Item 1. Business
ITEM 1. BUSINESS
Introduction
NioCorp was incorporated under the laws of the Province of British Columbia under the Business Corporations Act (British Columbia) on February 27, 1987, under the name “IPC International Prospector Corp.” On May 22, 1991, we changed our name to “Kingston Resources Ltd.” On June 29, 2001, we changed our name to “Butler Developments Corp.” On February 12, 2009, we changed our name to “Butler Resource Corp.” On March 4, 2010, we changed our name to “Quantum Rare Earth Developments Corp.” On March 4, 2013, we changed our name to “NioCorp Developments Ltd.”
NioCorp is a reporting issuer in British Columbia, Alberta, Saskatchewan, Ontario, and New Brunswick. Our registered and records office is located at 595 Burrard Street, Suite 2600, Vancouver, British Columbia V7X 1L3 (ATTN: Blake, Cassels & Graydon LLP). Our principal executive office is located at 7000 South Yosemite Street, Suite 115, Centennial, Colorado 80112.
Historical Development of the Business
During 2009 and 2010, the Company commenced mineral exploration activities in the Elk Creek, Nebraska area, including negotiations with local landowners for land access agreements. The acquisition of the Elk Creek Property was closed in December 2010 and involved the purchase of all of the issued and outstanding common shares of 0859404 BC Ltd., a private British Columbia company, which in turn held 100% of the issued and outstanding shares of ECRC and was signatory to the option agreements covering the Elk Creek Property area. A new Canadian company, 0886338 BC Ltd. was formed to merge with 0859404 BC Ltd., and this merged entity was subsequently amalgamated into 0896800.
The Company commenced a field exploration program in 2011, which included verification of previous work which was completed on the Elk Creek Property in the 1970s and 1980s, re-assaying of historic drill core, an airborne geophysical survey and the completion of five new diamond drillholes. The available data for the Elk Creek Property was compiled into an updated NI 43-101 resource estimate for the Elk Creek Project, which was issued in April 2012. Additional drilling and NI 43-101 technical reports, including resource updates and preliminary economic assessments, were completed and issued by the Company in 2014 and 2015.
During fiscal years 2016 and 2017, the Company focused on feasibility study development, and on June 30, 2017, we announced the completion of the 2017 Feasibility Study. In connection with a review by the OSC, on December 15, 2017, the Company filed a revised 2017 Feasibility Study. This revised study contained no changes to any previously reported numbers or forecasted economic returns of the Elk Creek Project from those contained in the originally filed 2017 Feasibility Study.
During fiscal year 2019, we received the new mine design based on detailed underground engineering conducted by Nordmin. On April 16, 2019, we announced the results of the updated underground mine design and supporting infrastructure, the results of an update to the Elk Creek Project’s mineral resource and mineral reserve estimates, and the 2019 Elk Creek Feasibility Study based on the new mine design. During fiscal year 2020, the Company focused efforts on advancing detailed engineering of the surface and underground facilities and negotiating the follow-on contracts associated with the planned construction of the surface and underground features of the project, as well as obtaining a State of Nebraska air construction permit (the “Air Permit”) from the NDEE. The Air Permit describes all of the prospective air emissions from the planned facility and required the completion of an air quality model that demonstrates compliance with the National Ambient Air Quality Standards (“NAAQS”). The final Air Permit was issued by the State of Nebraska on June 2, 2020, for the Elk Creek Project.
During fiscal year 2021, we obtained funding which allowed us to purchase land and mineral rights at the Elk Creek Property and continue early project execution activities. With the acquisition of the land and mineral rights, the Company now owns the surface land on which the Elk Creek Project’s mine infrastructure and supporting operations will be located once sufficient project financing is obtained, along with ownership of the mineral rights to more than 90% of the Elk Creek Project’s Mineral Resource and Mineral Reserve.
1
Information regarding the 2019 Elk Creek Feasibility Study is discussed below under Item 2., “Properties.”
Emerging Growth Company Status
We qualify as an “emerging growth company” as defined in Section 101 of the JOBS Act as we did not have more than $1.07 billion in annual gross revenue during our most recently completed fiscal year.
We will lose our status as an emerging growth company on June 30, 2022, which is the fiscal year following the fifth anniversary of the date of the first sale of Common Shares pursuant to an effective registration statement.
As an emerging growth company under the JOBS Act, we have elected to opt out of the extended transition period for complying with new or revised standards pursuant to Section 107(b) of the JOBS Act. The election is irrevocable.
As an emerging growth company, we are exempt from Section 404(b) of the Sarbanes-Oxley Act of 2002 and Section 14A(a) and (b) of the Exchange Act. Such sections are described below:
● Section
404(b) of the Sarbanes-Oxley Act of 2002 requires a public company’s auditor to
attest to, and report on, management’s assessment of its internal controls.
●
Sections 14A(a) and (b) of the Exchange Act, implemented by Section 951 of the Dodd–Frank Act, require companies to hold shareholder advisory votes on executive compensation and golden parachute compensation.
Because we will lose our status as an emerging growth company as of June 30, 2022, we will become subject to Section 14A(a) and (b) of the Exchange Act beginning next fiscal year. However, notwithstanding the loss of our status as an emerging growth company, we will continue to be exempt from Section 404(b) of the Sarbanes-Oxley Act of 2002 for so long as we are neither a “large accelerated filer” nor an “accelerated filer” as those terms are defined in Rule 12b-2 under the Exchange Act.
Corporate Structure
The Company’s business operations are conducted primarily through ECRC. The below table provides an overview of the Company’s current subsidiaries and their activities.
Name
State/Province of Formation
Ownership
Business
0896800 B.C. Ltd.
British Columbia
100%
by the Company
The only business of 0896800 is to hold the shares of ECRC
Elk Creek Resources Corp.
Nebraska
100%
by 0896800
The business of ECRC is the development of the Elk Creek Project
Business Operations
NioCorp is a mineral exploration company engaged in the acquisition, exploration, and development of mineral properties. NioCorp, through ECRC, is developing a superalloy materials project that, if and when developed, will produce niobium, scandium, and titanium products. Known as the “Elk Creek Project,” it is located near Elk Creek, Nebraska, in the southeast portion of the state.
●
Niobium is used to produce various superalloys that are extensively used in high performance aircraft and jet turbines. It also is used in HSLA steel, a stronger steel used in automobiles, bridges, structural systems, buildings, pipelines, and other applications that generally enables those applications to be stronger and lighter in mass. This “lightweighting” benefit often results in environmental benefits, including reduced fuel consumption and material usage, which can result in fewer air emissions.
●
Scandium can be combined with aluminum to make super-high-performance alloys with increased strength and improved corrosion resistance. Scandium also is a critical component of advanced solid oxide fuel cells, an environmentally preferred technology for high-reliability, distributed electricity generation.
2
●
Titanium is a component of various superalloys and other applications that are used for aerospace applications, weapons systems, protective armor, medical implants and many others. It also is used in pigments for paper, paint, and plastics.
During fiscal year 2021, the Company initiated a review of the economic potential of expanding its currently planned product suite from the Elk Creek Project to also include rare earth products. The Company’s review of previously collected data on rare earth content in its Elk Creek Project comes in response to growing interest by governments and industrial consumers around the world for additional sources of rare earths beyond current suppliers. The Company has completed a comprehensive geologic and metallurgical evaluation of all of the rare earth data associated with the Elk Creek Project; however, additional test work is required to establish a means of potentially extracting and recovering rare earths into saleable products.
Our primary business strategy is to advance our Elk Creek Project to commercial production. We are focused on obtaining additional funds to carry out our near-term planned work programs associated with securing the project financing necessary to complete mine development and construction of the Elk Creek Project.
Competitive Business Conditions
There is aggressive competition within the minerals industry to discover and acquire mineral properties considered to have commercial potential. We compete for the opportunity to participate in promising exploration projects with other entities. In addition, we compete with others in efforts to obtain financing to acquire and explore mineral properties, acquire and utilize mineral exploration equipment, and hire qualified mineral exploration personnel. We may compete with other mining companies for mining claims in regions adjacent to our existing claims, or in other parts of the world should we dedicate resources to doing so in the future. These companies may be better capitalized than us and we may have difficulty in expanding our holdings through the staking or acquisition of additional mining claims or other mineral tenures.
In competing for qualified mineral exploration personnel, we may be required to pay compensation or benefits relatively higher than those paid in the past, and the availability of qualified personnel may be limited in high-demand mining periods, such as was the case in past years when the price of gold and other metals was higher than it is now.
Cycles
The mining business is subject to mineral price cycles. The marketability of minerals and mineral concentrates is also affected by worldwide economic cycles. At the present time, strong demand for some minerals in many countries is lifting commodity prices, although it is difficult to assess how long such trends may continue. Fluctuations in supply and demand in various regions throughout the world are common.
The following table sets forth commodity prices for the last five calendar years for the ferroniobium, scandium trioxide and titanium dioxide products the Company anticipates extracting from its Elk Creek Project. These pricing surveys may not be representative of the pricing that the Company anticipates achieving for its products once commercial production begins from its Elk Creek Project.
Year
Ferroniobium
U.S.
Import Price ($/kg-Nb) (1)
Scandium
Trioxide
U.S. Price ($/kg) (2)
Titanium
Dioxide
U.S. Price ($/kg) (3)
2020
$37
$3,800
$1.20
2019
39
3,900
1.13
2018
38
4,600
1.03
2017
37
4,600
0.74
2016
41
4,600
0.74
(1)
Source: Argus Metal Prices, average annual ending price, 2020. Ferro-niobium 65% Niobium content, FOB U.S. warehouse.
(2)
Source: USGS Mineral Commodity Summary, 2021. scandium trioxide, 99.99% purity, 5-kilogram lot size.
(3)
Source: USGS Mineral Commodity Summary, 2021. Rutile mineral concentrate, bulk, minimum 95% Titanium Dioxide, f.o.b. Australia.
As NioCorp’s mining and exploration business is in the exploration stage, and NioCorp has not yet generated any revenue from the operation of the Elk Creek Project, it is not currently significantly affected by changes in commodity demand and prices, except to the extent that same impact the availability of capital for mineral exploration and development projects. As it does not carry on production activities, NioCorp’s ability to fund ongoing exploration is affected by the availability of financing, which is, in turn, affected by the strength of the economy and other general economic factors.
3
Economic Dependence
Other than land and mineral right option agreements and the Offtake Agreements, NioCorp’s business is not substantially dependent on any contract such as a contract to sell the major part of its product or services or to purchase the major part of its requirements for goods, services or its raw materials, or any franchise or license or other agreement to use a patent, formula, trade secret, process or trade name upon which its business depends.
Government Regulation
The exploration and development of a mining prospect is subject to regulation by a number of federal and state government authorities. These include the EPA and the USACE as well as the various state and local environmental protection agencies. The regulations address many environmental issues relating to air, soil, and water contamination, and apply to many mining related activities including exploration, mine construction, mineral extraction, ore milling, water use, waste disposal, and use of toxic substances. In addition, we are subject to regulations relating to labor standards, occupational health and safety, mine safety, general land use, export of minerals, and taxation. Many of the regulations require permits or licenses to be obtained, the absence of which and/or inability to obtain such permits or licenses will adversely affect our ability to conduct our exploration, development, and operation activities. The failure to comply with the regulations and terms of permits and licenses may result in fines or other penalties or in revocation of a permit or license or loss of a prospect.
General
While none of the lands on which the Elk Creek Project is proposed to be built are owned by the U.S. Government, mining rights are governed by the General Mining Law of 1872, as amended, which allows for the location of mining claims on certain federal lands upon the discovery of a valuable mineral deposit and compliance with location requirements. The exploration of mining properties and development and operation of mines is governed by both federal and state laws. Federal laws that govern mining claim location and maintenance and mining operations on federal lands are generally administered by the Bureau of Land Management. Additional federal laws, governing mine safety and health, also apply. State laws also require various permits and approvals before exploration, development or production operations can begin. Among other things, a reclamation plan must typically be prepared and approved, with financial assurance provided in the amount of projected reclamation costs. The financial assurance is used to ensure that proper reclamation takes place and will not be released until that time. Local jurisdictions may also impose permitting requirements, such as conditional use permits or zoning approvals.
Environmental Regulation
Our mineral projects are subject to various federal, state and local laws and regulations governing protection of the environment. These laws are continually changing and, in general, are becoming more restrictive. The development, operation, closure, and reclamation of mining projects in the U.S. requires numerous notifications, permits, authorizations, and public agency decisions. Compliance with environmental and related laws and regulations requires us to obtain permits issued by regulatory agencies and to file various reports and keep records of our operations. Certain of these permits require periodic renewal or review of their conditions and may be subject to a public review process during which opposition to our proposed operations may be encountered. We are currently operating under various permits for activities connected to mineral exploration, reclamation, and environmental considerations. Our policy is to conduct business in a way that safeguards public health and the environment. We believe that our operations are conducted in material compliance with applicable laws and regulations.
Changes to current local, state, or federal laws and regulations in the jurisdictions where we operate could require additional capital expenditures and increased operating and/or reclamation costs. Although we are unable to predict what additional legislation, if any, might be proposed or enacted, additional regulatory requirements could impact the economics of our projects.
4
Environmental Regulation - U.S. Federal Laws
The Comprehensive Environmental, Response, Compensation, and Liability Act (“CERCLA”), and comparable state statutes, impose strict, joint, and several liability on current and former owners and operators of sites and on persons who disposed of or arranged for the disposal of hazardous substances found at such sites. It is not uncommon for the government to file claims requiring clean-up actions and/or demands for reimbursement for government-incurred clean-up costs or natural resource damages. It is also not uncommon for neighboring landowners and other third parties to file claims for personal injury and property damage allegedly caused by hazardous substances released into the environment. The Federal Resource Conservation and Recovery Act (“RCRA”), and comparable state statutes, govern the disposal of solid waste and hazardous waste and authorize the imposition of substantial fines and penalties for noncompliance, as well as requirements for corrective actions. CERCLA, RCRA, and comparable state statutes can impose liability for clean-up of sites and disposal of substances found on exploration, mining and processing sites long after activities on such sites have been completed.
The Clean Air Act, as amended (“CAA”), restricts the emission of air pollutants from many sources, including mining and processing activities. Any future mining operations by the Company may produce air emissions, including fugitive dust and other air pollutants from stationary equipment, storage facilities, and the use of mobile sources such as trucks and heavy construction equipment, which are subject to review, monitoring and/or control requirements under the CAA and state air quality laws. New facilities may be required to obtain permits before work can begin, and existing facilities may be required to incur capital costs in order to remain in compliance. In addition, permitting rules may impose limitations on our production levels or result in additional capital expenditures in order to comply with the rules.
The National Environmental Policy Act (“NEPA”) requires federal agencies to integrate environmental considerations into their decision-making processes by evaluating the environmental impacts of their proposed actions, including issuance of permits to mining facilities and assessing alternatives to those actions. If a proposed action could significantly affect the environment, the agency must prepare either a detailed statement known as an Environmental Impact Statement (“EIS”) or a less detailed statement known as an Environmental Assessment (“EA”). The EPA, other federal agencies, and any interested third parties can review and comment on the scope of the EIS or EA and the adequacy of any findings set forth in the draft and final EIS or EA. This process can cause delays in issuance of required permits or result in changes to a project to mitigate its potential environmental impacts, which can in turn impact the economic feasibility of a proposed project.
The Clean Water Act (“CWA”), and comparable state statutes, impose restrictions and controls on the discharge of pollutants into waters of the U.S. The discharge of pollutants into regulated waters is prohibited, except in accordance with the terms of a permit issued by the EPA or an analogous state agency. The CWA regulates storm water from mining facilities and requires a storm water discharge permit or Stormwater Pollution Prevention Plan for certain activities. Such a permit requires the regulated facility to monitor and sample storm water run-off from its operations. The CWA and regulations implemented thereunder also prohibit discharges of dredged and fill material in wetlands and other waters of the U.S. unless authorized by an appropriately issued permit. The CWA and comparable state statutes provide for civil, criminal, and administrative penalties for unauthorized discharges of pollutants, and impose liability on parties responsible for those discharges for the costs of cleaning up any environmental damage caused by the release and for natural resource damages resulting from the release.
The Safe Drinking Water Act (“SDWA”) and the Underground Injection Control (“UIC”) program promulgated thereunder, regulate the drilling and operation of subsurface injection wells. The EPA directly administers the UIC program in some states and in others the responsibility for the program has been delegated to the state. The program requires that a permit be obtained before drilling a disposal or injection well. Violation of these regulations and/or contamination of groundwater by mining-related activities may result in fines, penalties, and remediation costs, among other sanctions and liabilities under the SDWA and state laws. In addition, third-party claims may be filed by landowners and other parties claiming damages for alternative water supplies, property damages, and bodily injury.
5
Environmental Regulation − Nebraska
Nebraska has a well-developed set of environmental regulations and responsible agencies but does not have clearly defined regulations with respect to permitting mines. As such, review of the project and the issuance of permits by Nebraska agencies and regulatory bodies could potentially impact the total time to market for our Elk Creek Project. Other Nebraska regulations govern operating and design standards for the construction and operation of any source of air emissions and landfill operations. Any changes to these laws and regulations could have an adverse impact on our financial performance and results of operations by, for example, requiring changes to operating conditions, technical criteria, fees, or surety requirements. The most stringent permit related to air quality is known as a Prevention of Significant Deterioration (“PSD”) Permit, which requires the applicant to demonstrate compliance with NAAQS and Best Available Control Technology (“BACT”) for the control of air emissions. If the facility exceeds the potential to emit thresholds for such a permit and is thus subject to PSD requirements, permanent construction at the project site may not begin until the responsible agency issues the PSD Permit. For facilities in Nebraska with potential emissions below PSD thresholds, a state air construction permit is needed. The state permit also requires a demonstration of compliance with NAAQS but does not require a BACT demonstration and further allows construction at a subject facility to proceed ahead of permit issuance through an established variance process.
Human Capital
The Company’s ability to continue to progress the Elk Creek Project will depend on its ability to attract and retain individuals with (among other skills) financial, administrative, engineering, geological and mining skills, and knowledge of our industry and targeted markets. Much of the necessary specialized skills and knowledge required by the Company as a mineral exploration company are available from the Company’s current management team and Board of Directors. The Company retains outside consultants if additional specialized skills and knowledge are required.
As of June 30, 2021, we had seven full-time and two part-time employees, as well as one contract employee. In addition, we use consultants with specific skills to assist with various aspects of our corporate affairs, project evaluation, due diligence, corporate governance and property management.
Our compensation programs are designed to align compensation of our employees with the Company’s performance and to provide the proper incentives to attract, retain and motivate employees to achieve superior results. The structure of our compensation programs balances competitive wages and benefits and incentive earnings for both short-term and long-term performance.
Our priority to maintain a culture of ethical performance as a core value is reflected in the Company’s Code of Conduct (as defined below) and other related policies. Oversight is provided by the Company’s Board of Directors and, for specific areas of performance, by committees of the Board of Directors. Employees are required to review the Code of Conduct on a periodic basis. Our compensation programs also include consideration of ethical performance in determining incentive awards.
The Company also provides a robust suite of benefits to our employees, including 401(k) participation, medical-insurance options, and programs to encourage and support the whole person.
Forward-Looking Statements
Certain statements contained in this Form 10-K (including information incorporated by reference herein) are “forward-looking statements” within the meaning of Section 27A of the Securities Act and Section 21E of the Exchange Act, and are intended to be covered by the safe harbor provided for under these sections. All statements, other than statements of historical facts, included herein concerning, among other things, planned capital expenditures, future cash flows and borrowings, pursuit of potential acquisition opportunities, our financial position, business strategy and other plans and objectives for future operations, future exploration activities, future mineral resource estimates, and future joint venture arrangements are forward-looking statements. These forward-looking statements are identified by their use of terms and phrases such as “may,” “expect,” “estimate,” “project,” “plan,” “believe,” “intend,” “achievable,” “anticipate,” “will,” “continue,” “potential,” “should,” “could,” and similar terms and phrases.
6
Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions, or future events or performance (often, but not always, using words or phrases such as “expects” or “does not expect,” “is expected,” “anticipates” or “does not anticipate,” “plans,” “estimates” or “intends,” or stating that certain actions, events or results “may,” “could,” “would,” “might,” or “will” be taken, occur, or be achieved) are not statements of historical fact and may be forward-looking statements. Forward-looking statements are subject to a variety of known and unknown risks, uncertainties, and other factors that could cause actual events or results to differ from those expressed or implied by the forward-looking statements, including, without limitation:
●
risks related to our ability to operate as a going concern;
●
risks related to our requirement of significant additional capital;
●
risks related to our limited operating history;
●
risks related to changes in economic valuations of the Elk Creek Project, such as net present value calculations, changes or disruptions in the securities markets;
●
risks related to our history of losses;
●
risks related to cost increases for our exploration and, if warranted, development projects;
●
risks related to feasibility study results;
●
risks related to mineral exploration and production activities;
●
risks related to our lack of mineral production from our properties;
●
risks related to the results of our metallurgical testing;
●
risks related to the establishment of a reserve and resource for rare earth elements and the development of a viable recovery process for rare earth elements;
●
risks related to the price volatility of commodities;
●
risks related to estimates of mineral resources and reserves;
●
risks related to changes in mineral resource and reserve estimates;
●
risks related to differences in U.S. and Canadian reserve and resource reporting;
●
risks related to our exploration activities being unsuccessful;
●
risks related to our ability to obtain permits and licenses for production;
●
risks related to government and environmental regulations that may increase our costs of doing business or restrict our operations;
●
risks related to proposed legislation that may significantly affect the mining industry;
●
risks related to land reclamation requirements;
●
risks related to competition in the mining industry;
●
risks related to the management of the water balance at our Elk Creek Project;
●
risks related to equipment and supply shortages;
●
risks related to current and future joint ventures and partnerships;
●
risks related to our ability to attract qualified management;
●
risks related to the ability to enforce judgment against certain of our Directors;
●
risks related to claims on the title to our properties;
●
risks related to surface access on our properties;
●
risks related to potential future litigation;
●
risks related to our lack of insurance covering all our operations;
●
risks related to the need for resilience in the face of potential impacts from climate change;
●
risks related to a disruption in, or failure of, our information technology (“IT”) systems, including those related to cybersecurity;
●
risks related to covenants contained in agreements with our secured creditors that may affect our assets;
●
risks related to the extent to which our level of indebtedness may impair our ability to obtain additional financing;
●
risks related to our status as a “passive foreign investment company” under the U.S. Internal Revenue Code of 1986, as amended;
●
risks related to our Common Shares, including price volatility, lack of dividend payments, dilution and penny stock rules;
●
risks related to our status as an “emerging growth company” and the impact of related reduced reporting requirements on our ability to attract investors; and
●
risks related to the effects of the COVID-19 pandemic on our business plans, financial condition and liquidity.
7
This list is not exhaustive of the factors that may affect our forward-looking statements. Some of the important risks and uncertainties that could affect forward-looking statements are described further under the Item 1A., – “Risk Factors,” below. Should one or more of these risks or uncertainties materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those anticipated, believed, estimated, or expected. We caution readers not to place undue reliance on any such forward-looking statements, which speak only as of the date made. We disclaim any obligation subsequently to revise any forward-looking statements to reflect events or circumstances after the date of such statements or to reflect the occurrence of anticipated or unanticipated events, except as required by law.
Available Information
We maintain a website at http://www.niocorp.com. Our Common Shares are currently registered under Section 12(g) of the Exchange Act, and we are currently required to file reports on Forms 10-K, 10-Q or 8-K. Our Annual Report on Form 10-K (which includes our audited financial statements), Quarterly Reports on Form 10-Q, Current Reports on Form 8-K and amendments to reports filed or furnished pursuant to Sections 13(a) and 15(d) of the Exchange Act, are available on our website, free of charge, as soon as reasonably practicable after we electronically file such reports with, or furnish those reports to, the SEC. The SEC maintains an internet site that contains reports, proxy and information statements, and other information regarding issuers that file electronically with the SEC (http://www.sec.gov). We do not intend to send security holders a printed version of our Annual Report as it will be available online.
We maintain a Code of Business Conduct and Ethics for Directors, Officers and Employees (“Code of Conduct”). A copy of our Code of Conduct may be found on our website in the “About Us” section under the main title “Corporate Governance.” Our Code of Conduct contains information regarding whistleblower procedures.
We are not including the information contained on or accessible through our website or the SEC’s website as a part of, or incorporating it by reference into, this Form 10-K.