Item 2. Management’s Discussion and Analysis
ITEM
2. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS
The
following discussion and analysis should be read in conjunction with our historical interim condensed consolidated financial statements
and related notes included elsewhere in this Quarterly Report on Form 10-Q and the Annual Report on Form 10-K filed with the Securities
and Exchange Commission (the “SEC”) for the year ended June 30, 2024 filed on September 23, 2024 (the “Annual
Report on Form 10-K”), which have been prepared in accordance with generally accepted accounting principles in the United
States (“U.S. GAAP”). This discussion and analysis contains forward-looking statements and forward-looking information
that involve risks, uncertainties, and assumptions. Our actual results may differ materially from those anticipated in these forward-looking
statements and information as a result of many factors, including, but not limited to, those set forth elsewhere in this Quarterly
Report on Form 10-Q. See “Note Regarding Forward-Looking Statements” below.
All
currency amounts are stated in U.S. dollars unless noted otherwise.
As
used in this Quarterly Report on Form 10-Q, unless the context otherwise indicates, references to “we,” “our,”
the “Company,” “NioCorp,” and “us” refer to NioCorp Developments Ltd. and its subsidiaries,
collectively.
Note
Regarding Forward-Looking Statements
This
Quarterly Report on Form 10-Q and the exhibits attached hereto contain “forward-looking statements” within the meaning
of Section 27A of the Securities Act of 1933, as amended (the “Securities Act”), and Section 21E of the Securities
Exchange Act of 1934, as amended (the “Exchange Act”), and “forward-looking information” within the meaning
of applicable Canadian securities legislation (collectively, “forward-looking statements”). Such forward-looking statements
concern our anticipated results and developments in the operations of the Company in future periods, planned exploration activities,
the adequacy of the Company’s financial resources, and other events or conditions that may occur in the future.
Forward-looking
statements have been based upon our current business and operating plans, as approved by the Company’s Board of Directors,
and may include statements regarding the anticipated benefits of the transactions (the “2023 Transactions”) contemplated
by the previously disclosed Business Combination Agreement, dated September 25, 2022 (the “Business Combination Agreement”),
among the Company, GX Acquisition Corp. II and Big Red Merger Sub Ltd, including NioCorp’s ability to access the full amount
of the expected net proceeds of the Standby Equity Purchase Agreement, dated January 26, 2023 (the “Yorkville Equity Facility
Financing Agreement”), between the Company and YA II PN, Ltd., an investment fund managed by Yorkville Advisors Global,
LP (“Yorkville”); the anticipated benefits of the November Offerings (as defined below); the anticipated benefits of the January 2025 Offering (as defined below); NioCorp’s ability to
receive a final commitment of financing from the Export-Import Bank of the United States (“EXIM”); anticipated benefits
of the listing of the Common Shares, no par value, of the Company (“Common Shares”) on The Nasdaq Stock Market LLC
(“Nasdaq”); the financial and business performance of NioCorp; NioCorp’s anticipated results and developments
in the operations of NioCorp in future periods; NioCorp’s planned exploration activities; the adequacy of NioCorp’s
financial resources; NioCorp’s ability to secure sufficient project financing to complete construction and commence operation
of the Company’s niobium, scandium and titanium project (the “Elk Creek Project”) located in southeastern Nebraska;
NioCorp’s expectation and ability to produce niobium, scandium, and titanium and the potential to produce rare earth elements
at the Elk Creek Project; NioCorp’s plans to produce and supply specific products and market demand for those products;
the outcome of current recovery process improvement testing and the evaluation of the benefits and costs of electrifying the mine
using Railveyor technology, and NioCorp’s expectation that such process and design improvements could lead to greater efficiencies
and cost savings in the Elk Creek Project; the Elk Creek Project’s ability to produce multiple critical metals; the Elk
Creek Project’s projected ore production and mining operations over its expected mine life; the completion of technical
and economic analyses on the potential addition of magnetic rare earth oxides to NioCorp’s planned product suite; NioCorp’s
updating its technical report for the Elk Creek Project; statements with respect to the estimation of mineral resources and mineral
reserves; the exercise of options to purchase additional land parcels; the execution of contracts with engineering, procurement
and construction companies; NioCorp’s ongoing evaluation of the impact of inflation, supply chain issues and geopolitical
unrest on the Elk Creek Project’s economic model; and the creation of full time and contract construction jobs over the
construction period of the Elk Creek Project.
Forward-looking
statements are frequently, but not always, identified by words such as “expects,” “anticipates,” “believes,”
“intends,” “estimates,” “potential,” “possible,” and similar expressions, or statements
that events, conditions,
19
or results “will,” “may,” “could,” or “should” (or the
negative and grammatical variations of any of these terms) occur or be achieved. Any statements that express or involve discussions
with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions, or future events or performance
(often, but not always, using words or phrases such as “expects” or “does not expect,” “is expected,”
“anticipates” or “does not anticipate,” “plans,” “estimates,” or “intends,”
or stating that certain actions, events, or results “may,” “could,” “would,” “might,”
or “will” be taken, occur or be achieved) are not statements of historical fact and may be forward-looking statements.
Forward-looking statements reflect material expectations and assumptions, including, without limitation, expectations and assumptions
relating to: NioCorp’s ability to receive sufficient project financing for the construction of the Elk Creek Project on
acceptable terms or at all; NioCorp’s ability to service its existing debt and meet the payment obligations thereunder;
the future price of metals; the stability of the financial and capital markets; and current estimates and assumptions regarding
the 2023 Transactions and their benefits. Such forward-looking statements reflect the Company’s current views with respect
to future events and are subject to certain known and unknown risks, uncertainties, and assumptions. Many factors could cause
actual results, performance, or achievements to be materially different from any future results, performance, or achievements
that may be expressed or implied by such forward-looking statements, including, among others, risks related to the following:
NioCorp’s ability to use the net proceeds of the November Offerings in a manner that will increase the value of shareholders’
investment; NioCorp’s ability to operate as a going concern; NioCorp’s requirement of significant additional capital;
NioCorp’s ability to receive sufficient project financing for the construction of the Elk Creek Project on acceptable terms
or at all; NioCorp’s ability to receive a final commitment of financing from EXIM on an acceptable timeline, on acceptable
terms, or at all; NioCorp’s ability to recognize the anticipated benefits of the 2023 Transactions, including NioCorp’s
ability to access the full amount of the expected net proceeds under the Yorkville Equity Facility Financing Agreement; NioCorp’s
ability to continue to meet Nasdaq listing standards; risks relating to the Common Shares, including price volatility, lack of
dividend payments and dilution or the perception of the likelihood of any of the foregoing; the extent to which NioCorp’s
level of indebtedness and/or the terms contained in agreements governing NioCorp’s indebtedness or the Yorkville Equity
Facility Financing Agreement may impair NioCorp’s ability to obtain additional financing; covenants contained in agreements
with NioCorp’s secured creditors that may affect its assets; NioCorp’s limited operating history; NioCorp’s
history of losses; the material weaknesses in NioCorp’s internal control over financial reporting, NioCorp’s efforts
to remediate such material weaknesses and the timing of remediation; the possibility that NioCorp may qualify as a “passive
foreign investment company” (“PFIC”) under the Internal Revenue Code of 1986, as amended (the “Code”);
the potential that the 2023 Transactions could result in NioCorp becoming subject to materially adverse U.S. federal income tax
consequences as a result of the application of Section 7874 and related sections of the Code; cost increases for NioCorp’s
exploration and, if warranted, development projects; a disruption in, or failure of, NioCorp’s information technology systems,
including those related to cybersecurity; equipment and supply shortages; variations in the market demand for, and prices of,
niobium, scandium, titanium and rare earth products; current and future offtake agreements, joint ventures, and partnerships;
NioCorp’s ability to attract qualified management; estimates of mineral resources and reserves; mineral exploration and
production activities; feasibility study results; the results of metallurgical testing; the results of technological research;
changes in demand for and price of commodities (such as fuel and electricity) and currencies; competition in the mining industry;
changes or disruptions in the securities markets; legislative, political or economic developments, including changes in federal
and/or state laws that may significantly affect the mining industry; the impacts of climate change, as well as actions taken or
required by governments related to strengthening resilience in the face of potential impacts from climate change; the need to
obtain permits and comply with laws and regulations and other regulatory requirements; the timing and reliability of sampling
and assay data; the possibility that actual results of work may differ from projections/expectations or may not realize the perceived
potential of NioCorp’s projects; risks of accidents, equipment breakdowns, and labor disputes or other unanticipated difficulties
or interruptions; the possibility of cost overruns or unanticipated expenses in development programs; operating or technical difficulties
in connection with exploration, mining, or development activities; management of the water balance at the Elk Creek Project site;
land reclamation requirements related to the Elk Creek Project; the speculative nature of mineral exploration and development,
including the risks of diminishing quantities of grades of reserves and resources; claims on the title to NioCorp’s properties;
potential future litigation; and NioCorp’s lack of insurance covering all of NioCorp’s operations.
Should
one or more of these risks or uncertainties materialize, or should underlying assumptions prove incorrect, actual results may
vary materially from those described herein. This list is not exhaustive of the factors that may affect any of the Company’s
forward-looking statements. Forward-looking statements are statements about the future and are inherently uncertain, and actual
achievements of the Company or other future events or conditions may differ materially from those reflected in the forward-looking
statements due to a variety of risks, uncertainties, and other factors, including without limitation those discussed under the
heading “Risk Factors” in our Annual Report on Form 10-K, as well as other factors described elsewhere in this Quarterly
Report on Form 10-Q and the Company’s other reports filed with the SEC.
20
The
Company’s forward-looking statements contained in this Quarterly Report on Form 10-Q are based on the beliefs, expectations,
and opinions of management as of the date of this Quarterly Report on Form 10-Q. The Company does not assume any obligation to
update forward-looking statements if circumstances or management’s beliefs, expectations, or opinions should change, except
as required by law. For the reasons set forth above, investors should not attribute undue certainty to, or place undue reliance
on, forward-looking statements.
Qualified
Person
All
technical and scientific information that forms the basis for the Elk Creek Project disclosure included in this Quarterly Report
on Form 10-Q has been reviewed and approved by Scott Honan, M.Sc., SME-RM, NioCorp’s Chief Operating Officer. Mr. Honan
is a “Qualified Person” as such term is defined in National Instrument 43-101 – Standards of Disclosure for
Mineral Projects and subpart 1300 of Regulation S-K.
Company
Overview
NioCorp
is developing the Elk Creek Project, located in southeast Nebraska. The Elk Creek Project is a development-stage property that
has disclosed niobium, scandium, and titanium reserves and resources and disclosed rare earth mineral resources. The Company is
continuing technical and economic studies around the rare earths contained in the Elk Creek Project’s mineral resources
in order to determine whether extraction of rare earth elements can be reasonably justified and economically viable after taking
into account all relevant factors. Niobium has developing applications in the formulation of solid-state lithium-ion batteries,
which may reduce charging times and increase battery safety. Niobium is used to produce various superalloys that are extensively
used in high performance aircraft and jet turbines. It also is used in High-Strength, Low-Alloy steel, a stronger steel used in
automobiles, bridges, structural systems, buildings, pipelines, and other applications that generally increases strength and/or
reduces weight, which can result in environmental benefits, including reduced fuel consumption and material usage and fewer air
emissions. Scandium can be combined with aluminum to make high-performance alloys with increased strength and improved corrosion
resistance. Scandium also is a critical component of advanced solid oxide fuel cells, an environmentally preferred technology
for high-reliability, distributed electricity generation. Titanium is a component of various superalloys and other applications
that are used for aerospace applications, weapons systems, protective armor, medical implants, and many others. It also is used
in pigments for paper, paint, and plastics. Rare earths are critical to electrification and decarbonization initiatives and can
be used to manufacture the strongest permanent magnets commercially available.
Our
primary business strategy is to advance our Elk Creek Project to commercial production. We are focused on obtaining additional
funds to carry out our near-term planned work programs associated with securing the project financing necessary to complete mine
development and construction of the Elk Creek Project.
Recent
Corporate Events
On January 31, 2025, the Company closed an underwritten registered direct offering (the “January 2025 Offering”), pursuant to the underwriting agreement, dated January 29, 2025 (the January 2025 Underwriting Agreement”), with Maxim Group LLC, as underwriter, pursuant to which the Company issued and sold 2,577,320 Common Shares, 2,577,320 Series A warrants to purchase up to 2,577,320 Common Shares (the “January 2025 Series A Warrants”) and 1,288,660 Series B warrants to purchase up to an additional 1,288,660 Common Shares (the “January 2025 Series B Warrants”). Each Common Share was sold together with one Series A Warrant and one-half of one Series B Warrant at a combined public offering price of $1.94. The gross proceeds from the January 2025 Offering were approximately $5.0 million before deducting underwriting discounts and offering expenses. The January 2025 Series A Warrants have an exercise price of $1.98 per underlying Common Share, are exercisable immediately, and will expire on August 2, 2027. The January 2025 Series B Warrants have an exercise price of $2.05 per underlying Common Share, are exercisable immediately, and will expire on January 31, 2029.
Elk
Creek Project Update
On
October 30, 2024, the Company announced that it had completed bench-scale testwork at a demonstration-scale processing plant located
in Trois-Rivieres, Quebec built by the Company and L3 Process Development (“L3”) and operated by L3 (the “Demonstration
Plant”) that successfully demonstrated that the process developed for extracting and recovering rare earth oxides found
in the ore at the Elk Creek Project can be used to recycle the rare earth content in rare earth permanent magnets. The L3 team
was able to demagnetize and grind up permanent rare earth magnets and then leach the contained rare earth elements from the magnet.
The successful outcome of this testing opens up the possibility
21
of accepting mixed rare earth concentrate from other mines into
the planned Elk Creek plant once it is constructed and operating to supplement the ore expected to be produced from the Elk Creek
mine.
During
the quarter ended December 31, 2024, the Company completed negotiations with four landowners in Nebraska and entered into contract
amendments which extended the option periods by approximately five years for each Option to Purchase agreement (“OPT”)
covering four parcels of land for project construction and operation which the Company does not already own. The Company paid
$106,000 upon closing of the OPT extensions and will make periodic payments totaling $184,000 over the extension period.
Other
Activities
If
funds become available through the Company’s fundraising efforts, we expect to undertake the following activities:
●
Continuation
of the Company’s efforts to secure federal, state and local operating permits;
●
Continued
evaluation of the potential to produce rare earth products and sell such products under offtake agreements;
●
Negotiation
and completion of offtake agreements for the remaining uncommitted production of niobium, scandium, and titanium from the
Elk Creek Project, including the potential sale of titanium as titanium tetrachloride, as well as potential rare earth element
production;
●
Negotiation
and completion of engineering, procurement, and construction agreements;
●
Completion
of the final detailed engineering for the underground portion of the Elk Creek Project;
●
Initiation
and completion of the final detailed engineering for surface project facilities;
●
Construction
of natural gas and electrical infrastructure under existing agreements to serve the Elk Creek Project site;
●
Completion
of water supply agreements and related infrastructure to deliver fresh water to the Elk Creek Project site;
●
Initiation
of revised mine groundwater investigation and control activities;
●
Initiation
of long-lead equipment procurement activities;
●
As
a follow-on to the Demonstration Plant operations, complete characterization and testing of waste materials to support tailings
impoundment and paste backfill plant designs;
●
Continue
the engineering and costing of road improvements near the junction of Nebraska state highways 50 and 62, which are intended
to facilitate access to the Elk Creek Project site and manage increased traffic in the project vicinity; and
●
Continue technical work with respect to improvements in the mine and the metallurgical process and costs.
Financial
and Operating Results
The
Company has no revenues from mining operations. Operating expenses incurred primarily related to costs incurred for the advancement
of the Elk Creek Project and the activities necessary to support corporate and shareholder duties and are detailed in the following
table.
22
For the Three Months Ended December 31,
For the Six Months Ended December 31,
2024
2023
2024
2023
Operating expenses
($000s)
Employee-related costs
$
904
$
328
$
1,234
$
650
Professional fees
772
952
1,222
2,139
Exploration expenditures
261
828
399
1,928
Other operating expenses
964
809
1,441
1,643
Total operating expenses
2,901
2,917
4,296
6,360
Change in fair value of Earnout Shares liability
(1,569
)
(806
)
(753
)
(2,899
)
Change in fair value of warrant liabilities
(837
)
71
(893
)
144
Change in fair values of convertible notes
23
-
40
-
Interest expense
4
1,176
48
3,251
Foreign exchange (gain) loss
(4
)
28
4
17
Other gains
-
-
(122
)
-
Loss on equity securities
-
1
-
2
Income tax benefit
-
-
-
(101
)
Net loss and comprehensive loss
(518
)
(3,387
)
(2,620
)
(6,774
)
Less: Loss attributable to noncontrolling interest
(68
)
(96
)
(99
)
(270
)
Net loss attributable to the Company
$
(450
)
$
(3,291
)
$
(2,521
)
$
(6,504
)
Three-
and six-month periods ended December 31, 2024 compared to the three- and six-month periods ended December 31, 2023
Significant
items affecting operating expenses are noted below:
Employee-related
costs increased for the three- and six-month periods in 2024 as compared to 2023, primarily due to the timing of fully vested
incentive options to purchase Common Shares (“Options”) issued to employees in 2024.
Professional
fees decreased for the three-month period in 2024 primarily due to increased audit fees associated with the
Company’s June 30, 2023 financial statements and increased review fees in connection with the Company’s September
30, 2023 financial statements, partially offset by transactions expenses (primarily legal and accounting costs) associated
with the warrant liabilities incurred with the November Offerings. Professional fees decreased for the six-month period in
2024 as compared to 2023, primarily due to higher costs incurred in 2023 related to the timing of legal services associated
with the Company’s SEC registration statements filed in October 2023, as well as increased audit fees associated with
the Company’s June 30, 2023 financial statements and increased review fees in connection with the Company’s
September 30, 2023 financial statements.
Exploration
expenditures decreased for the three- and six-month period in 2024 as compared to 2023, as 2023 costs included Demonstration
Plant operation costs. Operation of the Demonstration Plant ended during the prior year.
Other
operating expenses include costs related to investor relations, general office expenditures, equity offering and proxy expenditures,
board-related expenditures, and other miscellaneous costs. These costs increased for the three-month period in 2024 as compared
to 2023 primarily due to the timing of fully vested Options issued to board members and advisors in 2024 as well as broker fees
and other financial service costs associated with the warrant liabilities incurred with the November Offerings. These costs decreased
for the six-month period in 2024 as compared to 2023 primarily due to a decrease in director and officer insurance expense, as
well as declines in scandium development initiatives and financial-related services, partially offset by the timing of fully vested
Options issued to board members and advisors in 2024 and an increase in investor relation services.
Other
significant items impacting the change in the Company’s net loss are noted below :
Change
in fair value of Earnout Shares liability represents the changes in fair value related to the shares of Class B common stock
of Elk Creek Resource Corporation (“ECRC”), an indirect, majority-owned subsidiary of NioCorp formerly known as GX
Acquisition Corp. II, the rights of the holders of which to exchange such shares into Common
23
Shares are subject to certain vesting
conditions (such shares of ECRC Class B common stock, the “Earnout Shares”). The credit balances for all periods represents
the impact of decreases in the Company’s Common Share price on the financial modeling used to determine the period end fair
values.
Change
in fair value of warrant liabilities represents the changes in fair value of Common Share purchase warrants (“Warrants”)
that are carried as liabilities in the condensed consolidated balance sheet. Expenses for the three- and six-month periods ending
December 31, 2023, primarily related to Lind Global Asset Management III, LLC’s (“Lind III”) right to receive
additional warrants (the “Contingent Consent Warrants”) as consideration for entering into the previously disclosed
Waiver and Consent Agreement, dated September 25, 2022 (the “Lind Consent”), between the Company and Lind III. Expense
was recorded in these periods based on the impact of a lower closing Common Share price, which increased the probability of these
Contingent Consent Warrants being issued on the 18-month anniversary. The credit amounts booked for the three-and six-month periods
ending December 31, 2024, primarily related to the impact of our declining Common Share market price on the Black-Scholes modeling
results for our outstanding warrant liabilities.
Interest
expense decreased for the three-and six-month periods in 2024 as compared to 2023 as 2023 periods included accretion expense
associated with the unsecured convertible debentures (the “Convertible Debentures”) issued to Yorkville in March 2023.
The outstanding balance of the Convertible Debentures was substantially reduced during fiscal year 2023, and was fully retired
in the first quarter of 2024, resulting in lower accretion during 2024.
Other
Gain s for the six-month period ended December 31, 2024, primarily relates to a non-cash gain on the issuance of the Contingent
Consent Warrants, which were issued in September 2024.
Loss
attributable to noncontrolling interest represents the portion of net loss in ECRC not owned by the Company.
Liquidity
and Capital Resources
We
have no revenue generating operations from which we can internally generate funds. To date, our ongoing operations have been financed
by the sale of our equity securities by way of private placements, convertible securities issuances, the exercise of Options and
Warrants, and related party loans. With respect to currently outstanding Options and Warrants, we believe that exercise of these
instruments, and cash proceeds from such exercises, will not occur unless and until the market price for our Common Shares equals
or exceeds the related exercise price of each instrument.
On
April 12, 2024, the Company issued and sold to Yorkville and Lind Global Fund II LP (“Lind II” and, together with
Yorkville, the “April 2024 Purchasers”), pursuant to a securities purchase agreement, dated April 11, 2024 (the “April
2024 Purchase Agreement”), between the Company and each of the April 2024 Purchasers. The Company also issued to the April
2024 Purchasers, in proportion to the aggregate principal amount of the April 2024 Notes issued to each April 2024 Purchaser,
Warrants to purchase up to 615,385 Common Shares (the “April 2024 Warrants”), which are equal to 25% of the aggregate
principal amount of April 2024 Notes issued to the April 2024 Purchasers divided by the exercise price of $3.25, subject to any
adjustment to give effect to any stock dividend, stock split or recapitalization.
On
November 5, 2024, the Company closed the November 2024 Registered Offering, pursuant to the underwriting agreement, dated November
3, 2024 (the “Underwriting Agreement”), with Maxim Group LLC, as underwriter (the “Underwriter”), which
consisted of 1,592,356 Common Shares, 1,672,090 Warrants (the “Series A Public Warrants”) to purchase up to an additional
1,672,090 Common Shares and 836,045 Warrants (the “Series B Public Warrants” and, together with the Series A Public
Warrants, the “November Public Warrants”) to purchase up to an additional 836,045 Common Shares. Each Common Share
was sold together with one Series A Public Warrant and one-half of one Series B Public Warrant at a combined public offering price
of $1.57. The gross proceeds from the November 2024 Registered Offering were approximately $2.5 million before deducting underwriting
discounts and offering expenses. The Company entered into a warrant agency agreement with Computershare Inc. and its affiliate,
Computershare Trust Company, N.A., together as warrant agent, setting forth the terms and conditions of the November Public Warrants.
The Series A Public Warrants have an exercise price of $1.75 per underlying Common Share, are exercisable immediately, and will
expire on November 5, 2026. The Series B Public Warrants have an exercise price of $2.07 per underlying Common Share, are exercisable
beginning six months and one day from the date of issuance, and will expire on November 5, 2029. In addition, pursuant to the
Underwriting Agreement, the Company granted the Underwriter a 45-day over-allotment option to purchase (i) 238,853 additional
Common Shares and (ii) 358,280 Option Warrants (as defined below) to purchase up to an aggregate of 358,280 Common Shares. “Option
Warrant” means one Series A Public Warrant combined with one-half
24
of one Series B Public Warrant. On November 4, 2024, Underwriter
partially exercised its over-allotment option to purchase 79,734 additional Series A Public Warrants and 39,867 additional Series
B Public Warrants, which amounts are included in the amounts issued at closing of the November 2024 Registered Offering above.
On November 13, 2024, the Company
closed a non-brokered private placement (the “November 2024 Private Offering” and, together with the November 2024
Registered Offering, the “November Offerings”) pursuant to binding subscription agreements with certain accredited
investors (the “Private Placement Investors”) as part of a non-brokered private placement of 2,199,602 units of the
Company (the “November 2024 Units”). Each November 2024 Unit consists of one Common Share, one Warrant (the “Series
A Private Warrants”) to purchase up to an additional Common Share and one-half of one Warrant to purchase up to an additional
one-half of one Common Share (the “Series B Private Warrants” and, together with the Series A Private Warrants, the
“November Private Warrants”). Each November 2024 Unit was issued and sold at a price of $1.57. The gross proceeds of
the November 2024 Private Offering were approximately $3.5 million before deducting offering expenses. Certain directors and officers
of the Company purchased November 2024 Units at a price of $1.7675 per November 2024 Unit, which price includes $0.1975 per November
2024 Private Unit and allows such directors and officers to participate in the November 2024 Private Offering in accordance with
the rules of the Nasdaq. The Series A Private Warrants have an exercise price of $1.75 per underlying Common Share, are exercisable
immediately, and will expire on November 13, 2026. The Series B Private Warrants have an exercise price of $2.07 per underlying
Common Share, are exercisable beginning six months and one day from the date of issuance, and will expire on November 13, 2029.
The November Offerings and the sale of
the April 2024 Notes have provided, and the January 2025 Offering and the Yorkville Equity Facility Financing Agreement are expected
to provide, near-term and longer-term access to capital. The ability of the Company to draw down on the Yorkville Equity Facility
Financing Agreement, at its discretion, is subject to certain limitations and the satisfaction of certain conditions. When available,
the Yorkville Equity Facility Financing Agreement provides an opportunity to actively manage the cash needs of the Company more
closely. Historically, cash has generally been available to the Company through private placements of equity for which the timing
did not always coincide with the Company’s cash needs. In the near term, the Company intends to utilize the Yorkville Equity
Facility Financing Agreement for working capital and general corporate purposes, including to advance our efforts to launch construction
of the Elk Creek Project and move it to commercial operations. The Company may also utilize the Yorkville Equity Facility Financing
Agreement to potentially generate funds at a time when they are in need. Alternatively, the Company can also utilize the Yorkville
Equity Facility Financing Agreement for opportunistic share sales.
On
September 11, 2024, the Company and Mark Smith entered into the Smith Loan Agreement, which provides for a $2.0 million non-revolving
credit facility (the “Smith Loan”). A total of $504,000 was subsequently drawn down, and subsequently the Company
repaid $508,000, representing the balance of the interest and principal outstanding under the Smith Loan, plus $41,000 related
to the loan origination fees payable.
As
of December 31, 2024, the Company had cash of $0.5 million and a working capital deficit of $3.1 million, compared to cash of
$2.0 million and a working capital deficit of $9.0 million on June 30, 2024.
We expect that the Company will
operate at a loss for the foreseeable future. The Company’s current planned cash needs are approximately $13.0 million
until June 30, 2025. On September 4, 2024, NioCorp entered into (i) a consent and waiver (the “September Yorkville
Consent”) to the April 2024 Notes issued and sold to Yorkville pursuant to the April 2024 Purchase Agreement and (ii) a
consent and waiver (together with the Yorkville Consent, the “September Consents”) to the April 2024 Notes issued
and sold to Lind II. On October 3, 2024, NioCorp entered into (i) a consent and waiver (the “October Yorkville
Consent”) to the April 2024 Notes issued and sold to Yorkville pursuant to the April 2024 Purchase Agreement and (ii) a
consent and waiver (together with the September Consents and the October Yorkville Consent, the “2024 Note
Consents”) to the April 2024 Notes issued and sold to Lind II pursuant to the April 2024 Purchase Agreement. The 2024
Note Consents, among other things, extended and deferred certain monthly payments and extended the maturity of the April 2024
Notes until January 31, 2025. On January 3, 2025, NioCorp entered into a consent and waiver (the “January Yorkville
Consent”) to the April 2024 Notes issued and sold to Yorkville pursuant to the April 2024 Purchase Agreement. The
January Yorkville Consent, among other things, deferred the due date for the amounts that would otherwise have been due to
Yorkville on January 1, 2025 to the maturity date and extended the maturity date to February 17, 2025, and
prospectively waived any term of the April 2024 Notes that would otherwise be triggered upon a failure of the Company to pay
to Yorkville the remainder of the amount due on January 1, 2025. See Notes 6b and 13 to the interim condensed consolidated
financial statements for additional information on the terms of the 2024 Note Consents and January Yorkville Consent,
respectively. All remaining amounts due to Lind II ($176,000) and Yorkville ($1.0 million) under the April 2024 Notes were repaid on
January 6, 2025, And February 7, 2025, respectively.
In
addition to outstanding accounts payable and short-term liabilities, our average monthly planned expenditures through June 30,
2025, are expected to be approximately $2.275 million per month where approximately $0.350 million is for corporate overhead and
estimated costs related to securing financing necessary for advancement of the Elk Creek Project. This
25
includes general overhead costs and satisfying outstanding accounts payable. This also includes anticipated
financing costs associated with the Elk Creek Project. The scope of these financing costs remains under discussion with EXIM. Approximately
$1.925 million per month is planned for expenditures relating to the advancement of the Elk Creek Project by NioCorp’s majority
owned subsidiary, ECRC, including an updated mine plan in connection with the EXIM application process. The Company’s ability
to continue operations and fund our current work plan is dependent on management’s ability to secure additional financing.
The Company anticipates that it does not
have sufficient cash on hand to continue to fund basic operations for the next twelve months, and additional funds totaling $12.0
million to $15.0 million, net of funds raised from advances under the Yorkville Equity Facility Financing Agreement and borrowings
under the Smith Loan, if any, are likely to be necessary to continue advancing the Elk Creek Project in the areas of financing,
permitting, and detailed engineering. While the Yorkville Equity Facility Financing Agreement may provide the Company with access
to additional capital, the Company will likely require additional capital to meet its cash needs. Management is actively pursuing
such additional sources of debt and equity financing, and while it has been successful in doing so in the past, there can be no
assurance it will be able to do so in the future.
Current Elk Creek property lease commitments
are $136,000 through June 30, 2025. To maintain our currently held properties and fund our currently anticipated general and administrative
costs and planned exploration and development activities at the Elk Creek Project for the fiscal year ending June 30, 2025, the
Company will likely require additional financing during the current fiscal year. Should such financing not be available in that
timeframe, we will be required to reduce our activities and will not be able to carry out all our presently planned activities
at the Elk Creek Project.
On June 6, 2023, the Company announced
that it had submitted an application to EXIM for debt financing (the “EXIM Financing”) to fund the project costs for
the Elk Creek Project, under EXIM’s “Make More in America” initiative. The EXIM Financing is subject to, among
other matters, the satisfactory completion of due diligence, the negotiation and settlement of final terms, and the negotiation
of definitive documentation. There can be no assurance that the EXIM Financing will be completed on the terms described herein
or at all. The Company was informed that its application received approval by the first of three reviews by the EXIM Transaction
Review Committee (the “TRC”) on October 2, 2023. During the quarter, EXIM continued to process the Company’s
application for debt financing under EXIM’s Make More in America Program. The Company’s application sits at TRC in
the second step in EXIM’s four-step approval process. The Company continues to meet with EXIM as well as providing responses
to requests for additional information from EXIM and to the consultants that are conducting due diligence on the Company’s
application on behalf of EXIM. As part of the diligence process, EXIM has identified additional project activities to be undertaken,
including, among other things, an updated mine plan and updated Elk Creek Project capital costs on a final or close-to-final basis
reflecting updated process flows. However, there can be no assurance what further project activities or matters EXIM may request
in connection with the application process.
We
are currently unable to estimate how long the application process may take, and there can be no assurances that we will be able
to successfully negotiate a final commitment of debt financing from EXIM.
Except for the potential funding from advances under the Yorkville Equity Facility Financing Agreement,
as discussed above, and the potential exercise of Options and Warrants, we currently have no further funding commitments or arrangements
for additional financing at this time, and there is no assurance that we will be able to obtain any such additional financing on
acceptable terms, if at all. Pursuant to the Exchange Agreement, dated as of March 17, 2023 (as amended, supplemented or otherwise
modified, the “Exchange Agreement”), by and among NioCorp, ECRC and the Sponsor, NioCorp is restricted from issuing
equity or equity-linked securities (other than Common Shares) or any preferred equity or non-voting equity if such issuance would
adversely impact the rights of the holders of the shares of Class B common stock of ECRC, without the consent of the holders of
a majority of the shares of Class B common stock of ECRC. The January 2025 Underwriting Agreement also contains certain covenants
that, among other things, limit NioCorp’s ability to enter into any variable rate transaction, including issuances of equity
or debt securities that are convertible into Common Shares at variable rates and any equity line of credit, at-the-market agreement
or other continuous offering of Common Shares, subject to certain exceptions. Notwithstanding the restrictions set forth in the
Exchange Agreement and the January 2025 Underwriting Agreement, there is significant uncertainty that we would be able to secure
any additional financing in the current equity or debt markets. The quantity of funds to be raised and the terms of any proposed
equity or debt financing that may be undertaken will be negotiated by management as opportunities to raise funds arise. Management
may pursue funding sources of both debt and equity financing, including but not limited to the issuance of equity securities in
the form of Common Shares, Warrants, subscription receipts, or any combination thereof in units of the Company
26
pursuant to private placements to accredited investors or pursuant to public
offerings in the form of underwritten/brokered offerings, registered direct offerings, or other forms of equity financing and
public or private issuances of debt securities including secured and unsecured convertible debt instruments or secured debt project
financing. Management does not currently know the terms pursuant to which such financings may be completed in the future, but
any such financings will be negotiated at arm’s-length. Future financings involving the issuance of equity securities or
derivatives thereof will likely be completed at a discount to the then-current market price of the Company’s securities
and will likely be dilutive to current shareholders. In addition, we could raise funds through the sale of interests in our mineral
properties, although current market conditions and other recent worldwide events have substantially reduced the number of potential
buyers/acquirers of any such interests. However, we cannot provide any assurances that we will be able to be successful in raising
such funds.
Based
on the conditions described within, management has concluded, as supported by the notes that accompany our financial statements
for the year ended June 30, 2024, that substantial doubt exists as to our ability to continue as a going concern. The interim
condensed consolidated financial statements included in this Quarterly Report on Form 10-Q have been prepared under the assumption
that we will continue as a going concern. As defined under S-K 1300, we are a development stage issuer and we have incurred losses
since our inception. We may not have sufficient cash, including Option and Warrant exercises subsequent to June 30, 2024, to fund
normal operations and meet debt obligations for the next twelve months without deferring payment on certain current liabilities
and raising additional funds. Uncertainty in capital markets, supply chain disruptions, increased interest rates and inflation,
and the potential for geographic recessions have contributed to general global economic uncertainty. During the three months ended
December 31, 2024, these events continued to create uncertainty with respect to overall project funding and timelines. We believe
that the going concern uncertainty cannot be alleviated with confidence until the Company has entered into a business climate
where funding of its planned ongoing operating activities is secured. Therefore, these factors raise substantial doubt as to our
ability to continue as a going concern.
We
have no exposure to any asset-backed commercial paper. Other than cash held by our subsidiaries for their immediate operating
needs in Colorado and Nebraska, all of our cash reserves are on deposit with major U.S. and Canadian chartered banks. We do not
believe that the credit, liquidity, or market risks with respect thereto have increased as a result of the current market conditions.
However, in order to achieve greater security for the preservation of our capital, we have, of necessity, been required to accept
lower rates of interest, which has also lowered our potential interest income.
Operating
Activities
During
the six months ended December 31, 2024, the Company’s operating activities consumed $2.0 million of cash (2023: $4.6 million).
The cash used in operating activities for the six months ended December 31, 2024, reflects the Company’s funding of losses
of $2.6 million, increased fair value related to the Earnout Shares and Warrant liabilities, share-based compensation, and other
non-cash transactions. Overall, operational outflows during the six months ended December 31, 2024, decreased from the corresponding
period of 2023 due to costs and expenditures incurred in connection with the Company’s Demonstration Plant. Going forward,
the Company’s working capital requirements are expected to increase substantially in connection with the development of
the Elk Creek Project.
Financing
Activities
Financing
inflows were $0.5 million during the three months ended December 31, 2024 (2023 inflows: $2.9 million), with 2024 inflows reflecting
the gross receipts of $6.0 million from the November Offerings and $1.8 million from Common Share issuances under the Yorkville
Equity Facility Financing Agreement, offset by $6.0 million of convertible debt repayments and $1.3 million of share issuance
costs.
Cash
Flow Considerations
The Company has historically relied upon
debt and equity financings to finance its activities. Subject to the restrictions set forth in the Exchange Agreement and the January
2025 Underwriting Agreement, the Company may pursue additional debt and/or equity financing in the medium term; however, there
can be no assurance the Company will be able to obtain any required financing in the future on acceptable terms.
27
The
Company has limited financial resources compared to its proposed expenditures, no source of operating income, and no assurance
that additional funding will be available to it for current or future projects, although the Company has been successful in the
past in financing its activities through the sale of equity securities.
The
ability of the Company to arrange additional financing in the future will depend, in part, on the prevailing capital market conditions,
and its success in developing the Elk Creek Project. Any quoted market for the Common Shares may be subject to market trends generally,
notwithstanding any potential success of the Company in creating revenue, cash flows, or earnings, and any depression of the trading
price of the Common Shares could impact its ability to obtain equity financing on acceptable terms.
Historically,
the Company has used net proceeds from issuances of Common Shares to provide sufficient funds to meet its near-term exploration
and development plans and other contractual obligations when due. However, development and construction of the Elk Creek Project
will require substantial additional capital resources. This includes near-term funding and, ultimately, funding for Elk Creek
Project construction and other costs. See “ Liquidity and Capital Resources ” above for the Company’s discussion
of arrangements related to possible future financings.
Critical
Accounting Estimates
There
have been no material changes in our critical accounting estimates discussed in “Management’s Discussion and Analysis
of Financial Condition and Results of Operations” under the heading “Critical Accounting Estimates and Recent Accounting
Pronouncements” as of June 30, 2024, in the Annual Report on Form 10-K.
Certain
U.S. Federal Income Tax Considerations
If
NioCorp (or a subsidiary) is a PFIC for any taxable year (or portion thereof) that is included in the holding period of a U.S.
holder of Common Shares or other NioCorp securities (as determined under applicable U.S. federal income tax law), then certain
significant adverse tax consequences could apply to such U.S. holder, including requirements to treat any gain realized upon a
disposition of Common Shares (or other securities) as ordinary income, to include certain “excess distributions” on
Common Shares in income, and to pay an interest charge on a portion of any such gain or distribution. NioCorp believes that it
was classified as a PFIC during the taxable years ended June 30, 2024 and 2023, and, based on the current composition of its income
and assets, as well as current business plans and financial expectations, that it may be classified as a PFIC for its current
taxable year or in future taxable years. No opinion of legal counsel or ruling from the Internal Revenue Service (the “IRS”)
concerning the PFIC status of NioCorp or any subsidiary has been obtained or is currently planned to be requested. The determination
of whether any corporation was, or will be, a PFIC for a taxable year depends, in part, on the application of complex U.S. federal
income tax rules, which are subject to differing interpretations. In addition, whether any corporation will be a PFIC for any
taxable year depends on the assets and income of such corporation over the course of each such taxable year and, as a result,
cannot be predicted with certainty as of the date of this Quarterly Report on Form 10-Q. In addition, even if NioCorp concluded
that it or any subsidiary was not classified as a PFIC, the IRS could challenge such determination and a court could sustain the
challenge. Accordingly, there can be no assurance that NioCorp or any subsidiary will not be classified as a PFIC for any taxable
year. Each holder of Common Shares or other NioCorp securities should consult its own tax advisors regarding the PFIC status of
NioCorp and each subsidiary thereof and the resulting tax consequences to the holder, as well as any potential to mitigate such
tax consequences through a “QEF” or “mark-to-market” election. See the “Risk Factors” section
of the Annual Report on Form 10-K.
Other
The
Company has one class of shares, being Common Shares. A summary of outstanding shares, Options, Warrants, and convertible debt
as of February 7, 2025, is set out below, on a fully diluted basis.
Common
Shares
Outstanding
(Fully
Diluted)
Common
Shares
46,818,119
Vested
shares of ECRC Class B common stock (1)
3,934,031
Options
(2)
3,063,000
Warrants
(3)
30,376,495
28
(1)
Each
exchangeable into one Common Share at any time, and from time to time, until March 17, 2033.
(2)
Each
exercisable into one Common Share.
(3)
Includes 15,666,626 NioCorp Assumed Warrants that are each exercisable into 1.11829212 Common Shares and
14,709,869 Warrants that are each exercisable into one Common Share.
Text extracted from the filing as submitted to EDGAR. Formatting, tables and exhibits are simplified for reading; the original document is authoritative for anything you rely on.