We produce potash at three solution mining facilities: our HB solution mine in Carlsbad, New Mexico, a solution mine in Moab, Utah, and a brine recovery mine in Wendover, Utah. Additionally, we operate our North compaction facility in Carlsbad, New Mexico, which compacts and granulates product from the HB mine. We produce Trio ® from our conventional underground East mine in Carlsbad, New Mexico. We also have the West facility, which is a conventional underground potash mine that is not in operation and is in care-and-maintenance mode.
We also operate Intrepid South located in Lea County in southeastern New Mexico, which is comprised of 21,834 surface acres, 27,868 acres of BLM grazing leases and 10,097 acres of pending State of New Mexico grazing leases. In March 2020, we sold approximately 320 surface acres from our Intrepid South property, reducing our surface acre ownership from 22,154 acres acquired at the time of purchase, to the 21,834 acres we operate today.
26
Table of Contents
We control the rights to mine approximately 143,000 acres of land northeast of Carlsbad, New Mexico. We lease approximately 32,000 acres from the State of New Mexico, approximately 106,000 acres from the U.S. federal government through the BLM, and approximately 240 acres from private leaseholders. We own approximately 4,700 surface acres in the vicinity of our mine sites and adjacent to federal and state mining leases.
27
Table of Contents
We control the rights to mine approximately 14,100 acres of land west of Moab, Utah. We lease approximately 10,100 acres from the State of Utah and approximately 200 acres from the U.S. federal government through the BLM. We own approximately 3,800 surface acres overlying and adjacent to portions of our mining leases with the state of Utah.
.
28
Table of Contents
We control the rights to mine approximately 90,000 acres of land near Wendover, Utah. We own approximately 57,000 acres, and we lease approximately 8,000 acres from the State of Utah and approximately 25,000 acres from the U.S. federal government through the BLM.
29
Table of Contents
We conduct most of our mining operations on properties that we lease from states or the federal government. These leases generally contain stipulations that require us to commence mining operations within a specified term and continue mining to retain the lease.
The stipulations on our leases are subject to periodic readjustment by the applicable state government and the federal government. The lease stipulations could change in the future, which could impact the economics of our operations. Our federal leases are for indefinite terms subject to readjustment of the lease stipulations, including the royalty payable to the federal government, every 20 years. Our leases with the State of New Mexico are issued for terms of 10 years and for as long thereafter as potash is produced in commercial quantities and are subject to readjustment of the lease stipulations, including the royalty payable to the state. Our leases with the State of Utah are for terms of 10 years subject to extension and possible readjustment of the lease by the State of Utah. Our leases for our Moab mine are operated as a unit under a unit agreement with the State of Utah, which extends the terms of all of the leases as long as operations are conducted on any portion of the leases. The term of the state leases for our Moab mine is currently extended until 2024 or so long as potash is being produced. As of December 31, 2020, approximately 22% of our state, federal, and private lease acres at our New Mexico facilities will be up for renewal within the next five years, and 43% of our state and federal lease acres at our Utah operations will be up for renewal within the next five years.
We have water rights at each of our mine properties that we believe are adequate for our needs. All of our mining operations are accessible by paved state or county highways and are accessible by rail. All of our operations obtain electric power from local utilities.
Our mines, plants, and equipment have been in substantially continuous operation since the dates indicated in the chart entitled "Our Proven and Probable Reserves" on the following pages (except for our West facility, which is currently in care-and-maintenance mode), and our mineral development assets, mills, and equipment have been acquired over the interval since these dates.
As noted, we have relatively long-lived proven and probable reserves and consequently expect to conduct limited and focused additional exploration in the coming five years. We plan to drill core holes in areas near our Carlsbad, New Mexico, facility, in order to further define the ore body. Development of the underground mines is expected to be coincident with the continued advancement of ore zones. Development of the solution mine and brine evaporation operations is expected to be enhanced by the drilling of additional wells and flooding of new solution mine caverns. Although not in our current plans, we also have opportunities to rehabilitate the shafts at the currently idled North mine and additional surface infrastructure to accelerate mining of conventional reserves.
Our leased office space in Denver, Colorado, is approximately 19,000 square feet and has a term expiring on April 29, 2022.
We believe that all of our present facilities are adequate for our current needs and that additional space is available for future expansion on acceptable terms.
Proven and Probable Reserves
Our potash (produced from sylvite ore) and langbeinite (marketed as Trio ® ) reserves each have substantial life, with remaining reserve life ranging from four years to over 100 years, based on proven and probable reserves estimated in accordance with SEC requirements. This lasting reserve base is the result of our past acquisition and development strategy. The estimates of our proven and probable reserves as of December 31, 2020, were prepared by us and were reviewed and independently determined by Agapito Associates, Inc. ("Agapito") based on mine plans and other data furnished by us as described in footnote one below the table. The following table summarizes our proven and probable reserves, stated as product tons and associated percent ore grade, as of December 31, 2020.
30
Table of Contents
Our Proven and Probable Reserves 1
(tons in thousands) Proven 4
Probable 7
Product/Operations Date Mine Opened 2
Current Extraction Method Minimum Remaining Life (years) 3
Recoverable Ore Tons 5
Ore Grade 6 (% KCl)
Product Tons as KCl Recoverable Ore Tons 5
Ore Grade 6 (% KCl)
Product Tons as KCl
Potash
West 2
1931 Underground 48 78,190 23.9 % 14,920 31,540 17.8 % 5,980
East 1965 Underground 4 5,640 21.8 % 960 3,680 22.6 % 670
HB Mine 2, 9
2012 Solution 36 16,400 36.8 % 5,740 2,190 40.2 % 790
Moab 1965 Solution 100+ 29,250 44.4 % 11,350 31,400 46.2 % 14,760
Wendover 10
1932 Brine Evaporation 30 — — — — 0.7 % 3,060
Total Potash 33.2 % 32,970 32.3 % 25,260
(tons in thousands) Proven 4
Probable 7
Product/Operations Date Mine Opened 2
Current Extraction Method Minimum Remaining Life (years) 3
Recoverable Ore Tons 5
Ore Grade 6 (% Lang)
Product Tons as Langbeinite Recoverable Ore Tons 5
Ore Grade 6 (% Lang)
Product Tons as Langbeinite
Langbeinite
East 8,11
1965 Underground 24 21,190 39.5 % 7,710 14,880 38.3 % 5,420
1 The determination of estimated reserves has been prepared by us and is based on an independent review and analysis of our mine plans and geologic, financial and other data by Agapito, which is familiar with our mines. The most recent review performed by Agapito for the New Mexico East, West, and HB properties was in 2020. Agapito's analysis for the West, East and HB mines was based on detailed examination of our geologic site data and mine plan, which was updated with information from 2020, 2019, and 2018. As a result of the Agapito 2020 review, langbeinite reserves decreased in the East mine and sylvite reserves increased in the West mine compared to previously reported reserves. The change in reserves was primarily due to the reclassification of reserves in the 5th ore zones from langbeinite to sylvite as a result of the cutoff grade increasing. The cutoff grade for langbeinite also increased, thus decreasing reserves. The HB mine reserve estimate decreased due to depletion for 2020 production from the HB mine. The Moab property reserves are based on Agapito's 2018 mine reserve estimate adjusted for depletion for 2020 and 2019 production. The Wendover property reserves are based on Agapito's 2018 brine aquifer reserve. However, depletion did not change the reserve life of 30 years as discussed in footnote 3 below. Because reserves are estimates, they cannot be audited for the purpose of verifying exactness. Instead, reserve information was reviewed in sufficient detail to determine if, in the aggregate, the data provided by us is reasonable and sufficient to estimate reserves in conformity with practices and standards generally employed by, and within the mining industry, and that are consistent with the requirements of U.S. securities laws.
2 These mines, excluding the HB and West mines, have operated in a substantially continuous manner since the dates set forth in this table. The HB mine was originally opened in 1934 and operated continuously as an underground mine until 1996. In July 2016, we transitioned our West facility into care-and-maintenance mode due to the decline in potash prices.
3 Minimum remaining lives are calculated by dividing reserves by annual effective capacity. Effective capacity is the estimated amount of production that will likely be achieved based on the amount and quality of ore that we estimate can be mined, milled, and/or processed, assuming an estimated average reserve grade, potential future modifications to the systems, a normal amount of scheduled down time, average or typical mine development efforts and operation of all of our mines and facilities at or near full capacity. Minimum remaining lives at the West, East, HB mine, and Moab mines are based on reserves (product tons) divided by annual effective capacity over the full expected life of the ore body, and corrections for purity: one ton of red muriate of potash equals 0.95 ton of KCl; one ton of Moab white muriate of potash equals 0.97 ton of KCl; one ton of sulfate of potash magnesia equals 0.97 ton of langbeinite. East langbeinite minimum remaining life was based on a langbeinite-only plant and associated plant capacity. Langbeinite-only production commenced in April 2016 at the East facility and the sylvite plant was shut down at that time. The West facility was shut down and placed into care-and-maintenance mode in July 2016 due to low potash prices. If we decided to produce potash from our East and West mine sylvite ore reserves in the future, we expect that we would reopen the West facility and be required to construct a new plant to replace the East sylvite plant closed in 2016 to process the remaining reserves. Calculated mine lives that exceed 100 years are reported at 100+ years to balance the reserve life with the uncertainties associated with those extended time frames. We currently do not report more than 30 years mining life for Wendover due to the uncertainties associated with natural brine‑containing aquifers.
31
Table of Contents
4 Generally, "proven reserves" are reserves for which (a) quantity is computed from dimensions revealed in outcrops, trenches, workings, or drill holes; grade and/or quality are computed from the results of detailed sampling, and (b) the sites for inspection, sampling, and measurement are spaced so closely and the geologic character is so well-defined that the size, shape and depth, and mineral content of the reserves are well-established. Proven reserve tonnages are computed from projection of data using the inverse distance squared method taking into account mining dilution, mine extraction efficiency, ore body impurities, metallurgical recovery factors, sales prices, and operating costs from potash ore zone measurements as observed and recorded either in drill holes using cores, or channel samples in mine workings. This classification has the highest degree of geologic assurance. The data points for measurement are adequately spaced and the geologic character so well defined that the thickness, areal extent, size, shape, and depth of the potash ore zone are well-established. The maximum acceptable distance for projection from ore zone data points varies with the geologic nature of the ore zone being studied.
5 Recovery is the percentage of valuable material in the ore that is beneficiated prior to further treatment to develop a saleable product. Recoverable ore tons is defined as the hoisted ore for the conventionally mined ore in our East and West mines. This figure was derived from the in-place ore estimate that has been adjusted for factors such as geologic impurities and mine extraction ratios. For the HB mine and the Moab property, recoverable ore tons are defined as the potassium that can be extracted from the underground workings and pumped to the surface. This figure was derived from the in-place ore estimate that has been adjusted for factors such as geologic impurities, potash that dissolves but remains in the cavern (dissolution factor), and an extraction factor that accounts for potash that may not be recovered because solution may be channeled away or stranded due to cavern geometry. We do not calculate recoverable ore tons for the Wendover property as it is a lake brine resource, not an in-place ore deposit.
6 Ore grade is expressed as expected mill feed grade to account for minimum mining height for the East and West mines. Potash ore grade is reported in percent KCl and langbeinite ore grade is reported in percent langbeinite. The ore grade for the Moab and HB mines is the in-place KCl grade.
7 "Probable reserves" are reserves for which quantity and grade and/or quality are computed from information similar to that used for proven (measured) reserves, but the sites for inspection, sampling and measurement are farther apart or are otherwise less adequately spaced. The degree of assurance of probable (indicated) reserves, although lower than that for proven (measured) reserves, is high enough to assume geological continuity between points of observation. The classification of minerals as probable reserves requires that we believe with reasonable certainty that access to the reserves can be obtained, even though currently-issued permits are not required. Probable reserve tonnages are computed by projection of data using the inverse distance squared method taking into account mining dilution, mine extraction efficiency, ore body impurities, metallurgical recovery factors, sales prices, and operating costs from available ore zone measurements as observed either in drill holes using cores or in mine workings for a distance beyond potash classified as proven reserves. This classification has a moderate degree of geological assurance.
8 Our reserves in the 1 st , 3 rd , 4 th , 7 th , 8 th and 10 th ore zones contain either sylvite (KCl) or langbeinite (K 2 SO 4 (MgSO 4 ) 2 ) separately. Ore reserves in the East 5 th ore zone contain both sylvite and langbeinite which we call mixed ore. We ceased processing sylvite at the East facility in April 2016, and only the langbeinite ore contained in the East 5 th ore zone is included in the mine reserve estimate. Additionally, the reserve amounts include the West mine 4 th ore zone which contains langbeinite that we anticipate will be processed at the East facility.
9 The HB mine reserves were based on solution mining of old workings and recovery of potash from the residual pillars. Reserves are based on thicknesses, grades, and mine maps provided by us. The data presented here includes reserves available via the AMAX/Horizon mine as further described below under Our Development Assets .
10 The Wendover facility reserves are the combination of a shallow and a deep aquifer. There were no proven reserves reported for either aquifer because the shallow aquifer represents an unconventional resource and there is uncertainty of the hydrogeology of the deep aquifer. The estimating method for the shallow aquifer was based on brine concentration, brine density, soil porosity within the aquifer, and aquifer thickness from historical reports. The brine concentrations and brine density were confirmed by us recently, but values for the aquifer thickness and the porosity were obtained from literature published by other sources. Probable reserves for the shallow brine at the Wendover facility were calculated from KCl contained in the shallow aquifer based on estimates of porosity and thickness over the reserve area. The distance for projection of probable reserves is a radius of three‑quarters of a mile from points of measurement of brine concentration. Probable reserves for the deep-brine aquifer were estimated based on historical draw-down and KCl brine concentrations. The ore grade (% KCl) for both the shallow and deep aquifer is the percentage by weight of KCl in the brine.
11 A portion of these reserves are within the West mine boundary. The classification of the reserve as being associated with the East mine is a result of where the ore is intended to be processed.
32
Table of Contents
Production
Our facilities have a current estimated annual productive capacity of approximately 390,000 tons of potash, and approximately 400,000 tons of langbeinite, based on current design. Our annual production rates are less than our estimated productive capacity. Actual production is affected by operating rates, the grade of ore mined, recoveries, mining rates, evaporation rates, product pricing, and the amount of development work that we perform. Therefore, as with other producers in our industry, our production results tend to be lower than reported productive capacity.
Our production capabilities and capital improvements at our facilities are described in more detail below, along with our historical production of our primary products and byproducts for the years ended December 31, 2020, 2019, and 2018.
Solution Mines
• Potash ore at HB is mined from idled original mine workings in the Carlsbad, New Mexico, area.
• The HB mine has a current estimated productive capacity of 180,000 tons annually. The productive capacity may vary between approximately 160,000 and 200,000 tons of potash, primarily due to evaporation rates. Potash produced from our HB mine is shipped by truck to the North facility for compaction.
• Potash ore at Moab is mined from two stacked ore zones: the original mine workings in Potash 5 and the horizontal caverns in Potash 9.
• The Moab mine has a current estimated productive capacity of approximately 110,000 tons of potash annually; evaporation rates have historically varied and, consequently, productive capacity may vary between approximately 75,000 and 120,000 tons of potash.
• Potash at Wendover is produced primarily from brine containing salt, potash, and magnesium chloride that is collected in ditches from the shallow aquifers of the West Desert. These materials are also collected from a deeper aquifer by means of deep-brine wells.
• The Wendover facility has a current estimated productive capacity of approximately 100,000 tons of potash annually; evaporation rates have historically varied resulting in actual annual production between approximately 65,000 and 100,000 tons of potash.
Conventional Underground Mines
• Sylvite and langbeinite ore at our Carlsbad locations occurs in a stacked ore body containing at least 10 different mineralized zones, seven of which contain proven and probable reserves.
• The East mine has a current estimated productive capacity of approximately 400,000 tons of Trio ® annually, based on current design. The East mine was converted to a Trio ® -only operation in April 2016 and potash is no longer produced from the East mine.
• The West mine was idled in July 2016 and placed in care-and-maintenance mode. When operational, it has an estimated productive capacity of approximately 400,000 tons of red potash annually.
Compaction Facility
• The North facility receives compactor feed from the HB mine via truck and converts the compactor feed to finished granular-sized product and standard-sized product.
Our Development Assets
We have development opportunities in our New Mexico facilities with the acceleration of production from our reserves and mineralized deposits of potash, and the potential construction of additional production facilities in the region. We also own the leases on two idled mines near Carlsbad: the AMAX/Horizon mine and the North mine.
AMAX/Horizon Mine
• We acquired the potash leases associated with the AMAX/Horizon mine in October 2012. The AMAX/Horizon mine was in continuous operation between 1952 and 1993. This mine, similar to the HB mine, is a viable candidate for solution mining in a manner that is consistent with the HB mine.
• State and federal permits were obtained in 2015 to utilize these leases for solution mining. The AMAX/Horizon solution mine is expected to utilize the same evaporation ponds and processing mill as the HB mine. We have not yet made a determination to proceed with this potential development project; however, future work may be performed to determine the ability to convert this idled underground mine to a solution mining opportunity.
33
Table of Contents
• As noted in footnote 9 to Our Proven and Probable Reserves table, these tons are included in the data presented for the HB Mine.
North Mine
• The North mine operated from 1957 to 1982 when it was idled mainly due to low potash prices and mineralogy changes which negatively impacted mineral processing at the facilities. Although the mining and processing equipment has been removed, the mine shafts remain open. The compaction facility at the North mine is where we granulate, store, and ship potash produced from the HB mine. Two abandoned mine shafts, rail access, storage facilities, water rights, utilities and leases covering potash deposits, are already in place. As part of our long-term mine planning efforts, we may choose to evaluate our strategic development options with respect to the shafts at the North mine and their access to mineralized deposits of potash.
Our Production of Potash and Trio ®
One product ton of potash contains approximately 0.60 tons of K 2 O when produced at our Moab and Wendover facilities and approximately 0.60 or 0.62 tons of K 2 O when produced at our HB facility. One product ton of langbeinite produced at our East facility contains approximately 0.22 tons of K 2 O. The following table summarizes production of our primary products at each of our facilities for each of the years ended December 31, 2020, 2019, and 2018:
(tons in thousands) Year Ended December 31,
2020 2019 2018
Ore Production Mill Feed Grade 1
Finished Product Ore Production Mill Feed Grade 1
Finished Product Ore Production Mill Feed Grade 1
Finished Product
Potash
HB 724 15.2 % 145 734 16.9 % 158 679 17.4 % 150
Moab 536 15.3 % 104 509 15.6 % 94 506 15.8 % 105
Wendover 352 15.3 % 59 409 15.1 % 75 404 17.3 % 89
1,612 308 1,652 327 1,589 344
Langbeinite
East 2
913 8.9 % 213 944 9.1 % 228 935 9.1 % 217
Total Primary Products 521 555 561
1 Mill feed grade shown is as percent of K 2 O. Mill freed grade is a measurement of the amount of mineral contained in an ore as a percentage of the total weight of the ore. For potash it is often represented as a percent of potassium oxide (K 2 O) or percent potassium chloride (KCl).
Water and Byproduct Production
We have water rights in New Mexico under which we sell water primarily to support oil and gas development in the Permian Basin near our Carlsbad facilities. During the extraction of potash and Trio ® , we recover marketable salt, magnesium chloride, metal recovery salts, water, and brine containing salt and potassium from our mining processes. Our salt is used in a variety of markets including animal feed, industrial applications, pool salt, and the treatment of roads and walkways for ice melting or to manage road conditions. Magnesium chloride is typically used as a road treatment agent for both deicing and dedusting. At our Moab and Wendover facilities, we also produce metal recovery salt, which is potash mixed with salt, in ratios requested by our customers. Metal recovery salt is a combination of potash and salt that chemically enhances the recovery of aluminum in recycling processing facilities. Our brines are used primarily by the oil and gas industry to support well development and completion activities.