iaux-20241231
UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
Form 10-K
☒ ANNUAL REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934
For the Fiscal Year Ended December 31 , 2024
OR
☐ TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934
For the Transition Period from ____ to ____
Commission File Number: 001-41382
I-80 GOLD CORP.
(Exact Name of Registrant as Specified in Its Charter)
British Columbia
N/A
(State or Other Jurisdiction of
Incorporation or Organization)
(I.R.S. Employer
Identification No.)
5190 Neil Road , Suite 460
Reno , Nevada , USA
89502
(Address of Principal Executive Offices)
(Zip Code)
( 775 ) 525-6450
(Registrant’s Telephone Number, Including Area Code)
Securities registered pursuant to Section 12(b) of the Act:
Title of each class
Trading Symbol(s)
Name of each exchange on which registered
Common Shares
IAUX
NYSE American LLC
Securities registered pursuant to Section 12(g) of the Act: None
Indicate by check mark if the registrant is a well-known seasoned issuer, as defined in Rule 405 of the Securities Act. Yes ☐ No ☒
Indicate by check mark if the registrant is not required to file reports pursuant to Section 13 or Section 15(d) of the Act. Yes ☐ No ☒
Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days. Yes ☒ No ☐
1
Indicate by check mark whether the registrant has submitted electronically every Interactive Data File required to be submitted pursuant to Rule 405 of Regulation S-T (§ 232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit such files). Yes ☒ No ☐
Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, smaller reporting company, or an emerging growth company. See the definitions of “large accelerated filer,” “accelerated filer,” “smaller reporting company,” and “emerging growth company” in Rule 12b-2 of the Exchange Act.
Large accelerated filer ☐
Accelerated filer ☐
Non-accelerated filer ☒
Smaller reporting company ☒
Emerging growth company ☒
If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act. ☐
Indicate by check mark whether the registrant has filed a report on and attestation to its management’s assessment of the effectiveness of its internal control over financial reporting under Section 404(b) of the Sarbanes-Oxley Act (15 U.S.C. 7262(b)) by the registered public accounting firm that prepared or issued its audit report. ☐
If securities are registered pursuant to Section 12(b) of the Act, indicate by check mark whether the financial statements of the registrant included in the filing reflect the correction of an error to previously issued financial statements. ☐
Indicate by check mark whether any of those error corrections are restatements that required a recovery analysis of incentive-based compensation received by any of the registrant’s executive officers during the relevant recovery period pursuant to § 240.10D-1(b). ☐
Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act). Yes ☐ No ☒
Based on the last sale price on the NYSE American LLC (“NYSE American”) of the registrant’s common shares o n June 28, 2024 (the last business day of the registrant’s most recently completed second fiscal quarter) of $1.08 per share, the aggregate market value of the voting common shares held by non-affiliates was approximately $ 415,688,462 .
As of March 28, 2025, the registrant had 443,358,811 common shares, no par value, outstanding.
DOCUMENTS INCORPORATED BY REFERENCE
Certain portions of the registrant’s definitive proxy statement to be filed with the Securities and Exchange Commission pursuant to Regulation 14A not later than April 30, 2025, in connection with the registrant’s fiscal year 2024 annual meeting of shareholders, are incorporated by reference into Part III of this Annual Report on Form 10-K.
2
Table of C o ntents
EXPLANATORY NOTE
As of June 28, 2024, the Company determined that we no longer qualified as a "foreign private issuer," as such term is defined in Rule 405 under the Securities Act of 1933, as amended. Consequently, we were required to comply with U.S. domestic issuer requirements beginning January 1, 2025. As a U.S. domestic issuer, we have adopted U.S. generally accepted accounting principles for the first time with the preparation of our consolidated financial statements for the years ended December 31, 2024 and 2023. As a foreign private issuer, we previously prepared our consolidated financial statements in accordance with International Financial Reporting Standards, as issued by the International Accounting Standards Board.
3
Table of C o ntents
PART I
PAGE
Item 1.
Business
6
Item 1A.
Risk Factors
13
Item 1B.
Unresolved Staff Comments
25
Item 1C.
Cybersecurity
26
Item 2.
Properties
27
Item 3.
Legal Proceedings
90
Item 4.
Mine Safety Disclosures
90
PART II
Item 5.
Market for Registrant’s Common Equity, Related Stockholder Matters and Issuer Purchases of Equity Securities
91
Item 6.
[Reserved]
93
Item 7.
Management’s Discussion and Analysis of Financial Condition and Results of Operations
94
Item 7A
Quantitative and Qualitative Disclosures About Market Risk
117
Item 8.
Financial Statements and Supplementary Data
119
Item 9.
Changes in and Disagreements with Accountants on Accounting and Financial Disclosure
155
Item 9A.
Controls and Procedures
155
Item 9B.
Other Information
155
Item 9C.
Disclosure Regarding Foreign Jurisdictions that Prevent Inspections
156
PART III
Item 10.
Directors, Executive Officers and Corporate Governance
157
Item 11.
Executive Compensation
157
Item 12.
Security Ownership of Certain Beneficial Owners and Management and Related Stockholder Matters
157
Item 13.
Certain Relationships and Related Transactions, and Director Independence
157
Item 14.
Principal Accounting Fees and Services
157
PART IV
Item 15.
Exhibits and Financial Statement Schedules
158
Item 16.
Form 10-K Summary
159
Signatures
160
4
Table of C o ntents
FORWARD-LOOKING INFORMATION
Certain information set forth in this Annual Report on Form 10-K, including but not limited to management's assessment of the Company's future plans and operations, the perceived merit of projects or deposits, and the impact and anticipated timing of the Company’s development plan and recapitalization plan, production guidance and outlook, the anticipated growth expenditures, the anticipated timing of permitting, production, project development or technical studies constitutes forward looking statements or forward-looking information within the meaning of applicable securities laws. All statements other than statements of historical fact are forward-looking statements. Often, but not always, forward-looking statements can be identified by the use of words such as "plans", "expects", "is expected", "budget", "scheduled", "estimates", "continues", "forecasts", "projects", "predicts", "intends", "anticipates" or "believes", or variations of, or the negatives of, such words and phrases, or state that certain actions, events or results "may", "could", "would", "should", "might" or "will" be taken, occur or be achieved. Readers are cautioned that the assumptions used in the preparation of information, although considered reasonable at the time of preparation, may prove to be inaccurate and, as such, reliance should not be placed on forward looking statements. The Company's actual results, performance or achievement could differ materially from those expressed in, or implied by, these forward-looking statements and, accordingly, no assurance can be given that any of the events anticipated by the forward-looking statements will transpire or occur, or if any of them do so, what benefits, if any, that the Company will derive there from. By their nature, forward looking statements are subject to numerous risks and uncertainties, some of which are beyond the Company’s control, including general economic and industry conditions, volatility of commodity prices, title risks and uncertainties, ability to access sufficient capital from internal and external sources, the Company may be required to adopt one or more alternatives, such as selling assets, restructuring debt or obtaining additional equity capital on terms that may be onerous or highly dilutive. The Company's ability to refinance its indebtedness will depend on the capital markets and its financial condition at such time, currency fluctuations, construction and operational risks, licensing and permit requirements, environmental risks, competition from other industry participants, the lack of availability of qualified personnel or management, imprecision of mineral resource, or production estimates and stock market volatility. Please see “Risks Factors” in this Annual Report on Form 10-K for the fiscal year ended December 31, 2024 for more information regarding risks regarding the Company which is available on EDGAR at www.sec.gov/edgar and SEDAR+ at www.sedarplus.ca. All forward-looking statements contained in this Annual Report on Form 10-K speak only as of the date of this Annual Report on Form 10-K or as of the dates specified in such statements. The Company disclaims any intention or obligation to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise except as required by applicable law.
5
Table of C o ntents
PART I
ITEM 1. BUSINESS
Unless otherwise indicated or the context otherwise requires, use of the terms "Company", "i-80" and "i-80 Gold" in this Annual Report refer to i-80 Gold Corp. and its direct and indirect subsidiaries as of the date of this Annual Report, or other entities controlled by them, on a consolidated basis, notwithstanding that such direct and indirect subsidiaries may not have been controlled by them at all relevant times, including December 31, 2024.
Form and Year of Incorporation
i-80 Gold Corp. was incorporated on November 10, 2020 pursuant to the Business Corporations Act (British Columbia) ("BCBA"), as a wholly-owned subsidiary of Premier Gold Mines Limited ("Premier") for the purposes of effecting a plan of arrangement (the "Plan of Arrangement") under Section 182 of the Business Corporations Act (Ontario) (the "Arrangement"). The Arrangement was completed on April 7, 2021. Under the Arrangement, among other things, Premier transferred all of its ownership interest in Premier Gold Mines USA, Inc. ("Premier USA") to the Company and spun out 70% of the issued and outstanding common shares of the Company (the "Common Shares") to shareholders of Premier. As a result of the Arrangement, the Company became a public company and a "reporting issuer" under applicable Canadian securities laws and is no longer a subsidiary of Premier. Trading of the Common Shares commenced on the Toronto Stock Exchange ("TSX") on April 13, 2021 under the stock symbol "IAU", and on the NYSE American exchange ("NYSE") on May 19, 2022 under the stock symbol "IAUX". The Company's registered and records office is located at Suite 2500 Park Place, 666 Burrard Street, Vancouver, British Columbia, V6B 2X8. The Company's head office is located at 5190 Neil Road, Suite 460, Reno, Nevada, 89502.
Intercorporate Relationships
The Company's material wholly-owned subsidiary is Premier USA, a Delaware corporation. Premier USA has four material wholly-owned subsidiaries: (i) Au-Reka Gold LLC, a Delaware limited liability company ("Au-Reka LLC"); (ii) Goldcorp Dee LLC, a Nevada limited liability company ("Dee LLC"); (iii) Osgood Mining Company LLC, a Nevada limited liability company ("Osgood LLC"); and (iv) Ruby Hill Mining Company, LLC, a Nevada limited liability company ("Ruby Hill LLC"). On May 8, 2023, the Company acquired all of the issued and outstanding common shares of Paycore Minerals Inc. ("Paycore") pursuant to a plan of arrangement under Section 182 of the Business Corporations Act (Ontario) (the "Paycore Arrangement"), which owns the FAD Project located in Eureka County, Nevada. As of the date of this Annual Report, the Company does not consider the FAD Project to be a material property within the meaning of National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI-43-101") of the Canadian Securities Administrators or pursuant to Subpart 1300 of Regulation S-K ("S-K 1300").
The following diagram illustrates the condensed corporate structure of the Company and the location of the Company's principal assets as at the date hereof.
6
Table of C o ntents
Bankruptcy and Similar Procedures
There have been no bankruptcy, receivership or similar proceedings against the Company or any subsidiary of the Company, or any voluntary bankruptcy, receivership or similar proceedings by the Company or any subsidiary of the Company, within the three most recently completed financial years or during, or proposed for, the current financial year.
Reorganizations and Acquisitions
Other than in connection with the Paycore Arrangement, there have been no material reorganizations of the Company or any subsidiary of the Company, or acquisitions within the three most recently completed financial years or completed during, or proposed for, the current financial year.
General Description of the Business
Principal Products and Markets
The Company is a Nevada-focused, growth-oriented gold and silver producer engaged in the exploration, development and production of gold and silver mineral deposits. The Company's mineral properties include: (i) a 100% interest in the McCoy-Cove gold properties located on the Battle Mountain-Eureka Trend in Lander County, Nevada (collectively, the "Cove Project" or "Cove"); (ii) a 100% interest in the Granite Creek gold properties (formerly referred to as the Getchell project) located at the intersection of the Getchell gold belt and the Battle Mountain-Eureka Trend in Humboldt County, Nevada, which includes both an underground mine and an open pit project (collectively, the "Granite Creek Projects" or "Granite Creek"); (iii) a 100% interest in the Lone Tree and Buffalo Mountain gold deposits and Lone Tree processing complex, located midway between the Company's Cove and Granite Creek Projects in Humboldt County, Nevada (collectively, the "Lone Tree Project" or "Lone Tree"); (iv) a 100% interest in the Ruby Hill property located along the Battle Mountain-Eureka Trend in Eureka County, Nevada which includes an underground project, referred to as "Archimedes", and an open pit gold deposit referred to as "Mineral Point", collectively the "Ruby Hill Projects" or "Ruby Hill"; and (v) a 100% interest in the FAD property located along the Battle Mountain-Eureka Trend in Eureka County, Nevada (the "FAD Project" or "FAD").
The below figure shows the location of the Cove, Granite Creek, Lone Tree, Ruby Hill, and FAD projects within the State of Nevada. Each of the Cove, Granite Creek, and Ruby Hill projects are considered advanced properties within the meaning of NI-43-101 and material properties under S-K 1300. Under S-K 1300, all our properties are exploration stage as no mineral reserves have been determined. As of the date of this Annual Report, the Company does not consider the FAD Project to be a material property within the meaning of NI 43-101 or S-K 1300.
7
Table of C o ntents
The Company's business strategy is focused on creating value for stakeholders through its ownership and advancement of its mineral properties. In November of 2024, the Company adopted a new development plan which represented Management’s view of the most effective strategy to generating free cash flow while progressing earlier stage projects to provide a pipeline of growth in the medium and long-term. To achieve this new development plan, the Company is pursuing a recapitalization of its balance sheet which Management believes will be best supported by focusing on its advanced stage underground gold projects, as well as accelerating permitting and development of two large oxide deposits, Granite Creek and Mineral Point (within the Ruby Hill property). The three underground projects - Granite Creek, Archimedes (previously Ruby Hill underground and inclusive of Ruby Deeps and 426 zone), and Cove - are expected to have low capital intensity and a clear path to cash flow generation, Further, the Company believes that the Mineral Point open pit project has the potential to become the Company's flagship asset as a large scale heap leach mine as demonstrated through a preliminary economic assessment and initial assessment of this project, the key economic and technical terms of which were summarized by the Company in its press release of February 21, 2025 with plans for a detailed feasibility study in 2029.
To support the objectives of near term cash flow generation and providing a pipeline for growth, Management is focused on permitting and development of these five gold deposits through the balance of the decade. The Company believes that collectively, these five assets have the potential to create a mid-tier gold producer.
The Company's existing projects are comprised of mineral bodies containing both oxide and sulphide mineralized material. Sulphide minerals, to date sourced only from Granite Creek, has been processed via a toll milling arrangement with a third party processor. Higher grade oxide minerals, above a 5.0 gpt cut off, is processed under an ore purchase and sale agreement also with a third party, while lower grade oxide minerals are internally heap leached at existing pads at Lone Tree (for low grade oxide from Granite Creek). Management intends to complete a refurbishment feasibility study later this year for its Lone Tree autoclave complex.
The Lone Tree open pit project has a variety of financial, technical, environmental and social issues to be addressed. It is expected that the project will likely remain deferred for another decade.
8
Table of C o ntents
Distribution Methods
The Company is engaged in the exploration, development and production of gold and silver deposits in the State of Nevada. The Company's principal objective is to become a sustainable gold producer, with a secondary focus on silver. There is a global gold market into which the Company can sell its gold and, as a result, notwithstanding the Deterra Offtake Agreement and the Orion Offtake Agreement (each described below) , the Company is not dependent on a particular purchaser with regard to the sale of any gold that it produces. As noted above, the Company's materialized materials are anticipated to continue to be processed through a combination of internal and external facilities. Management is assessing the merits of an autoclave refurbishment at its Lone Tree Project to optimize its future processing requirements.
Competitive Conditions
The mineral exploration and mining business is very competitive in all phases of exploration, development and production. The Company competes with a number of other mining companies in the search for and acquisition of mineral properties, and to retain qualified personnel, suitable contractors for drilling operations and underground mining, technical and engineering resources and necessary exploration and mining equipment. Many of the companies that the Company competes with, including those active in the regions where the Cove Project, the Granite Creek Projects, the Lone Tree Project and the Ruby Hill Projects are located, have greater financial resources, operational expertise and/or more advanced properties than the Company. The Company's ability to acquire precious metal mineral properties in the future will depend not only on its ability to develop its present properties, but also on its ability to select and acquire suitable producing properties or prospects for precious metal development or mineral exploration. The Company has put in place experienced management personnel and will continue to evaluate the required expertise and skill to carry out its operations. As a result of this competition, the Company may be unable to achieve its exploration and development objectives in the future on terms it considers acceptable or at all . See "Risk Factors".
Specialized Skill and Knowledge
All aspects of the Company's business require specialized skills and knowledge. Such skills and knowledge include the areas of finance, operations, geology, drilling, logistical planning, implementation of exploration and development programs and mine plans, environmental management, health and safety, community relations, project construction, accounting, and mining operations. The Company retains executive officers and consultants with experience in these areas in Canada and the United States generally, as well as executive officers and consultants with relevant accounting experience. In order to attract and retain personnel with the specialized skills and knowledge required for its operations, the Company maintains remuneration and compensation packages that it believes to be competitive. The Company has been successful to date in identifying and retaining personnel with such skills and knowledge.
Environmental Protection and Regulation
The Company's exploration, development and production activities are subject to, and any future development and production operations will be subject to, environmental laws and regulations in the jurisdictions in which its operations are carried out. Mining is an extractive industry that impacts the environment. The Company's goal is to constantly evaluate ways to minimize that impact. The Company has strived to meet or exceed environmental standards at its mineral properties, and the Company expects to continue this approach through effective engagement with affected stakeholders, including local communities, government entities and regulatory agencies.
The Company is currently active only in the State of Nevada, which has established environmental standards and regulations that the Company strives to exceed. The Company's environmental performance is overseen at the Board of Directors (the "Board") level and environmental performance is the responsibility of the Company. In common with other natural resources and mineral processing companies, the Company's operations generate hazardous and non-hazardous waste, effluent and emissions into the atmosphere, water and soil in compliance with local and international regulations and standards. There are numerous environmental laws in the United States that apply to the Company's operations, exploration, development projects and land holdings. These laws address such matters as protection of the natural environment, air and water quality, emissions standards and disposal of waste. In accordance with applicable state laws, the Company currently has in place surety bonds in the aggregate amount of $132.8 million in favor of either the United States Department of the Interior, Bureau of Land Management or the State of Nevada, Department of Conservation and Natural Resources, as financial support for environmental reclamation and exploration permitting at its properties.
The Company recognizes environmental management as a corporate priority and places a strong emphasis on preserving the environment for future generations, while also providing for safe, responsible and profitable operations by developing natural resources for the benefit of its employees, shareholders and communities. The Company intends to maintain the standards of excellence for environmental performance that have been set at its mining properties into the future, and has adopted, or plans to adopt, various measures in order to do so. Cognizant of its responsibility to the environment, the Company strives to conform with all applicable environmental laws and regulations and to promote the respect of the environment in its activities. Employees are expected to maintain compliance with the letter and spirit of all laws governing the jurisdictions in which they perform their duties. Specifically, employees are expected to support the Company's efforts to develop, implement and maintain procedures and programs designed to protect and preserve the environment.
9
Table of C o ntents
Employees
As at the date hereof, the Company has 109 employees across all of its operations.
The Company believes that its success is dependent on the performance of its management team and key individuals, many of whom have specialized skills in the strategic development of a mining company, finance, financial reporting, legal, exploration, development and operation of mines in the United States and the precious metals industry. The Company believes that it has adequate personnel with the specialized skills required to carry out its current operations and anticipates making ongoing efforts to match its workforce capabilities with its business strategy for its operations as it evolves. The Board will continue to evaluate the required expertise and skills to execute the strategy described herein, and will seek to attract and retain the individuals required to meet the Company's goals.
Recent Developments in the Business
Extension Agreement to the Silver Purchase Agreement
On January 12, 2024 the Company entered into an extension agreement in relation to the Silver Purchase Agreement with and affiliate of Orion Mine Finance ("Orion") pursuant to which the deadline for deliveries was extended from January 15, 2024, to April 15, 2024. In connection with the extension agreement the Company paid an amendment fee of $0.2 million and issued 0.5 million Common Share warrants exercisable at C$2.72 per share, subject to customary anti-dilution adjustments, or until January 24, 2028.
Non-Brokered Private Placement of Common Shares
In February 2024, the Company completed a non-brokered private placement of Common Shares. An aggregate of 13,064,200 Common Shares were issued by the Company at a price of C$1.80 per Common Share for aggregate gross proceeds of approximately C$23.5 million.
Bought Deal Public Offering
On May 1, 2024, the Company completed a bought deal offering of 69,698,050 units (each a "Unit") at a price of C$1.65 per Unit for gross proceeds of approximately C$115 million. Each Unit was comprised of one Common Share and one half of one Common Share purchase warrant of the Company. Each warrant is exercisable to acquire one Common Share for a period of 48 months from closing of the Offering at an exercise price of C$2.15 per Warrant Share, subject to customer anti-dilution adjustments.
At the Market Equity Program
On August 12, 2024 the Company established of an at-the-market equity program ("ATM Program") pursuant to the terms of an equity distribution agreement dated August 12, 2024 (the “Equity Distribution Agreement”), among the Company and a syndicate of underwriters led by National Bank Financial Inc.(collectively, the “Agents”). The ATM Program allowed i-80, through the Agents, to, from time to time, offer and sell in Canada and the United States through the facilities of the TSX and the NYSE such number of Common Shares as would have an aggregate offering price of up to US$50 million. The ATM Program expired with the filing of this Annual Report, M arch 31, 2025.
Appointment of new Chief Executive Officer
On September 18, 2024 the Company announced the appointment of Mr. Richard Young as the new Chief Executive Officer ("CEO") and a director of the Company, succeeding Mr. Ewan Downie following his retirement.
New Development Plan
As described further above, on November 12, 2024 the Company announced a new development plan following a review of the strategic direction of the Company requested of the newly appointed CEO in September of 2024. The new development plan includes the development of three underground mines, but also includes accelerating, permitting, and the development of two large oxide open pit deposits, one at Granite Creek and the other, Mineral Point, within the Ruby Hill Project area. The new development plan is viewed by the Company as the most effective strategy to generate free cash flow while progressing earlier stage projects to provide a pipeline of growth over the medium and long term. The Company also confirmed the initialization of a recapitalization plan of its balance sheet to support the new development plan. The Lone Tree Autoclave remains the centralized refractory mineral processing facility in the new development plan and Management intends to continue its work towards completion of the refurbishment feasibility study in the third quarter of 2025.
Further, Management reported that a base metal focused joint venture on the Ruby Hill property does not fit the new development plan. Given the Company’s balance sheet constraints and additional capital required for the new development plan, all higher risk projects with low certainty of economic viability have been terminated of deferred. The Company will consider focusing on such projects when the balance sheet is in a stronger position and the Board approves allocating risk capital to these types of projects.
10
Table of C o ntents
Deferral of Gold Prepay and Silver Purchase Agreement Deliveries
On December 31, 2024 the Company addressed the first phase of its recapitalization plan by entering into agreements to defer the December 2024 Gold Prepay and January 2025 Silver Purchase Agreement deliveries until March 31, 2025 as part of an amendment of those agreements with Orion. As part of the agreements with Orion, gold and silver deliveries including 3,210 ounces of gold and 400,000 ounces of silver, scheduled for delivery on December 31, 2024, and January 15, 2025, respectively were deferred to March 31, 2025, subject to i-80 Gold’s compliance with the Waiver Agreements (as defined below), and the other conditions described below. Additionally, Orion agreed to extend the expiry date of its convertible credit agreement dated December 13, 2021 to June 30, 2026, which was reflected in an amended and restated convertible credit agreement with Orion on January 15, 2025 (the "Orion Convertible Loan").
In connection with the gold and silver delivery deferrals and the extension to the Orion Convertible Loan (collectively, the “Waiver Agreements”), i-80 Gold agreed to issue to Orion five million common share purchase warrants with an exercise price of C$1.01 per share, subject to customer anti-dilutive adjustments (the “2025 Orion Warrants”). The 2025 Orion Warrants have a four-year term. In addition, i-80 Gold and Orion agreed to enter into an offtake agreement dated February 7, 2025 (the “Orion Offtake Agreement”) based on similar terms to the existing amended and restated offtake agreement with Deterra Royalties Limited (acquirer of Trident Royalties PLC) which expires at the end of December 2028 (the "Deterra Offtake"). The Orion Offtake Agreement will become effective on December 28, 2028 and shall expire on December 31, 2034. The Waiver Agreements are subject to ongoing conditions, including a requirement to satisfy minimum cash requirements, as amended by these Waiver Agreements, through March 31, 2025.
Non-Brokered Prospectus Offering
On January 31, 2025, the Company announced the closing of its previously announced non-brokered prospectus offering of 28,212,593 Common Shares (the “Offered Shares”) at a price of C$0.80 per Offered Share for aggregate gross proceeds to the Company of approximately C$22,570,074 (the “Offering“).
The Offered Shares were offered in each of the provinces and territories of Canada, other than Québec, pursuant to a prospectus supplement dated January 27, 2025 (the “Prospectus Supplement“) to its short form base shelf prospectus filed on June 21, 2024 (the “Shelf Prospectus“) and in the United States pursuant to the Company’s U.S. registration statement on Form F-10 (Registration No. 333-279567, which includes the Shelf Prospectus and was declared effective by the United States Securities and Exchange Commission on June 25, 2024.
On February 28, 2025 the Company closed a private placement to certain insiders of the Company of an aggregate of 997,871 Common Shares at a price of C$0.80 per share for gross proceeds of approximately C$798,297.
First Supplemental Indenture to Convertible Indenture
On February 28, 2025, the Company announced that it entered into a first supplemental indenture (the "Supplemental Indenture") to the Convertible Debenture Indenture dated February 22, 2023 (the "Indenture") between the Company and the TSX Trust Company (the “Trustee”) to finalize the proposed amendments to the terms of the Indenture as previously disclosed in the Company's news release issued on January 13, 2025.
On February 22, 2023, the Company closed a private placement offering of US$65 million principal amount of secured convertible debentures (the “Convertible Debentures”) pursuant to the Indenture.
On October 15, 2024, holders of Convertible Debentures representing not less than 66 2/3% of the principal amount of the Convertible Debentures appointed, by written resolution, a committee of the Convertible Debenture holders (the “Committee”), to exercise, and to direct the Trustee to exercise, on behalf of the Convertible Debenture holders, the powers of the Convertible Debenture holders set out in the Indenture.
On February 28, 2025, the Committee delivered to the Company and the Trustee an extraordinary resolution approved by the Committee, acting on behalf of the Convertible Debenture holders, by instrument in writing effective, to approve the amendments to the Indenture as set forth in the Supplemental Indenture and to authorize and to direct the Trustee to enter into and execute the Supplemental Indenture. The Supplement Indenture amends the Indenture, to among other things, provide as follows:
(i) that the definitions relating to the conversion prices applicable to the conversion of the accrued and unpaid interest on the Convertible Debentures were revised to provide: (a) the conversion price applicable to the a debenture holder’s right to elect to convert outstanding and accrued interest on the Convertible Debentures is equal to the volume weighted average price of the Common Shares on the (“TSX”) during the five trading days immediately preceding the date of the debenture holder’s election notice, less a discount of 15%, converted into US dollars at the Bank of Canada rate on such date; (b) the conversion price applicable to the Company’ right to elect to convert outstanding and accrued interest on the Convertible Debentures is equal to equal to the greater of (x) 85% of the average closing price of the Common Shares as measured in US dollars on the NYSE American during the 10 business days immediately preceding the date of the Company’s election notice, and (y) the volume weighted average price of Common Shares on the TSX during the five trading days immediately preceding the date of the Company’s election notice, less a discount of 15%, converted into US dollars at the Bank of Canada rate on such date;
(ii) that the Company’s right to grant security against the Cove Project would rank subordinate to the security granted to the Convertible Debenture holders; and
(iii) the Company with a redemption right in respect of all of the outstanding Convertible Debentures which allows the Company to redeem, in its sole discretion, all of the outstanding Convertible Debentures for cash at a 104% premium of the outstanding principal, along with accrued interest up to the redemption date.
11
Table of C o ntents
Full details of the amendments are contained in the Supplemental Indenture, which is available on EDGAR (www.sec.gov) and SEDAR+ (www.sedarplus.ca) under the Company's issuer profile.
The Convertible Debentures are senior unsecured obligation of the Company and are secured on a limited recourse basis by Premier USA, the Company's wholly-owned subsidiary, with recourse limited to a pledge of all present and future limited liability company units issued by its wholly-owned subsidiary, Au-Reka LLC. The Convertible Debentures are guaranteed on a full recourse basis by Au-Reka LLC which is secured by a first ranking security over all of Au-Reka LLC's present and future real and personal property (including the Cove Project). The Convertible Debentures are not redeemable prior to their maturity date, other than as set out above.
Renewal of Third-Party Processing Agreements
On March 19, 2025 the Company confirmed it had finalized the extension of two third-party processing agreements (the “Processing Agreements”) in respect of toll milling as well as ore sales for refractory and oxide material, respectively. The toll milling agreement is an extension and amendment of a prior processing agreement which expired in the fourth quarter of 2024, while the ore sales agreement is an amended and restated version of an existing agreement. The updated toll milling agreement is now extended until December 31, 2027. As part of this renewal process, the Company also confirmed that it is targeting to have the anticipated refurbishment of its Lone Tree autoclave facility complete by December 31, 2027, to allow for all material from the Company’s underground gold mines to be processed at its autoclave facility.
The impact of the economic terms of the Processing Agreements on the anticipated life of mine cash flows for the Archimedes underground project and the Granite Creek underground project are set out in the preliminary economic assessments, also known as "Initial Assessments" for each of the Ruby Hill Projects and the Granite Creek Projects filed on EDGAR at www.sec.gov on the date hereof in accordance with S-K 1300 and Item 601 of Regulation S-K, and on SEDAR+ (www.sedarplus.ca) in accordance with NI 43-101, and previously disclosed in the Company's press releases dated February 18, 2025 and March 5, 2025, respectively.
New Gold & Silver Prepay Agreement & Working Capital Facility
On Ma rch 31, 2025 the Company entered into a new gold and silver prepay arrangement with National Bank of Canada ("National Bank") under which National Bank purchased approximately 6,800 o unces of gold and 345,000 ounces of silver from the Company for delivery to National Bank by September 30, 2025 or earlier, upon an infusion of capital in line with the recapitalization plan. The proceeds of this new prepay arrangement will be used to satisfy the March 31, 2025 gold and silver deliveries due to an affiliate of Orion Mine Finance under its respective Gold Prepay and Silver Purchase and sale agreements. The obligations under the prepay arrangement with National Bank are secured by the FAD project. In addition, the Company is finalizing a working capital facility with Auramet International, Inc. for up to $12 million, maturing in 12 months.
Available Information
General information about the Company is available through the Company’s website at https://www.i80gold.com. The Company’s press releases and filings with the SEC in the United States and on SEDAR+ in Canada are available free of charge within the Investors section of the Company’s website at https://www.i80gold.com/investors/. In addition, the SEC maintains an internet site that contains reports, proxy and information statements and other information regarding issuers, such as the Company, that are filed electronically with the SEC. The address of that website is https://www.sec.gov. The documents that the Company files under Canadian securities law requirements are available on SEDAR+ at the following address https://sedarplus.ca. The information on or linked to the Company’s website is neither a part of nor incorporated by reference in this Annual Report or any of the Company’s other SEC filings or filings made on SEDAR+. All references to www.i80gold.com in this Annual Report are inactive textual references only and information contained at that website is not incorporated herein and does not constitute a part of this Annual Report.
12
Table of C o ntents
ITEM 1A. RISK FACTORS
Risks Relating to the Company's Business
The Company's mining operations are inherently dangerous and various factors could result in a prolonged interruption of the Company's operations and negatively impact its business and financial condition.
Mining operations are inherently dangerous and generally involve a high degree of risk. The Company's operations are subject to all of the hazards and risks normally encountered in the exploration, development and production of gold and silver, including, without limitation, unusual and unexpected geologic formations, seismic activity, rock bursts, cave-ins, flooding, pit wall failure, mining voids and other conditions involved in the drilling and removal of material, any of which could result in damage to, or destruction of, mines and other producing facilities, personal injury or loss of life, damage to property and environmental damage, all of which may result in possible legal liability. Although the Company expects that adequate precautions to minimize risk will be taken, mining operations are subject to hazards such as fire, rock falls, geomechanical issues, equipment failure, failure of retaining dams around tailings disposal areas and instability of historical tailings, which may result in environmental pollution and consequent liability. The occurrence of any of these events could result in a prolonged interruption of the Company's operations that would have a material adverse effect on its business, financial condition, results of operations and prospects.
The Company's current and proposed exploration and development programs may not result in profitable commercial mining operations and, due to factors beyond its control, may result in the Company not receiving an adequate return on invested capital.
Development of any of the Company's exploration and development-stage mineral projects will only follow upon, among other things, obtaining satisfactory exploration results and the completion of feasibility or other economic studies. The exploration and development of mineral deposits involve significant financial risks over a significant period of time, which even a combination of careful evaluation, experience and knowledge may not eliminate. Few properties that are explored are ultimately developed into producing mines. Major expenses may be required to establish reserves by drilling and to construct mining and processing facilities at a site. It is impossible to ensure that the current or proposed exploration programs on exploration properties in which the Company has an interest will result in a profitable commercial mining operation.
The economics of exploring and developing mineral properties are affected by many factors, including capital and operating costs, variations of the grades and tonnages of ore mined, fluctuating mineral market prices, costs of mining and processing equipment, and such other factors as government regulations, allowable production, importing and exporting of minerals and environmental protection. Whether developing a producing mine is economically feasible will depend upon numerous factors, most of which are beyond the control of the Company, including the availability and cost of required development capital, movement in the price of commodities, securing and maintaining title to mining tenements, as well as obtaining all necessary consents, permits and approvals for the development of the mine. Should a producing mine be developed at any of the Company's exploration or development-stage mineral properties, other factors will ultimately impact whether mineral extraction and processing can be conducted economically, including actual mineralization, consistency and reliability of ore grades and future commodity prices, as well as the effective design, construction and operation of processing facilities. The Company's operating expenses and capital expenditures may increase in subsequent years as consultants, personnel and equipment associated with advancing exploration, development and commercial production of its properties are added. The effect of these factors cannot be accurately predicted, but the combination of these factors may result in the Company not receiving an adequate return on invested capital. Although the Company evaluates these risks and carries insurance policies to mitigate the risk of loss where economically feasible, not all of these risks are reasonably insurable and insurance coverages may contain limits, deductibles, exclusions and endorsements. The Company cannot assure that its coverage will be sufficient to meet its needs. Such a loss may have a material adverse effect on the Company.
Even if the development of one of the Company's projects is found to be economically feasible and approved by the Board, such development will require obtaining permits and financing, and the construction and operation of mines, processing plants and related infrastructure, including road access. As a result, the Company will be subject to all of the risks associated with establishing new mining operations, including those described above. The costs, timing and complexities of developing its projects may be greater than anticipated because such property interests are not located in developed areas, and, as a result, its property interests are not currently served by appropriate road access, water and power supply and other support infrastructure. Cost estimates may increase significantly as more detailed engineering work is completed on a project. It is common in new mining operations to experience unexpected costs, problems and delays during construction, development and mine start-up. In addition, delays in the early stages of mineral production often occur. Accordingly, the Company cannot provide assurance that its activities will result in profitable mining operations at its mineral properties.
The estimation of mineral reserves and mineral resources may be imprecise and depends upon subjective factors. Estimated mineral reserves and mineral resources may not be realized in actual production. The Company's results of operations and financial position may be adversely affected by inaccurate estimates.
Mineral reserves and mineral resources are estimates only, and no assurance can be given that the anticipated tonnages and grades will be achieved, that the indicated level of recovery will be realized or that mineral reserves can be mined or processed profitably. Mineral reserve and mineral resource estimates may be materially affected by environmental, permitting, legal, title, taxation, sociopolitical, marketing and other relevant issues. There are numerous uncertainties inherent in estimating mineral reserves and mineral resources, including many factors beyond the Company's control. Such estimation is a subjective process and the accuracy of any mineral reserve or mineral resource estimate is a function of the quantity and quality of available data, the nature of the ore body and of the assumptions made and judgments used in engineering and geological interpretation. These estimates may require adjustments or downward revisions based upon further exploration or development work or actual production experience.
13
Table of C o ntents
Fluctuations in gold or silver prices, results of drilling, metallurgical testing and production, the evaluation of mine plans after the date of any estimate, permitting requirements or unforeseen technical or operational difficulties may require revision of mineral reserve and mineral resource estimates. Prolonged declines in the market price of gold (or applicable by-product metal prices) may render mineral resources containing relatively lower grades of mineralization uneconomical to recover and could materially reduce the Company's mineral resources. Should reductions in mineral resources or mineral reserves occur, the Company may be required to take a material write-down of its investment in mining properties, reduce the carrying value of one or more of its assets or delay or discontinue production or the development of new projects, resulting in increased net losses and reduced cash flow. Mineral resources and mineral reserves should not be interpreted as assurances of mine life or of the profitability of current or future operations. There is a degree of uncertainty attributable to the calculation and estimation of mineral resources and mineral reserves and corresponding grades being mined, and, as a result, the volume and grade of mineral reserves mined and processed and recovery rates may not be the same as currently anticipated. Any material reductions in estimates of mineral reserves and mineral resources, or of the Company's ability to extract these mineral reserves, could have a material adverse effect on the Company's results of operations and financial condition.
Mineral resources are not mineral reserves and have a greater degree of uncertainty as to their existence and feasibility. There is no assurance that mineral resources will be upgraded to proven or probable mineral reserves.
The Company's mineral resources do not have demonstrated economic viability and may never be classified as proven or probable mineral reserves.
Mineral resources that are not mineral reserves do not have demonstrated economic viability. There is no assurance that the mineral resources estimated by the Company will ever be classified as proven or probable mineral reserves as a result of continued exploration. In addition, mineral resources that are classified as inferred mineral resources are considered too speculative geologically to have economic considerations applied to them to enable them to be categorized as mineral reserves. Due to the uncertainty which may attach to inferred mineral resources, there is no assurance that the estimated tonnage and grades as stated will be achieved or that they will be upgraded to measured and indicated mineral resources or proven and probable mineral reserves as a result of continued exploration.
Fluctuating commodity prices may result in the Company not receiving an adequate return on invested capital and a loss of all or part of an investment in securities of the Company may result.
Upon achieving commercial, the Company's profitability will be dependent upon the market price of gold and any other metals contained in minerals discovered. Historically, gold prices have fluctuated widely and are affected by numerous external factors beyond the Company's control, including industrial and retail demand, central bank lending, sales and purchases of gold, forward sales of gold by producers and speculators, production and cost levels in major producing regions, short-term changes in supply and demand because of speculative hedging activities, confidence in the global monetary system, expectations of the future rate of inflation, the strength of the U.S. dollar (the currency in which the price of gold is generally quoted), interest rates, terrorism and war, the spread of communicable diseases and other global or regional political or economic events. Gold and silver prices have fluctuated widely and are sometimes subject to rapid short-term changes because of speculative activities. The exact effect of these factors cannot be accurately predicted, but any one of, or any combination of, these factors may result in the Company not receiving an adequate return on invested capital and a loss of all or part of an investment in securities of the Company may result.
Failure to further develop the Company's anticipated three underground mines and two potential open pit projects may result in a material adverse effect on the Company's business, financial condition, results of operations, cash flows and prospects.
The ability of the Company to sustain or increase its present level of gold and silver production is dependent, in part, on the success of its projects. Each of the Ruby Hill, Granite Creek and Lone Tree properties include ongoing extraction, with residual leaching of historic leach pads at Lone Tree and Ruby Hill producing minor amounts of gold. Cove is an exploration stage project. Risks and unknowns inherent in all projects include, but are not limited to: the accuracy of mineral reserve and mineral resource estimates; metallurgical recoveries; geotechnical and other technical assumptions; capital and operating costs of ongoing production of these projects; the future price of gold and silver; environmental compliance regulations and restraints; political climate and/or governmental regulation and control; the accuracy of engineering; the ability to manage large-scale construction and scoping of major projects, including delays, aggressive schedules and unplanned events and conditions. The significant capital expenditures and long time period required to further develop these projects are considerable and changes in costs and market conditions or unplanned events or construction schedules can affect project economics. The Company's ability to maintain licenses to operate these projects is also important to the success of these projects. Actual costs and economic returns may differ materially from estimates prepared by the Company, or the Company could fail or be delayed in obtaining all approvals necessary for execution of these projects, in which case, any or all of the projects may not proceed either on its original timing or at all. In addition, none of the Ruby Hill Projects, the Granite Creek Projects, Cove Project or the Lone Tree Project may demonstrate attractive economic feasibility at low gold or silver prices.
The capital costs for each of the Ruby Hill Projects, the Granite Creek Projects, Cove Project and the Lone Tree Project may outweigh the Company's capital, financial and staffing capacity and may adversely affect the development of these projects. The inability to further develop these projects could have a material adverse effect on the Company's business, financial condition, results of operations, cash flows or prospects.
Projects also require the successful completion of feasibility studies, the resolution of various fiscal, tax and royalty matters, the issuance of, and compliance with, necessary governmental permits and the acquisition of satisfactory surface or other land rights. It may also be necessary for the Company to, among other things, find or generate suitable sources of water and power for the project, ensure that appropriate community infrastructure is developed by third parties to support the project and to secure appropriate financing to fund these expenditures. It is also not unusual in the mining industry for mining operations to experience unexpected problems during the start-up phase, resulting in delays and requiring the investment of more capital than anticipated.
14
Table of C o ntents
If the Company is not able to obtain any additional financing required to develop the Lone Tree Project, the Cove Project, the Granite Creek Projects, or the Ruby Hill Projects, it may be required to reduce the scope of its planned business objectives, which may have a material adverse effect on its future prospects.
The Company will have various capital requirements and exploration and development expenditures as it proceeds to expand exploration, accelerate permitting and development activities at its mineral properties (including the anticipated refurbishment and retrofit of the Lone Tree facilities), develop any such properties or take advantage of opportunities for acquisitions, joint ventures or other business opportunities that may be presented to it. Funds from mining operations at the Granite Creek Underground Project is not expected to be sufficient to fund the capital requirements of the Ruby Hill Projects, the Lone Tree Project or the Cove Project. The continued exploration and future development of the Company's exploration and development-stage properties will therefore depend on the Company's ability to obtain the required financing. In particular, any potential development of its projects will require substantial capital commitments, which the Company cannot currently quantify with certainty and may not currently have in place. The Company can provide no assurance that it will be able to obtain financing on favorable terms or at all.
In addition, the Company may incur substantial costs in pursuing future capital requirements, including investment banking fees, legal fees, accounting fees, securities law compliance fees, printing and distribution expenses and other costs. The ability to obtain needed financing may be impaired by such factors as the capital markets (both generally and in the gold industry in particular), the price of gold on the commodities markets (which will impact the amount of asset-based financing available) and/or the loss of key management personnel. If the Company is unable to obtain additional financing as needed, it may not be able to move forward with its planned exploration and development activities at the Ruby Hill Projects, the Lone Tree Project, the Cove Project and the Granite Creek Projects. Any of the foregoing could have a material adverse effect on the Company's business, financial condition, results of operations, cash flows or prospects.
The Company may not be able to generate sufficient cash to service all of its indebtedness and may be forced to take other actions to satisfy its obligations under such indebtedness, which may not be successful.
The Company's ability to make scheduled payments of the principal of, to pay interest on or to refinance its indebtedness depends on the Company's future performance, which is subject to economic, financial, competitive and other factors, many of which are not under the control of the Company. Liquidity risk is the risk that the Company will not be able to meet its financial obligations as they become due, including, among others, debt repayments, interest payments and contractual commitments.
The Company may not continue to generate cash flow from operations in the future sufficient to service the debt and make necessary capital expenditures. If the Company is unable to generate such cash flow, it may be required to adopt one or more alternatives, such as selling assets, restructuring debt or obtaining additional equity capital on terms that may be onerous or highly dilutive. The Company's ability to refinance its indebtedness will depend on the capital markets and its financial condition at such time. The Company may not be able to engage in any of these activities, or engage in these activities on desirable terms, which could result in a default on its debt obligations.
In addition, the Company's arrangements with Orion and a fund managed by Sprott Asset Management USA, Inc. ("Sprott"), National Bank of Canada and Auramet International Inc. and the Convertible Debentures require the Company to satisfy various affirmative and negative covenants and to meet certain financial ratios and tests. These covenants limit, among other things, the Company's ability to incur further indebtedness, create certain liens on assets, or engage in certain types of transactions. There are no assurances that the Company will not, as a result of such covenants, be limited in its ability to respond to changes in its business or competitive activities, or be restricted in its ability to engage in mergers, acquisitions or dispositions of assets. Furthermore, a failure to comply with such covenants could result in an event of default under any debt instruments, which may allow the lenders thereunder to accelerate repayment obligations or enforce security, if any.
Failure to achieve capital and operational cost estimates could have an adverse impact on the Company's future cash flows and financial condition.
Decisions about the development of the Company's mineral properties in the future will ultimately be based upon technical studies. Technical studies derive estimates of cash operating costs based upon, among other things: anticipated tonnage, grades and metallurgical characteristics of the ore to be mined and processed; anticipated recovery rates of gold, silver and other metals from the ore; cash operating costs of comparable facilities and equipment; and anticipated climatic conditions.
It is important to note that the economic parameters described in technical studies include a number of assumptions and estimates that could prove to be incorrect. For example, capital costs, operating costs, production and economic returns and other estimates contained in studies or estimates prepared by or for the Company may differ significantly from those anticipated by the Company's current studies and estimates, and there can be no assurance that the Company's actual operating costs will not be higher than currently anticipated. The Company's actual costs may vary from estimates for a variety of reasons, including: short-term operating factors; revisions to mine plans; risks and hazards associated with mining; natural phenomena, such as inclement weather conditions, water availability, floods and earthquakes; the outbreak of communicable diseases; and unexpected labor shortages or strikes. Operational costs may also be affected by a variety of factors, including: changing waste-to-ore ratios; ore grade metallurgy; labor costs; the cost of commodities; general inflationary pressures; currency exchange rates; availability and terms of financing; difficulty of estimating construction costs over a period of years; delays in obtaining environmental or other government permits; and potential delays related to social and community issues. Many of these factors are beyond the Company's control. Failure to achieve estimates or material increases in costs could have an adverse impact on the Company's future cash flows, business, results of operations and financial condition.
Furthermore, delays in the construction and commissioning of mining projects or other technical difficulties may result in even further capital expenditures being required. Any delay in the development of a project or cost overruns or operational difficulties once the project is fully developed may have a material adverse effect on the Company's business, results of operations and financial condition.
15
Table of C o ntents
Forecasts of future production are estimates and actual production may be less than estimated, which could have a material adverse effect on the Company's results of operations and financial condition.
Forecasts of future production at the Company's mineral projects are estimates prepared by senior management of the Company and are based on interpretation and assumptions and actual production may be less than estimated. The ability of the Company to achieve and maintain the production rates on which such estimates are based is subject to a number of risks and uncertainties. Production estimates for all of the Company's mineral projects are dependent on, among other things, the accuracy of mineral reserve and mineral resource estimates, the accuracy of assumptions regarding ore grades and recovery rates, ground conditions, and the physical characteristics of ores, such as hardness and the presence or absence of particular metallurgical characteristics, and the accuracy of estimated rates and costs of mining and processing. Actual production at the Company's mineral projects may vary from estimates prepared by the Company for a variety of reasons. The failure to achieve production estimates could have a material adverse effect on the Company's results of operations and financial condition. There is no guarantee that anticipated production costs will be achieved at any of the Company's mineral projects. Failure to achieve anticipated production costs could have a material adverse impact on the Company's ability to repay any loans and generate revenue and cash flow to fund operations and future profitability.
Reliance on Third-Party Processing Agreements
Pursuant to the autoclave toll milling agreement dated October 14, 2021 (the "Toll Milling Agreement"), involving Osgood LLC and a third party processor, (the "Processor"), the Processor agreed to process up to an aggregate of 1,000 tons/day of ore produced from the Granite Creek Project at its autoclave facilities, until the earlier of (i) the date the Lone Tree autoclave becomes fully operational, and (ii) October 14, 2024, subject to extension by mutual agreement between the parties. In March of 2025, a new toll milling (autoclave) agreement was entered into with the Processor for a term expiring on December 31, 2027, with Ruby Hill Mining Company, LLC included as a party thereto (the "New Toll Milling Agreement").
The Company anticipates that it will process refractory material from its Granite Creek underground mine and Archimedes underground mine at the Processor's autoclave facility until such time that the Lone Tree autoclave facility is operational. Based on the Company's present estimates, and dependent on the results of a forthcoming refurbishment study, the Company's Lone Tree autoclave is targeted for completion by the end of 2027. If the Lone Tree autoclave refurbishment is not completed by December 31, 2027, there is no certainty that the Company will be able to arrive at a mutual agreement for extension of the New Toll Milling Agreement with the Processor. In such circumstances, if the Company is unable to obtain an extension of the New Toll Milling Agreement in a timely manner (or at all), the Company will be required to seek other arrangements for the processing of refractory material from its Granite Creek and Archimedes underground operations. There can be no certainty that such arrangement can be reached in a timely manner (or at all) on terms that are acceptable to the Company. If an extension of the New Toll Milling Agreement or an alternative arrangement cannot be obtained, the Company's underground operations at Granite Creek and Archimedes will be disrupted until such time as an extension or alternative arrangement can be reached. In addition, as the Company is dependent on third parties' autoclave facilities, there can be no assurance that there will not be interruptions in production capabilities and/or increase in production costs or reduction in profitability as a result of toll milling arrangements.
Any interruptions in the Company's ability to process refractory material from its Granite Creek and Archimedes operations, will have a material adverse effect on the Company's results of operations and financial performance and condition.
The Company may continue to have negative cash flow from operating activities in future periods.
The Company had negative cash flow from operating activities for the year ended December 31, 2024. The Company cannot guarantee that it will have positive or negative cash flow from operating activities in future periods. The Company cannot provide any assurances that it will achieve sufficient revenues (if at all) or maintain profitability or positive cash flow from operating activities. If the Company does not achieve or maintain profitability or positive cash flow from operating activities, then there could be a material adverse effect on the Company's business, financial condition and results of operation, and the Company may need to deploy a portion of its working capital to fund such negative operating cash flows or seek additional sources of funding.
The Company is dependent on a small number of key employees. The loss of one or more of these key employees, if not replaced, could have a material adverse effect on the Company's business, results of operations and financial condition.
The Board and management of the Company currently consist of a relatively small number of key personnel, the loss of any of whom could have a material adverse effect on its operations. There is intense competition for engineers, geologists and persons with mining expertise. The ability of the Company to hire and retain engineers, geologists and persons with mining expertise is key to its mining operations. Further, relations with employees may be affected by changes in the scheme of labor relations that may be introduced by the relevant governmental authorities in the jurisdictions in which the Company's mining operations are conducted. Changes in such legislation or otherwise in the Company's relationships with its employees may result in strikes, lockouts or other work stoppages, any of which could have a material adverse effect on the Company's mining operations, results of operations and financial condition.
The Company does not have in place formal programs for succession and training of management and does not have key person insurance on such individuals, which insurance would provide the Company with insurance proceeds in the event of their death. Without key person insurance, the Company may not have the financial resources to develop or maintain its business until it replaces the individual. The loss of one or more of these key employees, if not replaced, could have a material adverse effect the Company's business, results of operations and financial condition.
Failure to retain directors and senior management could have material adverse effect on the Company and its prospects.
The success of the Company is largely dependent on the performance of the Board and senior management. There is no assurance that the Company can maintain the services of the Board and management or other qualified personnel required to operate its business. Failure to do so could have a material adverse effect on the Company and its prospects.
16
Table of C o ntents
The Company relies on third parties for important relationships and services. Any loss of one or more of these key business alliances or contracts could adversely impact the Company and its business, operating results and prospects.
The Company relies significantly on strategic relationships with other entities. The Company also relies on good relationships with regulatory and governmental departments and upon third parties to provide essential contracting services. There can be no assurance that the Company's existing relationships will continue to be maintained or that new ones will be successfully formed, and the Company could be adversely affected by changes to such relationships or difficulties in forming new ones. Any circumstance which causes the early termination or non-renewal of one or more of these key business alliances or contracts could adversely impact the Company, its business, operating results and prospects.
The Company's financial statements may not reflect what the Company's financial position, results of operations or cash flows will be in the future.
The Company believes that management has made reasonable assumptions underlying the Company's financial statements, such as expenses related to employee benefits, finance, human resources, legal, information technology and executive management. However, because the Company's financial statements are based on certain assumptions, the Company's financial statements may not reflect what the Company's financial position, results of operations or cash flows will be in the future.
There can be no assurance that the Company's title to mineral projects will be secured or that it will not be affected by an unknown title defect.
The acquisition of title to mineral projects is a very detailed and time-consuming process. Although the Company has taken precautions to ensure that legal title to its property interests is properly recorded in the name of the Company where possible, there can be no assurance that such title will ultimately be secured. Furthermore, there is no assurance that the interests of the Company in any of its properties may not be challenged or impugned. Title insurance is generally not available for mineral properties and the Company has a limited ability to ensure that it has obtained secure claim to individual mineral claims. While the Company intends to take all reasonable steps to maintain title to its mineral properties, there can be no assurance that the Company will be successful in extending or renewing mineral rights on or prior to expiration of their term, or that the title to any such properties will not be affected by an unknown title defect.
The Company's activities are subject to extensive governmental regulation. The costs and delays associated with obtaining necessary licenses and permits from governmental bodies could stop or materially delay or restrict the Company from proceeding with the development of an exploration project, which in turn could have a material adverse effect on its business.
Exploration, development and mining of minerals are subject to extensive federal, provincial, state and local laws and regulations governing acquisition of the mining interests, prospecting, development, mining, production, exports, taxes, labor standards, occupational health, waste disposal, toxic substances, water use, land use, environmental protection and remediation, endangered and protected species, mine safety and other matters. No assurance can be given that new rules and regulations will not be enacted or that existing rules and regulations will not be applied or amended in a manner that could have a material adverse effect on the business, financial condition and results of operations of the Company.
The costs and delays associated with obtaining necessary licenses and permits and complying with these licenses and permits and applicable laws and regulations could stop or materially delay or restrict the Company from proceeding with the development of an exploration project. Any failure to comply with applicable laws and regulations or licenses and permits, even if inadvertent, could result in interruption or closure of exploration, development or mining operations or material fines, penalties or other liabilities. The Company may be required to compensate those suffering loss or damage by reason of its mining operations and may have civil or criminal fines or penalties imposed for violations of such laws, regulations and permits.
In addition, any changes in government policy may result in changes to laws affecting ownership of assets, mining policies, monetary policies, taxation, royalty rates, rates of exchange, environmental regulations, labor relations and return of capital. This may affect both the ability of the Company to undertake exploration and development activities in respect of present and future properties in the manner currently contemplated, as well as the ability of the Company to continue to explore, develop and operate those properties in which it has an interest or in respect of which it has obtained exploration and development rights to date. The possibility that future governments may adopt substantially different policies, which might extend to expropriation of assets, cannot be ruled out.
Public Health Risks
The Company's business, operations and financial condition could be materially adversely affected by the outbreak of epidemics or pandemics or other health crises. On March 11, 2020, the outbreak of the novel strain of coronavirus, specifically identified as "COVID-19", was classified as a global pandemic, which resulted in governments enacting emergency measures to combat the spread of the virus. These measures, which included the implementation of travel bans, self-imposed quarantine periods and social distancing, caused material disruption to businesses globally resulting in an economic slowdown. While the Company experienced minimal disruption to its operations during the COVID-19 pandemic, there may be impacts in the future on the Company's operations, key suppliers, supply chain, and cash flows, the Company's ability to raise financing or the pricing of such financing should another pandemic or health crises occur.
Interference in the maintenance or provision of the Company's infrastructure could adversely affect the Company's operations, financial condition and results of operations.
Mining, processing, development and exploration activities depend, to one degree or another, on adequate infrastructure. Reliable roads, railways, power sources and water supply are important determinants affecting capital and operating costs. Unusual or infrequent weather phenomena, sabotage, government or other interference in the maintenance or provision of such infrastructure could adversely affect the Company's operations, financial condition and results of operations.
17
Table of C o ntents
Labor difficulties might result in the Company not meeting its business objectives.
Factors such as work slowdowns or stoppages caused by, among other things, the attempted unionization of operations and difficulties in recruiting qualified miners and hiring and training new miners could materially adversely affect the Company's business. This would have a negative effect on the Company's business and results of operations, which might result in the Company not meeting its business objectives.
Failure to maintain or obtain permits and licenses could cause increases in exploration expenses, capital and operating expenditures or require abandonment or delays in development or exploitation of mining properties.
The Company is required to maintain in good standing a number of permits and licenses from various levels of governmental authorities in connection with the development and operations at its mineral properties.
Although the Company has all required permits for its current state of operations, there is no assurance that delays will not occur in the renewal of certain permits and there is no assurance that the Company will be able to obtain additional permits for any possible future changes to operations or additional permits associated with new legislation. There is also no assurance that the Company can obtain, or that there will not be delays in obtaining, the environmental approval or permits necessary to develop any future projects.
To the extent such approvals or consents are required and are delayed or not obtained, the Company may be curtailed or prohibited from continuing its operations or proceeding with any further development. Failure to comply with applicable laws, regulations and permitting requirements may result in enforcement actions thereunder, including orders issued by regulatory or judicial authorities causing operations to cease or be curtailed, and may include corrective measures requiring capital expenditures, installation of additional equipment or remedial actions. Parties engaged in mining operations or in the exploration, development or exploitation of mineral properties may be required to compensate those suffering loss or damage by reason of the mining activities and may have civil or criminal fines or penalties imposed for violations of applicable laws or regulations.
Amendments to current laws, regulations and permits governing operations and activities of mining and exploration companies or more stringent implementation thereof could have a material adverse impact on the Company and cause increases in exploration expenses and/or capital and operating expenditures or require abandonment or delays in development or exploitation of mining properties.
The Company's operations are subject to extensive environmental regulation and non-compliance with any laws could result in enforcement actions and cause operations to cease or be curtailed or lead to significant financial exposure.
The operations of the Company are subject to environmental regulations promulgated by government agencies from time to time and primarily the Nevada Division of Environmental Protection. Environmental legislation provides for restrictions and prohibitions on spills, releases or emissions of various substances produced in association with certain mining industry operations, such as seepage from tailings disposal areas, which would result in environmental pollution. In addition, certain types of operations require the submission and approval of environmental impact assessments. Environmental hazards may exist on the properties on which the Company holds interests which are unknown to the Company at present, and which have been caused by previous or existing owners or operators of the properties. Failure to comply with applicable laws, regulations and permitting requirements may result in enforcement actions thereunder, including orders issued by regulatory or judicial authorities causing operations to cease or be curtailed, and may include corrective measures requiring capital expenditures, installation of additional equipment or remedial actions. Parties engaged in exploration or mining operations may be required to compensate those suffering loss or damage by reason of the exploration or mining activities and may have civil or criminal fines or penalties imposed for violations of applicable laws or regulations and, in particular, environmental laws.
Environmental legislation is evolving in a manner that will require stricter standards and enforcement, increased fines and penalties for non-compliance, more stringent environmental assessments of proposed projects and a heightened degree of responsibility for companies and their officers, directors and employees. Amendments to current laws, regulations and permits governing operations and activities of mining companies, or more stringent implementation thereof, could have a material adverse impact on the Company and cause increases in exploration expenses, capital expenditures or production costs, reduction in levels of production at producing properties, or abandonment or delays in development of new mining properties. The potential financial exposure may be significant.
The Company is subject to land reclamation requirements. If the Company is required to carry out unanticipated reclamation work, its financial position could be adversely affected.
Land reclamation requirements are generally imposed on mineral exploration companies (as well as companies with mining operations) in order to minimize long-term effects of land disturbance. Reclamation may include requirements to treat ground and surface water to drinking water standards, control dispersion of potentially deleterious effluents and reasonably re-establish pre-disturbance landforms and vegetation.
In order to carry out reclamation obligations imposed on the Company in connection with exploration, potential development and production activities, the Company may be required to allocate financial resources that might otherwise be spent on further exploration and development programs. In addition, regulatory changes could increase the Company's obligations to perform reclamation and mine closing activities. If the Company is required to carry out unanticipated reclamation work, the Company's financial position could be adversely affected.
18
Table of C o ntents
If the Company is not able to arrange for, or continue to obtain, surety bonds in favor of government agencies, it could adversely affect the Company's business, financial condition and results of operations.
The Company, in the ordinary course of its operations and developments, is required to issue financial assurances including surety bonds and/or bank guarantee instruments, in favor of government agencies as financial support for environmental reclamation and exploration permitting at its properties. The Company’s ability to provide such assurances is subject to external financial and credit markets and assessments, and its own financial position. If the Company is not able to arrange for, or continue to obtain, satisfactory surety bonds in favor of government agencies, as financial support for environmental reclamation and exploration permitting at its properties, this could adversely affect the Company's business, financial condition and results of operations.
There are significant hazards associated with mining activities, some of which may not be fully covered by insurance. The Company might become subject to liability for hazards which it may not be insured against and could incur significant costs from the losses arising out of such events.
The Company's business is subject to production and operational risks that could have a material adverse effect on the financial condition, results of operations or cash flows of the Company and the Company's insurance may not cover these risks and hazards adequately or at all.
Mining and metals processing involve significant production and operational risks normally encountered in the exploration, development and production of gold and other base or precious metals, some of which are outside of the Company's control, including, without limitation, the following: unanticipated ground and water conditions; adverse claims to water rights and shortages of water to which the Company has rights; adjacent or adverse land or mineral ownership that results in constraints on current or future mine operations; geological problems, including seismic activity, earthquakes and other natural disasters; metallurgical and other processing problems; unusual or unexpected mineralogy or rock formations; ground or slope failures; tailings design or operational issues, including dam breaches or failures; structural cave-ins, wall failures or rock-slides; flooding or fires; equipment failures; periodic interruptions due to inclement or hazardous weather conditions or operating conditions and other force majeure events; lower than expected ore grades or recovery rates; accidents; delays in the receipt of or failure to receive necessary government permits; delays in transportation; the results of litigation, including appeals of agency decisions; interruption of energy supply; labor disputes; inability to obtain satisfactory insurance coverage; the availability of drilling and related equipment in the area where mining operations will be conducted; and the failure of equipment/processes to operate in accordance with specifications or expectations.
These risks could result in damage to, or destruction of, the any of the Company's mineral projects, resulting in partial or complete shutdowns, personal injury or death, environmental or other damage to properties of the Company or others, delays in mining, reduced production, monetary losses and potential legal liability. Milling operations are subject to hazards, such as equipment failure or failure of retaining dams around tailings disposal areas that may result in personal injury or death, environmental pollution and consequential liabilities. In addition, the Company relies on a few key vendors for its operations. A breach of the applicable contract by any of these vendors, a significant dispute with any of these vendors, a force majeure event or other operational or financial issues affecting one or more of these vendors, including labor strikes or work stoppages, or any other event that would significantly impede the ability of these vendors to perform their contractual obligations to the Company or that would have a significant negative impact on the Company's contractual relationship with them would adversely affect the ability of the Company to produce its primary products, which could have a material impact on the Company's financial condition and results of operations.
Although the Company may maintain insurance to protect against certain risks in such amounts as it considers to be reasonable, its insurance will not cover all the potential risks associated with its operations and insurance obtained may contain exclusions and limitations on coverage. In addition, although certain risks are insurable, the Company may be unable to maintain insurance to cover these risks at economically feasible premiums. Insurance coverage may not continue to be available or, if available, may not be adequate to cover any resulting liability. Moreover, insurance against risks such as environmental pollution or other hazards as a result of exploration, development and production is not generally available to the Company or to other companies in the mining industry on acceptable terms. The Company might also become subject to liability for pollution or other hazards which it may not be insured against or which the Company may elect not to insure against because of premium costs or other reasons. Losses from these events may cause the Company to incur significant costs that could have a material adverse effect upon its business, consolidated financial condition and results of operations.
Existing or future competition in the mining industry could materially adversely affect the Company's prospects for mineral exploration and success in the future.
There is significant competition in the precious metals mining industry for mineral rich properties that can be developed and produced economically, the technical expertise to find, develop and operate such properties, the labor to operate the properties and the capital for the purpose of funding such properties. Many competitors not only explore for and mine precious metals but conduct refining and marketing operations on a global basis. As a result of this competition, some of which is with large established mining companies with substantial capabilities and greater financial and technical resources than the Company, the Company may be unable to acquire desired properties, to recruit or retain qualified employees or to acquire the capital necessary to fund its operations and develop its projects. Existing or future competition in the mining industry could materially adversely affect the Company's prospects for mineral exploration and success in the future. Increased competition can result in increased costs and lower prices for metal and minerals produced and reduced profitability. Consequently, the revenues of the Company, its operations and financial condition could be materially adversely affected.
From time to time, several companies may participate in the acquisition, exploration and development of natural resource properties, thereby allowing for their participation in larger programs, permitting involvement in a greater number of programs and reducing financial exposure in respect of any one program. It may also occur that a particular company will assign all or a portion of its interest in a particular program to another of these companies due to the financial position of the company making the assignment. In determining whether or not the Company will participate in a particular program and the interest therein to be acquired by it, the directors will primarily consider the degree of risk to which the Company may be exposed and its financial position at that time.
19
Table of C o ntents
The Company may fail to select appropriate acquisition targets and may not be able to integrate any acquired businesses and their workforce into the Company.
The Company will continue to seek new resource properties and development opportunities in the mining industry. In pursuit of such opportunities, the Company may fail to select appropriate acquisition targets or negotiate acceptable arrangements, including arrangements to finance acquisitions or integrate the acquired businesses and their workforce into the Company. Ultimately, any acquisitions would be accompanied by risks, which could include changes in commodity prices, difficulty with integration, failure to realize anticipated synergies, significant unknown liabilities, delays in regulating approvals and exposure to litigation. Any material issues that the Company encounters in connection with an acquisition could have a material adverse effect on its business, results or operations and financial position.
There may be undisclosed risks and liabilities relating to the Company's acquisitions.
While the Company conducted substantial due diligence of the acquisitions of its various projects, including the acquisitions of the Granite Creek Project, the Ruby Hill Project, the Lone Tree Project, and the FAD Project (collectively, the "Acquisitions"), there are risks inherent in any acquisition. Specifically, there could be unknown or undisclosed risks or liabilities relating to these projects for which the Company is not indemnified pursuant to the provisions of the agreements relating to the Acquisitions. Any such unknown or undisclosed risks or liabilities could have a material adverse effect on its business, results of operations and financial position. The Company could encounter additional transaction and integration related costs or other factors, such as the failure to realize all of the benefits anticipated in the Acquisitions. All of these factors could cause dilution to the Company's earnings per share or decrease or delay the anticipated accretive effect of the Acquisitions and cause a decrease in the market price of the Common Shares.
The anticipated benefits of the Company's Acquisitions may not be realized.
There can be no assurance that management of the Company will be able to fully realize the expected benefits of the Acquisitions. There is a risk that some or all of the expected benefits will fail to materialize or may not occur within the time periods anticipated by management of the Company. The realization of such benefits may be affected by a number of factors, many of which are beyond the control of the Company.
The Company's directors and officers may be subject to conflicts of interest in their capacities as directors and officers of other public resource companies.
The directors and officers of the Company may serve as directors or officers of other public resource companies or have significant shareholdings in other public resource companies. Situations may arise in connection with potential acquisitions and investments where the other interests of these directors and officers may conflict with the interests of the Company.
The Company is subject to the ESTMA, and any non-compliance thereof could lead to significant fines and sanctions.
The Canadian Extractive Sector Transparency Measures Act ("ESTMA"), which became effective June 1, 2015, requires public disclosure of payments to governments by mining and oil and gas companies engaged in the commercial development of oil, gas and minerals who are either publicly listed in Canada or with business or assets in Canada. Mandatory annual reporting is required for extractive companies with respect to payments made to foreign and domestic governments at all levels, including entities established by two or more governments. ESTMA requires reporting on the payment of any taxes, royalties, fees, production entitlements, bonuses, dividends, infrastructure improvement payments and any other prescribed payment over $100,000. Failure to report, false reporting or structuring payments to avoid reporting may result in fines of up to $250,000 (which may be concurrent). If the Company becomes subject to an enforcement action or is in violation of ESTMA, this may result in significant penalties, fines and/or sanctions, which may have a material adverse effect on the Company's reputation.
The Company's success depends on developing and maintaining relationships with local communities and other stakeholders, which cannot be guaranteed.
The Company's relationships with the communities in which it operates are critical to the future success of its existing operations and the construction and development of its projects. In recent years, there has been ongoing and potentially increasing public concern relating to the effects of resource extraction on the natural landscape, communities and the environment. Certain non-governmental organizations, public interest groups and reporting organizations ("NGOs") who oppose globalization and resource development can be vocal critics of the mining industry and its practices, including the use of cyanide and other hazardous substances in processing activities. In addition, there have been many instances in which local community groups have opposed resource extraction activities, resulting in disruption and delays to the relevant operations. Adverse publicity generated by such NGOs or others related to the mining industry, or to extractive industries generally, could have an adverse effect on the Company's reputation or financial condition and may impact its relationship with the communities in which it operates. While the Company seeks to operate in a socially responsible manner and believes it has good relationships with local communities in the regions in which it operates, there is no guarantee that its efforts in this respect will mitigate this potential risk. NGOs or local community groups could direct adverse publicity against and/or disrupt the operations of the Company in respect of one or more of its properties, despite the Company's successful compliance with social and environmental best practices. Any such actions and the resulting media coverage could have adverse effects on the reputation and financial condition of the Company or its relationships with the communities in which it operates, which could have a material adverse effect on the business, financial condition, results of operations, cash flows or prospects of the Company.
The Company's ability to successfully obtain key permits and approvals to explore for, develop and operate mines and to successfully operate in Nevada will likely depend on its ability to develop, operate and close mines in a manner that is consistent with the creation of social and economic benefits in the surrounding communities, which may or may not be required by law. Mining operations should be designed to minimize the negative impact on such communities and the environment, for example, by modifying mining plans and operations or by relocating those affected to an agreed location. The cost of these measures could increase capital and operating costs and therefore could have an adverse impact upon the Company's financial condition and operations. The Company seeks to promote improvements in health and safety, human rights, environmental performance and community relations. However, the Company's ability to operate could be adversely impacted by accidents or events detrimental (or perceived to be detrimental) to the health, safety and well-being of the Company's employees, human rights, the environment or the communities in which the Company operates.
20
Table of C o ntents
The Company may become subject to disputes with third parties and an inability to resolve these disputes favorably could have a material adverse impact on the Company's business and financial condition.
The Company may become involved in disputes with third parties in the future that may result in litigation. The results of litigation cannot be predicted with certainty and defense and settlement costs of legal claims can be substantial, even with respect to claims that have no merit. If the Company is unable to resolve these disputes favorably, or if the cost of the resolution is substantial, such events may have a material adverse impact on the Company's business, rights, financial condition, results of operations, cash flows or prospects.
Damage to the Company's image and reputation may lead to decreased investor confidence and impede the Company's ability to advance its projects.
Damage to the Company's reputation can be the result of the actual or perceived occurrence of any number of events and could include any negative publicity, whether true or not. Although the Company places a great emphasis on protecting its image and reputation, it does not ultimately have direct control over how it is perceived by others. Reputation loss may lead to increased challenges in developing and maintaining community relations and decreased investor confidence and may act as an impediment to the Company's overall ability to advance its projects, thereby having a material adverse impact on financial performance, cash flows and growth prospects.
Climate change could have a material adverse impact on the Company's business and results of operations.
There is significant evidence of the effects of climate change on our planet and an intensifying focus on addressing these issues. Climate change is a global challenge that may have both favorable and adverse effects on our business in a range of possible ways. Mining and processing operations are energy intensive and result in a carbon footprint either directly or through the purchase of fossil-fuel based electricity. As such, the Company is impacted by current and emerging policy and regulation relating to greenhouse gas emission levels, energy efficiency, and reporting of climate-change related risks. While some of the costs associated with reducing emissions may be offset by increased energy efficiency, technological innovation, or the increased demand for our metals as part of technological innovations, the current regulatory trend may result in additional transition costs at some of our operations. Governments are introducing climate-change legislation and treaties at the international, national, and local levels, and regulations relating to emission levels and energy efficiency are evolving and becoming more rigorous. Current laws and regulatory requirements are not consistent across the jurisdictions in which we operate, and regulatory uncertainty is likely to result in additional complexity and cost in our compliance efforts. Public perception of mining is, in some respects, negative and there is increasing pressure to curtail mining in many jurisdictions as a result, in part, of perceived adverse effects of mining on the environment and on local communities. Concerns around climate change may also affect the market price of our Common Shares as institutional investors and others may divest interests in industries that are thought to have more environmental impacts. While the Company is committed to operating responsibly and reducing the negative effects of our operations on the environment, our ability to reduce emissions and energy and water usage by increasing efficiency and adopting new innovation is constrained by technological advancement, operational factors, and economics. Adoption of new technologies, the use of renewable energy, and infrastructure and operational changes necessary to reduce water usage may also increase our costs significantly. Concerns over climate-change, and our ability to respond to regulatory requirements and societal pressures, may have significant impacts on our operations and our reputation and may even result in reduced demand for our products.
The physical risks of climate change could also adversely impact our operations. These risks include, among other things, extreme weather events, resource shortages, changes in rainfall and storm patterns and intensities, water shortages, changing sea levels, and extreme temperatures. Over the past several years, changing weather patterns and climatic conditions due to natural and man-made causes have added to the unpredictability and frequency of natural disasters, such as hurricanes, earthquakes, hailstorms, wildfires, snow, ice storms, the spread of disease and insect infestations. Climate-related events such as mudslides, floods, droughts, and fires can have significant impacts, directly and indirectly, on our operations and could result in damage to our facilities, disruptions in accessing our sites with labor and essential materials or in shipping products from our mines, risks to the safety and security of our personnel and to communities, shortages of required supplies such as fuel and chemicals, inability to source enough water to supply our operations, and the temporary or permanent cessation of one or more of our operations. There is no assurance that we will be able to anticipate, respond to, or manage the risks associated with physical climate-change events and impacts, and this may result in material adverse consequences to our business and to our financial results.
The Company may not be able to access the resources and materials it needs to advance its exploration programs.
Mining exploration requires ready access to mining equipment, such as drills, and crews to operate that equipment. There can be no assurance that such resources will be available to the Company on a timely basis or at a reasonable cost. Failure to obtain these resources when needed may result in delays in the Company's exploration programs.
The Company's mineral properties or mineral projects may be subject to various land payments and any failure by the Company to satisfy such payments could result in the loss of property interests.
The Company's mineral properties or projects may be subject to various land payments, royalties and/or work commitments. Failure by the Company to meet its payment obligations or otherwise fulfill its commitments under these agreements could result in the loss of related property interests.
Geological, hydrological, and climatic events could have a material adverse effect on the Company.
All mining operations face geotechnical, hydrological and climate challenges. Unanticipated adverse geotechnical and hydrological conditions, such as landslides, subsidence and uplift, embankment failures and rock fragility may occur in the future and such events may not be detected in advance. Geotechnical instabilities and adverse climatic conditions can be difficult to predict and are often affected by risks and hazards outside of the Company's control, such as severe weather and seismic activity. Geotechnical failures could result in limited or restricted access to mines, suspension of operations, environmental damage, government investigations, increased monitoring costs, remediation costs, loss of mineralized material and other impacts, which could result in loss of revenue or increased costs and could result in a material adverse effect on the Company's business, financial condition, results of operations, cash flows or prospects.
21
Table of C o ntents
Rising inflation could lead to increased costs.
Consumer price inflation has risen significantly in recent years and if it continues will mean much higher costs for the Company's expenditure programs. The Company's program cost estimates could rapidly become out-of-date. If this happens, the Company will need to either raise additional funds causing equity dilution or increased debt levels or reduce its expenditures and reducing progress. Increases in inflation usually result in central bank interest rate hikes which can trigger negative capital market conditions making financing difficult. While inflation increases have often led to higher precious metals prices, there can be no assurance of that, and the Company's operations and its share price could be adversely affected by increased inflation.
Trade Wars could lead to increased costs.
If high US tariffs are imposed on Canadian products and the products of other countries and Canada and the other countries retaliate with import tariffs on US products, the consequences on the capital markets and global supply chains could adversely impact the Company’s ability to raise funds and source the supplies the Company relies on to perform its planned work programs or, if available, the cost of such supplies could soar, impairing the Company’s ability to complete work programs. The eventuality, timing and rates of potential US tariffs, and the countries on which they are levied are difficult to predict at this time. However, US tariffs are likely to be met with retaliatory tariffs and a multi-country trade war against the US could develop. The Company imports products into the US and could be directly impacted by the imposition of new tariffs on goods imported. However, the economic impact of tariffs or a broader trade war on the Canadian economy, the US economy and the global economy could negatively impact capital markets and the Company’s ability to raise funds to undertake its work programs. A Canada-US or a broader trade war has the potential to adversely impact global supply chains and make supplies required by the Company for exploration programs, construction work or operations harder to obtain or unavailable. Canadian tariffs or scarcity in the global supply chain would likely increase the cost of supplies required by the Company that are available, which could impair the Company’s ability to undertake all of the work it plans to perform. The Company has some flexibility to adjust the timing, scale of, or even cancel, many of its work programs in response to increasing costs or unavailability of supplies. The indirect effects of tariffs imposed by the US or by both countries are difficult to assess, but the potential for tariffs represents a risk to the Company’s ability to fulfill some of its key objectives.
Securities analysts or other third parties may publish inaccurate or unfavorable research reports.
The trading market for Common Shares may rely in part on the research and reports that securities analysts and other third parties choose to publish about the Company. The Company does not control these analysts or other third parties. The price of the Common Shares could decline if one or more securities analysts downgrade the Common Shares or if one or more securities analysts or other third parties publish inaccurate or unfavorable research about the Company or cease publishing reports about the Company.
Internal control over financial reporting and disclosure controls and procedures cannot provide complete assurance of error-free reporting.
Internal control over financial reporting is a process designed to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with US General Accepted Accounting Principles ("US GAAP"). Disclosure controls and procedures are designed to ensure that information required to be disclosed by a company in reports filed with securities regulatory agencies is recorded, processed, summarized, and reported on a timely basis and is accumulated and communicated to a company's management, as appropriate, to allow timely decisions regarding required disclosure. No evaluation can provide complete assurance that the Company's internal control over financial reporting and disclosure controls and procedures will detect or uncover all failures of persons within the Company to disclose material information required to be reported. The effectiveness of the Company's control and procedures could also be limited by simple errors or faulty judgments. In addition, as the Company continues to expand, the challenges involved in implementing appropriate internal control over financial reporting and disclosure controls and procedures will increase and will require that the Company continue to improve its internal control over financial reporting and disclosure controls and procedures. Although the Company intends to devote substantial time and incur substantial costs, as necessary, to ensure ongoing compliance, the Company cannot be certain that it will be successful in complying with National Instrument 52-109 – Certification of Disclosure in Issuers’ Annual and Interim Filings of the Canadian Securities Administrators as well as comparable US securities disclosure laws including the Sarbanes-Oxley Act.
International conflict and other geopolitical tensions or events, such as the current Russia-Ukraine conflict, may have an adverse effect on the Company's business, financial condition and results of operations.
International conflict and other geopolitical tensions and events, including war, military action, terrorism, trade disputes and international responses thereto have historically led to, and may in the future lead to, uncertainty or volatility in global commodity and financial markets and supply chains. Russia's invasion of Ukraine has led to sanctions being levied against Russia by the international community and may result in additional sanctions or other international action, any of which may have a destabilizing effect on commodity prices, supply chains and global economies more broadly. Volatility in commodity prices and supply chain disruptions may adversely affect the Company's business, financial condition and results of operations. The extent and duration of the Russia-Ukraine conflict and related international action cannot be accurately predicted at this time and the effects of such conflict may magnify the impact of the other risks identified in this Annual Report, including those relating to commodity price volatility and global financial conditions. The situation is continuing to change and unforeseeable impacts, including on our shareholders and counterparties on which we rely and transact with, may materialize and may have an adverse effect on the Company's business, results of operation and financial condition.
22
Table of C o ntents
Risks Relating to the Common Shares Generally
No guarantee of positive return on investment.
There is no guarantee that an investment in the securities of the Company will earn any positive return in the short term or long term. The mineral exploration and development business is subject to numerous inherent risks and uncertainties, and any investment in the securities of the Company should be considered a speculative investment. Past successful performance provides no assurance of any future success. The purchase of securities of the Company involves a high degree of risk and should be undertaken only by investors whose financial resources are sufficient to enable them to assume such risks. An investment in the securities of the Company is appropriate only for investors who have the capacity to absorb a loss of some or all of their investment.
There is no certainty that an active trading market for the Common Shares will develop or be sustained.
While the Common Shares are listed on the TSX and NYSE American, there can be no assurance that an active trading market will develop for the Common Shares, or if developed, that such a market will be sustained. There can be no assurance that fluctuations in the trading price will not have a material adverse impact on the Company's ability to raise equity funding without significant dilution to shareholders of the Company, or at all.
In addition, the disruptions recently experienced in the international and domestic markets have led to reduced liquidity and increased credit risk premiums for certain companies and have resulted in a reduction of available financing. Developing companies may be particularly susceptible to these disruptions and reductions in the availability of credit or increases in financing costs, which could result in them experiencing financial difficulty. The availability of credit is significantly influenced by levels of investor confidence in markets as a whole and as such any factors that impact market confidence (for example, a decrease in credit ratings, state or central bank intervention in one market, terrorist activity and conflict or the spread of other communicable diseases and viruses) could affect the price or availability of funding for entities within any of these markets.
Common Shares may be subject to significant price and volume fluctuations.
The Common Shares are listed on the TSX and NYSE American. In recent years, the securities markets have experienced a high level of price and volume volatility, and the market price of securities of many companies, particularly those considered exploration or development stage companies, have experienced wide fluctuations in price which have not necessarily been related to the operating performance, underlying asset values or prospects of such companies. There can be no assurance that continued fluctuations in price will not occur, which may result in losses to investors. The purchase of Common Shares should be undertaken only by investors who have no need for immediate liquidity in their investment.
The trading price of the Common Shares may increase or decrease in response to a number of events and factors, including, but not limited to: the Company's operating performance and the performance of competitors and other similar companies; volatility in gold and other metal prices; the public's reaction to the Company's press releases, other public announcements and the Company's filings with the various securities regulatory authorities; the failure of the Company to meet the reporting and other obligations under Canadian securities laws or imposed by the TSX, NYSE American or the United States Securities Exchange Commission (the "SEC"); changes in recommendations by research analysts who track the Common Shares or the shares of other companies in the resource sector; a reduction in coverage by such research analysts; changes in general economic and/or political conditions; the arrival or departure of key personnel; and acquisitions, strategic alliances or joint ventures involving the Company or its competitors, which, if involving the issuance of Common Shares, or securities exercisable or exchangeable for or convertible into Common Shares, would result in dilution to present and prospective holders of Common Shares. In addition, the market price of the Common Shares is affected by many variables not directly related to the Company's success and are, therefore, not within the Company's control, including other developments that affect the market for all resource sector securities, the breadth of the public market for the Common Shares and the attractiveness of alternative investments.
Securities class action litigation often has been brought against companies following periods of volatility in the market price of their securities. The Company may in the future be the target of similar litigation. Securities litigation could result in substantial costs and damages and divert management's attention and resources.
The Company may need to sell additional Common Shares to finance its operations and such future sales may dilute shareholders' equity position in the Company.
The Company has limited financial resources and will have further capital requirements and exploration expenditures as it proceeds to expand activities at its mineral projects, develop any such projects or take advantage of opportunities for acquisitions, joint ventures or other business opportunities that may be presented to it. The Company may sell additional Common Shares or other securities in the future to finance its operations or may issue additional Common Shares or other securities as consideration for future acquisitions. The Company cannot predict the size or nature of future sales or issuances of securities or the effect, if any, that such future sales and issuances will have on the market price of the Common Shares. Sales or issuances of substantial numbers of Common Shares, or the perception that such sales or issuances could occur, may adversely affect prevailing market prices of the Common Shares and will dilute each shareholder's equity position in the Company. The Company's articles permit, among other things, the issuance of an unlimited number of Common Shares for such consideration and on such terms and conditions as are established by the directors of the Company, in many cases, without the approval of the shareholders of the Company.
Sales by existing shareholders in the public market could reduce the price of the Common Shares and impair the Company's ability to raise additional capital.
The Common Shares are listed on the TSX and NYSE American and sales of a substantial number of Common Shares in the public market could occur at any time. These sales, or the market perception that the holders of a large number of Common Shares intend to sell Common Shares, could reduce the market price of the Common Shares. If this occurs and continues, it could impair the Company's ability to raise additional capital through the sale of securities.
23
Table of C o ntents
The Company's dual listing may increase the volatility of the Common Shares.
The Company incurs significant legal, accounting, reporting and other expenses in order to maintain a dual listing on both the TSX and NYSE American. Moreover, the Company's listing on both the TSX and NYSE American may increase volatility due to the ability to buy and sell Common Shares in two places, different market conditions in different capital markets, and different trading volumes. This may result in less liquidity on both exchanges, different liquidity levels, and different prevailing trading prices.
A decline in the price of Common Shares could impede the Company's ability to raise additional capital to finance its operations and may materially adversely affect its business plan and ability to meet obligations as they become due.
A decline in the market price of the Common Shares could result in a reduction in the liquidity of the Common Shares and a reduction in the Company's ability to raise additional capital for its operations. A decline in the price of the Common Shares could have an adverse effect upon the liquidity of the Common Shares and the Company's continued operations. A reduction in the Company's ability to raise equity capital in the future could have a material adverse effect upon the Company's business plan and operations, including its ability to continue its current operations. If the price for the Common Shares declines, the Company may not be able to raise additional capital or generate funds from operations sufficient to meet its obligations.
The Company has no history of earnings and has no current plans to pay dividends in the foreseeable future.
The Company has no history of earnings as a stand-alone entity and does not anticipate paying dividends on the Common Shares in the foreseeable future. Several of the agreements entered into in connection with the Financing Package, including the Orion Convertible Loan and the Sprott Convertible Loan, and the Convertible Debentures restrict the ability of the Company to pay dividends to its shareholders. Payment of any future dividends will be at the discretion of the Board after taking into account many factors, including operating results, financial condition and anticipated cash needs. See " Dividends and Distributions ".
Forward-looking statements are based on assumptions and the actual results of the Company may differ materially from those suggested by the forward-looking statements.
Shareholders should not place undue reliance on forward-looking statements. By their nature, forward-looking statements involve numerous assumptions, known and unknown risks and uncertainties, of both general and specific nature, that could cause actual results to differ materially from those suggested by the forward-looking statements or contribute to the possibility that predictions, forecasts or projections will prove to be materially inaccurate. Additional information on such risks, assumptions and uncertainties can be found under the heading " Cautionary Note Regarding Forward-Looking Information ".
The Company relies upon certain accommodations available to it as an "emerging growth company".
The Company is an "emerging growth company" as defined in section 3(a) of the U.S. Exchange Act (as amended by the JOBS Act, enacted on April 5, 2012), and the Company will continue to qualify as an emerging growth company until the earliest to occur of: (a) the last day of the fiscal year during which the Company has total annual gross revenues of US$1,070,000,000 (as such amount is indexed for inflation every five years by the SEC) or more; (b) the last day of the fiscal year of the Company following the fifth anniversary of the date of the first sale of common equity securities of the Company pursuant to an effective registration statement under the U.S. Securities Act; (c) the date on which the Company has, during the previous three year period, issued more than US$1,000,000,000 in non-convertible debt; and (d) the date on which the Company is deemed to be a "large accelerated filer", as defined in Rule 12b–2 under the U.S. Exchange Act. The Company will qualify as a large accelerated filer (and would cease to be an emerging growth company) at such time when on the last business day of its second fiscal quarter of such year the aggregate worldwide market value of its common equity held by non-affiliates will be US$700,000,000 or more. For so long as the Company remains an emerging growth company, it is permitted to and intends to rely upon exemptions from certain disclosure requirements that are applicable to other public companies that are not emerging growth companies. These exemptions include not being required to comply with the auditor attestation requirements of Section 404 of the Sarbanes-Oxley Act. The Company cannot predict whether investors will find the Common Shares less attractive because the Company relies upon certain of these exemptions. If some investors find the Common Shares less attractive as a result, there may be a less active trading market for the Common Shares and the Common Share price may be more volatile. On the other hand, if the Company no longer qualifies as an emerging growth company, the Company would be required to divert additional management time and attention from the Company's development and other business activities and incur increased legal and financial costs to comply with the additional associated reporting requirements, which could negatively impact the Company's business, financial condition and results of operations.
Enforcement of Civil Liabilities in the United States
The Company is incorporated under the laws of the Province of British Columbia, Canada. Some of its directors and officers are residents of Canada, and most of the assets of these persons are located outside of the United States. As a result, it may be difficult for shareholders to initiate a lawsuit within the United States against these non-United States residents, or to enforce judgments in the United States against the Company or these persons which are obtained in a United States court and that are predicated upon civil liabilities under the United States federal securities laws or the securities or "blue sky" laws of any state within the United States.
24
Table of C o ntents
A failure or breach of the Company's network systems could corrupt the Company's financial or operational data and may have a material adverse impact on the Company's reputation and results of operations.
Major equipment failures, natural disasters including severe weather, terrorist acts, acts of war, cyber-attacks or other breaches of network systems or security that affect computer systems within the Company's network could disrupt the Company's business functions, including the Company's exploration and production activities. The mining industry has become increasingly dependent on digital technologies. Mines and mills are automated and networked, and the Company relies on digital technologies to conduct certain exploration, development, production, processing and other activities. The mining industry faces various security threats, including cyber-security threats. Such attacks are increasing and include malicious software, attempts to gain unauthorized access to data and other electronic security breaches that could lead to disruptions to critical systems, unauthorized release of confidential information and corruption of data. A cyber-attack could negatively impact the Company's operations. A corruption of the Company's financial or operational data or an operational disruption of the Company's production infrastructure could, among other potential impacts, result in: loss of production or accidental discharge; expensive remediation efforts; distraction of management; damage to the Company's reputation or its relationship with customers, vendors and employees; or events of noncompliance, which events could lead to regulatory fines or penalties. Any of the foregoing could have a material adverse impact on the Company's reputation, profitability, future cash flows, earnings, results of operations and financial condition.
Information technology failures or cyber security incidents could adversely affect the reputation, operations or financial performance of the Company.
The Company is reliant on the continuous and uninterrupted operations of its information technology ("IT") systems. User access and security of all IT systems are critical elements to the operations of the Company. Protection against cyber security incidents and cloud security, and security of all of the Company's IT systems are critical to the operations of the Company. Any IT failure pertaining to availability, access or system security could result in disruption for personnel and could adversely affect the reputation, operations or financial performance of the Company.
The Company's IT systems could be compromised by unauthorized parties attempting to extract business sensitive, confidential or personal information, corrupting information or disrupting business processes or by inadvertent or intentional actions by the Company's employees or vendors. A cyber security incident resulting in a security breach, or failure to identify a security threat, could disrupt business and could result in the loss of business sensitive, confidential or personal information or other assets, as well as litigation, regulatory enforcement, violation of privacy and security laws and regulations and remediation costs.
The Corporation could become classified as a passive foreign investment company for U.S. federal income tax purposes in the current tax year or a future tax year, which could result in adverse U.S. federal income tax consequences to U.S. investors.
The Corporation would be classified as a passive foreign investment company, or “PFIC”, for any taxable year if, after the application of certain look-through rules with respect to the income and assets of the Corporation's corporate subsidiaries in which the Corporation owns 25% (by value) of the stock, either: (i) 75% or more of the Corporation's gross income for such year is "passive income" (as defined in the relevant provisions of the Internal Revenue Code of 1986, as amended), or (ii) 50% or more of the value of the Corporation's assets (generally determined on the basis of a quarterly average) during such year is attributable to assets that produce or are held for the production of passive income. The Corporation believes that it was not a PFIC for its prior tax year, and based on current business plans and financial expectations, the Corporation expects that it will not be a PFIC for its current tax year and expects that it will not be a PFIC for the foreseeable future. However, this is a factual determination that must be made annually after the close of each taxable year and is dependent on many factors, including the value of the Corporation's passive assets, the amount and type of the Corporation's gross income and market capitalization. Therefore, there can be no assurance that the Corporation will not be classified as a PFIC for the current or future taxable years. Certain adverse U.S. federal income tax consequences could apply to a U.S. investor if the Corporation is treated as a PFIC for any taxable year during which such U.S. investor holds Common Shares.
ITEM 1B. UNRESOLVED STAFF COMMENTS
None.
25
Table of C o ntents
ITEM 1C. CYBERSECURITY
Risk Management and Strategy Overview
Protecting the information systems, assets, data, and communication infrastructure is critical to the Company's operations. Consequently, cybersecurity is prioritized through the implementation of a comprehensive cybersecurity risk management program that is managed by the executive team leadership in conjunction with the IT Department and falls within the boundaries of the overall organization risk management program.
Key Principles of the Cybersecurity Risk Management Program:
• Risk Management - a proactive approach to identifying and mitigating risks to protect the organization’s assets and integrity through third party assessments, internal assessments and global cybersecurity threat analysis.
• Defense Strategy - adopts a robust defense approach to protect systems from potential threats, including an assumption of breach mindset.
• Zero-Trust Architecture - implements a zero-trust philosophy, ensuring that no entity is inherently trusted without verification.
• Least Privileged Access - employ strict identity and access management principles to limit user access based on necessity.
• Mitigation and Management of Incidents or Disasters - our risk management program includes policies and procedures for incident response and mitigation.
Key Components of the Cybersecurity Program:
• Ongoing Detecting and Monitoring - Continuous surveillance of networks to identify threats and intrusions in real-time.
• Vulnerability Assessment - Regular assessments conducted by both internal teams and external partners to identify system vulnerabilities.
• Employee Training - Regular cybersecurity training and awareness campaigns are undertaken to equip employees with the knowledge needed to mitigate risks.
• IT Leadership - The IT Department leads the implementation of the cybersecurity risk management program, ensuring adherence to Company and regulatory standards.
Compliance Framework
The cybersecurity program aligns with the National Institute of Standards and Technology’s Cybersecurity Framework. The IT Department, in collaboration with external vendors, diligently works to detect vulnerabilities, identify compromised devices, and maintain compliance across the organization’s IT systems.
External Engagement
The Company engages with third-party organizations to conduct regular assessments of compliance, controls, and overall risk management strategies, ensuring a comprehensive approach to cybersecurity. Quarterly vulnerability assessments are performed on external and internal systems, as well as a larger annual audit of system security and compliance.
Responsibility and Communication
The Company promotes a culture where cybersecurity awareness is recognized as everyone's responsibility. Regular communications about cybersecurity risk mitigation and intrusion prevention measures are shared with senior management and the Board of Directors.
Incident History
The Company has not experienced any cybersecurity incidents during the year ended December 31, 2024, or in any prior year that resulted in interruptions to normal business operations or breaches of systems.
Governance Structure
IT Director’s Role
• The IT Director leads the cybersecurity risk management program with over 25 years of experience in managing cybersecurity programs, auditing, and IT operations within the US mining and manufacturing sectors. They possess a bachelor’s degree in computer information security and a master’s degree in management information systems.
Board of Directors Involvement
• The Board is actively engaged in overseeing the cybersecurity program, receiving regular updates and assessments concerning governance and compliance. Quarterly updates from the IT Director cover the status of cybersecurity controls, exposures, and overall program results. The Board insists on being informed about any material cybersecurity incidents.
This structured overview distills the essence of the cybersecurity risk management and governance processes within the Company, emphasizing the proactive approach to cybersecurity management and the involvement of leadership at all levels.
26
Table of C o ntents
ITEM 2. PROPERTIES
MINERAL PROJECTS
The Company is subject to the mining disclosure standards of Subpart 229.1300 of Regulation S-K – Disclosure by Registrants Engaged in Mining Operations (“S-K 1300”). The Company is also subject to NI 43-101. The information in Item 2, Properties, below is common to both reports and contains pertinent information required under S-K 1300 and NI 43-101.
As used in this Form 10-K, the terms “mineral resource,” “measured mineral resource,” “indicated mineral resource,” “inferred mineral resource,” “mineral reserve,” “proven mineral reserve” and “probable mineral reserve” are defined and used in accordance with S-K 1300. All determinates of mineral resources and mineral reserves have been prepared by qualified persons who are not affiliated with the Company. Under S-K 1300, mineral resources may not be classified as “mineral reserves” unless the determination has been made by a qualified person that the mineral resources can be the basis of an economically viable project. Mineral resources are not mineral reserves and do not meet the threshold for mineral reserve modifying factors, such as estimated economic viability, that would allow for conversion to mineral reserves. There is no certainty that any part of the mineral resources estimated will be converted into mineral reserves.
Except for that portion of mineral resources classified as mineral reserves, mineral resources have not demonstrated economic value. Inferred mineral resources are estimates based on limited geological evidence and sampling and have too high of a degree of uncertainty to apply relevant technical and economic factors likely to influence the prospects of economic extraction in a manner useful for evaluation of economic viability. Estimates of inferred mineral resources may not be converted to a mineral reserve. It cannot be assumed that all or any part of an inferred mineral resource will be upgraded to a higher category. A significant amount of exploration must be completed to determine whether an inferred mineral resource may be upgraded to a higher category. Therefore, you are cautioned not to assume that all or any part of an inferred mineral resource can be the basis of an economically viable project, or that it will be upgraded to a higher category.
The subsections below describe the property locations, overviews and mineral resource and mineral reserve estimates. Our material projects, as determined pursuant to S-K 1300, are the Cove Project, the Granite Creek Project, the Lone Tree Project, and the Ruby Hill Project. All of our projects are located in the State of Nevada. Further information about these properties can be found in the technical report summaries for each material project filed as exhibits to this Form 10-K as well as under the individual project descriptions below.. In addition to our material projects, we also hold the FAD Project, Tabor Project and Argenta Property. All of our projects are considered exploration stage projects because the Company has not determined that mineral reserves at any of its properties pursuant to S-K 1300. With respect to Ruby Hill, Lone Tree, and Granite Creek, the Company has started extraction activities without determining mineral reserves.
Except as otherwise stated, the scientific and technical information relating to the Cove Project contained in this Form 10-K is derived from the S-K 1300 report for the Cove Project titled “S-K1300 Initial Assessment & Technical Report Summary for the Cove Project, Lander County, Nevada” effective December 31, 2024 prepared by Practical Mining LLC., TR Raponi Consulting Ltd. and Montgomery & Associates, none of whom are affiliated with the Company. The Company has also caused to be prepared the NI 43-101 technical report for the Cove Project titled “NI 43-101 Preliminary Economic Assessment for the Cove Project, Lander County, Nevada” with an effective date of December 31, 2024] (the “43-101 Cove Report”) which was prepared by Practical Mining LLC and TR Raponi Consulting LTD.
Except as otherwise stated, the scientific and technical information relating to the Granite Creek Project contained in this Form 10-K is derived from the S-K 1300 report for the Granite Creek Complex titled “Initial Assessment of the Granite Creek Mine, Humboldt County, NV” effective December 31, 2024 prepared by Practical Mining LLC., TR Raponi Consulting Ltd. and Montgomery & Associates, none of whom are affiliated with the Company. The Company has also caused to be prepared the NI 43-101 technical report for the Granite Creek titled “Preliminary Economic Assessment NI 43-101 Technical Report, Granite Creek Mine Project, Humboldt County, Nevada, USA” with an effective date of December 31, 2024 (the “43-101 Granite Creek Report”) which was prepared by Global Resource Engineering, Ltd. and Practical Mining, LLC.
Except as otherwise stated, the scientific and technical information relating to the Lone Tree Project contained in this Form 10-K is derived from the S-K 1300 report for the Lone Tree Project titled “S-K 1300 Technical Report Summary on the Mineral Resource Estimates for the Lone Tree Deposit, Nevada” effective December 31, 2024 prepared by GeoGlobal which is not affiliated with the Company. The Company has also caused to be prepared the NI 43-101 technical report for the Lone Tree Project titled “Technical Report on the Mineral Resource Estimates for the Lone Tree Deposit, Nevada” with an effective date of December 31, 2024] (the “43-101 Lone Tree Report”) which was prepared by GeoGlobal LLC.
Except as otherwise stated, the scientific and technical information relating to the Ruby Hill Project contained in this Form 10-K is derived from the S-K 1300 report for the Ruby Hill Project titled “S-K 1300 Technical Report Summary Initial Assessment of the Ruby Hill Project, Eureka County NV” effective December 31, 2024 prepared by Forte Dynamics, Inc., Practical Mining LLC, and TR Raponi Consulting Ltd., none of whom are affiliated with the Company. The Company has also caused to be prepared the NI 43-101 technical report for the Ruby Hill Project titled “Preliminary Economic Assessment of the i-80 Gold Corp. Ruby Hill Project, Eureka County NV” with an effective date of December 31, 2024 (the “43-101 Ruby Hill Report”) which was prepared by Forte Dynamics, Inc., Practical Mining LLC, and TR Raponi Consulting Ltd.
Each S-K 1300 technical report summary has been filed as an exhibit to the Form 10-K, and is available for review on EDGAR at www.sec.gov. Copies of technical reports for the material properties prepared in accordance with NI 43-101 are available under the Company's profile on SEDAR+. All of the technical reports are available on the Company’s website at www.i80gold.com. The Technical Report Summaries should be read in conjunction with the information in this Item 2. Properties.
27
Table of C o ntents
Summary Disclosure
The following descriptions summarize selected information about the Company's four material properties (Cove, Granite Creek, Ruby Hill, and Lone Tree) as of December 31, 2024. All of the material properties are wholly owned by the Company or a wholly owned subsidiary.
Mineral Production
The Company sold 21,527 ounces of gold for the year ended December 31, 2024, 29,370 ounces of gold for the year ended December 31, 2023, and 13,031 ounces of gold for the year ended December 31, 2022. Which includes equivalent gold production from mineralized material sold during 2024, 2023 in the amounts of 52,261 and 76,143 tonnes, respectively. The Company produced 4,476 ounces of silver for the year ended December 31, 2024, 10,942 ounces of silver for the year ended December 31, 2023, and 8,027 ounces of silver for the year ended December 31, 2022.
28
Table of C o ntents
Summary of Mineral Resource Estimates as of December 31, 2024
Measured Mineral Resources Indicated Mineral Resources Measured + Indicated Mineral Resources Inferred Mineral Resources
Tonnes (kt) g/t ounces (k) Tonnes (kt) g/t ounces (k) Tonnes (kt) g/t ounces (k) Tonnes (kt) g/t ounces (k)
Gold
Nevada
Granite Creek Project
Granite Creek Underground
133 8.50 37 641 10.90 224 775 10.50 261 782 13.00 326
Granite Creek Open Pit
26,362 1.26 1,066 11,339 1.01 369 37,701 1.18 1,435 2,148 1.09 75
Ruby Hill Complex
Archimedes Underground — — — 1,791 7.60 436 1,791 7.60 436 4,188 7.30 988
Mineral Point
— — — 216,982 0.48 3,376 216,982 0.48 3,376 194,442 0.34 2,117
Archimedes Open Pit
— — — 4,320 1.96 272 4,320 1.96 272 870 1.12 31
Cove Project
Cove
— — — 1,177 8.20 310 1,177 8.20 310 4,047 8.90 1,156
Lone Tree
Lone Tree Open Pit
— — — 7,690 1.73 428 7,690 1.73 428 52,940 1.64 2,789
Total
26,495 — 1,103 243,940 0.69 5,415 270,435 0.75 6,518 259,417 0.90 7,482
Silver
Granite Creek Project
Granite Creek Underground
— — — — — — — — — — — —
Granite Creek Open Pit
— — — — — — — — — — — —
Ruby Hill Complex
Archimedes Underground — — — 1,791 1.60 92 1,791 1.60 92 4,188 2.10 286
Mineral Point — — — 216,982 15.00 104,332 216,982 15.00 104,332 194,442 14.60 91,473
Archimedes Open Pit — — — 4,320 10.60 1,490 4,320 10.60 1,490 870 8.50 250
Cove Project
Cove — — — 1,177 15.00 568 1,178 15.00 569 4,047 11.10 1,439
Lone Tree
Lone Tree Open Pit — — — — — — — — — — — —
Total — — — 224,270 12.30 106,482 224,270 12.30 106,482 203,547 11.30 93,448
See the mineral estimates set forth in the individual property descriptions for more detail regarding the resource estimates. Except as set forth in the individual property sections, mineral resources were determined in situ using a gold price of $2,175.
29
Table of C o ntents
FAD Project
Location 1.5 miles east of the town of Eureka, Nevada
Type and amount of ownership interests 100% ownership
Operator Golden Hill Mining LLC
Titles, mineral rights, leases or options and acreage
156 unpatented lode claims and 110 patented claims totaling approximately 3,627 acres
Property Stage Exploration
Key permit conditions Possess permits required for exploration
Mine types and mineralization styles Polymetallic massive sulfide
Processing plants and other facilities None
Tabor Project
Location 55 miles west of the town of Tonapah, Nevada
Type and amount of ownership interests option to earn in up to 100%
Operator Au-Reka LLC
Titles, mineral rights, leases or options and acreage 276 unpatented Claims totaling approximately 5,595 acres
Property Stage Exploration
Key permit conditions Subject to a plan of operations through the United States Forest Service
Mine types and mineralization styles low-sulfidation epithermal gold/silver
Processing plants and other facilities None
The following descriptions summarize selected information about the Company's four material properties (Cove, Granite Creek, Ruby Hill, and Lone Tree) as of December 31, 2024. All of the material properties are wholly owned by the Company or a wholly owned subsidiary.
Cove Project
Property Description and Location
The Cove Project covers 32,110 acres and is located 32 miles south of the Town of Battle Mountain, in the Fish Creek Mountains of Lander County, Nevada. It is centered approximately at 40°22’ N and 117°13’ W and lies within the McCoy Mining District. The project area contains 1,728 unpatented and nine patented mining claims owned 100% by i-80, through its wholly-owned subsidiaries Premier Gold Mines USA, Inc. and Au-Reka Gold Corp. The unpatented claims are on land administered by the Bureau of Land Management (BLM).
The Cove deposit consists of the Helen, Gap, CSD, and 2201 zones. They are located beneath the historically mined Cove open pit and extend approximately 2,000 feet northwest from the pit. The Cove deposit was mined by Echo Bay Mines Ltd. (Echo Bay) between 1987 and 2001. During this period the Cove deposit produced 2.6 million ounces of gold and 100 million ounces of silver. Gold and silver production from heap leach pads continued until 2006.The following figure shows the location of the McCoy-Cove Property.
30
Table of C o ntents
The BLM MLRS mining claim database shows all claim fees paid through September 2025. County NIH fee payments are current. Patented claims are subject to property taxes, which were current at the time of this report.
On June 14, 2012, Premier USA, through its wholly-owned subsidiary, Au-Reka, acquired a 100% interest in the Cove portion of the McCoy-Cove Property (the "Cove Deposit") from Victoria Gold Corporation ("Victoria") pursuant to an asset purchase agreement dated June 4, 2012. In the event of production from the Cove Deposit, the Corporation will make additional payments to Victoria in the aggregate amount of C$20 million.
The Corporation is responsible for all environmental liabilities related to the closure of the McCoy-Cove Property as well as final clean-up of surface drill pads and minor drill roads. All closure activities other than reclamation of three water treatment ponds, evaporation of the tailings facility and water quality testing have been temporarily put on hold pending the potential for future production out of the Cove underground.
Access to the McCoy-Cove Property area is via State Highway 305, 30 miles south from the Town of Battle Mountain, and then west approximately seven miles along the secondary paved McCoy Mine Road. Battle Mountain is off Interstate Highway 80, approximately 70 miles west of Elko, Nevada.
History
Gold was first discovered in the McCoy Mining District in 1914 by Joseph H. McCoy. Production through 1977 included approximately 10,000 ounces of gold plus minor amounts of silver, lead and copper. Production in these early years came from placers and from gold-quartz veins that occurred in northeast striking faults and in intersections of northeast and northwest striking faults. Most of the non-placer production, however, came from argillized and oxidized skarn at what became the McCoy open pit mine.
Summa Corporation ("Summa"), a Howard Hughes company, acquired most of the mining claims in the McCoy Mining District in the 1950s and 1960s. In 1977, Houston Oil and Minerals Corporation ("Houston") purchased the McCoy-Cove Property. Gold Fields Mining Corporation ("Gold Fields") leased the property in 1981 until September 1984, whereupon the property was returned to Tenneco Minerals Company ("Tenneco"), which had acquired Houston. Echo Bay Mines Ltd. ("Echo Bay") purchased the precious metal holdings of Tenneco in October 1986. Newmont took ownership of the Cove and McCoy properties in February 2003 following the merger between TVX Gold Inc., Echo Bay and Kinross Gold Corporation.
Victoria leased a portion of the property from Newmont in June 2006. In June 2012, Premier entered into an agreement to acquire the lease of the McCoy-Cove Property from Victoria and subsequently acquired a 100% interest in the land package from Newmont in September 2014.
31
Table of C o ntents
Modern exploration for copper and gold in the McCoy Mining District started in the 1960s by Bear Creek Mining Company and Pilot Exploration drilling in 1967. Summa conducted extensive exploration on the McCoy skarn deposit from 1969 to 1977. Summa also undertook regional geologic mapping of 55 square miles (including the McCoy-Cove Property area) and extensive rock chip surveys. Houston explored the property in 1980, including geologic mapping, soil geochemical surveys, ground magnetic surveys and drilling. Gold Fields conducted an extensive induced polarization program, airborne magnetic surveys, detailed rock chip sampling, as well as limited geologic mapping and drilling between 1981 and 1984.
In 1985, Tenneco undertook drilling, metallurgical testing, and engineering and feasibility studies and began mining the McCoy deposit in February 1986. Tenneco also began systematic district-wide exploration in 1985 with the collection of 500 stream sediment samples from an eight-square mile area around the McCoy deposit. Evidence of what would become the Cove deposit was found in early 1986, when seven samples yielded gold values of between 15 parts per billion ("ppb") and 72 ppb with associated anomalous silver, arsenic, mercury, antimony and thallium. Subsequent detailed geologic mapping identified jasperoid, manganiferous limestone and outcrops of altered felsic dikes in the area of the anomalous samples. Surface rock chip samples of these rocks all contained significant gold mineralization. Tenneco's detailed mapping covered a large area that included both McCoy and Cove and extended to the north, west and south. In September and October 1986, a total of 147 soil samples were collected from the B and C soil horizons over the altered area at Cove on a 100-foot by 200-foot grid.
Echo Bay continued the systematic district exploration program initiated by Tenneco that included stream sediment, soil and rock chip sampling, plus geologic mapping, exploration trenching using a bulldozer and drilling. Later soil sampling at Cove defined a gold anomaly measuring 2,800 feet long by 100 feet to 600 feet wide, with gold values ranging from 100 ppb to 2,600 ppb. Bulldozer trenching exposed ore grade rock over the entire length of this soil anomaly. Echo Bay discovered the Cove deposit with drilling in January 1987. By March 1987, Echo Bay had drilled 42 shallow exploration holes and development drilling began in late March. Echo Bay drilled 458 reverse circulation ("RC") holes totaling 315,000 feet from January 1987 through June 1988, and 51 core holes totaling approximately 65,800 feet through 1989.
In 1999, Echo Bay drilled eight surface drill holes totaling 6,700 feet on the Cove South Deep ("CSD") deposit. This drilling, combined with bulk sampling from an underground exploration drift, confirmed the presence of a high-grade zone (0.25 troy ounces per short ton ("opt") Au) that could be mined by underground methods. Detailed underground drilling of this deposit continued during 2000 as mining proceeded.
Newmont drilled 15 vertical holes on the property from 2004 to 2005. Victoria began exploring the property in 2006, resulting in the discovery of the Carlin-style Helen zone immediately northwest of the Cove pit.
The earliest known significant mining was in the early 1930s at the Gold Dome mine, previously located on the northeast side of the present McCoy open pit mine. This operation included a 250-foot shaft and five levels of workings at 50-foot intervals producing gold grades ranging between 0.25 opt and 2.0 opt.
Tenneco commenced mining at the McCoy open pit mine in 1986 and Echo Bay began open pit mining of the Cove deposit in 1988, accompanied by three phases of underground mining. Underground access at the Cove mine was via a decline with rubber-tire machines using a room and pillar mining method. From 1988 to 1993, underground mining was used to recover high grade ore ahead of the pit. In 1999, additional underground mining at CSD recovered approximately 300,000 tons of mineralization beyond the ultimate pit limits. The mineralization was relatively flat-lying from 10 feet to 80 feet thick. Longhole stoping and drift and fill methods were used with cemented rock fill. ("CRF").
Conventional open pit mining methods were utilized at the Cove open pit, with drilling and blasting of ore on 20 foot benches (double benched to 40 feet) and waste on 30 foot benches (double benched to 60 feet). The lower sulfide orebody was reached in late 1991.
Processing of low grade, run-of-mine heap leach ores from Cove began in 1992 and mining of high grade ores was completed in 1995. Open pit mining ended at Cove in October 2000.
In 1996, the mill facility was expanded from 7,500 stpd to 10,000 stpd, with milling of stockpiled ores from the Cove open pit beginning in the second half of 1997. Mill recoveries declined during the remaining life of the mine as lower grade, more refractory ores were processed. By October 2000, the mill was processing 11,369 stpd. As of that date, the gold grade was 0.055 opt Au and plant gold recovery was 51.8%; silver grade was 4.00 opt Ag and plant silver recovery was 71.5%.
The mill contained gravity, flotation and cyanide leach circuits. Through 2006, a total of 3.41 million ounces of gold and 110.2 million ounces of silver were produced from Cove and McCoy, with the vast majority of both metals reportedly coming from the Cove deposit. Approximately 2.6 million ounces of gold were produced from the Cove open pit.
Geology and Mineral Resource
Regional Geology
The McCoy-Cove Property is located in the central Nevada portion of the Basin and Range Province, which underwent regional extension during the Tertiary Period, creating the present pattern of alternating largely fault bounded ranges separated by alluvial filled valleys. Prior to this extension, central Nevada had been the site of numerous tectonic events, including at least two periods of regional compression. The property lies west of the central part of the Battle Mountain-Eureka Trend.
32
Table of C o ntents
During the Paleozoic, central Nevada was the site of the generally north-northeast trending continental margin of North America, along which pre-orogenic rocks of Cambrian to Early Mississippian age were deposited. A carbonate platform sequence was deposited to the east along the continental margin, with siliceous and volcanic rocks deposited to the west. In Late Devonian to Early Mississippian time during the Antler Orogeny, rocks of the western assemblage moved eastward along the Roberts Mountains thrust, perhaps as much as 90 miles over the eastern assemblage carbonate rocks. A post-orogenic assemblage of coarse clastic sedimentary rocks of Mississippian to Permian age was shed eastward from an emerging highland to the west, overlapping the two earlier facies. Mesozoic rocks, primarily shallow water siliciclastic and carbonate units with minor volcanic and volcaniclastic rocks, are found in this part of Nevada.
Local Geology
The stratigraphy of the McCoy Mining District is well documented. The major lithological units of the McCoy-Cove Property are listed below in order of oldest to youngest:
1. Havallah Formation;
2. Koipato Formation;
3. Dixie Valley Formation;
4. Favret Formation;
5. Augusta Mountain Formation – Home Station Member;
6. Augusta Mountain Formation – Panther Canyon Member;
7. Augusta Mountain Formation – Smelser Pass Member;
8. Tuff of Cove Mine;
9. Intrusive Igneous Rocks;
10. Quaternary Alluvium.
Structural Geology
Deposits on the McCoy-Cove Property are related to specific structural features.
1. Major Defining Structures : The major structure and control on fluid movement is the broad northwest-striking, gently southeast-plunging Cove anticline interpreted as a fault propagation fold over a deep northwest striking reverse fault identified in deep drill holes under the Cove pit. While the reverse fault can be identified in the 2201 zone, its presence at the Gap and Helen Zones is uncertain due to limited drilling in areas that would confirm its continuation. A northwest striking vertical dike called the Northwester Dike (classified as “type 2 and 3”) extends from the Bay fault through the Gap and into the Helen. It appears to prohibit the flow of mineralizing fluids to the southwest in areas between the major northeast striking faults. Though there is no discernible separation on the dike, it may be related to a near vertical to steeply southwest dipping fault mapped in the pit by Echo Bay geologists called the Northwester fault. The other major structures for fluid movement and mineralization are a number of northeast striking normal faults (Cay, Blasthole, Bay, 110, and Gold Dome). The northeast striking faults commonly host altered granodioritic dikes, the largest of which is the Gold Dome. The north-south striking Lighthouse fault also contains altered granodioritic dikes and is believed to have had both pre- and post-mineralization movement.
2. Mineralization Controls: Carlin-style mineralization appears to be controlled by a combination of the axis of the Cove anticline, normal faults that cut the anticline, mafic sills and dikes throughout the property and contacts between different sedimentary units. Generally, the highest grades are found where the rhythmically bedded unit of the Favret limestone is cut by mafic dikes and sills along the axis of the anticline, and especially where this area is cut by apparent small-scale, unmapped faults. The northeast striking faults commonly contain quartz-sericite-pyrite and argillic altered granodioritic dikes that carry low to anomalous values of silver and gold. In the 2201 zone, structural controls are poorly defined, however, vein-bearing gold occurrences do trend northwest and may be related to structures formed in the hanging wall of the deep-seated reverse fault or to the near vertical to steeply southwest dipping Northwester fault.
3. Post-Mineral Faulting: There is at least one instance of significant post-mineral faulting. The Striper splay is believed to be a splay off of the Lighthouse fault which is known to have both pre- and post- mineralization movement. It dips steeply northeast and strikes approximately 320° along the northeast limb of the Cove anticline causing significant post-mineral normal displacement before terminating against the Bay/110 fault complex. The overlying volcanics are not significantly faulted, as defined by holes NW-1, NW-2 & 2A and NW-3. It is likely there is minor post-mineral movement on all northeast and north striking faults as a result of Basin and Range extension beginning during the Miocene and continuing through present day.
The below sets out the four distinct mineralization types known on the property, and a brief description of each:
1. Carlin-Style (Au-Ag): The gold in Carlin-style deposits is usually sub-micron in size and generally occurs in pyrite and arsenical pyrite. An envelope characterized by decalcification, silicification and argillization accompanied by anomalous amounts of silver, arsenic, antimony, thallium and mercury often accompanies mineralization. The Carlin-style mineralization at Cove is relatively rich in silver compared to similar deposits elsewhere in northern Nevada. When Carlin-style mineralization occurs in the silty limestones and packstones of the Favret Formation and Home Station dolomite, decarbonatization replaces fine-grained calcite and/or dolomite with quartz and forms very fine-grained illite and pyrite. Diagenetic pyrite was probably present in the Helen zone before Carlin-style mineralization based on the abundant presence of subhedral pyrite grains that bear no arsenian rims. The arsenic-bearing pyrite precipitated as a product of Carlin-style mineralization in the Helen are fine-grained (~10 microns) patchy, anhedral "fuzzy" pyrite generally smaller than the diagenetic pyrite grains. In the CSD zone, most pyrite grains in high-grade samples are larger (~20 microns), display spectacular, sharp geochemical zonations, and are rimmed with arsenian pyrite or stoichiometric arsenopyrite. The few samples studied from the Gap under the scanning electron microscope ("SEM") suggest it shares more in common with the CSD zone, though its silver content is lower overall.
33
Table of C o ntents
2. Polymetallic Sheeted Veins (Au-Ag±Pb-Zn) : The polymetallic veins in the 2201 zone are enveloped by a zone of illitic of the conglomerate matrix detected by sodium cobaltinitride staining and confirmed by SEM analysis. Minor silicification is relatively common, especially in the conglomerate, however, it is not present everywhere and not always directly associated with mineralization.
3. Carbonate Replacement (Ag-Pb-Zn±Au): Carbonate replacement mineralization occurs as local pods of manto-style mineralization characterized by massive sulfide (pyrite-sphalerite-galena) replacing basal limestone at the Dixie Valley/Favret contact. Mineralization is discontinuous and generally defined by high-grade Ag-Zn-Pb±Au.
4. Skarn (Au-Ag±-Cu) : Skarn mineralization at the historic McCoy pit occurs as both endoskarn and exoskarn mineralization characterized by a predominantly garnet-diopside-magnetite mineral assemblage.
The Carlin-style mineralization across the deposit appears to represent an evolving system from a "primary" end-member represented by the CSD zone with higher silver/gold, coarser-grained pyrite and a close proximal relationship to Ag-Pb-Zn-(Au) mineralization to the "evolved" end-member represented by the Helen zone with lower silver/gold, very fine-grained pyrite and weak spatial association with any other styles of mineralization. The Gap can be considered a "transition" zone between the two end-members until more petrography is conducted on the recently discovered Gap to test this hypothesis. Helen zone geochemistry is distinct from the CSD zone in many ways. For samples greater than 1 parts per million ("ppm") Au, less than or equal to 100 ppm Ag and confirmed to be Carlin-style mineralization by core photo review, the Helen zone has an average silver/gold ratio of approximately 0.85 whereas the CSD zone is 2.25. Gold in both the Helen and CSD zones correlates with arsenic, antimony and mercury, however, gold correlates moderately (0.52 correlation coefficient) with silver in the CSD zone but more weakly (0.3652 correlation coefficient) in the Helen zone. Like the geochemistry, the mineralization in the Helen and CSD is also distinct. The arsenic-bearing (assumed to also be gold-bearing) pyrite in the Helen are generally finer-grained, less euhedral and more poorly zoned than the arsenic-bearing CSD zone pyrite. The complicated nature of the mineralized pyrite at the CSD zone is suggestive of a more complex and long-lasting mineralizing event in comparison to the seemingly simple Helen mineralization. In the 2201 zone, gold correlates with silver, arsenic, copper, iron, lead, antimony and zinc – a distinctly different grouping of elements from the CSD, Gap and Helen zones.
Deposit Types
The Cove-Helen deposit consists of two mineralization styles, Carlin-style and polymetallic sheeted veins. The Carlin-style mineralization within the Helen, Gap and CSD zones comprises approximately 85% of the existing resource with high gold and silver grades occurring as both stratabound and structurally controlled mineralization at the intersection of the Cove anticline and favourable lithologic beds, structures, intrusive dikes and sills.
The polymetallic 2201 zone is a separate deposit from the shallower Carlin-style mineralization and is believed to be a structurally controlled sheeted vein system. Veining is oriented northwest, with vein geometry being controlled by a deeper northwest striking reverse fault. Due to its depth, the 2201 zone has seen limited drilling since its original discovery in late 2013, however, additional infill and step-out drilling in the future will help to better define deposit potential and mineralization controls.
Drilling
All drilling since January 2023 has been conducted from recently mined underground drill platforms for resource conversion of the Helen and Gap zones. The drill project is ongoing and is not included in the resource. The resource will be updated in 2025 to include the resource conversion holes now that the drill project is complete. The project included about 125 drillholes totaling 140,000 feet of drilling.
The McCoy-Cove drill hole database is large, containing many holes drilled across the large land package. For the current resource estimate, the drill data was filtered to contain only holes within and near the Helen, CSD, CSD-Gap, Gap Hybrid and 2201 zones. A total of 1,397 holes totaling 1,127,481 feet of drilling were included in the current estimate. Holes were drilled using both core and RC methods. Premier drilled 123 of the holes and the remainder were drilled by Victoria, Newmont and Echo Bay.
Recent drill projects have predominantly been completed by coring, while RC drilling was used extensively to delineate historic pit and underground resources. Accordingly, the recently discovered Helen, 2201 and CSD-Gap zones were modeled almost exclusively using core holes, while the pit-proximal CSD zone and low-grade lenses were modeled using a mix of RC drilling and core. The authors of the McCoy-Cove Report consider both core and RC data to be reliable.
Current Drilling Methodology
Drill Hole Placement
Initial surface collar locations are based on drill plan targeting – collar locations are marked in the field by a geologist using a hand held global positioning system (GPS) device loaded with coordinates from drill plans in either Gemcom or MapInfo project files. A wooden collar picket is marked with both the azimuth and dip designations. The azimuth is also painted in a line on the ground directly in-line with the collar picket allowing the drill rig to line up on the correct bearing from the collar location. The geologist re-confirms both azimuth and dip once the rig is lined up on the drill pad using a Brunton compass. After drilling is complete, holes are abandoned and marked with a metal tag cemented into the collar. A final collar location survey is performed by a professional contract surveyor. A UTM NAD83 Zone 11N coordinate system is used.
34
Table of C o ntents
RC Drilling Procedures
Holes are drilled using industry standard RC drilling equipment. Samples are collected on five-foot intervals using a cyclone sample collector. The sample interval is written on the sample bag using permanent marker. Drilling advances are paused at the end of each sample run to ensure the complete sample has been collected and avoid contamination of the following sample. The optimum sample size collected is approximately one quarter to one half of a 17-inch by 22-inch sample bag (about 4.5 to 9 kilograms or 10 to 20 pounds).
Core Drilling
Core holes are drilled using HQ (about 3-inch diameter) core. Holes may be reduced to NQ (about 2.4-inch diameter) to permit continuation of a hole in difficult drill conditions. Premier has used both standard and triple-tube tooling. Triple-tube is preferable in broken ground because it facilitates placement of core into the core box, allowing the sample to remain more intact. Drilled material is placed in wax-impregnated core boxes. Drillers label the end of the core run to the nearest half of a foot and measure and record the recovery in feet on wooden blocks, which are placed in the core box at the end of each drilled interval. Core boxes are labeled with company name, property, bore hole identifying number (BHID), box number and drilled interval. The authors of the McCoy-Cove Report believe the drilling procedures are adequate.
Sampling Methodology
Boxed core is transported by i-80 personnel from Cove to the Lone Tree core storage yard adjacent to the logging facility. When a geologist is ready to log the hole, a geotechnician moves the core inside the logging facility, places it on logging tables and washes off any drill mud. A geologist records detailed geology data directly into acQuire software. Data fields include geotechnical, sampling intervals, lithology, alteration, oxide, sulfide, structure, point data, veins and density.
Sample intervals are chosen by the geologist based on detailed geologic observations. Sample intervals may range from ten feet to a minimum of one foot, with a maximum of five feet in areas of interest. The geologist marks sample intervals on the core and staples a sample ticket double-stub in the core box at the end of the sample interval. Sample IDs are automatically generated in acQuire, with a prefix that designates the project. Sample tickets are then printed out with sample IDs. Logged core boxes are photographed with a high-resolution camera while wet and then stacked on a wooden pallet prior to being moved to the sample cutting area.
The geologist prints a cut-sheet from acQuire software with the sample numbers and intervals and gives the cut-sheet to the geotechnician. The geotechnician places a sample bag in a five-gallon plastic bucket on the floor next to the core saw. The core is sawed in half, the left piece is placed into the sample bag, and the right piece goes back into the core box. In the case of broken core, the sampler does their best to divide the sample equally. Once the interval is split, the geotechnician takes one part of the double sample stub from the core box and staples it to the sample bag. The remaining sample stub remains in the core box for future reference. The geotechnician then ties the sample bag shut and marks the sample off the cut-sheet. The tied sample bags are stored in a sample bin for the lab driver to pick up.
The geologist assigns QAQC samples while logging targeting 5% blanks, 5% standards, and 2.5% field duplicates. The geologist attempts to place blanks after high-grade samples where available. The geologist also attempts to place standards proximal to mineralized zones with standard gold values approximately that of the mineralized zone gold values. However, since the gold value of the rock cannot be known prior to assay, the standard value may not always compare well to the mineralized zone. The geotechnician places the blanks and duplicates with their sample tags in the sample bin with the regular core samples. The standards are placed in a small sample bag with the corresponding sample ID. The standards corresponding to a single hole are then placed in a larger bag prior to shipment to the assay lab.
The geologist completes a sample submittal sheet. The assay lab driver picks up the samples from the Lone Tree core shed and is given a chain of custody form with sample ID’s for the shipment. An electronic copy of the sample submittal form is emailed to the assay lab.
Drill hole status, such as splitting, sample dispatch date, batch ID, and dates of both preliminary and final results, are tracked in acQuire as well as on ALS Mineral’s online portal..
Core Recovery
The average recovery for core drilled by Premier is about 90%, which is consistent with historic recovery measurements. Recovery is calculated by measuring the length of material between blocks in the core box and dividing that length by the drilled interval length. It is difficult to measure length accurately for a broken interval of core, and the tendency is to over-estimate recovery in broken intervals. This is a typical problem for drilling in northern Nevada, and the authors believe that 90% is a reasonable estimate of recovery. Although any sample with less than 100% recovery is sub-optimal, the authors believe the samples provide a reasonable representation of the rock package.
Surveying
Sampling and Data Verification
Exploration samples are submitted to ALS Minerals, an ISO/IEC 17025:2017 certified and accredited laboratory in Sparks, Nevada, for sample preparation and analysis. American Assay Laboratory in Sparks, Nevada is used for umpire check sample analysis. The drill and geochemical samples are collected in accordance with accepted industry standards. Data verification was completed as part of the generation of the mineral resources estimate. All data collected, including but not limited to collar location, downhole survey, geological, and analytical data, are subject to i-80 Gold’s Quality Assurance, Quality Control (“QAQC”) procedures. Property Grid and Drill Hole Collars
35
Table of C o ntents
Mineral Processing and Metallurgical Testing
Testing programs completed demonstrate that samples from Gap and Helen zones are refractory to standard cyanide leaching. The samples showed significant levels of preg robbing from naturally occurring carbonaceous matter and refractory gold in sulfide minerals. Some samples showed better amenability to roasting while others showed better amenability to pressure oxidation. Processing of Cove production will require a facility with refractory treatment either in a new process plant or through an existing operation that can provide third party processing. Head assaying for both the Helen Zone and Gap indicated that the gold in the two resources will likely be finely disseminated and not amenable to gravity gold recovery.
Mineral Resource Estimates
The mineral resource estimate presented herein has been prepared following the guidelines of S-K 1300 as well as NI 43-101 and Form 43-101F1 and in conformity with generally accepted "CIM Estimation of Mineral Resources and Mineral Reserves Best Practice Guidelines 2019". Mineral resources have been classified in accordance with the definitions set forth in S-K 1300 and "CIM Definition Standards for Mineral Resources and Mineral Reserves" adopted by the Canadian Institute of Mining, Metallurgy and Petroleum (CIM) Council on May 10, 2014.
The Cove area includes four distinct mineralized zones: CSD, GAP, Helen, and 2201. The mineralized zones follow a southeast to northwest trend beginning below the historic Cove pit and extending over 6,000 feet to the northwest.
The cutoff grade for mineral resources varies by process type and estimated recovery. It is anticipated that total gold production will be limited by mine capacity and cut off grades will range from a low of 0.112 Au opt to a high of 0.155 Au opt. Details of Cutoff grade estimation are given in section 18.4. of the Cove Technical Report.
Tons
(000)
Tonnes
(000) Au
(opt) Au
g/t Ag
(opt) Ag
(g/t) Au ozs
(000) Ag ozs
(000)
Indicated Mineral Resource
Helen 743 674 0.271 9.3 0.074 2.6 201 55
Gap 280 254 0.219 7.5 0.239 8.9 61 72
CSD 275 249 0.175 6 1.603 55 48 441
Total Indicated 1,298 1,177 0.239 8.2 0.438 15 310 568
Inferred Mineral Resource
Helen 1,743 1,582 0.245 8.4 0.083 2.9 427 146
Gap 2,229 2,022 0.244 8.4 0.262 9 543 585
CSD 319 290 0.173 5.9 1.685 57.8 55 538
2201 168 153 0.78 26.7 1.016 34.8 131 171
Total Inferred 4,459 4,047 0.259 8.9 0.323 11.1 1,156 1,439
Notes:
1. Mineral resources have been estimated at a gold price of $2,175 per troy ounce and a silver price of 27.25 per troy ounce;
2. Mineral resources have been estimated using gold metallurgical recoveries ranging from 73.2% to 93.3% for roasting and 78.5% to 95.1 % for pressure oxidation;
3. Roaster cutoff grades range from 4.15 to 5.29 Au g/t (0.121 to 0.154 opt) and pressure oxidation cutoff grades range from 3.83 to 4.64 Au g/t (0.112 to 0.135 opt);
4. The effective date of the mineral resource estimate is December 31, 2024;
5. Mineral resources, which are not mineral reserves, do not have demonstrated economic viability. The estimate of mineral resources may be materially affected by environmental, permitting, legal, title, socio-political, marketing, or other relevant factors;
6. An inferred mineral resource is that part of a mineral resource for which quantity and grade or quality are estimated on the basis of limited geological evidence and sampling. Geological evidence is sufficient to imply but not verify geological and grade or quality continuity. An inferred mineral resource has a lower level of confidence than that applying to an indicated mineral resource and must not be converted to a mineral reserve. It is reasonably expected that the majority of inferred mineral resources could be upgraded to indicated mineral resources with continued exploration; and
7. The reference point for mineral resources is in situ.
Grade Estimation and Resource Classification
The gold and silver variables in the block model were estimated using inverse distance cubed (ID3) and nearest neighbor methods. The estimations were completed with one pass.
Anisotropic search parameters were set to the average orientation of each zone. Average orientation was determined by loading the modeled 3 g/t lenses by zone in Vulcan and visually estimating average dip and dip direction. Distances were selected based on the drill spacing of samples intercepting the lenses and on the general orientation and shape of the interpreted solids. Blocks inside of the modelled 3 g/t lenses were estimated using only composites flagged with the corresponding lens code. Blocks outside of the 3 g/t lenses were estimated using composites with the corresponding low-grade flag. Blocks lying outside the low-grade halo were not estimated. The estimation search parameters are listed below and discusses in Section 11.8 of the Cove Technical Report.
36
Table of C o ntents
Estimation Parameters
Zone Mineral Lens Code Bearing Plunge Dip Major Search Axis (ft) Semi-major Search Axis (ft) Minor Search Axis (ft) Min Samp Max Samp
CSD_GAP
220X
315 4.8 10.3 300 300 100 1 3
GAP Hybrid
500X
315 5.0 0.0 300 300 100 1 3
CSD
110X
315 6.3 7.1 300 300 100 1 3
Upper Helen
310X
315 10.7 7.0 300 300 100 1 3
Upper Helen Wedge
330X
315 6.2 -7.4 300 300 100 1 3
Lower Helen
320X
315 0.0 0.0 300 300 100 1 3
Lower Helen Wedge
340X
315 -1.5 0.0 300 300 100 1 3
2201 high angle vein 1
1301 342 0.0 73.6 300 300 300 1 3
2201 high angle vein 2
1302 342 0.0 73.6 300 300 300 1 3
2201 high angle vein 3
1303 322 0.0 73.6 300 300 300 1 3
2201 low angle
140X
315 7.6 15.7 300 300 100 1 3
Low_CSD_GAP and GAP Hybrid
22000 315 4.8 10.3 300 300 100 1 3
Low_CSD
11000 315 6.3 7.1 300 300 100 1 3
Low_Upper Helen
31000 315 10.7 7.0 300 300 100 1 3
Low_Upper Helen Wedge
33000 315 6.2 -7.4 300 300 100 1 3
Low_Lower Helen
32000 315 0.0 0.0 300 300 100 1 3
Low_Lower Helen Wedge
34000 315 -1.5 0.0 300 300 100 1 3
Low_NE of CR fault
10000 315 0.0 0.0 300 300 100 1 3
Low_Other_1100X
1100X
315 6.3 7.1 300 300 100 1 3
Low_Other_2200X
2200X
315 4.8 10.3 300 300 100 1 3
Low_Other_3300X
3300X
315 6.2 -7.4 300 300 100 1 3
Low_Other_3400X
3400X
315 -1.5 0.0 300 300 100 1 3
A script was run on the estimated block model to populate the classification variable. The classification categories are indicated, inferred and none. Classification was determined based on three block model variables: au_dist, au_ndh and au_nn_dist. These three variables represent, respectively, the average distance to the composites used to estimate the grade of the block, the number of drill holes contributing to the grade of the block, and the distance to the nearest composite. The default value was defined as ‘none’, which was over-written by indicated or inferred where the required conditions were satisfied. The conditions of the classification script are listed in the chart below.
Class Script Condition au_dist (ft) au_ndh au_nn_dist (ft)
Indicated if <100 at least 2 50 or less
Inferred elseif <=300 at least 2
None default
Significant parameters used in the gold and silver estimations included:
1. Only composites with a value of greater than or equal to zero were used;
2. A minimum of one and maximum of three composites were used;
3. Only one composite per drill hole was allowed;
4. Composites were selected using anisotropic distances oriented to the local dip and dip direction of the zone;
5. Only composites within a lens were used to estimate blocks within the lens;
6. Grades were capped using a top cut method; and
7. Gold and silver for blocks outside modelled 3 g/t and low-grade shells were not estimated.
Processing and Recovery Operations
Mineralization from Cove operation which is amenable to roasting will be processed via dry grind, roasting followed by carbon in leach (CIL) at a third-party processing facility. Up to 750 tons per day of Cove production will be processed at this facility.
Beginning 2028, amenable production will also be processed through the Lone Tree pressure oxidation facility. Operating conditions will be determined. Production will likely be blended with feed from other i-80 operations.
i-80 Gold plans to process single refractory ore from their Nevada mines at their Lone Tree Mill in a hub and spoke arrangement.
The Lone Tree Mine is located immediately adjacent to I-80, approximately 12 miles west of Battle Mountain, 50 miles east of Winnemucca, and 120 miles west of Elko. Mining commenced at Lone Tree in April 1991 with the first gold pour in August of 1991. In 1993, a POX circuit was added to the facility, which included a SAG / ball mill circuit, followed by a thickening circuit, the POX process for refractory gold ores, and finally CIL, carbon stripping, and refining.
37
Table of C o ntents
In 1997, a 4,500 tpd flotation plant was constructed to make concentrate to supplement the feed to the POX circuit, as well as to ship excess concentrate to Newmont’s Twin Creeks POX plant or to its Carlin roaster. The Lone Tree processing facilities were shut down at the end of 2007. Since that time, the mills have been rotated on a regular basis to lubricate the bearings. In general, the facility is still in place with most of the equipment sitting idle.
i-80 Gold Corp’s objective is to refurbish and restart the POX circuit and associated unit operations, including the existing oxygen plant, as it was operating before the shut-down, while meeting all new regulatory requirements. The flotation circuit is not being considered for restart. The POX circuit will have capability to operate under either acidic or basic conditions.
In order to restart the process plant, new environmental regulations in relation to allowable mercury emissions must be met. In February 2011, the NDEP and the EPA brought about new standards to limit mercury emissions to 127 lb of mercury for every million tons of ore processed. In order to meet this requirement, the Lone Tree facility will require several environmental upgrades prior to restart.
I nfrastructure, Permitting and Compliance Activities
Access to the mineralized zones is through a portal located just north of the Cove Pit. Primary development totals 23,048 feet with gradients up to +/- 15%. Ventilation and secondary egress will be gained through a ventilation intake portal in the southwest pit wall and an exhaust raise equipped with a personal hoist for evacuation.
Drift and fill mining with mining heights of fifteen feet will be the primary method for extraction of the Helen and Gap mineral resource. Where the mineralized lenses thicken, breasting the sill or back can recover additional mineralization. Waste rock from development and waste reclaimed from historic dumps will be used for Cemented Rock Fill (CRF) or unconsolidated (GOB) fill as appropriate to achieve high levels of extraction. Development and production mining will be performed by a qualified mining contractor thus reducing the capital requirements for the Project.
A trucking contractor will transport mineralization mined over local, state, and federal roads for processing at a third party roaster or at i-80’s Lone Tree pressure oxidation (POX) facility.
Dewatering will be accomplished using 15 surface wells and a pit lake barge producing up to 43,000 gallons per minute (gpm) Dewatering water will be piped to several Rapid Infiltration Basins (RIBs) constructed at the northern project boundary. The RIB locations have been selected to prevent recharge into the Cove hydrogeologic system. During the summer irrigation season water will be provided to local ranchers for irrigation of alfalfa crops.
Long term electrical power demands up to 11.5 MW will be supplied by NV Energy via an existing 120kV transmission line which connects the Project site to NV Energy’s Bannock substation. A new substation and 13.8kV distribution system will be constructed at Cove.
Power for initial mine development and underground delineation drilling will be provided from an existing 24.9kV distribution line that also terminates on the property. A substation for the 24.9kV line and a distribution line to the portal site was constructed in 2019. Power will be stepped down from the 120kV substation and use the same distribution line.
Baseline environmental studies have been undertaken to facilitate the National Environmental Protection Act (NEPA) administered by federal land management agencies. This, along with dewatering, constitutes the critical path to production.
All of the historical dewatering infrastructure has been removed except the water monitoring wells and piezometers. i-80 will be required to construct the following:
• Dewatering wells with production string;
• Pit lake dewatering barge;
• Electrical distribution lines and transformers to the dewatering wells and pit lake barge;
• Collection pipelines to each well and pit lake barge’
• Rapid Infiltration Basins, and;
• Pipeline from the collection piping system to the RIBs.
Mine Facilities
The below figure shows the proposed location of mine facilities. The laydown area will contain the mine office, maintenance shop, equipment wash down bay, fuel and oil storage, employee dry facilities and warehouse.
38
Table of C o ntents
Backfill
Backfill material for unconsolidated waste fill can be obtained from any suitable source, such as development waste, open pit waste dumps or leach pads. Backfill material for CRF will need to meet specifications designed to achieve minimum uniaxial compressive strength specifications. This specification is designed to provide the pillar strength needed to maintain stability of adjacent underground excavations and may require screening and/or crushing. CRF material will be mixed at a backfill plant located near the portal and transported underground using the same truck fleet used to remove mineralized material and waste from the mine.
Impact
Au-Reka is the owner and operator of the Cove Project and is responsible for all permitting requirements associated with the site including ensuring that mineral exploration activities are conducted in compliance with all applicable environmental protection legislation. The Cove Project is primarily located on public lands administered by the Bureau of Land Management (BLM) and is subject to both Federal and State permitting requirements. Au-Reka is unaware of any existing environmental issues or compliance problems that have the potential to impede production at the Project. Au-Reka is working closely with both State and Federal regulators to ensure that the permitting and compliance strategies are acceptable and will not cause delays in production or mine development. At this time, there are no community or social impact issues regarding work being completed at the Project. Au-Reka continues to engage with the surrounding community and other external stakeholders.
The Cove Project site is located within a previously mined area and most activities are currently being conducted or are planned on existing previously disturbed or mined areas, thereby limiting the potential environmental impacts to the site. All necessary studies and permits are in place to support the permitted exploration and test mining activities at the site.
The underground exploration decline was advanced in 2022-2023 followed by infill drilling of the ore body that continued in 2025.
Au-Reka is currently in the process of advancing the full-scale underground mining phase of the Project and, during 2023-2024, baseline studies were conducted to support the federal permitting action which is expected to be an Environmental Impact Statement (EIS) through the BLM. In addition, an associated POO Amendment will also be completed and submitted to address the Project specifics for full-scale underground mining. Nevada Division of Environmental Protection (NDEP) permits will also be secured as the Project permitting progresses.
McCoy-Cove Property Existing Permits
Permit Name Agency Permit Number
Plan of Operations - Cove Helen UG BLM NVN-088795
Plan of Operations - McCoy Cove Mine BLM NVN-067086
Plan of Operations - McCoy Cove Exploration BLM NVN-067716
Mine Reclamation Permit - Cove Helen UG NDEP-BMRR 342
Mine Reclamation Permit - McCoy Cove Mine NDEP-BMRR 147
Mine Reclamation Permit - McCoy Cove Exploration NDEP-BMRR 62
Surface Area Disturbance Permit - Cove Helen UG NDEP-BAPC AP1041-2192.03
Surface Area Disturbance Permit - McCoy Cove Exploration NDEP-BAPC AP1041-3762
Water Pollution Control Permit - Cove Helen UG NDEP-BMRR NEV2010102
39
Table of C o ntents
Water Pollution Control Permit - Cove Helen RIBs NDEP-BMRR NEV2010107
Water Pollution Control Permit - McCoy Cove Mine NDEP-BMRR NEV0088009
Mining Stormwater General Permit NDEP-BWPC NVR300000: MSW-678
Onsite Sewage Disposal System General Permit NDEP-BWPC GNEVOSDS09L0112
Industrial Artificial Pond Permit NDOW S400418
Dam Safety Permit Nevada State Engineer/NDWR J-495
Class III Waivered Landfill NDEP-BSMM SW335
Closure and Reclamation Requirements
Reclamation bonding requirements during the pre-construction phase of the project are $166k per year and increase to $826k per year during construction and operation of the mine. Regulatory bonding requirements will be satisfied by the purchase of surety for an annual cost of 2% per year. Estimated reclamation costs net of salvage total $22.9M. Post closure monitoring is forecast to continue for 5 years following final reclamation at a cost of $250k per annum. Closure and reclamation costs on a per unit basis total $42.30 per gold ounce.
Economic Analysis
Royalties include both the 1½ % Newmont NSR and the 2% Summa Corporation NSR. The Summa royalty applies only to a portion of the mine production.
Federal income taxes of 21% apply to taxable income after appropriate deductions for depreciation and depletion. The gold percentage depletion rate is 15%. Nevada’s commerce tax is 0.051% on all revenue above $4M per annum. The excise tax is 0.75% on all revenue above $20M and less than $150M and 1.1% on revenues over $150M.
Capital spending over the life of the project is subdivided into three categories. Pre-development spending of $17.3M encompasses definition drilling, baseline data collection, engineering, hydrogeologic investigations, metallurgical testing and permitting. Construction capital is required for Helen and Gap dewatering, infrastructure and mine development and is projected at $157.4 M over a two-year period commencing in 2028. Sustaining capital includes mine development and facilities. Sustaining capital totals $49.1M commencing in 2030.
Gold recovery will total 740,000 ounces over the eight-year mine production life. Material mined for processing averages 0.305 Au opt. Full production is reached after two years of ramp up in 2031 and averages 1,190 tpd from 2031 through 2036.
The Helen and Gap zones contain 70% and 89% inferred mineral resources respectively. The results without inferred are the result of a gross factorization of the production stream. There has been no adjustment to capital development, dewatering capital or mine facilities capital. Furthermore, there has not been any recalculation of productivities or operating costs due to the lower production rates.
Financial Statistics
With Inferred Without Inferred
Gold price (US$/oz) $2,175
Silver price (US$/oz) $27.25
Mine life (years) 8
Average mineralized mining rate (tons/day) 1,010 200
Average mineralized mining rate (tonnes/day)
916 181
Average grade (oz/t Au) 0.305 0.313
Average grade (g/tonne Au)
10.5 10.7
Average gold recovery (roaster %) 79% 79%
Average gold recovery (autoclave %) 86% 86%
Average annual gold production (koz) 92 19
Total recovered gold (koz) 740 148
Pre-development capital ($M) $17.3 $17.2
Mine construction capital ($M) $157.4 $157.4
Sustaining capital (M$) $49.1 $49.1
Construction Start Date 1/1/2028
Economic Indicators Post Construction Decision 3
Cash cost (US$/oz) 1
$1,194 $1,697
All-in sustaining cost (US$/oz) 2
$1,303 $2,240
All in cost (US$/oz) 5
$1,635 $3,302
Project after-tax NPV 5% (M$)
$271 ($160)
40
Table of C o ntents
Project after-tax NPV 8% (M$)
$216 ($159)
Project after-tax IRR 30% NA
Payback Period 5.5 Years NA
Profitability Index 5% 4
2.4 0.2
Financial Statistics Including Pre-Construction Period (1/1/2025 – 12/31/2027) 6
All in cost (US$/oz) 5
$1,658 $3,419
Project after-tax NPV 5% (M$)
$256 ($178)
Project after-tax NPV 8% (M$)
$198 ($177)
Project after-tax IRR 25% NA
Payback Period 6.8 years NA
Profitability Index 5% 4
1.9 0.2
Notes:
1. Net of byproduct sales;
2. Excluding income taxes, construction capital, corporate G&A, corporate taxes and interest on debt;
3. Discounted to 2028, Construction Start;
4. Profitability index (PI), is the ratio of payoff to investment of a proposed project. It is a useful tool for ranking projects because it allows you to quantify the amount of value created per unit of investment. A profitability index of 1 indicates breakeven;
5. Excluding corporate G&A, corporate taxes and interest on debt;
6. Discounted to 2025;
7. This IA is preliminary in nature, it includes inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves, and there is no certainty that the IA will be realized. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability;
8. Inferred mineral resources constitute 70 % of the Helen zone and 89% of the Gap zone. The “Without Inferred” statistics presented are a gross factorization of the mine plan without any redesign of mine excavations or recalculation of productivities and costs. Capital costs are the same for the “With Inferred” and “Without Inferred” scenarios. The “Without Inferred” scenario is presented solely to illustrate the projects dependence on inferred mineral resources.
9. The financial analysis contains certain information that may constitute "forward-looking information" under applicable Canadian and United States securities regulations. Forward-looking information includes, but is not limited to, statements regarding the Company’s achievement of the full-year projections for ounce production, production costs, AISC costs per ounce, cash cost per ounce and realized gold/silver price per ounce, the Company’s ability to meet annual operations estimates, and statements about strategic plans, including future operations, future work programs, capital expenditures, discovery and production of minerals, price of gold and currency exchange rates, timing of geological reports and corporate and technical objectives. Forward-looking information is necessarily based upon a number of assumptions that, while considered reasonable, are subject to known and unknown risks, uncertainties, and other factors which may cause the actual results and future events to differ materially from those expressed or implied by such forward looking information, including the risks inherent to the mining industry, adverse economic and market developments and the risks identified in Premier's annual information form under the heading "Risk Factors". There can be no assurance that such information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such information. Accordingly, readers should not place undue reliance on forward-looking information. All forward-looking information contained in this Presentation is given as of the date hereof and is based upon the opinions and estimates of management and information available to management as at the date hereof. Premier disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, except as required by law;
41
Table of C o ntents
Mineral Resources Comparison
For the year ended December 31, 2023, the Company was not subject to S-K 1300, and reported its mineral reserve and resources in accordance with NI 43-101.
The comparison of the Mineral Resources as of December 31, 2023 and December 31, 2024 can be found in the table below. In 2024 for the Cove Underground Project, the total tonnes increased and total ounces decreased in comparison to 2023 in both the indicated and inferred categories. The increase in tonnes is the result of using a higher gold price and lower cut-off grade. The decrease in ounces is due to the use of stope optimizer software in the estimation process of the new resource. The new methodology generates optimal mineable stope geometries while considering several factors including geological constraints, grade distribution and stope dimensions. This significantly improves the accuracy of mineral resource estimates and has become an industry standard for underground deposits in Nevada.
December 31, 2024 December 31, 2023 Percent Difference
Category Ounces
Gold Ounces
Silver Ounces
Gold Ounces
Silver Gold Silver
Indicated 310 568 351 943 (12)% (40)%
Inferred 1156 1439 1353 2565 (15)% (44)%
Net Book Value
The net book value of the Cove Project and its associated plant, equipment and mineral interests was approximately $52.9 million as of December 31, 2024.
42
Table of C o ntents
Granite Creek
Property Description, Location and Access
The Granite Creek property (the "Granite Creek Property" or "Granite Creek Project"), was formerly known as the Getchell property, and originally as the Pinson property. The Granite Creek Project is located in Humboldt County, Nevada, 28 miles northeast of the town of Winnemucca, and it is part of the historic Potosi mining district. It is centered at roughly 41° 8’ N latitude and 117° 15.5’ W longitude. It encompasses about 4,506 acres (1,823.5 hectares) including owned unpatented claims, leased unpatented claims and owned surface fee land.
The Granite Creek Property is accessed by a combination of paved interstate and state highways, and well-maintained, unpaved private roads. The project site is 35 miles from Winnemucca by road and is 60 road miles northwest of Battle Mountain, Nevada. The project area encompasses approximately 1,300 hectares in the Potosi mining district, surrounding and including the existing Granite Creek mine.
The following figure shows the location of the Granite Creek Property.
Ownership, Mineral Rights and Tenure
In April 2021, i-80 Gold Corp. (the "Corporation"), through its wholly owned subsidiary, Premier Gold Mines USA, Inc. ("Premier USA"), completed its acquisition of Osgood Mining Company LLC ("Osgood LLC"), the owner of the Granite Creek Property. In May 2021, the Corporation purchased additional property from Seven Dot Cattle Co. LLC and the Christison family, and in May of 2022 purchased fee land from Nevada Gold Mines LLC, further increasing the size and ownership in the land package.
The approximately five square mile project area contains both private land and unpatented federal lode mining claims on Bureau of Land Management ("BLM") land. The Corporation controls the Granite Creek Project through a combination of full ownership, majority ownership and leases. The properties included in the project area and relation to the proposed mine plans are shown in the figure below.
43
Table of C o ntents
Granite Creek Property and Mining Claims Map
44
Table of C o ntents
Unpatented Federal Lode Mining Claims
The Corporation controls 68 mining claims covering portions of Sections 28 and 32, Township 38 North, Range 42 East, and 36 mining claims covering Section 6, Township 37 North, Range 42 East, through ownership (full or majority) and leases. Federal and county holding costs for the unpatented mining claims for 2024 were approximately $22,060.The Corporation, through Osgood LLC, owns a 100% interest in the Pacific #1A-7A mining claims located in Section 28, Township 38 North, Range 42 East. These claims were initially staked by the Cordilleran Explorations partnership, the original developer of the Granite Creek Property, and are subject to the Royal Gold Royalty, the Cordilleran Royalty and the PMC Royalty as described below.
The Corporation, through Osgood LLC, owns a 100% interest in the CX #1A-23A claims located in Section 28, Township 38 North, Range 42 East. These claims were initially staked by Pinson Mining Company ("PMC") and are subject to the Royal Gold Royalty and the PMC Royalty as described below.
The Corporation, through Osgood LLC, controls a 100% interest in the BEE DEE group of claims (56 mining claims) through a mining lease agreement with Franco-Nevada U.S. Corporation (50%) and S&G Pinson, LLC (50%) as the current lessors (the "BEE DEE Lease Agreement"). These claims are located in Section 32, Township 38 North, Range 42 East and Section 6, Township 37 North, Range 42 East. The BEE DEE Lease Agreement provides for monthly minimum advance royalty payments to the lessors, which payments currently total $122,495.24 per year (subject to increases or decreases in accordance with the Consumer Price Index). Osgood LLC is also required under the BEE DEE Lease Agreement to maintain the leased claims with the BLM and Humboldt County, Nevada. The BEE DEE Lease Agreement expires on May 9, 2040. These claims are subject to a 2% net mint or smelter returns ("NSR") royalty in favor of the lessors pursuant to the BEE DEE Lease Agreement, as well as the Royal Gold Royalty and the PMC Royalty as described below.
The Corporation, through Osgood LLC and Premier USA, owns a 11/12 interest in the Pinson #1A-18A mining claims located in Section 32, Township 38 North, Range 42 East. 1/2 interest is held by Premier Gold Mines USA, Inc. The remaining 1/12 interest is owned by Michael Murphy, and is not leased by Osgood LLC. The fact that Osgood LLC has not leased the unowned 1/12 interest in these claims does not preclude it from mining the claims. Osgood LLC, as the co-owner of an undivided interest in these claims, has the right to mine the claims without permission or approval from (and even over any objections by) the other co-owner, subject, however, to an obligation on the part of Osgood LLC to account to the other co-owner for their proportionate share of mining revenues less their proportionate share of mining expenses. These claims are subject to the Royal Gold Royalty and the PMC Royalty as described below, and are also subject to a royalty initially held by Kate Murphy et al.
Fee Lands
The Corporation, through Osgood LLC, owns a 100% interest in Sections 29 and 33, Township 38 North, Range 42 East. Section 29 is subject to the Royal Gold Royalty, the Cordilleran Royalty and the PMC Royalty as described below. Section 33 is subject to the Royal Gold Royalty, the PMC Royalty, the Goldfield Royalty and the Conoco Royalty as described below.
The Corporation, through Osgood LLC and Premier USA, owns a 91.67% interest in the 120-acre parcel comprising the east half of the southwest quarter and southeast quarter of the southwest quarter of Section 28, Township 38 North, Range 42 East. The remaining interest in this parcel is owned by Michael Murphy (8.33% undivided interest) and is not leased by Osgood LLC. As noted above with respect to the Pinson unpatented mining claims (which are only partially owned by Osgood LLC), the fact that Osgood LLC does not own or lease the outstanding 8.33% interest in this land does not preclude Osgood LLC from mining the land. Osgood LLC, as the co-owner of an undivided interest in the land, has the right to mine the land without permission or approval from (and even over any objections by) the other co-owners, subject, however, to an obligation on the part of Osgood LLC to account to the other co-owners for their proportionate shares of mining revenues less their proportionate shares of mining expenses. This parcel is subject to the Royal Gold Royalty and the PMC Royalty as described below, as well as a royalty tied to PMC's purchase of the land.
The Corporation, through Osgood LLC, owns a 100% interest in Section 21, Township 38 North, Range 42 East. Section 21 is subject to the Royal Gold Royalty, and the PMC Royalty, as well as the NGM royalty as described below.
The Corporation, through Premier USA, owns a 100% interest in Section 31, Township 38 North, Range 42 East.
Royalties
The Granite Creek Property is subject to several royalties. As of the date of this Annual Report, the following table summarizes the royalties present on the various properties making up the Granite Creek Property.
Several royalties are in effect on various areas of the property. Some royalties were retained by previous owners upon sale of the property while others were negotiated as lease agreements with claim holders.
45
Table of C o ntents
Summary of Royalties Related to the Granite Creek Property
Lessor/Grantor Lease Type
Gold Royalty U.S. Corp. 10% NPI
Franco-Nevada 2% NSR
Franco-Nevada and S&G Pinson 2% NSR
proportionate to individual interests Noceto/Phillips/K. Murph 3.1249% NSR
proportionate to individual interests Noceto/Phillips/K. Murphy/D. Christison/J. Christison/M. Murphy 2% NSR
0.166667% (0.5 of 1/12th of 2%) NSR to Franco-Nevada and S&G Pinson 0.166667% NSR
Nevada Gold Mines 0.5% NSR
Royal Gold 3-5% NSR
1996 Sliding scale royalty with successors to agreement: Royal Gold and D.M. Duncan 1-4% NSR
Environmental Liabilities
The reclamation and closure cost for the Granite Creek Mine surface and underground is estimated to be approximately $3 million at December 31, 2024. A bond in the amount of approximately $1 million is held by the Bureau of Land Management (BLM) to address reclamation activities associated with the underground mine while an additional approximately $2 million bond is held for surface reclamation activities. Subsequent to year end the Company completed the three year update to the reclamation liability and the liability increased to approximately $5 million total, approximately $3 million of which is held by the BLM and the remaining $2 million held by the state of Nevada. There are no other known environmental liabilities associated with pre-Project operations.
History
The Granite Creek Property has been explored by a number of individuals and mining/exploration companies since the late 1930s. The original discovery on the Granite Creek Property was made by Clovis Pinson and Charles Ogee in the mid to late 1930s, but production did not occur until after World War II, when ore from the original discovery was shipped to and processed at the Getchell mine mill. In 1949 and 1950, total production from the Granite Creek mine amounted to approximately 10,000 tons grading approximately 0.14 ounces per ton ("opt").
The Granite Creek Property remained functionally dormant from 1950 to 1970, when an exploration group known as the Cordex I Syndicate ("Cordex") leased the Granite Creek Property from the Christison family (descendants of Mr. Pinson and property owners), on the strength of its similarity to the Getchell property and structural position along the Range-Front fault zone bordering the Osgood Mountains. Following a surface mapping and sampling program in 1971, 17 reverse circulation ("RC") drillholes were completed in and around the 1940s era Granite Creek pit, confirming low-grade gold values. An 18 th step-out hole encountered a 90-foot intercept of 0.17 opt gold. This intercept was interpreted as a subcropping extension of known mineralization northeast of the original pit and was the basis for delineation of what would become the "A" zone at the Granite Creek Property, a 60-foot by 1,000-foot shear zone. During the late 1970s, Cordex reorganized into a Nevada partnership known as PMC, with Rayrock Resources as the project operator, and began production at the Granite Creek Property.
Cordex, and its successor, PMC, explored the Granite Creek Property largely through mapping and geochemical sampling. There are three known mapping programs:
1. a regional mapping program from Preble to Getchell by Pete Chapman in the late 1970s;
2. a 1:6000 scale mapping program of the Granite Creek Property in 1983; and
3. a 1:2400 scale mapping program of the pit areas through the active life of the mine.
PMC began developing the A pit in 1980 and produced gold the following year. Production from the B pit began in 1982. Step-out drilling in 1982 to 1983 to the northeast of the A zone intersected two more discrete zones: the C zone (extending east-northeast from the A zone) and the CX zone (extending northeast from the C zone). Step-out drilling northeast of the CX zone in 1984 located an apparently independent fault system (striking north-northwest), dipping steeply east that became the core of the Mag deposit, which went into production in 1987. PMC produced from the CX, CX-West and Mag pits into the mid to late 1990s, until a combination of falling gold prices and erratic mill feed forced closure of the oxide mill in early 1998. Continued attempts to expand production of oxide ore failed, and all active mining ceased on January 28, 1999. The project was officially closed in May 2000.
In the 1990s, Homestake Mining Company ("Homestake") and Barrick Gold Corporation ("Barrick") became "fifty-fifty" partners in PMC through the purchase of minority interests. Homestake and Barrick conducted an exploration program from 1996 to 2000 through PMC, expending approximately $12 million on the project. The joint venture explored the deeper feeder fault zones of the Granite Creek Property, exploring for a large, high-grade gold system that would support a refractory mill complex. This work, while successful in identifying gold mineralization with underground grades, failed to identify a deposit of sufficient size to be of development interest to Homestake or Barrick, and the partners concluded the exploration program. Subsequent to that decision, in 2003, Barrick acquired Homestake and drilled an additional three exploration drillholes.
46
Table of C o ntents
In August 2004, Atna Resources Ltd. ("Atna") acquired an option to earn a 70% joint venture interest in the Granite Creek Property from PMC, a wholly owned subsidiary of Barrick, and commenced additional follow-up exploration and development of the property. Atna completed its earn-in in 2006 and vested in its 70% interest in the project after expending the required $12 million in exploration and development expenditures. PMC elected to back-in to the project and re-earn an additional 40% interest (bringing PMC's interest to 70% and Atna's interest to 30%) on April 5, 2006. PMC spent over $30 million on the project during the next three-year period and completed its "claw-back" in early 2009. Their work included surface and underground diamond core drilling, RC drilling, underground drifting and surface infrastructure construction (rapid infiltration basins ("RIBs"), mineralized material stockpile pad, underground electrical service upgrades, etc.). A new mining joint venture was formed in 2009 reflecting the project's ownership, with PMC owning a 70% interest in the venture and Atna owning a 30% interest. PMC, as the majority interest owner, was the operator of the joint venture.
In September 2011, Atna negotiated the acquisition of PMC's 70% joint venture interest in the core property position at the Granite Creek Project. The asset purchase and sale agreement included all right, title and interest to the core property described above, as well as an evergreen processing agreement with Barrick for the processing of underground refractory ores from Granite Creek at Barrick's Goldstrike facilities.
Development of the Granite Creek underground mine commenced in early 2012, and mine ramp-up began in late 2012. In total, 6,011 feet of primary and secondary development were completed during 2012 and 2013. The primary spiral ramp was driven to the 4530 level from the 4650 adit level, and both top cut and underhand ore mining occurred in three Ogee zone stope blocks during development. Additional secondary access drifts were in progress when the mine was placed on care and maintenance to access the Range Front and Adams Peak mineral zones but were not completed prior to cessation of underground work. Mining was performed by contract miners utilizing underground mining equipment owned by the contractor. Approximately 30,000 short tons of ore containing 7,900 ounces of gold were mined and shipped to off-site processing facilities. Work on the project continued until June 2013, when the mine was placed on care and maintenance. This decision was driven by a number of factors, including the steep decline in gold prices in 2013.
In May 2014, the status of the underground mine was changed to an intermittent production status. Under this status, periodic mining of ores from stoping areas developed in 2013 was conducted to develop and test revised stoping methods for the underground and to prove mining economics at small production rates.
Osgood LLC, then a wholly owned subsidiary of Waterton Global Resource Management, Inc. ("Waterton"), acquired the Granite Creek Project from Atna in May 2016, after Atna filed for Chapter 11 bankruptcy. Osgood LLC completed numerous drillhole database compilation and verification campaigns, beginning with migration of the Atna database to Maxwell Resources' ("Maxwell") Datashed database software in 2017, and database verification and improvement efforts in 2018. In 2016, Osgood LLC, with an external consultant, completed a project-scale structural geology study that included surface and underground mapping, historical data review and cross section interpretation aimed at defining the main structural architecture at Granite Creek and developing exploration and resource drilling targets. This work formed the basis of an updated 3-dimensional (3D) litho-structural model that was used for the 2020 Mineral Resource estimation. From 2017 to 2018, Osgood LLC also completed an extensive drill material inventory and salvage program that secured the available drill core and RC chips on the property.
Osgood LLC continued to maintain compliance and keep all environmental permits for the site in good standing. This included performing permit-related sampling and reporting, as well as renewing permits. Osgood LLC also performed regular inspections of the site. During the ownership period, Osgood LLC worked with the State of Nevada to close out a Water Pollution Control Permit for a reclaimed portion of the mine, reducing the overall compliance monitoring and reporting liabilities for the operator. In addition, Osgood LLC received approval from the State of Nevada to remove portions of the reclaimed site from the bond.
In addition to these geology and compliance activities, Osgood LLC continued to maintain and improve site infrastructure, including a third-party review of hydrology and dewatering requirements that resulted in the replacement of pumps and the upgrading of two dewatering well process controls. RIBs have been maintained as needed, with water flows being tracked and monitored.
In April 2021, the Corporation completed its acquisition of Osgood LLC from Waterton. In May 2021, additional land was purchased by the Corporation from Seven Dot Cattle Co. LLC. and the Christison family.
In 2022, Section 21 fee land T. 38 N., R. 42 E. was acquired by Osgood Mining Company from Nevada Gold Mines, and lessee interest on the BEE DEE unpatented claims in Section 6, T. 37 N., R. 42 E.
47
Table of C o ntents
Geological Setting, Mineralization and Deposit Types
Regional Geology
The Granite Creek Property is located on the eastern flank of the Osgood Mountains within the Basin and Range tectonic province of northern Nevada. The Granite Creek mine, together with the Preble, Getchell, Turquoise Ridge and Twin Creeks mines, are on what is referred to as the Getchell gold trend. The main Getchell trend generally strikes northeast-southwest and has been cross-cut by secondary north-south and northwest-southeast-trending structures. The deposits are hosted in Paleozoic marine sedimentary rocks. The rocks are exposed in the Osgood Mountains and have been complexly thrust faulted and intruded by the Cretaceous-aged (92 million years ago) Osgood Mountains granodiorite stock. These units are unconformably overlain by Miocene volcanic rocks.
Local Geology
The geology at the Granite Creek Property is typified by folded Cambrian to Ordovician sedimentary rocks that have been intruded by Cretaceous stocks, which have been cross-cut by later high-angle structural deformation. It is suggested that the high angle faulting is related to the Basin and Range extension. The older rocks are overlain by Miocene andesitic basalt and the surrounding fault-bounded basins filled with quaternary alluvial gravel. The Osgood Mountains have a general northeast trend, although, in the vicinity of the Granite Creek mine, the east flank of the range trends north. Gold mineralization is primarily hosted by fine-grained marine sedimentary rocks that overlie a large stock of Cretaceous granodiorite. The Granite Creek Property is considered to be part of the Osgood Mountain terrane.
At the Granite Creek Property, Cambrian to Ordovician siliciclastic and carbonate rocks have been intruded by the Cretaceous Osgood Mountain granodiorite, resulting in the formation of largemetamorphosed aureoles with development of several tungsten-bearing skarns. The lowest stratigraphic units recognized at the Granite Creek Property are the Cambrian phyllitic shales, limestone interbeds and various hornfelsed sedimentary rocks of the Preble Formation, which are juxtaposed against the granodioritic intrusive. The Preble is overlain by Ordovician sedimentary rocks of the Comus Formation, both of which have been folded into a broad, north-plunging anticline. The west flank of the anticline has been over-thrust by the Ordovician Valmy Formation, which consists of deep-water siliceous shales and cherts. The core of the anticline and scattered localities along the east side of the Osgood Mountains are unconformably overlain or in fault contact with sandstones and conglomerates of the Battle Formation and limestones of the Etchart Formation.
Gold mineralization at the Granite Creek Property is primarily hosted in the Comus Formation.
Property Geology
The Granite Creek Property is located on the eastern flank of a large Cretaceous granodiorite stock that forms the southern core of the Osgood Mountains. Rocks adjacent to the eastern side of the stock have a general east dip and strike sub-parallel to the trend of the Osgood Mountains. The oldest units exposed against the granodiorite are Cambrian Preble phyllitic shales, interbedded limestones and various hornfelsed sediments. Overlying the Preble is a thick package of Ordovician Comus sediments. The lowest portion of the Comus is composed of medium to massively bedded, micritic to silty limestone. The middle portion consists of interbedded limestone and shale layers with local interbedded debris flows. The Upper Comus is comprised of mildly to non-calcareous shales with minor shaly limestone interbeds.
The depositional relationship between the Preble Formation and the overlying Comus Formation is not clearly understood. At the Granite Creek Project, the two formations are in fault contact with each other and subparallel to the Range Front fault that juxtaposes the Comus Formation in the hanging wall against the Preble Formation in the footwall.
A Cretaceous aged (90 – 92 million years ago) granodiorite stock intrudes the Paleozoic section in the southern half of the Osgood Mountains. Emplacement of the stock resulted in the formation of an irregular contact metamorphic aureole, which extends as much as 10,000 feet from the intrusive contact. The metamorphic event resulted in the formation of maroon-colored, biotite-cordierite hornfels in the Upper Preble Formation and chiastolite hornfels in the Upper Comus Formation within much of the Granite Creek Property area. Several tungsten-bearing skarn deposits were also formed along the margins of the stock. Two tungsten skarns are on the Granite Creek Property.
Mineralization on the Granite Creek Property exhibits strong structural control. A wide variety of mineralized structural orientations have been documented. The most important structural feature on the Granite Creek Property is the network of faults that border the escarpment marking the southern and eastern edge of the Osgood granodiorite. The fault system can be divided into three structural and stratigraphically mineralized zones, with each mineralized zone defined by one or more major structural elements. These are referred to as the Range Front, CX and Mag zones. Sedimentary rocks in the vicinity of this system generally dip steeply (easterly) away from the contacts of the granodiorite.
48
Table of C o ntents
Mineralization
Underground mineralization associated with the CX and Range Front fault typically strikes northeast to north-northeast, with moderate to subvertical dip and thickness varying between 5 feet to 30 feet. High-grade gold mineralized zones are moderately discontinuous and occur within near-vertical pipe-like bodies at fault intersections and along fault parallel structural corridors. Gold mineralization is characterized by pervasive sulphide that consists of two stages of pyrite development, an early non-ore pyrite stage and a gold-bearing arsenian pyrite stage. Megascopically, the gold-bearing pyrite is typically dull brassy to black in color and very fine-grained. Pyrite may also be associated with remobilized carbon, imparting a "sooty" appearance to the pyrite. Gold is primarily contained in pyrite as microscopic inclusions or found in arsenian-pyrite rims around fine pyrite grains. Gold mineralization can be found in multiple styles, including fine sulphide associated with quartz veining and brecciation.
Gold mineralization at the Granite Creek Property is primarily hosted by the Upper and Lower Comus Formations, which consist of interbedded shale, siltstone and limestone. The Upper Comus is the primary host lithology in the Mag zone and currently is host to the majority of surface resources at the deposit. The Upper Comus is also locally mineralized within the A, B, C, CX, CX-West and portions of the Range Front zone. The Lower Comus hosts the majority of the higher-grade underground resources.
The Preble rocks are a poor host for gold mineralization but do contain localized gold concentrations where they have been brecciated and are adjacent to major hydrothermal conduits.
Oxide mineralization includes pervasive limonite and hematite, along with other iron and arsenic oxides. Oxidation is extensive in the CX fault system, occurring along the entire length of the zone and penetrating to a depth of 1,500 feet. Within the Range Front fault system, oxidation is more variable than within the CX fault system. In some fault and shear zones, oxidation may be present to depths of 1,800 feet, whereas in others it may only reach to depths of < 500 feet.
Mag Pit Mineralization
Gold mineralization within the Mag pit is hosted by interbedded carbonate and shale of the Upper Comus Formation. The mineralized zone has a north-northwest orientation, sub-parallel to the Mag fault, dips to the east-northeast and plunges to the south-southeast. The orebody is tabular, has a strike length of approximately 2,500 feet, varies from 200 to 400 feet in width, and ranges in depth from 250 to 300 feet. Higher grade zones are localized along high-angle northwest or northeast-trending faults. Mineralization within the Mag deposit is more disseminated and lower grade than the Range Front, CX and Ogee zones.
Gold mineralization is spatially associated with decarbonatization, kaolinization, white kaolinite fracture-filling, silicification and quartz veinlets. With the exception of massive limestones, the original carbonate content of the host lithologies was removed during decarbonatization, leaving a porous silty textured rock.
Underground Mineralized Zones
Range Front-Ogee Zone
The Range Front zone mineralization consists of discontinuous occurrences of pervasive argillization and decarbonatization within host rock lithologies. Silicification is minor, with carbonate alteration (calcite) occurring along the borders of fault zones. Karst and dissolution breccias that occur along bedding and structural intersections within the Lower Comus Formation are particularly receptive to mineralization. The Ogee zone, which is a near vertical, pipe-like mineralization shoot, occurs at the intersection of the CX-West and Ogee faults. The upper Ogee zone is characterized by strong iron oxide staining, whereas the lower portion of the zone, which is hosted by the Lower Comus Formation, consists of decarbonatized limestone-siltstone dissolution breccia. Below the 4,650-foot elevation within the Ogee zone, sulfide mineralization becomes prevalent. The zone has a strike length of approximately 350 feet, a vertical extent of 600 feet and averages 30 feet in width.
The Range Front fault bounds the eastern front of the Osgood Mountains. Mineralization hosted within the Range Front fault has a strike length of 4,000 feet, a down dip extent of 3,000 feet and averages 100 feet in thickness. Higher grade gold mineralization within the zone is discontinuous, with strike lengths between 40 and 200 feet and thicknesses varying from 10 to over 60 feet.
Gold mineralization along the CX-West fault zone strikes approximately northeast, dips steeply to the north-northwest and has a strike length of approximately 3,000 feet. The mineralized zone averaged approximately 100 feet in width and occurred primarily along the fault contact between the Upper and Lower Comus Formations.
The Linehole Fault zone consists of two fault strands, the Linehole North fault and the Linehole fault. The Linehole North fault is the extension of the Linehole fault north of the intersection with the CX-West fault, and the Linehole fault the extension to the south of the intersection with the CX-West fault. The Linehole mineralization strikes to the northeast, has a strike length of approximately 4,500 feet and a downdip extent of 1,800 feet. Mineralization averages approximately 15 feet in width.
The Adams Peak Shear is a broad structural zone that strikes to the northeast and dips to the northwest. Mineralization within the shear is highly variable, consisting of multiple strands within the structural zone. The mineralization has a strike length of approximately 1,500 feet and continues down dip to the intersection with the Range Front fault. The average width of mineralization is approximately 125 feet.
The Otto Stope fault is located between the CX-West and Linehole faults. The mineralization has a strike length of approximately 2,000 feet and an average thickness of 10 feet.
49
Table of C o ntents
CX Zone
The CX zone mineralization can be described as a series of discontinuous occurrences of pervasive argillization and decarbonatization within karst and dissolution breccias along bedding and structural intersections within the Lower Comus Formation. Silicification is minor, and carbonate alteration (calcite) is common along fault zones. Dissolution breccias formed in the CX zone are structurally controlled and reflect the geometry of the individual faults.
The CX fault is a zone of continuous mineralization with a strike length of approximately 4,500 feet and a width ranging between 10 and 100 feet. Mineralization has a down-dip extent of 1,300 feet as defined by exploration drilling. The following faults either cut or control the orientation of the mineralization in the CX Zone.
• The SOS fault has an average width of 10 feet and a strike length of 1,400 feet, and extends down-dip to its intersection with the CX Fault.
• The CX fault hanging wall splays extend between the CX and SOS faults for approximately 500 feet and have an average thickness of 15 feet. They extend down-dip to their intersection with the CX Fault.
• The CX fault footwall splay has a strike length of approximately 500 feet, averages 20 feet in width and extends down-dip for 750 feet.
• The SOS dike has an average thickness of 15 feet, a strike length of approximately 2,700 feet and extends down-dip to its intersection with the CX fault.
• The SOS Cross fault strikes between the SOS fault and the SOS dike for approximately 700 feet, extends down-dip to its intersection with the CX fault and has an average width of five feet.
South Pacific Zone
The South Pacific Zone (SPZ) is a northeast trending and southeast dipping zone of high-grade fault-bound mineralization with a northeast plunge of 45o. The mineralization is controlled by the along-strike and down-dip extent of the Otto fault. The zone is defined by a suite of northeast striking moderately southeast dipping anastomosing fault splays with the highest grades concentrated along faults that juxtapose the Upper and Lower Comus Formations. The mineralization has a strike length of 1,250 feet (381 meters), a down dip extent of 900 feet (274 meters), and average fault-bound mineralization widths of 25 feet (7.6 meters).
Deposit Types
The structural setting, alteration mineralogy and mineralization characteristics of the deposit is consistent with Carlin-type deposits.
Drilling
The following table presents a summary of drilling at the Granite Creek Property.
Drillholes Within the Current Property Boundary by Type and Operator
Company Core Holes (includes RC pre-collar with Core Tail) Core Footage RC Holes RC Footage Rotary Holes Rotary Footage Total Holes Total Footage
i-80 339 167,293 501 115,222 — — 840 282,515
Atna 113 68,334 201 49,920 — — 314 118,254
PMC - Barrick 123 91,006 41 33,375 — — 164 124,381
PMC 46 76,297 1,369 631,061 387 124,298 1802 831,656
Total 621 405,042 2,112 829,578 387 124,298 3120 1,356,806
Note: RC=reverse circulation
Mineral Resource Estimates
The Pinson deposit, for the purposes of modelling and estimations, is broken into two areas: the open pit area and the underground area. The open pit area is the location of previous open pit mining and includes the A pit, B pit, CX pit and Mag pit. The underground area is considered separately from the open pit due to the narrow, vein-like structures associated with the resource.
The open pit and underground Mineral Resource estimates for the Granite Creek Property have been prepared following the guidelines of S-K 1300 and in conformity with generally accepted "CIM Estimation of Mineral Resources and Mineral Reserves Best Practice Guidelines 2019". Mineral Resources have been classified in accordance with the "Definition Standards for Mineral Resources and Mineral Reserves" adopted by the Canadian Institute of Mining, Metallurgy and Petroleum (CIM) Council on May 10, 2014. The Mineral Resource estimates include Inferred Mineral Resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as Mineral Reserves under the S-K 1300 CIM definition standards. Readers are advised that Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability, and there is no certainty that all or any part of the Mineral Resources will be converted into Mineral Reserves. The Granite Creek Property presently has no Mineral Reserves. Whittle
50
Table of C o ntents
pit optimization was applied to the open pit Mineral Resource estimate to assess the reasonable prospects for economic extraction for the resource.
The Mineral Resource estimates presented herein are based on the current drillhole database for the Pinson deposit, previously mined out volumes and backfilled volumes. The authors performed a data validation of the drill hole database prepared by the Corporation and determined it to be of suitable accuracy to perform a Mineral Resource estimate for the Granite Creek Property.
The tables below summarize the current open pit and underground Mineral Resource estimates for the Granite Creek Property.
Open Pit Statement of Mineral Resources As of December 31, 2024
Class Zone Total Process Material
(1000s tonnes) Gold Grade (g/t) Total Contained Gold
(1000s oz)
Measured B Pit 2910
1.32
123.41
A Pit 563
1.07
19.30
CX Pit 10889
1.30
455.27
Mag Pit 12000
1.21
467.97
Total 26362
1.26
1065.95
Indicated
B Pit 360
1.10
12.73
A Pit 689
0.80
17.78
CX Pit 2973
1.25
119.62
Mag Pit 7317
0.93
219.16
Total 11339
1.01
369.29
Measured and Indicated B Pit 3270
1.29
136.14
A Pit 1252
0.92
37.08
CX Pit 13862
1.29
574.89
Mag Pit 19317
1.11
687.13
Total 37701
1.18
1435.24
Inferred B Pit 32
0.64
0.67
A Pit 205
0.59
3.88
CX Pit 1347
1.16
50.24
Mag Pit 563
1.11
20.17
Total 2148
1.09
74.95
Notes:
(1) The effective date of the Mineral Resource estimate is December 31, 2024.
(2) Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability.
(3) Mineral resources are reported at a 0.30g/t cut-off, an assumed gold price of $2,040 $/per troy ounce using variable recovery, a slope angle of 41 degrees, 6% royalty, heap leach processing cost of $9.04 per tonne (includes admin) and CIL processing cost of $17.22 per tonne (includes admin)..
(4) The reference point is in situ.
Criteria for Reasonable Prospect for Economic Extraction
The requirement, “reasonable prospects for economic extraction,” generally implies that the quantity and grade estimates meet certain economic thresholds and that the mineral resources are reported at a cutoff grade considering appropriate extraction scenarios and processing recoveries. To meet this requirement, GRE considered that major portions of the Granite Creek deposit are amenable for open pit extraction.
To determine the quantities of material offering “reasonable prospects for economic extraction” by an open pit, GRE constructed open pit scenarios developed from the resource block model estimate using Whittle’s Lerchs-Grossman miner “Pit Optimizer” software. Reasonable mining assumptions were applied to evaluate the portions of the block model (Measured, Indicated, and Inferred blocks) that could be “reasonably expected” to be mined from an open pit. The optimization parameters presented in the table below were selected based on experience and benchmarking against similar projects. The results are used as a guide to assist in the preparation of a mineral resource statement and to select an appropriate resource reporting cutoff grade. GRE considers that the blocks located within the resulting conceptual pit envelope show “reasonable prospects for economic extraction” and can be reported as a mineral resource. For more information on the estimation parameters for both the open pit and underground resource estimates see sections 11.6 and 11.7 of the Granite Creek technical report.
51
Table of C o ntents
Granite Creek Resource Parameters for Open Pit Optimization
.
Variables Unit Value
Mining Cost (waste/mineralized material) $/ tonne mined $2.46
Heap Leach Cost $/ tonne mineralized material treated $9.04
Carbon in Leach Cost $/ tonne mineralized material treated $17.22
Heap Leach (HLCH) Recovery with CN Solubitity <60 % CN solubility*100
Heap Leach (HLCH) Recovery with CN Solubitity >=60 % ((0.1225*[Au PPM])+0.4164)*100
CIL Recovery % ((0.5388*CN Solubility)+0.3201)*100
Gold Price $/oz $2,040
Selling Costs and Penalties $/oz $114
Total Royalty (Simplified) % 6%
Slope Angle degrees 41
HLCH tonnes per year 2,975,000
CIL tonnes per year 1,050,000
Underground Statement of Mineral Resources As Of December 31, 2024
Zone ktons ktonnes Au opt Au g/t Au koz
Measured
Ogee 88 80 0.244 8.4 22
Otto 59 53 0.256 8.8 15
Meas Total
147 133 0.249 8.5 37
Indicated
CX 8 7 0.391 13.4 3
Ogee 181 164 0.352 12.1 64
Otto 295 268 0.316 10.8 93
South Pacific 223 203 0.286 9.8 64
Ind Total 707 641 0.317 10.9 224
Measured and Indicated
CX 8 7 0.391 13.4 3
Ogee 269 244 0.317 10.9 85
Otto 354 321 0.306 10.5 108
South Pacific 223 203 0.286 9.8 64
M&I Total 854 775 0.305 10.5 261
Inferred
CX 97 88 0.351 12 34
Ogee 42 38 0.563 19.3 24
Otto 187 170 0.401 13.7 75
South Pacific 536 486 0.361 12.4 194
Inf Total 862 782 0.378 13 326
Notes Pertaining to Underground Mineral Resources:
1. Mineral Resources have been estimated at a gold price of $2,175 per troy ounce and a silver price of $27.25 per ounce.
2. Mineral Resources have been estimated using gold metallurgical recoveries of 85.2% to 94.2% for pressure oxidation. Payment for refractory mineralization sold to a third party is 58%. Oxide CIL mineralization payments vary from 40% to 70% based upon the grade of the mineralization.
3. The cutoff grade for refractory Mineral Resources varies from 0.151 to 0.184 opt. for acidic conditions. The cutoff grade for oxide mineral resources is 0.075 opt.
4. The contained gold estimates in the Mineral Resource table have not been adjusted for metallurgical recoveries.
5. Numbers have been rounded as required by reporting guidelines and may result in apparent summation differences.
6. A Mineral Resource is a concentration or occurrence of solid material of economic interest in or on the Earth’s crust in such form, grade or quality and quantity that there are reasonable prospects for eventual economic extraction. The location, quantity, grade or quality, continuity and other geological characteristics of a Mineral Resource are known, estimated or interpreted from specific geological evidence and knowledge, including sampling.
7. An Inferred Mineral Resource is that part of a Mineral Resource for which quantity and grade or quality are estimated on the basis of limited geological evidence and sampling. Geological evidence is sufficient to imply but not verify geological and grade or quality continuity. An Inferred Mineral Resource has a lower level of confidence than that applying to an Indicated Mineral Resource and must not be converted to a Mineral Reserve. It is reasonably expected that the majority of Inferred Mineral Resources could be upgraded to Indicated Mineral Resources with continued exploration.
8. Mineral Resources, which are not Mineral Reserves, do not have demonstrated economic viability. The estimate of Mineral Resources may be materially affected by environmental, permitting, legal, title, socio-political, marketing, or other relevant factors.
9. Mineral Resources have an effective date of December 31, 2024, and;
10. The reference point for mineral resources is in situ.
52
Table of C o ntents
Mining Methods
Open Pit
The Granite Creek Mine Project will employ conventional open pit mining techniques using front end loaders and rear dump rigid frame haul trucks. As discussed in Section 17, open pit material will be treated using CIL circuit. The mine plan is designed to deliver an average of 10,000 tonnes of potentially economically viable material per day from the open pit to the crusher which will then be run through the CIL mill. The average daily waste production rate over the life of the mine is 84,750 tonnes per day. Waste material would be either placed on waste rock storage facilities (WRSF) or as backfill in previously mined open pits.
There are three distinct open pit production areas on the Granite Creek Project: B pit, CX pit and Mag pit. The CX and Mag pits were each designed with three phases, for a total of seven mining phases for the project. The production pits will be sequentially mined with minor overlap of simultaneous production dependent on short term scheduling needs. The proposed mining sequence begins with pit B and is shown in the table below.
Summary of Pit Phases
Pit / Phase Start Day End Day
Pit B -129
208
CX 1 118 618
CX 2 423.0 1,077
CX 3 997.0 1,969
MAG A 1,969 2,137
MAG B 1,918 2,656
MAG C 2,388 3,103
The authors of the Granite Creek Report prepared a base case pit resource estimate using a cut-off rate of 0.30 g/t. The resource estimate assumes the use of CIL processing at the project. A preliminary mining schedule was then generated from the base case pit resource estimate. The schedule is based on a mining rate of 10,000 tonnes per day and assumes the project will operate on two 12-hour shifts, 365 days per year.
53
Table of C o ntents
Base Case Mine Schedule
Fresh mineralized material and waste rock is comprised of a mix of shale, limestone, dolomite, conglomerates and granodiorite. All of this material will require drilling and blasting prior to excavation. Some areas within the pits to be excavated consist of alluvium or previous backfill; those areas will not require drilling and blasting, except to the extent drill holes are needed for grade control. Drilling and blasting will employ conventional techniques, which will entail drilling 7-inch diameter blastholes spaced on 18-foot centers. The rock will be blasted with ammonium nitrate fuel oil ("ANFO") blasting agent initiated with shock tube, boosters and nonel blasting caps. Potential noise and dust from blasting is not anticipated to impact the surrounding community due to the Granite Creek Project's remote location far away from residential or commercial structures.
To store the waste material generated during mining activities, two waste rock piles are proposed. The waste piles will be located south of the CX pit and east of the Mag pit. Additionally, as mining progresses, waste rock will be backfilled into portions of the mined-out B and CX pits. These locations have been selected to minimize hauling distances and disturbed acreage. Up to approximately 108 million tonnes of waste rock will be mined and placed into the waste rock piles and approximately 100 million tonnes will be backfilled into mined out pits.
Underground
The Granite Creek Project has a zone of high grade material suitable for underground mining. Three methods were considered for the underground resource, each having a situational usefulness that can be applied when certain criteria are met:
• Overhand Cut and Fill : Overhand cut and fill will be used when the ground is stable. The underground mining method will involve mining stopes sized 50 feet in height and 100 feet in length. Mining is fully mechanized with mobile equipment. Development required to access stopes consists of ramps, level drifts and ventilation excavations. The previous underground workings at the site will provide initial access and fulfill ventilation requirements in the early stages of the mine.
• Underhand Cut and Fill : Underhand cut and fill will be used when the ground conditions are very poor. The reason being that mining work takes place under a cemented, reinforced backfill that will remain intact when the surrounding wall rock fails. This method costs more, but is a far safer alternative.
54
Table of C o ntents
• Longhole Stoping : Longhole stoping will be used when rock quality is good and the average stope width is wide enough to allow full stope recovery. Alternative bulk underground mining methods that can be used include longhole stoping with delayed fill and AVOCA stoping methods.
Preliminary schedules for the production and development of the underground resource are set out below. The schedules assume the mine will operate on two 12-hour shifts, 365 days per year.
Annual Production and Development Schedule (Including Inferred Mineral Resources)
Calendar Year 2025 2026 2027 2028 2029 2030 2031 2032 2033 Total
Mineralized Material Mined
Total Mineralization Mined (000's Tons) 212 207 222 242 274 206 168 59 — 1,589
Total Mineralization Mined (000's Tonnes)
193 188 201 220 249 186 152 53 — 1,442
Gold Grade (Ounce/Ton) 0.328 0.394 0.341 0.346 0.324 0.316 0.316 0.354 — 0.339
Gold Grade (g/t)
11 14 12 12 11 11 11 12 — 12
Contained Gold (000's Ounces) 70 81 76 84 89 65 53 21 — 538
Production Mining
Stope Development and Drift and Fill Mining (000's Tons) 212 207 222 242 274 206 168 59 — 1,589
Stope Development and Drift and Fill Mining (000's Tonnes)
193 188 201 220 249 186 152 53 — 1,442
Mineralization Production Rate (tpd) 582 566 608 662 752 563 460 160 — 435
Mineralization Production Rate (tonnes/day)
528 513 552 601 682 511 417 145 — 395
Backfill
Total CRF Backfill (000's Tons) 212 207 222 242 274 206 168 59 — 1589
Waste Mining
Expensed Waste (000's Tons) 115 100 111 111 124 90 76 28 — 754
Expensed Waste (000's Tonnes)
104 91 101 101 113 81 39 25 — 684
Primary Capital Drifting (Feet) 6,675 7,913 5,233 1,694 0 0 0 0 — 21,515
Capital Raising (Feet) 1,050 640 180 180 150 150 0 0 — 2,350
Capitalized Mining (000's Tons) 180 202 116 39 1 1 0 0 — 539
Capitalized Mining (000's Tonnes)
163 183 106 35 1 1 0 0 — 489
Total Tons Mined (000's Tons) 508 508 450 392 400 296 243 87 — 2,883
Total Tons Mined (000's Tonnes)
461 461 408 355 363 269 221 79 — 2,615
Mining Rate (tpd) 1,391 1,392 1,232 1,070 1,095 811 667 236 — 658
Mining Rate (tonnes/day)
1,262 1,263 1,118 971 993 736 605 214 — 597
55
Table of C o ntents
Annual Production and Development Schedule (Excluding Inferred Mineral Resources)
Calendar Year 2025 2026 2027 2028 2029 2030 2031 2032 2033 Total
Mineralized Material Mined
Total Mineralization Mined (000's Tons) 106 103 111 121 137 102 84 59 — 820
Total Mineralization Mined (000's Tonnes)
96 93 100 109 124 93 76 53 — 744
Gold Grade (Ounce/Ton) 0 0 0 0 0 0 0 0 — 0
Gold Grade (g/t)
10 12 11 11 10 10 10 5 — 10
Contained Gold (000's Ounces) 31 36 34 37 40 29 24 9 — 239
Production Mining
Stope Development and Drift and Fill Mining (000's Tons) 106 103 111 121 137 102 84 29 — 791
Stope Development and Drift and Fill Mining (000's Tonnes)
96 93 100 109 124 93 76 26 — 718
Mineralization Production Rate (tpd) 290 282 303 329 374 280 229 160 — 225
Mineralization Production Rate (tonnes/day)
263 256 275 298 339 254 208 145 — 204
Backfill
Total CRF Backfill (000's Tons) 106 103 111 121 137 102 84 29 — 791
Waste Mining
Expensed Waste (000's Tons) 57 50 55 55 62 45 38 14 — 376
Expensed Waste (000's Tonnes)
52 45 50 50 56 41 34 13 — 341
Primary Capital Drifting (Feet) 6675 7913 5233 1694 0 0 0 0 — 21515
Capital Raising (Feet) 1050 640 180 180 150 150 0 0 — 2350
Capitalized Mining (000's Tons) 180 202 116 39 1 1 0 0 — 539
Capitalized Mining (000's Tonnes)
163 183 106 35 1 1 0 0 — 489
Total Tons Mined (000's Tons) 343 354 282 214 199 148 121 43 — 1705
Total Tons Mined (000's Tonnes)
311 321 256 194 181 134 110 39 — 1546
Mining Rate (tpd) 940 970 773 585 546 405 332 118 — 389
Mining Rate (tonnes/day)
853 880 701 531 495 367 301 107 — 353
Production is scheduled to take stopes near or directly adjacent to existing underground development for an economically advantageous low cost of development. Development is sequenced to ensure that all necessary excavations are complete before production on a given level begins.
Horizontal development and production drilling will be done with jumbo drill rigs. However, the drilling pattern for development and production will be different. Blasting will utilize a mixture of ANFO and emulsion. The ANFO will be loaded into holes using a pneumatic loader, and the emulsion will be packaged in sticks to allow loading. Blasting will be initiated using blasting caps, boosters and detonation cord. Mucking will be done with load-haul-dump ("LHD") equipment. The LHD will muck the working face by tramming to a muck bay, where material will be rehandled and loaded into a haul truck that hauls to the surface.
Underground development and production will take place below the groundwater table. It is expected that as the workings progress deeper, the flow rate will increase. Seasonal changes will affect the groundwater inflow, but this will be largely limited to shallower workings. Dewatering pumps will be needed to remove groundwater, and groundwater discharge will need to be managed as per applicable local laws and regulations.
The current ventilation plan is designed to supply fresh air down the ramp to active areas and to exhaust through vent raises using two 150-horsepower main fans per mining area. The number and size of ventilation fans is based on the number of active faces and total horsepower of major equipment.
Processing and Recovery Operations
CIL Process
The Granite Creek Open Pit Project will employ open pit mining with a CIL system on a 365 day per year, 24 hour per day basis. The CIL circuit will use crushed ROM material at a nominal size of approximately 1/2 inch. Crushed material will advance to a ball mill, where lime will be added to control pH levels in the CIL circuit.
56
Table of C o ntents
A pre-leach thickener will then be used to thicken the ground material and flocculant will be added to improve settling rates. The thickener underflow will then be pumped to a series of CIL tanks in which the slurry flows sequentially. As gold is extracted via cyanidation, it is quickly adsorbed onto carbon. Carbon will flow counter-current to the slurry and be recovered in the first tank. The loaded carbon will then be treated with an acid wash to remove any deposits and will be pumped to an elution column. A stripping solution strips gold off the loaded carbon. The pregnant solution will be pumped to the electrowinning process and the precious metal cathodes are smelted into dore bars.
A regeneration kiln is used for the reactivation of barren carbon from the elution column. This reactivated carbon is pumped back into the last CIL tank. Fresh carbon may be added to the regeneration kiln as well. Tailings from the CIL tanks are pumped to a thickener and are properly stored.
Third Party Processing
Until the Company's Lone Tree Autoclave is operational the Company will utilize a third party autoclave facility. The third party autoclave circuit processes 4 - 5 million tons per year and consists of primary crushing, two parallel semi-autogenous grinding (SAG) Mill-Ball Mill grinding circuits with pebble crushing, five parallel autoclaves capable of acid pressure oxidation (POX) and three of which are capable of alkaline POX, two parallel calcium thiosulphate (CaTS) leaching circuits with resin-in-leach (RIL), electrowinning for gold recovery, and a refinery producing doré bullion from both autoclave and roaster circuits.
Gold recovery estimates are based on both testwork and operational history with curves utilized for both depending on operating strategy and ore characteristics.
Lone Tree Pressure Oxidation Facility
i-80 Gold plans to process single refractory mineralization from Granite Creek at their Lone Tree Mill in a hub and spoke arrangement upon completion of a refurbishment of the facility.
Infrastructure, Permitting and Compliance Activities
Project Infrastructure
The Granite Creek mine is a past operating mine, and as such, has a large portion of the necessary infrastructure in place. Existing infrastructure at the Granite Creek Property includes an office building, dry and warehouse facilities, a small shop facility and a lined stockpile area on the surface. Landline telephone and digital subscriber line service are available at the Project site. Cellular phone service is also available, but is dependent on the strength of receiving antennas, topography, and lines of sight. A fiber optic line provides wifi throughout surface infrastructure and key areas of the underground to support phone, radio, and process control instrumentation. The metallurgical laboratory is still on the project site, although the analytical equipment has been removed. Within the lab are offices, a wet lab, sample preparation and a fire assay area. In addition, there is a fully functional and operating truck scale adjacent to the office facility, which was used to weigh trucks when the underground material was toll treated by a third-party mill.
A paved county road (number 789) leads to the edge of the property with a short gravel section, less than one mile from the existing Granite Creek office building. A complete well maintained road system allows access to the historic open pits and underground mine in the CX Pit.
Six deep dewatering wells were drilled and cased at the property, four of which are currently being operated. Water from the dewatering system is discharged to one of two RIBs on the east side of the county road. There is also a process water well, which feeds a process water tank and distribution system.
Electrical infrastructure suitable for mine operations is installed. A 120 kV line feeds the mine-owned transformer, which is further stepped down to 13.8 kV, with available power estimated at 2 MW. Power to the underground operations is supplied at 480 V. There is a small transformer at the mine portal. All power lines to the underground mine and dewatering system are above ground and mounted on poles.
Over 9,000 feet of underground workings have been completed at the property. The mine is accessed through either of two portals, and dual egress has been established for most areas of the mine. Where dual egress is not possible, rescue chambers have been installed. Equipment is repaired in an underground mine shop. Air doors and a ventilation fan provide required air supply to the workings in compliance with Mine Safety and Health Administration standards.
Water Management
To manage excess water at the project site, the Granite Creek Project has four permitted RIBs. These are closed basins surrounded by a berm, which allow for the infiltration of excess mine water. Two RIBs and associated pipelines have been constructed at the property. A total of four RIBs are permitted for the infiltration of 6,900 gallons per minute ("gpm") of water. This capacity can be used to dewater the pits, and will likely be sufficient for any reasonable scenario for underground dewatering at the Granite Creek Project. The authors suggested that, prior to anticipated demand, two more RIBs should be constructed.
57
Table of C o ntents
There are many prior hydrogeologic studies of the Granite Creek site, and a long history of pit and underground dewatering. This experience has shown that the aquifers appear to be fairly low-yield with compartmentalized stored water and a relatively modest steady state inflow rate. There also appears to be an unconductive fault between the MAG and CX pit which limits flow between these nearby areas. This is observed by the fact that the water level in the MAG pit lake is higher than the water level in the CX pit and underground workings. In other words, pumping CX dry has not dried up MAG.
The proposed mine plan contemplates starting with the B and CX pits, with mining of the Mag pit scheduled to start in Year Three. Operations will need to manage the RIBs in such a way that the MAG pit can be dewatered prior to mining while maintaining a maximum water disposal rate of 6,900 gpm.
The RIBs still require some development. The Corporation committed to regulators that it would construct a RIB surge pond to remove sediments and stabilize flow, and that it would conduct an arsenic attenuation study. However, in lieu of the study, and with communication with the regulators, the Corporation has constructed a water treatment plant.
Environmental Permitting Requirements
Active Permits
The permits listed below allow for the current ongoing underground operation at Granite Creek. Major permit revisions, as well as additional permits, will be required for the proposed plan of operations outlined in the technical report.
The National Environmental Policy Act (NEPA) is likely the largest single permitting hurdle that the project will face. The NEPA process is required when disturbances are anticipated to take place on federal lands and non-patented mining claims. It is reasonable to expect that this NEPA permitting effort will require the completion of an Environmental Impact Statement (EIS) through the BLM. State permits are required for air quality protection, groundwater protection, surface water protection, and water rights.
As of the date of this Annual Report, the major active permits held by Osgood LLC are presented in the table below. These permits do not permit on-site mineral processing, nor the large-scale storage of mine waste.
Granite Creek Project – Active Permits
Permit Name Agency Permit Number
Plan of Operations Granite Creek Mine Project BLM NVN-064101
Class II Air Quality Operating Permit NDEP-BAPC AP1041-3086.02
Mercury Operating Permit to Construct NDEP-BAPC MOPTC AP1041-3089 (De Minimis)
Water Pollution Control Permit - Rapid Infiltration Basins NDEP-BMRR NEV2005102
Water Pollution Control Permit - Granite Creek Mine NDEP-BMRR NEV2005103
Mine Reclamation Permit NDEP-BMRR 47
Granite Creek UG Mine Reclamation Permit NDEP-BMRR 242
Mining Stormwater General Permit NDEP-BWPC NVR300000: MSW-42365
Onsite Sewage Disposal System NDEP-BWPC GNEVOSDS09S0177
Hazardous Materials Storage Permit Nevada State Fire Marshal 12441012106
Waters of the United States Jurisdictional Determination USACE Request for Approved Jurisdictional Determination (AJD) submitted to USACE November 2022
The project site has full water rights for Granite Creek, the largest drainage that crosses the property. Granite Creek is an ephemeral drainage that is captured upgradient from the CX pit and conveyed in a pipeline to the channel downgradient from the open pits, which then flows between the RIBs. This water right is useful because if operations require it, this water can be managed at the discretion of the project.
Economic Analysis
Granite Creek Open Pit
GRE performed an economic analysis of the project by building an economic model based on the following assumptions:
• Federal corporate income tax rate of 21%
• Nevada taxes:
◦ Proceeds of Minerals Tax – variable, with a maximum of 5% of Net Proceeds
◦ Property tax – 2.5605%
◦ Nevada gold and silver mine royalty – variable, with a maximum of 1.1% of gross revenue
◦ Nevada Commerce tax of 0.051% on revenues greater than $4 million.
58
Table of C o ntents
• Sales and use taxes are not included in the model
• Equipment depreciated over a straight 7 or 15 years and has no salvage value at the end of mine life
• Loss carried forward
• Depletion allowance, lesser of 15% of net revenue or 50% of operating costs
• Gold price of $2,175 per troy ounce
• Gold recovery calculated per block as detailed in Section 13
• Royalties on individual claims calculated by block, ranging from 0.02% to 7.5%, averaging 5.7%. There also is a 10% royalty applied to net profit.
After analyzing the economic results of all cases considered, GRE selected the CIL only case with 0.85 g/t high grade cutoff, contractor operation, conventional tailings, and 133-tonne haul trucks and 21.9-tonne loaders as the base case as it results in the best overall economic results.
The economic model assumes a 1-year construction period. The time for permitting has not been included in the economic model, but the permitting for the open pit mine is likely to take three to five years and occur during the underground mining portion of the project.
Open Pit Mine Financial Statistics
After Tax Economic Measure
Value
Gold price (US$/oz) $2,175
Silver price (US$/oz) $27.25
Mine life (years) 10
Average mineralized mining rate (tons/day) 11,023
Average mineralized mining rate (tonnes/day)
10,000
Average grade (oz/t Au) 0.036
Average grade (g/t Au)
1.25
Average gold recovery (CIL %)
86.6%
Average annual gold production (koz) 110
Total recovered gold (koz) 1,120
Initial Capital (Millions)
$234.0
Sustaining capital (M$) $30.3
All-in Sustaining Cost ($/oz Au produced)
$1,227.4
Cash Cost ($/oz Au produced)
$1,180.5
After Tax NPV@5% (millions)
$417.2
After Tax IRR
28.7%
Underground Mine Financial Statistics
After Tax Economic Measure With Inferred Without Inferred
Gold price (US$/oz) $2,175
Silver price (US$/oz) $27.25
Mine life (years) 8
Average mineralized mining rate (tons/day) 435 225
Average mineralized mining rate (tonnes/day)
395 204
Average grade (oz/t Au) 0.339 0.292
Average grade (g/t Au)
11.6 10
Average gold recovery (autoclave %) 78% 78%
Average annual gold production (koz) 52 23
Total recovered gold (koz) 418 186
Sustaining capital (M$) $88.8 $88.8
Cash cost (US$/oz) 1
$1,366 $1,699
All-in sustaining cost (US$/oz) 1,2
$1,597 $2,217
Project after-tax NPV 5% (M$)
$155 ($30)
Project after-tax NPV 8% (M$)
$135 ($33)
Project after-tax IRR 84% -12.7%
1. Net of byproduct sales;
2. Excluding income taxes, resource conversion drilling, corporate G&A, corporate taxes and interest on debt;
3. Profitability index (PI), is the ratio of payoff to investment of a proposed project. It is a useful tool for ranking projects because it allows you to quantify the amount of value created per unit of investment. A profitability index of 1 indicates breakeven;
59
Table of C o ntents
4. This IA is preliminary in nature, it includes inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves, and there is no certainty that the IA will be realized. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability;
5. Inferred mineral resources constitute 50% of mass and 56% of gold ounces of all mineral resources. The “Without Inferred” statistics presented are a gross factorization of the mine plan without any redesign of mine excavations or recalculation of productivities and costs. Capital costs are the same for the “With Inferred” and “Without Inferred” scenarios. The “Without Inferred” scenario is presented solely to illustrate the project’s dependence on inferred mineral resources;
6. The financial analysis contains certain information that may constitute "forward-looking information" under applicable Canadian and United States securities regulations. Forward-looking information includes, but is not limited to, statements regarding the Company’s achievement of the full-year projections for ounce production, production costs, AISC costs per ounce, cash cost per ounce and realized gold/silver price per ounce, the Company’s ability to meet annual operations estimates, and statements about strategic plans, including future operations, future work programs, capital expenditures, discovery and production of minerals, price of gold and currency exchange rates, timing of geological reports and corporate and technical objectives. Forward-looking information is necessarily based upon a number of assumptions that, while considered reasonable, are subject to known and unknown risks, uncertainties, and other factors which may cause the actual results and future events to differ materially from those expressed or implied by such forward looking information, including the risks inherent to the mining industry, adverse economic and market developments and the risks identified in Premier's annual information form under the heading "Risk Factors". There can be no assurance that such information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such information. Accordingly, readers should not place undue reliance on forward-looking information. All forward-looking information contained in this Presentation is given as of the date hereof and is based upon the opinions and estimates of management and information available to management as at the date hereof. Premier disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, except as required by law.
Mineral Resources Comparison
For the year ended December 31, 2023, the Company was not subject to S-K 1300, and reported its mineral reserve and resources in accordance with NI 43-101.
The comparison of the Mineral Resources as of December 31, 2023 and December 31, 2024 can be found in the table below. In 2024 the total tonnes and ounces in the Granite Creek Open Pit increased in all categories due to a new resource estimate which used a higher gold price and lower cut-off grade than the previous estimate.
In 2024 the total tonnes and ounces in the Granite Creek Underground decreased in the measured category, but increased in the indicated and inferred categories. This increase in indicated and inferred and decrease in measured are both due to a new resource estimate which used different estimation methods than the previous resource estimate. In addition, the new resource estimate contained new drilling conducted by i-80 Gold since the publication of the previous resource estimate.
December 31, 2024 December 31, 2023 Percent Difference
Category Ounces
Gold Ounces
Silver Ounces
Gold Ounces
Silver Gold Silver
Granite Creek Underground - Measure 37 0 156 0 (76)% —%
Granite Creek Underground - Indicated 224 0 181 0 24% —%
Granite Creek Underground - Inferred 326 0 319 0 2% —%
Granite Creek Open PIt - Measured 1066 0 988 0 8% —%
Granite Creek Open PIt - Indicated 369 0 304 0 21% —%
Granite Creek Open Pit - Inferred 75 0 62 0 21% —%
Net Book Value
The net book value of Granite Creek and its associated plant, equipment and mineral interests was approximately $93.5 million as of December 31, 2024.
60
Table of C o ntents
Lone Tree Project
Property Description, location and access
Property Description
The Lone Tree project (the "Lone Tree Project") was acquired on October 14, 2021, by i-80 Gold Corp. ("i-80") from Nevada Gold Mines LLC ("NGM"). NGM is a joint venture in respect of the Lone Tree mineral deposit located in Nevada, U.S.A., between Newmont Mining Corporation ("Newmont") and Barrick Gold Corporation ("Barrick").
Resource expansion potential exists down-plunge of the main Lone Tree deposit and in the unmined Sequoia zone discovery where previous drilling returned multiple wide, high-grade, intercepts. The Lone Tree Report focuses only on the Lone Tree mine properties (the "Lone Tree Properties").
The Location and Means of Access
The Lone Tree mine project is approximately 30 miles east of Winnemucca, Nevada, and 20 miles northwest of Battle Mountain, Nevada at 40° 50' 19" N, 117° 12' 37" W. The land package includes the process area, the Lone Tree Pit, and the Buffalo Mountain Property. Processing infrastructure at Lone Tree includes an autoclave, carbon-in-leach mill, flotation mill, and heap leach facility.
The mine office is accessible from Interstate 80 by a paved highway.
61
Table of C o ntents
The site of the Lone Tree Project has an autoclave and flotation mill, which as of the date of this Lone Tree Report, are on care and maintenance. The list of processing plants includes the following facilities:
• Lone Tree Autoclave, which processes higher-grade refractory ore.
• Lone Tree Flotation Plant, which processes lower-grade refractory ore.
• Lone Tree leach pad (Phases 1-4), which treats oxide ore in a cyanide heap-leach process.
• Lone Tree leach pad (Phase 5), which treats oxide ore in a cyanide heap-leach process.
• Lone Tree leach pad (Phase 6), which treats oxide ore in a cyanide heap-leach process.
62
Table of C o ntents
63
Table of C o ntents
The climate is cold and semi-arid, typical of eastern Nevada.
Title to or Interest
The Lone Tree Properties include interests in fee lands, mineral rights in fee lands, patented mining claims, and unpatented mining claims which are leased or owned by the Corporation through its subsidiary Goldcorp Dee LLC. i-80 has been informed by the Clerk of the Eleventh Judicial District Court, Humboldt County, Nevada that there are no pending actions which relate to the Lone Tree Properties in which i-80, its subsidiaries, or NGM are named as parties.
Permits/Licenses
Several permits are in place at the Lone Tree Project, including permits from the BLM and the Nevada Division of Environmental Protection, and numerous minor permits and licenses. No major environmental study has been conducted by i-80 to address various liabilities including dewatering.
Environmental Liabilities
Reclamation activities from past mining and processing at the Lone Tree project are ongoing. A reclamation cost estimate prepared in March 2022 estimated cost to close and reclaim the project is $87 M. This amount includes closure of all permitted mining and exploration disturbance at the project and is calculated using standardized reclamation cost estimators
History
In the early days the Lone Tree area was explored for copper, but no significant resources were discovered. The initial discovery hole at Lone Tree was drilled in July 1989 by Cordex Exploration Co. ("Cordex") on the southern extension of what was to become the Lone Tree gold deposit. This southern portion of the deposit was referred to as the Stonehouse deposit. Santa Fe Pacific Gold ("Santa Fe") discovered the main part of the Lone Tree deposit in the pediment on the west flank of the hill in 1989 and acquired the Stonehouse portion of the deposit from Cordex. Newmont acquired the deposit from Santa Fe through a merger and began operations in 1991, continuing mining operations until 2006. Operations were discontinued in 2006 due to the increased production costs, largely resulting from the influx of groundwater into the deepening pit. The pit was allowed to flood which created a lake within the pit. Approximately 4.6 million ounces of gold were produced from the Lone Tree mine and approximately 5.2 million ounces of gold were produced at the Lone Tree processing facilities during this time.
Mining on the Brooks deposit, which lies to the southwest of the main Lone Tree pit, was conducted in 2015-2019. Approximately 52,000 ounces were placed on the heap leach pad and residual leaching is ongoing. Residual leaching and ongoing reclamation activities from the Lone Tree mine continued until 2007. In July 2019 the non-operating Lone Tree project became part of NGM, and i-80 then, through its subsidiary Goldcorp Dee LLC, acquired the Lone Tree property and processing facilities from NGM on October 14, 2021.
Geological Setting, Mineralization and Deposit Types
Mineralization is structurally controlled within three Paleozoic rock sequences at the Lone Tree deposit. The oldest of these three is the Valmy Formation which is unconformably overlain by rocks of the Pennsylvanian Antler Sequence of the Battle and Edna Mountain Formations. The Pennsylvanian-Permian Havallah sequence rocks were thrust over the Antler Sequence rocks in the mine area. The Havallah Sequence is dominated by siltstones, chert and basalts with lesser sandstones and conglomerates. Amongst the three mineralized Paleozoic sequences, Antler Sequence rocks appear to have been preferentially mineralized within the structural zones.
Out of three principal mineralized zones namely the Wayne Zone, the Sequoia Zone, and the Antler High Zone, the Wayne zone is the most preferred zone with higher amount of mineralized material. The main structural component of the Wayne zone is the north-sound trending Powerline Fault. While the pit bottom is currently under water, the footwall of the Powerline fault seems to be exposed on the east wall of the Lone Tree mine.
Regional Geology
The Lone Tree deposit occurs in Humboldt County, Nevada, within the Basin and Range physiographic province, in the northern part of the Battle Mountain mining district. The Battle Mountain mining district is dominated by Late Cretaceous and Eocene age magmatism with a variety of ore deposit types including porphyry Cu-Au, porphyry Mo, skarn, distal disseminated +/- Carlin-type deposits. A number of Cu-Mo porphyry along with sedimentary rock-hosted gold deposits, such as Lone Tree, Buffalo Valley, Marigold, North Peak, and Trenton Canyon, have been classified as distal disseminated and Carlin-type deposits and Au-skarn deposits, such as those at Buckingham, Copper Canyon, Copper basin, and Elder Creek. Au/Ag ratios are consistent with most other Carlin-type deposits, although the lower ratios of some ores overlap with the distal-disseminated Au-Ag deposits such as Lone Tree, Nevada.
The high Au/Ag ratios and lack of base metals have been used to differentiate Carlin-type Deposits from other sedimentary rock-hosted deposits in northern Nevada such as Lone Tree, Nevada, which are classified as pluton-related or distal-disseminated Ag- Au.
64
Table of C o ntents
Regional tectonic activities in northern Nevada, occurred over a period of two billion years starting with Precambrian rocks occurring in the East Humboldt. Paleozoic rocks in this region generally comprise four distinct tectonostratigraphic assemblages:
• Cambrian-Ordovician miogeoclinal carbonate shelf-slope rocks identified through deep drilling in the district but not exposed at the surface.
• Ordovician-Mississippian eugeoclinal siliciclastic rocks of the Roberts Mountain allochthon, including the Valmy Formation.
• Autochthonous Pennsylvanian to Permian shallow-water facies of the Antler overlap sequence.
• Mississippian to Permian deep-water siliciclastic rocks and basalts of the Golconda allochthon, which were thrust on top of the Antler overlap sequence by the Golconda thrust during the Permian-Triassic Sonoma orogeny (Theodore, 2000), constituting the Havallah sequence; many of the clastic constituents of these rocks appear to be sourced from the Antler highlands.
Gold deposits are hosted in a variable stratigraphic package of Ordovician through lower Mississippian shallow-water rocks that have been overthrust by deep-water, siliciclastic allochthonous rocks along the Roberts Mountains Thrust during the late Devonian to Early Mississippian Antler orogeny. Subsequent orogenic shortening during the Pennsylvanian and Permian (Humboldt disturbance), Early Triassic (Sonoma orogeny), Middle Jurassic (Elko orogeny) and Early Cretaceous (Sevier orogeny) have reactivated earlier basement and Antler-related faults. The sedimentary rocks are intruded or unconformably overlain by igneous rocks of three magmatic episodes: Cretaceous, Eocene, and Miocene age.
The current regional physiography is the result of extensional tectonics during the Tertiary. High angle faults formed during this period are interpreted as the main pathways for ore forming fluids. Economic concentrations of gold typically occur near the intersections of northeast and north-south faults, along the margins of intrusive bodies, or at contacts between siliceous and carbonate lithologies. Geochemical enrichment in trace elements such as silver, arsenic, antimony, mercury, and thallium are common to nearly all trend deposits.
Local Geology & Mineralization
Mineralization is hosted within structures which crosscut all three Paleozoic rock sequences present in the mine area. The oldest of these three sequences is the Ordovician Valmy Formation, which is a part of the Roberts Mountain Allochthon.
In the mine area, the Valmy consists primarily of quartzite, with lesser amounts of chert, argillite, and minor basalt. The Valmy rocks are unconformably overlain by rocks of the Pennsylvanian Antler Sequence, which belong to the Battle and Edna Mountain Formations. The Edna Mountain Formation at Lone Tree is typified by a sandy siltstone unit grading downward into a lithic sandstone unit. The Battle Formation is observed as a poorly sorted cobble conglomerate of varying thickness. A thin calcareous sandstone tentatively identified as a lateral equivalent of the Antler Formation rocks present at the Marigold Mine has been encountered in drill holes on the southeastern margin of the mine area. Rocks of the Pennsylvanian-Permian Havallah sequence were thrust over the Antler Sequence rocks in the mine area during the Sonoma Orogeny. The Havallah Sequence at Lone Tree encompasses several rock types within at least three packages, but is dominated by siltstones, chert and basalts with lesser sandstones and conglomerates. Although gold mineralization is present in all three Paleozoic sequences, Antler Sequence rocks appear to have been preferentially mineralized within the structural zones. Alluvial cover over the deposit ranges from a minimum of two feet to a maximum in excess of 400 feet. Bedrock has been sharply down-dropped to the north and to the southeast by post-mineral faulting, creating alluvium-filled basins in excess of 1,000 feet deep.
Three principal mineralized structural zones and at least one lesser zone is currently recognized. The three principal structural zones are known as the Wayne Zone, the Sequoia Zone, and the Antler High Zone. The most significant of the three major zones, in terms of known strike length as well as contained tons and ounces, is known as the Wayne Zone. The Wayne Zone encompasses more than fifty percent of the contained tons and ounces within the overall deposit. The most widely recognized of the lesser zones is known as the Chaotic Zone, aptly named for the structural complexity associated with it.
The Wayne Zone has been described as a system of relatively narrow north-northwest and north-northeast trending faults forming an anastomosing complex of brittle shears enveloping rhomboid blocks of relatively competent but highly fractured domains of lesser strain. With few exceptions, ore-grade mineralization does not extend along the north-northeast and north-northwest faults beyond the margins of the Wayne Zone. Detailed examination of blast hole data clearly demonstrates a "zig-zag" pattern of mineralization within the principal component structure of the Wayne Zone, known as the Powerline Fault. Higher gold grades within the Powerline Fault are commonly associated with the hanging wall and footwall margins of the fault, which averages 50 feet in width.
The Powerline fault zone is a North - South trending high angle fault zone, extends at least 2,500 m along strike. Mineralization is truncated to the north by the NE trending Poplar Fault. Mineralization in the Wayne Zone is hosted in all three rock packages (Valmy, Antler, Havallah) as breccia within the complex structure.
The southern zones of mineralization (Sequoia, Antler High zones) are primarily hosted in the Edna Mtn. Fm. of the Antler sequence. This mineralization is a combination of structural (Sequoia Fault) and stratiform control. Gold is primarily hosted in arsenopyrite rather than arsenian pyrite found in most Carlin-type systems. Lone Tree has always been considered a horst block cored by the Valmy Fm. siliciclastic sediments with the Powerline Fault on west side and Sequoia Fault on east side being the main controls to mineralization.
Mineralization is hosted both within the fault plane itself, and within the highly shattered rocks of the adjacent hanging wall block. The age of the Redwood Fault is not known, but certain evidence suggests that it pre-dates the Sonoma Orogeny.
Mineralized structures have been identified in the hanging wall of the Wayne Zone, and within the footwall of both the Wayne Zone and the Sequoia Zone. Many structures controlling gold mineralization are moderate to high angle, west- or east-dipping normal faults or fractures.
65
Table of C o ntents
Some lower-angle mineralized structures, which are thought to have been re-activated during extension, have been noted. As within the Wayne Zone, mineralization most often occurs at the intersection of NNW and NNE-trending faults of varying dip angles. Strike-slip or oblique-slip motion has been noted on some structures, although kinematic indicators are essentially non-existent in the highly silicified, brittle rocks of the Edna Mountain Formation, or in the Valmy quartzite.
A principal characteristic of the Lone Tree deposit is the spatial coincidence of several structurally controlled episodes of mineralization. Hydrothermal breccias, with as much as 25% matrix expansion, host a significant portion of the gold mineralization. High grade ore occurs at fault or fracture intersections, or at jogs in the faults, which form dilatant zones.
Silicified, multiple phase breccias have been noted along the margins of the principle mineralized zones. These appear to be early, and in general, are lower in grade. Later tectonic breccias have been superposed on the hydrothermal breccias. The most recent structures tend to be milled-breccia post-mineral faults and shears, which often possess >50% clay gouge, and display a crude lamination produced by streaks of iron oxide, pyrite, or angular clasts. Reactivation of high-angle faults is demonstrated by barren, vuggy silica-cemented structures overprinting similarly oriented mineralized zones.
Mineralization is also known to occur in crackle breccias within the more brittle rocks of the Edna Mountain and Valmy Formations, which are crosscut by the Wayne Zone. Zones of intense micro-fracturing noted in the highly silicified Edna Mountain rocks are the closest approximation to "classical" disseminated mineralization yet noted at Lone Tree.
Numerous cross-structures have been identified at Lone Tree. Significant gold mineralization has not been observed in association with any of these structures. The Wayne Zone is cut on the north by a major northeast-trending fault zone known as the Poplar Fault zone. While the Wayne Zone as a structural zone does not appear to be terminated by the Poplar Fault zone, down drop of the bedrock surface, thinning of the mineralized faults, and decreased grade all currently limit the economic potential of the Wayne Zone north of the Poplar. Other northeast-trending faults, such as the Willow Fault in Section 11, have significant effects on the mineralization even though they do not offset the Wayne Zone.
A west-northwest-trending zone of southerly dipping normal faults known as the Pinon Fault zone truncates Lone Tree Hill to the south and is associated with a change in the strike direction of the Wayne Zone at that location. At the extreme southern end of the known mineralization, the Wayne Zone and Sequoia Fault converge. Drilling has identified at least one major northeast-trending structural zone in this area which appears to have some effect on mineralization.
As a result of the fact that the Lone Tree deposit occurs at the margin of a bedrock block essentially surrounded by alluvium, the relationship of the deposit to regional structure is not well understood. It has been speculated that the deposit may have formed in response to strike-slip and normal faulting related to regional wrench faulting. An alternate hypothesis suggests that the faults which control and host mineralization at Lone Tree may be dominantly extensional in nature, with little relationship to strike-slip and wrench faults. The age of the mineralization and of the faults is not known, although it is clear that numerous episodes of fault movement have occurred at the Lone Tree Properties.
The principal alteration process associated with gold mineralization at Lone Tree is potassic alteration. Other alteration types noted in the mine area are argillization, silicification, propylitization, and skarnification. A general progression from oxidized argillic alteration in the Havallah sediments down into unoxidized argillization, silicification and potassic alteration in the Antler and Valmy rocks has been noted. Alteration assemblages are commonly mixed within the fault zones as a result of the structural control of mineralization. Pervasive pre-mineral silicification is common in portions of the Havallah Sequence, and throughout most of the Antler Sequence rocks at Lone Tree Mine.
Gold mineralization occurs as sub-micron sized inclusions within a distinct generation of very fine-grained pyrite and arsenopyrite in the sulfide zone. Evidence gathered to date suggests that the main gold deposition event occurred in a temperature range of 200o to 450o (epithermal to mesothermal). The ore mineralogy shows evidence of two overprinted assemblages reflecting at least two hydrothermal episodes at Lone Tree Properties. Partial oxidation of the main stage mineralization occurred prior to a later, epithermal event characterized by open-space filling textures and weakly auriferous pyrite and marcasite. In the oxidized portions of the deposit, and particularly in the Havallah rocks, gold occurs as micron-sized particles in goethite and limonite. Post-mineral oxidation extends as much as 700 feet down major structures such as the Wayne Zone. No supergene effects or gold remobilization have been proven or documented at the Lone Tree Properties.
Deposit Types
The Lone Tree deposit is characterized as a pluton-related or distal-disseminated Ag- Au deposit. The Lone Tree deposit among others in the Battle Mountain district appears to be related genetically to porphyry systems, even though many deposits do not contain obvious near-surface features that would indicate this connection, mainly because the gold-silver mineralization in these deposits may be over one km away from the causative intrusions. This is why the deposit has been characterized as both "distal disseminated" (to intrusive center). Due to complex tectonic and extension in the region, the mineralization in these deposit types may have substantially different geometric relations to the intrusive centers and hosted in different stratigraphic horizons. The mineralization at Lone Tree occurs in intensely fractured three stratigraphic horizons which is similar in other deposits in the region; however, it is not the same in all deposits.
Gold is associated with low Ag:Au (<2:1), As, Sb, Hg and Tl as well as elevated Bi, Mo and W. Gold is hosted in arsenopyrite indicating higher temperatures of ore formation in comparison to typical Carlin-type deposits where gold is hosted in arsenian pyrite.
66
Table of C o ntents
Exploration
Exploration History
Prospecting around Lone Tree Hill is believed to have started in the middle 1860's when the construction of the Central Pacific portion of the Transcontinental Railroad started about 3 kilometers northeast of the Lone Tree Properties. Sporadic exploration activities continued for copper and gold without much success until Duval Corp and Bear Creek explored the area in 1960's and 1970's for porphyry copper. These exploration activities aided in the discovery of low-grade gold mineralization in the area.
Exploration activities in the 1980s by Nerco, Freeport and several Canadian junior companies yielded intercepts of narrow, fracture filled gold mineralization. In 1989 Cordex and Santa Fe formed a joint venture for exploration of the Lone Tree deposit resulting in a discovery of substantial gold mineralization about 1 km from Lone Tree Hill. Subsequently, 12 additional holes were drilled and a north-south fault system controlling mineralization was discovered. The first gold was poured in 1991.
Later, Newmont acquired the deposit from Santa Fe through a merger and began operations in 1991. Newmont completed mining operations in 2006. Residual leaching and ongoing reclamation activities continued until 2007. In July 2019 the non-operating Lone Tree Project became part of NGM, a joint venture between Barrick and Newmont.
Recent Exploration Drilling
In 2020, a drill-hole (LTE-20001) was drilled on the West side of the mine which tested for the existence of the Comus Formation below the Lone Tree mine. The Comus Formation is significant because it is the host rock for the Turquoise Ridge, Twin Creeks, and Granite Creek Mines. Four zones of mineralization were encountered:
1. Upper zone of 10.7m @ 4.49 g/t above a QFP dike on the contact of the Havallah Fm. and Edna Mtn Fm. The Upper zones of mineralization are consistent with stratiform mineralization identified in wide spaced drilling through the hanging wall to the Powerline Fault; this zone is open in three directions.
2. Zone along the contact of Edna sandstone and Valmy quartzite (7.6m @ 6.04 g/t including 1.5m @ 13.5 g/t).
3. Zone of sulfide breccia in Valmy quartzite (38.1m @ 2.15 g/t w/ grades up to 18.95 g/t Au).
4. Lower zone of mineralization hosted within a QFP dike with sooty pyrite on fractures and in the groundmass of the intrusive (40.3m @ 1.22 g/t).
The Lower Plate Ord. Comus Fm was intercepted at 1155 m (3790'). The Comus is characterized by strong calc-silicate hornfels intruded by fine grained diabase sills.
A narrow zone of mineralization was encountered down dip on the Powerline Fault in the Comus Fm. (3.0m @ 1.84 g/t). Additional drilling is warranted to vector from the strong calc-silicate alteration to intersect ore controlling structures in more reactive host rocks.
Drilling
Between 1980 and 2015 a total of 1,904 drillholes, summarized in a table below, were completed in and around the Lone Tree mine. For the purposes of this resource estimate only 1,840 of these drill holes are utilized.
Hole Type Number Drill Holes Total Footage
Unknown 241 197,561
CORE 108 66,263
CORE; RC 176 139,912
RC 1,379 865,613
Rotary Drilling
Historic drilling included rotary drilling starting in 1980. Samples were typically collected at the drill site after traversing through a rotary wet splitter attached to the return air hose. Most splitters allow for sample size changes by blocking some of the internal rotating vane chambers, thus causing sample material excess to be discarded. The normal sample interval is every five feet, with dry sample weights ranging from 5 to 20 pounds.
Rotary air samples are normally produced by either a down hole percussion hammer bit or a rotary tricone roller bit, with the sample traversing from the bit face up the annulus between the bit and sub or hammer assembly, then into an opening into the drill pipe (interchange) center tube and then up to the surface. In the past ten years more use has been made of drill bits that direct the sample into the center tube through an opening in the drill bit face.
Typically, the sample bag (13" by 26" Tyvek 1680 series porous fabric) is clamped on the splitter outlet. Note that early (circa mid 1980's) rotary air sampling may have been accomplished in dry conditions using non-porous plastic bags.
67
Table of C o ntents
Drilling technique for the last twelve years includes clearing the bottom of the hole after every rod change and before the next sample chips are collected and washing the splitter if any material is noted sticking to the sampling surfaces.
Some early rotary holes were drilled using the conventional air circulation method wherein the sample returned in the annulus between the drill pipe and rock.
Rotary mud drilling includes conventional water-based mud systems in which the sample chips return up the annulus between the drill string and the rock suspended in a 'mud' solution. At the surface, the liquid either runs through a settling trough, and the chips manually scooped out of the trough into bags or is directed over a vibrating screen which allows the fluid to fall drain off while the chips progress into a random vane stationary ('pinball') splitter and then into sample bags.
Reverse Circulation Drilling
The Lone Tree Project followed a standard procedure for Reverse Circulation (RC) drilling executed by a responsible party.
1. Samples are collected by the drill contractors through a rotating splitter attached to the drill rig by the drilling contractor.
2. Samples are collected in five-foot intervals and chip trays are simultaneously filled for later geologic interpretation by the drilling contractor.
3. Nominal sample weight is between 8 and 12 pounds as collected by the drilling contractor.
4. Samples are collected in micro-pore bags to minimize loss of the fine fraction of sample. These bags are provided to the drill contractor by the Newmont drill services department. Bags are tagged with a bar code to track status and for ease of processing and marked with the hole number and sample footage interval for the lab and the project geologist by the drilling contractor.
5. Problems with sample contamination in the rotating splitter (cyclone) are minimized by the strict practice of cleaning the inside of the cyclone regularly by the drilling contractor.
6. All drilling problems, including lost circulation, poor sample recovery, high water flow is discussed with the project geologist and drilling services and remedied, if possible, by the drilling contractor.
7. Samples are prepared for shipment to the assay lab by being placed in multi-sample bins by the drilling contractor.
8. The geologist consults historic data and elects an assay procedure that is appropriate for the style of mineralization (e.g., whether there is a coarse gold issue or "nugget", and what is the nature of the gold mineralization and gold digestion techniques) by the Lone Tree Complex Geology.
9. The geologist completes the sample submittal with all necessary analytical requests, assay packages and submitted quality-check standards (blanks) by the Lone Tree Complex Geology.
10. The geologist notifies the accredited assay lab to request a sample pick-up.
11. Assay results are relayed to the database department and to the project geologist upon completion.
12. Sample pulps and coarse rejects are temporarily stored at the assay lab and then returned for storage at the Twin Creeks warehouse or the Winnemucca hangar - independent assay lab by Newmont drill services.
13. Significant drill intercepts or intercepts that appear anomalously low are often reanalyzed at a different lab as a quality control and verification measure as determined by Lone Tree Complex Geology.
14. Hard copies of the assay results are filed with the completed geology log for the respective hole in the geology logging facility at the Lone Tree offices by the Lone Tree Complex Geology.
15. Assay data are computerized and available for extraction by Database management.
Core Drilling
The following procedure pertains to core drilling and sampling at the Lone Tree Properties:
1. Core is cut by the contractor by a diamond bit in 5 to 10-foot runs. The standard diameter for exploration drilling is HQ, 2 ¾-inch diameter.
2. Samples are laid in boxes containing approximately 10-foot capacities by the drilling contractor.
3. Records are maintained concerning core recovery, run length, core loss, rig time and hole conditioning, and drilling contractor.
4. Blocks are placed in the boxes which mark the end of a core run and record the length of the run and the length of the core recovered by the drilling contractor.
5. All drilling problems, including lost circulation, poor sample recovery, high water flow is discussed with the project geologist and drilling services and remedied, if possible, by the drilling contractor.
6. Any core loss is treated as serious and the proper remedies including fluid modification are implemented by the contractors and the drill services representative by the drilling contractor and Newmont drill services.
7. Boxes are stacked when filled and taken by geology to the logging facility by Lone Tree Complex Geology.
8. Core is washed (minimally) and logged for detailed geologic interpretation. Geotechnical logging is done at the same time as the geology. Core loss is noted on the log by Lone Tree Complex Geology.
9. Sample intervals are marked out in the boxes with aluminum tags for later core cutting/sampling. Sample breaks are based on the geologist's interpretation and lithology/structure/alteration contacts. In general samples in homogenous intervals are nominally 5 feet in length by Lone Tree Complex Geology.
10. The geologist consults historic data and elects an assay procedure that is appropriate for the style of mineralization (e.g., whether there is a coarse gold issue or "nugget", and what is the nature of the gold mineralization and gold digestion techniques) by Lone Tree Complex Geology.
11. The geologist completes the sample submittal with all necessary analytical requests, assay packages and submitted quality-check standards (blanks) by Lone Tree Complex Geology.
68
Table of C o ntents
12. Core is picked up by the drill services group and taken to Twin Creeks mine for cutting and shipment to the assay lab. It is standard procedure to saw the core in half lengthwise and send half to the accredited assay lab and store half in the Twin Creeks warehouse. The geologist can request that the core be cut down a specific "cut line" marked and denoted on the piece of core but this is rare. Whole core (as in the 2003 program) has been sent for assay without cutting in areas where sample integrity must be ensured by drill services.
13. Metallurgical/petrographic/geochemical/density testing may occur at this stage depending on the maturity of the project by Lone Tree Complex Geology, One Tree Process.
14. Remaining half of core is stored in the Twin Creeks warehouse or company-rented hangar in Winnemucca by drill services.
15. Sample pulps and coarse rejects are temporarily stored at the assay lab and then returned for storage at the Twin Creeks warehouse or the Winnemucca hangar by Drill services.
16. Assay results are relayed to the project geologist and the database manager, and a hard copy of the results are filed with the geologic log in the geology logging facilities at the Lone Tree offices by Lone Tree Complex Geology.
17. Significant drill intercepts or intercepts that appear anomalously low may are often reanalyzed at a different lab as a quality control and verification measure by Lone Tree Complex Geology and independent assay lab.
18. Assay data are computerized and available for extraction and geologic modeling-database management, Lone Tree Complex Geology by Proceed to Data Quality Control and Validation Flowsheet.
19. Once core was collected, the footage blocks and cut list were checked for accuracy. The core was then laid out, washed, and logged for lithology, formation, alteration, mineralization, and structural measurements on a standardized Lone Tree Properties log form. Samples were then selected based on geologic changes or approximately every 5 feet in geologically homogenous rock. Samples were marked with aluminum tags. Core was then photographed and processed.
Collar Surveys/Locations
Collar grid coordinates have been determined by optical surveys (1960's through late 1980's), field estimates, Brunton compass and pacing, compass, and string distance, and most recently the use of laser survey or global positioning system measurements. Modern hole locations were transferred electronically to the database and loaded using automated data programs. Hole locations were field checked by Geologists and support staff, plotted on maps, and visually checked for reasonableness in the database.
Drills were oriented on site using a fore and back sight set of survey stakes. Normally these stakes are placed by the geologist using a compass to determine orientation.
Prior to a preliminary economic assessment work is required to better understand the quality and completeness of the drill hole database.
Down-Hole Surveys
Determination of the hole trace has been accomplished historically by projection of the initial collar orientation, using a down-hole single-shot or multi-shot film camera.
Most recent downhole survey practice includes the use of gyroscopic surveys, the results of which are automatically loaded to the drillhole database using a direct import function. Gyroscopic surveys are normally reported at 25-foot intervals. Readings are taken with reference to true north (adjustments for declination are made on-site). Magnetic interference is not generally a problem for most of the drill sites in Nevada. Care is taken to reduce the effects of nearby metal objects when compasses are used for survey tool orientation.
Standard procedure at Lone Tree was to perform a downhole survey on all holes greater than 300 feet in length. In some cases (e.g., important angle holes) shorter holes are surveyed as well. An independent contractor performs the survey. The azimuth of the drilled hole is determined using a correction from magnetic north to true north with a standard Brunton pocket transit/compass. The angle correction used for 2003 was 14.5 degrees west of magnetic north as read on the compass. This correction was standard for the contractors and the geologist lining up the drill rig. The downhole survey is done by lowering a gyro through the intact drilling steel and measuring the deviation of the original angle and the variance of the original azimuth. The survey data was recorded, and the geologist received a hard (paper) copy immediately after the survey. An electronic copy of the data was sent to Newmont data input managers for inclusion in the database. Possible errors were screened by the geologist and the database managers at this stage before the data become final.
Sampling, Analysis and Data Verification
Sampling methodology and security are discussed in Section titled " Drilling " of this Schedule "C", as part of the drilling procedures practiced by Newmont.
Sample Preparation and Analysis
Exploration drill holes were assayed at a variety of accredited laboratories throughout the life of the Lone Tree mine. The most commonly used labs include the internal company labs of Newmont, Santa Fe, and Battle Mountain, as well as Chemex (now "ALS Chemex").
Sample preparation occurs at the analytical laboratories, and techniques vary depending upon laboratory and the type of analysis to be performed. Gold assays are commonly performed by two methods. The first is crushing the entire sample, pulverizing a sample split to minus 100 to 200 mesh, subjecting a 5 to 30 gram split of the pulp to acid or cyanide, and taking readings using an atomic absorption machine. The second method is to pulp the sample, add a lead litharge charge, and fire the sample in a furnace ("fire assay"). The resulting metal bead containing gold is then dissolved in acid and analyzed.
69
Table of C o ntents
In general fire assays with an atomic absorption or gravimetric finish were standard using 1-assay ton samples. Fire assay methods account for 99.97% of the 'best assays' reported in the NGM database. Multi-element ICP geochemical analyses were common but not run on every sample. All gold assay certificates, and geochemical reports were copied and filed with the geologic logs. These logs are available for review in the geology logging facilities at the Lone Tree offices.
Multi-elemental analysis contained in the source database includes ICP and wet geochemistry multi-element suites analyzed by commercial laboratories, consisting of several elements determined from one sample, and XRD/XRF semiquantitative X-ray determinations. Most X-ray analyses were accomplished in-house by the Newmont Metallurgical Services Department.
Data Security
Newmont implemented the use of an AcQuire database in 2002 to store all drilling related data including assays. The database is secured by Oracle permissions, user ODBC connections across a Novell Network, and user license permissions and is maintained by designated database managers.
The Newmont Laboratory at Gold Quarry was electronically connected to the AcQuire database, and an automated process transfers data every two hours. Data from the Lone Tree lab (rare) is loaded via the acQuire data input forms.
Outside lab data, primarily from ALS Chemex, was loaded via an AcQuire direct import protocol. The import program also generates the quality control reports for standards and check samples. Data was normally downloaded from a secure ALS Chemex web site. Access to the site was restricted to three Newmont Nevada employees via a username/password scheme. The ALS Chemex internal QA samples and results are available to Newmont data staff. Regular audits were conducted by ALS Chemex at the request of Newmont.
Survey data was loaded via emailed survey certificates. Sample intervals are electronically created via an automated form at the Newmont sample prep facilities. These intervals update the AcQuire Sample table, and contain the sample ID, footages, and sample types.
Collar creation is accomplished via form inputs. Collar creation for surface holes is restricted to data staff. The coordinates and depths are left blank until an (normally) electronic survey is sent via email or placed on the network. Depths are taken from the geologists email, the drill cost report, from the last assay interval, or driller's logs.
Because of the loss of paper copies due to rodent infestation in the storage facility, starting in 2005 the certificates from Chemex have been sent in the form of non-editable, digitally signed, PDF files. These are archived on the network. No certificates are, or have ever been, available from the internal Newmont labs, nor is QA data generally shared.
Data extractions are accomplished either using the AcQuire software interface, or by use of an in-house program. Extractions are normally done by one of the two database administrators.
QA/QC Procedures
Internal check assays are performed at all labs. Pulps are retained for all assays where pulps are returned by the lab. Either pulps or coarse rejects can be re-assayed.
A combination of in-house Standard Reference Material (SRM) and commercially prepared SRM's were used to control assay accuracy. In-house SRMs have been developed over many years, mainly from gold deposits on the Carlin Trend. Commercial SRMs were obtained from Geostats Pty Ltd in Australia. SRMs represent all grade bins; very high-grade, high-grade, medium-grade, and low-grade gold, in oxide and refractory mineralization. Values have been established for the in-house SRMs for gold assays only, using round robin analysis.
Earlier Standard reference materials (SRMs) were submitted at a nominal frequency of one every 60 metres (200 feet), or one SRM for every 40 samples.
Generally, for RC drilling, blanks are inserted at intervals of 15 meters (50 ft) and multiples of 15 meters (50 ft). For core drilling samples, blanks inserted at nominal 60 metres (200 feet) intervals. This results in a frequency of SRM insertion of between 2% to 5%. The actual rate of insertion depends on the time period.
Approximately 5% of the total material is dispatched to umpire laboratories as part of the check assay program. Typical checks will be on pulps and coarse reject samples to test the analytical processes and preparation procedure, respectively. Overall, each sample batch submitted for analysis will contain between three to seven check samples.
Data Verification
The data and information available for the Lone Tree deposit was reviewed by the author of the Lone Tree Report. This includes the topographic data, the drill hole data, the geological interpretation data, the density data, and documents in support of the processes and procedures followed for collection, compilation, storage, security, and quality control. The review concluded that the processes followed for maintaining the quality of the data meets the best practices guidelines as outlined by CIM. The data are adequate for the use in undertaking a mineral resource estimate. The data provided by NGM is suitable to be used as the basis of a mineral resource estimate that can be used in future studies on the Lone Tree Properties.
70
Table of C o ntents
Mineral Processing and Metallurgical Testing
Oxide Heap Leach
Newmont did a metallurgical study on ore from the Brooks deposit which was mined and processed between 2015 and 2020. During the ten years of operation prior to the acquisition by i-80, Newmont did not conduct any comprehensive metallurgical studies on ore from the Lone Tree deposit. Since its acquisition in 2021, i-80 has not conducted any metallurgical tests or pilot studies on Lone Tree ore(s).
The remaining mineralization in the Lone Tree deposit is located in extensions of the mineralized zones and structures that were mined and processed by Newmont between 1991 and 2019. Therefore, processing data drawn from historical production reported by Newmont/NGM was used to support the metallurgical performances reported herein.
Most of the remaining mineralization in Lone Tree is expected to be sulfidic and require autoclave pretreatment to facilitate gold leaching. Some low grade oxide and high grade oxide ores are also expected but not valued as significant in this study. The historical and proposed recoveries for each material type are shown in the table below and are expected to prevail in the remaining material.
Recoveries and Material Types or Lone Tree
Mine Definition Process 2005 Actual 4 (%)
Life of Property Actual (% Proposed Au Recovery 1 (%)
Lone Tree High Grade Oxide ore CIP/CIL 94.2 NA 60
Lone Tree High Grade Sulfidic Ore Autoclave/CIL 2
94.6 93.05 5 %
94.9
Lone Tree Concentrates Autoclave/CIL 91 NA 93.9
Lone Tree Low Grade Sulfides Flotation 3
77.52 81.35 5 %
78.59
Lone Tree Low Grade Oxides Heap Leach NA 81 6 %
67.3
Lone Tree Leach Grade Sulfides Heap Leach NA NA 63.6
1. Source - Zacarias, P., A., February 28, 2006, 2005 Mineral Resource and Ore Reserve Report as of December 31, 2005, pp65.
2. Autoclave recovery based on acid autoclave.
3. Flotation Recovery - Recovery is to Concentrate= 83.7% and then 93.9% recovery from the Concentrate results in a - Combined Recovery - 83.7(93.9) = 78.59%.
4. Source - 2005 LT Summary.xls
5. Source - Lone Tree Statistics (1998 - H1 2019).xlsx.
6. Source - 2.4.4.1.3 Brooks leach curve EA.25.xlsx and i-80 Pad Tracking LoneTree.xlsx
Mineral Resource Estimates
The estimated mineral resources are presented in the table below.
Tonnes (Mt) Au (g/t) Au (K ozs)
Indicated Mineral Resources 7.69
1.73
428
Inferred Mineral Resources 52.94
1.64
2,789
Notes:
(1) Mineral Resources have an effective date of December 31, 2024.
(2) Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability.
(3) Mineral resources are shown above a 0.62 g/T (0.018 opt) Au cut-off grade.
(4) Mineral Resources are constrained to oxide and transitional oxide-sulfide mineralization inside a conceptual open pit shell. A gold price of $2,175/oz Au. A 94.9% recovery for gold in the autoclave process and 78.6% recovery for flotation is used as parameters for pit shell construction. Open pit mining costs of $3.00 per ton for rocks and $2.75 for fill materials, average processing 2,500 tpd autoclave at $44.50 per ton processed and 5,000 tpd flotation at $29.91 per ton including general and administrative costs are considered. A 3% NSR royalty and pit slopes of 40° to 45° was used.
(5) Mineral Resources are stated as in-situ with no consideration for planned or unplanned external mining dilution.
(6) The contained gold estimates in the Mineral Resource table have not been adjusted for metallurgical recoveries.
(7) Units shown are in Million Tonnes (MT), grams per metric tonne (g/T), and thousands of ounces of contained gold (K ozs).
(8) Numbers have been rounded as required by reporting guidelines and may result in apparent summation differences.
Criteria for Reasonable Prospect for Economic Extraction
To meet the RPEE criteria, an optimized pit shell was created within which all blocks will be considered as resources. An optimized pit shell was generated using a $2,175 gold price, $44.50 per ton milled Autoclave processing cost, $29.91 per ton milled flotation processing cost, and 94.9% recovery factor for autoclave and 78.6% recovery factor for flotation based on the operational data from i-80 Gold. The gold price of $2,175 was provided by i-80 using the consensus forward prices as of December 2024 as provided by major Canadian financial institutions. This pit shell meets the RPEE criteria and, hence, will be used for resource statements. The cutoff grade is the minimum gold grade at which the value for ore processing is positive and applying a 3% royalty. The cutoff grade used is 0.018 ounces per ton or 0.62 grams per metric tonne. See Section 11.10 of the Lone Tree Report for more information.
The following parameters are used for generating the optimized pit limit. The optimum pit-shell was developed by Mr. Paul Gates, an associate of GeoGlobal. This pit shell will be referred to as the $2,175 pit shell.
71
Table of C o ntents
Optimum Pit Criteria Applied to Resource Estimate
.
Variables Value Notes
Au Price $2,175 Provided by i-80 Gold
Mine Cost ($/ton)
$3.00 Rock (Provided by i-80 Gold)
$2.75 Fill material (Provided by i-80 Gold)
Processing + G&A Cost ($/ton) $44.50 for autoclave
$29.91 for flotation Assume 2,500 tons per day autoclave and 5,000 tons per day Flotation (Refer Section 14
Recovery 94.9% for autoclave
78.6% for flotation Refer to Section 10, Table 10‑1
Royalty 3.0% NSR
Cutoff Grade 0.018 Opt (i.e. 0.62 g/Tonne) Refer discussions above
Slope Angles 40°-45° Azimuth from 20 o to 219 o slope angle 45 o
Azimuth from 220 o to 19 o slope angle 40 o
Mineral Resources Comparison
For the year ended December 31, 2023, the Company was not subject to S-K 1300, and reported its mineral reserve and resources in accordance with NI 43-101.
The comparison of the Mineral Resources as of December 31, 2023 and December 31, 2024 can be found in the table below.
In 2024 the total tonnes and ounces in the Lone Tree Open Pit in both the indicated and inferred categories increased due to a new resource estimate which used a higher gold price and lower cut-off grade than the previous estimate.
December 31, 2024 December 31, 2023 Percent Difference
Category Ounces
Gold Ounces
Silver Ounces
Gold Ounces
Silver Gold Silver
Indicated 428 — 410 0 4% —%
Inferred 2,789 — 2,764 0 1% —%
Net Book Value
The net book value of Lone Tree and its associated plant, equipment and mineral interests was approximately $220.9 million as of December 31, 2024.
72
Table of C o ntents
Ruby Hill Complex
Property Description and Location
The Ruby Hill project (the "Ruby Hill Project", "Ruby Hill", or the "Project"), acquired together with company operating the Project (Ruby Hill Mining Company LLC ("RHMC")) in July 2021 by i-80 Gold Corp. ("i-80 Gold"), is a mine located in Nevada, U.S.A. The Project consists of mining and mill site claims and patents, surface landholdings, water rights, mine and mineral processing infrastructure, the Mineral Point Trend, and the Archimedes deposit. The Archimedes deposit is comprised of the West Archimedes, East Archimedes, Blackjack, 426 and Ruby Deeps zones. RHMC acquired the Ruby Hill Project from Barrick Gold Corporation ("Barrick") in 2015. When Barrick sold the Ruby Hill Project, the open pit mine was on care and maintenance following a slope failure on the south wall of the pit that caused suspension of mining activities in 2013. RHMC's intent was to re-compile the Ruby Hill Mineral Resource Database and study restart of operations and development of the Mineral Point, 426, Blackjack and Ruby Deeps zones. RHMC continued to irrigate and recover gold from the heap leach pads and re-activated the open pit in 2020 to mine 12 benches on the north wall of the pit to the level of the slide material from the south wall that filled bottom of the pit. i-80 Gold acquired RHMC and the Ruby Hill Project in a transaction with Waterton Nevada Splitter LLC and Waterton Nevada Splitter II LLC (collectively, "Waterton") in July 2021.
Location and Access
The Ruby Hill Project is located on the Battle Mountain/Eureka gold trend approximately 1.5 miles northwest of the town of Eureka in Eureka County, Nevada, U.S.A., approximately 115 miles south of Elko and 245 miles east of the city of Reno, Nevada, U.S.A.
The Project is a 4.5-hour drive east of Reno, Nevada. Access to the Project area from Reno is via Interstate Highway 80 for 65 miles to the town of Fallon, then 180 miles east from Fallon on paved U.S. Highway 50 to its intersection with Nevada State Highway 278, and south from U.S. Highway 50 on a well-graded dirt road for less than one mile to the site gate. The Project area can also be accessed from Elko via Interstate Highway 80 for 35 km, then south on Highway 278 for 115 miles to Eureka. Additionally, the Ruby Hill Project can be accessed from Ely, Nevada near the border with Utah, west along US Highway 50 for 78 miles.
The nearest airport is a regional airport located in Elko, Nevada, where scheduled commercial service is available. Year-round road access to the property is available from Elko, located to the north, Reno to the south and Eureka and Ely, located to the east of the Ruby Rill Project.
Property
The property is located on owned fee land, owned and leased patented mining claims, and owned and leased unpatented mining claims. i-80 Gold purchased the northern portion of the Ruby Hill property, containing the Archimedes and Mineral Point deposits and small historic underground mines including TL, Holly and Helen from Waterton Global in 2021. The southern portion of the property, including the historic Ruby Hill mine and FAD deposit, was acquired by i-80 through a merger with Golden Hill Mining Corporation in 2022. The Ruby Hill complex comprises 10,608 acres from the Ruby Hill purchase and 3,229 acres from the Golden Hill Merger. i-80 differentiates the property for managerial/administrative purposes, referring to the northern portion as Ruby Hill and the southern portion as Golden Hill. Collectively they are known as the Ruby Hill Project or the Ruby Hill Complex.
The Ruby Hill Complex land position comprises various forms of title. On the northern Ruby Hill portion of the property, i-80, through its wholly owned subsidiaries Ruby Hill Mining Company LLC and Golden Hill Mining Corporation, owns 34 patented claims, 640 unpatented claims, and leases seven unpatented lode claims. i-80 also owns a land patent covering about 1,644.5 acres (665.6 hectares) in the vicinity of the Archimedes and Mineral Point deposits. The mineral rights underlying the patented land are held by patented and unpatented lode claims.
On the Golden Hill portion of the property, i-80 owns 105 patented lode and millsite claims, leases 5 patented claims, owns 149 unpatented lode claims, and leases seven unpatented lode claims.
Patented land is subject to property taxes and lease holding payments to the claim owner if applicable. Unpatented claims have annual maintenance fees of $200 per claim payable to the Bureau of Land Management and a notice of intent to hold (NIH) in the amount of $12 per claim payable to Eureka County. The BLM MLRS mining claim database shows all claim fees paid through September 2025.
Climate
The climate in Eureka County is typical of the high-desert environment. Typical summer temperatures near Eureka range between 50°F and 82°F while winter temperatures range between 18°F and 38°F. Average precipitation is about 11.8 inches including just under 59 inches of snowfall. Typical snow accumulation is roughly 3 inches on average at lower elevations, although occasional large storms may accumulate significantly more for short durations. The town of Eureka lies at about 6485 ft elevation, while the project area ranges from 6160 ft to 6680 ft. The FAD shaft to the south of the Project sits at about 6900 ft elevation.
Mining operations are able to continue year-round with brief pauses for summer lightning storms or unusually heavy winter snowstorms.
73
Table of C o ntents
Royalties
Several royalties are in effect on various areas of the property. The tables below list the royalties in the Ruby Hill area and in the Golden Hill area. The map below shows the royalty areas. Some royalties were retained by previous owners upon sale of the property while others were negotiated as lease agreements with claim holders. Royalties are not payable until production occurs in the area covered by the royalty.
Ruby Hill Royalties
Lessor/Grantor Lease Type
ASARCO Incorporated 4% NSR
RG Royalties, LLC 3% NSR
Arthur A. & Elizabeth O. Biale Trust 3% NSR
Placer Dome 2.5% NSR
74
Table of C o ntents
Golden Hill Royalties
Lessor/Grantor Lease Type
ASARCO Incorporated 4% NSR
Biale Lease 3% NSR
Herrera Lease 4% NSR
MacKenzie Lease (50% Interest) 2% NSR
Warren Lease 4% NSR
RG Royalties 3% NSR
Royalty Consolidation Company 0.5-1.5% NSR
History
The following table summarizes the ownership and exploration history at the Ruby Hill Project:
Ownership and Exploration History at the Ruby Hill Project
Year Company Comment
1864 Various • Oxidized gold-silver deposits discovered by prospectors.
1869 Various • Ruby Hill deposits discovered on Prospect Mountain.
• W.W. McCoy devises furnace for recovering metals from oxidized ores.
1873-1905 Richmond Mining Company • Production from the Ruby Hill deposit.
• Smelting ceased 1890.
1873-1916 Eureka Consolidated Mining Company • Production from the Ruby Hill deposit.
• The Locan shaft was sunk to 1200 level. High water flow encountered in crosscut partially flooding shaft. Shaft dewatering unsuccessful, mine shut down.
• Smelting ceased 1891.
1905-1912 Richmond-Eureka Mining Company • Richmond Mining Company and Eureka Consolidated Mining Company properties consolidated into Richmond-Eureka Mining Company.
• Controlling interest held by Unites States Smelting, Refining, and Mining Company.
• Rehabilitation of Richmond and Eureka consolidated mines. Processing of stope fill and low-grade ore.
1919 Ruby Hill
Development
Company
• Leased property from Richmond-Eureka Mining Company. Dewatered Locan shaft.
• Project abandoned due to exhaustion of finances.
1923 Richmond-Eureka Mining Company • Dewatered Locan shaft to 1,200 level.
• Drove SE crosscut to Ruby Hill fault, and a drift to SW. SW drift encountered high water flow and work stopped.
• Vertical exploration hole (type unknown) drilled from 900 level. Hole caved, and project abandoned.
1920's − 1930's Various lessors • Sporadic production
1937-1959 Eureka Corporation, Ltd. • Obtained leases on Ruby Hill property from Richmond-Eureka Mining Company.
• Completed 4 churn holes (totaling 3,596 feet), 260 surface and underground core holes (87,633.8 feet), 13 mud rotary holes (14,252 feet), and 6 reverse circulation ("RC") holes (9,903 feet).
• Intersection of high-grade polymetallic mineralization in 5 surface core holes led to the FAD shaft being sunk to 2,500' depth to develop mineralization. Underground development encountered high water flow which flooded shaft.
• Rotary drilling in 1953 in Adams Hill area intersected mineralization in Hamburg Dolomite.
• Sinking of the T.L. shaft started in 1953 to exploit mineralization and was completed in 1955 to a depth of 1,127 feet.
• Mining commenced in 1956 and shut down in 1958 due to lack of ore.
1989-1991 ASARCO • Drilled 12 RC exploration holes totaling 5,314 feet.
75
Table of C o ntents
1960-1992 Ruby Hill Mining Company • Richmond-Eureka Mining Company (75%) and Eureka Corporation (25%) form Ruby Hill Mining Company.
• In June 1960 a consortium was formed consisting of Richmond-Eureka Mining Company, Eureka Corporation, Newmont Mining Company, Cyprus Mines Corporation, and Hecla Mining Company to finance additional drilling and produce a FAD feasibility study.
• Collectively, Consortium drilled 148 exploration holes (129,362.3 feet); 13 churn (3,641 feet); 33 Mud Rotary (74,039 feet); 6 percussion (395 feet); 3 RC (1,458 feet); and 93 core holes (50,218.3 feet).
• Fourteen holes drilled in FAD shaft area intersected mineralization. Decision made to dewater FAD shaft to exploit new mineralization.
• In 1963 FAD shaft was dewatered to the 2250 level. New crosscut, 1,028' long, to evaluate mineralized zone completed in 1964. Crosscut used to drill exploration percussion and core holes.
• Drilling completed in 1966 and mine placed on inactive status pending economic evaluation.
• 1966 and 1974 Hecla feasibility studies indicate project not feasible.
• In 1974 Newmont withdrew from the consortium followed by Hecla in 1979.
• Cyprus remains as surviving partner drilling 39 mud rotary (7,945 feet), and 98 air track (4,983 feet) exploration holes for near-surface, bulk-mineable gold mineralization between 1980-1981.
• Exploration unsuccessful and property reverted to Sharon Steel Corporation successor to Ruby Hill Mining Company in 1982.
• Sharon Steel Corporation drilled 127 exploration/definition RC holes totaling 31,539 between 1982 and 1991.
1993-1994 Placer Dome • Drilled 11 RC exploration holes (12,350 feet) at Ruby Flats.
1994 Unknown • Drilled 1 RC hole for 500 feet.
1992-2001 Homestake • Homestake acquired Ruby Hill property from Ruby Hill Mining Company in 1992.
• Exploration/definition drilling between 1992-1993 discovers/defines the Archimedes deposit (both West and East) along with the 426 zone.
• In 1994 Homestake announced plans to develop an open pit mine and processing facility to exploit West Archimedes mineralization. Construction began in 1997 and production commenced in 1998.
• The eastern portion of the Archimedes deposit (East Archimedes) not developed due to low gold prices, high strip ratio, change of mineralization from oxide to sulfide, and mineralization largely below water table creating permitting issues.
• Mining ceased in 2002 and reclamation activities started on mine waste dumps and pit area.
• Completed 1,502 (1,022,842.5 feet) exploration/definition holes between 1992-2001; 1374 RC holes (875,083 feet), and 128 core holes (147,759.5 feet).
• DIGHEM Surveys conducted an airborne magnetic & electromagnetic survey in 1994 on E-W flight lines at nominal 600' spacing with mean terrain clearance of 115 feet.
• Zonge Geosciences completed ground magnetics survey at 150' spacing in 2000.
• In 1998, conducted dump sampling program on Diamond Tunnel dump to evaluate grade and tonnage.
• Between 1999-2000 conducted rock chip sampling program to determine.
76
Table of C o ntents
2001-2015 Barrick • Barrick acquired Ruby Hill property during 2001 merger with Homestake.
• In 2002 Chadwick and Russell completed Archimedes pit mapping.
• Completed positive feasibility study on East Archimedes deposit in 2004, a mineral reserve audit in 2005, and NI 43-101 Technical Reports in 2008 and 2012.
• 2005 East Archimedes developed as conventional open-pit mining and heap leach operation with initial gold production in 2007.
• In 2013 the East Archimedes high wall failed, and mining was suspended pending economic assessment of moving failed material to continue mining.
• Barrick completed a pre-feasibility study on the 426 zone in 2009 and a feasibility study in 2012. The 2012 feasibility concluded that the 426 zone needed +$975/oz gold to be economical.
• 2003-2015 drilled 674 (811,575 feet) exploration/infill/definition drill holes; 523 RC (630,745 feet) and 151 core (180,830) holes.
• 2002 Quantec Consulting Inc. conducted a 5-line Titan-24 magnetotelluric survey, added additional 4 lines in 2010.
• 2006 merged gravity data from multiple sources and various scales.
• 2007 Magee Geophysics Services LLC conducted a 3,182 station gravity survey on 300' grid spacing.
• Conducted rock chip sampling program in 2002.
2015 Waterton • Purchased Ruby Hill mine from Barrick. Waterton formed new corporate entity called Ruby Hill Mining Company, LLC.
2015-2021 RHMC • Completed 42 sonic drill holes totaling 4,106' between 2019 – 2020.
• 2017 reprocessing of selected historical geophysical datasets, multi-element analysis study of drill core to aid in lithology identification, and structural review by SRK. Conveyed the Historic Ruby Hill claims and Fad Mine to Golden Hill Mining Corp.
• In August 2021 there was continued residual leaching and gold production from the East Archimedes heap leach pad.
• McCoy Mining was hired to begin mining from the bottom of the East Archimedes Pit in August 2020. The operation mined about 2,599,000 tons of ore containing 40,900 ozs Au. Mining was completed in November of 2021
October 2021- Present i-80 Gold Corp • Acquired Project October 18, 2021.
• Completed East Archimedes mining November 2021.
• Residual leaching and gold recovery from the East Archimedes heap leach pad.
• IP Survey 2022.
• Ongoing drilling (72 holes totaling 135,941 ft (41,435 m) at time of writing. (Not all holes are within the current resource area.)
• February 2023 purchased FAD property from Paycore Minerals. Paycore had initiated drilling programs testing CRD mineralization at depth and a near-surface oxide target proximal to historic Archimedes Underground mine with favorable results.
April 2022- February 2023 Golden Hill Mining Corp. • Acquired FAD property (south of the Project), drilled 33,675 feet (10264 m), sold to i-80
77
Table of C o ntents
Production History at the Ruby Hill Project
Year Company Comment
1866-1964 Numerous Eureka District produced 1.65 Moz Au, 39 Moz Ag, 625 Mlb Pb and 12 Mlb Zn from 2 Mtons of ore.
• 1873-1905 Richmond Mining Company mined 488,081 tons of material valued at $15,209,012.
• 1873-1916 Eureka Consolidated Mining Company mined 550,455 tons material valued at $19,242,012.
• 1871-1939 Richmond-Eureka Mining Company mined 88,081 tons material valued at $4,021,674.
• Small scale sporadic production from numerous lessors.
1998-2000 Homestake Produced 365,491 oz Au from 3.7 Mtons of mineralization from West Archimedes Pit
2001-2015 Barrick Produced 1,081,458 oz Au from approximately 18 Mtons of ore from West and East Archimedes Pits
2016-2021 RHMC Produced 21,105 oz Au from residual leaching of pad. Began mining East Archimedes Pit in August 2021.
2021-2024
RHMC
Produced 23,292 oz Au from residual leaching of pad.
78
Table of C o ntents
Geological Setting, Mineralization and Deposit Types
Regional Geology
The Ruby Hill Project is located in the Eureka mining district in east-central Nevada, within the northern part of the Fish Creek Range which is a nearly continuous sequence of Cambrian and Ordovician sedimentary rocks totaling nearly 10,000 ft in thickness. These strata accumulated on a stable continental shelf margin and consisted primarily of carbonate units with subordinate shale and sandstone. The Cambrian Eldorado Dolomite, the Hamburg Dolomite and overlying Dunderberg Shale, portions of the Windfall Formation, and the Goodwin-Ninemile transition, host most of the mineralization within the district.
During the Mississippian Antler Orogeny, the Roberts Mountains Allochthon, consisting primarily of deep marine sedimentary rocks, was thrust from the west onto the continental margin, creating a foreland basin in the vicinity of the present-day location of the town of Eureka, Nevada. Post-Antler Mississippian and Permian strata deposited after the Antler Orogeny filled the basin with arbonaceous silts, sands, and conglomerates represented by the Chainman and Diamond Peak formations.
Thrust faulting and significant deformation of the Paleozoic section occurred between Permian and Late Cretaceous time, and culminated in the development of the Prospect Mountain duplex of the Early Cretaceous Hoosac thrust fault; a major regional scale structure that cuts Permian rocks, and is in turn cut by intrusive units dated 110 to 100 Ma. Most of the Eureka district is located in the hanging wall of the Hoosac thrust.
Cretaceous fresh-water sedimentary rocks unconformably overlie the older Paleozoic units east of Eureka, Nevada. Cretaceous age granodiorite and quartz porphyry intrude the Paleozoic section. These include the Mineral Hill stock, Bullwhacker Sill, and Graveyard Flat intrusive which are interpreted to be genetically linked to the base metalcarbonate replacement deposits at Ruby Hill, as well as to those in the Ruby Deeps. Oligocene volcanic tuffs and andesite intrusive rocks are also present within the district, primarily to the NE and SE. The youngest deformational event occurred during the Miocene when basin and Range extension formed regional highangle N-S trending normal faults.
The Eureka district hosts mid-Cretaceous, igneous-related, polymetallic carbonate replacement deposits that have subsequently been overprinted by Carlin-type gold-silver mineralization. Gold and silver mineralization possibly dates to the early-middle Cenozoic (Eocene) and temporally coincides with the onset of extension and Eocene-Oligocene magmatism. Post mineral uplift exposed portions of the Archimedes gold deposit, and likely contributed to the relatively deep level of oxidation. Subsequent Miocene Basin and Range faulting resulted in reburial of the Archimedes system beneath 60 to 500 ft of Tertiary-Quaternary overburden in East Archimedes.
Local and Property Geology
The Ruby Hill Project is located along the southeastern end of the Battle Mountain/Eureka gold trend. The Eureka gold mining district exposes a nearly continuous sequence of Cambrian and Ordovician sedimentary rocks approximately 10,000' thick consisting of primarily carbonate units with subordinate shale and quartz sandstone.
The main precious metal mineralization at Ruby Hill occurs in favorable lithostratigraphic units bound by high angle structures that are interpreted to have been conduits for hydrothermal fluids responsible for gold and silver mineralization. There is also earlier carbonate replacement base metal mineralization in skarn-altered limestone units proximal to Cretaceous intrusions.
Mineralization
Within the Ruby Hill Project area, two styles of mineralization occur:
• Early polymetallic (Au-Ag-Pb-Zn) skarn or carbonate replacement deposit ("CRD"): Blackjack and TL.
• Late Au±Ag Carlin-type: East Archimedes, West Archimedes, 426, Ruby Deeps, Mineral Point zones.
The polymetallic skarn and CRD style is the oldest mineralization event recognized at the Ruby Hill Project and related to emplacement of the Cretaceous intrusive units. The precious metal-rich Carlin style overprints the older CRD event and interpreted to have developed during early-middle Cenozoic (Eocene) times, similar to other Au-Ag deposits of the Battle Mountain/Eureka Trend. Mineralization is largely controlled by lithology and structure.
Gold-silver mineralization occurs broadly as a near N-trending zone (Mineral Point Trend), consisting of smaller zones of structurally and lithologically controlled deposits (East and West Archimedes, 426, Ruby Deeps, Mineral Point, Achilles, and Hector). Mineralization, both Au-Ag and Au-Au-Pb-Zn is primarily hosted within the Windfall and Goodwin Formations, and within the Hamburg Dolomite. Combined mineralization spans an area approximately 12,000 ft long, 9,000 ft wide, at the maxima, and spans from surface to approximately 2,400 ft below surface. Mineralization is focused along high- and low-angle faults, lithologic contacts, fold axis, and sanded plus breccia zones.
Gold occurs as free grains within the oxide portions along with iron oxides, and associated with sulfide minerals (pyrite, arsenopyrite, arsenian pyrite, realgar, and orpiment) within the unoxidized portions of the deposits. Within the oxide horizons, petrographic work for samples from the Archimedes deposits "…indicate(s) that the gold was originally associated with pyrite grains, with no evidence of silica encapsulation. Higher grade gold mineralization occurs in zones of jasperoid and decalcified limestone".
79
Table of C o ntents
Mineral Point Trend Geology and Mineralization
The Mineral Point Trend deposit consists of gold and silver mineralization hosted by the Cambrian Hamburg dolomite in the nose of a broad anticline that plunges to the northnortheast and is bound to the east by the Holly Fault and to the west by the West Fault. The Mineral Point Trend is 9,000 ft long, 2,400 ft wide and up to 500 ft thick. The top of the Mineral Point Trend is near surface at its south end and 500 ft below surface at its north end. Majority of the mineralization in the Mineral Point Trend deposit is oxidized and has a high ratio of cyanide soluble to fire assay total gold. This deposit has not been mined and is the largest precious metal Mineral Resource in the Ruby Hill Project.
West Archimedes Geology and Mineralization
The West Archimedes deposit is hosted in the Ordovician Upper Goodwin limestone unit and is bound to the west by the Holly Fault. The zone strikes north-west and dips shallowly to the north-east. The deposit measures 2,000 ft along strike and 740 ft down dip and is up to 300 ft thick. The majority of West Archimedes was mined in an open pit before mining at East Archimedes. The mineralization in the West Archimedes deposit is oxidized and has a high ratio of cyanide soluble to fire assay total gold.
East Archimedes Geology and Mineralization
The East Archimedes Zone occurs east of the Graveyard Fault and proximal to the Graveyard Stock. Mineralization extends eastward from the West Archimedes Zone in the Upper Goodwin Formation and extends downward in the Lower Laminated and Lower Goodwin units along the contact with the Graveyard Stock. Silver and base metal grades are elevated in the East Archimedes zone in comparison with the other zones in the Ruby Hill Project in an envelope around the Blackjack zone replacement-style zinc mineralization described below. Mineralization in East Archimedes is roughly 1,200 ft wide and 1,200 ft long in plan and extends from surface where it is well defined by shallow drilling to several mineralized intersections over 1,800 ft below surface. The upper portion of the East Archimedes deposit, above an elevation of approximately 5,000 ft, is oxidized and transitional oxide-sulfide mineralization with a high ratio of cyanide soluble to total fire assay gold. The upper portion of the East Archimedes zone has been mined from surface.
426 Zone Geology and Mineralization
The 426 zone occurs in the Lower Laminated unit of the Goodwin Formation and the upper part of the underlying basal Goodwin unit of the Goodwin Formation in the nose of a fold. The mineralized zone forms a rod-shaped body plunging shallowly to the northeast that is 1,400 ft long, 200 ft wide and 200 ft thick. The top of the zone is approximately 1,000' below surface, but it is 500' below the bottom of the current East Archimedes pit bottom. Majority of the higher-grade mineralization occurring in the Goodwin Formation Lower Laminated unit is sulfide-style mineralization with a low ratio of cyanide soluble to total fire assay gold but the lower portion of the zone that is hosted in the basal Goodwin Unit has a moderate cyanide soluble to total fire assay gold mineralization.
Ruby Deeps Zone Geology and Mineralization
The Ruby Deeps zone is a north-northeast striking, shallowly east dipping zone of mineralization hosted in the Windfall Formation in proximity to bodies of Bullwhacker Sill intrusive bound by the Graveyard Fault to the east and the Holly Fault to the west. The zone is 2,400 ft long 500 ft wide and 600 ft thick. The top of the zone is 1,600 ft below surface and 1,000 ft below the bottom of the West Archimedes pit. Within the zone there are several tabular horizons of higher-grade mineralization that are 40 ft to 100 ft thick.
Blackjack Zone Geology and Mineralization
The Blackjack zone is a pod of replacement style zinc mineralization hosted by the Lower Goodwin Unit directly in contact with the Graveyard Stock within the East Archimedes Zone. Mineralization occurs as a pod of sphalerite mineralization with elevated lead, copper, and silver. The base metal-rich carbonate replacement style mineralization has been overprinted by later Carlin-style gold mineralization. The Blackjack zone measures approximately 500 ft wide, 500 ft long, and 950 ft high. The upper part of the Blackjack zone is partially oxidized with a high-to-moderate ratio of cyanide soluble to total fire assay gold, but sphalerite is un-oxidized. The lower portion of the zone is un-oxidized.
Deposit Types
Mineralization at Ruby Hill is characterized by intrusion-related distal-disseminated, carbonate replacement, and skarn deposits that have been overprinted by younger Carlin-type gold mineralization.
Polymetallic Replacement Deposits
The carbonate replacement mineralization is similar to other polymetallic (Pb-Zn-Ag ±Au) deposits found worldwide that are spatially associated with Cretaceous age intrusive units.
Carlin-Type Gold Deposits
Gold and silver mineralization within the Ruby Hill deposits is predominantly attributed to a Carlin-type overprint interpreted to temporally coincide with the onset of extensional tectonics and Eocene-Oligocene magmatism.
80
Table of C o ntents
The structural setting, alteration mineralogy, and mineralization characteristics of the Ruby Hill gold deposits is consistent with Carlin-type deposits.
Carbonate Replacement and Carlin Style Mineralization at Ruby Hill
Elevated concentrations of zinc, lead, copper and silver are found in the Mineral Point Trend and the Blackjack zone and deeper parts of the Ruby Deeps zone of the Archimedes deposit. This mineralization is attributed to the earlier polymetallic carbonate replacement phase of mineralization and is found in favorable carbonate units proximal to the Graveyard Stock and Bullwhacker Sill.
The gold mineralization at Ruby Hill precious metal deposits have features typical of Carlin-type gold deposits and can consider to be members of the broad spectrum of Carlin-type gold deposits found in the Great Basin. These include:
• Complex structural and stratigraphic controls on gold mineralization.
• Nature of alteration (jasperoid formation, decalcification, sanding, argillic alteration).
• Association of micron scale gold with fine grained pyrite.
• General geochemical signature of anomalous As-Sb-Hg.
• Tertiary age of gold mineralization coinciding with Basin and Range extension.
The authors concluded that the local structural setting, host rocks and mineralization style of the Blackjack zone and deeper parts of the Ruby Deeps Zone and Mineral Point Trend are consistent with a carbonate replacement or skarn type Zn-Pb-Cu-Ag-Au style mineralization.
The tectonic and local structural settings, lithological characteristics of the host rock, alteration mineralization style of the Mineral Point, Hector, East Archimedes, West Archimedes 426 and Ruby Deeps zones are consistent with the Carlin-style sedimenthosted precious metal mineralization found in northern Nevada.
The authors expressed an opinion that deposit model concepts, and the understanding of the geological features of the Ruby Hill Project that control precious and base metal mineralization are sufficiently advanced to support exploration activities and Mineral Resource estimation.
Mineral Resource and Mineral Reserve Estimates
Mineral Resource Estimate
Archimedes Open Pit
The Archimedes deposit was previously mined by Homestake and Barrick for West Archimedes and East Archimedes respectively. Mining ceased after a pit wall failure. In this study an updated estimation of the Archimedes mineral resource has been developed Forte Dynamics, Inc. (Forte), and the mining potential for continuing the surface exploitation of the deposit was evaluated to estimate a current open pit mineral resource estimate.
The Archimedes mineral resources are detailed in the table below. Mineral resources are not Mineral Reserves and have not been demonstrated to have economic viability. There is no certainty that the mineral resource will be converted to Mineral Reserves. Inferred mineral resources do not have sufficient confidence that modifying factors can be applied to convert them to mineral reserves. The quantity and grade or quality is an estimate and is rounded to reflect the fact that it is an approximation. Quantities may not sum due to rounding.
Deposit Cutoff Au
(g/t) Tonnes
(000) Au
(g/t) Ag
(g/t) Au oz
(000) Ag oz
(000)
Indicated Mineral Resources
Archimedes Pit 0.2 4,280 1.98 10.7 272 1,460
0.1 4,320 1.96 10.6 272 1,490
0.05 4,340 1.95 10.6 272 1,480
Inferred Mineral Resources
Archimedes Pit 0.2 820 1.18 8.9 31 230
0.1 870 1.12 8.5 31 250
0.05 880 1.11 8.5 31 250
Notes:
(1) Mineral resources have an effective date of December 31, 2024.
(2) Mineral resources are the portion of Mineral Point that can be mined profitably by open pit mining method and processed by heap leaching.
(3) Mineral resources are below an updated topographic surface (below Archimedes pit).
(4) Mineral resources are constrained to economic material inside a conceptual open pit shell. The main parameters for pit shell construction are a gold price of $2,175/oz Au, a silver price of $26.00/oz, average gold recovery of 77%, average silver recovery of 40%, open pit mining costs of $3.31/tonne, heap leach average processing costs of $3.47/tonne, general and administrative cost of $0.83/tonne processed, gold refining cost of $1.85/oz, silver refining cost of $0.50, and a 3% royalty.
(5) Mineral resources are reported above a 0.1 g/t Au cutoff grade. Silver revenues were not considered in the cutoff grade.
81
Table of C o ntents
(6) Mineral resources are stated as in situ.
(7) Mineral resources have not been adjusted for metallurgical recoveries.
(8) Reported units are metric tonnes.
(9) Reported table numbers have been rounded as required by reporting guidelines and may result in summation discrepancies.
Mineral Point Open Pit Mineral Resource Statement
The estimated tonnages and grades in the mineral resource estimate have not been adjusted for mining recovery and dilution. Contained metal estimates in the mineral resource statement table have not been adjusted for metallurgical recoveries.
Mineral resources are not Mineral Reserves and have not been demonstrated to have economic viability. There is no certainty that the mineral resource will be converted to mineral reserves. The quantity and grade or quality is an estimate and is rounded to reflect the fact that it is an approximation. Quantities may not sum due to rounding.
There is no guarantee that mineral resources can be converted to mineral reserves. Inferred mineral resources do not have sufficient confidence that modifying factors can be applied to convert them to mineral reserves.
Deposit Tonnes
(000) Au
(g/t) Ag
(g/t) Au oz
(000) Ag oz
(000)
Indicated Mineral Resources
Mineral Point 216,982 0.48 15 3,376 104,332
Total Indicated 216,982 0.48 15 3,376 104,332
Inferred Mineral Resources
Mineral Point 194,442 0.34 14.6 2,117 91,473
Total Inferred 194,442 0.34 14.6 2,117 91,473
(1) Mineral resources have an effective date of December 31, 2024.
(2) Mineral resources are the portion of Mineral Point that can be mined profitably by open pit mining method and processed by heap leaching.
(3) Mineral resources are below an updated topographic surface.
(4) Mineral resources are constrained to economic material inside a conceptual open pit shell. The main parameters for pit shell construction are a gold price of $2,175/oz Au, a silver price of $26.00/oz, average gold recovery of 77%, average silver recovery of 40%, open pit mining costs of $3.31/tonne, heap leach average processing costs of $3.47/tonne, general and administrative cost of $0.83/tonne processed, gold refining cost of $1.85/oz, silver refining cost of $0.50, and a 3% royalty.
(5) Mineral resources are reported above a 0.1 g/t Au cutoff grade.
(6) Mineral resources are stated as in situ.
(7) Mineral resources have not been adjusted for metallurgical recoveries.
(8) Reported units are metric tonnes.
(9) Reported table numbers have been rounded as required by reporting guidelines and may result in summation discrepancies.
Archimedes Underground
Practical Mining LLC estimated the Archimedes Underground mineral resource using all drilling and geological data available through October 31, 2022. Wood Canada Ltd. estimated and reported open pit mineral resources in the inaugural NI 43-101 Technical Report under i-80’s ownership of the Ruby Hill Project. All work, including drilling, done since the time of the inaugural report has targeted the 426, Ruby Deeps and other underground deposits and does not influence the Open Pit mineral resource reported on the October 2021 report. The open pit mineral resources reported in October 2021 are current and are restated herein.
Deposit Tonnes
(000) Au
(g/t) Ag
(g/t) Au oz
(000) Ag oz
(000)
Indicated Mineral Resources
426 899 6.9 0.8 199 22
Ruby Deeps 892 8.3 2.4 237 69
Total Indicated 1,791 7.6 1.6 436 92
Inferred Mineral Resources
426 1,038 6.6 1.2 219 40
Ruby Deeps 3,150 7.6 2.4 769 246
Total Inferred 4,188 7.3 2.1 988 286
Notes:
(1) Underground mineral resources have been estimated at a gold price of $2,175 per troy ounce and a silver price of $27.25 per ounce.
(2) Mineral resources have been estimated using pressure oxidation gold metallurgical recoveries of 96.8% and 89.5% for the 426 and Ruby Deeps deposits respectively.
(3) Pressure oxidation cutoff grades are 5.06 and 5.48 Au g/t (0.148 and 0.160 opt) for the 426 and Ruby Deeps deposits respectively.
(4) Detailed input mining, processing, and G&A costs are defined in Section 18.1.
(5) Units shown are metric.
(6) The contained gold ounces estimates in the mineral resource table have not been adjusted for metallurgical recoveries.
(7) Numbers have been rounded as required by reporting guidelines and may result in apparent summation differences.
(8) A mineral resource is a concentration or occurrence of solid material of economic interest in or on the Earth’s crust in such form, grade or quality and quantity that there are reasonable prospects for eventual economic extraction. The location, quantity, grade or quality, continuity and other geological characteristics of a mineral resource are known, estimated or interpreted from specific geological evidence and knowledge, including sampling.The dimensions of a minimum minable stope cross section are 20 feet wide x 15 feet high. Individual stope lengths can vary from a minimum of 20 feet to a maximum of 100 feet.
82
Table of C o ntents
(9) An inferred mineral resource is that part of a mineral resource for which quantity and grade or quality are estimated on the basis of limited geological evidence and sampling. Geological evidence is sufficient to imply but not verify geological and grade or quality continuity. An inferred mineral resource has a lower level of confidence than that applying to an indicated mineral resource and must not be converted to a Mineral Reserve. It is reasonably expected that the majority of inferred mineral resources could be upgraded to indicated mineral resources with continued exploration.
(10) Mineral resources, which are not Mineral Reserves, do not have demonstrated economic viability. The estimate of mineral resources may be materially affected by environmental, permitting, legal, title, socio-political, marketing, or other relevant factors.
(11) Mineral resources have an effective date of December 31, 2024.
(12) The reference point for mineral resources is in situ.
Reasonable Prospects for Eventual Economic Extraction
A mineral resource optimized LG pit shell was constructed to define the portion of the Mineral Point resource having reasonable prospects for eventual economic extraction (RPEEE) amenable to open pit mining and processing by heap leaching using the 25 ft x 25 ft x 25 ft block model. Open pit mineral resources contained within the pit shell are reported above a fixed cut-off grade of 0.1 g/t Au. See Section 11.4 of the Ruby Hill Report.
Parameters for Mineral Resource Pit Shell Construction
Parameter Unit Value
Metals Price
Gold US$/toz 2,175
Silver US$/toz 26
Au Process Recovery
% 77
Ag Process Recovery
% 40
Mining Operating Cost
US$/tonne 3.31
Processing Cost
US$/tonne 3.47
G&A Cos US$/tonne processed 0.83
Royalty % 3.0%
Payable Meta
Gold % 99.9
Silver % 99.5
Treatment & Refining Cost - Gold
US$/toz 1.85
Treatment & Refining Cost - Silver
US$/toz 0.5
Overall Slope Angles (OSA)
Dumps degree 30
Alluvium degree 55
Sanded degree 45
Unsanded degree 45
(1) Note: Au and Ag presented recoveries are weighted averages for all materials.
Mining Method and Infrastructure
Permitting approval for development and mining above the 5100 elevation is anticipated by the end of Q2 2025 and underground development will commence immediately thereafter. This is consistent with previously approved permits for mining the Archimedes open pits. Production mining in the 426 deposit will start in 2026 and continue through 2027 with oxide material processed on site in the existing heap leach facility and refractory material sent to a third party for toll processing. Permits for mining below the 5100 elevation are anticipated in the second quarter of 2027 with development mining for the Ruby Deeps deposit beginning shortly thereafter.
Mining conditions anticipated are typical for northern Nevada underground mines. Long hole open stoping will be the primary mining method and will be supplemented with underhand drift and fill mining where deposit geometry dictates. Mining will be undertaken by a qualified contractor, eliminating the need to recruit a workforce and purchase mining equipment.
Transportation, electrical and support infrastructure already exists at Ruby Hill. Additional infrastructure requirements are limited to:
• Overhead power line and transformer at the portal site.
• Backfill and shotcrete plants.
• Fuel and oil storage near the portal.
• Contractor’s maintenance facility and office.
• Mine water supply tank.
Archimedes Open Pit
The Archimedes Open Pit mineral resource has not been evaluated for surface mining.
83
Table of C o ntents
Mineral Point Open Pit
The Mineral Point Project is planned as an open pit mining operation using conventional equipment, targeting a processing rate of 68,000 tons per day. While there is currently no Mineral Reserve Estimate, the project contains indicated and inferred mineral resources. Pit optimization using Hexagon Mine Plan software identified an optimal pit shell (LG72) with a 78% revenue factor, containing 4.98 million ounces of gold and 195.5 million ounces of silver at an average stripping ratio of 2.8:1. Key economic parameters include a gold price of $2,175/toz, silver price of $27.25/toz, and heap leach average recovery rates of 78% for gold and 41% for silver. The calculated cutoff grade for gold is 0.011 oz/ton, ensuring the extraction of economically viable material.
The mine design consists of nine pit phases, with mining benches at 50-foot intervals and a projected Life-of-Mine (LOM) of 17 years. The operation will rely on a mining fleet comprising two rope shovels, (2) hydraulic shovels, (26) haul trucks, and various support equipment. Annual production is expected to average 4.5 million ounces of gold and 177.3 million ounces of silver. Dewatering will be required in later mine stages, though the extent is yet to be determined.
The project will leverage existing infrastructure from previous mining activities at the Ruby Hill site, including site access, haul roads, waste rock storage, and power supply, with necessary upgrades. Key processing facilities include a crushing and stacking system, a heap leach pad, and a Merrill Crowe plant for gold and silver recovery. The heap leach facility will be developed in five phases, with a total capacity of 466.8 million tons, while a Merrill Crowe plant will process pregnant leach solution at a rate of 11,500 gallons per minute, ultimately producing doré bars for off-site refining.
Supporting infrastructure includes an expanded truck shop, warehouse, administration building, and water management systems for process, potable, fire suppression, and stormwater control. Power will be sourced from an existing substation with potential upgrades, and site communications will be maintained through telemetry and radio networks. Waste rock storage will utilize both surface storage and in-pit backfilling. Environmental considerations include stormwater management ponds, lined heap leach pads, and containment systems for fuel and hazardous materials. Road expansions and rerouting will be necessary to accommodate mining activities, ensuring operational efficiency while minimizing environmental impact.
Environmental Factors
The closure cost for Ruby Hill is estimated to be $27 million. The associated Bond was accepted by the Bureau of Land Management (BLM) on August 8, 2023 and covers authorized disturbance associated with issued permits for Ruby Hill (RHMC 2023). There are no other known environmental liabilities associated with pre-Project operations.
RHMC controls a total of 8,107-acre feet per annum (AFA) of water rights for consumption and occupation.
Due to a history of over pumping in the region based on a heavy agricultural reliance, the Diamond Valley Basin was categorized as a Critical Management Area (CMA) by the Nevada State Engineer’s office in 2015. The designation allowed the State Engineer and the community to agree on certain tools to reduce over-pumping, including the implementation of a Diamond Valley Groundwater Management Plan (GMP). Following resolution of a lengthy legal dispute by senior water rights holders in the Basin, the GMP was reinstated effective January 1, 2023. As a groundwater user within the GMP designated area, RHMC controls sufficient water rights to support its mining operations.
Social or Community Factors
Mining activity at the property began in the 1860s and has continued with periodic interruptions until the present day. Throughout its history, Ruby Hill has been a constant presence in the town of Eureka and has been an economic benefit to the community by offering employment, direct and indirect benefits.
Ruby Hill and its predecessors, including Homestake Mining Company and Barrick Gold Corporation, have each maintained comprehensive community relations programs. Ruby Hill works closely with community and local stakeholders to provide updates on key developments, including; Project status (operations and permitting) and community program and initiatives.
Due to the proximity of the mine to the town, Ruby Hill diligently monitors; Blasting, Noise, Light, Dust, and Water Use.
RHMC holds quarterly meetings with the public, landowners, and County officials to discuss operational status, safety and environmental compliance at the Project including monitoring, blasting schedules, and other matters of similar relevance to the Project’s neighbors. Additionally, Eureka is a community that is familiar with and supportive of mining. RHMC continues to have a positive professional relationship with its stakeholders, including its regulators at the federal and state agencies.
Permits
In conjunction with the permitting actions associated with the Archimedes Underground Mine Project in-pit surface support facilities, a DNA was deemed sufficient for the PoO Amendment NVN-067782 approved by the BLM March 30, 2023. Additionally, on June 23, 2023, the NDEP-BMRR approved an EDC to WPCP NEV0096103 for the construction of the surface facilities. Permitting actions tied to mining of the underground are currently in progress with the BLM evaluating a PoO Amendment and associated EA while NDEP-BMRR is analyzing a WPCP Major Modification.
84
Table of C o ntents
RHMC is currently permitted to carry out mining operations and reclamation activities at the Project site. This permitting allows it to carry out the exploration, geotechnical and metallurgical field work recommended in this Report. Specific permits related to site activities are presented in the following table.
Ruby Hill Project Significant Permits
Permit Name Permitting Agency/Authority Permit Number
Mine Plan of Operations BLM NVN-067782
Rights of Way BLM N-60801; N-60802; N-60359; N-61422
Class II Air Quality Operating Permit NDEP/BAPC AP1041-0713.04
Mercury Operating Permit to Construct NDEP/BAPC AP1041-2252
Water Pollution Control Permit –
Infiltration Project
NDEP/BMRR NEV2005106
Water Pollution Control Permit – Mine NDEP/BMRR NEV0096103
Reclamation Permit (Mine) NDEP/BMRR 0107
Mining Stormwater General Permit NDEP/BWPC NVR300000: MSW-44886
Public Drinking Water System NDEP-BSDW EU-0885-NTNC: NV0000885
Nitrate Removal System NDEP-BSDW EU-0885-TP02: NV0000885
Onsite Sewage Disposal System NDEP/BWPC GNEVOSDS09 L0107
Industrial Artificial Pond Permit NDOW S479016
Hazardous Materials Permit Nevada State Fire Marshal 112113
Class III Waivered Landfill NDEP-BSMM SWW362
EPA RCRA Hazardous Waste ID (Small Quantity Generator) NDEP-BSMM NVR000002899
Waters of the United States Jurisdictional Determination USACOE Updated Request for Jurisdictional Determination (JD) approval submitted to USACOE 11/01/2022 as current JD expired 11/13/2022
Water Use Permits
RHMC controls a total of 8,107 acre feet per annum (AFA) of water rights for consumption and occupation (RHMC, 2024).
Due to a history of over pumping in the region based on a heavy agricultural reliance, the Diamond Valley Basin was categorized as a CMA by the Nevada State Engineer’s office in 2015. The designation allowed the State Engineer and the community to agree on certain tools to reduce over-pumping, including the implementation of a Diamond Valley GMP. Following resolution of a lengthy legal dispute by senior water rights holders in the Basin, the GMP was reinstated effective January 1, 2023. As a groundwater user within the GMP designated area, RHMC controls sufficient water rights to support its mining operations.
Metallurgy and Mineral Processing
Historically, there have been three destinations for treatment of mineralization from the Ruby Hill Mine: (i) run of mine (ROM) and crushed mineralization to a heap leach pad, (ii) crushing and tank leaching with agglomerated tailings routed to the heap leach pad, and (iii) higher-grade sulfide mineralization (DSO) routed to Nevada Gold Mines Goldstrike Operation for autoclave processing.
For the Archimedes Underground, production with be processed at a third party destination capable of processing refractory ore until such time that i-80 has refurbished the Lone Tree Autoclave facility. The third party destination is an autoclave circuit capable of processing 4 - 5 million tons per year and consists of primary crushing, two parallel semi-autogenous grinding (SAG) Mill-Ball Mill grinding circuits with pebble crushing, five parallel autoclaves capable of acid pressure oxidation (POX) and three of which are capable of alkaline POX, two parallel calcium thiosulphate (CaTS) leaching circuits with resin-in-leach (RIL), electrowinning for gold recovery, and a refinery producing doré bullion from both autoclave and roaster circuits.
The Lone Tree Autoclave Facility is located immediately adjacent to I-80, approximately 12 miles west of Battle Mountain, 50 miles east of Winnemucca, and 120 miles west of Elko. The Lone Tree processing facilities were shut‑down at the end of 2007. Since that time, the mills have been rotated on a regular basis to lubricate the bearings. In general, the facility is still in place with most of the equipment sitting idle. i-80 Gold Corp’s objective is to refurbish and restart the POX circuit and associated unit operations, including the existing oxygen plant, as it was operating before the shut-down, while meeting all new regulatory requirements. The flotation circuit is not being considered for restart. The POX circuit will have capability to operate under either acidic or basic conditions.
For the Mineral Point Open Pit Project, previous operating experience as well as the metallurgical test work confirms the amenability of oxide material to heap leaching for precious metals extraction. From 2004 to 2014, seven test work programs were carried out, by Kappes Cassiday Associates (KCA) focusing on column leaching and bottle roll leach testing of the oxide deposits, namely Archimedes, 426 and
85
Table of C o ntents
Mineral Point. Mineral Point estimated recoveries are based on alteration type ranging from 83% to 84.4% gold and 40% to 45.2% silver for oxide mineralization.
Exploration and Drilling
The RHMC drillhole database consists of data from over 3,600 drillholes and 2.3 million feet of drilling from throughout the southern portion of Eureka County. The database includes holes that have been drilled to test 24 different targets and includes reverse circulation, diamond core, reverse circulation pre-collar with diamond core tail and percussion and churn drill hole types. A total of 2,491 drillholes have been drilled on the current Ruby Hill property and 2,100 drillholes totaling 1.5 million feet of drilling define the Mineral Point Trend and Archimedes deposits.
The dataset used to produce the Mineral Resource Estimate for the Mineral Point Trend consists of drillhole data compiled from eight companies and work carried out from 1950 to 2015; however, 95% of the drilling was completed from 1992 to 2015 by Homestake, and subsequently by Barrick following completion of its acquisition of Homestake in 2004.
Just over 75% of drilling carried out at Ruby hill has been reverse circulation drilling. Diamond drilling has been used to provide drill core for detailed geological and geotechnical logging, metallurgical sampling, to extend reverse circulation holes below the water table to ensure representative sampling for assaying and as twin holes to confirm reverse circulation hole sampling. Mud rotary and other drill types have mainly been used to drill pre-collar holes for diamond drilling.
i-80 completed 9,883 feet of drilling in 2021 at Ruby Deeps for infill. Holes were drilled using RC pre-collars followed by HQ core-tails. In 2022, 137,210 feet of drilling was completed with a mix of core and RC. Core drilling was conducted by National Drilling (Salt Lake City, UT) with RC conducted by Envirotech Drilling (Winnemucca, NV). Where documented, core sizes drilled include PQ (3.345 in), HQ3 (2.406 in), HQ (2.5 in), and NQ (1.875 in). Most holes were inclined. Thirty-six i-80 holes totaling 75,546.5 feet contributed to the current resource estimation, representing about 30 percent of holes flagged for use in the Ruby Deeps and 426 deposits. The remainder of the i-80 drilling was in exploration areas including Hilltop, Ruby Deeps expansion, Blackjack definition, 428, and Blue Sky. All of the i-80 holes contributing to the current resource estimation were drilled using core or RC precollar with core tail.
Drill hole collars are surveyed by the Ruby Hill surveyor using Trimble equipment with sub-centimeter accuracy referencing a local base station with GNSS rover. Coordinates are collected in the Ruby Hill mine grid, NAD83(2011), US survey feet. Downhole surveys are performed by IDS using a north seeking gyro.
i-80 logs geological characteristics of drill samples in Excel, filling data fields similar to those recorded by Barrick and Homestake but with additional focus on sulfides to support characterization of CRD mineralization. Data is organized in Excel sheets with tabs for geotechnical, sampling, lithology, alteration, oxide, sulfide, structure, point data, veins, density and water level information. Core recovery averaged about 93%, which is comparable to core recovery of Barrick’s drilling campaigns. Recovery within the modeled mineral envelopes is similar to overall recovery, about 93% for Ruby Deeps and about 95% for 426. The slightly higher recovery within the 426 zone correlates with relatively high RQD values in the OGLL host unit.
Geometry of Carlin type mineralization at Ruby Hill is well understood, and drill spacing is close enough to allow true thickness to be reasonably represented by interpolating between mineralized intercepts in adjacent drill holes. Most holes intersect the mineralization at near-normal orientations.
Sampling and Data Verification
Since 2021, Carlin-type mineralization exploration samples have been submitted to ALS Minerals, an ISO/IEC 17025:2017 certified and accredited laboratory of Sparks, Nevada. Base-metal mineralization exploration samples have been submitted to American Assay Laboratories, which is an ISO 9001 and 17025 certified and accredited laboratory in Sparks, Nevada, for sample preparation and analysis. American Assay Laboratory is used for umpire check sample analysis of Carlin-type mineralization. ALS Minerals is used for umpire check sample analysis of base-metal mineralization. The drill and geochemical samples are collected in accordance with accepted industry standards. Data verification was completed as part of the generation of the mineral resources estimate. All data collected, including but not limited to collar location, downhole survey, geological, and analytical data, are subject to i-80 Gold’s Quality Assurance, Quality Control (“QAQC”) procedures.
86
Table of C o ntents
Economic Analysis
Archimedes Underground
The economic model is based on a mine plan that includes 69% inferred mineral resources. The results obtained excluding inferred material is a gross adjustment. Recalculation of capital and operating costs has not been included in the scenario excluding inferred mineral resources. The values presented are derived from a constant dollar after tax cash flow analysis.
Value Without Inferred
Value With Inferred
Gold price (US$/oz) $2,175
Silver price (US$/oz) $27
Mine life (years) 10
Mining Rate (tons/day)
450 1600
Mining Rate (tonnes/day)
408 1451
Tons processed Autoclave (kton)
1452 4846
Tons processed Autoclave (ktonnes)
1317 4396
Average Grade Autoclave (Au oz/ton)
0.209 0.209
Average Grade Autoclave (Au g/t)
7.17 7.17
Average Gold Recovery (Autoclave %)
90% 90%
Autoclave Gold Produced (koz)
272 910
Tons Processed Heap Leach (kton)
56 171
Tons Processed Heap Leach (ktonnes)
51 155
Average Grade Heap Leach (Au oz/ton)
0.111 0.111
Average Grade Heap Leach (Au g/t)
3.81 3.81
Average Gold Recovery (Heap Leach %)
87% 87%
Heap Leach Gold Production (koz)
5.5 18
Average Annual Gold Production (koz)
31 110
Total Gold Recovered (koz)
278 928
Project After Tax NPV 5% (M$)
N/A
127
Project After Tax NPV 8% (M$)
N/A
91
Project After Tax IRR
NA
0.23
Payback Period
NA Years
7.8 Years
Notes:
1. Net of byproduct sales.
2. Excludes, construction capital, exploration, corporate G&A, interest on debt, and corporate taxes.
3. Excludes exploration, corporate G&A, interest on debt, and corporate taxes.
4. The financial analysis contains certain information that may constitute "forward-looking information" under applicable United States and Canadian securities legislation. Forward-looking information includes, but is not limited to, statements regarding the Company’s achievement of the full-year projections for ounce production, production costs, AISC costs per ounce, cash cost per ounce and realized gold/silver price per ounce, the Company’s ability to meet annual operations estimates, and statements about strategic plans, including future operations, future work programs, capital expenditures, discovery and production of minerals, price of gold and currency exchange rates, timing of geological reports and corporate and technical objectives. Forward-looking information is necessarily based upon a number of assumptions that, while considered reasonable, are subject to known and unknown risks, uncertainties, and other factors which may cause the actual results and future events to differ materially from those expressed or implied by such forward looking information, including the risks inherent to the mining industry, adverse economic and market developments and the risks identified in the Company’s annual information form under the heading "Risk Factors". There can be no assurance that such information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such information. Accordingly, readers should not place undue reliance on forward-looking information. All forward-looking information contained in this report is given as of the date hereof and is based upon the opinions and estimates of management and information available to management as at the date hereof. The Company disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, except as required by law.
Mineral Point Open Pit
The economic analysis of the Mineral Point Project is based on the mine schedule, capital and operating costs, metal recovery parameters, and royalties. The project, operated by i-80 Gold, is planned as an open pit operation with a processing rate of 68,000 tons per day. The economic model assumes a gold price of $2,175/oz and a silver price of $27.25/oz, with a total initial capital investment of $708 million and sustaining capital of $388 million. In addition, approximately 115 million tons of stripping is required to gain access to the body of mineralized material, costing $287 million. The life-of-mine (LOM) plan spans approximately 16.5 years, with total recovered gold and silver estimated at 3.5 million ounces and 72 million ounces, respectively. The estimated pre-tax net present value (NPV) at a 5% discount rate is $827.6 million, with an internal rate of return (IRR) of 13.8% and a payback period of 7.6 years. After-tax, the NPV at 5% is reduced to $614.1 million, with an IRR of 12.1% and a payback period of 7.9 years.
87
Table of C o ntents
Parameter
Unit
Value Without Inferred Value With Inferred
Gold price
US$/oz
$2,175 $2,175
Silver price
US$/oz
$27.25 $27.25
Mine life (years) year 11.5 16.5
Mining Rate
kton/day 328.8 356.2
Mining Rate ktonnes/day
298.3 323.1
Processing Rate
kton/day 49.3 68.4
Processing Rate ktonnes/day
44.7 62.1
Total Processed Material
kton 195.6 395.4
Total Processed Material ktonnes
177.4 358.7
Total Mine Material
kton 988.0 1,675.2
Total Mine Material ktonnes
896.3 1,519.7
Average Processing Grade Au toz/ton 0.012 0.011
Average Processing Grade Au g/t
$0.4 0.38
Average Processing Grade Ag toz/ton 0.383 0.448
Average Processing Grade Ag g/t
13.1 15.4
Contained Au ktoz 2,430 4,525
Contained Ag Ktoz 76,109 177,293
Recovered Au ktoz 1,969 3,529
Recovered Ag ktoz 31,407 72,028
Heap Leach Recovery Au (average) % 81% 78%
Heap Leach Recovery Ag (average) % 41% 41%
Total LOM CAPX US$M $941.2 $1,383.2
NPV @ 5% US$M $157.9 $614.1
NPV @ 8% US$M $(10.9) $295.8
IRR % 8% 12%
Payback Period Year 7.9 7.6
Mineral Resources Comparison
For the year ended December 31, 2023, the Company was not subject to S-K 1300, and reported its mineral reserve and resources in accordance with NI 43-101.
The comparison of the Mineral Resources as of December 31, 2023 and December 31, 2024 can be found in the table below.
In 2024 the total tonnes and ounces in the Mineral Point Open Pit increased due to a new resource estimate which used a higher gold price and lower cut-off grade than the previous estimate.
In 2024 for the Archimedes Underground Project, the total tonnes and ounces increased in the indicated category, but decreased in the inferred category. The increase in indicated tonnes and ounces and decrease in inferred tonnes and ounces are both due to a new resource estimate which used a combination of stope optimizer software in the estimation process, a lower cut-off grade, and higher gold price. The stope optimizer methodology generates optimal mineable stope geometries while considering several factors including geological constraints, grade distribution and stope dimensions. This significantly improves the accuracy of mineral resource estimates and has become an industry standard for underground deposits in Nevada. In addition, the new resource estimate contained new drilling conducted by i-80 Gold since the publication of the previous resource estimate.
In 2024 the total tonnes and ounces in the Archimedes Open Pit decreased in both the indicated and inferred categories due to a new resource estimate which only included oxide gold and silver mineralization and excluded base metal mineralization.
December 31, 2024 December 31, 2023 Percent Difference
Category Ounces
Gold Ounces
Silver Ounces
Gold Ounces
Silver Gold Silver
Ruby Hill Mineral Point Open Pit - Indicated 3376 104332 3217 97457 5% 7%
Ruby Hill Mineral Point Open Pit - Inferred 2117 91473 1872 72370 13% 26%
Ruby Hill Archimedes Underground - Indicated 436 92 202 22 116% 318%
Ruby Hill Archimedes Underground - Inferred 988 286 1588 439 (38)% (35)%
Ruby Hill Archimedes Open PIt - Indicated 272 1490 657 5878 (59)% (75)%
Ruby Hill Archimedes Open PIt - Inferred 31 250 190 1102 (84)% (77)%
88
Table of C o ntents
Net Book Value
The net book value of the Ruby Hill Complex and its associated plant, equipment and mineral interests was approximately $110.4 million as of December 31, 2024.
89
Table of C o ntents
ITEM 3. LEGAL PROCEEDINGS AND REGULATORY ACTIONS
Legal Proceedings
There are no legal proceedings material to the Company to which the Company or its subsidiaries is or was a party, or to which any of the Company's property is or was subject, since the beginning of the most recently completed financial year of the Company, and, as of the date hereof, no such proceedings are known by the Company to be contemplated, other than as set out herein.
Regulatory Actions
No penalties or sanctions were imposed against the Company by a court relating to securities legislation or by a securities regulatory authority, nor were any settlement agreements entered into by the Company before a court relating to securities legislation or with a securities regulatory authority, during the last financial year of the Company, and no other penalties or sanctions have been imposed by a court or regulatory body against the Company or its subsidiaries that would likely be considered important to a reasonable investor in making an investment decision.
ITEM 4. MINE SAFETY DISCLOSURES
Information pertaining to mine safety matters is reported in accordance with Section 1503(a) of the Dodd-Frank Wall Street Reform and Consumer Protection Act in Exhibit 95.1 attached to this Form 10-K.
90
Table of C o ntents
PART II
ITEM 5. MARKET FOR REGISTRANT'S COMMON EQUITY, RELATED SHAREHOLDER MATTERS AND ISSUER PURCHASES OF EQUITY SECURITIES
Market Information
The Company’s Common Shares trade on the NYSE American and the TSX under the symbols IAUX and IAU, respectively. On March 28, 2025, there were approximately 91 holders of record of the Shares, which does not include shareholders for which shares are held in nominee or street name. The Company believes that more than half of our common shares are beneficially owned by investors in the United States.
Dividends and Distributions
The Company does not have a formal dividend policy and it has not declared any cash dividends or distributions since its formation. The Company currently intends to retain future earnings, if any, to finance further business development. The payment of any cash dividends or distributions to shareholders of the Company in the future will be at the discretion of the directors of the Company and will depend on, among other things, the financial condition, capital requirements and earnings of the Company and any other factors that the directors may consider relevant. In addition to those restrictions set out under the BCBCA, several of the Corporation's financing documents, including its convertible credit agreements with Orion and Sprott, restrict the ability of the Company to pay dividends to its shareholders. The BCBCA provides that a company may declare or pay a dividend, whether out of profits, capital or otherwise, unless there are reasonable grounds for believing that the company is insolvent or that the payment of the dividend would render the company insolvent.
Prior Sales of Unregistered Securities
The following information represents securities sold by the Corporation for the period covered by this Annual Report which were not registered under the Securities Act of 1933, as amended (the “Securities Act”).
On May 1, 2024, the Corporation completed a bought deal public offering of an aggregate of 69,698,050 million Units at a price of C$1.65 per Unit for aggregate gross proceeds to the Corporation of approximately $83.5 million (C$115.0 million). Each Unit consists of one Common Share and one-half of one Common Share purchase warrant of the Corporation. The public offering was conducted relying on Regulation S and/or Section 4(a)(2) of the Securities Act.
On March 20, 2024, the Corporation issued 1,127,336 Common Shares to Waterton Nevada Splitter, LLC and Waterton Nevada Splitter II, LLC at a deemed price of US$1.2738 per share as partial consideration of the contingent value rights payment related to Granite Creek relying on Regulation S of the Securities Act.
On February 20 and 21, 2024, the Corporation completed the first tranche of a non-brokered private placement of common shares. An aggregate of 12,989,204 million shares were issued by the Corporation at a price of C$1.80 per common share for aggregate gross proceeds of C$23,380,567.20. Certain directors and/or officers of the Corporation subscribed for an aggregate of 162,404 Common Shares under the private placement. On March 20, 2024, the Corporation completed a second tranche of the private placement, issuing an additional 75,000 Common Shares at a price of C$1.80 per share to an arm's length purchaser for additional gross proceeds of C$135,000. The private placement was conducted relying on Regulation S, Section 4(a)(2) and/or Rule 506(b) of the Securities Act.
On February 9, 2024, the Corporation issued 1,600,000 Common Shares to Waterton Nevada Splitter, LLC and Waterton Nevada Splitter II, LLC at a deemed price of US$1.33 per share as partial consideration of the contingent value rights payment related to Granite Creek relying on Regulation S of the Securities Act.
On January 24, 2024, the Corporation issued 500,000 warrants to OMF Fund III (Hg) Ltd., an affiliate of Orion, with each warrant exercisable to acquire one Common Share at a price of C$2.717 per share, subject to customary anti-dilution adjustments, until January 24, 2028. The warrants were issued in connection with the extension of certain of the Corporation's delivery obligations under its Silver Purchase and Sale Agreement and relied on Regulation S of the Securities Act.
During the fiscal year ended December 31, 2024, we granted to certain of our directors, officers, key employees, and consultants options to purchase 891,316 Common Shares with a weighted average exercise price of CAD$1.75 per share relying on Regulation S and/or Section 4(a)(2) of the Securities Act.
During the fiscal year ended December 31, 2024, we issued an aggregate of 2,051,374 restricted share units and 420,927 deferred share units to certain directors in reliance on Section 3(a)(9) of the Securities Act.
During the fiscal year ended December 31, 2024, we issued an aggregate of 2,051,374 restricted share units and 420,927 deferred share units, and an aggregate of 420,927 Common Shares upon settlement of restricted share units and deferred share units, to certain directors in reliance on Rule 506(b) of the Securities Act.
91
Table of C o ntents
Certain Canadian Federal Tax Considerations for U.S. Holders
The following generally summarizes certain Canadian federal income tax consequences generally applicable under the Income Tax Act (Canada) and the regulations thereunder (collectively, the “Canadian Tax Act”) and the Canada-United States Tax Convention (1980) (the “Convention”) to the holding and disposition of our common shares.
Comment is restricted to holders who are beneficial owners of our common shares each of whom, at all relevant times for the purposes of the Canadian Tax Act and the Convention, (i) is resident solely in the United States for tax purposes, (ii) is a “qualifying person” under and entitled to the benefits of the Convention, (iii) holds all common shares as capital property, (iv) deals at arm’s length with and is not affiliated with i-80, (v) does not and is not deemed to use or hold any common shares in a business carried on in Canada, (vi) is not an insurer that carries on business in Canada and elsewhere and (vii) is not an “authorized foreign bank” (as defined in the Canadian Tax Act) (each such holder, a “U.S. Resident Holder”).
Generally, a U.S. Resident Holder’s common shares will be considered to be capital property of such holder for purposes of the Canadian Tax Act provided that the U.S. Resident Holder is not a trader or dealer in securities, did not acquire, hold, or dispose of the common shares in one or more transactions considered to be an adventure or concern in the nature of trade, and does not hold the common shares in the course of carrying on a business.
Certain U.S.-resident entities that are fiscally transparent for United States federal income tax purposes (including certain limited liability companies) may not in all circumstances be entitled to the benefits of the Convention. Members of or holders of an interest in such an entity that holds common shares should consult their own tax advisers regarding the extent, if any, to which the benefits of the Convention will apply to the entity in respect of its common shares. This summary does not deal with special situations such as the particular circumstances of traders or dealers in securities or holders who have entered into a “derivative forward agreement”, “synthetic equity arrangement” or “synthetic disposition arrangement” (each as defined in the Canadian Tax Act) in respect of the common shares. Such holders should consult their own tax advisors.
This summary is based on the information contained in this Form 10-K, the current provisions of the Canadian Tax Act in force as of the date prior to the date hereof, all specific proposals to amend the Canadian Tax Act publicly announced by or on behalf of the Minister of Finance (Canada) prior to the date hereof (“Proposed Amendments”), the provisions of the Convention as amended by the Protocols thereto prior to the date hereof, and the administrative policies and assessing practices of the Canada Revenue Agency (the “CRA”) published in writing by the CRA prior to the date hereof. This summary assumes that the Proposed Amendments will be enacted in the form proposed, although no assurance can be given that the Proposed Amendments will be enacted or otherwise implemented in their current form, if at all. Other than the Proposed Amendments, this summary does not take into account nor anticipate any changes in law or in the CRA’s administrative policies or assessing practices, whether by way of judicial, legislative, governmental, or administrative decision or action, although no assurance can be given in these respects. Except as otherwise expressly provided, this summary does not take into account any provincial, territorial or foreign tax considerations, which may differ materially from the federal Canadian income tax considerations set out herein.
This summary is of a general nature only, is not exhaustive of all possible Canadian federal income tax considerations, and is not intended to be and should not be construed as legal or tax advice to any particular U.S. Resident Holder. U.S. Resident Holders are urged to consult their own tax advisers for advice with respect to their particular circumstances. The discussion below is qualified accordingly.
Currency conversion
Generally, for the purposes of the Canadian Tax Act, all amounts relating to the acquisition, holding or disposition of common shares (including dividends, adjusted cost base and proceeds of disposition) must be converted into Canadian dollars based on the relevant exchange rate as determined in accordance with the Canadian Tax Act.
Dividends on common shares
A U.S. Resident Holder to whom i-80 pays or credits, or is deemed to pay or credit, a dividend