Item 2. Management’s Discussion and Analysis
ITEM
2. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS
The
following discussion and analysis should be read in conjunction with our unaudited condensed interim consolidated financial statements
as of, and for the three and nine months ended March 31, 2022, and the related notes thereto, which have been prepared in accordance
with generally accepted accounting principles in the United States (“US GAAP”). This discussion and analysis
contains forward-looking statements and forward-looking information that involve risks, uncertainties, and assumptions. Our actual
results may differ materially from those anticipated in these forward-looking statements and information as a result of many factors,
including, but not limited to, those set forth elsewhere in this Quarterly Report on Form 10-Q. See “Note Regarding Forward-Looking
Statements” below.
All
currency amounts are stated in thousands of U.S. dollars unless noted otherwise.
As
used in this report, unless the context otherwise indicates, references to “we,” “our,” the “Company,”
“NioCorp,” and “us” refer to NioCorp Developments Ltd. and its subsidiaries, collectively.
Note
Regarding Forward Looking Statements
This
Quarterly Report on Form 10-Q and the exhibits attached hereto contain “forward-looking statements” within the meaning
of Section 27A of the Securities Act of 1933, as amended (the “Securities Act”), and Section 21E of the Securities
Exchange Act of 1934, as amended (the “Exchange Act”), and “forward-looking information” within the meaning
of applicable Canadian securities legislation (collectively, “forward-looking statements”). Such forward-looking statements
concern our anticipated results and developments in the operations of the Company in future periods, planned exploration activities,
the adequacy of the Company’s financial resources, and other events or conditions that may occur in the future.
Forward-looking
statements have been based upon our current business and operating plans, as approved by the Company’s Board of
Directors; our cash and other funding requirements and timing and sources thereof; results of feasibility studies; the
accuracy of mineral resource and reserve estimates and assumptions on which they are based; the results of economic
assessments and exploration activities; and current market conditions and project development plans. The material assumptions
used to develop the forward-looking statements and forward-looking information included in this Quarterly Report on Form 10-Q
include: our expectations of mineral prices; our forecasts and expected cash flows; our projected capital and operating
costs; accuracy of mineral resource estimates and resource modeling and feasibility study results; expectations regarding
mining and metallurgical recoveries; timing and reliability of sampling and assay data; anticipated political and social
conditions; expected national and local government policies, including legal reforms; successful advancement of the
Company’s required permitting processes; and the ability to successfully raise additional capital.
Forward-looking
statements are frequently, but not always, identified by words such as “expects,” “anticipates,” “believes,”
“intends,” “estimates,” “potential,” “possible,” and similar expressions, or statements
that events, conditions, or results “will,” “may,” “could,” or “should” (or the
negative and grammatical variations of any of these terms) occur or be achieved. Any statements that express or involve discussions
with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions, or future events or performance
(often, but not always, using words or phrases such as “expects” or “does not expect,” “is expected,”
“anticipates” or “does not anticipate,” “plans,” “estimates,” or “intends,”
or stating that certain actions, events, or results “may,” “could,” “would,” “might,”
or “will” be taken, occur or be achieved) are not statements of historical fact and may be forward-looking statements.
Such forward-looking statements reflect the Company’s current views with respect to future events and are subject to certain
known and unknown risks, uncertainties, and assumptions. Many factors could cause actual results, performance, or achievements
to be materially different from any future results, performance, or achievements that may be expressed or implied by such forward-looking
statements, including, among others, risks related to the following:
13
Risks
Related to Our Business:
●
risks related to
our ability to operate as a going concern;
●
risks related to
our requirement of significant additional capital;
●
risks related to
our limited operating history;
●
risks related to
our history of losses;
●
risks related to
cost increases for our exploration and, if warranted, development projects;
●
risks related to
changes in economic valuations of the Elk Creek Project, such as net present value calculations, changes or disruptions in
the securities markets;
●
risks related to
a disruption in, or failure of, our information technology (“IT”) systems, including those related to cybersecurity;
●
risks related to
equipment and supply shortages;
●
risks related to
current and future offtake agreements, joint ventures, and partnerships;
●
risks related to
our ability to attract qualified management;
●
risks related to
the effects of the COVID-19 pandemic on our business plans, financial condition and liquidity;
●
risks related to
the effects of the current Russia/Ukraine conflict; and
●
risks related to
the ability to enforce judgment against certain of our Directors.
Risks
Related to Mining and Exploration:
●
risks related to
feasibility study results;
●
risks related to
mineral exploration and production activities;
●
risks related to
our lack of mineral production from our properties;
●
risks related to
the results of our metallurgical testing;
●
risks related
to the price volatility of commodities;
●
risks related
to the establishment of a reserve and resource for rare earth elements (“REEs” or “Rare Earths”) and
the development of a viable recovery process for REEs;
●
risks related to
estimates of mineral resources and reserves;
●
risks related to
changes in mineral resource and reserve estimates;
●
risks related to
differences in U.S. and Canadian reserve and resource reporting;
●
risks related to
our exploration activities being unsuccessful;
●
risks related to
competition in the mining industry;
●
risks related to
the management of the water balance at our Elk Creek Project;
●
risks related to
claims on the title to our properties;
●
risks related to
surface access on our properties;
●
risks related to
potential future litigation; and
●
risks related to
our lack of insurance covering all our operations.
Risks
Related to Government Regulations:
●
risks related to
our ability to obtain or renew permits and licenses for production;
●
risks related
to government and environmental regulations that may increase our costs of doing business or restrict our operations;
●
risks related
to changes in federal and/or state laws that may significantly affect the mining industry;
●
risks related
to the impacts of climate change, as well as actions taken or required by governments related to strengthening resilience
in the face of potential impacts from climate change; and
●
risks related
to land reclamation requirements.
Risks
Related to Our Debt:
●
risks related
to covenants contained in agreements with our secured creditors that may affect our assets; and
●
risks related
to the extent to which our level of indebtedness may impair our ability to obtain additional financing.
14
Risks
Related to Our Common Shares:
●
risks related
to our status as a “passive foreign investment company” under the U.S. Internal Revenue Code of 1986, as amended;
●
risks related
to our Common Shares, including price volatility, lack of dividend payments, dilution and penny stock rules; and
●
risks related
to our status as an “emerging growth company” and the impact of related reduced reporting requirements on our
ability to attract investors.
Should
one or more of these risks or uncertainties materialize, or should underlying assumptions prove incorrect, actual results may
vary materially from those described herein. This list is not exhaustive of the factors that may affect any of the Company’s
forward-looking statements. Forward-looking statements are statements about the future and are inherently uncertain, and actual
achievements of the Company or other future events or conditions may differ materially from those reflected in the forward-looking
statements due to a variety of risks, uncertainties, and other factors, including without limitation those discussed under the
heading “Risk Factors” of our Annual Report on Form 10-K for the fiscal year ended June 30, 2021, as well as other
factors described elsewhere in this report and the Company’s other reports filed with the Securities and Exchange Commission
(“SEC”).
The
Company’s forward-looking statements contained in this Quarterly Report on Form 10-Q are based on the beliefs, expectations,
and opinions of management as of the date of this report. The Company does not assume any obligation to update forward-looking
statements if circumstances or management’s beliefs, expectations, or opinions should change, except as required by law.
For the reasons set forth above, investors should not attribute undue certainty to, or place undue reliance on, forward-looking
statements.
National
Instrument 43-101 Compliance
Scott
Honan, M.Sc., SME-RM, a qualified person as defined by National Instrument 43-101 - Standards of Disclosure for Mineral Projects
(“NI 43-101”), has supervised the preparation of the scientific and technical information that forms the basis for
the Elk Creek Project disclosure in this Quarterly Report on Form 10-Q and has approved the disclosure in this Quarterly Report
on Form 10-Q related thereto. Mr. Honan is not independent of the Company, as he is the Chief Operating Officer. Additional information
on the updated Feasibility Study for the Elk Creek Project (the “2019 Feasibility Study”) is available in our NI 43-101
Technical Report, issued May 29, 2019, which is available under NioCorp’s profile on the Canadian Administrators website
at www.sedar.com and on our website at www.niocorp.com/wp-content/uploads/180001_FINAL_43-101_FS_NioCorp_AS_FILED.pdf.
Company
Overview
NioCorp
is developing the Elk Creek Project, located in southeast Nebraska. The Elk Creek Project is an advanced Niobium (“Nb”),
Scandium (“Sc”), and Titanium (“Ti”) exploration project. The Company also is evaluating the potential
to produce several Rare Earth byproducts from the Elk Creek Project. Niobium is used to produce various superalloys that are extensively
used in high performance aircraft and jet turbines. It also is used in High-Strength, Low-Alloy (“HSLA”) steel, a
stronger steel used in automobiles, bridges, structural systems, buildings, pipelines, and other applications that generally increases
strength and/or reduces weight, which can result in environmental benefits, including reduced fuel consumption and material usage
and fewer air emissions. Scandium can be combined with aluminum to make high-performance alloys with increased strength and improved
corrosion resistance. Scandium also is a critical component of advanced solid oxide fuel cells, an environmentally preferred technology
for high-reliability, distributed electricity generation. Titanium is a component of various superalloys and other applications
that are used for aerospace applications, weapons systems, protective armor, medical implants and many others. It also is used
in pigments for paper, paint, and plastics. Rare Earths are critical to electrification and decarbonization initiatives and can
be used to manufacture the strongest permanent magnets commercially available.
Our
primary business strategy is to advance our Elk Creek Project to commercial production. We are focused on obtaining additional
funds to carry out our near-term planned work programs associated with securing the project financing necessary to complete mine
development, construction, commissioning, and operation of the Elk Creek Project.
15
Emerging
Growth Company Status
We
qualify as an “emerging growth company” as defined in Section 101 of the Jumpstart our Business Startups Act (“JOBs
Act”) as we did not have more than $1.07 billion in annual gross revenue during our most recently completed fiscal year.
We
will lose our status as an emerging growth company on June 30, 2022, which is the fiscal year following the fifth anniversary
of the date of the first sale of Common Shares pursuant to an effective registration statement.
As
an emerging growth company under the JOBS Act, we have elected to opt out of the extended transition period for complying with
new or revised standards pursuant to Section 107(b) of the JOBS Act. The election is irrevocable.
As
an emerging growth company, we are exempt from Section 404(b) of the Sarbanes-Oxley Act of 2002 and Section 14A(a) and (b) of
the Exchange Act. Such sections are described below:
●
Section 404(b) of
the Sarbanes-Oxley Act of 2002 requires a public company’s auditor to attest to, and report on, management’s assessment
of its internal controls.
●
Sections 14A(a)
and (b) of the Exchange Act, implemented by Section 951 of the Dodd-Frank Wall Street Reform and Consumer Protection Act of
2010 (the “Dodd-Frank Act”), require companies to hold shareholder advisory votes on executive compensation and
golden parachute compensation.
Because
we will lose our status as an emerging growth company as of June 30, 2022, we will become subject to Section 14A(a) and (b) of
the Exchange Act beginning next fiscal year. However, notwithstanding the loss of our status as an emerging growth company, we
will continue to be exempt from Section 404(b) of the Sarbanes-Oxley Act of 2002 for so long as we are neither a “large
accelerated filer” nor an “accelerated filer” as those terms are defined in Rule 12b-2 under the Exchange Act.
COVID-19
Since
March 2020, several measures have been implemented in the United States, Canada, and the rest of the world in response to the
increased impact from the COVID-19 pandemic. Such impacts include, among others, supply chain disruptions, labor shortages, regulatory
challenges, inflationary pressures, as well as market volatility. The full extent to which the COVID-19 pandemic and our precautionary
measures may continue to impact our business will depend on future developments, which continue to be highly uncertain and cannot
be predicted at this time, including, but not limited to, the duration and geographic spread of the pandemic, its severity, the
actions to contain the virus or treat its impact, future spikes of COVID-19 infections resulting in additional preventative measures
to contain or mitigate the spread of the virus, the effectiveness, distribution and acceptance of COVID-19 vaccines, including
the vaccines’ efficacy against emerging COVID-19 variants, and how quickly and to what extent normal economic and operating
conditions can resume. We believe this could have an adverse impact on our ability to obtain financing, development plans, results
of operations, financial position, and cash flows during the current fiscal year. As a result of the COVID-19 pandemic, the Company
is following, and will continue to follow, social distancing, health and safety protocol, business-related social gathering restrictions,
and other similar guidelines promulgated by Colorado and Nebraska governmental officials.
The
COVID-19 pandemic has caused, and continues to cause, uncertainty with regards to overall project funding timelines and a heightened
risk remains that we may be unable to secure sufficient additional capital, including but not limited to equity and debt offerings,
to fund future expenditures or to maintain our liquidity. It is also possible that the COVID-19 pandemic could further adversely
affect our business plans, results of operations, financial condition or liquidity in the future. The impact of the COVID-19 pandemic
is fluid and continues to evolve, and therefore, we cannot currently predict the extent to which our business plans, results of
operations, financial condition or liquidity will ultimately be impacted.
Russia/Ukraine
Conflict
On
February 24, 2022, Russian military forces launched a military action in Ukraine. In response to this action, the U.S. and other
countries have imposed various economic sanctions and measures against Russia and related persons and entities. Russia has subsequently
enacted countermeasures. We are monitoring developments and potential impacts from enacted sanctions and measures and will take
mitigating actions as appropriate. This conflict and resulting response has impacted the global economy and financial markets
and could adversely affect our business, financial condition, and results of operations.
16
Recent
Corporate Events
The
Company developed and deployed an Environmental and Social Management System (“ESMS”) in the third fiscal quarter
of 2022 based on the “Equator Principles.” The Equator Principles are intended to serve as a common baseline and risk
management framework to facilitate the identification, assessment, and management of environmental, social, and governing risks
(“ESG”), and are oftentimes used to evaluate projects in a financing context.
The
development of the Equator Principles has formalized and documented many of NioCorp’s existing ESG practices. The ESMS includes
the following elements:
● Environmental
and Social Risk Assessment;
● Climate
Change Risk Assessment;
● Environmental
and Community Assessment, including an Environmental Justice evaluation;
● A
website-based Grievance Mechanism for members of the local community;
● A
series of management procedures to guide day-to-day activities; and
● Environmental
and Social Management Plans for Air Emissions and Wastewater.
Elk
Creek Project Update
On
January 3, 2022, the Company announced positive results from its ongoing metallurgical work regarding the process to extract Rare
Earth elements (“REEs”) from ore samples sourced at its Elk Creek Project. Salt Lake City-based L3 Process Development
(“L3”) has been conducting small-scale testing for NioCorp on Rare Earth recovery and flowsheet improvement, with
the following results and planned work steps:
● L3
demonstrated that Scandium can be effectively extracted and separated from the REEs in
solution using a phosphate-based extractant. With additional work, this phosphate-based
recovery process could be shown capable of replacing the phosphoric acid-based extraction
process that is part of the current Project design.
● L3
further demonstrated that the REEs (lanthanum through lutetium, including the magnetic
Rare Earths neodymium, praseodymium, dysprosium, and terbium) can be selectively extracted
and separated from the leach solution using an amide-based extractant.
● Additional
testing is planned at L3’s laboratory to further verify and optimize a Rare Earth
recovery operation for the Elk Creek project as well as establish metallurgical performance
and recovery data for three prospective Rare Earth products: neodymium/praseodymium oxide,
dysprosium oxide, and terbium oxide.
● L3
is now in the process of constructing a small-scale integrated demonstration plant at
its Quebec facility, which will address hydrometallurgical recommendations from the Company’s
2019 Feasibility Study as well as demonstrating potential Rare Earth recovery operations.
Construction
of this demonstration facility advanced during the current quarter along with the bench-scale testing needed to support final
plant design. Management believes plant construction will be completed, and the test facility will be in operation, during our
current fiscal quarter ending June 30, 2022.
Work
efforts to define a mineral resource with respect to Rare Earth data continued during the quarter; however, it is not yet certain
if this work will result in Rare Earth data being delineated as a mineral resource.
On
April 15, 2022, the Company announced that the Nebraska Department of Environment and Energy (“NDEE”) advised the
Company that periodic extensions to the Elk Creek Project’s construction air permit are no longer required because the Company
has met the regulatory definition of “construction, reconstruction, or modification of the source” since the permit
was issued.
17
Other
Activities
Our
long-term financing efforts continued during the quarter ended March 31, 2022. However, as noted above under “ COVID-19,”
the COVID-19 pandemic has created uncertainty and continues to impact processes related to the Company’s efforts to
obtain project financing. As funds become available through the Company’s fundraising efforts, we expect to undertake the
following activities:
●
Continuation of
the Company’s efforts to secure federal, state and local permits;
●
Continued evaluation
of the potential to produce Rare Earth products;
●
Negotiation
and completion of offtake agreements for the remaining uncommitted production from the project;
●
Negotiation and
completion of engineering, procurement and construction agreements;
●
Completion of the
final detailed engineering for the underground portion of the Elk Creek Project;
●
Initiation and completion
of the final detailed engineering for surface project facilities;
●
Construction of
natural gas and electrical infrastructure under existing agreements to serve the Elk Creek Project site;
●
Completion of water
supply agreements and related infrastructure to deliver fresh water to the project site;
●
Initiation of revised mine
groundwater investigation and control activities;
●
Initiation of long-lead equipment procurement
activities; and
●
Construction and operation of a small-scale
demonstration plant to address process recommendations contained in the 2019 Feasibility Study and to quantify REE metallurgical
performance.
Financial
and Operating Results
The
Company has no revenues from mining operations. Operating expenses incurred related primarily to performing exploration activities,
as well as the activities necessary to support corporate and shareholder duties, and are detailed in the following table.
For
the Three Months
Ended March 31,
For
the Nine Months
Ended March 31,
2022
2021
2022
2021
Operating expenses
Employee-related
costs
$
308
$
327
$
1,859
$
1,332
Professional fees
16
83
530
276
Exploration expenditures
845
297
1,957
711
Other
operating expenses
217
138
1,324
802
Total operating
expenses
1,386
845
5,670
3,121
Other
income
-
(22
)
-
(208
)
Loss
on debt extinguishment
-
-
-
163
Change
in financial instrument fair value
-
(60
)
-
(32
)
Foreign exchange (gain)
loss
(48
)
(94
)
101
(497
)
Interest expense
477
354
1,457
612
Loss (gain) on equity
securities
1
(10
)
6
(12
)
Income
tax benefit
-
-
-
-
Net Loss
$
1,816
$
1,013
$
7,234
$
3,147
18
Nine
months ended March 31, 2022 compared to nine months ended March 31, 2021
Significant
items affecting operating expenses are noted below:
Employee-related
costs increased in 2022 as compared to 2021 due to increased share-based compensation costs, which primarily reflected the
impact of increased Common Share values in the Black Scholes model. Options issued in both 2022 and 2021 were fully vested upon
issuance and expensed on the grant date.
Professional
fees increased in 2022 as compared to 2021, primarily due to the timing of legal services related to SEC filings, including
our shelf registration statement on Form S-3 filed in November 2021.
Exploration
expenditures increased in 2022 as compared to 2021, reflecting costs incurred in connection with high pressure grinding rolls
comminution testing, process optimization, demonstration plant EPC efforts, Equator Principles program development and current
efforts in evaluating the potential to update the existing mineral resource with REEs.
Other
operating expenses include investor relations, general office expenditures, equity offering and proxy expenditures, board-related
expenditures and other miscellaneous costs. These costs increased in 2022 as compared to 2021 primarily due to increased financial
advisory fees and investor relations fees associated with our ongoing financing efforts. In addition, share-based compensation
for directors and other advisors increased in 2022 as compared to 2021 due to increased share-based compensation costs, which
primarily reflected the impact of increased Common Share values in the Black Scholes model. Options issued in both 2022 and 2021
were fully vested upon issuance and expensed on the grant date.
Other
significant items impacting the change in the Company’s net loss are noted below :
Other
income for 2021 represents the one-time forgiveness of the Company’s U.S. Small Business Administration Loan, which
occurred on November 18, 2020.
Loss
on extinguishment for 2021 represents the one-time loss incurred in connection with the December 18, 2020, conversion of the
Nordmin accounts payable balance to a one-year convertible note (the “Nordmin Note”).
Foreign
exchange (gain) loss is primarily due to changes in the U.S. dollar against the Canadian dollar and reflects the timing of
foreign currency transactions, primarily U.S. dollar-based related party loans, and subsequent changes in exchange rates, and
the loss during 2022 as compared to a gain in 2021 is due to an increase in the U.S. dollar relative to the Canadian dollar in
2022, and a decrease in the U.S. dollar relative to the Canadian dollar in 2021.
Interest
expense increased in 2022 as compared to 2021 primarily due to the accretion of the Nordmin Note, which was issued in December
2020, as well as accretion of the convertible security issued to Lind Global Asset Management III, LLC, which was issued in February
2021.
Three
months ended March 31, 2022 compared to three months ended March 31, 2021
Overall,
the increase in net loss for the three months ended March 31, 2022, as compared to the same period in 2021, is primarily the result
of the same factors underlying the nine-month changes in exploration expenditures and interest expense as discussed
above.
Liquidity
and Capital Resources
We
have no revenue generating operations from which we can internally generate funds. To date, our ongoing operations have been financed
by the sale of our equity securities by way of private placements, convertible securities issuances, the exercise of incentive
stock options and share purchase warrants, and related party loans. While the COVID-19 pandemic has created uncertainty with respect
to overall project funding timelines, we believe that we will be able to secure additional private placement financings in the
future, although we cannot predict the timing, size, or pricing of any such financings. In addition, we could raise funds through
the sale of interests in our mineral properties, although current market conditions and the impacts of the COVID-19 pandemic have
substantially reduced the number of potential buyers/acquirers of any such interests. However, we cannot provide any assurances
that we will be able to be successful in raising such funds.
19
As
of March 31, 2022, the Company had cash of $3.5 million and a working capital deficit of $1.4 million, compared to cash of $7.3
million and working capital surplus of $3.4 million on June 30, 2021.
We
expect that the Company will operate at a loss for the foreseeable future. The Company’s current planned cash needs are
approximately $4.2 million until June 30, 2022. In addition to outstanding accounts payable and short-term liabilities, our average
monthly planned expenditures are approximately $500 per month where approximately $245 is for corporate overhead and estimated
costs related to securing financing necessary for advancement of the Elk Creek Project. Approximately $255 per month is planned
for expenditures relating to the advancement of Elk Creek Project by NioCorp’s wholly owned subsidiary, Elk Creek Resources
Corp. The Company’s ability to continue operations and fund our current work plan is dependent on management’s ability
to secure additional financing.
The
Company anticipates that it may not have sufficient cash to continue to fund basic operations for the next twelve months, and
additional funds totaling $5.5 million to $6.25 million are likely to be necessary to continue advancing the project in the areas
of financing, permitting, and detailed engineering. Management is actively pursuing such additional sources of debt and equity
financing, and while it has been successful in doing so in the past, there can be no assurance it will be able to do so in the
future.
Elk
Creek property lease commitments are -nil- until June 30, 2022. To maintain our currently held properties and fund our currently
anticipated general and administrative costs and planned exploration and development activities at the Elk Creek Project for the
fiscal year ending June 30, 2022, the Company will likely require additional financing during the current fiscal year. Should
such financing not be available in that timeframe, we will be required to reduce our activities and will not be able to carry
out all our presently planned activities at the Elk Creek Project.
We
currently have no further funding commitments or arrangements for additional financing at this time, other than the potential
exercise of options and warrants, and there is no assurance that we will be able to obtain additional financing on acceptable
terms, if at all. There is significant uncertainty that we will be able to secure any additional financing in the current equity
or debt markets. The quantity of funds to be raised and the terms of any proposed equity or debt financing that may be undertaken
will be negotiated by management as opportunities to raise funds arise. Management is currently pursuing funding sources of both
debt and equity financing, including but not limited to the issuance of equity securities in the form of Common Shares, Warrants,
subscription receipts, or any combination thereof in units of the Company pursuant to private placements to accredited investors
or pursuant to equity lines of credit or public offerings in the form of underwritten/brokered offerings, at-the-market offerings,
registered direct offerings, or other forms of equity financing and public or private issuances of debt securities including secured
and unsecured convertible debt instruments or secured debt project financing. Management does not currently know the terms pursuant
to which such financings may be completed in the future, but any such financings will be negotiated at arm’s length. Future
financings involving the issuance of equity securities or derivatives thereof will likely be completed at a discount to the then-current
market price of the Company’s securities and will likely be dilutive to current shareholders.
Based
on the conditions described within, management has concluded and the audit opinion and notes that accompany our financial statements
for the year ended June 30, 2021, disclose that substantial doubt exists as to our ability to continue in business. The financial
statements included in this Quarterly Report on Form 10-Q have been prepared under the assumption that we will continue as a going
concern. We are an exploration stage company and we have incurred losses since our inception. We may not have sufficient cash
to fund normal operations and meet debt obligations for the next twelve months without deferring payment on certain current liabilities
and raising additional funds. The continuing COVID-19 pandemic has resulted in business travel restrictions and capital market
disruptions, and this has had an adverse impact on our ability to obtain financing, development plans, results of operations,
financial position, and cash flows during the current fiscal year. We believe that the going concern uncertainty cannot be alleviated
with confidence until the Company has entered into a business climate where funding of its planned ongoing operating activities
is secured. Therefore, these factors raise substantial doubt as to our ability to continue as a going concern.
We
have no exposure to any asset-backed commercial paper. Other than cash held by our subsidiaries for their immediate
operating needs in Colorado and Nebraska, all of our cash reserves are on deposit with major United States and Canadian
chartered banks. We do not believe that the credit, liquidity, or market risks with respect thereto have increased as a
result of the current market conditions. However, in order to achieve greater security for the preservation of our capital,
we have, of necessity, been required to accept lower rates of interest, which has also lowered our potential interest
income.
20
Operating
Activities
During
the nine months ended March 31, 2022, the Company’s operating activities consumed $4.4 million of cash (2021: $3.6 million).
The cash used in operating activities for the nine months ended March 31, 2022, reflects the Company’s funding of losses
of $7.2 million, partially offset by the accretion of convertible debt, share-based compensation costs and other non-cash transactions,
as well as a $0.5 million increase in prepaid expenses related to the set-up of the L3 demonstration plant. Overall, operational
outflows during the nine months ended March 31, 2022, increased from the corresponding period of 2021 due to an increase in exploration-related
spending at the Elk Creek Project and a prepayment related to planned process optimization testing. Going forward, the Company’s
working capital requirements are expected to increase substantially in connection with the development of the Elk Creek Project.
Financing
Activities
Financing
inflows were $0.7 million during the nine months ended March 31, 2022, as compared to $11.9 million during the corresponding period
in 2021, primarily reflecting the timing of convertible debt issuance, warrant and option exercises, and related party debt repayments
during the comparative periods.
Cash
Flow Considerations
As
noted above under “ COVID-19 ,” the COVID-19 pandemic has created uncertainty with respect to overall project
funding timelines. The Company has historically relied upon debt and equity financings to finance its activities. The Company
may pursue additional debt and/or equity financing in the medium term; however, there can be no assurance the Company will be
able to obtain any required financing in the future on acceptable terms.
The
Company has limited financial resources compared to its proposed expenditures, no source of operating income, and no assurance
that additional funding will be available to it for current or future projects, although the Company has been successful in the
past in financing its activities through the sale of equity securities.
The
ability of the Company to arrange additional financing in the future will depend, in part, on the prevailing capital market conditions,
including the impacts of the COVID-19 pandemic on the timing and availability of funding, and its success in developing the Elk
Creek Project. Any quoted market for the Common Shares may be subject to market trends generally, notwithstanding any potential
success of the Company in creating revenue, cash flows, or earnings, and any depression of the trading price of the Common Shares
could impact its ability to obtain equity financing on acceptable terms.
Historically,
the Company has used net proceeds from issuances of Common Shares to provide sufficient funds to meet its near-term exploration
and development plans and other contractual obligations when due. However, development and construction of the Elk Creek Project
will require substantial additional capital resources. This includes near-term funding and, ultimately, funding for Elk Creek
Project construction and other costs. See “ Liquidity and Capital Resources ” above for the Company’s discussion
of arrangements related to possible future financings.
Contractual
Obligations
There
have been no material changes to our contractual obligations discussed in “Management’s Discussion and Analysis of
Financial Condition and Results of Operations” under the heading “Contractual Obligations” as of June 30, 2021,
in our Annual Report on Form 10-K for the fiscal year ended June 30, 2021, other than reductions in convertible debt balances
as noted in Note 5 to the financial statements accompanying this Quarterly Report on Form 10-Q, and the extension of the term
of the related party credit facility as discussed in Note 7 to the financial statements accompanying this Quarterly Report on
Form 10-Q.
21
Off-Balance
Sheet Arrangements
The
Company has no off-balance sheet arrangements.
Critical
Accounting Policies
There
have been no material changes in our critical accounting policies discussed in “Management’s Discussion and Analysis
of Financial Condition and Results of Operations” under the heading “Critical Accounting Policies” as of June
30, 2021, in our Annual Report on Form 10-K for the fiscal year ended June 30, 2021.
Certain
U.S. Federal Income Tax Considerations
The
Company has been a “passive foreign investment company” (“PFIC”) as defined under Section 1297 of the
U.S. Internal Revenue Code of 1986, as amended, in recent years and expects to continue to be a PFIC in the future. Current and
prospective United States shareholders should consult their tax advisors as to the tax consequences of PFIC classification and
the U.S. federal tax treatment of PFICs. Additional information on this matter is included in the “Risk Factors” section
of the Company’s Annual Report on Form 10-K for the fiscal year ended June 30, 2021, under the heading “Risks Related
to the Common Shares.”
Other
The
Company has one class of shares, being Common Shares. A summary of outstanding shares, share options, warrants, and convertible
debt option as of February 4, 2022, is set out below, on a fully-diluted basis.
Common
Shares
Outstanding
(fully
diluted)
Common
Shares
269,041,264
Stock
options 1
13,964,000
Warrants 1
13,470,118
Convertible
Debt 2
6,269,300
1 Each
exercisable into one Common Share
2 Represents
Common Shares issuable on conversion of aggregate outstanding principal amounts of $4.05 million of convertible debt as of
May 6, 2022, assuming a market price per Common Share of $0.74
on that date.
Text extracted from the filing as submitted to EDGAR. Formatting, tables and exhibits are simplified for reading; the original document is authoritative for anything you rely on.