Item 2. Management’s Discussion and Analysis
ITEM 2
MANAGEMENT'S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS
CAUTION REGARDING FORWARD-LOOKING STATEMENTS
Statements
in this Quarterly Report on Form 10-Q that express our "belief," "anticipation" or
"expectation," as well as other statements that are not historical
fact, are forward-looking statements within the meaning of Section 27A of the
Securities Act, Section 21E of the Securities Exchange Act of 1934, as amended,
or the Exchange Act and the Private Securities Litigation Reform Act of
1995. Statements regarding our goals, priorities, growth and
expansion plans and expectation for our water and wastewater subsidiaries and
non-regulated subsidiaries, customer base growth opportunities in Delaware and
Cecil County, Maryland, our belief regarding the timing and results of our rate
requests, our belief regarding our capacity to provide water services for the
foreseeable future to our customers, our belief relating to our compliance and
the cost to achieve compliance with relevant governmental regulations, including
per- and polyfluoroalkyl substances (“PFAS”) regulations, and the Lead and
Copper Rule Improvements, our expectation of the timing of decisions by
regulatory authorities, our belief regarding the success of any rate increase
request, the impact of weather on our operations and the execution of our
strategic initiatives, our expectation of the timing for construction on new
projects, our expectation relating to the adoption of recent accounting
pronouncements, contract operations opportunities, legal proceedings, our
properties, deferred tax assets, adequacy of our available sources of
financing, the expected recovery of expenses related to our long-term debt, our
expectation to be in compliance with financial covenants in our debt
instruments, our ability to refinance our debt as it comes due, our ability to
adjust our debt level, interest rate, maturity schedule and structure, the
timing and terms of renewals of our lines of credit, plans to increase our
wastewater treatment operations, engineering services and other revenue streams
less affected by weather, expected future contributions to our postretirement
benefit plan, anticipated growth in our non-regulated division, the impact of
recent acquisitions on our ability to expand and foster relationships,
anticipated investments in certain of our facilities and systems and the
sources of funding for such investments, and the sufficiency of internally
generated funds and credit facilities to provide working capital and our
liquidity needs are forward-looking statements within the meaning of the
Private Securities Litigation Reform Act of 1995 and involve risks and uncertainties
that could cause actual results to differ materially from those
projected. Words such as "expects",
"anticipates", "intends", "plans",
"believes", "seeks", "estimates",
"projects", "forecasts", "may",
"should", variations of such words and similar expressions are
intended to identify such forward-looking statements. Certain
factors as discussed under Item 1A - Risk Factors, in our Annual Report on Form
10-K for the year ended December 31, 2024, and this Quarterly Report on Form
10-Q for the quarter ended June 30, 2025, such as changes in weather, changes
in our contractual obligations, changes in government policies, changes in tax laws,
including, without limitation, the One Big Beautiful Bill Act, the timing and
results of our rate requests, failure to receive regulatory approvals, changes
in economic and market conditions generally, and other matters could cause
results to differ materially from those in the forward-looking
statements. While the Company may elect to update forward-looking
statements, we specifically disclaim any obligation to do so and you should not
rely on any forward-looking statement as a representation of the Company's
views as of any date subsequent to the date of the filing of this Quarterly Report on Form 10-Q.
RESULTS OF OPERATIONS FOR THE PERIOD ENDED JUNE 30, 2025
OVERVIEW
Our profitability is primarily attributable to the sale of water and wastewater services in our regulated utility business. Our regulated utility segment comprised 93.0% of total operating revenues for the six months ended June 30, 2025 and 93.4% for the six months ended June 30, 2024. Water sales are subject to seasonal fluctuations, particularly during summer when water demand may vary with rainfall and temperature. In the event temperatures during the typically warmer months are cooler than expected or rainfall is greater than expected, the demand for water may decrease and our revenues may be adversely affected. We believe these effects of weather are short term and do not materially affect the execution of our strategic initiatives. Our wastewater services provide a revenue stream that is not affected by these changes in weather patterns. We continue to seek growth opportunities to provide wastewater services in Delaware and the surrounding areas.
26
Table of Contents
Our profitability is also attributed to other non-utility business, such as various contract operations, SLP Plans and other services we provide. Our contract operations, SLP Plans and other services also provide a revenue stream that is not affected by changes in weather patterns. We also continue to explore and develop relationships with developers and municipalities in order to increase revenues from contract water and wastewater operations, wastewater management services, and design, construction and engineering services. We plan to continue developing and expanding our contract operations and other services in a manner that complements our growth in water service to new customers. Our anticipated growth in these areas is subject to changes in residential and commercial construction, which may be affected by interest rates, inflation and general housing and economic market conditions. We anticipate continued growth in our non-utility subsidiaries mostly due to our SLP Plans.
Inflation
We are affected by inflation, most notably by the continually increasing costs required to maintain, improve and expand our service capability. The cumulative effect of inflation results in significantly higher facility replacement costs as well as increased operating costs, which must be recovered from future cash flows. Our ability to recover increases in investments in facilities and operating costs is dependent upon future rate increases, which are subject to approval by the applicable regulatory authority. We can provide no assurances that any future rate increase request will be approved, and if approved, we cannot guarantee that any rate increase will be granted in a timely manner and/or will be sufficient in amount to cover costs for which we initially sought the rate increase. The impact of inflation could adversely affect our results of operations, financial position or cash flows.
Regulated Water Subsidiaries
Artesian Water,
Artesian Water Maryland and Artesian Water Pennsylvania provide water service
to residential, commercial, industrial, governmental, municipal and utility
customers. Increases in the number of
customers contribute to increases, or help to offset any intermittent
decreases, in our operating revenue. As
of June 30, 2025, the number of metered water customers in Delaware increased approximately
1.7% compared to June 30, 2024. The
number of metered water customers in Maryland increased approximately 2.0% compared
to June 30, 2024. The number of metered
water customers in Pennsylvania remained consistent compared to June 30, 2024. For the six months ended June 30, 2025, approximately
4.6 billion gallons of water were distributed in our Delaware systems and
approximately 48.4 million gallons of water were distributed in our Maryland
systems.
On April 4, 2025, Artesian
Water filed a request with the DEPSC to implement new rates to meet a requested
increase in revenue of 12.41%, or approximately $10.8 million, on an annualized
basis. The DEPSC approved and Artesian
Water implemented a temporary rate increase effective June 3, 2025, until
permanent rates are determined by the DEPSC.
This is discussed further in Note 13 –
Regulatory Proceedings.
Regulated Wastewater Subsidiaries
Artesian Wastewater and TESI own wastewater collection and treatment infrastructure and provide regulated wastewater services to customers in Sussex County, Delaware. Artesian Wastewater Maryland is able to provide regulated wastewater services to customers in Maryland. It is not currently providing these services in Maryland. The majority of our residential and commercial wastewater customers are billed a flat monthly fee, and our large industrial wastewater customer is billed monthly based on wastewater flow, which contributes to providing a revenue stream unaffected by weather. As of June 30, 2025, the number of Delaware wastewater customers increased approximately 6.2% compared to June 30, 2024.
Non-Utility Subsidiaries
Artesian Utility provides contract water and wastewater operation services to private, municipal, and governmental institutions. Artesian Utility also offers three protection plans to customers: the WSLP Plan, the SSLP Plan, and the ISLP Plan. SLP Plan customers are billed a flat monthly or quarterly rate, which contributes to providing a revenue stream unaffected by weather. Artesian Utility
implemented a rate increase effective December 1, 2024. There has been consistent customer growth over the years. As of June 30, 2025, the eligible customers enrolled in the WSLP Plan, the SSLP Plan and the ISLP Plan increased 0.6%, collectively , compared to June 30, 2024.
Strategic Direction and Recent Developments
Our strategy is to increase customer growth, revenues, earnings and dividends by expanding our water, wastewater and SLP Plan services across the Delmarva Peninsula. We remain focused on providing superior service to our customers and continuously seek ways to improve our efficiency and performance. Our strategy has included a focus on building strategic partnerships with county governments, municipalities and developers. By providing water and wastewater services, we believe we are positioned as the primary resource for developers and communities throughout the Delmarva Peninsula seeking to fill both needs simultaneously. We believe we have a proven ability to acquire and integrate high growth, reputable entities, through which we have captured additional service territories that will serve as a base for future revenue. We believe this experience presents a strong platform for further expansion and that our success to date also produces positive relationships and credibility with regulators, municipalities, developers and customers in both existing and prospective service areas.
27
Table of Contents
In our regulated water subsidiaries, our strategy is to focus on a wide spectrum of activities, which include strategic acquisitions of existing systems, expanding certificated service area, identifying new and dependable sources of supply, developing the wells, treatment plants and delivery systems to supply water to customers and educating customers on the wise use of water. Our strategy includes focused efforts to expand through strategic acquisitions and in new regions added to our Delaware service territory over the last 10 years. We plan to expand our regulated water service area in the Cecil County designated growth corridor and to expand our business through the design, construction, operation, management and acquisition of additional water systems. The expansion of our exclusive franchise areas elsewhere in Maryland and the award of contracts will similarly enhance our operations within the state.
Our ability to develop partnerships with various county governments, municipalities and developers has provided a number of opportunities. In recent years, we have completed several acquisitions including asset purchase agreements with municipal and developer/homeowner association operated systems.
We believe that Delaware's generally lower cost of living in the region and availability of development sites in relatively close proximity to the Atlantic Ocean in Sussex County have resulted, and will continue to result, in increases to our customer base. Delaware’s lower property and income tax rate make it an attractive region for new home development and retirement communities. Substantial portions of Delaware currently are not served by a public water system, which could also assist in an increase to our customer base as systems are added.
In our regulated wastewater subsidiaries, we foresee significant growth opportunities and will continue to seek strategic partnerships and relationships with developers and governmental agencies to complement existing agreements for the provision of wastewater service on the Delmarva Peninsula. There are numerous locations in Sussex County where Artesian Wastewater’s and Sussex County’s facilities are connected or integrated to allow for the movement and disposal of wastewater generated by one or the other’s system in a manner that most efficiently and cost effectively manages wastewater transmission, treatment and disposal. In addition, Artesian Wastewater plans to utilize our larger regional wastewater facilities to expand service areas to new customers while transitioning our smaller treatment facilities into regional pump stations in order to gain additional efficiencies in the treatment and disposal of wastewater. We believe this will reduce operational costs at the smaller treatment facilities in the future because they will be converted from treatment and disposal plants to pump stations to assist with transitioning the flow of wastewater from one regional facility to another. In addition, Artesian’s Delaware wastewater subsidiaries are the sole regional regulated wastewater utilities in Delaware, which we believe will enable us to increase efficiencies in the treatment and disposal of wastewater and provide additional opportunities to expand our wastewater operations.
In April 2024, Artesian Wastewater received a permit from the Delaware Department of Natural Resources and Environmental Control for construction of a 625,000 gallon per day regional wastewater treatment facility, including a primary receiving headworks at its Sussex Regional Recharge Facility, or SRRF. Under its previous permit, SRRF provided solely land disposal services for a single commercial processing and treatment plant. Under its new permit, SRRF will continue providing those disposal services alongside the new treatment plant. The new treatment facility will provide service for Artesian Wastewater’s regional system comprised primarily of residential and small commercial customers. The construction will also include the primary receiving facility for untreated effluent, sized to allow for the expansion of the regional treatment system planned for the site. The new treatment facility will utilize the existing disposal infrastructure and is expected to be completed in 2025.
The general need for increased capital investment in our water and wastewater systems is due to a combination of population growth, more protective water quality standards, aging infrastructure and acquisitions. Our planned and budgeted capital improvements over the next three years include projects for water infrastructure improvements and expansion in both Delaware and Maryland and wastewater infrastructure improvements and expansion in Delaware. The DEPSC and MDPSC have generally recognized the operating and capital costs associated with these improvements in setting water and wastewater rates for current customers and capacity charges for new customers.
In our non-utility subsidiaries, we continue pursuing opportunities to expand our contract operations. Through Artesian Utility, we will seek to expand our contract design, engineering and construction services of water and wastewater facilities for developers, municipalities and other utilities. We also anticipate continued growth due to our water, sewer and internal SLP Plans. Artesian Development owns two nine-acre parcels of land, located in Sussex County, Delaware, which allows for construction of a water treatment facility and wastewater treatment facility.
28
Table of Contents
Other Matters
Securities
and Trading Markets
As
previously disclosed, on July 1, 2025, the Board of Directors of the Company
appointed a third independent director to the Board, who was also appointed to
serve on the Audit Committee effective as of such date. On July 2, 2025, the Nasdaq Stock Market LLC,
or Nasdaq, delivered to the Company a formal confirmation that the Company has
regained compliance with Nasdaq’s Majority Independent Board Requirement and
Audit Committee Composition Requirement, as a result of the appointment of the
independent director prior to the deadline established in the Nasdaq’s initial
notice to the Company on May 30, 2025.
Accordingly, Nasdaq has determined that the Company has regained
compliance with Nasdaq Marketplace Rule 5605(b)(1) and Nasdaq Marketplace Rule
5605(c)(2), and the matter is now closed.
Environmental, Health and Safety, and Water Quality Regulation
As required by the Safe Drinking Water Act, the U.S. Environmental Protection Agency, or EPA, establishes maximum contaminant levels, or MCLs, for various substances found in drinking water to ensure that the water is safe for human consumption. On April 10, 2024, the EPA established MCLs for certain per- and polyfluoroalkyl substances, or PFAS, in drinking water. Under these regulations, water utilities will be required to complete initial monitoring for PFAS by 2027 and to conduct ongoing compliance monitoring. Water utilities also will
be required to meet the new MCLs by April 2029 and to notify the public of any
violations of the MCLs as of and after that date. To allow drinking water systems more time to develop plans for
addressing PFAS where they are found and implement solutions, the EPA plans to
develop a rulemaking to provide additional time for compliance, including a
proposal to extend the compliance date to 2031. The EPA plans to finalize this rule in the
Spring of 2026. The Company has installed treatment for PFAS at several wellfields to date and has included installation of treatment at additional locations in 2025 in its capital budget, with any remaining necessary treatment planned to be installed before 2029. The capital investment and operating costs for treatment of PFAS are anticipated to be recoverable in water rates charged to customers as approved by the applicable public service commission. The Company is participating in the multi-district litigation class action settlements with certain manufacturers of PFAS seeking reimbursement of costs incurred and that will continue to be incurred. See Note 15 – Legal Proceedings.
The Lead and Copper Rule, or LCR, is a federal regulation that limits the concentration of lead and copper allowed in public drinking water at the consumer's tap, in addition to limiting the permissible amount of pipe corrosion occurring due to the water itself. The LCR limits the levels of lead and copper in water by improving water treatment, testing for lead and copper at customer taps, and eliminating the water supply as a significant source of lead and copper. The EPA published a revised LCR in 2021, or LCR Revisions, to provide greater and more effective protection of public health by reducing exposure to lead and copper in drinking water. Implementation of the revised rule is intended to better identify high levels of lead, improve the reliability of lead tap sampling results, strengthen corrosion control treatment requirements, expand consumer awareness and improve risk communication. In addition, implementation of the revised rule is anticipated to accelerate lead service line replacements by closing existing regulatory loopholes, propelling early action, and strengthening replacement requirements. We filed all required Lead Service Line Inventories by the October 16, 2024 deadline and are fully compliant with the LCR Revisions.
On October 8, 2024, the EPA announced the new final regulations requiring the removal of lead water lines. The EPA’s rule, known as the Lead and Copper Rule Improvements, or LCRI, requires all public water systems to remove lead service lines within 10 years, among other changes to regulations in the EPA’s LCR. The service lines connect a home’s plumbing system to a public water system’s main water line. The LCRI specifies that the water provider will cover the cost for replacements of the customer’s service line up to the first fitting inside the structure being served. Capital investment and operating costs incurred by water utilities for customer-side pipe replacements are typically recoverable in water rates charged to customers as approved by the applicable public service commission.
Results of Operations – Analysis of the Three Months Ended June 30, 2025 Compared to the Three Months Ended June 30, 2024.
Operating Revenues
Revenues totaled
$28.5 million for the three months ended June 30, 2025, $1.1 million, or 4.1%,
more than revenues for the three months ended June 30, 2024 .
29
Table of Contents
Water sales revenue
increased $0.6 million, or 2.6%, for the three months ended June 30, 2025 from
the corresponding period in 2024, primarily the result of an
increase in DSIC revenue, a temporary rate increase of 1.22% of gross water
sales placed into effect on June 3, 2025, as permitted under Delaware law,
until permanent rates are determined by the DEPSC and customer growth. Since the DSIC rate is set to zero when
temporary rates are placed into effect, the temporary rate increase of 2.88%, less
the DSIC rate of 1.66% that was previously in effect, resulted in a net change
of 1.22%. We realized 80.9% and 82.1% of our total operating revenue for the three
months ended June 30, 2025 and June 30, 2024, respectively, from the sale of
water.
Other utility operating revenue increased approximately $0.4 million, or 10.7%, for the three months ended June 30, 2025 compared to the three months ended June 30, 2024. This increase is primarily due to an increase in wastewater revenue associated with customer growth.
Non-utility operating
revenue increased approximately $0.2 million, or 12.3%, for the three months
ended June 30, 2025 compared to the three months ended June 30, 2024. This increase is primarily due to an increase
in Service Line Protection Plan revenue, primarily the result of an increase in
rates that were placed into effect on December 1, 2024.
Operating Expenses
Operating expenses, excluding depreciation and income taxes, increased $0.3 million, or 1.8%, for the three months ended June 30, 2025, compared to the same period in 2024.
Utility operating expenses increased $0.3 million, or 2.7%, for the three
months ended June 30, 2025 compared to the same period in 2024. The increase in utility operating expenses
consists of a $0.2 million increase in transmission, distribution and collection system costs and a $0.1 million increase in both purchased power and administrative
costs. The increase in utility operating
expenses is partially offset by a $0.1 million decrease in payroll and employee
benefit costs.
Non-utility operating
expenses decreased $0.1 million, or 11.9%, for the three months ended June 30, 2025 compared to the same
period in 2024. This decrease is primarily
due to a decrease in administrative costs and payroll and employee benefit
costs.
The
ratio of operating expense, excluding depreciation and income taxes, to total revenue
was 53.0% for the three months ended June 30, 2025, compared to 54.2% fo r the three
months ended June 30, 2024.
Federal
and state income tax expense increased $0.2 million, or 11.2%, primarily due to
higher pre-tax book income, partially offset by higher regulatory deferred
income tax amortization in 2025 compared to 2024.
Property
and other taxes increased $0.1 million, or 5.2%, primarily due to an increase
in New Castle County, Delaware tax rates on utility plant and an increase in
utility plant subject to taxation.
Property taxes are assessed on land, buildings and certain utility
plant, which include the footage and size of pipe, hydrants and wells.
Other Income
Other income increased $0.3 million, primarily due to an increase in allowance for funds used during construction, or AFUDC, as a result of higher long-term construction activity subject to AFUDC.
Net Income
Our net
income applicable to common stock increased $1.0 million, or 18.1%. Total operating revenues increased $1.1 million
and other income increased $0.3 million, offset by a $0.5 million increase in
total operating expenses.
Results of Operations – Analysis of the Six Months Ended June 30, 2025 Compared to the Six Months Ended June 30, 2024.
Operating Revenues
Revenues totaled
$54.4 million for the six months ended June 30, 2025, $2.5 million, or 4.8%,
more than revenues for the six months ended June 30, 2024 .
30
Table of Contents
Water sales
revenue increased $1.4 million, or 3.4%, for the six months ended June 30, 2025
from the corresponding period in 2024, primarily the result of an increase in overall water
consumption, DSIC revenue, customer growth and a temporary rate increase of
1.22% of gross water sales placed into effect on June 3, 2025, as permitted
under Delaware law, until permanent rates are determined by the DEPSC. Since the DSIC rate is set to zero when
temporary rates are placed into effect, the temporary rate increase of 2.88%, less
the DSIC rate of 1.66% that was previously in effect, resulted in a net change
of 1.22%. We realized 80.4% and 81.5%
of our total operating revenue for the six months ended June 30, 2025 and June
30, 2024, respectively, from the sale of water.
Other
utility operating revenue increased approximately $0.7 million, or 11.0%, for
the six months ended June 30, 2025 compared to the six months ended June 30, 2024. This increase is primarily due to an increase
in wastewater revenue associated with customer growth.
Non-utility
operating revenue increased approximately $0.3 million, or 10.1%, for the six
months ended June 30, 2025 compared to the six months ended June 30, 2024. This increase is primarily due to an increase
in Service Line Protection Plan revenue, primarily the result of an increase in
rates that were placed into effect on December 1, 2024.
Operating Expenses
Operating expenses, excluding depreciation and income taxes, increased
$0.7 million, or 2.4%, fo r the six months ended June
30, 2025, compared to the same period in 2024.
Utility operating expenses increased $0.7 million, or 2.9%, for the six
months ended June 30, 2025 compared to the same period in 2024. The increase in utility operating expenses
consists of a $0.5 million increase in administrative costs, a $0.3 million
increase in each of purchased power and transmission, distribution and collection system costs. The increase in utility
operating expenses is partially offset by a $0.2 million decrease in each of payroll
and employee benefit costs and supply and treatment costs.
Non-utility operating
expenses decreased $0.1 million, or 5.7%, for
the six months ended June 30, 2025 compared to the same period in 2024. This decrease is primarily due to a decrease
in payroll and employee benefit costs.
The ratio of operating expense, excluding depreciation and income taxes, to total revenue was 55.6% for the six months ended June 30, 2025, compared to 56.8% for the six months ended June 30, 2024.
Depreciation
and amortization expense decreased $0.1 million, or 1.7%, primarily due to a
decrease in depreciation expense related to an increase in depreciation on
utility plant funded by Contributions in Aid of Construction, or CIAC. Artesian Water offsets depreciation recorded
on utility plant by depreciation on utility property funded by CIAC.
Federal and state income tax expense increased $0.4 million, or 10.7%, primarily due to higher pre-tax book income, partially offset by higher regulatory deferred income tax amortization in 2025 compared to 2024.
Property and other taxes increased $0.2 million, or 5.0%, primarily due
to an increase in New Castle County, Delaware tax rates on utility plant and an
increase in utility plant subject to taxation.
Property taxes are assessed on land, buildings and certain utility
plant, which include the footage and size of pipe, hydrants and wells.
Other Income
Other income
increased $0.5 million, or 22.5%, primarily
as a result of higher long-term construction activity subject to AFUDC.
Net Income
Our net income applicable
to common stock increased $2.0 million, or 20.4%. Total operating revenues increased $2.5
million and other income increased $0.5 million, offset by a $1.0 million
increase in total operating expenses.
LIQUIDITY AND CAPITAL RESOURCES
Overview
Our
primary sourc es of liquidity for the six
months ended June 30, 2025 were $18.9 million of cash provided by operating
activities and $11.9 million in net contributions and advances from
developers. We depend on the
availability of capital for expansion, construction and maintenance. We rely on our sources of liquidity for
investments in our utility plant and to meet our various payment obligations.
31
Table of Contents
Operating Activities
One of our
primary sources of liquidity for the six months ended June 30, 2025 was $18.9
million provided by cash flow from operating activities, compared to $19.5
million for the six months ended June 30, 2024.
The decrease in cash flows from operating activities is primarily from lower
material and supplies, accrued expenses and income taxes receivable, offset by
higher net income and accounts payable. Cash flow from operating
activities is primarily provided by our utility operations and is impacted by
the timeliness and adequacy of rate increases and changes in water consumption
as a result of year-to-year variations in weather conditions, particularly
during the summer. A significant part of
our ability to maintain and meet our financial objectives is to ensure that our
investments in utility plant and equipment are recovered in the rates charged
to customers. As such, from time to
time, we file rate increase requests to recover increases in operating expenses
and investments in utility plant and equipment.
See Note 13 – Regulatory Proceedings. We will continue to borrow on
available lines of credit in order to satisfy current liquidity needs. In addition,
the Company has a long history of paying regular quarterly dividends as
approved by our Board of Directors using net cash from operating activities.
Investment Activities
The primary focus of our investments is to continue to
provide high quality reliable service to our growing service territory. Capital
expenditures during the first six months of 2025 were $26.3 million compared to
$18.4 million during the same period in 2024. During the first six months of 2025, these
investments include renewals associated with the rehabilitation of aging
infrastructure, installation of new mains, construction of a new wastewater
treatment plant, upgrading elevated storage tanks, upgrading and replacing our
meter reading equipment, and upgrading existing pumping stations to better
serve our customers.
Financing Activities
For the six months ended June
30, 2025, cash flows provided by financing activities were $6.5 million,
compared to $2.0 million for the six months ended June 30, 2024. Our primary source of liquidity from
financing activities for the six months ended June 30, 2025 was $11.9 million
in net contributions and advances from developers and $2.0 million from line of
credit borrowings. The cash flows
provided by financing activities increased due to an increase in net contributions and advances from
developers and an increase in borrowings from lines of credit . We have
several sources of liquidity to finance our investment in utility plant and
other fixed assets. We estimate that
future investments will be financed by our operations and external
sources. We expect to fund our
activities for the next twelve months using our projected cash generated from
operations, bank credit lines, government grants and capital market financing as needed to
provide sufficient working capital to maintain normal operations, to meet our
financing requirements and to expand through strategic acquisitions. We believe that our cash on hand and future
cash generated from the foregoing activities will provide adequate resources to
fund our short-term and long-term capital, operating and financing needs.
However, there is no assurance that we will be able to secure funding on terms
acceptable to us, or at all. Our cash
flows from operations are primarily derived from water sales revenues and may
be materially affected by changes in water sales due to weather and the timing
and extent of increases in rates approved by state public service commissions.
Material Cash Requirements
Lines of Credit and Long-Term Debt
At June 30, 2025,
Artesian Resources had a $40 million line of credit with Citizens Bank, or
Citizens, which is available to all subsidiaries of Artesian Resources. As of June 30, 2025, there was $38.0 million
of available funds under this line of credit.
The interest rate is a one-month Daily Secured Overnight Financing Rate,
or SOFR, plus 10 basis points, or Term SOFR, plus an applicable margin of
1.10%. Term SOFR cannot be less than
0.00%. This is a demand line of credit
and therefore the financial institution may demand payment for any outstanding
amounts at any time. The term of this
line of credit expires on the earlier of May 18, 2026 or any date on which
Citizens demands payment. The Company expects to renew this line of credit.
At June 30, 2025, Artesian Water had a $20 million line of credit with CoBank, ACB, or CoBank, that allows for the financing of operations for Artesian Water, with up to $10 million of this line available for the operations of Artesian Water Maryland. As of June 30, 2025, there was $20.0 million of available funds under this line of credit. The interest rate for borrowings under this line are either a daily SOFR rate plus 1.45% option or a term SOFR rate plus 1.45% option that is locked in for either one or three months. The term of this line of credit expires on October 31, 2025. Artesian Water expects to renew this line of credit.
32
Table of Contents
The Company’s material cash requirements include the following lines of credit commitments and contractual obligations:
Material Cash Requirements
Payments Due by Period
In thousands
Less than 1 Year
1-3 Years
4-5 Years
After 5 Years
Total
First mortgage bonds (principal and interest)
$
7,843
$
40,610
$
12,476
$
192,089
$
253,018
State revolving fund loans (principal and interest)
1,065
2,130
2,130
9,129
14,454
Promissory note (principal and interest)
962
1,923
1,926
8,207
13,018
Asset purchase contractual obligation (principal and interest)
326
320
-
-
646
Lines of credit
1,986
-
-
-
1,986
Operating leases
28
55
40
1,319
1,442
Operating agreements
38
27
-
-
65
Unconditional purchase obligations
943
560
114
227
1,844
Total contractual cash obligations
$
13,191
$
45,625
$
16,686
$
210,971
$
286,473
Artesian’s long-term debt agreements and revolving lines of credit contain customary affirmative and negative covenants that are binding on us (which are in some cases subject to certain exceptions), including, but not limited to, restrictions on our ability to make certain loans and investments, guarantee certain obligations, enter into, or undertake, certain mergers, consolidations or acquisitions, transfer certain assets or change our business. As of June 30, 2025, we were in compliance with these covenants.
Long-term debt obligations reflect the maturities of certain series of our first mortgage bonds, which we intend to refinance when due if not refinanced earlier. One first mortgage bond is subject to redemption in a principal amount equal to $150,000 plus interest per calendar quarter. The state revolving fund loan obligation and promissory note obligation have an amortizing mortgage payment payable over a 20-year period. The first mortgage bonds, the state revolving fund loan and the promissory note have certain financial covenant provisions, the violation of which could result in default and require the obligation to be immediately repaid, including all interest. We have not experienced conditions that would result in our default under these agreements.
The asset purchase contractual obligation is related to the purchase of substantially all of the water operating assets from the Town of Clayton in May 2022, by Artesian Water. The total purchase price was $5.0 million. At closing, Artesian Water paid approximately $3.4 million. The balance is payable in five equal annual installments on the anniversary date of the closing date. Each annual installment is payable with interest at an annual rate of 2.0%.
Payments for unconditional purchase obligations reflect minimum water purchase obligations based on rates that are subject to change under an interconnection agreement with the Chester Water Authority. The agreement is effective from January 1, 2022 through December 31, 2026, includes automatic five-year renewal terms, unless terminated by either party, and has a “take or pay” clause which currently requires us to purchase a minimum of 0.5 million gallons of water per day. In addition, payments for unconditional purchase obligations reflect minimum water purchase obligations based on a contract rate under our interconnection agreement with the Town of North East, which expires June 26, 2029. The agreement includes a remaining automatic five-year renewal term, unless terminated by either party.
In April 2021, Artesian Water entered into a 3-year agreement with
Worldwide Industries Corporation effective July 1, 2021 to paint elevated water
storage tanks. Pursuant to the
agreement, the total expenditure for the three years was $1.2 million. In September 2022, this agreement was amended
to paint an additional elevated water storage tank and to extend the term of
the agreement for an additional year.
Pursuant to the amended agreement, the total expenditure for the four
years was $2.2 million. The total
expenditure was fully paid to
Worldwide Industries Corporation as of April 2025.
In order to control purchased power costs and avoid fluctuations in electricity rates that happen due to the change of seasons, energy supply changes, or other outside factors, we utilize contracts with electric suppliers that provide a fixed rate. In February 2021, Artesian Water entered into an electric supply contract with MidAmerican that is effective from May 2021 to May 2025. The fixed rate was lowered 5.6% starting in May 2021. In April 2025, Artesian entered into an electric supply contract with Constellation NewEnergy, Inc. that is effective from May 2025 to May 2029 for Delaware operations. The supply rate was increased approximately 25% starting in May 2025. The total estimated annual increase in electric supply expense beginning in May 2025 is approximately $0.5 million. In February 2022, Artesian Water Maryland entered into an electric supply agreement with Constellation NewEnergy, Inc., effective from May 2022 through November 2025. In April 2025, Artesian Water Maryland entered into an electric supply agreement with WGL Energy that is effective from November 2025 through November 2029 for Maryland operations. The fixed rate was increased 5.5% starting in November 2025. In January 2022, following the acquisition of Tidewater Environmental Services, Inc. dba Artesian Wastewater, or TESI, assumed an electric supply contract with WGL Energy that was effective through December 2024. In November 2024, TESI entered into a short-term electric supply contract with WGL Energy effective December 2024 through May 2025. The fixed rate was increased 44.4% starting in December 2024. These fixed rate electric supply contracts are for normal purchases and are not derivative instruments.
33
Table of Contents
Critical Accounting Estimates; Recent Accounting Pronouncements
This discussion and analysis of our financial condition and results of operations is based on the accounting policies used and disclosed in our 2024 consolidated financial statements and accompanying notes that were prepared in accordance with accounting principles generally accepted in the United States of America and included as part of our annual report on Form 10-K for the year ended December 31, 2024. The preparation of those financial statements required management to make assumptions and estimates that affected the reported amounts of assets and liabilities and disclosure of contingent assets and liabilities at the dates of the financial statements as well as the reported amounts of revenues and expenses during the reporting periods. Actual amounts or results could differ from those based on such assumptions and estimates.
Our critical accounting estimates are described in Management's Discussion and Analysis of Financial Condition and Results of Operations included in our annual report on Form 10-K for the year ended December 31, 2024. There have been no changes in our critical accounting estimates. Our significant accounting policies are described in our notes to the 2024 consolidated financial statements included in our annual report on Form 10-K for the year ended December 31, 2024.
Information concerning our implementation and the impact of recent accounting pronouncements issued by the FASB is included in the notes to our 2024 consolidated financial statements included in our annual report on Form 10-K for the year ended December 31, 2024 and also in the notes to our unaudited condensed consolidated financial statements contained in this Quarterly Report on Form 10-Q. We did not adopt any accounting policy in the first six months of 2025 that had a material impact on our financial condition, liquidity or results of operations.
Text extracted from the filing as submitted to EDGAR. Formatting, tables and exhibits are simplified for reading; the original document is authoritative for anything you rely on.