Item 2. Properties
ITEM 2. PROPERTIES.
Utility Plant
The water utility plant in our systems consists of
source of supply, pumping, water treatment, transmission and distribution, general facilities and all appurtenances, including all connecting
pipes.
17
Index
The wastewater utility plant in our systems consist
of pumping, treatment, collection mains, general facilities and all appurtenances, including all connecting pipes.
We believe our water and wastewater utility plant
facilities are sufficient for the operations of the Company.
Middlesex System
The Middlesex System’s principal source of surface
supply is the Delaware & Raritan Canal owned by the State of New Jersey and operated as a water resource by the NJWSA.
Water is withdrawn from the Delaware & Raritan
Canal at New Brunswick, New Jersey through our intake and pumping station, located on state-owned land bordering the canal. Water is transported
through two raw water pipelines for treatment and distribution at our CJO Plant in Edison, New Jersey.
The CJO Plant includes chemical storage and chemical
feed equipment, two dual rapid mixing basins, four upflow clarifiers which are also called superpulsators, two ozone contactors, twelve
rapid filters containing gravel, sand and anthracite for water treatment and a steel washwater tank. The CJO Plant also includes a computerized
Supervisory Control and Data Acquisitions system to monitor and control the CJO Plant and the water supply and distribution system in
the Middlesex System. There is a State of New Jersey certified on-site laboratory capable of performing bacteriological, chemical, process
control and advanced instrumental chemical sampling and analysis. The firm design capacity of the CJO Plant is 55 mgd (60 mgd maximum
capacity). The five electric motor-driven, vertical turbine pumps presently installed have an aggregate capacity of 85 mgd.
In addition, there is a 15 mgd auxiliary pumping station
on-site at the CJO Plant location. It has a dedicated substation and emergency power supply provided by a diesel-driven generator. It
pumps from the 10 million gallon distribution storage reservoir directly into the distribution system.
The transmission and distribution system is comprised
of 746 miles of mains and includes 24,300 feet of 48-inch concrete transmission main and 23,400 feet of 42-inch ductile iron transmission
main connecting the CJO Plant to our distribution pipe network and related storage facilities. Also included are a 58,600 foot transmission
main and a 38,800 foot transmission main, augmented with a long-term, non-exclusive agreement with East Brunswick to transport water through
the East Brunswick system to several of our other contract customers.
The Middlesex System’s storage facilities consist
of a 10 million gallon reservoir at the CJO Plant, 5 million gallon and 2 million gallon reservoirs in Edison and a 2 million gallon reservoir
at the Park Avenue Well Field.
In New Jersey, we own the properties on which the
Middlesex System’s 27 wells are located, the properties on which our storage tanks are located as well as the property where the
CJO Plant is located. We own our operations center located at 1500 Ronson Road, Iselin, New Jersey, consisting of a 27,000 square foot
office building, 16,500 square foot maintenance facility and a 1.96 acre equipment and materials storage and staging yard. We lease 29,036
square feet of commercial office space adjacent to the Ronson Road complex. The leased space, which is under contract through 2028, houses
our corporate administrative functions including executive, accounting, customer service and billing, engineering, human resources, information
technology and legal.
Tidewater System
The Tidewater System is comprised of 87 production
plants that vary in pumping capacity from 46,000 gallons per day to 4.4 mgd. Water is transported to our customers through 888 miles of
transmission and distribution mains. Storage facilities include 46 tanks, with an aggregate capacity of 7.9 million gallons. The Delaware
office property, located on an eleven-acre parcel owned by White Marsh, consists of two office buildings totaling approximately 17,000
square feet. In addition, Tidewater maintains a field operations center servicing its largest service territory in Sussex County, Delaware.
The operations center is located on a 2.9 acre parcel owned by White Marsh, and consists of three buildings totaling approximately 12,000
square feet.
18
Index
Pinelands Water System
Pinelands Water owns well site and storage properties
in Southampton Township, New Jersey. The Pinelands Water storage facility is a 1.3 million gallon standpipe. Water is transported to our
customers through 18 miles of transmission and distribution mains.
Pinelands Wastewater System
Pinelands Wastewater owns a 12 acre site on which
its 0.5 mgd capacity wastewater treatment plant and connecting pipes are located. Its wastewater collection system is comprised of approximately
24 miles of sewer lines.
Bayview System
The Bayview System includes two well sites, which
are located in Downe Township, Cumberland County, New Jersey. Water is transported to its customers through our 4.2 mile distribution
system.
USA-PA, USA and White Marsh
Our non-regulated subsidiaries, namely USA-PA, USA
and White Marsh, do not own utility plant property.