Item 2. Properties
Item 2. PROPERTIES
Coal Mining Segment - Operations
NACCO-owned Properties
1.0 INTRODUCTION
Information concerning the Company’s mining properties in this Form 10-K have been prepared in accordance with the requirements of subpart 1300 of Regulation S-K. As used in this Report on Form 10-K, the terms “mineral resource,” “measured mineral resource,” “indicated mineral resource,” “inferred mineral resource,” “mineral reserve,” “proven mineral reserve” and “probable mineral reserve” are defined and used in accordance with subpart 1300 of Regulation S-K. Under subpart 1300 of Regulation S-K, mineral resources may not be classified as “mineral reserves” unless the determination has been made by a qualified person that the mineral resources can be the basis of an economically viable project. Readers are specifically cautioned not to assume that any part or all of the mineral deposits (including any mineral resources) in these categories will ever be converted into mineral reserves, as defined by the subpart 1300 of Regulation S-K.
Readers are cautioned that, except for that portion of mineral resources classified as mineral reserves, mineral resources do not have demonstrated economic value. Inferred mineral resources are estimates based on limited geological evidence and sampling and have too high of a degree of uncertainty as to their existence to apply relevant technical and economic factors likely to influence the prospects of economic extraction in a manner useful for evaluation of economic viability. Estimates of inferred mineral resources may not be converted to a mineral reserve. It cannot be assumed that all or any part of an inferred mineral resource will ever be upgraded to a higher category. A significant amount of exploration must be completed in order to determine whether an inferred mineral resource may be upgraded to a higher category. Therefore, readers are cautioned not to assume that all or any part of an inferred mineral resource exists, that it can be the basis of an economically viable project, or
29
Table of Contents
that it will ever be upgraded to a higher category. Likewise, readers are cautioned not to assume that all or any part of measured or indicated mineral resources will ever be converted to mineral reserves. See "Item 1A - “Risk Factors” on page 19.
The information that follows is derived, for the most part, from, and in some instances is an extract from, the technical report summary (“TRS”) prepared in compliance with the Item 601(b)(96) and subpart 1300 of Regulation S-K. The TRS was prepared by employees of the Company. Portions of the following information are based on assumptions, qualifications and procedures that are not fully described herein. Reference should be made to the full text of the TRS, incorporated herein by reference and made a part of this Report on Form 10-K. The information regarding MLMC was reviewed by employees of the Company that are qualified persons as defined by subpart 1300 of Regulation S-K.
Coteau, Falkirk, Coyote Creek and MLMC, each wholly-owned subsidiaries of NACCO, operate surface coal mines under long-term contracts with power generation companies pursuant to a service-based business model.
The Company operates additional surface coal mines where the customer owns or controls the coal tonnages. The Company conducts activities to extract these customer-owned coal tonnages pursuant to long-term contracts. The Company has determined these properties are not subject to subpart 1300 of Regulation S-K reporting and has not estimated mineral resources or reserves for these properties in accordance with subpart 1300 of Regulation S-K.
Locations of the properties subject to SEC Section 1300 reporting are shown in Figure 1.1 Surface Coal Mines Operational During 2022 Subject to SEC Section 1300 Reporting.
Figure 1.1 Surface Coal Mines Operational During 2022 Subject to SEC Section 1300 Reporting
30
Table of Contents
A summary of coal production at the Mines subject to SEC Section 1300 Reporting for the past three years has been tabulated and is presented on Table 1.1 Production Summary.
Tons (in millions)
2020
2021
2022
The Coteau Properties Company
12.6
12.5
13.4
The Falkirk Mining Company
7.2
7.9
7.6
Coyote Creek Mining Company
2.0 2.0 1.8
Mississippi Lignite Mining Company
2.5
3.0 3.2
Totals
24.3
25.4
26.0
Table 1.1 Production Summary
2.0 MINING PROPERTIES SUBJECT TO SUBPART 1300 OF REGULATION S-K REPORTING
2.1 Red Hills Mine — Mississippi Lignite Mining Company
MLMC is the owner and operator of the Red Hills Mine. The Red Hills Mine is a lignite surface mine in production. Prior to MLMC, there were no previous mining operations on the Red Hills Mine property.
The MLMC contract is the only operating coal contract in which the Company is responsible for all operating costs, capital requirements and final mine reclamation; therefore, MLMC is consolidated within NACCO’s financial statements. MLMC sells coal to its customer at a contractually agreed-upon price which adjusts monthly, primarily based on changes in the level of established indices which reflect general U.S. inflation rates. Profitability at MLMC is affected by customer demand for coal and changes in the indices that determine sales price and actual costs incurred.
A summary of coal production at MLMC for the past three years has been tabulated and is presented on Table 2.1 Production Summary.
Tons (in millions)
2020
2021
2022
Mississippi Lignite Mining Company
2.5
3.0
3.2
Table 2.1 Production Summary
The Red Hills Mine generally produces between 2 million and 3 million tons of lignite coal annually. The Red Hills Mine started delivering coal in 2000. All production from the mine is delivered to its customer's Red Hills Power Plant.
The Red Hills Mine, operated by MLMC, is located approximately 120 miles northeast of Jackson, Mississippi (Figure 2.1). The entrance to the mine is by means of a paved road located approximately one mile west of Highway 9. MLMC owns in fee approximately 7,773 acres of surface interest and 4,761 acres of coal interests. MLMC holds leases granting the right to mine approximately 5,538 acres of coal interests and the right to utilize approximately 5,065 acres of surface interests. MLMC holds subleases under which it has the right to mine approximately 1,623 acres of coal interest. The majority of the leases held by MLMC were originally acquired during the mid-1970s to the early 1980s with terms extending 50 years, many of which can be further extended by the continuation of mining operations. The lignite deposits of the Gulf Coast are found primarily in a narrow band of strata that outcrops/subcrops along the margin of the Mississippi Embayment. The potentially exploitable tertiary lignites in Mississippi are found in the Wilcox Group. The outcropping Wilcox is composed predominately of non-marine sediments deposited on a broad flat plain.
The towns of Ackerman, Eupora, Starkville, Louisville, Kosciusko, and numerous smaller communities are within a 40-mile radius of the Red Hills Mine and provide a vast employment base. Furthermore, Mississippi State University (MSU) is located approximately 30 miles east of the mine in Starkville. MLMC has a history of partnership with MSU as well as the local community colleges for science, technology, engineering, and mathematics (STEM) research and skilled trades training.
The Red Hills Mine sources power for mine office facilities and operations from 4-County Electric Power Association, and water for the mine office facilities from the Choctaw Water Association. Fuel for equipment is supplied by Dickerson
31
Table of Contents
Petroleum located in Kosciusko. The Red Hills Mine has, or is currently constructing, all supporting infrastructure for mining operations.
Local access to the Red Hills Mine is by way of Highway 9 between Ackerman, Mississippi and Eupora, Mississippi which connects to Pensacola Road that leads to the Red Hills Mine paved access road. Pensacola Road connects with Highway 9 approximately 5 miles north of Ackerman, MS. The mine road is approximately 1 mile west from Highway 9 along Pensacola Road.
Travel to the Red Hills Mine by air is possible using the Jackson-Medgar Wiley Evers International Airport in Jackson, Mississippi, approximately 104 miles south of the mine, and then using ground transportation, traveling via Highway 25, Highway 15, and Highway 9. Alternatively, the Golden Triangle Regional Airport is a smaller airport approximately 50 miles from the Red Hills Mine by means of Highway 82 west, Highway 15 south, and Highway 9 north.
The Red Hills Mine is in close proximately to river ports of the Tennessee-Tombigbee Waterway and the Mississippi River. The Lowndes County Port is approximately 60 miles east of the mine. The Port of Greenville is approximately 135 miles west of the mine, and the Port of Vicksburg, approximately 150 miles southwest of the mine. All ports are connected by major state and federal highways.
In addition to transportation via roadways, air and waterways, the Kansas City Southern (KCS) railroad has a depot located approximately 5 miles south of the mine in Ackerman, and is accessible by Highway 9 and Highway 15. MLMC currently has all permits in place for the Red Hills Mine to operate and adhere to a mine plan projected through April 2032. No mineral processing occurs at the Red Hills Mine.
The geology encountered at the Red Hills Mine is stratigraphic in nature with depositional sequences of sands, silts, clays, and lignite. The vertical repetition of geologic strata facilitated a straightforward setting to establish and study the baseline geological, geochemical, geotechnical, and geohydrological conditions at the Red Hills Mine.
Development of the Red Hills Mine began in 1997, with full commercial deliveries commencing in 2002. The mining operation is comprised of four major equipment fleets. Primary removal of burden is achieved with one 82-cubic yard electric-powered dragline, four large track-type push dozers, and a truck and shovel fleet utilizing a 41-cubic yard electric rope shovel. Lignite is mined using a surface miner or a hydraulic backhoe to load a fleet of end dump haul trucks, and is directly shipped to the RHPP or the lignite stockpile. The overall average quality of the mined lignite seams meets the required power plant quality specifications. Therefore, no mineral processing is performed by MLMC.
The mine office facilities and original equipment fleets at the Red Hills Mine were constructed, acquired, or purchased new during the development stage of the mine. The facilities and equipment are maintained to allow for safe and efficient operation. The equipment is well maintained, in good physical condition and is either updated or replaced periodically with newer models or upgrades available to keep up with modern technology. As equipment wears out, MLMC evaluates what replacement option will be the most cost-efficient, including the evaluation of both new and used equipment.
The total cost of the property and equipment, net of applicable accumulated amortization, depreciation and impairment as of December 31, 2022 is $80.4 million.
The Red Hills Mine currently has no significant encumbrances to the property. No mining permit violations have been issued at the Red Hills Mine in the past ten years. One notice of violation ("NOV") was issued in April 2020 for a water quality exceedance that was determined to not be the fault of Red Hills Mine and no further action was required. A second NOV was issued in June 2022 for a water sampling violation. Both NOVs were not related to the mining permit. Permitting requirements are discussed in Section 17.0 of the TRS.
32
Table of Contents
Figure 2.1 – Red Hills Mine Location
Mineral resources and reserves have been summarized from the TRS for MLMC and have been included as Table 2.2 and Table 2.3. Qualities are being reported on an as-received moisture basis. Prices in Table 2.2 are based on economic cut-off grades of $29.66 per ton at MLMC. Prices in Table 2.3 are based on economic cut-off grades of $36.06 per ton at MLMC.
Material assumptions and criteria used in the determination of Mineral Resource and Mineral Reserves reported herein are provided within the filed TRS for the Mississippi Lignite Mining Company – Red Hills Mine dated December 2022.
Section 11.0 of the TRS describes the key assumptions, parameters, and methods used for the estimation of Mineral Resources. Assumptions include a maximum cumulative stripping ratio of 18:1 based on an assumed lignite sales price of $29.66 per ton. A further description of the verified drilling data used to model the lignite deposit for estimation of Mineral Resources is provided in Section 7.2 Drilling Exploration, 8.0 Sample Preparation, Analyses, and Security, and Section 9.0 Data Verification.
Section 12.0 of the TRS describes the key assumptions, parameters, and methods used for the estimation of Mineral Reserves, and include the following:
• Maximum stripping ratio: 14:1;
• Mining production rates on a cubic yard and per ton basis remain relatively consistent with historical performance;
• Mining costs on a unit basis remain relatively consistent with historical performance;
• Minimum minable lignite thickness: 1.0 feet;
• Minimum parting thickness before seams are composited: 6.0 inches;
• Maximum depth of mining: approximately 320 feet;
• Lignite density defined by seam from coal core drilling data and modified by dilution parameters and approximately 80 lb/ft³; and
33
Table of Contents
• Recovery rates by seam ranging from 67% to 100%.
Modifying factors including dilution parameters and technical information related to the mining process are described in detail under Section 13.0 Mining Methods. Economic factors to support the Mineral Reserve estimates are described in Section 18.0 Capital and Operating Costs and 19.0 Economic Analyses.
The Mineral Resources presented in Table 2.2 below have been estimated by applying a series of geologic and physical limits as well as high-level mining and economic constraints. The mining and economic constraints were limited to a level sufficient to support reasonable prospect for future economic extraction of the estimated Mineral Resources. The categorized Mineral Resources reported herein are exclusive of Mineral Reserves.
Lignite Coal
Resource Classification
Tonnage
(Kiloton "Kt")
Grades/Qualities
Calorific Value (Btu/lb)
Moisture (%wt)
Ash (%wt)
Sulfur (%wt)
Mississippi Lignite Mining Company
Measured
4,300 5,210 44.6 12.8 0.6
Mississippi Lignite Mining Company
Indicated
500 5,300 43.6 12.7 0.7
Mississippi Lignite Mining Company
Measured + Indicated
4,800 5,220 44.5 12.8 0.6
Mississippi Lignite Mining Company
Inferred
1,600 5,370 46.0 9.9 0.5
Note:
– Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability and there is no certainty that all or any part of such Mineral Resources will be converted into Mineral Reserves.
– Mineral Resources are in-situ and exclusive of 25.4 million tons (Mt) of Mineral Reserves.
– Mineral Resources are reported using an economic cutoff of $29.66 per ton.
– Resources are presented with a minimum 1 foot seam thickness, a maximum as received moisture basis ash content of 30%, and a minimum calorific value of 4000 BTUs on an as received moisture basis cutoff.
– Resources are estimated using Vulcan Software.
– Tonnages and qualities have been rounded to an accuracy level deemed appropriate by the QP. Summation errors due to rounding may exist.
Table 2.2 Mineral Resources Summary as of December 31, 2022
The Mineral Reserves presented in Table 2.3 below were determined to be the economically mineable portion of the measured and indicated Mineral Resources after the consideration of modifying factors related to the mining process. Inferred Mineral Resources were not considered for Mineral Reserves.
Lignite Coal Reserve Classification Tonnage
(Kt) Grades/Qualities
Calorific Value (Btu/lb) Moisture (%wt) Ash (%wt) Sulfur (%wt)
Mississippi Lignite Mining Company Proven 18,000 5,090 43.4 14.8 0.6
Mississippi Lignite Mining Company Probable 7,400 5,120 42.6 15.4 0.7
Mississippi Lignite Mining Company Total 25,400 5,100 43.1 15.0 0.6
Note:
– Mineral Reserves have been demonstrated to be economic based on a positive cash flow
– Mineral Reserves are stated on a Run of Mine basis
– An economic cutoff in the Life of Mine plan averaged $36.06 per ton and was used to demonstrate coal reserves
– Recovery varies by coal seam and ranges from 67% to 100%
– Mineral Reserves use an economic cut-off of a maximum cumulative stripping ratio of 14:1. There are some instances where the stripping ratio for a single year could exceed 14:1, but the average for the entire area evaluated is less than 14:1.
– Historical coal recovery rates at Red Hills Mine have been applied to generate the Mineral Reserve tonnages.
– Mineral Reserves are estimated using Vulcan Software.
34
Table of Contents
– Tonnages and qualities have been rounded to an accuracy level deemed appropriate by the Qualified person ("QP"). Summation errors due to rounding may exist.
Table 2.3 Mineral Reserves Summary as of December 31, 2022
Table 2.4 describes the difference between the Mineral Reserves and Mineral Resources reported as of December 31, 2021 and December 31, 2022.
Resource Classification December 31, 2021 Tonnage (Kt) December 31, 2022 Tonnage (Kt) Percent Change
Measured 11,500 4,300 (63)%
Indicated 15,200 500 (97)%
Measured + Indicated 26,700 4,800 (82)%
Inferred — 1,600 N/A
Reserve Classification December 31, 2021 Tonnage (Kt) December 31, 2022 Tonnage (Kt) Percent Change
Proven 17,200 18,000 4%
Probable 10,300 7,400 (28)%
Proven + Probable 27,400 25,400 (7)%
Table 2.4. Net difference of reported Mineral Resources and Mineral Reserves from previous reporting period to current reporting period.
The Mineral Resources and Mineral Reserves as of December 31, 2022 reflect an update to the life of mine ("LOM") plan and economic assessment. The methodology used to determine the Mineral Resource classification has been revised by the mineral resource QP. The change in methodology included revised estimates of quality and thickness cutoff assumptions as well as the removal of minor seams and the exclusion of certain areas that are no longer considered to contain recoverable coal. Additionally, MLMC delivered 3.2 million tons during 2022.
2.2 Material Properties with no Mineral Resources or Mineral Reserves
The lignite coal tonnages at Coteau, Falkirk and Coyote Creek have not been classified as “measured resources”, “indicated resources”, or “inferred resources” as defined in Items 1300 through 1305 of Regulation S-K, and as a result, do not have any “proven” or “probable” reserves under such definition and are therefore classified as an “Exploration Stage Property” pursuant to Items 1300 through 1305 of Regulation S-K. Coteau, Falkirk and Coyote Creek will continue to be classified as exploration stage properties until such time as proven or probable mineral reserves have been established in accordance with subpart 1300 of Regulation S-K, even though they continue to deliver lignite to their respective customers.
At Coteau, Coyote Creek and Falkirk, the Company is paid a management fee per ton of coal or heating unit (MMBtu) delivered. Each contract specifies the indices and mechanics by which fees change over time, generally in line with broad measures of U.S. inflation. The customers are responsible for funding all mine operating cost, including final mine reclamation, and directly or indirectly providing all of the capital required to build and operate the mine. This contract structure eliminates the Company's exposure to spot coal market price fluctuations.
Coteau, Coyote Creek and Falkirk each have only one customer for which they extract and deliver coal. These customers operate coal-fired electric generation power plants adjacent to each mine location (and in the case of Coteau, a synthetic natural gas and chemical/fertilizer production facility).
The sales price under the Coteau, Coyote Creek and Falkirk contracts are not market driven. Unlike traditional sales made based on market factors, under the provisions of the long-term mining agreements, the coal sales price at Coteau, Coyote Creek and Falkirk includes (i) all costs incurred to extract, process and deliver coal (i.e. the cost of production) and (ii) the agreed-upon profit per ton of coal or MMBtu unit delivered to the customer. Cost of production includes all the costs actually incurred in the operation of the mine including mining, processing and delivery of coal. Costs included within revenue include all production, transportation and maintenance costs including, without limitation, the following types of costs:
35
Table of Contents
◦ Labor, which include wages and all related payroll taxes, benefits and fringes, including welfare plans; group insurance, vacations and other comparable benefits of employees
◦ Materials and supplies,
◦ Tools,
◦ Machinery and equipment not capitalized or leased,
◦ Costs of acquiring interests in coal reserves and surface lands,
◦ Rental of machinery and equipment,
◦ Power costs,
◦ Reasonable and necessary services by third parties
◦ Insurance including worker’s compensation
◦ Certain taxes, and
◦ Cost of reclamation
The contractually-determined coal sales price includes reimbursement of all costs incurred and the agreed-upon profit. The agreed-upon profit adjusts based on changes in the level of established indices (e.g., CPI-U and/or PPI indices). The cost-plus nature of the contracts provide assurance that all costs incurred, including contemporaneous and final reclamation, will be reimbursed by the respective customer and negates any risk of loss which allows the mines to remain cash flow positive through the end of the contract terms. The coal sales price as well as profitability at Coteau, Falkirk and Coyote Creek are not subject to any change based on market factors. Profitability at these mines is affected by two factors: demand for coal (because this impacts units of agreed profit that are charged) and changes in the indices that determine coal sales price (because this adjusts the agreed-upon per unit profit). Under any scenario, Coteau, Coyote Creek and Falkirk will be cash flow positive as a result of the terms of the mining agreements.
Extraction of Coteau, Coyote Creek and Falkirk’s lignite tonnages is only economically viable as a result of the long-term mining agreements in place with each mine’s respective customer. The development of the Coteau, Coyote Creek and Falkirk mines was conducted in tandem with the development of the respective mine mouth power plants each serve. The power plants were designed to operate exclusively on the coal provided by the adjacent mines. No other market exists for the lignite at Coteau, Coyote Creek and Falkirk as the cost of transportation makes sales to any entity other than the current mine-mouth operator unprofitable.
Coteau, Coyote Creek and Falkirk meet the definition of a variable interest entity (“VIE”). In each case, NACCO is not the primary beneficiary of the VIE as it does not exercise financial control; therefore, NACCO does not consolidate the results of these operations within its financial statements. Instead, these contracts are accounted for as equity method investments. The income before income taxes associated with these VIEs is reported as Earnings of unconsolidated operations on the Consolidated Statements of Operations, and the Company’s investment is reported on the line Investments in Unconsolidated Subsidiaries in the Consolidated Balance Sheets
Coteau
The Freedom Mine, operated by Coteau, generally produces between 12.5 million and 13.5 million tons of lignite coal annually. The mine started delivering coal in 1983. All production from the mine is delivered to Dakota Coal Company, a wholly owned subsidiary of Basin Electric. Dakota Coal Company then sells the coal to the Synfuels Plant, Antelope Valley Station and Leland Olds Station, all of which are operated by affiliates of Basin Electric. The Synfuels Plant is a coal gasification plant that manufactures synthetic natural gas and produces fertilizers, solvents, phenol, carbon dioxide, and other chemical products for sale.
The Freedom Mine is located approximately 90 miles northwest of Bismarck, North Dakota (Figure 2.2). The main entrance to the Freedom Mine is accessed by means of a paved road and is located on County Road 15. Coteau holds 374 leases granting the right to extract approximately 33,966 acres of coal interests and the right to utilize approximately 23,451 acres of surface interests. In addition, Coteau owns in fee 33,888 acres of surface interests and 4,107 acres of coal interests. Substantially all of the leases held by Coteau were acquired in the early 1970s and have been replaced with new leases or have lease terms for a period sufficient to meet Coteau’s contractual production requirements.
36
Table of Contents
Figure 2.2 – Freedom Mine Location
The towns of Beulah, Hazen, and Stanton along with other smaller communities are within a 40-mile radius of the Freedom Mine and provide a vast supply of the employment base. Employees also come from the cities of Bismarck, Minot, and Dickinson, all of which are less than 100 miles away from the mine.
The Freedom Mine sources power for mine office facilities and operations from Roughrider Electric Cooperative, and water for the mine office facilities from the Southwest Water Authority. Fuel for equipment is supplied by multiple local vendors. The Freedom Mine has, or is currently constructing, all supporting infrastructure for mining operations.
The main entrance to the Freedom Mine is accessed by traveling north of Beulah on Highway 49 for one mile, then north on County Road 21 for two miles, then west on County Road 26 for three miles, and then north on County Road 15 for two miles as shown on Figure 2.2. Location of the Freedom Mine.
Travel to the Freedom Mine by air is possible by means of the Bismarck Municipal Airport, Bismarck, ND, which is approximately 90 miles southeast of the mine. From the airport, the mine is accessed by means of ground transportation by traveling west approximately 50 miles via Interstate 94, taking exit 110 and traveling north approximately 28 miles on ND Highway 49 to Beulah, ND, and so on as explained in the previous paragraph.
Travel to the Freedom Mine by rail is possible using the Amtrak Network, which runs through northern North Dakota mostly along the US Highway 2 corridor, and passes through the larger cities of Williston, Minot, Grand Forks, and Fargo, and smaller cities of Stanley, Rugby, and Devils Lake. From these locations, the mine can be accesses via ground transportation on Interstate 29 or Interstate 94 and various highways. The main highways are US Highway 2, US Highway 83, US Highway 85, US Highway 200, and US Highway 281.
37
Table of Contents
North Dakota’s freight rail service is largely provided by Burlington Northern Santa Fe Railway and Canadian Pacific Railway.
The coal tonnages are located in Mercer County, North Dakota, starting approximately two miles north of Beulah, North Dakota. The formations of sedimentary origin were deposited in the Williston Basin, the dominant structural feature of western North Dakota. The center of the basin is located near the city of Williston, North Dakota, approximately 100 miles northwest of the Freedom Mine. The economically mineable coal occurs in the Sentinel Butte Formation, and is overlain by the Coleharbor Formation. The Coleharbor Formation unconformably overlies the Sentinel Butte Formation. It includes all of the unconsolidated sediments resulting from deposition during glacial and interglacial periods. Lithologic types include gravel, sand, silt, clay and till. The modified glacial channels are in-filled with gravels, sands, silts and clays overlain by till. The coarser gravel and sand beds are generally limited to near the bottom of the channel fill. The general stratigraphic sequence in the upland portions of the reserve area consists of till, silty sands and clayey silts.
Fill-in drilling programs are routinely conducted by Coteau for the purpose of refining guidance related to ongoing operations. It is common practice at the Freedom Mine to tighten the drilling density within the three to four-year block ahead of active operations to an average drill hole spacing of 660-feet. However, additional exploration may also be scheduled in areas farther out to increase confidence in future mine plan projections.
Coteau utilizes standard surface mining techniques to extract coal from the proposed permit area. Mining operations will typically occur in a sequence of seven events: SPGM removal, overburden removal, coal removal, overburden replacement, final grading, SPGM replacement, and revegetation.
The mine office facilities and original equipment fleets at the Freedom Mine were constructed, acquired, or purchased new during the development stage of the mine. The facilities and equipment are maintained to allow for safe and efficient operation. The equipment is well maintained, in good physical condition and is either updated or replaced periodically with newer models or upgrades available to keep up with modern technology. As equipment wears out, Coteau evaluates what replacement option will be the most cost-efficient, including the evaluation of both new and used equipment.
The total cost of the property, plant and equipment, net of applicable accumulated amortization, depreciation and impairment as of December 31, 2022 is $90.4 million.
The Freedom Mine currently has no significant encumbrances to the property. No NOVs have been issued at the Freedom Mine in the past three years. Coteau currently has all permits in place for the Freedom Mine to operate through 2031. Permit expansions required to extend the life of the mine through 2045 will be acquired as needed. No mineral processing occurs at the Freedom Mine.
Falkirk Mine
The Falkirk Mine generally produces between 7 million and 8 million tons of lignite coal annually. The mine started delivering coal in 1978 primarily for the Coal Creek Station, an electric power generating station. Coal Creek Station was owned by GRE until May 1, 2022 when it was purchased by Rainbow Energy. In 2014, Falkirk began delivering coal to Spiritwood Station, another electric power generating station owned by GRE.
The Falkirk Mine, operated by Falkirk, is located approximately 50 miles north of Bismarck, North Dakota on a paved access road off U.S. Highway 83 (Figure 2.3). Falkirk holds 340 leases granting the right to extract approximately 43,648 acres of coal interests and the right to utilize approximately 24,164 acres of surface interests. In addition, Falkirk owns in fee 40,666 acres of surface interests and 1,788 acres of coal interests. Substantially all of the leases held by Falkirk were acquired in the early 1970s with initial terms that have been further extended by the continuation of mining operations.
The towns of Underwood and Washburn are located within ten miles of the mine, with other small communities also nearby. Numerous employees also reside in Bismarck and Mandan, a distance of about 50 miles.
The Falkirk Mine receives both its power and water from Coal Creek Station. However, Falkirk’s East shift change building receives water from McLean-Sheridan Rural Water. Fuel for equipment is supplied by multiple local vendors including: Farstad Oil, Missouri Valley Petroleum, and Enerbase Cooperative Resources.
The main entrance to the Falkirk Mine is accessed by traveling north from Bismarck on State Highway 83 for approximately 50 miles, then going west on the access road, 1st Street SW located four miles south of Underwood. The mine office is located two miles to the west.
38
Table of Contents
Travel to the Falkirk Mine by air is possible using the Bismarck Airport in Bismarck, ND, approximately 55 miles south of the mine, and then using ground transportation, traveling via US Highway 83.
The main railway systems near the Falkirk Mine are Canadian Pacific, BNSF, and Dakota Missouri Valley & Western (DMVW). DMVW crosses through the Falkirk Mine Reserve.
The coal tonnages are located in McLean County, North Dakota, from approximately nine miles northwest of the town of Washburn, North Dakota to four miles north of the town of Underwood, North Dakota. Structurally, the area is located on an intercratonic basin containing a thick sequence of sedimentary rocks. The economically mineable coal occurs in the Sentinel Butte Formation and the Bullion Creek Formation and are unconformably overlain by the Coleharbor Formation. The Sentinel Butte Formation conformably overlies the Bullion Creek Formation. The general stratigraphic sequence in the upland portions of the reserve area (Sentinel Butte Formation) consists of till, silty sands and clayey silts, main hagel lignite bed, silty clay, lower lignite of the hagel lignite interval and silty clays. Beneath the Tavis Creek, there is a repeating sequence of silty to sand clays with generally thin lignite beds.
Operationally, overburden and interburden removal are accomplished using scrapers, dozers, front end loaders, truck shovel fleets, and draglines. Lignite is mined with front end loaders or hydraulic backhoes, and loaded into haul trucks to transport to the stockpile or directly to the customer via truck dumps and conveyors.
Fill-in drilling programs are routinely conducted by Falkirk for the purpose of refining guidance related to ongoing operations. It is common practice at the Falkirk Mine to tighten the drilling density within the three to four-year block ahead of active operations to an average drill hole spacing of 1320-feet. However, additional exploration may also be scheduled in areas farther out to increase confidence in future mine plan projections.
The mine office facilities and original equipment fleets at the Falkirk Mine were constructed, acquired, or purchased new during the development stage of the mine. The facilities and equipment are maintained to allow for safe and efficient operation. The equipment is well maintained, in good physical condition and is either updated or replaced periodically with newer models or upgrades available to keep up with modern technology. As equipment wears out, Falkirk evaluates what replacement option will be the most cost-efficient, including the evaluation of both new and used equipment.
The total cost of the property, plant and equipment, net of applicable accumulated amortization, depreciation and impairment as of December 31, 2022 is $22.4 million.
The Falkirk Mine currently has no significant encumbrances to the property. No Notice of Violations (NOVs) have been issued at the Falkirk Mine in the past three years. There are no outstanding permits related to the LOM plan awaiting regulatory approval. The Falkirk Mining Company currently has all permits in place to operate and adhere to the current mine plan. No mineral processing occurs at the Falkirk Mine.
39
Table of Contents
Figure 2.3 – Falkirk Mine Location
Coyote Creek
The Coyote Creek Mine generally produces between 1.5 million and 2.0 million tons of lignite annually. The mine began delivering coal in 2016 to the Coyote Station owned by Otter Tail Power Company, Northern Municipal Power Agency, Montana-Dakota Utilities Company and Northwestern Corporation.
The Coyote Creek Mine is located approximately 70 miles northwest of Bismarck, North Dakota (Figure 2.4). The main entrance to the Coyote Creek Mine is accessed by means of a four-mile paved road extending west off of State Highway 49. Coyote Creek holds a sublease to 86 leases granting the right to mine approximately 8,129 acres of coal interests and the right to utilize approximately 15,168 acres of surface interests. In addition, Coyote Creek Mine owns in fee 160 acres of surface interests and has four easements to conduct coal mining operations on approximately 352 acres.
40
Table of Contents
Figure 2.4 – Coyote Creek Mine Location
The towns of Beulah, Hazen, and Stanton along with other smaller communities are within a 40-mile radius of the Coyote Creek Mine and provide a vast supply and employment base. A vast supply and employment base also come from some of the major cities of Bismarck, Minot, and Dickinson, all of which are less than 100 miles away from the mine.
The Coyote Creek Mine sources power for mine office facilities and operations from Roughrider Electric Cooperative and Montana-Dakota Utilities Co., and water for the mine office facilities from the Southwest Water Authority. Fuel for equipment is supplied by multiple local vendors. The Coyote Creek Mine has all supporting infrastructure for mining operations.
The main entrance to the mine will be accessed by traveling south of Beulah on Highway 49 for five miles, then west on County Road 25 for four miles. The general location of the Coyote Creek Mine is shown in Figure 1.0 Location of Coyote Creek Mine.
Travel to the Coyote Creek Mine by air is possible using the Bismarck Municipal Airport, Bismarck, ND, approximately 75 miles southeast of the mine. From the airport, the mine is accessed using ground transportation by traveling west approximately 50 miles via Interstate 94, taking exit 110 and traveling north approximately 21 miles on ND Highway 49 to County Road 25, then west for four miles on County Road 25.
Travel to the Coyote Creek Mine by rail is possible using the Amtrak Network, which runs through northern North Dakota mostly along the US Highway 2 corridor, and passes through the larger cities of Williston, Minot, Grand Forks, and Fargo, and smaller cities of Stanley, Rugby, and Devils Lake. From these locations, the mine can be accesses via ground transportation on Interstate 29 or Interstate 94 and various highways. The main highways are US Highway 2, US Highway 83, US Highway 85, US Highway 200, and US Highway 281.
41
Table of Contents
North Dakota’s freight rail service is largely provided by Burlington Northern Santa Fe Railway and Canadian Pacific Railway.
The coal tonnages are located in Mercer County, North Dakota, starting approximately six miles southwest of Beulah, North Dakota. The formations of sedimentary origin were deposited in the Williston Basin, the dominant structural feature of western North Dakota. The center of the basin is located near the city of Williston, North Dakota, approximately 110 miles northwest of the Coyote Creek Mine. The economically mineable coal occurs in the Sentinel Butte Formation, and is overlain by the Coleharbor Formation. The Coleharbor Formation unconformably overlies the Sentinel Butte Formation. It includes all of the unconsolidated sediments resulting from deposition during glacial and interglacial periods. Lithologic types include gravel, sand silt, clay and till. The modified glacial channels are in-filled with gravels, sands, silts and clays overlain by till. The coarser gravel and sand beds are generally limited to near the bottom of the channel fill. The general stratigraphic sequence in the upland portions of the reserve area consists of till, silty sands and clayey silts.
Fill-in drilling programs are routinely conducted by Coyote Creek for the purpose of refining guidance related to ongoing operations. It is common practice at the Coyote Creek Mine to tighten the drilling density within the three to four-year block ahead of active operations to an average drill hole spacing of 660-feet. However, additional exploration may also be scheduled in areas farther out to increase confidence in future mine plan projections.
Operationally, overburden removal is accomplished using scrapers, dozers, front end loaders, excavators, truck fleets, and a dragline. Lignite is mined with front end loaders, and loaded into haul trucks to transport to the coal stockpile.
The mine office facilities and original equipment fleets at the Coyote Creek Mine were constructed, acquired, or purchased during the development stage of the mine. The facilities and equipment are maintained to allow for safe and efficient operation. The equipment is well maintained, in good physical condition and is either updated or replaced periodically with newer models or upgrades available to keep up with modern technology. As equipment wears out, Coyote Creek evaluates what replacement option will be the most cost-efficient, including the evaluation of both new and used equipment.
The total cost of the property, plant and equipment, net of applicable accumulated amortization, depreciation and impairment as of December 31, 2022 is $122.7 million.
The Coyote Creek Mine currently has no significant encumbrances to the property. No NOVs have been issued at the Coyote Creek Mine in the past three years. There are no outstanding permits related to the LOM plan awaiting regulatory approval. Coyote currently has all permits in place for the Coyote Creek Mine to operate and adhere to a mine plan projected through 2040. No mineral processing occurs at the Coyote Creek Mine.
3.0 Internal Control Disclosure Over Mineral Resources and Reserves
The modeling and analysis of the Company’s resources and reserves has been developed by Company mine personnel and reviewed by several levels of internal management, including the QPs. The development of such resources and reserves estimates, including related assumptions, was a collaborative effort between the QPs and Company staff. This section summarizes the internal control considerations for the Company’s development of estimations, including assumptions, used in resource and reserve analysis and modeling.
When determining resources and reserves, as well as the differences between resources and reserves, management developed specific criteria, each of which must be met to qualify as a resource or reserve, respectively. These criteria, such as demonstration of economic viability, points of reference and grade, are specific and attainable. The QPs and Company management agree on the reasonableness of the criteria for the purposes of estimating resources and reserves. Calculations using these criteria are reviewed and validated by the QPs.
Estimations and assumptions were developed independently for each significant mineral location. All estimates require a combination of historical data and key assumptions and parameters. When possible, resources and data from generally accepted industry sources were used to develop these estimations. Review teams were created by utilizing subject matter experts from across all of NACCO to review the cost assumptions and estimations used as the basis of the classification of mineral resources and reserves.
Geological modeling and mine planning efforts serve as a base assumption for resource estimates at MLMC. These outputs have been prepared and reviewed by Company personnel. Mine planning decisions are determined and agreed upon by Company management. Management adjusts forward-looking models by reference to historic mining results, including by reviewing actual versus predicted levels of production from the mineral deposit, and if necessary, re-evaluating mining
42
Table of Contents
methodologies if production outcomes were not realized as predicted. Ongoing mining of the mineral deposit, coupled with product quality validation pursuant to Company and customer expectations, provides further empirical evidence as to the homogeneity, continuity and characteristics of the deposit. Geologic modeling assumptions are evaluated to historic mining results and are adjusted if necessary to better reflect actual mining results. Ongoing quality validation of production also provides a means to monitor for any potential changes in quality. Also, ongoing monitoring of ground conditions within the mine, surveying for evidence of subsidence and other visible signs of deterioration that may signal the need to re-evaluate rock mechanics and structure of the mine ultimately inform extraction ratios and mine design, which underpin mineral reserve estimates.
Management also assesses risks inherent in mineral resource and reserve estimates, such as the accuracy of geophysical data that is used to support mine planning, changes in QPs, identifying hazards and informing operations of the presence of mineable deposits. Also, management is aware of risks associated with potential gaps in assessing the completeness of mineral extraction licenses, entitlements or rights, or changes in laws or regulations that could directly impact the ability to assess mineral resources and reserves or impact production levels. Risks inherent in overestimated reserves can impact financial performance when revealed, such as changes in amortizations that are based on life of mine estimates.
4.0 Customer-owned Properties
South Hallsville No. 1 Mine — The Sabine Mining Company
The South Hallsville No. 1 Mine generally produces between 1.5 million and 2.0 million tons of lignite annually. The mine began delivering coal in 1985. All production from the mine is delivered to Southwestern Electric Power Company's ("SWEPCO") Henry W. Pirkey Plant (the "Pirkey Plant"). SWEPCO is an American Electric Power (“AEP”) company. The mine's coal tonnages are owned and controlled by AEP. The Company conducts activities to extract these customer-owned and controlled coal tonnages.
The South Hallsville No. 1 Mine, operated by Sabine, is located approximately 150 miles east of Dallas, Texas on FM 968. The entrance to the mine is by means of a paved road. Sabine has no title, claim, lease or option to acquire any of the reserves at the South Hallsville No. 1 Mine. Southwestern Electric Power Company controls all of the reserves within the South Hallsville No. 1 Mine.
AEP intends to retire the Pirkey Plant during 2023. Sabine expects deliveries to cease in March 2023. Sabine expects to begin final reclamation on April 1, 2023. Funding for mine reclamation is the responsibility of SWEPCO.
5.0 Facilities and Equipment
The facilities and equipment for each of the coal mines are maintained to allow for safe and efficient operation. The equipment is well maintained, in good physical condition and is either updated or replaced periodically with newer models or upgrades available to keep up with modern technology. As equipment wears out, the mines evaluate what replacement option will be the most cost-efficient, including the evaluation of both new and used equipment, and proceed with that replacement. The mining method and total cost of the property, plant and equipment, net of applicable accumulated amortization, depreciation and impairment as of December 31, 2022 is set forth in the chart below:
Location Mining Method Total Historical Cost of Mine
Property, Plant and Equipment
(excluding Coal Land, Real Estate
and Construction in Progress), Net of
Applicable Accumulated
Amortization, Depreciation and Impairment
Unconsolidated Mining Operations (in millions)
Freedom Mine — The Coteau Properties Company Dragline operation with 3 draglines $ 90.4
Falkirk Mine — The Falkirk Mining Company Dragline operation with 4 draglines $ 22.4
South Hallsville No. 1 Mine — The Sabine Mining Company Dragline operation with 4 draglines $ 15.0
Coyote Creek Mine — Coyote Creek Mining Company, LLC Dragline operation with 1 dragline $ 122.7
43
Table of Contents
Consolidated Mining Operations
Red Hills Mine — Mississippi Lignite Mining Company Dragline operation with 1 dragline $ 80.4
NAMining Segment - Operations
NAMining provides contract mining services for independently owned mines and quarries, primarily operating and maintaining draglines at limestone quarries and utilizing other mining equipment at sand and gravel quarries. During 2022, NAMining operated 32 draglines and other equipment at 25 quarries. Of the 32 draglines, 8 are owned by the Company and 24 are owned by customers. At December 31, 2022, NAMining had $42.4 million in property, plant and equipment, net of applicable accumulated amortization, depreciation and impairment.
The mining process at the limestone mines involves excavating limestone from a water-filled quarry utilizing draglines. The excavated limestone is transported and processed by the customer. The following mines were operational during 2022:
Location Name Aggregate Location State Customer Year NACCO Started Operations
White Rock — North Limestone Miami FL WRQ 1995
Krome Limestone Miami FL Cemex 2003
Alico Limestone Ft. Myers FL Cemex 2004
FEC Limestone Miami FL Cemex 2005
SCL Limestone Miami FL Cemex 2006
Central State Aggregates Limestone Zephyrhills FL McDonald Group 2016
Mid Coast Aggregates Limestone Sumter County FL McDonald Group 2016
West Florida Aggregates Limestone Hernando County FL McDonald Group 2016
St. Catherine Limestone Sumter County FL Cemex 2016
Center Hill Limestone Sumter County FL Cemex 2016
Inglis Limestone Crystal River FL Cemex 2016
Titan Corkscrew Limestone Ft. Myers FL Titan America 2017
Palm Beach Aggregates Limestone Loxahatchee FL Palm Beach Aggregates 2017
Perry Limestone Lamont FL Martin Marietta 2018
SDI Aggregates Limestone Florida City FL Blue Water Industries 2018
Queensfield Sand and gravel King William County VA King William Sand and Gravel Company, Inc. 2018
Newberry Limestone Alachua County FL Argos USA, LLC 2019
Titan Pennsuco (a)
Limestone Miami FL Titan America 2020
Seven Diamonds Limestone Pasco County FL Seven Diamonds, LLC 2021
Johnson County Sand and gravel Johnson County IN Martin Marietta 2021
Little River Sand and gravel Ashdown AR Lehigh Hanson 2021
Rosser Sand and gravel Ennis TX Lehigh Hanson 2021
Brooksville Cement Plant Limestone Brooksville FL Cemex 2021
Ash Grove Limestone Louisville NE Ash Grove 2022
(a) The Titan Pennsuco contract was terminated during the second quarter of 2022. NAMining mined de minimis amounts of limestone at this location during the 2022 and 2021 periods.
NAMining's customers control all of the limestone and sand reserves within their respective mines. NAMining has no title, claim, lease or option to acquire any of the reserves at any of the mines where it provides services.
Access to the White Rock mine is by means of a paved road from 122nd Avenue.
Access to the Krome mine is by means of a paved road from Krome Avenue.
Access to the Alico mine is by means of a paved road from Alico Road.
Access to the FEC mine is by means of a paved road from NW 118th Avenue.
44
Table of Contents
Access to the SCL mine is by means of a paved road from NW 137th Avenue.
Access to the Central State Aggregates mine is by means of a paved road from Yonkers Boulevard.
Access to the Mid Coast Aggregates mine is by means of a paved road from State Road 50.
Access to the West Florida Aggregates mine is by means of a paved road from Cortez Boulevard.
Access to the St. Catherine mine is by means of a paved road from County Road 673.
Access to the Center Hill mine is by means of a paved road from West Kings Highway.
Access to the Inglis mine is by means of a paved road from Highway 19 South.
Access to the Titan Corkscrew mine is by means of a paved road from Corkscrew Road.
Access to the Palm Beach Aggregates mine is by means of a paved road from State Road 80.
Access to the Perry mine is by means of paved road from Nutall Rise Road.
Access to the SDI Aggregates mine is by means of paved road from SW 167 th AVE.
Access to the Queensfield Mine is by means of paved road from Dabney's Mill Road (SR 604).
Access to the Newberry mine is by means of paved road from NW County Road 235 (CR 235).
Access to the Seven Diamonds mine is by means of a paved road from US-41 S/Broad St.
Access to the Johnson County mine is by means of a paved road from Old State 37/N Waverly Park Road.
Access to the Little River mine is by means of an unpaved road from Little River 60.
Access to the Rosser mine is by means of a paved road from TX-34 S.
Access to Brooksville Cement plant is by means of a paved road from Cement Plant Road.
Access to Ash Grove Louisville Quarry is by means of a paved road from HWY 50.
Minerals Management - Operations
As an owner of royalty and mineral interests, the Company’s access to information concerning activity and operations of its royalty and mineral interests is limited. The Company does not have information that would be available to a company with oil and natural gas operations because detailed information is not generally available to owners of royalty and mineral interests. Consequently, the exact number of wells producing from or drilling on the Company’s mineral interests at a given point in time is not determinable. The following table sets forth the Company’s estimate of the number of gross and net productive wells:
December 31, 2022 December 31, 2021
Gross Net Gross Net
Oil 1,049 3.3 467 0.9
Natural Gas 251 10.1 398 11.4
Total 1,300 13.4 865 12.3
Gross wells are the total wells in which an interest is owned.
Net wells are calculated based on the Company's net royalty interest, factoring in both ownership percentage of gross wells and royalty rate.
The majority of the Company’s producing mineral and royalty interest acreage now, or in the future, can be pooled with third-party acreage to form pooled units. Pooling proportionately reduces the Company’s royalty interest in wells drilled in a pooled unit, and it proportionately increases the number of wells in which the Company has such reduced royalty interest.
45
Table of Contents
The following table includes the Company's estimate of acreage for oil and gas mineral interests, NPRIs, and ORRIs:
December 31, 2022 December 31, 2021
Gross Acres Net Royalty Acres
Gross Acres
Net Royalty Acres
Appalachia
34,661 36,199 34,661 36,199
Gulf Coast
27,932 20,105 27,932 20,105
Permian
77,278 2,050 63,998 1,243
Rockies
326 72 — —
Williston
1,194 2,388 1,194 2,388
Total
141,391 60,814 127,785 59,935
The Company may own more than one type of interest in the same tract of land, but the overlap is not significant. Net Royalty Acres are calculated based on the Company’s ownership and royalty rate, normalized to a standard 1/8 th royalty lease, and assumes a 1/4 th royalty rate for unleased acres.
The following table includes the Company's estimate of developed and undeveloped acreage based on the gross acres in a basin or region and includes mineral interests, NPRIs, and ORRIs:
December 31, 2022 December 31, 2021
Developed Acreage Undeveloped Acreage Gross Acreage Developed Acreage Undeveloped Acreage Gross Acreage
Appalachia 32,027 2,634 34,661 28,011 6,650 34,661
Gulf Coast 22,191 5,741 27,932 21,784 6,148 27,932
Permian 73,862 3,416 77,278 62,496 1,502 63,998
Rockies 326 — 326 — — —
Williston — 1,194 1,194 — 1,194 1,194
Total 128,406 12,985 141,391 112,291 15,494 127,785
Undeveloped acres are either unleased and open or are leased acres on which wells have not been drilled or completed to a point that would permit the production of commercial quantities of oil or natural gas, regardless of whether such acreage contains proved reserves.
46
Table of Contents
Production and Price History
The following table sets forth the estimated oil and natural gas production data related to the Company’s mineral and royalty interests as well as certain price and cost information for the years ended December 31:
2022 (4)
2021 (4)
Production data:
Oil (bbl) (1)
46,571 32,627
NGL (bbl) (1)
61,511 63,559
Residue gas (Mcf) (2)
7,329,985 6,225,422
Total BOE (3)
1,329,747 1,133,756
Average realized prices:
Oil (bbl) (1)
$ 94.31 $ 66.87
NGL (bbl) (1)
$ 36.81 $ 29.33
Residue gas (Mcf) (2)
$ 5.87 $ 3.36
Average unit cost
BOE (3)
$ 4.26 $ 4.99
(1) Bbl. One stock tank barrel, or 42 U.S. gallons liquid volume.
(2) Mcf. One thousand cubic feet of natural gas at the contractual pressure and temperature bases.
(3) BOE. Barrel of Oil Equivalent, a conversion factor of 6 MCF of gas was used for 1 equivalent bbl of oil.
(4) As an owner of mineral and royalty interests, the Company’s access to information concerning activity and operations of its royalty and mineral interests is limited. As a result, the Company estimated the last two months of 2022 and 2021 production and pricing data using projections based on decline rates of wells and prior expense information.
Evaluation and Review of Reserves
The reserve estimates as of December 31, 2022 were prepared by Haas Petroleum Engineering Services, Inc. ("Haas Engineering"). Haas Engineering has provided reservoir engineering services, consulting and ongoing support for major and independent petroleum companies, public utilities, financial institutions, investors, and government agencies since 1980. Haas Engineering does not own an interest in NACCO or any of the Company's properties, nor is it employed on a contingent basis. A copy of Haas Engineering's estimated proved reserve report as of December 31, 2022 is incorporated by reference herein to Exhibit 99.1 to this Form 10-K.
The properties evaluated for proved reserves are located in Alabama, Louisiana, Ohio, Pennsylvania, Texas and Wyoming and represent all of the Company’s oil and gas reserves. A reserves audit is not the same as a financial audit. Reserve engineering is a subjective process of estimating volumes of economically recoverable oil and natural gas that cannot be measured in an exact manner. The accuracy of any reserve estimate is a function of the quality of available data and of engineering and geological interpretation. As a result, the estimates of different engineers often vary. In addition, the results of drilling, testing, and production may justify revisions of such estimates. Accordingly, reserve estimates often differ from the quantities of oil and natural gas that are ultimately recovered. Estimates of economically recoverable oil and natural gas and of future net revenues are based on several variables and assumptions, all of which may vary from actual results, including geologic interpretation, prices, and future production rates and costs.
The reserves estimates have been prepared using standard engineering practices generally accepted by the petroleum industry. Decline curve analysis was used to estimate the remaining reserves of pressure depletion reservoirs with enough historical production data to establish decline trends. Reservoirs under non-pressure depletion drive mechanisms and non-producing reserves were estimated by volumetric analysis, research of analogous reservoirs, or a combination of both. Reserves have been estimated using deterministic and probabilistic methods. The appropriate methodology was used, as deemed necessary, to estimate reserves in conformance with SEC regulations. The maximum remaining reserves life assigned to wells included in this report is 50 years.
Total net proved reserves are defined as those natural gas and hydrocarbon liquid reserves to the Company's interests after deducting all royalties, overriding royalties, and reversionary interests owned by outside parties that become effective upon
47
Table of Contents
payout of specified monetary balances. All reserves estimates have been prepared using standard engineering practices generally accepted by the petroleum industry and conform to guidelines developed and adopted by the SEC.
Technologies Used in Reserve Estimation
The SEC’s reserves rules allow the use of techniques that have been proved effective by actual production from projects in the same reservoir or an analogous reservoir or by other evidence using reliable technology that establishes reasonable certainty. The term “reasonable certainty” implies a high degree of confidence that the quantities of oil, natural gas and/or NGLs actually recovered will equal or exceed the estimate. To achieve reasonable certainty, the Company employed technologies that have been demonstrated to yield results with consistency and repeatability. The technologies and economic data used in the estimation of the Company’s proved reserves include, but are not limited to, well logs, geologic maps, seismic data, well test data, production data, historical price and cost information and property ownership interests. The accuracy of the estimates of the Company’s reserves is a function of:
• the quality and quantity of available data and the engineering and geological interpretation of that data;
• estimates regarding the amount and timing of future operating costs, development costs and workovers, all of which may vary considerably from actual results;
• future prices of oil, natural gas and NGLs, which may vary considerably from those estimated; and
• the judgment of the persons preparing the estimates.
The following table presents the Company's estimated net proved oil and natural gas reserves based on the reserve report prepared by Haas Engineering, the Company’s independent petroleum engineering firm. All of the Company’s reserves are located in the United States.
Net reserves as of December 31, 2022 Net reserves as of December 31, 2021
Oil (bbl) (1)
NGL (bbl) (1)
Residue gas (Mcf) (2)
Oil (bbl) (1)
NGL (bbl) (1)
Residue gas (Mcf) (2)
Proved developed 305,710 408,280 25,907,890 167,430 282,230 16,617,360
Proved undeveloped 32,570 11,030 1,784,670 220 90 1,210
Total 338,280 419,310 27,692,560 167,650 282,320 16,618,570
(1) Bbl. One stock tank barrel, or 42 U.S. gallons liquid volume.
(2) Mcf. One thousand cubic feet of natural gas at the contractual pressure and temperature bases.
As an owner of mineral and royalty interests and not working interests, the Company is not required to make capital expenditures and did not make capital expenditures to convert proved undeveloped reserves from undeveloped to developed.
Internal Control Disclosure
The Company's internal staff works closely with Haas Engineering to ensure the integrity, accuracy and timeliness of the data used to calculate proved reserves relating to NACCO's assets. Internal technical team members met with independent reserve engineers periodically during the period covered by the reserves report to discuss the assumptions and methods used in the proved reserve estimation process.
The preparation of the Company's proved reserve estimates is completed in accordance with internal control procedures. These procedures, which are intended to ensure reliability of reserve estimations, include the following:
• Review and verification of historical production data, which data is based on actual production as reported by third-party producers who lease the Company’s royalty and mineral interests;
• Preparation of reserve estimates by Haas Engineering under the direct supervision of internal staff;
• Verification of property ownership by the Company's land department; and
• No employee’s compensation is tied to the amount of reserves booked.
The Minerals Management Segment’s Vice President of Engineering and Finance is the technical person primarily responsible for overseeing the preparation of the internal reserve estimates and for coordinating with Haas Engineering in the preparation of the third-party reserve report. The Vice President of Engineering and Finance has over 15 years of industry experience with positions of increasing responsibility and reports directly to the President of Catapult Mineral Partners, the Company’s business unit focused on managing and expanding the Company’s portfolio of oil and gas mineral and royalty interests.
48
Table of Contents
Estimated Proved Reserves
The following table summarizes changes in proved reserves during the year ended December 31, 2022:
Estimated Proved Reserves
Oil (bbl) (1)
NGL (bbl) (1)
Residue gas (Mcf) (2)
December 31, 2021 167,650 282,320 16,618,570
Purchases 99,345 35,222 202,314
Extensions and discoveries 121,542 68,167 12,801,109
Revisions of previous estimates (3)
(2,504) 95,577 5,405,803
Production (46,571) (61,511) (7,329,985)
Other (1,182) (465) (5,251)
December 31, 2022 338,280 419,310 27,692,560
(1) Bbl. One stock tank barrel, or 42 U.S. gallons liquid volume.
(2) Mcf. One thousand cubic feet of natural gas at the contractual pressure and temperature bases.
(3) Revisions of previous estimates include technical revisions due to changes in commodity prices, historical and projected performance and other factors.
Estimated Proved Undeveloped Reserves ("PUDs")
The following table summarizes changes in PUDs during the year ended December 31, 2022:
Estimated Proved Undeveloped Reserves
Oil (bbl) (1)
NGL (bbl) (1)
Residue gas (Mcf) (2)
December 31, 2021 220 90 1,210
Purchases 21,790 5,104 38,571
Extensions and discoveries 10,780 5,926 1,746,099
Revisions of previous estimates (3)
(220) (90) (1,210)
December 31, 2022 32,570 11,030 1,784,670
(1) Bbl. One stock tank barrel, or 42 U.S. gallons liquid volume.
(2) Mcf. One thousand cubic feet of natural gas at the contractual pressure and temperature bases.
(3) Revisions of previous estimates include technical revisions due to changes in commodity prices, historical and projected performance and other factors.
As an owner of mineral and royalty interests, the Company generally does not have evidence or approval of operators’ development plans. As a result, proved undeveloped reserve estimates are limited to those relatively few locations for which drilling permits have been publicly filed. As of December 31, 2022, PUD reserves consists of 42 wells in various stages of drilling or completions. As of December 31, 2022, approximately 6% of the Company's total proved reserves were classified as PUDs.
Headquarter locations
NACCO leases office space in Mayfield Heights, Ohio, a suburb of Cleveland, Ohio, which serves as its corporate headquarters.
Coal Mining and Minerals Management lease corporate headquarters office space in Plano, Texas.
NAMining leases office and warehouse space in Medley, Florida.
49
Table of Contents