−Removed: We are a vertically integrated Bitcoin mining company principally engaged in enhancing our capabilities to mine Bitcoin.
−Removed: We also provide comprehensive and critical mining infrastructure for institutional-scale hosted clients to mine Bitcoin at our Bitcoin mining facility in Rockdale, Texas (the “Rockdale Facility”).
−Removed: Our Rockdale Facility currently provides 700 megawatts in total developed capacity for our Bitcoin mining and data center hosting services for institutional-scale hosted clients.
−Removed: Our Rockdale Facility is believed to be the largest Bitcoin mining facility in North America, as measured by developed capacity, and we are currently growing its capacity.
−Removed: Additionally, we are developing a second large-scale Bitcoin mining and data center facility outside of Corsicana, Texas (the “Corsicana Facility”), which, upon completion, is expected to have approximately one gigawatt of capacity available for our own Bitcoin mining and data center hosting services for institutional-scale hosted clients.
−Removed: We operate in an environment that is consistently evolving based on the market outlook, and demand of, Bitcoin and cryptocurrencies in general.
−Removed: A significant component of our strategy is to effectively and efficiently allocate capital between opportunities that we believe will generate the highest return on our investment.
−Removed: We are organized and operate in three reportable business segments:
+Added: We are a vertically integrated Bitcoin mining company principally engaged in enhancing our capabilities to mine Bitcoin in support of the Bitcoin blockchain.
+Added: We also provide comprehensive and critical infrastructure for institutional-scale Bitcoin mining at our large-scale Bitcoin mining facilities in Rockdale, Texas (the “Rockdale Facility”) and Navarro County, Texas (the “Corsicana Facility”).
+Added: Our Rockdale Facility is believed to be the largest single Bitcoin mining facility in North America, as measured by developed capacity, and we are currently evaluating further growing its capacity.
+Added: Additionally, we are developing the Corsicana Facility, our second large-scale Bitcoin mining facility, which, upon completion, is expected to have approximately one gigawatt of Bitcoin mining capacity.
+Added: We operate in an environment and industry which frequently evolves based on the proliferation and uptake of Bitcoin.
+Added: A significant component of our strategy is to effectively and efficiently allocate capital among opportunities that we believe will generate the highest return on our investment.
+Added: We operate in three reportable business segments:
Bitcoin Mining, Data Center Hosting, and Engineering, which are organized based on purpose and services performed.
Each of our business segments is further discussed herein.
−Removed: Amounts disclosed in this Annual Report are in thousands except for share, per share, Bitcoin, and miner amounts, or as otherwise noted.
+Added: Amounts in this Annual Report are stated in thousands of U.S.
+Added: Dollars except for share and per share amounts, numbers of miners, hash rate, and Bitcoin quantities and prices, or as otherwise noted.
Business Segments
Bitcoin Mining
−Removed: As of December 31, 2022, our Bitcoin Mining business segment operated 88,556 miners, with a hash rate capacity of 9.7 exahash per second (“EH/s”).
+Added: As of December 31, 2023, our Bitcoin Mining business segment operated 112,944 miners with a total hash rate capacity of 12.4 exahash per second (“EH/s”).
In 2023, we mined 6,626 Bitcoin, which represented an increase of 19.3% over the 5,554 Bitcoin we mined in 2022.
−Removed: Based on our existing operations and expected deliveries and deployment of miners we have purchased, we anticipate having approximately 111,216 miners in operation by the end of 2023.
−Removed: Our Bitcoin Mining operations are focused on maximizing our ability to successfully mine Bitcoin by growing our hash rate (the amount of computer power we devote to supporting the Bitcoin blockchain) to increase our chances of successfully finding cryptographic hashes that create new blocks on the Bitcoin blockchain (a process known as “solving a block”).
−Removed: Generally, the greater share of the Bitcoin blockchain’s total network hash rate (the aggregate hash rate deployed to solving a block on the Bitcoin blockchain) represented by a miner’s hash rate, the greater the miner’s chances of solving a block and therefore earning the block reward, which is currently 6.25 Bitcoin plus transaction fees per block.
−Removed: As additional miner operators enter the market in response to increased demand for Bitcoin, the Bitcoin blockchain’s network hash rate grows.
−Removed: As we expect this trend to continue, we will need to continue to grow our hash rate to compete in our dynamic and highly competitive industry.
−Removed: A key component of the Bitcoin Mining segment is to acquire highly specialized computer servers (known in the industry as “miners”) built to operate application-specific integrated circuit (“ASIC”) chips designed specifically to mine Bitcoin and deploying them at-scale in our Rockdale Facility and Corsicana Facility, including in immersion-cooled environments.
−Removed: The Rockdale Facility has a dedicated best-in-class team that supports our Bitcoin Mining operations and, along with our Corsicana Facility, provide the necessary infrastructure and available power capacity for us to further scale our Bitcoin Mining business in the future.
−Removed: We believe ASIC miners are the most effective and energy-efficient miners available today, and we believe deploying them at-scale, including in immersion-cooled environments, with its more efficient heat dissipation and reduced wear-and-tear versus traditional air-cooled hardware, will enable us to continue to grow our hash rate and optimize the output and longevity of our miners once they are deployed.
−Removed: During the year ended December 31, 2021, we executed purchase orders totaling $480 million with Bitmain Technologies Limited (“Bitmain”) for 82,500 ASIC miners, including 30,000 of Bitmain’s latest generation Antminer model S19XP (140 TH/s) miners, and 52,500 S19j and S19j Pro miners, including 43,500 model S19j (90 TH/s) miners and 9,000 model S19j Pro (100 TH/s) miners.
−Removed: All miners subject to these purchase orders were delivered through December 31, 2022, except for 5,130 miners, which were delivered in January 2023.
−Removed: For additional discussion of our purchase orders with Bitmain, see the discussion under the heading
−Removed: “Mining Operations” in Part II, Item 7.
−Removed: “Management’s Discussion and Analysis of Financial Condition and Results of Operations” of this Annual Report, as well as the purchase orders themselves, which are incorporated by reference as exhibits to this Annual Report.
−Removed: The Company monitors the level of Bitcoin retained from our monthly production in consideration of operational and expansion cash requirements.
−Removed: Bitcoin is classified on our balance sheet as a current asset due to our ability to sell it in a highly liquid marketplace and its intent to liquidate its Bitcoin to support operations when needed.
−Removed: We constantly evaluate our Bitcoin retention policy to determine the most efficient use of that asset.
−Removed: Data Center Hosting
−Removed: Our Data Center Hosting business segment is operated at our Rockdale Facility and focuses on providing co-location services for institutional-scale Bitcoin mining companies.
−Removed: The Rockdale Facility provides the critical infrastructure and workforce necessary for institutional-scale miners to deploy and operate their miners.
−Removed: We provide our clients with licensed space in specifically designed buildings to operate large quantities of miners with access to electricity to operate those miners under colocation agreements.
−Removed: In pursuit of achieving the most efficient power strategy, we combine fixed low-cost power agreements, real-time spot power procurement, and income from ancillary power services revenue.
−Removed: We benefit from this low-cost energy by maximizing production margins.
−Removed: As of December 31, 2022, our 400 MW expansion at the Rockdale Facility had achieved multiple progress milestones while navigating the challenges with the current state of the global supply chain, including the completion of the substation expansion to 700 MW, successful installation of the substation busbar, and 400 MW of high-voltage transformers.
−Removed: We also completed construction of three new buildings in 2022, and a fourth is nearing completion in the first quarter of 2023, which, when completed, will finalize our Rockdale Facility expansion.
−Removed: Two of the four buildings are self-mining buildings dedicated to immersion-cooled Bitcoin mining.
−Removed: The construction completion timeline is currently on track, despite global supply chain shortages and delays.
−Removed: Our Engineering business segment designs and manufacturers power distribution equipment and custom engineered electrical products that provide us with the ability to vertically integrate many of the critical electrical components and engineering services necessary for our Rockdale and Corsicana facilities’ expansions and to reduce our execution and counter-party risk in ongoing and future expansion projects.
−Removed: Our engineering talent also allow us to continue to explore new methods to optimize and develop a best-in-class Bitcoin mining operation and have been instrumental in the development of our industrial-scale immersion-cooled Bitcoin mining hardware.
−Removed: Our Engineering business segment also provides electricity distribution product design, manufacture, and installation services primarily focused on large-scale commercial and governmental customers and serves a broad scope of clients across a wide range of markets including data center, power generation, utility, water, industrial, and alternative energy.
−Removed: Products are custom built to client and industry specifications under customers’ own Underwriters Laboratories, or UL, files;
−Removed: the bulk of these products consist of medium and low voltage switchgear as well as power distribution centers.
−Removed: Additionally, we utilize an in-house field service and repair department.
+Added: Based on our existing operations and expected deliveries and deployment of miners we have purchased, we anticipate having approximately 28 EH/s of total hash rate in operation by the end of 2024.
+Added: Our Bitcoin Mining operations are focused on maximizing our ability to successfully mine Bitcoin by growing our hash rate (the amount of computer power we devote to supporting the Bitcoin blockchain), to increase our chances of successfully creating new blocks on the Bitcoin blockchain (a process known as “solving a block”).
+Added: Generally, the greater share of the Bitcoin blockchain’s total network hash rate (the aggregate hash rate deployed to solving a block on the Bitcoin blockchain) a miner’s hash rate represents, the greater that miner’s chances of solving a block and, therefore, earning the block reward, which is currently 6.25 Bitcoin plus transaction fees per block (subject to periodic halving, as discussed below).
+Added: As the proliferation of Bitcoin continues and the market price for Bitcoin increases, we expect additional miner operators to enter the market in response to an increased demand for Bitcoin which we anticipate to follow increased Bitcoin prices.
+Added: As these new miner operators enter the market and as increasingly powerful miners are deployed in an attempt to solve a block, the Bitcoin blockchain’s network hash rate grows, meaning an existing miner must increase its hash rate at pace commensurate with the growth of network hash rate to maintain its relative chance of solving a block and earning a block reward.
+Added: As we expect this trend to continue, we will need to continue growing our hash rate to compete in our dynamic and highly competitive industry.
+Added: A key component of the Bitcoin Mining business segment is to acquire highly specialized computer servers (known in the industry as “miners”), which operate application-specific integrated circuit (“ASIC”) chips designed specifically to mine Bitcoin, and deploy such miners at-scale in our Rockdale Facility and Corsicana Facility, that utilize innovative and efficient immersion-cooled environments.
+Added: The Rockdale Facility and the Corsicana Facility, which are supported by our dedicated best-in-class team, enable our large-scale Bitcoin Mining operations and provide the necessary infrastructure and available power capacity for us to continue scaling our Bitcoin Mining business.
+Added: We believe ASIC miners are the most effective and energy-efficient miners available today, and we believe deploying them at-scale, including in quiet immersion-cooled environments, with their more efficient heat dissipation and reduced wear-and-tear compared to traditional air-cooled hardware, will enable us to continue growing our hash rate and optimize the output and longevity of our miners once they are deployed.
+Added: During the year ended December 31, 2023, we entered into a long-term master purchase and sales agreement, dated as of June 23, 2023, as amended (the “Master Agreement”) with MicroBT Electronics Technology Co., LTD, through its manufacturing affiliate,
+Added: SuperAcme Technology (Hong Kong) Limited (collectively, “MicroBT”) to secure the long-term supply of state-of-the-art immersion miners from MicroBT, all of which are being manufactured in the United States.
+Added: Pursuant to the Master Agreement, MicroBT agreed to provide us with ready access to its newest and most powerful miners, at their most competitive prices.
+Added: In 2023, we executed two purchase orders under the Master Agreement to acquire a total of 99,840 new MicroBT miners (consisting of 8,320 M56S+ model miners, 22,684 M56S++ model miners, 20,778 M66 model miners, and 48,058 M66S model miners), primarily for use at our Corsicana Facility, for a total purchase price of approximately $453.4 million.
+Added: Delivery of these miners began in the fourth quarter of 2023 and will be completed in monthly batches according to the delivery schedules specified under the applicable purchase order.
+Added: All 99,840 miners are expected to be received and deployed by mid-2025.
+Added: Upon full deployment of these new, state-of-the-art MicroBT immersion miners, we anticipate a total self-mining hash rate capacity of 38 EH/s.
+Added: The Master Agreement also provides us with options to purchase up to 66,560 additional miners per year through December 31, 2027, on the same terms as the initial order, for an aggregate of 265,000 additional miners.
+Added: For additional discussion of our purchase orders with MicroBT, see the purchase orders incorporated by reference as exhibits to this Annual Report.
A “mining pool” is a service operated by a mining pool operator that pools the resources of individual miners to share their processing power over a network.
2 unchanged sentences
Mining pools are subject to various risks such as disruption and down time.
−Removed: In the event that a pool experiences down time or is not yielding returns, our results may be impacted.
−Removed: During the year ended December 31, 2022, we utilized two types of mining pools:
+Added: In the event that a pool we utilize experiences down time or is not yielding returns, our results may be impacted.
+Added: We have utilized two types of mining pools:
● The first type of mining pool uses software that coordinates the pool members’ hash rate, identifies new block rewards, records how much work all the participants are doing, and assigns Bitcoin rewards to its participants in proportion to the hash rate each participant contributed to the successful mining transaction.
Fees are paid to the mining pool operator to cover the costs of maintaining the pool and are deducted from amounts we may otherwise earn.
−Removed: Fees and payouts fluctuate
−Removed: and historically have been no more than approximately 2% per reward earned, on average.
−Removed: The Company utilized this mining pool during the years ended December 31, 2020, 2021 and throughout 2022 until mid-December 2022.
−Removed: ● The second type of mining pool pays Bitcoin rewards utilizing a Full-Pay-Per-Share payout of Bitcoin based on hash rate provided to the mining pool.
−Removed: The Company transitioned completely to this mining pool in December 2022.
+Added: Fees and payouts fluctuate and historically have been no more than approximately 2% per reward earned, on average.
+Added: We utilized this type of mining pool during the years ended December 31, 2021 and throughout 2022, until mid-December 2022.
+Added: ● The second type of mining pool pays Bitcoin rewards utilizing a “Full-Pay-Per-Share” payout of Bitcoin based on a contractual formula, which calculates payout primarily based on the hash rate provided by us to the mining pool as a percentage of total network hash rate, along with other inputs.
+Added: We are entitled to consideration even if a block is not successfully placed by the mining pool operator.
+Added: We transitioned completely to this type of mining pool in December 2022, and utilized it for the year ended December 31, 2023.
+Added: Immersion-cooling
+Added: The initial phase of the development of the Corsicana Facility involves the construction of 400 megawatts (“MW”) of immersion-cooled Bitcoin Mining and Data Center Hosting infrastructure.
+Added: We anticipate that immersion-cooling technology will present many unique opportunities to increase efficiencies in Bitcoin mining and are constantly evaluating new and emerging technologies in the Bitcoin ecosystem to make our mining operations more efficient.
+Added: When miners are immersion-cooled, they operate in a more stable environment that is better able to dissipate the heat generated by the miners’ operation, allowing the equipment to run at sustained higher productivity rates for longer periods of time.
+Added: We are continuing to test our immersion-cooling mining operations and, if our desired performance metrics are achieved, we plan to leverage our infrastructure development capabilities to expand the implementation of our immersion-cooled Bitcoin mining hardware to increase our Bitcoin mining hash rate without relying solely on purchasing additional new miners and mining equipment, which we believe will result in increased operating efficiencies, and, thus, improved capital efficiencies.
+Added: Data Center Hosting
+Added: Our Data Center Hosting business segment is operated at our Rockdale Facility and focuses on providing co-location services for institutional-scale Bitcoin mining companies.
+Added: The Rockdale Facility provides the critical infrastructure and workforce necessary for institutional-scale miners to deploy and operate their miners in buildings specifically designed to operate Bitcoin miners at scale.
+Added: In pursuit of achieving the most efficient power strategy, we combine fixed low-cost power agreements, real-time spot power procurement, and credit from our participation in ancillary power services programs established by the Electric Reliability Council of Texas (“ERCOT”).
+Added: We benefit from this low-cost energy by maximizing production margins.
+Added: During the year ended December 31, 2023, we completed our expansion of the Rockdale Facility, more than doubling its developed capacity from the time of its acquisition in May 2021.
+Added: The expansion of our Rockdale Facility has provided us with the capacity to deploy our current fleet of miners and bring our Bitcoin Mining business segment entirely in-house, while still allowing us to continue offering Data Center Hosting services.
+Added: We believe deploying our miners at the expanded Rockdale Facility offers many advantages for our Bitcoin Mining operations, such as operating without incurring third-party colocation services fees and doing so at the low fixed energy costs available to the Rockdale Facility under its long-term Power Purchase Agreement (“PPA”).
+Added: Our Engineering business segment designs and manufacturers power distribution equipment and custom engineered electrical products that provide us with the ability to vertically integrate many of the critical electrical components and engineering services necessary for our Corsicana Facility development and Rockdale Facility expansion and to reduce our execution and counter-party risk in ongoing and future expansion projects.
+Added: Engineering and other specialized talent employed in our Engineering business segment also allows us to continue to explore new methods to optimize and develop a best-in-class Bitcoin mining operation and has been instrumental in the development of our industrial-scale immersion-cooled Bitcoin mining hardware.
+Added: Our Engineering business segment also provides electricity distribution product design, manufacturing, and installation services primarily focused on large-scale commercial and governmental customers and serves a broad scope of clients across a wide range of markets including data center, power generation, utility, water, industrial, and alternative energy.
+Added: Products are custom built to client and industry specifications.
Our business is highly competitive and operates 24 hours a day, 7 days a week, on a global basis.
1 unchanged sentence
Our competition in the Bitcoin mining space fluctuates due to a number of factors, including, but not limited to, the value of Bitcoin rewards for mining and public perception.
−Removed: In 2022, we saw a decrease in the number of Bitcoin miners attempting to expand their mining operations at scale, however, we anticipate that over the long-term there will be a significant increase in the number of Bitcoin miners attempting to enter into, and expand, their Bitcoin mining activities as market demand recovers.
+Added: See more details below under “Industry Trends”.
Our main competitors generally include other large Bitcoin mining companies, both publicly listed and private, as well as other Bitcoin miners who participate in mining pools.
−Removed: As more Bitcoin miners enter the space, we expect additional pressure on the industry, with greater competition for access to miners and high-quality industrial scale mining infrastructure which is in limited supply.
Data center hosting, particularly in relation to Bitcoin mining, is also highly competitive.
1 unchanged sentence
In order to ensure this supply of large amounts of low-cost electricity, we have entered into long-term power purchase agreements with our energy supplier at the Rockdale Facility, which allows us to control our power costs and project them over a long-term, enabling us to focus on developing best-in-class mining infrastructure and delivering best-in-class services.
+Added: Industry Trends
+Added: During 2022 and 2023, we observed several companies in the Bitcoin ecosystem experience significant challenges and initiate bankruptcy proceedings due to the significant volatility in the price of Bitcoin, the increase in interest rates, the volatility in spot prices of power, and other national and global macroeconomic factors.
+Added: We anticipate this trend will likely continue as companies attempt to shift their business models to operate on significantly compressed margins.
+Added: Further affecting the margins of the companies within the Bitcoin ecosystem, the Bitcoin reward for solving a block is subject to periodic incremental halving, as described below under the heading “Factors Affecting Profitability - Halving.”
+Added: The dramatic increase in the price of Bitcoin observed in the market during prior years caused many companies to over-leverage themselves, thus operating in potentially unsustainable ways given the recent variability in the price of Bitcoin.
+Added: We chose to refrain from engaging in any significant debt-financing activities during this period and, as a result, has not been subject to the significant
+Added: debt-service shortfalls some of our competitors are experiencing.
+Added: Despite such challenges in the ecosystem, we continue to focus on building long-term stockholder value by taking strategic action to vertically integrate our business, expanding the Rockdale Facility and developing the Corsicana Facility.
+Added: Management believes this focus will positively affect each of our three business segments by providing more capacity for our Bitcoin Mining and Data Center Hosting operations, and by capitalizing on supply chain efficiencies garnered through our Engineering segment.
+Added: As we grow our business, we continue to focus on deploying our efficient Bitcoin mining fleet, at scale, while realizing the benefits of being an owner and operator of our Bitcoin Mining and Data Center Hosting facilities.
+Added: We anticipate companies in our industry will continue to experience challenges, and that 2024 may continue to be a period of consolidation in the Bitcoin mining industry.
+Added: Further, given our relative position, liquidity, and absence of any significant long-term debt, we believe we are well positioned to benefit from such consolidation.
+Added: We are continuously evaluating strategic opportunities which we may decide to undertake as part of our strategic growth initiatives;
+Added: however, we can offer no assurances that any strategic opportunities which we decide to undertake will be achieved on the schedule or within the budget we anticipate, if at all, in our competitive and evolving industry, and our business and financial results may change significantly as a result of such strategic growth.
+Added: The recent shutdowns of certain digital asset exchanges and trading platforms due to fraud or business failure has negatively impacted confidence in the digital asset industry as a whole and led to increased oversight and scrutiny of the industry.
+Added: We did not have any exposure to any digital asset lenders or exchanges who have declared bankruptcy or have suspended operations.
+Added: We only hold and sell Bitcoin that we have mined and do not sell, hold, or redeem any Bitcoin for any other parties.
+Added: Our Bitcoin is held in cold storage wallets by a well-known U.S.-based third-party digital asset-focused custodian.
+Added: We also sell our Bitcoin using our custodian’s U.S.
+Added: brokerage services.
+Added: In 2023, the banking industry and financial services sector experienced disruptions and instability.
+Added: In March 2023, Silvergate Capital Corporation, the holding company for Silvergate Bank, which was primarily focused on the digital asset industry, announced its intent to wind down operations and voluntarily liquidate its holdings.
+Added: Also in March, Silicon Valley Bank and Signature Bank both closed.
+Added: The Federal Deposit Insurance Corporation (“FDIC”) was appointed receiver following their closures and transferred substantially all assets of the former banks to newly created, FDIC-operated bridge banks in an action to protect all depositors of the banks.
+Added: In May 2023, First Republic Bank was closed, and the FDIC sold substantially all of First Republic Bank’s assets to JP Morgan Chase & Co.
+Added: Although we maintained certain operating accounts with Signature Bank prior to its closure, we have since transferred all our deposits previously held with the bank to other banking institutions.
+Added: We did not lose access to our accounts or experience interruptions in banking services, and we suffered no losses with respect to our deposits at Signature Bank as a result of the bank’s closure.
+Added: We did not have any banking relationships with Silicon Valley Bank, Silvergate Bank, or First Republic Bank, and currently hold our cash and cash equivalents at multiple banking institutions.
+Added: Although we did not suffer any losses, we continue to monitor for updates to mitigate any future impacts we may be subject to as a result of instability of the banking industry and financial services sector.
Research and Development
−Removed: During 2021, we announced the first industrial scale deployment of 200 MW of immersion-cooled Bitcoin mining at the Rockdale Facility, and during 2022, we completed the deployment of miners.
−Removed: During 2022, we announced plans for the development of an additional 400 MW of immersion-cooled Bitcoin mining at the Corsicana Facility.
−Removed: We anticipate immersion-cooling technology will present many unique opportunities to increase efficiencies in Bitcoin mining and are constantly evaluating new and emerging technologies in the Bitcoin ecosystem to make our mining operations more efficient.
+Added: In 2022, we initiated development of the Corsicana Facility to expand our Bitcoin Mining and Data Center Hosting capabilities on a 265-acre site in Navarro County, Texas, located next to the Navarro Switch.
+Added: Once complete, we expect the Corsicana Facility to have one gigawatt of developed capacity for Bitcoin Mining and Data Center Hosting operations.
+Added: The initial phase of the development of the Corsicana Facility involves the construction of 400 MW of immersion-cooled Bitcoin Mining and Data Center Hosting infrastructure, as well as a high-voltage power substation and transmission facilities to supply power and water to the facility.
+Added: Construction of the substation and the data centers is ongoing and operations are expected to commence by the end of the first quarter of 2024, following commissioning of the substation.
Materials and Suppliers
1 unchanged sentence
Given the complexity of developing mining hardware, there are few suppliers that can produce miners at scale.
−Removed: For example, our historic purchase orders with Bitmain had future delivery schedules that extended out many months before those miners are delivered to our Rockdale Facility.
+Added: For example, our purchase orders with MicroBT have future delivery schedules that extend out many months before those miners are delivered to our Rockdale Facility.
These fluctuations in delivery timelines require us to plan to purchase miners well in advance of when we anticipate deploying those miners.
−Removed: Our expansion at the Rockdale and Corsicana facilities requires large quantities of electrical infrastructure components and construction materials.
−Removed: We seek to procure these materials from our suppliers in sufficient quantities so that we can deploy miners at scale on accelerated timelines.
+Added: Our development of the Corsicana Facility requires large quantities of electrical infrastructure components and construction materials.
+Added: We seek to procure these materials from our suppliers in sufficient quantities so that we can deploy miners at scale on
+Added: accelerated timelines.
Further, our immersion-cooled Bitcoin Mining activities require large volumes of specialized non-conductive fluid, for which there are limited manufacturers.
−Removed: Cryptocurrency mining is largely an unregulated activity at both the state and federal level.
−Removed: We anticipate that cryptocurrency mining will be a focus for increased regulation in the near- and long-term, and we cannot predict how future regulations may affect our business or operations.
−Removed: State regulation of cryptocurrency mining is important with respect to where we conduct our mining operations.
+Added: Global Logistics
+Added: Global supply logistics have caused delays across all channels of distribution.
+Added: Similarly, we have also experienced delays in certain of our miner delivery schedules and in our infrastructure development schedules due to constraints on the globalized supply chains for miners, electricity distribution equipment and construction materials.
+Added: Through the date of this Annual Report, we have been able to effectively mitigate any delivery delays to avoid materially impacting our miner deployment schedule;
+Added: however, there are no assurances we will be able to continue to mitigate any such delivery delays in the future.
+Added: Additionally, the development of the Corsicana Facility requires large quantities of construction materials, specialized electricity distribution equipment and other component parts that can be difficult to source.
+Added: We have procured and hold many of the required materials to help mitigate global supply logistic and pricing concerns.
+Added: We continue to monitor developments in the global supply chain and assess their potential impact on our expansion plans.
+Added: We anticipate that Bitcoin mining will be a focus for potential increased regulation in the near- and long-term, and we cannot predict how future regulations may affect our business or operations.
+Added: State regulation of Bitcoin mining is an important consideration with respect to where we conduct our mining operations.
Our Rockdale Facility and our Corsicana Facility are both located in the State of Texas.
−Removed: To the extent that there is any state regulation, Texas is one of the most favorable regulatory environments for cryptocurrency miners.
−Removed: In January 2022, we received a letter from a group of Members of Congress requesting information about our current and planned energy usage.
−Removed: On February 24, 2022, we replied to the letter and provided the Senators and members of Congress with the information they requested.
−Removed: In March 2022, the United States announced plans to establish a unified federal regulatory regime for cryptocurrency, and a group of United States Senators sent a letter to the United States Treasury Department asking Treasury Secretary Yellen to investigate Treasury’s ability to monitor and restrict the use of cryptocurrencies to evade sanctions imposed by the United States.
−Removed: We are unable to predict the impact that any new regulations may have on our business at the time of filing this Annual Report.
−Removed: We continue to monitor and proactively engage in dialogue on legislative matters related to our industry.
−Removed: On August 17, 2022, the Committee on Energy and Commerce of the U.S.
−Removed: House of Representatives sent letters to Riot and three other public companies with Bitcoin mining operations requesting information related to the environmental impact and energy consumption of the recipients.
−Removed: The letter addressed to Riot contained inquiries concerning our energy usage and sources, curtailment practices, and electronic waste.
−Removed: Riot submitted a written response to the Committee replying to its inquiries on September 14, 2022.
−Removed: In September 2022, the White House issued a report regarding the Climate and Energy Implications of Crypto-Assets in the United States.
−Removed: The report states that the Department of Energy and Environmental Protection Agency should initiate a process to solicit data and develop environmental performance and energy conservation standards for crypto-asset technologies, including mining equipment.
−Removed: Should such measures prove ineffective at achieving the Administration’s environmental goals, the report calls for the Administration to explore executive actions and legislation to limit or eliminate the use of high energy intensity consensus mechanisms for crypto-asset mining.
−Removed: We are unable to predict the impact that any new standards, legislation, or regulations may have on our business at the time of filing this Annual Report.
−Removed: We continue to monitor and proactively engage in dialogue on regulatory and legislative matters related to our industry.
−Removed: Further, in December 2022 the SEC’s Division of Corporation Finance issued guidance advising companies to disclose exposure and risk to the cryptocurrency market.
−Removed: While the focus is on digital asset managers and exchanges, and not Bitcoin miners, the failure of such large asset managers and exchanges may create increased price volatility of Bitcoin.
−Removed: Riot does not store our Bitcoin on such exchanges;
−Removed: however, we may be impacted by such failures.
−Removed: In January 2023, the Federal Reserve, Office of the Comptroller of the Currency, and Federal Deposit Insurance Corporation issued a joint statement discouraging banks from doing business with clients in crypto-asset industries.
−Removed: In January 2023, the Federal Reserve also issued a policy statement broadening its authority to cover state-chartered banks.
−Removed: Also in January 2023, the House of Representatives announced its first ever Financial Services Subcommittee on Digital Assets and the intention to develop a regulatory framework for the digital asset industry.
+Added: To the extent that there is any state regulation of Bitcoin mining, we believe Texas is likely to remain one of the most favorable regulatory environments for Bitcoin miners.
+Added: In March 2022, the SEC issued proposed climate-related disclosure requirements for registrants and received thousands of comments on the proposal.
+Added: We continue to await the release of any potential finalized rules requiring such disclosures following the analysis of the comments.
+Added: In January 2023, the Board of Governors of the Federal Reserve System (the “Federal Reserve”), Office of the Comptroller of the Currency, and FDIC issued a joint statement regarding perceived risks to banks with clients in crypto-asset industries.
+Added: In January 2023, the Federal Reserve also issued a policy statement broadening its regulatory authority to limit the activities of state-chartered banks.
+Added: Several leaders in the U.S.
+Added: Congress sent oversight letters to the prudential regulators pushing back on any efforts to place limits on banking activity for digital asset industries.
+Added: Riot has also diversified banking relationships to mitigate any potential regulatory risk with respect to financial services.
+Added: Additionally, in January 2023, the U.S.
+Added: House of Representatives announced its first ever Financial Services Subcommittee on Digital Assets and its intention to develop a regulatory framework for the digital asset industry.
Bipartisan leadership of the Senate Banking Committee announced that goal as well.
−Removed: As the regulatory and legal environment evolves, we may become subject to new laws, such as further regulation by the SEC and other agencies, which may affect our mining and other activities.
−Removed: For additional discussion regarding our belief about the potential risks existing and future regulation pose to our business, see Part I, Item 1A.
+Added: Over the course of 2023, the House Financial Services Committee passed various bills, including a bill to provide a market structure for digital assets, but no such legislation has received a vote on the floor of the full House.
+Added: In January 2024, a decade after initial applications were filed, the SEC approved a series of spot Bitcoin exchange-traded funds, which have received billions of dollars of in-flows.
+Added: Also in January 2024, the U.S.
+Added: Energy Information Administration initiated a provisional survey of electricity consumption information from cryptocurrency mining companies operating in the United States.
+Added: The survey was authorized by the Office of Management and Budget as an emergency data request.
+Added: This action is purely a survey, and it remains unclear whether or how the information will be used in future regulatory efforts.
+Added: Leaders on both the U.S.
+Added: House Financial Services Committee and U.S.
+Added: Senate Banking Committee have expressed interest in passing legislation to provide additional regulatory authority to address risks related to the use of digital assets in illicit financial activity.
+Added: Treasury Department has also requested additional authorities to address such risks.
+Added: However, we have not seen sufficient support emerge in favor of any particular proposal to anticipate any specific changes at this time.
+Added: We are unable to predict the impact that any new standards, legislation, or regulations may have on our business at the time of filing this Annual Report.
+Added: However, we continue to monitor and proactively engage in dialogue on regulatory and legislative matters related to our industry.
+Added: As the regulatory and legal environment evolves, we may become subject to new laws, such as further regulation by the SEC and other agencies, which may affect our Bitcoin Mining and other activities.
+Added: For additional discussion regarding our belief about the potential risks that existing and future regulation pose to our business, see Part I, Item 1A.
“Risk Factors” of this Annual Report.
4 unchanged sentences
Bitcoin mining operations present a stable demand for energy and can be quickly curtailed, uniquely positioning businesses that engage in Bitcoin mining to respond to increased electricity demand in emergency situations.
−Removed: In February 2021 and throughout 2022, Riot voluntarily reduced our operations and curtailed our energy consumption to allow our energy provider to redirect our power allotment back into the Electric Reliability Council of Texas (“ERCOT”) market during extreme weather events.
+Added: Throughout 2023, we voluntarily reduced our operations and curtailed our energy consumption to allow our energy provider to redirect our power allotment back into the ERCOT market during extreme weather events.
By taking such actions, we immediately helped to stabilize the grid by allowing our power allotment to be delivered to the areas of greatest need, such as heating homes and powering hospitals.
−Removed: Overall, our operations incentivize new power
−Removed: generation development and our actions help to reduce the frequency and impact of power failures and electricity price surges.
+Added: Overall, our operations incentivize new power generation development and our actions help to reduce the frequency and impact of power failures and electricity price surges.
In exchange for powering down our systems in response to high electricity demand, we receive benefits associated with the difference between our contractual cost of power and the price at which such power is sold on the ERCOT market (less any applicable fees payable to our consultants who assist with our participation in the ERCOT Demand Response Services Program).
Additionally, we voluntarily participate in load response programs operated by ERCOT, whereby we temporarily give ERCOT the right to curtail a set portion of our power load at their discretion in exchange for a fee.
−Removed: Ultimately, these benefits are shared between us, other consumers participating in the ERCOT market, and the overall health of the Texas grid.
+Added: Ultimately, these benefits are shared by us and all participants in the ERCOT market, through the positive incentivizing of energy supply and demand consistency across the ERCOT marketplace, which contributes positively to the overall health of the Texas grid.
Human Capital Resources
+Added: During the past year, we have made substantial investments in our workforce to retain and attract best-in-class employees, substantially growing our employee base, while also internally promoting individuals to key positions across the Company.
As of December 31, 2023, we had a total workforce of approximately 534 employees across our entire organization, including professionals in engineering, information and technology, operations, construction, manufacturing.
3 unchanged sentences
Our strategy with human capital resources is to align the interests of our employees with our key long-term success drivers.
−Removed: In execution of this strategy, we adopted a long-term performance incentive plan, under which all eligible employees are granted performance-based restricted stock awards that vest based on the Company’s achievement of specific performance milestones.
−Removed: Certain employees under the long-term performance plan are eligible to receive cash in lieu of restricted shares of the Company’s common stock awards based on achievement of these same performance milestones.
−Removed: We believe our performance plan is a key incentive for our employees that aligns their long-term interests with our long-term objectives as an organization.
−Removed: At Riot, we seek to attract a pool of diverse, best-in-class candidates and foster their career growth by hiring the best talent available, rather than relying solely on educational background.
+Added: In execution of this strategy, we adopted a long-term performance incentive program, under which all eligible employees are granted a combination of service-based restricted stock awards that generally vest over a three-year period and performance-based restricted stock awards that are eligible to vest based on our achievement of specific performance or total stockholder return milestones.
+Added: During 2023, certain employees under the long-term performance program were eligible to receive cash in lieu of restricted shares of our common stock awards based on achievement of these same performance milestones.
+Added: We believe our performance program is a key incentive for our employees that aligns their long-term interests with our long-term objectives as an organization.
+Added: In addition to Riot’s long-term incentive program and competitive cash compensation practices, our employees are provided with excellent health benefits, paid parental leave, paid time off, and additional benefits.
+Added: We recognize the positive impact that leaders within a company can have on their teams, and we believe every employee is and should be a leader within our Company.
+Added: Consequently, in addition to seeking out top talent from outside of our organization to foster this positive impact, we offer management and executive leadership training, and encourage the continuous development of leaders across the Company, and motivate every Company employee to take ownership over their impact on the Company’s success.
+Added: We seek to attract a pool of diverse, best-in-class candidates and foster their career growth by hiring the best talent available, rather than relying solely on educational background.
In support of such initiative, we look for candidates in local communities and large cities alike, and from a variety of backgrounds.
2 unchanged sentences
Diversity, Equity, and Inclusion
−Removed: At Riot, we support diversity and inclusion in a workplace where employees can thrive.
+Added: We support diversity and inclusion in a workplace where employees can thrive, and our policies are designed to promote fairness and respect for everyone.
Diverse backgrounds, experiences and opinions are encouraged and welcomed.
−Removed: In support of such diversity and inclusion, we act in accordance with our Code of Conduct and Ethics to create a safe environment free from discrimination or harassment that respects the human rights of our employees.
+Added: In support of such diversity and inclusion, we act in accordance with our Code of Ethics and Business Conduct and our Non-Discrimination and Anti-Harassment Policy to create a safe environment free from discrimination or harassment that respects the human rights of our employees.
We strive to achieve a workplace where opportunities for success are created and available for all employees.
−Removed: In support of this goal, in 2022 we deployed to all employees unconscious bias and harassment trainings.
+Added: In support of this goal, in 2023, we required all employees to complete unconscious bias and harassment trainings.
Compensation and Benefits
−Removed: Riot’s compensation programs are designed to provide incentives to attract, retain, and motivate employees to achieve the Company’s long-term goals.
+Added: Our compensation programs are designed to provide incentives to attract, retain, and motivate employees to achieve our long-term goals.
Specifically, we compare salary and wages against quantitative benchmarks and adjust monetary compensation to ensure wages are competitive and consistent with employee positions, skill levels, experience, and geographic location.
We maintain a robust process for ensuring pay equity across the Company and increases in incentives and compensation based on merit and performance.
−Removed: We provide a comprehensive range of benefits options, including medical, dental and vision insurance for employees and family members, paid and unpaid leaves, and life and disability/accident coverage.
+Added: We provide a comprehensive range of benefits options, including medical, dental, and vision insurance for employees and family members, paid and unpaid leaves, and life and disability/accident insurance coverage.
Benefits for employees outside of the United States are provided based on country-specific practices and are intended to support the health and well-being of our employees and their families.
−Removed: Immersion-cooling
−Removed: During 2021, we announced the first industrial scale deployment of 200 MW of immersion-cooled Bitcoin mining at the Rockdale Facility, and during 2022, we completed deployment.
−Removed: During 2022, we also announced plans to develop an additional 400 MW of immersion-cooled Bitcoin mining operations at the Corsicana Facility.
−Removed: We anticipate immersion-cooling technology will present many unique opportunities to increase efficiencies in Bitcoin mining, and are constantly evaluating new and emerging technologies in the Bitcoin ecosystem to make our mining operations more efficient.
−Removed: When miners are immersion-cooled, they operate in a more stable environment that is better able to dissipate the heat generated by the miners’ operation, allowing the equipment to run at sustained higher productivity rates for longer periods of time.
−Removed: We are continuing to test our immersion-cooling mining operations and, if our desired performance metrics are achieved, we plan to leverage our infrastructure development capabilities to expand the implementation of our immersion-cooled Bitcoin mining hardware to increase our Bitcoin mining hash rate without relying solely on purchasing additional new miners and mining equipment, which we believe will result in increased operating efficiencies, and, thus, improved capital efficiencies.
Bitcoin Mining Results
Bitcoin Mining Production and Bitcoin Sales
−Removed: One way the Company measures the success of its operations is by the number and U.S.
−Removed: Dollar value of the Bitcoin rewards it earns from its Bitcoin Mining activities.
−Removed: The following table presents information regarding our Mining operations, including Bitcoin production and sales of the Bitcoin the Company mines.
+Added: One way we measure the success of our operations is by the number and U.S.
+Added: Dollar value of the Bitcoin rewards we earn from our Bitcoin Mining activities.
+Added: The following table presents information regarding our Mining operations, including Bitcoin production and sales of the Bitcoin we mine.
Balance as of January 1, 2021
Revenue recognized from Bitcoin mined
−Removed: Mining pool operating fees
−Removed: Proceeds from sale of Bitcoin
−Removed: Realized gain on sale/exchange of Bitcoin (as restated)
−Removed: Impairment of Bitcoin (as restated)
−Removed: Bitcoin received from sale of equipment
−Removed: Balance as of December 31, 2020 (as restated)
−Removed: Revenue recognized from Bitcoin mined
Exchange of Bitcoin for employee compensation
−Removed: Realized gain on sale/exchange of Bitcoin (as restated)
−Removed: Impairment of Bitcoin (as restated)
−Removed: Balance as of December 31, 2021 (as restated)
+Added: Realized gain on sale/exchange of Bitcoin
+Added: Impairment of Bitcoin
+Added: Balance as of December 31, 2021
Revenue recognized from Bitcoin mined
4 unchanged sentences
Balance as of December 31, 2022
+Added: Cumulative effect upon adoption of ASU 2023-08
+Added: Revenue recognized from Bitcoin mined
+Added: Bitcoin receivable
+Added: Proceeds from sale of Bitcoin
+Added: Exchange of Bitcoin for employee compensation
+Added: Change in fair value of Bitcoin
+Added: Balance as of December 31, 2023
We increased the quantity of Bitcoin rewards earned from our Bitcoin Mining operations from 5,554 Bitcoin mined in 2022, to 6,626 Bitcoin mined in 2023, representing an increase of approximately 19.3%.
−Removed: Revenue recognized from our Bitcoin Mining activities decreased from approximately $184.4 million during fiscal year 2021 to $156.9 million during fiscal year 2022, representing a decrease of approximately 14.9%.
−Removed: The decrease was due to lower values for Bitcoin mined in 2022, averaging $28,245 per coin, as compared to $45,744 per coin in 2021, and an increase in the global network hash rate, partially offset by an increase in Bitcoin rewards earned as a result of an increase in the number of miners deployed from 30,907 as of December 31, 2021, to 88,556 as of December 31, 2022.
+Added: Revenue recognized from our Bitcoin Mining activities increased from approximately $156.9 million during 2022 to $189.0 million during 2023, representing an increase of approximately 20.5%.
+Added: The increase was due to an increase in Bitcoin rewards earned as a result of an increase in the number of miners deployed from 88,556 as of December 31, 2022, to 112,944 as of December 31, 2023, partially offset by an increase in the global network hash rate.
Factors Affecting Profitability
2 unchanged sentences
The prices of cryptocurrencies, including Bitcoin, have experienced substantial volatility, meaning that high or low prices may be based on speculation and incomplete information, subject to rapidly changing investor sentiment, and influenced by factors such as technology, regulatory void or changes, fraudulent actors, manipulation, and media reporting.
−Removed: Bitcoin (as well as other cryptocurrencies) may have value based on various factors, including their acceptance as a means of exchange by consumers and producers, scarcity, and market demand which are beyond our control.
−Removed: Further affecting the industry, and particularly for the Bitcoin blockchain, the Bitcoin reward for solving a block is subject to periodic incremental halving.
−Removed: Halving is a process designed to control the overall supply and reduce the risk of inflation in Bitcoin using a
−Removed: Proof-of-Work consensus algorithm.
+Added: Bitcoin (as well as other cryptocurrencies) may have value based on various factors, including, but not limited to, their acceptance as a means of exchange by consumers and producers, scarcity, and market demand, all of which are beyond our control.
+Added: Further affecting the industry, particularly for the Bitcoin blockchain, the Bitcoin reward for solving a block is subject to periodic incremental halving.
+Added: Halving is a process designed to control the overall supply and reduce the risk of inflation in Bitcoin, which uses a proof-of-work consensus algorithm.
At a predetermined block, the mining reward is cut in half, hence the term “halving.” For Bitcoin the reward was initially set at 50 Bitcoin currency rewards per block.
2 unchanged sentences
(2) on July 9, 2016, at block height 420,000;
−Removed: (3) on May 11, 2020, at block height 630,000, when the reward was reduced to its current level of 6.25 Bitcoin per block.
+Added: and (3) on May 11, 2020, at block height 630,000, when the reward was reduced to its current level of 6.25 Bitcoin per block.
The next halving for the Bitcoin blockchain is currently anticipated to occur in April 2024 at block height 840,000.
8 unchanged sentences
Therefore, as new and existing miners deploy additional hash rate, the global network hash rate will continue to increase, meaning a miner’s share of the global network hash rate (and therefore its chance of earning Bitcoin rewards) will decline if it fails to deploy additional hash rate at pace with the industry.
−Removed: For further discussion of the factors affecting our profitability, see the discussion under Part II, Item 7 “Management’s Discussion and Analysis” under the heading “Summary of Mining Results” of this Annual Report, as well as the discussion of various risks, factors, and uncertainties we believe may affect our revenue and results of operations under Part I, Item 1A.
+Added: For further discussion of the factors affecting our profitability, see the discussion under Part II, Item 7 “Management’s Discussion and Analysis of Financial Condition and Results of Operations” under the heading “Summary of Bitcoin Mining Results” of this Annual Report, as well as the discussion of various risks, factors, and uncertainties we believe may affect our revenue and results of operations under Part I, Item 1A.
“Risk Factors” of this Annual Report.
6 unchanged sentences
Therefore, to remain competitive, miners seek to continually increase their total hash rate, creating a feedback loop:
−Removed: as Bitcoin gains popularity and its relative market price increases, more miners attempt to mine Bitcoin and its network hash rate is increased;
−Removed: in response, existing miners and new miners devote more and more hash rate to the Bitcoin blockchain by adding more, and increasingly powerful, miners to attempt to ensure their ability to earn additional Bitcoin rewards, and, in response, the network difficulty of the Bitcoin network is increased to maintain the pace of new block additions, spurring miners to seek to deploy yet further hash rate to earn the same relative number of new Bitcoin rewards.
+Added: as Bitcoin gains popularity and its relative market price increases, more miners attempt to mine Bitcoin and its global network hash rate is increased;
+Added: in response, existing miners and new miners devote more and more hash rate to the Bitcoin blockchain by adding more, and increasingly powerful, miners to attempt to ensure their ability to earn additional Bitcoin rewards.
+Added: As a result, the network difficulty of the Bitcoin network is increased to maintain the pace of new block additions, spurring miners to seek to deploy yet further hash rate to earn the same relative number of new Bitcoin rewards.
In theory, this process should continually replicate itself until the supply of available Bitcoin is exhausted.
2 unchanged sentences
Compounding this phenomenon, it has been observed that some manufacturers of Bitcoin miners may increase prices for new miners as the market price of Bitcoin increases.
−Removed: Further, these manufacturers have also been impacted by the ongoing global supply chain crisis resulting from COVID-19, both in terms of increased prices for the components of these new miners resulting from the constrained supply of the semiconductors used in the production of the highly specialized ASIC chips miners rely on, and in terms
−Removed: of labor costs to manufacture new miners as workforces are affected by increased absenteeism due to COVID-19 restrictions and employee burnout.
−Removed: Thus, miner manufacturers are subject to increasing price pressures due to both increased demand for new miners and decreased supply of necessary components and labor, ultimately leading to higher prices for new miners.
+Added: Further, these manufacturers have also been impacted by the ongoing global supply chain crisis resulting from COVID-19, both in terms of increased prices for the components of these new miners resulting from the constrained supply of the semiconductors used in the production of the highly specialized ASIC chips miners rely on, and in terms of labor costs to manufacture new miners as workforces are affected by increased absenteeism due to COVID-19 restrictions and employee burnout.
+Added: Thus, miner manufacturers are subject to increasing price pressures due to both increased demand for new miners and decreased supply of necessary components and labor, ultimately leading manufacturers to charge higher prices for new miners.
Intellectual Property
We actively use specific hardware and software for our Bitcoin Mining operations.
−Removed: The Bitcoin blockchain is generally built on open-source code and, in certain cases, the source code and other software assets we use in our mining operations may be subject to an open-source license.
+Added: The Bitcoin blockchain is generally built on open-source code and, in certain cases, the source code and other software assets we use in our Bitcoin Mining operations may be subject to an open-source license.
For these works, we adhere to the terms of any license agreements that may be in place.
We also rely upon the intellectual property rights of others in certain respects in connection with our immersion-cooling technology.
−Removed: We currently rely upon trade secrets, trademarks, service marks, trade names, copyrights, and other intellectual property rights, and to license the use of such intellectual property rights owned and controlled by others.
+Added: We currently rely on trade secrets, trademarks, service marks, trade names, copyrights, and other intellectual property rights, and on licenses to use intellectual property rights owned and controlled by others.
In addition, we have developed and may further develop certain proprietary software and hardware applications in connection with Bitcoin Mining operations, including our immersion-cooled Bitcoin Mining developments.
Information About Our Executive Officers
−Removed: The following sets forth the name, age, and position of each of the persons who were serving as executive officers as of the filing of this annual report on Form 10-K.
−Removed: There are no immediate familial relationships among our executive officers and any directors.
−Removed: There are no arrangements or understandings between any of our executive officers and any other person pursuant to which any of such executive officers were selected.
+Added: The following sets forth the name, age, and position of each of the persons who were serving as executive officers as of the filing of this Annual Report.
Director and Chief Executive Officer (principal executive officer)
Director and Executive Chairman
−Removed: Chief Financial Officer (principal financial officer)
+Added: Executive Vice President, Chief Financial Officer (principal financial officer)
William Jackman
Executive Vice President, General Counsel and Secretary
+Added: Executive Vice President, Head of Corporate Development & Strategy
Senior Vice President, Chief Accounting Officer (principal accounting officer)
−Removed: Jason Les (age 37) has served as our Chief Executive Officer (“CEO”) since February 2021 and as a member of the Board since October 2017.
−Removed: He has been deeply involved with Bitcoin since 2013, with significant experience in cryptocurrency mining, as an engineer studying protocol development, and contributing to open-source projects.
+Added: Jason Les (age 38) has served as our Chief Executive Officer (“CEO”) since February 2021 and as a member of the board of directors since October 2017.
+Added: He has been deeply involved with Bitcoin since 2013, with significant experience in Bitcoin mining, as an engineer studying protocol development, and contributing to open-source projects.
Les was previously a founding partner of Binary Digital from May 2017 to November 2020, a software-development company where he led the engineering team and coordinated project development for artificial intelligence, reverse engineering, and inter-software compatibility projects.
2 unchanged sentences
Benjamin Yi (age 41) has served as our Executive Chairman since May 2021, as a member of the Board since October 2018, and as Chairman of the board of directors from November 2020 through May 2021.
+Added: In this role, he is directly involved in our day-to-day operations, playing a key role in setting and fulfilling the Board’s strategic aims for the Company.
+Added: Yi brings significant corporate governance experience to Riot’s Board and executive management team, having served as an independent director and committee chair of several private and public companies.
Prior to joining Riot, Mr.
−Removed: Yi led capital markets and corporate development at IOU Financial, a tech-enabled lender to small businesses and investee company of Neuberger Berman from January 2017 through May 2021.
+Added: Yi led capital markets and corporate development at IOU
+Added: Financial, a fin-tech enabled lender to small businesses across North America and investee company of Neuberger Berman from January 2017 through May 2021.
+Added: Yi brings almost two decades of unique capital markets experience to the Company, and a particular expertise in fintech, specialty finance, and investing throughout a company’s capital structure.
Yi holds a Bachelor of Commerce, specialist in Finance, major in Economics from University of Trinity College and a Master of Finance from University of Toronto – Rotman School of Management.
−Removed: Colin Yee (age 47) has served as our Chief Financial Officer (“CFO”) since September 2022.
−Removed: He was previously our Head of Corporate and Financial Operations from April 2022 to September 2022.
+Added: Colin Yee (age 48) has served as our Executive Vice President, Chief Financial Officer since July 2023, and Chief Financial Officer from September 2022 to July 2023.
+Added: Previously, he was our Head of Corporate and Financial Operations from April 2022 to September 2022.
Prior to joining Riot, Mr.
Yee founded Clear Capital Management Corporation which has been operating since September 2007.
−Removed: He served as the Chief Operating Financial Officer of Avebury Partners, a leading asset management firm that operates within the real estate and construction sectors, from March 2021 to March 2022.
+Added: He served as the Chief Operating Financial Officer of Avebury Partners, a leading asset management firm that operates within the real estate, geothermal exchange, and construction sectors, from March 2021 to March 2022.
+Added: From 2016 to 2021, Mr.
+Added: Yee served as the CFO for Forum Equity Partners, a large private equity firm specializing in real estate, renewable energy and infrastructure.
Yee is a Chartered Professional Accountant and holds a Bachelor of Science in Cellular Biology and a Bachelor of Commerce in Accounting from the University of Calgary.
−Removed: William Jackman (age 39) has served as our Executive Vice President since September 2022, and as General Counsel and Secretary since July 2021.
+Added: William Jackman (age 40) has served as our Executive Vice President, General Counsel and Secretary, since September 2022, and as General Counsel and Secretary since July 2021.
+Added: As a member of the executive team, Mr.
+Added: Jackman manages the Company’s legal affairs, drawing upon his unique business and legal acumen to navigate strategic decisions and develop innovative solutions to complex challenges.
+Added: Previously, Mr.
+Added: Jackman represented S&P 500 companies as well as other public companies in the areas of securities laws, mergers and acquisitions, and power generation.
Prior to joining Riot, Mr.
2 unchanged sentences
Jackman holds dual Juris Doctorate law degrees from the Universities of Windsor and Detroit, as well as an MBA from Nova Southeastern, and is a member of the New York, Florida, and Ontario Bar Associations.
+Added: Jason Chung (age 42) has served as our Executive Vice President, Head of Corporate Development & Strategy since July 2023, and Head of Corporate Development & Strategy from June 2022 to July 2023.
+Added: Chung spearheads the coordination of Riot's corporate development, capital markets, and investor relations efforts.
+Added: Chung brings two decades of experience in investment banking and a wealth of knowledge in corporate finance to Riot.
+Added: Prior to joining Riot, Mr.
+Added: Chung served as Managing Director, M&A, at Nomura Holdings, Inc.
+Added: from March 2017 through June 2022 and Executive Director, Mergers & Acquisitions from March 2014 through December 2016 where he advised global clients on cross-border transactions in the technology sector across multiple countries, including the US, Canada, Germany, Japan, Korea, France, and Singapore .
+Added: Chung’s investment banking career spanned nearly $20 billion in mergers and acquisitions transactions and included building and growing advisory teams.
+Added: Chung is a CFA charter holder and earned a Bachelor of Commerce and Finance degree, minoring in History, from the University of Toronto.
Ryan Werner (age 44) has served as our Senior Vice President and Chief Accounting Officer since September 2022.
−Removed: Previously, he was our Vice President of Finance since joining Riot in March 2021.
+Added: Previously, Mr.
+Added: Werner served as our Vice President of Finance from March 2021 to September 2022.
+Added: Werner is responsible for the leadership and oversight of our public accounting function, leading the Company’s team of accounting and finance professionals.
Prior to joining Riot, Mr.
−Removed: Werner was a Senior Director, Real Estate and Transactions Accounting at UDR, a real estate investment trust, from March 2013 through March 2021.
−Removed: Werner holds a Bachelor’s degree in Accounting and Business Administration with an emphasis in finance, and a Master’s in Accounting and Information Systems from the University of Kansas.
+Added: Werner was a Senior Director, Real Estate and Transactions Accounting at UDR, an S&P 500 constituent and multifamily real estate investment trust, from March 2013 through March 2021.
+Added: Werner began his career in Ernst & Young’s audit practice, where he was a Senior Manager and specialized in publicly traded companies.
+Added: Werner is a Certified Public Accountant and holds a Master of Accounting and Information Systems degree, as well as a Bachelor of Science in Accounting & Business Administration degree, both from the University of Kansas.
+Added: There are no familial relationships among our executive officers and any directors, except that Mr.
+Added: Yi is married to the first cousin of Hannah Cho, who serves on our board of directors.
+Added: There are no arrangements or understandings between any of our executive officers and any other person pursuant to which any of such executive officers were selected.
Corporate Information
−Removed: Our principal executive office is located at 3855 Ambrosia Street, Suite 301, Castle Rock, CO 80109, and our telephone number is (303) 794-2000.
+Added: Our principal executive office is located at 3855 Ambrosia Street, Suite 301, Castle Rock, Colorado 80109, and our telephone number is (303) 794-2000.
Our records are kept at our principal executive office.
1 unchanged sentence
Effective October 19, 2017, we adopted the corporate name Riot Blockchain, Inc., and changed our state of incorporation to Nevada.
−Removed: Effective December 30, 2022, we adopted our current corporate name, Riot Platforms, Inc., and remain incorporated in Nevada.
+Added: Effective December 30, 2022, we adopted our current corporate name, Riot Platforms, Inc., and remained incorporated in Nevada.
Our website address is www.riotplatforms.com.
−Removed: Restatement of Previously Issued Consolidated Financial Statements
−Removed: On February 27, 2023, the Audit Committee (the “Audit Committee”) of the Board of Directors of the Company, after consulting with management and the Company’s independent registered public accounting firm, Marcum LLP, determined that the Company’s consolidated financial statements included in its 2021 Annual Report on Form 10-K as of December 31, 2021 and for the years ended December 31, 2021 and 2020, as amended, as well as the Company’s previously issued condensed interim consolidated financial statements as of and for the interim periods in 2022 and 2021 as filed in the Company’s Quarterly Reports on Form 10-Q for the periods ended March 31, 2022 and 2021, June 30, 2022 and 2021, and September 30, 2022 and 2021 (together with the financial statements contained in the 2021 Annual Report, the “Impacted Financials”) should no longer be relied upon due to material misstatements that are described in greater detail in Note 2.
−Removed: Restatement of Previously Issued Financial Statements , and Note 23.
−Removed: Restatement of Previously Issued Interim Condensed Consolidated Financial Statements, of the Notes to the Consolidated Financial Statements included within this Annual Report.
−Removed: Similarly, any previously filed reports, press releases, earnings releases, or investor presentations or other communications describing Riot’s financial statements and other related financial information covering the previously mentioned Impacted Financials should no longer be relied upon.
Additional Information
−Removed: Our annual reports on Form 10-K, proxy statements, quarterly reports on Form 10-Q, current reports on Form 8-K, and amendments to these reports, as filed with the SEC, can be accessed, free of charge, on the SEC’s website www.sec.gov.
+Added: We file or furnish periodic reports and amendments thereto, including our annual reports on Form 10-K, proxy statements, quarterly reports on Form 10-Q, current reports on Form 8-K, proxy statements and other information with the SEC.
+Added: These reports, and any amendments thereto, as filed with the SEC, can be accessed, free of charge, on the SEC’s website www.sec.gov.
These documents may also be accessed on our website:
1 unchanged sentence
The contemplated documents are placed on our website as soon as practicable after their filing with the SEC.
−Removed: The information on our website is not incorporated by reference in this Annual Report.
+Added: The information posted on our website is not incorporated by reference into this Annual Report.
Compared sentence by sentence after normalising whitespace, quotation marks, case and digits, so re-formatting and restated figures do not read as changed language. Wording changes appear as one removal and one addition. The current filing and the prior one are authoritative.