Item 1B. Unresolved Staff Comments
ITEM 1B. UNRESOLVED STAFF COMMENTS
None.
ITEM 2. PR OPERTIES
Corporate Office
We maintain our corporate offices in Tampa, Florida where we lease approximately 6,000 square feet of office space. We currently do not own any buildings or land. We believe our current leased facility is sufficient for our foreseeable needs.
Don Diego Phosphorite Project
Summary
We have one material mining project, the Don Diego Phosphorite Project, which is located in the Mexican Exclusive Economic Zone (the "Mexican EEZ") offshore Baja California Sur, Mexico in the Pacific Ocean. The exclusive mining concessions for the Don Diego Phosphorite Project are held by Exploraciones Oceánicas S. de R.L. de CV ("ExO"), a Mexican company in which we hold, through other subsidiaries, a 56.14% interest. The Primary concession (concession No. 244813) was granted in 2012, and rights for the two additional adjacent concessions (Norte concession No. 242994 and Sur concession No. 242995) were acquired in 2014. Exploration has confirmed the Don Diego West Phosphorite Deposit lies within the Primary and Norte concessions. The Don Diego Phosphorite Project currently has no reportable mineral reserves.
Location and Brief Description
The Don Diego Phosphorite Project concession area is a sedimentary marine phosphorite deposit located in the Mexican EEZ offshore Baja California Sur, Mexico in the Pacific Ocean. The property is located using a multi-point polygonal property
13
Table of Contents
demarcation bounded by latitudes 26.1°, 25.4°, and longitudes -112.2°, -112.9° WGS 1984. The property is roughly 20 to 45 kilometers from shore. Following is a map denoting the three concessions in relation to Baja California Sur, Mexico.
Infrastructure and Access
There is no material infrastructure located on the property where the concessions are located. Access to the site is by sea-going vessels dispatched from various nearby ports of opportunity. Project engineering anticipates use of existing dredging technology
14
Table of Contents
to recover the phosphorite ore, including a trailing suction hopper dredger, and on-site mechanical beneficiation using a floating production and storage platform to produce phosphate rock concentrate, none of which introduces chemicals to the marine environment.
Description of Concessions
Total concessions encompass approximately 114,775 hectares of seafloor at a water depth of approximately 80 meters and consist of three concessions in total (see section Location and Brief Description above). The concessions were granted to ExO by the Mexican Secretary of Economy, General Coordination of Mining, and are valid for 50 years, with an option for a 50-year extension. The Primary concession was granted in 2012, and rights for the other two concessions (Norte and Sur) were acquired thereafter in 2014. To commence further operations on the Don Diego Phosphorite Project, ExO must obtain approval of its Environmental and Social Impact Assessment ("ESIA") from the Mexican Ministry of Environment and Natural Resources ("SEMARNAT"). See ExO Phosphate Project in the above ITEM 1. BUSINESS for additional information.
The property is subject to rents, fees and other payments to the Government of Mexico or its designated government ministry or agency. The anticipated annual obligations for each of the years in the three-year period ending December 31, 2025 are set forth in the table below.
Primary Concession
Year
Area
(Hectares)
Annual Rent, MxN Pesos, owed semesterly
2023
80,050.5
32,591,742
2024
80,050.5
The above is based on 203.57 MXN per hectare per semester, with an
increase in this rate from inflation
2025
80,050.5
The above is based on 203.57 MXN per hectare per semester, with an
increase in this rate from inflation
Norte Concession
Year
Area
(Hectares)
Annual Rent, Mx Pesos, owed semesterly
2023
14,300
3,308,448
2024
14,300
Will be based on 115.68 MXN per hectare per semester, with an
increase in this rate from inflation
2025
14,300
Will be based on 115.68 MXN per hectare per semester, with an
increase in this rate from inflation
Sur Concession
Year
Area
(Hectares)
Annual Rent, Mx Pesos, owed semesterly
2023
20,425
4,725,528
2024
20,425
Will be based on 115.68 MXN per hectare per semester, with an
increase in this rate from inflation
2025
20,425
Will be based on 115.68 MXN per hectare per semester, with an
increase in this rate from inflation
15
Table of Contents
Work Completed
The Don Diego Phosphorite Project has sufficient data to confirm the geological continuity of the deposit and the estimation of measured, indicated and inferred resource tonnes. ExO, through exploration operations conducted by Odyssey, explored the area, characterized the environmental baseline to enable drafting of the ESIA, and acquired approximately 200 vibracore samples for assay. These cores were split into individual strata core units each of approximately 1 meter length. The cores were assayed at Florida Industrial and Phosphate Research Institute in Bartow, Florida under the guidance of Mr. Henry Lamb.
Related Matters
This annual report on Form 10-K does not include a resource estimate for the Don Diego Phosphorite Project because currently we do not have a technical report summary for the project that meets the requirements of Item 601(b)(96) of Regulation S-K.
Text extracted from the filing as submitted to EDGAR. Formatting, tables and exhibits are simplified for reading; the original document is authoritative for anything you rely on.