
 
The raw materials we require to carry on our business are readily available through normal supply or business contracting channels in the United States and Canada. Historically, we have been able to secure the appropriate equipment and supplies required to conduct our contemplated programs. As a result, we do not believe that we will experience any shortages of required equipment or supplies in the foreseeable future.
 
Seasonality
 
Our business can be seasonal as our mineral exploration and development activities take place in southwestern Alaska. Due to the northern climate, work on the Donlin Gold project can be limited due to excessive snow cover and cold temperatures. In general, surface work often is limited to late spring through early fall, although work in some locations is more readily and efficiently completed during the winter months when the ground is frozen.
 
Gold Price History
 
The price of gold is volatile and is affected by numerous factors, all of which are beyond our control, such as the sale or purchase of gold by various central banks and financial institutions, inflation, recession, fluctuation in the relative values of the U.S. dollar and foreign currencies, changes in global and regional gold demand, in addition to international and national political and economic conditions.
 
The following table presents the annual high, low and average daily afternoon London Bullion Market Association (“LBMA”) Gold Price over the past five calendar years on the London Bullion Market ($/ounce):
 
Year
 
High
 
 
Low
 
 
Average
 
2017
 
$
1,346
 
 
$
1,151
 
 
$
1,257
 
2018
 
$
1,355
 
 
$
1,178
 
 
$
1,269
 
2019
 
$
1,546
 
 
$
1,271
 
 
$
1,392
 
2020
 
$
2,067
 
 
$
1,474
 
 
$
1,770
 
2021
 
$
1,943
 
 
$
1,684
 
 
$
1,799
 
2022 (through January 19)
 
$
1,827
 
 
$
1,789
 
 
$
1,812
 
 
On January 19, 2022, the afternoon LBMA gold price was $1,827 per ounce.
 
Data Source: www.kitco.com
 
13
NOVAGOLD RESOURCES INC.
 
 
Available Information
 
We maintain a website at www.novagold.com and make available, through the Investors section of the website, our Annual Reports on Form 10-K, Quarterly Reports on Form 10-Q, Current Reports on Form 8-K, Section 16 filings and all amendments to those reports, as soon as reasonably practicable after such material is electronically filed with the Securities and Exchange Commission (“SEC”). These reports are also available at the SEC website at www.sec.gov. Certain other information, including but not limited to the Company’s Corporate Governance Guidelines, the charters of key committees of its Board of Directors and its Code of Business Conduct and Ethics are also available on the website. Our website and the information contained therein or connected thereto are not intended to be, and are not incorporated into this Annual Report on Form 10-K.
 
Item 1A.
 Risk Factors
 
You should carefully consider the following risk factors in addition to the other information included in this Annual Report on Form   10-K. Each of these risk factors could adversely affect our business, operating results and financial condition, as well as adversely affect the value of an investment in our common shares. The risks described below are not the only ones facing the Company. Additional risks that we are not presently aware of, or that we currently believe are immaterial, may also adversely affect our business, operating results and financial condition. We cannot assure you that we will successfully address these risks and caution that other unknown risks may exist or may arise that may affect our business.
 
An investment in our securities is speculative and involves a high degree of risk due to the nature of our business and the present stage of exploration and development of our mineral properties. The following risk factors, as well as risks not currently known to us, could materially adversely affect our future business, operations and financial condition and could cause them to differ materially from the estimates described in the forward-looking statements relating to us.
 
Risks Related to Our Business
 
We have no history of commercially producing precious metals from our mineral exploration properties and there can be no assurance that we will successfully establish mining operations or profitably produce precious metals.
 
The Donlin Gold project is not in production or currently under construction, and we have no ongoing mining operations or revenue from mining operations. Mineral exploration and development has a high degree of risk and few properties that are explored are ultimately developed into producing mines. The future development of the Donlin Gold project will require obtaining permits and financing and the construction and operation of mines, processing plants and related infrastructure. As a result, we are subject to all of the risks associated with establishing new mining operations and business enterprises, including:
 
 
●
the need to obtain necessary environmental and other governmental approvals and permits, and the timing and conditions of those approvals and permits;
 
 
●
the availability and cost of funds to finance construction and development activities;
 
 
●
the timing and cost, which can be considerable, of the construction of mining and processing facilities as well as related infrastructure;
 
 
●
potential opposition from non-governmental organizations, environmental groups or local groups which may delay or prevent development activities;
 
 
●
potential increases in construction and operating costs due to changes in the cost of labor, fuel, power, materials and supplies, services, and foreign exchange rates;
 
 
●
the availability and cost of skilled labor and mining equipment; and
 
 
●
the availability and cost of appropriate smelting and/or refining arrangements.
 
The costs, timing and complexities of mine construction and development are increased by the remote location of our mineral properties, with additional challenges related thereto, including access, water and power supply, and other support infrastructure. Cost estimates may increase significantly as more detailed engineering work and studies are completed on a project. New mining operations commonly experience unexpected costs, problems and delays during development, construction, and mine start-up. In addition, delays in the commencement of mineral production often occur. Accordingly, there are no assurances that our activities will result in profitable mining operations, or that we will successfully establish mining operations, or profitably produce precious metals at the Donlin Gold project.
 
In addition, there is no assurance that our mineral exploration activities will result in any discoveries of new ore bodies. If further mineralization is discovered there is also no assurance that the mineralized material would be economical for commercial production. Discovery of mineral deposits is dependent upon a number of factors and significantly influenced by the technical skill of the exploration personnel involved. The commercial viability of a mineral deposit is also dependent upon a number of factors which are beyond our control, including the attributes of the deposit, commodity prices, government policies and regulation, and environmental protection requirements.
 
14
NOVAGOLD RESOURCES INC.
 
 
We have a history of net losses and expect losses to continue for the foreseeable future.
 
We have a history of net losses and we expect to incur net losses for the foreseeable future. The Donlin Gold project has not advanced to the commercial production stage and we have no history of earnings or cash flow from operations. We expect to continue to incur net losses unless and until such time the Donlin Gold project commences commercial production and generates sufficient revenues to fund continuing operations. The development of our mineral properties to achieve production will require the commitment of substantial financial resources. The amount and timing of expenditures will depend on a number of factors, including the progress of ongoing exploration and development, the results of consultants’ analyses and recommendations, the rate at which operating losses are incurred, the process of obtaining required government permits and approvals, the availability and cost of financing, the participation of our partners, and the execution of any sale or joint venture agreements with strategic partners. These factors, and others, are beyond our control. There is no assurance that we will be profitable in the future.
 
We have a limited property portfolio.
 
At present, our only material mineral property is the interest that we hold in the Donlin Gold project. Unless we acquire or develop additional mineral properties, we will be solely dependent upon this property. If no additional mineral properties are acquired by us, any adverse development affecting our operations and further development at the Donlin Gold project may have a material adverse effect on our financial condition and results of operations.
 
Our ability to continue the exploration, permitting, development, and construction of the Donlin Gold project, and to continue as a going concern, will depend in part on our ability to obtain suitable financing.
 
We have limited financial resources. We will need external financing to develop and construct the Donlin Gold project. According to the S-K 1300 Report, the total initial capital cost estimate for the Donlin Gold project is approximately $7,402 million which includes the costs related to the natural gas pipeline (100% basis). These cost estimates may change materially as our studies are updated. Our failure to obtain sufficient financing could result in the delay or indefinite postponement of exploration, development, construction, or production at the Donlin Gold project. The cost and terms of such financing may significantly reduce the expected benefits from development of the Donlin Gold project and/or render such development uneconomic. There can be no assurance that additional capital or other types of financing will be available when needed or that, if available, the terms of such financing will be favorable. Our failure to obtain financing could have a material adverse effect on our growth strategy and results of operations and financial condition.
 
We intend to fund our business plan from working capital, the proceeds of financings, and the proceeds received from the sale of our interest in the Galore Creek project. In the future, our ability to continue our exploration, permitting, development, and construction activities, if any, will depend in part on our ability to obtain suitable financing. If we raise additional funding by issuing additional equity securities or other securities that are convertible into equity securities, such financings may substantially dilute the interest of existing or future shareholders. Sales or issuances of a substantial number of securities, or the perception that such sales could occur, may adversely affect the prevailing market price for our common shares. With any additional sale or issuance of equity securities, investors will suffer dilution of their voting power and may experience dilution in earnings per share.
 
There can be no assurance that we will commence production at the Donlin Gold project or generate sufficient revenues to meet our obligations as they become due or obtain necessary financing on acceptable terms, if at all. Our failure to meet our ongoing obligations on a timely basis could result in the loss or substantial dilution of our interests (as existing or as proposed to be acquired) in the Donlin Gold project. In addition, should we incur significant losses in future periods, we may be unable to continue as a going concern, and realization of assets and settlement of liabilities in other than the normal course of business may be at amounts materially different than our estimates.
 
Actual capital costs, operating costs, production and economic returns may differ significantly from those we have anticipated and there are no assurances that any future development activities will result in profitable mining operations.
 
The capital costs to take the Donlin Gold project into production may be significantly higher than anticipated. As a result of the content updates included in the 2021 Technical Report and S-K 1300 Report, the total initial capital cost estimate for the Donlin Gold project is $7,402 million. Likewise, the total sustaining capital estimate is $1,723 million.
 
We do not have an operating history upon which we can base estimates of future operating costs. Decisions about the development of the Donlin Gold project will ultimately be based upon feasibility studies. Feasibility studies derive estimates of cash operating costs based upon, among other things:
 
 
●
anticipated tonnage, grades and metallurgical characteristics of the ore to be mined and processed;
 
 
●
anticipated recovery rates of gold and other precious metals from the ore;
 
 
●
cash operating costs of comparable facilities and equipment; and
 
15
NOVAGOLD RESOURCES INC.
 
 
 
●
anticipated climatic conditions.
 
Capital costs, operating costs, production and economic returns, and other estimates contained in studies or estimates prepared by or for us may differ significantly from those anticipated by our current or future studies and estimates, and there can be no assurance that the initial capital costs incurred to construct, and the sustaining capital and operating costs incurred in operating the Donlin Gold project will not be higher than currently anticipated.
 
Changes in the market price of gold, which in the past has fluctuated widely, affect our financial condition.
 
Our profitability and long-term viability will depend, in large part, upon the market price of gold that may be produced from our Donlin Gold project. The market price of gold is volatile and is impacted by numerous factors beyond our control, including:
 
 
●
global or regional consumption patterns;
 
 
●
expectations with respect to the rate of inflation;
 
 
●
the relative strength of the U.S. dollar and certain other currencies;
 
 
●
interest rates;
 
 
●
global or regional political or economic conditions, including interest rates and currency values;
 
 
●
supply and demand for jewelry and industrial products containing gold; and
 
 
●
sales or purchases by central banks and other holders, speculators, and producers of gold in response to any of the above factors.
 
We cannot predict the effect of these factors on the price of gold. A decrease in the market price of gold could affect our ability to finance the development of the Donlin Gold project, which would have a material adverse effect on our financial condition and results of operations. There can be no assurance that the market price of gold will remain at current levels or that such prices will improve. An increase in worldwide supply, and consequent downward pressure on prices, may result over the longer term from increased production from the development of new or expansion of existing mines. There is no assurance that if commercial quantities of gold are discovered, that a profitable market may exist or continue to exist for a production decision to be made or for the ultimate sale of gold.
 
General economic conditions may adversely affect our growth, future profitability and ability to finance.
 
Some key impacts which can contribute to financial market turmoil potentially impacting the mining industry include contraction in credit markets resulting in a widening of credit risk, imposition of trade tariffs among various countries, devaluations, high volatility in global equity, commodity, foreign exchange and precious metal markets and a lack of market liquidity. The prices of gold and gold mining company equities have experienced significant volatility over the past few years.
 
A decrease in gold prices or tightening of credit in the financial markets or other economic conditions, including but not limited to, consumer spending, employment rates, business conditions, inflation, fuel and energy costs, consumer debt levels, lack of available credit, the state of the financial markets, interest rates and tax rates, may adversely affect our ability to finance development and construction of the Donlin Gold project. Specifically:
 
 
●
global economic conditions could make other investment sectors more attractive, thereby affecting the cost and availability of financing to us and our ability to achieve our business plan;
 
 
●
the imposition of protectionist or retaliatory trade tariffs by countries may impact our ability to import materials needed to construct our projects or conduct our operations, or to export our products, at prices that are economically feasible for our operations, or at all;
 
 
●
the volatility of metal prices would impact the economic viability of the Donlin Gold project and any future revenues, profits, losses and cash flow;
 
 
●
negative economic pressures could adversely impact demand for future production from the Donlin Gold project;
 
 
●
construction related costs could increase and adversely affect the economics of the Donlin Gold project;
 
 
●
volatile energy, commodity and consumables prices and currency exchange rates would impact our future production costs; and
 
 
●
the devaluation and volatility of global stock markets would impact the valuation of our equity and other securities.
 
The coronavirus (COVID-19) pandemic may affect our operations.
 
The Company faces risks related to health epidemics/pandemics, and other outbreaks of communicable diseases, which could significantly disrupt its operations and may materially and adversely affect its business and financial conditions.
 
The Company’s business could be adversely impacted by the effects of COVID-19 or other epidemics/pandemics. The extent to which COVID-19 impacts the Company’s business, including its operations and the market for its securities, will depend on future developments, which are highly uncertain and cannot be predicted at this time, and include the duration, severity and scope of the pandemic and the actions taken to contain or treat COVID-19. In particular, the continued spread of COVID-19 could materially and negatively impact the Company’s business including without limitation, employee health, workforce productivity, insurance premiums, ability to travel, the availability of industry experts and personnel, restrictions or delays to future Donlin Gold drill and work programs and/or the timing to process drill and other metallurgical testing, and other factors that will depend on future developments beyond the Company’s control, which may have a material and adverse effect on its business, financial condition and results of operations.
 
 
16
NOVAGOLD RESOURCES INC.
 
 
There can be no assurance that the Company's personnel will not be impacted by these epidemic/pandemic diseases and ultimately see its workforce productivity reduced and incur increased medical costs or insurance premiums due to these health risks.
 
We are dependent on a third party that participates in exploration and development of our Donlin Gold project.
 
Our success with respect to the Donlin Gold project depends on the efforts and expertise of a third party with whom we have an agreement; we hold a 50% interest and the remaining 50% interest is held by a third party that is not under our control or direction. We are dependent on that third party for the progress and development of the Donlin Gold project. The third party may also have different priorities which could impact the timing and cost of development of the Donlin Gold project. The third party may also be in default of its agreement with us, without our knowledge, which may put the mineral property and related assets at risk. The existence or occurrence of one or more of the following circumstances and events could have a material adverse impact on our ability to achieve our business plan, profitability, or the viability of our interests held with the third party, which could have a material adverse impact on our business, future cash flows, earnings, results of operations and financial condition: (i) disagreement with the third party on how to develop and operate the Donlin Gold project efficiently; (ii) inability to exert influence over certain strategic decisions made in respect of the jointly-held Donlin Gold project; (iii) inability of the third party to meet its obligations to the joint business or other parties; and (iv) litigation with the third party regarding joint business matters.
 
Opposition to our operations from local stakeholders or non-governmental organizations could have a material adverse effect on us.
 
There is ongoing public concern relating to the effect of mining production on its surroundings, communities, and environment. Local communities and non-governmental organizations (NGOs), some of which oppose resource development, are often vocal critics of the mining industry. While we seek to operate in a socially responsible manner, opposition to extractive industries or our operations specifically or adverse publicity generated by local communities or NGOs related to extractive industries, or our operations specifically, could have an adverse effect on our reputation and financial condition or our relationships with the communities in which we operate. As a result of such opposition or adverse publicity, we may be unable to obtain permits necessary for our operations or to continue our operations as planned or at all. See “Recent Developments” above.
 
We require various permits to conduct our current and anticipated future operations, and delays or a failure to obtain such permits, or a failure to comply with the terms of any such permits that we have obtained, could have a material adverse impact on us.
 
Our current and anticipated future operations, including further exploration and development activities and commencement of production on the Donlin Gold project, require permits from various United States federal, state, and local governmental authorities. There can be no assurance that all permits that we require for the construction of mining facilities and to conduct mining operations will be obtainable on reasonable terms, or at all. Delays or a failure to obtain such permits, or a failure to comply with the terms of any such permits that we have obtained, could have a material adverse impact on us.
 
The duration and success of efforts to obtain and renew permits are contingent upon many variables not within our control. Shortage of qualified and experienced personnel in the various levels of government could result in delays or inefficiencies. Backlog within the permitting agencies could affect the permitting timeline of the various projects. Other factors that could affect the permitting timeline include (i) the number of other large-scale projects currently in a more advanced stage of development which could slow down the review process and (ii) significant public response regarding a specific project. As well, it can be difficult to assess what specific permitting requirements will ultimately apply to the Donlin Gold project.
 
The quantities for our mineral resources and mineral reserves are estimates based on interpretation and assumptions and may yield less mineral production under actual conditions than is currently estimated.
 
Unless otherwise indicated, mineralization quantities presented in this Annual Report on Form 10-K and in our other filings with securities regulatory authorities, press releases and other public statements that may be made from time to time are based upon estimates made by our personnel and independent professionals. In addition, these estimates are imprecise and depend upon geologic interpretation and statistical inferences drawn from drilling and sampling analysis, which may prove to be unreliable. There can be no assurance that:
 
 
●
these estimates will be accurate;
 
 
●
mineral reserve, mineral resource or other mineralization figures will be accurate; or
 
 
●
this mineralization could be mined, processed, or sold profitably.
 
17
NOVAGOLD RESOURCES INC.
 
 
Because we have not commenced commercial production at the Donlin Gold project, mineralization estimates may require adjustments, including potential downward revisions based upon further exploration or development work, actual production experience, or changes in the price of gold. In addition, the grade of ore ultimately mined, if any, may differ from that indicated by drilling results. There can be no assurance that the percentage of minerals recovered in small-scale tests will be duplicated in large-scale tests under on-site conditions or at production scale.
 
Mineral resource estimates for mineral properties that have not commenced production are based, in many instances, on limited and widely spaced drill hole information, which is not necessarily indicative of the conditions between and around drill holes. Accordingly, such mineral resource estimates may require revision as more drilling information becomes available or as actual production experience is gained. No assurance can be given that any part or all of our mineral resources constitute or will be converted into reserves.
 
The estimating of mineral reserves and mineral resources is a subjective process that relies on the judgment and experience of the persons preparing the estimates. The process relies on the quantity and quality of available data and is based on knowledge, mining experience, analysis of drilling results and industry practices. Valid estimates made at a given time may significantly change when new information becomes available. By their nature, mineral resource and reserve estimates are imprecise and depend, to a certain extent, upon analysis of drilling results and statistical inferences that may ultimately prove to be inaccurate. There can be no assurances that actual results will meet the estimates contained in studies.
 
Estimated mineral reserves or mineral resources may have to be recalculated based on changes in metal prices, further exploration or development activity, or actual production experience. In addition, if production costs increase, recovery rates decrease, if applicable laws and regulations are adversely changed, there is no assurance that the anticipated level of recovery will be realized or that mineral reserves or mineral resources as currently reported can be mined or processed profitably. This could materially and adversely affect estimates of the volume or grade of mineralization, estimated recovery rates or other important factors that influence mineral reserve or mineral resource estimates. The extent to which mineral resources may ultimately be reclassified as mineral reserves is dependent upon the demonstration of their profitable recovery. Any material changes in mineral resource estimates and grades of mineralization will affect the economic viability of placing a mineral property into production and a mineral property’s return on capital. We cannot provide assurance that mineralization identified at the Donlin Gold project can or will be mined or processed profitably.
 
The mineral resource and mineral reserve estimates contained in this Annual Report on Form 10-K have been determined and valued based on assumed future prices, cut-off grades and operating costs that may prove to be inaccurate. Extended declines in market prices for gold may render portions of our mineralization uneconomic and result in reduced reported mineralization. Any material reductions in estimates of mineralization, or of our ability to extract this mineralization, could have a material adverse effect on our ability to implement our business strategy, the results of operations or our financial condition.
 
We have established the presence of proven and probable mineral reserves at the Donlin Gold project in accordance with the disclosure definition and standards contained in S-K 1300 and in NI 43-101. There can be no assurance that any mineral resource estimates for our mineral projects will ultimately be reclassified as mineral reserves. The failure to establish proven and probable mineral reserves could restrict our ability to successfully implement our strategies for long-term growth and could impact future cash flows, earnings, results of operation and financial condition.
 
Lack of infrastructure could delay or prevent us from developing advanced projects.
 
Completion of the development of the Donlin Gold project is subject to various requirements, including the availability and timing of acceptable arrangements for power, water, transportation, access, and facilities. The lack of availability on acceptable terms or the delay in the availability of any one or more of these items could prevent or delay development of the project. There can be no assurance that adequate infrastructure, including access and power supply, will be built, that it will be built in a timely manner or that the cost of such infrastructure will be reasonable or that it will be sufficient to satisfy the requirements of the project. If adequate infrastructure is not available in a timely manner, there can be no assurance that:
 
 
●
the development of the Donlin Gold project will be commenced or completed on a timely basis, if at all;
 
 
●
the resulting operations will achieve the anticipated production volume; or
 
 
●
the construction costs and ongoing operating costs associated with the development of the Donlin Gold project will not be higher than anticipated.
 
Access to the Donlin Gold project is limited and there is no infrastructure that serves the project area. An approximately 507-kilometer natural gas pipeline is needed to supply fuel to the proposed on-site generating plant to provide power for the Donlin Gold project. The proposed pipeline would traverse generally undeveloped areas in Alaska that are difficult to access. Transportation of most of the supplies needed to construct and operate the Donlin Gold project would be accomplished by barging materials on the Kuskokwim River during the annual shipping season which typically occurs from late April to mid-October. Two ports would be needed on the Kuskokwim River, the first located in Bethel, Alaska, where ocean barges would transition materials to river barges; and the second located approximately 320 kilometers upriver from Bethel. A 48-kilometer access road from the upriver port to the project site is needed to deliver the materials. Additionally, a 1,500-meter airstrip would be built to provide year-round access to the project. Terrain, geologic conditions, ground conditions, steep slopes, river levels, ice breakup, weather, climate change impacts and other natural conditions that are beyond our control along the pipeline and transportation routes present design, permitting, construction, and operational challenges for the project. Cost and schedule estimates may increase significantly as more detailed engineering work, geotechnical and geological studies are completed.
 
 
18
NOVAGOLD RESOURCES INC.
 
 
Title and other rights to our mineral properties are subject to agreements with other parties.
 
The subsurface mineral and surface rights at the Donlin Gold project are owned by Calista and TKC, respectively, two Native corporations. Donlin Gold operates on these lands pursuant to a Mining Lease with Calista (“Calista Lease”) and a Surface Use Agreement (“SUA”) with TKC. The ability of Donlin Gold to continue to explore and develop the Donlin Gold project depends upon its continued compliance with the terms and conditions of the Calista Lease and SUA. Furthermore, our ability to continue to explore and develop other mineral properties may be subject to agreements with other third parties, including agreements with Native corporations, for instance.
 
Our largest shareholder has significant influence on us and may also affect the market price and liquidity of our securities.
 
Electrum Strategic Resources L.P. (“Electrum”) and its affiliate GRAT Holdings LLC hold in the aggregate 25.4% of our issued and outstanding common shares as of January 19, 2022. Accordingly, Electrum and its affiliates will have significant influence in determining the outcome of any corporate transaction or other matter submitted to the shareholders for approval, including mergers, consolidations, and the sale of all or substantially all of our assets and other significant corporate actions. Unless full participation of all shareholders takes place in such shareholder meetings, Electrum and its affiliates may be able to approve such matters itself. The concentration of ownership of the common shares by Electrum and its affiliates may: (i) delay or deter a change of control of the Company; (ii) deprive shareholders of an opportunity to receive a premium for their common shares as part of a sale of the Company; and (iii) affect the market price and liquidity of the common shares. In conjunction with the January 22, 2009 financing, we provided Electrum with the right to designate an observer at all meetings of the board of directors (the “Board”) and any committee thereof so long as Electrum and its affiliates hold not less than 15% of our common shares. Electrum designated Igor Levental, President of The Electrum Group LLC, an investment advisor that manages Electrum’s investments, as its observer at our Board meetings. In July 2010, Mr. Levental was appointed to our Board. In November 2011, Dr. Thomas S. Kaplan, was appointed Chairman of our Board. Dr. Kaplan is also the Chairman and Chief Executive Officer of The Electrum Group LLC. As long as Electrum and its affiliates maintain its shareholdings in the Company, Electrum will have significant influence in determining the members of the Board. Without the consent of Electrum, we could be prevented from entering into transactions that are otherwise beneficial to us. The interests of Electrum and its affiliates may differ from or be adverse to the interests of our other shareholders. The effect of these rights and Electrum’s influence may impact the price that investors are willing to pay for our shares. If Electrum or its affiliates sell a substantial number of our common shares in the public market, the market price of the common shares could fall. The perception among the public that these sales will occur could also contribute to a decline in the market price of our common shares.
 
Some of the directors and officers have conflicts of interest as a result of their involvement with other natural resource companies.
 
Certain of our directors and officers also serve as directors, or have significant shareholdings in, other companies involved in natural resource exploration and development or mining-related activities. To the extent that such other companies may participate in ventures in which we may participate in or in ventures which we may seek to participate in, the directors and officers may have a conflict of interest. In all cases where the directors or officers have an interest in other companies, such other companies may also compete with us for the acquisition of mineral property investments. Any decision made by any of these directors and officers involving the Company will be made in accordance with their duties and obligations to deal fairly and in good faith with a view to the best interests of the Company. In addition, each of the directors is required to declare and refrain from voting on any matter in which these directors may have a conflict of interest in accordance with the procedures set forth in the Business Corporations Act (British Columbia) and other applicable laws. In appropriate cases, the Company will establish a special committee of independent directors to review a matter in which several directors, or management, may have a conflict. Nonetheless, as a result of these conflicts of interest, the Company may not have an opportunity to participate in certain transactions, which may have a material adverse effect on the Company’s business, profitability, financial condition, results of operation, and prospects.
 
We have ongoing reclamation on some of our mineral properties and may be required to fund additional work that could have a material adverse effect on our financial position.
 
Land reclamation requirements are generally imposed on mineral exploration companies (as well as companies with mining operations) in order to minimize long term effects of land disturbance. Reclamation may include requirements to:
 
 
●
treat ground and surface water to applicable water standards;
 
19
NOVAGOLD RESOURCES INC.
 
 
 
●
control dispersion of potentially deleterious effluents;
 
 
●
reasonably re-establish pre-disturbance landforms and vegetation; and
 
 
●
provide adequate financial assurance to ensure required reclamation of land affected by our activities.
 
Exploration and other activities at the Donlin Gold project site have created disturbance that must be reclaimed. Financial resources spent on reclamation might otherwise be spent on further exploration and development programs. In addition, regulatory changes could increase our obligations to perform reclamation and mine closure activities. There can be no assurance that we will not be required to fund additional reclamation work at the site that could have a material adverse effect on our financial position.
 
We are exposed to credit, liquidity, and interest rate risk.
 
Credit risk is the risk of an unexpected loss if a customer or third party to a financial instrument fails to meet its contractual obligations. Our cash equivalents and term deposit investments are held through large Canadian chartered banks with high investment-grade ratings. These investments mature at various dates over the current operating period. A portion of the proceeds from the sale of our Galore Creek assets include notes receivable from a subsidiary of Newmont Corporation (“Newmont”), a publicly traded company with investment-grade credit ratings. The notes receivable included a $75 million note receivable of which payment was received on July 27, 2021 and include a $25 million note receivable upon the earlier of the completion of a Galore Creek project feasibility study or July 27, 2023. An additional $75 million will be receivable if, and when a Galore Creek project construction plan is approved by the owner(s). No value was assigned to the final $75 million contingent note receivable due to the uncertainty with regards to the approval of a Galore Creek project construction plan. The carrying amount of financial assets recorded in the financial statements, net of any allowances for losses, represents our maximum exposure to credit risk.
 
Liquidity risk is the risk that we will not be able to meet our financial obligations as they come due. We manage liquidity risk through the management of our capital structure and financial leverage. Accounts payable and accrued liabilities are due within one year from the balance sheet date.
 
Interest rate risk is the risk that the fair value or future cash flows of a financial instrument will fluctuate because of changes in market interest rates. The risk that we will realize a loss as a result of a decline in the fair value of the term deposit investments is limited because these investments have an original term of less than one year and are generally held to maturity. The promissory note owed to Barrick is variable with the U.S. prime rate. Based on the amount owing on the promissory note as of November 30, 2021, and assuming all other variables remain constant, a 1% change in the U.S. prime rate would result in an increase/decrease of $1.2 million in the interest accrued on the promissory note per annum. For more detail with respect to the promissory note, see section Item 2, Donlin Gold Project, Alaska , below.
 
Risks Related to Our Industry
 
Mining is inherently risky and subject to conditions or events some of which are beyond our control, and which could have a material adverse effect on our business.
 
Mining involves various types of risks, including:
 
 
●
environmental hazards;
 
 
●
industrial accidents;
 
 
●
metallurgical and other processing problems;
 
 
●
unusual or unexpected geologic formations and conditions;
 
 
●
structural cave-ins or slides;
 
 
●
flooding;
 
 
●
fires;
 
 
●
power outages;
 
 
●
labor disruptions;
 
 
●
explosions;
 
 
●
landslides and avalanches;
 
 
●
mechanical equipment and facility performance problems;
 
 
●
availability of materials and equipment;
 
 
●
metals losses; and
 
 
●
periodic interruptions due to inclement or hazardous weather conditions.
 
These risks could result in damage to, or destruction of, mineral properties, production facilities or other properties; personal injury or death, including to employees; environmental damage; delays in construction or mining operations; increased production costs; asset write downs; monetary losses; and possible legal liability. We may not be able to obtain insurance to cover these risks at economically feasible premiums or at all. Insurance against certain environmental risks, including potential liability for pollution or other hazards as a result of the disposal of waste products occurring from mineral production, is not generally available to us or to other companies within the mining industry. We may suffer a material adverse impact on our business if we incur losses related to any significant events that are not covered by our insurance policies.
 
 
20
NOVAGOLD RESOURCES INC.
 
 
Exploration, construction, and production activities may be limited or delayed by inclement weather and shortened exploration, construction and operating seasons. For example, Donlin Gold proposes to transport the bulk of the supplies required to operate the Donlin Gold project to the site from ports in the United States and Canada. This would require the supplies to be transported by barge on the Kuskokwim River which is free of ice and open for barge traffic for a limited period each year. Delays in the ice breakup or early freeze-up, low flow levels and water depths, or other conditions affecting the Kuskokwim River could delay or prevent Donlin Gold from transporting supplies to the site. Any such interference with the delivery of needed supplies to the Donlin Gold project could adversely affect the construction or operation of the project and/or the costs associated with these activities which, in turn, would adversely affect our business.
 
We are subject to significant governmental regulation.
 
Our operations, exploration and development activities in the United States, are subject to extensive federal, state and local laws and regulations governing various matters, including:
 
 
●
environmental protection;
 
 
●
management and use of toxic substances and explosives;
 
 
●
management of tailings and other wastes generated by our operations;
 
 
●
management of natural resources;
 
 
●
exploration and development of mines, production and post-closure reclamation;
 
 
●
exports;
 
 
●
price controls;
 
 
●
taxation and mining royalties;
 
 
●
regulations concerning business dealings with native groups;
 
 
●
availability and use of water resources;
 
 
●
labor standards and occupational health and safety, including mine safety; and
 
 
●
preservation of historic and cultural resources.
 
Failure to comply with applicable laws and regulations may result in civil or criminal fines or penalties or enforcement actions, including orders issued by regulatory or judicial authorities enjoining, curtailing or closing operations or requiring corrective measures, installation of additional equipment or remedial actions, any of which could result in us incurring significant expenditures. We may also be required to compensate private parties suffering loss or damage by reason of a breach of such laws, regulations or permitting requirements. It is also possible that future laws and regulations, or a more stringent enforcement of current laws and regulations by governmental authorities, could cause additional expense, capital expenditures, restrictions on or suspensions of our operations and delays in the exploration and development of our mineral properties.
 
Our activities are subject to environmental laws and regulations that may increase our costs of doing business and restrict our operations.
 
Our exploration, potential development and production activities in the United States are subject to regulation by governmental agencies under various environmental laws. To the extent that we conduct exploration activities or undertake new mining activities in other foreign countries, we will also be subject to environmental laws and regulations in those jurisdictions. These laws address emissions into the air, discharges into water, management of waste, management of hazardous substances, use of water, protection of natural resources, antiquities and endangered species, and reclamation of lands disturbed by mining operations. Environmental legislation and regulations continue to evolve, and the trend has been toward stricter standards and enforcement, increased fines and penalties for non-compliance, more stringent environmental assessments of proposed projects and increasing responsibility for companies and their officers, directors and employees. Compliance with environmental laws and regulations may require significant capital outlays on our behalf and may cause material changes or delays in our intended activities. There can be no assurance that future changes in environmental regulations will not adversely affect our business, and it is possible that future changes in these laws or regulations could have a significant adverse impact on some portion of our business, causing us to re-evaluate those activities at that time.
 
Environmental hazards may exist on our mineral properties that are unknown to us at the present time, and that have been caused by previous owners or operators or that may have occurred naturally. We may be liable for remediating such damage.
 
21
NOVAGOLD RESOURCES INC.
 
 
Failure to comply with applicable environmental laws, regulations and permitting requirements may result in enforcement actions thereunder, including orders issued by regulatory or judicial authorities, causing operations to cease or to be curtailed, and may include corrective measures requiring capital expenditures, installation of additional equipment or remedial actions.
 
Our insurance will not cover all of the potential risks associated with mining operations.
 
Our business is subject to a number of risks and hazards generally including adverse environmental conditions, industrial accidents, labor disputes, unusual or unexpected geological conditions, ground or slope failures, cave-ins, changes in the regulatory environment and natural phenomena, such as inclement weather conditions, floods, hurricanes and earthquakes. Such occurrences could result in damage to mineral properties or production facilities, personal injury or death, environmental damage to our properties or the property of others, delays in construction or mining, monetary losses, and possible legal liability.
 
Although we maintain insurance to protect against certain risks in such amounts as we consider reasonable, our insurance will not cover all the potential risks associated with a mining company’s operations. We may also be unable to maintain insurance to cover these risks at economically feasible premiums. Insurance coverage may not continue to be available or may not be adequate to cover any resulting liability. Moreover, insurance against risks such as loss of title to mineral property, environmental pollution, or other hazards, as a result of exploration and production is not generally available to us or to other companies in the mining industry on acceptable terms. We might also become subject to liability for pollution or other hazards which may not be insured against or which we may elect not to insure against because of premium costs or other reasons. Losses from these events may cause us to incur significant costs that could have a material adverse effect on our financial performance and results of operations.
 
Title and other rights to our mineral properties cannot be guaranteed and may be subject to prior unregistered agreements, transfers or claims and other defects.
 
We cannot guarantee that title to our mineral properties will not be challenged. We may not have, or may not be able to obtain, all necessary surface rights to develop a mineral property. Title insurance is generally not available for mineral properties and our ability to ensure that we have obtained secure claim to individual mineral properties or mining concessions may be severely constrained. Our mineral properties may be subject to prior unregistered agreements, transfers or claims, and title may be affected by, among other things, undetected defects. We have not conducted surveys of all the mineral properties in which we hold direct or indirect interests. A successful challenge to the precise area and location of these mineral properties could result in us being unable to operate on our mineral properties as permitted or being unable to enforce our rights with respect to our mineral properties. This could result in us not being compensated for our prior investment relating to the mineral property.
 
Rising metal prices encourage mining exploration, development, and construction activity, which in the past has increased demand for and cost of contract mining services and equipment.
 
Increases in metal prices tend to encourage increases in mining exploration, development, and construction activities. During past expansions, demand for and the cost of contract exploration, development and construction services and equipment have increased as well. Increased demand for and cost of services and equipment could cause project costs to increase materially, resulting in delays if services or equipment cannot be obtained in a timely manner due to inadequate availability, and increased potential for scheduling difficulties and cost increases due to the need to coordinate the availability of services or equipment, any of which could materially increase project exploration, development, or construction costs, result in project delays, or both. There can be no assurance that increased costs may not adversely affect our development of our mineral properties in the future.
 
We may experience difficulty attracting and retaining qualified management and technical personnel to meet our business objectives, and the failure to manage our business effectively could have a material adverse effect on our business and financial condition.
 
We are dependent on the services of key executives including our President and Chief Executive Officer and other highly skilled and experienced executives and personnel focused on managing our interests and the advancement of the Donlin Gold project, in addition to the identification of new opportunities for growth and funding. Due to our relatively small size, the loss of these persons or our inability to attract and retain additional highly skilled employees required for the development of our activities may have a material adverse effect on our business or future operations.
 
We may be subject to legal proceedings.
 
Due to the nature of our business, we may be subject to a variety of regulatory investigations, claims, lawsuits, and other proceedings in the ordinary course of our business. The results of these legal proceedings cannot be predicted with certainty due to the uncertainty inherent in litigation, including the effects of discovery of new evidence or advancement of new legal theories, the difficulty of predicting decisions of judges and juries and the possibility that decisions may be reversed on appeal. There can be no assurances that these matters will not have a material adverse effect on our business.
 
 
22
NOVAGOLD RESOURCES INC.
 
 
General Risk Factors
 
The Company is dependent upon information technology systems, which are subject to disruption, damage, failure, and risks associated with implementation and integration.
 
The Company’s information technology systems used in its operations are subject to disruption, damage, or failure from a variety of sources, including, without limitation, computer viruses, security breaches, cyberattacks, natural disasters and defects in design. Cybersecurity incidents are evolving and include, but are not limited to, malicious software, attempts to gain unauthorized access to data or machines and equipment, and other electronic security breaches that could lead to disruptions in systems, unauthorized release of confidential or otherwise protected information, the corruption of data or the disabling, misuse or malfunction of machines and equipment. Various measures have been implemented to manage the Company’s risks related to information technology systems and network disruptions. However, given the unpredictability of the timing, nature and scope of information or operational technology disruptions, the Company could potentially be subject to the compromising of confidential or otherwise protected information, destruction or corruption of data, security breaches, other manipulation or improper use of our systems and networks or financial losses from remedial actions, any of which could have a material adverse effect on cash flows, financial condition or results of operations.
 
The Company could also be adversely affected by system or network disruptions if new or upgraded information technology systems are defective, not installed properly or not properly integrated into operations. Various measures have been implemented to manage the risks related to the system implementation and modification, but system modification failures could have a material adverse effect on the Company’s business, financial position, and results of operations.
 
We believe we were a passive foreign investment company (PFIC) in 2021 which could have negative tax consequences for U.S. investors.
 
U.S. holders of our common shares should be aware that we believe that for U.S. federal income tax purposes we were classified as a PFIC for our fiscal year ended November 30, 2021, and that we may continue to be classified as a PFIC in future years. The determination of whether the Company is a PFIC is a factual determination dependent on a number of factors and cannot be made until the close of the applicable tax year. Accordingly, no assurances can be given regarding the Company’s PFIC status for the current year or any future year. If the Company is a PFIC at any time during a U.S. holder’s holding period, then certain potentially adverse tax consequences could apply to such U.S. holder’s acquisition, ownership, and disposition of common shares. For more information, please see the discussion in Item 5. Market for Registrant ’ s Common Equity, Related Shareholder Matters and Issuer Purchases of Equity Securities “ Certain U.S. Federal Income Tax Considerations for U.S. Holders ” below.
 
Global climate change is an international concern and could impact our ability to conduct future operations.
 
Global climate change is an international issue and receives an enormous amount of publicity. We would expect that the imposition of international treaties or U.S. or Canadian federal, state, provincial, or local laws or regulations pertaining to mandatory reductions in energy consumption or emissions of greenhouse gasses could affect the feasibility of mining projects and increase operating costs.
 
The Donlin Gold project is not directly threatened by current predictions of sea level rise as it is located inland at elevations 150 meters to 640 meters above sea level. However, changes in sea levels could affect ocean and river transportation and shipping facilities, which would be used to transport supplies, equipment and personnel to the Donlin Gold project and products from the project to world markets. The Donlin Gold project proposes to deliver the vast majority of construction and operations equipment, supplies, consumables, and other required materials to the project site via the Kuskokwim River when it is ice-free. Historically, the Kuskokwim River has been ice-free from late April until mid-October and models based on historic weather and river flow records predict that there would be sufficient flow in the river to allow the transportation of the required materials to the project site annually. If climate changes alter the ice-free season or flow patterns of the Kuskokwim River, the current supply logistics plan for the project may need to be modified.
 
Climate changes also could affect the availability of water required to sustain operations at the Donlin Gold project. Also, management of water is an essential component of the project’s operating plans. Climate change could require modifications to the project’s water management plan, which may require additional capital investments or increase operating costs, if precipitation increases or decreases relative to historic records.
 
Extreme weather events (such as increased frequency or intensity of storms, increased snowpack, prolonged drought, and associated fire danger) have the potential to disrupt operations. Where appropriate the Donlin Gold project has developed contingency plans for managing extreme weather conditions; however, extended disruptions to supply lines due to extreme weather could result in interruption of activities at the project site, delay or increase the cost of construction of the project, or otherwise adversely affect our business.
 
23
NOVAGOLD RESOURCES INC.