Electric - At December 31, 2022, IPL’s and WPL’s facilities by primary fuel type were as follows:
−Removed: IPL Nameplate Generating
−Removed: In-service Capacity Capacity
−Removed: Name of Facility and Location Dates in MW in MW (a)
+Added: IPL Generating
+Added: In-service Capacity
+Added: Name of Facility and Location Dates in MW (a)
Marshalltown Generating Station (Units 1-3);
41 unchanged sentences
Mason City, IA 1991 63
−Removed: Total Oil 90 66
−Removed: Dubuque Solar Garden;
+Added: Dubuque Solar Facility;
Dubuque, IA 2017 5
−Removed: Marshalltown Solar Garden;
+Added: Marshalltown Solar Facility;
Marshalltown, IA 2020 3
4 unchanged sentences
Total capacity 3,663
−Removed: WPL Nameplate Generating
−Removed: In-service Capacity Capacity
−Removed: Name of Facility and Location Dates in MW in MW (a)
+Added: Table of Co ntents
+Added: WPL Generating
+Added: In-service Capacity
+Added: Name of Facility and Location Dates in MW (a)
Riverside Energy Center (Units 1-3);
21 unchanged sentences
Total Coal 940
+Added: Wood County Solar Facility, Wood Co., WI 2022 150
+Added: Bear Creek Solar Facility, Richland Co., WI 2022 50
+Added: North Rock Solar Facility, Rock Co., WI 2022 50
+Added: West Riverside Solar Facility, Beloit, WI (j) 2021 4
+Added: Customer- and Community-hosted Solar;
+Added: various locations in WI 2021-2022 4
+Added: Total Solar 258
Prairie du Sac Hydro Plant (8 Units);
3 unchanged sentences
Total Hydro 19
−Removed: West Riverside Solar Garden, Beloit, WI (j) 2021 4 —
−Removed: Total Solar 4 —
+Added: Battery Storage;
+Added: Portage, WI 2022 5
+Added: Total Battery Storage 5
Total capacity 3,027
−Removed: (a) Based on the accredited generating capacity of the EGUs as of December 31, 2021 included in MISO’s resource adequacy process for the planning period from June 2021 through May 2022.
−Removed: IPL’s Battery Storage did not receive any accredited generating capacity for the planning period from June 2021 through May 2022.
−Removed: Electricity generated from the West Riverside Solar Garden is used to offset electricity usage at the West Riverside Energy Center and does not receive any accredited generating capacity.
−Removed: (b) Represents IPL’s 48% ownership interest in this 726 MW (nameplate capacity) / 656 MW (generating capacity) EGU, which is operated by IPL.
−Removed: (c) Represents IPL’s 25.695% ownership interest in this 696 MW (nameplate capacity) / 610 MW (generating capacity) EGU, which is operated by MidAmerican Energy Company.
−Removed: (d) Represents IPL’s 28% ownership interest in this 584 MW (nameplate capacity) / 501 MW (generating capacity) EGU, which is operated by MidAmerican Energy Company.
−Removed: (e) Represents IPL’s 4% ownership interest in this 812 MW (nameplate capacity) / 708 MW (generating capacity) EGU, which is operated by MidAmerican Energy Company.
−Removed: (f) Represents WPL’s 91% ownership interest in this 723 MW (nameplate capacity) / 654 MW (generating capacity) EGU, which is operated by WPL.
+Added: (a) Based on the accredited generating capacity included in MISO’s resource adequacy process for the planning period from June 2022 through May 2023, except for wind facilities, solar facilities and battery storage, which are based on nameplate capacity.
+Added: (b) Represents IPL’s 48% ownership interest, which is operated by IPL.
+Added: (c) Represents IPL’s 25.695% ownership interest, which is operated by MidAmerican Energy Company.
+Added: (d) Represents IPL’s 28% ownership interest, which is operated by MidAmerican Energy Company.
+Added: (e) Represents IPL’s 4% ownership interest, which is operated by MidAmerican Energy Company.
+Added: (f) Represents WPL’s 91% ownership interest, which is operated by WPL.
(g) Represents Units 2 and 3, which WPL owns.
WPL also operates, but does not own, South Fond du Lac Combustion Turbines Units 1 and 4.
−Removed: (h) Represents WPL’s 42.64% ownership interest in this 138 MW (nameplate capacity) / 17 MW (generating capacity) EGU, which is operated by Invenergy Services, LLC.
−Removed: (i) Represents WPL’s 53.5% ownership interest in this 1,112 MW (nameplate capacity) / 1,093 MW (generating capacity) EGU, which is operated by WPL.
−Removed: (j) Represents WPL’s 91% ownership interest in this 4 MW (nameplate capacity) EGU, which is operated by WPL.
+Added: (h) Represents WPL’s 42.64% ownership interest, which is operated by Invenergy Services, LLC.
+Added: (i) Represents WPL’s 53.5% ownership interest, which is operated by WPL.
+Added: (j) Represents WPL’s 91% ownership interest, which is operated by WPL.
IPL and WPL own overhead electric distribution line, underground electric distribution cable and substation distribution transformers, substantially all of which are located in Iowa for IPL and Wisconsin for WPL.
4 unchanged sentences
Corporate Services - Corporate Services’ property included in “Property, plant and equipment, net” on Alliant Energy’s balance sheet at December 31, 2022 consisted primarily of a customer billing and information system for IPL and WPL and other computer software, and the corporate headquarters building located in Madison, Wisconsin.
+Added: Table of Co ntents
AEF - AEF’s principal properties included in “Property, plant and equipment, net” on Alliant Energy’s balance sheet at December 31, 2022 were as follows:
3 unchanged sentences
a Mississippi River barge, rail and truck freight terminal in Illinois;
−Removed: freight brokerage services;
−Removed: and a rail-served warehouse in Iowa, which began operations in 2021.
+Added: and a rail-served warehouse in Iowa.