Item 2. Management’s Discussion and Analysis
ITEM 2. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS
The following discussion and analysis of the results of operations and financial condition of KULR Technology Group, Inc. (“KULR”) and its wholly-owned subsidiary, KULR Technology Corporation (“KTC”) (collectively referred to as “KULR” or the “Company”) as of June 30, 2026 and for the three and six months ended June 30, 2026 and 2025 should be read in conjunction with our unaudited condensed consolidated financial statements and the notes to those unaudited condensed consolidated financial statements that are included elsewhere in this Quarterly Report. References in this Management’s Discussion and Analysis of Financial Condition and Results of Operations to “us”, “we”, “our” and similar terms refer to the Company. This Management’s Discussion and Analysis of Financial Condition and Results of Operations contains statements that are forward-looking. These statements are based on current expectations and assumptions that are subject to risk, uncertainties and other factors. These statements are often identified by the use of words such as “may,” “will,” “expect,” “believe,” “anticipate,” “intend,” “could,” “estimate,” or “continue,” and similar expressions or variations. Actual results could differ materially because of the factors discussed in “Risk Factors” elsewhere in this Quarterly Report, and other factors that we may not know. There have been no material changes to the risk factors discussed in Item 1A. Risk Factors in our Annual Report on Form 10-K which was filed with the SEC on March 31, 2026, unless disclosed elsewhere in this Quarterly Report.
Overview
KULR designs and builds advanced battery systems for autonomous platforms, digital infrastructure, e-mobility and Space – sold as a product or delivered as service subscription. The Company addresses two primary constraints in electrification: thermal management and safety. As energy and power density increase across aerospace, autonomous machines, digital infrastructure and industrial applications, managing heat generation, current density, and propagation risk becomes essential to system reliability and survivability.
KULR is establishing a fully integrated battery energy storage system design and production infrastructure in Houston, Texas. KULR brings battery pack design, prototyping, testing, certification, and manufacturing; as well as battery management system software and electronics design capabilities together under one roof. This full-stack approach enables faster development cycles and rapid transition from prototype to cost-effective volume production. The facility is designed to build high-power and high-energy battery packs that require advanced thermal, mechanical, and safety engineering. With domestic supply chain alignment and scalable production capacity, KULR is positioning itself as a leading manufacturer of advanced battery packs for mission-critical and high-performance applications in the United States.
KULR VIBE is a vibration-reduction technology designed to improve performance and reliability in high-speed and rotor-driven systems. Derived from vibration management solutions used in defense helicopters for over 20 years, it addresses excess vibration that reduces efficiency, increases mechanical wear, and shortens vehicle lifespan. KULR VIBE enables motors, rotating assemblies, and sensitive electronics to operate more smoothly and efficiently across a range of applications, including helicopters, drones, performance vehicles, wind turbines, and other electric and autonomous systems.
In June 2026, the Company communicated its strategy to position itself as an energy-systems platform for “physical AI,” prioritizing product revenue growth, gross margin improvement, and cost discipline across its target markets, which include space and defense, the low-altitude drone economy, AI data center backup power, Energy-as-a-Service for critical infrastructure, and robotics.
Recent Developments
Credit Agreement
Subsequent to June 30, 2026, the Company repaid the outstanding principal balance of $20.0 million under its credit facility with Coinbase. In accordance with the terms of the Master Loan Agreement, dated as of July 1, 2025, the repayment resulted in the automatic release of 565 BTC from the collateral account. The Company sold an aggregate of 333 BTC for total proceeds of approximately $21.5 million at an average price of approximately $64,467 per BTC, of which approximately $20.0 million (approximately 310 BTC) was used to fund the repayment.
30
Table of Contents
Strategic Initiatives
KULR expects its existing liquidity, together with disciplined balance-sheet management, will support its planned operations and growth initiatives for the near term, which include:
1. Scale its flagship KULR ONE Space (K1S) architecture providing scalable, standardized battery solutions that meet rigorous human spaceflight safety standards.
2. Ramp production of its KULR ONE Air products for military and commercial drone applications.
3. Advance the development of its KULR ONE MAX battery backup solutions for AI data center and telecommunications applications.
Bitcoin Strategy
On May 7, 2026, the Company’s Board of Directors authorized management to sell digital assets as deemed necessary to fund key business priorities in lieu of issuing equity. During the period from July 9, 2026 through August 11, 2026, 333 BTC have been sold for net proceeds of $21.5 million.
See the section “Our Bitcoin Acquisition Strategy” below for further information regarding our Bitcoin purchases, including the sources of capital used to purchase Bitcoin.
At the Market Offering
The Company has an at-the-market offering program (“ATM”) pursuant to an ATM arrangement with Cantor Fitzgerald and Craig-Hallum, under which the Company previously announced it had decided to pause transactions through June 30, 2026. During the three and six months ended June 30, 2026, the Company did not issue any shares of common stock pursuant to the ATM. On June 26, 2026, the Company announced that it had extended the pause of ATM transactions through September 30, 2026.
Results of Operations
Three and Six Months Ended June 30, 2026, Compared With Three and Six Months Ended June 30, 2025
Revenue
For the Three Months Ended
June 30,
Variances
2026
2025
$
%
Product sales
$
650,163
$
1,978,066
$
(1,327,903)
(67)
%
Contract services
355,080
555,836
(200,756)
(36)
%
Grant revenue
468,952
—
468,952
N/A
Digital asset mining
605,982
1,118,569
(512,587)
(46)
%
Total Revenue
$
2,080,177
$
3,652,471
$
(1,572,294)
(43)
%
For the Six Months Ended
June 30,
Variances
2026
2025
$
%
Product sales
$
2,783,401
$
3,138,625
$
(355,224)
(11)
%
Contract services
1,037,725
1,594,129
(556,404)
(35)
%
Grant revenue
937,188
—
937,188
N/A
Digital asset mining
1,268,293
1,368,323
(100,030)
(7)
%
Total Revenue
$
6,026,607
$
6,101,077
$
(74,470)
(1)
%
31
Table of Contents
For the three months ended June 30, 2026 and 2025, we generated $2.1 million and $3.7 million, respectively, of revenues from 26 and 30 customers in each period. For the six months ended June 30, 2026 and 2025, we generated $6.0 million and $6.1 million, respectively, of revenues from 39 and 43 customers in each period.
Our customers and prospective customers for product and service revenue are large organizations with multiple levels of management, controls/procedures, and contract evaluation/authorization. Furthermore, our solutions are new and do not necessarily fit into pre-existing patterns of purchase commitments. Accordingly, the business activity cycle between expression of initial customer interest to shipping, acceptance, performance of services, and billing can be lengthy, unpredictable, and lumpy, which can influence the timing, consistency and reporting of sales growth.
Product Revenue
Product sales consist of battery systems delivered through our KULR ONE platform — including space, defense and aviation battery assemblies (“KULR ONE products”), battery management system hardware and lithium iron phosphate (“LFP”) battery packs — together with internal short circuit (“ISC”) cells and devices and battery storage and transport products (“Safe Cases”).
We had 16 product sales customers during the three months ended June 30, 2026, compared with 25 during the three months ended June 30, 2025. Product sales for the period were driven principally by two large orders, each of which was to a new customer and consisted of a new battery product configuration — custom lithium-ion battery assemblies and LFP battery packs. The decrease in product sales compared to the prior year period was primarily due to supply chain disruptions related to battery cell supply and power electronics during the period, which delayed the sale, production and delivery of certain battery products.
We had 29 product sales customers during the six months ended June 30, 2026, compared with 32 during the six months ended June 30, 2025. Product sales for the 2026 six-month period were driven principally by our largest order of the period, an FTI program delivered to a new defense customer during the first quarter of 2026, together with custom lithium-ion battery assemblies and LFP battery packs sold to two additional new customers. The decrease in product sales compared to the prior year period was primarily due to supply chain disruptions related to battery cell supply and power electronics during the period, which delayed the sale, production and delivery of certain battery products.
Service Revenue
Contract services consists of battery engineering and design services, including non-recurring engineering (“NRE”); cell screening and characterization; pack-level qualification and abuse testing, including calorimetry and propagation resistance testing; and KULR VIBE vibration services.
We had 10 contract services customers during the three months ended June 30, 2026, compared with 12 during the three months ended June 30, 2025. Contract services revenue for the 2026 period was driven principally by engineering services performed for our two largest services customers for the period, together with qualification and abuse testing services performed for several other customers. The decrease in contract services revenue was primarily attributable to the substantial completion of engineering services contracts that were in progress during the three months ended June 30, 2025, including a government-funded engineering program and two other significant engineering services contracts that did not recur in the 2026 period, partially offset by testing services performed for new customers during the 2026 period.
We had 17 contract services customers during the six months ended June 30, 2026, compared with 23 during the six months ended June 30, 2025. Contract services revenue for the 2026 six-month period was driven principally by NRE performed for our largest services customer and vibration testing and qualification services performed for our second largest services customer, together with engineering services performed for several other customers. The decrease in contract services revenue was primarily attributable to the substantial completion of engineering services contracts that were in progress during the six months ended June 30, 2025, including a large government-funded engineering program and three other significant engineering services contracts that did not recur at a comparable scale in the 2026 period. The decrease was partially offset by an increased volume of qualification and abuse testing services performed for new customers.
32
Table of Contents
Grant Revenue
Grant revenue during the three and six months ended June 30, 2026 was $0.5 million and $0.9 million related to the reimbursement of R&D expenses. Grant revenue consists of an award from the Texas Space Commission to perform research and development of cold-temperature lithium-ion battery solutions for the next generation of Lunar and Martian missions which is part of our ongoing major or central activities. The contract award was executed on September 23, 2025. Revenue is earned on the award once specific grant conditions have been met, which is generally when the costs relevant to the condition have been incurred by the Company. There was no grant revenue recognized for the three and six months ended June 30, 2025.
Revenue for the six months ended June 30, 2026 reflects the correction of an immaterial error in previously reported grant revenue for the three months ended March 31, 2026. See Note 3 – Immaterial Revision of Previously Reported Financial Information, to the condensed consolidated financial statements for further information.
Mining of Digital Assets Revenue
For the three months ended June 30, 2026, the decrease in revenue from mining of digital assets was primarily due to fewer BTC earned, as the Company operated under two machine lease agreements during the three months ended June 30, 2026, compared to three agreements in effect during the three months ended June 30, 2025. The decrease was further driven by a lower average fair value of BTC on the dates earned in 2026.
For the six months ended June 30, 2026, the decrease in revenue from mining of digital assets was primarily due to fewer BTC earned, as the Company operated under two machine lease agreements during the six months ended June 30, 2026, compared to three agreements in effect during the six months ended June 30, 2025. The decrease was further driven by a lower average fair value of BTC on the dates earned in 2026.
The two machine lease agreements in effect during the six months ended June 30, 2026 have both since concluded. The first agreement became effective July 30, 2025 and expired by its terms on July 30, 2026, and the Company did not renew or extend it. The second agreement was originally scheduled to continue through October 31, 2027; however, in July 2026, the Company and the mining services provider under that agreement agreed to terminate it prior to its stated term, and the Company has no further obligations thereunder. As a result, the Company no longer operates under any machine lease or mining services agreement. See Note 13 – Subsequent Events for further information.
Cost of Revenue, Gross Profit and Gross Profit Margin
Cost of revenue consists of the cost of our products as well as labor expenses directly related to product sales or contract services, and lease and non-lease costs incurred pursuant to Machine Lease Agreements in connection with mining digital assets. The following tables present the gross profit (loss) and gross profit (loss) margin by revenue type for the periods presented.
For the Three Months Ended
June 30, 2026
Gross Profit (Loss)
Revenue
COGS
$
%
Gross Margins
Product sales
$
650,163
$
974,664
$
(324,501)
(50)
%
Contract services
355,080
689,099
(334,019)
(94)
%
Grant revenue
468,952
—
468,952
100
%
Mining of digital assets
605,982
1,055,347
(449,365)
(74)
%
Total
$
2,080,177
$
2,719,110
$
(638,933)
(31)
%
33
Table of Contents
For the Three Months Ended
June 30, 2025
Gross Profit (Loss)
Revenue
COGS
$
%
Gross Margins
Product sales
$
1,978,066
$
1,013,386
$
964,680
49
%
Contract services
555,836
822,637
(266,801)
(48)
%
Mining of digital assets
1,118,569
1,102,738
15,831
1
%
Total
$
3,652,471
$
2,938,761
$
713,710
20
%
For the Six Months Ended
June 30, 2026
Gross Profit (Loss)
Revenue
COGS
$
%
Gross Margins
Product sales
$
2,783,401
$
2,647,679
$
135,722
5
%
Contract services
1,037,725
1,403,319
(365,594)
(35)
%
Grant revenue
937,188
—
937,188
100
%
Mining of digital assets
1,268,293
2,097,250
(828,957)
(65)
%
Total
$
6,026,607
$
6,148,248
$
(121,641)
(2)
%
For the Six Months Ended
June 30, 2025
Gross Profit (Loss)
Revenue
COGS
$
%
Gross Margins
Product sales
$
3,138,625
$
1,286,836
$
1,851,789
59
%
Contract services
1,594,129
2,451,448
(857,319)
(54)
%
Mining of digital assets
1,368,323
1,442,738
(74,415)
(5)
%
Total
$
6,101,077
$
5,181,022
$
920,055
15
%
Revenue mix plays an important part in our reported average margins for any period. Because we are introducing new revenue streams at an early stage in our development cycle, the margins earned can vary significantly between periods, customers, products and services due to the learning process, customer negotiating strengths, and product mix.
Product Revenue Margins
For the three months ended June 30, 2026, the gross profit margin on product sales decreased compared to the prior year period, driven primarily by lower product sales from supply chain disruptions related to battery cell supply and power electronics in the second quarter of 2026, while expenses associated with direct labor, outsourced labor and other production costs did not decline proportionately.
For the six months ended June 30, 2026, the gross profit margin on product sales decreased compared to the prior year period, driven primarily by reduced margins recognized on various product lines during the period, and by lower product sales in the second quarter of 2026 from supply chain disruptions related to battery cell supply and power electronics without a proportionate decline in associated expenses.
Service Revenue Margins
For the three months ended June 30, 2026, the gross loss on contract services increased slightly from the prior year period in dollar terms, and the gross profit margin percentage on contract services declined, driven primarily by lower contract services revenue recognized relative to depreciation and project labor costs during the period, including excess labor and material costs on a customer engineering program that generated a gross loss during the period. Substantially all other contract services projects generated positive gross margins during the period. In the prior year period, gross losses on contract services were concentrated in two other customer engineering programs.
For the six months ended June 30, 2026, the gross loss on contract services decreased compared to the prior year period in dollar terms, driven primarily by the completion of two projects that had been impacted by excess labor hours and generated negative margins during the first quarter of 2026, partially offset by excess labor and material costs on a customer engineering program during the second quarter
34
Table of Contents
of 2026. The gross profit margin percentage on contract services improved compared to the prior year period, as contract services cost of revenue decreased at a faster rate than contract service revenue compared to the prior period.
Mining of Digital Asset Revenue Margins
For the three months ended June 30, 2026, the gross profit margin on mining of digital assets decreased compared to the prior year period, driven primarily by the decline in BTC prices relative to the prior year period, which reduced the value of BTC mined relative to the fixed costs associated with machine lease obligations.
For the six months ended June 30, 2026, the gross profit margin on mining of digital assets decreased compared to the prior year period, driven primarily by the decline in BTC prices relative to the prior year period, which reduced the value of BTC mined relative to the fixed costs associated with machine lease obligations. Additionally, the 2026 period includes a full six months of lease and hosting costs, while the 2025 period includes four months due to mining operations beginning in March 2025.
Grant Revenue Margins
Grant revenue, which represents a reimbursement of costs, reflected a full gross margin contribution. The related costs include $0.5 million and $0.9 million, respectively, for the three and six months ended June 30, 2026 and are classified within research and development expenses.
Research and Development
Research and development (“R&D”) includes expenses incurred in connection with the R&D of our CFV thermal management solution, high-areal-capacity battery electrodes, and 3D engineering for a rechargeable battery, as well as costs incurred under the Texas Space Commission award, which are reimbursed through grant revenue. R&D expenses are charged to operations as incurred. The following table presents the dollar and percentage variances in R&D expenses for the periods presented.
For the Three Months Ended
June 30,
Variances
2026
2025
$
%
Operating Expenses
Research and development
$
2,985,659
$
2,436,754
$
548,905
23
%
For the Six Months Ended
June 30,
Variances
2026
2025
$
%
Operating Expenses
Research and development
$
4,756,159
$
4,886,654
$
(130,495)
(3)
%
We expect that our R&D expenses will increase as we expand our future operations.
The increase in research and development expenses for the three months ended June 30, 2026 was primarily attributable to costs incurred under the Texas Space Commission grant, which are reimbursed through grant revenue.
The decrease in research and development expenses for the six months ended June 30, 2026 was primarily attributable to progress made on several key initiatives in the prior year, including third-party engineering and development services, testing equipment purchases, and investments to support manufacturing expansion, which resulted in lower activity levels and associated costs during the current period, partially offset by R&D expenses incurred related to the Texas Space Commission grant in the 2026 periods.
Selling, General, and Administrative
Selling, general and administrative expenses consisted primarily of stock-based compensation, marketing and advertising, salaries, payroll taxes and other benefits, Board member compensation, accounting and tax, consulting fees, travel and entertainment, rent
35
Table of Contents
expense, office expenses, and legal and professional fees. The following table presents the dollar and percentage variances in selling, general and administrative expenses for the periods presented.
For the Three Months Ended
June 30,
Variances
2026
2025
$
%
Operating Expenses
Selling, general, and administrative
$
6,307,097
$
6,941,599
$
(634,502)
(9)
%
For the Six Months Ended
June 30,
Variances
2026
2025
$
%
Operating Expenses
Selling, general, and administrative
$
12,839,066
$
13,573,072
$
(734,006)
(5)
%
The decrease in selling, general and administrative expenses for the three and six months ended June 30, 2026 was primarily attributable to the conclusion of strategic investment and corporate development activities that drove costs higher during 2025, including a minority investment in an external company that did not recur during the three and six months ended June 30, 2026. Accounting, legal, consulting, and other professional fees decreased as these activities wound down. Marketing, travel, insurance, and personnel-related expenses similarly reflect lower activity levels in the current period compared to the elevated investment and expansion efforts undertaken throughout 2025.
Impairment Expense
There were no impairment expenses for the three and six months ended June 30, 2026. For the three and six months ended June 30, 2025, impairment expenses were $786,397 and $1,355,174, respectively, due to the write-off of equipment deposits.
Credit Losses
During the six months ended June 30, 2026, the Company recorded a credit loss of $500,000 on Auto-Vibe assets. There was no comparable charge in the prior year period.
For the three and six months ended June 30, 2026, credit losses on accounts receivable were approximately $1.3 million, which related to a single customer and was determined based on a specific assessment of that customer’s ability to pay. There were no credit losses on accounts receivable for the three and six months ended June 30, 2025.
Other Income (Expense)
The following table presents the dollar and percentage variances in other income (expense) for the periods presented.
For the Three Months Ended
June 30,
Variances
2026
2025
$
%
Other Income (Expense)
Change in fair value of digital assets
$
(10,591,667)
$
17,367,660
$
(27,959,327)
(161)
%
Interest income
47,476
168,975
(121,499)
(72)
%
Miscellaneous income
7,000
—
7,000
N/A
Interest expense
(229,047)
(2,124)
(226,923)
10,684
%
Change in fair value of accrued issuable equity
—
58,678
(58,678)
(100)
%
Total Other Income (Expense), net
$
(10,766,238)
$
17,593,189
$
(28,359,427)
(161)
%
For the Six Months Ended
June 30,
Variances
2026
2025
$
%
Other Income (Expense)
Change in fair value of digital assets
$
(31,359,380)
$
7,619,060
$
(38,978,440)
(512)
%
36
Table of Contents
Interest income
85,963
337,399
(251,436)
(75)
%
Miscellaneous income
7,000
—
7,000
N/A
Interest expense
(234,488)
(12,521)
(221,967)
1,773
%
Change in fair value of accrued issuable equity
—
319,276
(319,276)
(100)
%
Amortization of debt discount
—
(82,878)
82,878
(100)
%
Gain on debt extinguishment, net
—
50,000
(50,000)
(100)
%
Total Other Income (Expense), net
$
(31,500,905)
$
8,230,336
$
(39,731,241)
(483)
%
The three month change is primarily attributable to the $28.0 million unfavorable change in the fair value of BTC holdings, reflecting the change in market price of BTC, from $68,228 on April 1, 2026, to $58,554 on June 30, 2026, compared to the change from $82,560 on April 1, 2025, to $107,176 on June 30, 2025.
The six month change is primarily attributable to the $39.0 million unfavorable change in the fair value of BTC holdings, reflecting the change in market price of BTC, from $87,502 on January 1, 2026, to $58,554 on June 30, 2026, compared to the change from $93,384 on January 1, 2025, to $107,176 on June 30, 2025.
Our Bitcoin Acquisition Strategy
In December 2024, we adopted BTC as our primary treasury reserve asset on an ongoing basis, subject to market conditions and our anticipated cash needs. Our strategy included acquiring and holding BTC using cash that exceeds our working capital requirements, and from time to time, subject to market conditions, issuing equity or debt securities or engaging in other capital raising transactions with the objective of using the proceeds to purchase BTC. However, for the foreseeable future, we do not expect to allocate surplus cash to BTC as we prioritize scaling our operating business, including KULR ONE and related products and services. We have not set any specific target for the amount of BTC we seek to hold, and we will continue to monitor market conditions in determining whether to engage in additional BTC transactions. This overall strategy also contemplates that we could periodically leverage or sell BTC for general corporate purposes or in connection with strategies that generate tax benefits in accordance with applicable law, enter into additional capital raising transactions, including those that could be collateralized by our BTC holdings, and consider pursuing strategies to create income streams or otherwise generate funds using our BTC holdings. Through June 30, 2026, KULR had not sold any BTC from its treasury holdings.
On May 7, 2026, our Board of Directors authorized management to sell digital assets as deemed necessary to fund operations and key business priorities in lieu of issuing equity. Accordingly, rather than issue equity under the ATM at current levels, we intend to sell BTC to fund our planned operations and growth initiatives, including scaling our KULR ONE Space architecture, ramping production of our KULR ONE Air products, and advancing development of our KULR ONE MAX battery backup solutions. Subsequent to June 30, 2026, we repaid the remaining outstanding principal and interest balance under our $20.0 million loan agreement with Coinbase, which resulted in the automatic release of the 565 BTC held in the collateral account. To fund the repayment, we sold an aggregate of approximately 333 BTC for total proceeds of approximately $21.5 million, at an average price of approximately $64,467 per BTC, of which we used proceeds of approximately $20.0 million to fund the principal repayment. See Note 13 – Subsequent Events for further information regarding sales of BTC subsequent to June 30, 2026.
As of June 30, 2026, we had contractual commitments with digital asset mining services providers related to the operation of digital asset mining machines. On July 30, 2025, we entered into a one-year mining services agreement, which was not renewed, with a digital asset mining services company, with total committed payments of $2.6 million, of which all were made as of June 30, 2026. In addition, on October 1, 2025, we entered into a two-year mining services agreement with a digital asset mining services company, that included certain non-lease operating expense commitments and the remaining commitments as of June 30, 2026 for future operating expenses associated with this lease totaled $2.1 million (see Note 13 – Subsequent Events, related to the termination of this agreement in July 2026).
For the three and six months ended June 30, 2026, the Company earned 8.44 and 17.23 BTC from mining operations. As of June 30, 2026, we held 1,091.69 BTC with a fair value of $63.9 million, of which 565 BTC with a fair value of $33.1 million were pledged as collateral under the Company’s loan agreement with Coinbase and are presented as digital assets, pledged as collateral, on the condensed consolidated balance sheets.
37
Table of Contents
The following table presents BTC activity during the six months ended June 30, 2026:
Weighted
Average
Digital Assets(1)
Bitcoin Held
Per Bitcoin
Fair value as of December 31, 2025
$
93,995,256
1,074.21
$
87,502
Digital assets purchased
—
—
—
Digital assets mined
1,268,293
17.23
73,594
Received as downtime credits
18,701
0.25
75,641
Change in fair value of digital assets
(31,359,380)
Fair value as of June 30, 2026
$
63,922,870
1,091.69
$
58,554
Less: Digital assets, pledged as collateral
(33,083,010)
Digital assets, net
$
30,839,860
(1) The source of capital used to purchase Bitcoin was primarily proceeds from ATM offerings.
Liquidity and Capital Resources
As of August 11, 2026 and June 30, 2026, we had unrestricted cash balances of $8.7 million and $12.8 million, respectively. As of June 30, 2026, we had working capital of $59.6 million. As of June 30, 2026, we also had BTC holdings of $63.9 million.
For the six months ended June 30, 2026 and 2025, net cash used in operating activities was $17.7 million and $21.5 million, respectively. Our net cash used in operations for the six months ended June 30, 2026, was primarily attributable to our net loss of $51.0 million, adjusted for non-cash expenses in the aggregate amount of $35.0 million, plus $1.7 million of net cash used to fund changes in the levels of operating assets and liabilities. Our net cash used in operations for the six months ended June 30, 2025, was primarily attributable to our net loss of $10.7 million, adjusted for non-cash gains in the aggregate amount of $4.2 million, plus $6.6 million of net cash used to fund changes in the levels of operating assets and liabilities.
For the six months ended June 30, 2026 and 2025, net cash used in investing activities was $2.1 million and $73.6 million, respectively. Net cash used in investing activities during the six months ended June 30, 2026, was primarily related to purchases of property and equipment of $1.5 million and the payment of a holdback amount related to an asset acquisition of $0.6 million. Net cash used in investing activities during the six months ended June 30, 2025, was primarily related to purchases of digital assets of $69.9 million, equity investments of $3.3 million, and purchases of property and equipment of $0.3 million.
For the six months ended June 30, 2026 and 2025, net cash provided by financing activities was $19.6 million and $85.8 million, respectively. Net cash provided by financing activities during the six months ended June 30, 2026, was primarily due to proceeds from our loan payable of $20.0 million, partially offset by payment of employee tax withholding on stock-based compensation of $0.4 million. Net cash provided by financing activities during the six months ended June 30, 2025, was primarily due to proceeds from ATM equity financing of $89.5 million, partially offset by issuance costs on ATM equity financing of $2.2 million, repayments of notes payable of $0.6 million, payments for deferred financing costs of $0.6 million, and payment of employee tax withholding on stock-based compensation of $0.3 million.
Future cash requirements for our June 30, 2026 current liabilities include approximately $4.4 million for accounts payable and accrued expenses, $20.0 million to repay our loan payable, of which the outstanding balance was repaid subsequent to June 30, 2026, and $0.3 million for future payments under our operating leases to be made within the next year. Future cash requirements for our long-term liabilities include $2.4 million for future payments under operating leases. In July 2026, we terminated our digital asset mining services agreement and we were relieved of future commitments of $2.1 million in exchange for an early termination fee of $0.15 million.
Our primary source of liquidity has historically been cash generated from equity and debt offerings. Under ASC Subtopic 205-40, Presentation of Financial Statements—Going Concern, we have the responsibility to evaluate whether conditions and/or events raise substantial doubt about our ability to meet future financial obligations as they become due within one year after the date that the financial statements are issued. We have a history of recurring net losses and recurring use of cash in operations.
On December 22, 2025, the Company decided to pause its ATM transactions, and subsequently extended that pause through September 30, 2026. During the six months ended June 30, 2026, the Company fully drew down its Master Loan Agreement with Coinbase Credit,
38
Table of Contents
Inc., resulting in $20.0 million outstanding as of June 30, 2026, which was repaid in full subsequent to June 30, 2026, and accordingly, the full $20.0 million loan facility remains available as of the date of this filing. As of June 30, 2026, we believe that our cash on hand, BTC holdings and working capital balances will be sufficient to meet our obligations as they become due over the next twelve months from the date these condensed consolidated financial statements were issued.
Our ATM transactions remain paused as of the date of this filing.
Off-Balance Sheet Arrangements
There are no off-balance sheet arrangements between us and any other entity that have, or are reasonably likely to have, a current or future effect on financial conditions, changes in financial conditions, revenues or expenses, results of operations, liquidity, capital expenditures or capital resources that is material to stockholders.
Critical Accounting Estimates
We prepare our condensed consolidated financial statements in accordance with U.S. generally accepted accounting principles, which require our management to make estimates and assumptions that affect the reported amounts of assets, liabilities and disclosures of contingent assets and liabilities at the balance sheet dates, as well as the reported amounts of revenues and expenses during the reporting periods. To the extent that there are material differences between these estimates and actual results, our financial results will be affected. The accounting policies that reflect our more significant estimates and judgments and which we believe are the most critical to aid in fully understanding and evaluating our reported financial results are described below. We consider an accounting estimate to be critical if: (i) the accounting estimate requires us to make assumptions about matters that were highly uncertain at the time the accounting estimate was made, and (ii) changes in the estimate that are reasonably likely to occur from period to period or use of different estimates that we reasonably could have used in the current period, would have a material impact on our financial condition or results of operations. There are items within our condensed consolidated financial statements that require estimation but are not deemed critical, as defined above. There have been no material changes to our critical accounting estimates from those described in our Annual Report on Form 10-K for the year ended December 31, 2025, which was filed with the SEC on March 31, 2026.
ITEM 3. QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK
We are a smaller reporting company, as defined by Rule 229.10(f)(1) and are not required to provide the information required by this Item.
Text extracted from the filing as submitted to EDGAR. Formatting, tables and exhibits are simplified for reading; the original document is authoritative for anything you rely on.