Idaho Power's ability to recover its costs and earn a reasonable rate of return can be affected by many regulatory factors, including the time between when Idaho Power incurs costs and when Idaho Power recovers those costs in customers’ rates (often called "regulatory lag" in the utility industry), and differences between the costs included in rates and the amount of actual costs incurred.
−Removed: Idaho Power expects to incur increasing costs, which is likely to occur before the IPUC, OPUC, or FERC approve the recovery of those costs, such as construction costs for new facilities and transmission resources, costs associated with changes in the long-term cost-effectiveness or operating conditions of Idaho Power's assets that could result in early retirements of utility facilities, costs of compliance with legislative and regulatory requirements, fuel and wholesale power costs, and increased funding levels of Idaho Power's defined benefit pension plan.
+Added: Idaho Power expects to incur increasing costs for construction of new facilities and transmission resources, O&M, compliance with legal and regulatory requirements, and pension contributions, among others, which is likely to occur before the IPUC, OPUC, or FERC approve the recovery of those costs.
The IPUC, OPUC, and FERC may not allow Idaho Power to recover some or all of those costs or costs that have already been deferred as regulatory assets if they find Idaho Power did not reasonably or prudently incur those costs or for other reasons.
5 unchanged sentences
With the large amount of ongoing and projected investments and the associated regulatory lag in cost recovery, Idaho Power filed rate cases in Idaho in 2023, 2024, and 2025, and Oregon in 2023 and expects that it will likely file rate cases or seek other types of regulatory relief on a regular basis in the next few years.
−Removed: There can be no assurance that any rate case filed by Idaho Power will result in an outcome that is satisfactory for Idaho Power.
In the past, Idaho Power has been denied recovery, or required to defer recovery pending the next general rate case, including denials or deferrals related to capital expenditures for long-term project expenses.
6 unchanged sentences
A majority of the differences between these two amounts is deferred for future recovery from, or refund to, customers through rates.
−Removed: Volatility in power supply costs continues to be significant, in large part due to fluctuations in hydropower generation conditions, fuel cost variability from factors including supply chain disruptions and inflation, supply and demand economics for fuel and power, the impact of high costs to purchase renewable energy under mandatory long-term contracts, and market price variability for power purchases from third parties based on seasonal demands and transmission system constraints.
+Added: Volatility in power supply costs continues to be significant, in large part due to fluctuations in hydropower generation conditions, fuel cost variability from factors including supply chain disruptions and inflation, supply and demand economics for fuel and power, high costs to purchase renewable energy under mandatory long-term contracts, and market price variability for power purchases from third parties based on seasonal demands and transmission system constraints.
Changes in market dynamics due to the emergence of day ahead or other energy and transmission markets in the western United States could also increase the volatility of power supply costs.
−Removed: While the power cost adjustment mechanisms function to mitigate the potentially adverse impact on net income of power supply cost volatility, the mechanisms do not eliminate the cash flow impact of that volatility.
+Added: While the power cost adjustment mechanisms function to mitigate adverse impacts on net income of power supply cost volatility, the mechanisms do not eliminate the cash flow impact of that volatility.
When power costs rise above the level recovered in current retail rates, Idaho Power incurs the costs but recovery of those costs is deferred to a subsequent collection period, which can adversely affect operating cash flow and liquidity until those costs are recovered.
4 unchanged sentences
Changes in customer growth and customer usage may negatively affect IDACORP's and Idaho Power's business, financial condition, and results of operations .
−Removed: Changes in the number of customers and customers' use of electricity are affected by a number of factors, such as population growth or decline in Idaho Power's service area, expansion or loss of service area, changes in customer needs and expectations, changes to customer rates, adoption rates of energy efficiency measures, customer-generated power such as from solar panels and gas-fired generators, demand-side management requirements, regulation or deregulation, and economic conditions.
−Removed: Continued inflationary pressures, including as a result of new or increased tariffs or other trade restrictions, or a n economic downturn or recession, could also negatively impact customer use and reduce revenues and cash flows, thus adversely affecting results of operations.
+Added: Changes in the number of customers and customers' use of electricity are affected by a number of factors, such as population growth or decline, expansion or loss of service area, changes in customer needs and expectations, customer rates, energy efficiency measures, customer-generated power, demand-side management requirements, regulation or deregulation, and economic conditions.
+Added: Inflationary pressures, including as a result of new or increased tariffs or other trade restrictions, or a n economic downturn, could also negatively impact customer use and reduce revenues and cash flows, thus adversely affecting results of operations.
Many electric utilities, including Idaho Power, have experienced a long-term decline in usage per customer, in part attributable to energy efficiency activities.
−Removed: State or federal regulations may be enacted to encourage or require mandatory energy conservation or technological advances that increase energy efficiency, which could further reduce usage per customer.
−Removed: Also, changing customer needs and expectations, such as a desire for increased renewable or low GHG-emitting sources of energy, increased customer rates as a result of recent rate cases and any future rate cases, and increased competition from customer-owned generation could lead to lower customer satisfaction, reduced loyalty, difficulty in obtaining rate increases, legislation to deregulate electric service, and customers seeking alternative sources of energy and electric service.
+Added: State or federal regulations may be enacted to encourage or require energy conservation or technological advances that increase energy efficiency, which could further reduce usage per customer.
+Added: Also, changing customer needs and expectations, such as a desire for increased renewable or low GHG-emitting sources of energy, increased customer rates, and increased competition from customer-owned generation could lead to lower customer satisfaction, reduced loyalty, difficulty in obtaining rate increases, legislation to deregulate electric service, and customers seeking alternative sources of energy and electric service.
If customers choose to generate their own energy, discontinue a portion or all service from Idaho Power, or replace electric power for heating with natural gas, demand for Idaho Power's energy may decline and adversely impact the affordability of its services for remaining customers.
1 unchanged sentence
There is also no guarantee that Idaho Power will continue to experience an increase in the number of customers at the current rate of growth or at all.
−Removed: Rate mechanisms, such as the Idaho FCA for residential and small commercial customers, are designed to address the financial disincentive associated with promoting energy efficiency activities, but there is no assurance that the mechanism will result in full or timely collection of Idaho Power's fixed costs, which are currently collected in large part through the company's volume-based energy rates that are based on historical sales volume.
+Added: Rate mechanisms, such as the Idaho FCA for residential and small commercial customers, are designed to address the financial disincentive associated with promoting energy efficiency activities, but there is no assurance that the mechanism will result in full or timely collection of Idaho Power's fixed costs.
Any undercollection of fixed costs would adversely impact revenues, earnings, and cash flows.
The formation of municipal utilities or similar entities for distribution systems within Idaho Power's service area could also result in a load decrease.
−Removed: Idaho Power is experiencing a rapid addition of new industrial and commercial customer load.
−Removed: is possible that such new industrial and commercial customers may not meet forecasted power usage ramp rates or amounts.
−Removed: The loss of loads resulting from any of these events may result in excess infrastructure and stranded costs and require IDACORP and Idaho Power to modify or eliminate large generation, storage, or transmission projects.
−Removed: This could in turn result in reduced revenues as well as write-downs or write-offs if regulators determine that the costs of the projects were incurred imprudently, which could have a material adverse impact on IDACORP's and Idaho Power's financial condition, results of operations, and cash flows.
+Added: Idaho Power is experiencing a rapid addition of new industrial customer load, but if the new load does not meet forecasted power usage ramp rates or amounts, the loss of load may result in excess infrastructure and stranded costs and require Idaho Power to modify or eliminate large generation, storage, or transmission projects.
+Added: This could in turn result in reduced revenues, earnings, and cash flows, as well as write-downs or write-offs if regulators determine that the costs of the projects were incurred
+Added: imprudently, which could have a material adverse impact on IDACORP's and Idaho Power's financial condition, results of operations, and cash flows.
Conversely, if Idaho Power were to experience an unanticipated increase in the demand for energy through, for example, the rapid addition of new industrial and commercial customers or population growth in the service area, Idaho Power may be required to rely on higher-cost purchased power to meet peak system demand and may need to accelerate investment in additional generation or transmission resources.
−Removed: Idaho Power's 2023 IRP preferred resource portfolio and action plan included a need to ac quire significant generation and storage resources to meet forecasted increasing energy and capacity needs.
+Added: Idaho Power's 2025 IRP preferred resource portfolio included a need to ac quire significant generation and storage resources to meet forecasted increasing energy and capacity needs.
There can be no assurance that these energy and capacity needs will not change or that the resources will be adequate to meet load demands, in which case Idaho Power would need to rely on additional wholesale power purchases and would be subject to the volatility of wholesale markets.
1 unchanged sentence
Changes in weather conditions, severe weather, and the impacts of climate change can affect IDACORP's and Idaho Power's operating results and cause them to fluctuate seasonally.
−Removed: Idaho Power's electric power sales are seasonal, with demand in Idaho Power's service area peaking during the hot summer months, with a secondary peak during the cold winter months.
+Added: Idaho Power's electric power sales are seasonal, with demand in Idaho Power's service area peaking during the summer months and a secondary peak during the winter months.
Electric power demands by irrigation customers in Idaho Power's service area, which are impacted by temperatures and the timing and amount of precipitation, can also create significant seasonal changes in usage.
11 unchanged sentences
Costs incurred in connection with such events might also not be recovered through customer rates if the costs incurred are greater than those allowed for recovery by regulators.
−Removed: Idaho Power's customers' energy needs vary with weather and to the extent weather conditions are affected by climate change, customers' energy use could increase or decrease.
Increased energy use due to weather changes may require Idaho Power to invest in generating assets and transmission and distribution infrastructure, while decreased energy use due to weather changes may result in decreased revenues.
−Removed: Extreme weather conditions creating high energy demand may raise wholesale electricity prices for power that Idaho Power purchases to serve customers, increasing the cost of energy Idaho Power provides to its customers, and at the same time can increase the revenues Idaho Power receives for wholesale market sales of excess generation during regional extreme weather events.
+Added: Extreme weather conditions creating high energy demand may raise wholesale electricity prices for power that Idaho Power purchases to serve customers, increasing the cost of energy Idaho Power provides to its customers, and at the same time can increase the revenues Idaho Power receives for wholesale market sales of excess generation.
Variations in hydropower generation that increase Idaho Power's reliance on market purchases may lead to more costly power supply sources for its customers and reduce benefits from selling surplus hydropower in the wholesale market.
The price of power in the wholesale energy markets tends to be higher during periods of high regional demand that tends to occur with weather extremes, which may cause Idaho Power to purchase power in the wholesale market during peak price periods, increasing power supply costs.
−Removed: Idaho Power has in place mechanisms to help
−Removed: mitigate the effects of energy market price volatility, but there is no assurance these mechanisms will continue to be in place or function as intended.
+Added: Idaho Power has in place mechanisms to help mitigate the effects of energy market price volatility, but these mechanisms may not continue to be in place or function as intended.
In addition, state and federal legislation and regulations have been proposed in recent years and may be implemented in the future, intended to limit the severity and impact of climate change.
−Removed: Proposals have included imposing mandatory reductions in GHG emissions, which could increase Idaho Power’s power supply and compliance costs or require generation facilities to be retired early, resulting in potential stranded costs and write-downs or write-offs if Idaho Power is unable to fully recover investments in such facilities.
+Added: Proposals have included imposing mandatory reductions in GHG emissions, which could increase Idaho Power’s power supply and compliance costs or require generation facilities to be
+Added: retired early, resulting in potential stranded costs and write-downs or write-offs if Idaho Power is unable to fully recover investments in such facilities.
For additional information relating to legislation, regulations, and legal proceedings related to environmental matters, see Part II - Item 7 - MD&A - "Environmental Matters” in this report.
Liability from fires could adversely impact IDACORP's and Idaho Power's business, financial condition, and results of operations, and Idaho Power's WMP and other protocols may not prevent such liability.
−Removed: Fires alleged to have been caused by Idaho Power's transmission, distribution, or generation infrastructure, or that allegedly result from Idaho Power’s or its contractors’ operating or maintenance practices, have exposed, and in the future could expose, Idaho Power to claims for fire suppression and clean-up costs, evacuation costs, fines and penalties, and liability for economic damages, personal injury, loss of life, property damage, and environmental pollution, whether based on claims of negligence, trespass, or otherwise.
−Removed: The risk of wildfires is exacerbated in forested areas where beetle infestations and rising tree mortality rates have caused a significant increase in the quantity of standing dead and dying timber, increasing the risk that such trees may fall from either inside or outside Idaho Power's right-of-way into a powerline, igniting a fire and increasing the severity of fires.
+Added: Fires alleged to have been caused by Idaho Power's transmission, distribution, or generation infrastructure, or that allegedly result from Idaho Power’s or its contractors’ operating or maintenance practices, have exposed, and in the future could expose, Idaho Power to claims for fire suppression and clean-up costs, evacuation costs, fines and penalties, and liability for economic damages, personal injury, loss of life, property damage, inverse condemnation, and environmental pollution.
+Added: The risk of wildfires is exacerbated in forested areas with standing dead and dying timber, increasing the risk that such trees may fall into a powerline, igniting a fire and increasing the severity of fires.
A significant number of urban-wildland interfaces in and near Idaho Power's service area, and commonly hot, dry summer conditions that may worsen as a result of climate change, increase the likelihood and magnitude of damages that may be caused by fires burning into or allegedly originating from utility equipment.
2 unchanged sentences
Idaho Power maintains insurance coverage for such risks, but insurance coverage is subject to terms and limitations and may not be sufficient to cover Idaho Power’s ultimate liability.
−Removed: Coverage limits within wildfire insurance policies could result in material self-insured costs due to self-insured retention amounts under the terms of Idaho Power’s insurance policies.
−Removed: Idaho Power, its contractors, and its customers have experienced coverage reductions and increased wildfire insurance costs and may continue to do so in future years.
+Added: Coverage limits within Idaho Power's wildfire insurance policies could result in material self-insured costs.
+Added: In the past, Idaho Power has experienced coverage reductions and increased wildfire insurance costs and may continue to do so in future years.
Idaho Power may be unable to recover costs in excess of insurance through customer rates or regulatory mechanisms and, even if such recovery is possible, it could take several years to collect.
2 unchanged sentences
Advances in technology and changes in customer demand and preferences in the electric utility industry have encouraged the development of new technologies for power generation, renewable energy, energy storage, customer-owned generation, and energy efficiency.
−Removed: In particular, in recent years the net cost of solar and wind generation and storage technology has decreased significantly, and there are federal and state regulations, laws, and other incentives in place to help further reduce the net cost of solar, wind, and energy storage facilities.
+Added: In particular, in recent years the net cost of solar and wind generation and storage technology has decreased significantly, and there have been federal and state regulations, laws, and other incentives to help further reduce the net cost of solar, wind, and energy storage facilities.
There is potential that customer-owned solar power generation systems could become sufficiently cost-effective and efficient that an increasing number of Idaho Power's customers choose to install such systems on their homes or businesses, which in turn could require changes in the way Idaho Power builds and manages its distribution systems and substantial grid infrastructure costs, and at the same time reduce the demand for and sale of energy.
4 unchanged sentences
A reduction in load, however, would not necessarily reduce Idaho Power's need for ongoing investments in its infrastructure to reliably serve its customers.
−Removed: If Idaho Power is unable to adjust its rate design or maintain adequate regulatory mechanisms allowing for timely cost recovery, declining usage from customer-owned generation sources and energy efficiency could result in under-recovery of Idaho Power's costs and investment in infrastructure, and reduce revenues, which would adversely impact IDACORP's and Idaho Power's financial condition and results of operations.
−Removed: Acts or threats of terrorism, acts of war, social unrest, cyber or physical security attacks, and other malicious acts of individuals or groups seeking to disrupt Idaho Power's operations or the electric power grid or compromise data could
−Removed: adversely impact IDACORP's and Idaho Power's business, financial condition, and results of operations.
−Removed: Idaho Power operates in an industry that requires the continuous use and operation of sophisticated information technology and increasingly complex operational technology systems and network infrastructure.
+Added: If Idaho Power is unable to adjust its rate design or maintain adequate regulatory mechanisms allowing for timely cost recovery, declining usage resulting from customer-owned generation sources and energy efficiency could result in under-recovery of Idaho Power's costs and investment in infrastructure, and reduce revenues, which would adversely impact IDACORP's and Idaho Power's financial condition and results of operations.
+Added: Acts or threats of terrorism, acts of war, social unrest, cyber or physical security attacks, and other malicious acts of individuals or groups seeking to disrupt Idaho Power's operations or the electric power grid or compromise data could adversely impact IDACORP's and Idaho Power's business, financial condition, and results of operations.
Idaho Power's generation and transmission facilities and its grid operations are potential targets for terrorist acts and threats, acts of war, social unrest, cyber and physical security attacks, and other disruptive activities of individuals or groups, including by nation states or nation state-sponsored groups.
−Removed: There have been cyber and physical attacks on energy infrastructure within the energy industry and on Idaho Power specifically in the past, and there are likely to be additional attacks in the future.
−Removed: Idaho Power and its vendors have been subject to, and will likely continue to be subject to, attempts to gain unauthorized access to systems and confidential information or to disrupt operations.
+Added: There have been cyber and physical attacks on energy infrastructure within the energy industry and on Idaho Power specifically in the past, and there are likely to be additional attacks in the future on Idaho Power, its vendors, and other utilities.
The utility industry is continuing to experience an increase in the frequency and sophistication of cybersecurity incidents.
3 unchanged sentences
Cyber and physical threats and attacks can have cascading impacts that unfold with increasing speed across networks, information systems, and other technologies.
−Removed: Network, information systems, and technology-related events, including those caused by IDACORP or Idaho Power through process breakdowns, human error, security architecture or design vulnerabilities, or by third parties through cyber or physical security attacks, could result in a degradation or disruption in the energy grid and the services of the companies, as well as the ability to record, process, and report customer, business, and financial information.
+Added: Network, information systems, and technology-related events, including those caused by Idaho Power or by third parties, could result in a degradation or disruption in the energy grid and the services of the companies, as well as the ability to record, process, and report customer, business, and financial information.
Physical or cyber attacks against key suppliers or service providers could have a similar effect on Idaho Power.
2 unchanged sentences
All information technology systems are vulnerable to being disabled, unauthorized access, unintentional defects, user error, errors in system changes, and cybersecurity incidents.
−Removed: Idaho Power is in the process of pursuing complex business system upgrades, and these significant changes increase the risk of system interruption.
−Removed: Any data security breaches, such as misappropriation, misuse, leakage, falsification or accidental release or loss of information maintained in Idaho Power's information technology systems or on third-party systems, including customer or employee data, could result in violations of privacy and other laws and associated litigation and liability for damages, fines, and penalties;
+Added: Idaho Power is pursuing complex business system upgrades, and these significant changes increase the risk of system interruption.
+Added: Any data security breaches, such as misappropriation, misuse, leakage, falsification or accidental release or loss of information maintained in Idaho Power's information technology systems or on third-party systems, including customer or employee data, could result in violations of privacy and other laws and associated litigation and liability;
financial loss to Idaho Power or to its customers;
1 unchanged sentence
and damage to Idaho Power’s reputation, all of which could materially adversely affect Idaho Power's financial condition and results of operations.
−Removed: No security measures can completely shield Idaho Power's systems, infrastructure, and data from vulnerabilities to cyber attacks, human error, intrusions, or other catastrophic events that could result in their failure or reduced functionality, and ultimately the potential loss of sensitive information or the loss of Idaho Power's ability to fulfill critical business functions and provide reliable electric power to customers.
+Added: No security measures can completely shield Idaho Power's systems, infrastructure, and data from vulnerabilities that could result in their failure or reduced functionality, and ultimately the potential loss of sensitive information or the loss of Idaho Power's ability to fulfill critical business functions and provide reliable electric power to customers.
Despite the steps Idaho Power may take to detect, mitigate, or eliminate threats and respond to security incidents, the techniques used by those who seek to obtain unauthorized access, and possibly disable or sabotage systems or abscond with information and data, change frequently and Idaho Power may not be able to protect against all such actions.
−Removed: Idaho Power actively monitors developments in cybersecurity and is involved in various related government and industry groups, and the company’s board receives security updates at least quarterly.
−Removed: Although Idaho Power continues to make investments in its cybersecurity program, including personnel, technologies, and training of personnel, there can be no assurance that these systems or their expected functionality will be implemented, maintained, or expanded effectively;
−Removed: nor can security measures completely eliminate the possibility of a cybersecurity breach.
−Removed: Further, the implementation of security guidelines and measures has resulted in, and Idaho Power expects to continue to result in, increased costs.
+Added: There can be no assurance that Idaho Power's cybersecurity measures will be effective, nor can security measures completely eliminate the possibility of a cybersecurity breach.
+Added: Further, the implementation of security measures has resulted in, and Idaho Power expects to continue to result in, increased costs.
Terrorist attacks, acts of war, social unrest, cyber and physical security attacks, and similar incidents can also have indirect impacts by creating political, economic, social, or financial market instability, and can cause damage to or interference with Idaho Power’s operating assets, customers, or suppliers.
−Removed: This may result in business interruption, lost revenue, higher commodity prices, disruption in fuel supplies, lower energy consumption, and unstable commodity and financial markets,
−Removed: particularly with respect to electricity and natural gas, any of which may materially adversely affect Idaho Power.
+Added: This may result in business interruption, lost revenue, higher commodity prices, disruption in fuel supplies, lower energy consumption, and unstable commodity and financial markets, particularly with respect to electricity and natural gas, any of which may materially adversely affect Idaho Power.
These events, and governmental actions in response, could result in a material decrease in revenues and increase costs to protect, repair, and insure Idaho Power's assets and operate its infrastructure, systems, and business.
3 unchanged sentences
Also, short-term and long-term anticipated increases in both the number of customers and the demand for energy require expansion and reinforcement of that infrastructure as described in Idaho Power's 2025 IRP.
−Removed: Idaho Power is participating in three high-voltage transmission line projects and has also entered into contracts to purchase and own 300 MW of wind generation and 1,320 MWh of new battery storage assets expected to come online from 2025 to 2027, as well as issued RFPs for new resources, which are intended to help meet increasing customer energy demands.
−Removed: The level of investments that Idaho Power expects to make in capital improvements and expenditures for infrastructure projects over the next five years is roughly double what it was in the immediately preceding five years.
+Added: Idaho Power is participating in three high-voltage transmission line projects, has applied for a CPCN for additional gas-fueled generating capacity next to an existing gas power plant, and has also entered into contracts to purchase, own, and utilize, 1,400 MWh of new battery storage assets expected to come online from 2026 to 2028, as well as issued RFPs for new resources, which are intended to help meet increasing customer energy demands.
+Added: The level of investments that Idaho Power expects to make in capital improvements and expenditures for infrastructure projects over the next five years is over $1.2 billion per year
These projects are subject to usual permitting and construction risks that can adversely affect project costs and the completion time.
1 unchanged sentence
• the ability to timely obtain labor or materials at reasonable costs;
−Removed: • defaults and delays by suppliers and contractors, including delays for specialty equipment that require significant lead times;
+Added: • defaults and delays by suppliers and contractors, including delays for specialty equipment that requires significant lead times;
• increases in price and limitations on availability of commodities, materials, and equipment;
15 unchanged sentences
Thus, termination of a project could negatively affect IDACORP's and Idaho Power's financial condition and results of operations.
−Removed: Demand for power could exceed supply, particularly in light of the rapid addition of new industrial and commercial customer load, resulting in deliverability risks and increased costs for, or difficulty in, purchasing capacity in the market or acquiring or constructing additional generation resources and battery storage facilities .
−Removed: Idaho Power's 2023 IRP identified a low-cost preferred resource portfolio and action plan for the next 20-year period that includes adding substantial renewable resources and the conversion from coal to natural gas of two units at the Jim Bridger plant in 2024, the two units at the North Valmy plant in 2026, and the remaining two units at the Jim Bridger plant in 2030.
+Added: Demand for power could exceed Idaho Power's available generation capacity, particularly in light of the rapid addition of new industrial and commercial customer load, resulting in deliverability risks and increased costs for, or difficulty in, purchasing capacity in the market or acquiring or constructing additional generation resources and battery storage facilities .
+Added: Idaho Power's 2025 IRP identified a low-cost preferred resource portfolio and action plan for the next 20-year period that includes adding substantial renewable resources and the conversion from coal to natural gas of the two units at the North Valmy plant by mid-2026 and the remaining two units at the Jim Bridger plant in 2030.
As Idah o Power implements the IRP's action plan, it remains obligated to provide reliable and affordable energy to its customers, but there are certain potential deliverability and cost risks associated with implementation.
−Removed: These risks include, but are not limited to, (1) the failure to timely obtain or construct additional resources to meet forecast needs related to load growth, (2) the rapid addition of new industrial and
−Removed: commercial customer load and the volatility of such new load demand, (3) increased renewable energy generation presenting risks of uncertainty and variability that could be further compounded as neighboring systems transition towards increasing levels of renewable resources, and (4) increased potential resource volatility due to changes in the energy market.
+Added: These risks include, but are not limited to, (1) the failure to timely obtain or construct additional resources to meet forecast needs related to load growth, (2) the rapid addition of new industrial and commercial customer load and the volatility of such new load demand, (3) increased renewable energy generation presenting risks of uncertainty and variability that could be further compounded as neighboring systems transition towards increasing levels of renewable resources, and (4) increased potential resource volatility due to changes in the energy market.
During peak periods, power demand could exceed, and on occasion has exceeded, Idaho Power’s available generation capacity, particularly if Idaho Power’s power plants are not performing as anticipated and additional resources and battery storage are not available as needed to meet demand.
4 unchanged sentences
During 2025 and 2024, 52 percent and 54 percent, respectively, o f Idaho Power's electric power from Idaho Power-owned generation was from hydropower facilities.
−Removed: Due to Idaho Power’s heavy reliance on hydropower generation, the impacts of factors such as precipitation and snowpack, the timing of run-off, requirements for flood control, and the availability of water in the Snake River Basin can significantly affect its operations.
+Added: Due to Idaho Power’s heavy reliance on hydropower
+Added: generation, the impacts of factors such as precipitation and snowpack, the timing of run-off, requirements for flood control, and the availability of water in the Snake River Basin can significantly affect its operations.
The combination of a long-term trend of declining Snake River base flows, over-appropriation of water, and periods of drought have led to water rights disputes and proceedings among surface water and ground water irrigators and the State of Idaho.
3 unchanged sentences
therefore, costs increase and opportunities for wholesale energy sales are reduced, reducing revenues and potentially earnings.
−Removed: Through its power cost adjustment mechanisms, Idaho Power expects to recover most (but not all) of the increase in net power supply costs caused by lower hydropower generation.
+Added: Through its power cost adjustment mechanisms, Idaho Power expects to recover most (but not all) of any increase in net power supply costs caused by lower hydropower generation.
The timing of recovery of the increased costs, however, may not occur until the subsequent power cost adjustment year, adversely affecting cash flows and liquidity.
1 unchanged sentence
A s part of its normal business operations, Idaho Power purchases coal and natural gas in the open market or under short-term or long-term contracts, often with variable pricing terms.
−Removed: Market prices for coal and natural gas are volatile and influenced by factors impacting supply and demand such as weather conditions, the adequacy and type of generating capacity, fuel transportation availability, economic conditions, regulations related to GHG emissions, changes in technology, moratoriums on federally leased coal, and increases in coal lease costs.
−Removed: Natural gas transportation to Idaho Power's three natural gas plants in Idaho is limited to one primary p ipeline, and natural gas transportation to the Jim Bridger plant is also limited to a separate, single pipeline, presenting a heightened possibility of supply constraint and disruptions separate from the risk of counterparty default.
−Removed: Idaho Power's current coal supply arrangements are under long-term contracts for coal originating in Wyoming, Utah, and Colorado, and thus Idaho Power is exposed to risk of disruption of coal production in, or transportation from, those regions.
+Added: Market prices for coal and natural gas are volatile and influenced by factors impacting supply and demand such as weather conditions, the adequacy and type of generating capacity, fuel transportation availability, economic conditions, regulations related to GHG emissions, and changes in technology.
+Added: Natural gas transportation to Idaho Power's three natural gas plants in Idaho is limited to one primary p ipeline, and natural gas transportation to each of the Jim Bridger plant and the North Valmy plant is also limited to a separate, single pipeline for each plant, presenting a heightened possibility of supply constraint and disruptions separate from the risk of counterparty default.
+Added: Idaho Power's current coal supply arrangements are under long-term contracts for coal originating in Wyoming, and Idaho Power is exposed to risk of disruption of coal production in, or transportation from, its coal suppliers.
Idaho Power may from time to time enter into new, or renegotiate, these contracts but can provide no assurance that such contracts will be negotiated or renegotiated on satisfactory terms, or at all.
There also can be no assurance that counterparties to the natural gas or coal supply agreements will fulfill their obligations to supply natural gas or coal, and they may experience regulatory, financial, or technical problems or unforeseeable events that inhibit their ability to deliver natural gas or coal.
−Removed: Disruptions in transportation of fuel and defaults by coal and natural gas suppliers may cause Idaho Power to seek alternative, and potentially more costly, sources of fuel or rely on other generation sources or wholesale market power purchases.
+Added: When the conversion of North Valmy plant unit 2 to gas firing is completed, approximately 40 percent of Idaho Power's generation resources, measured by nameplate capacity, will be fueled by natural gas.
+Added: Any disruptions in transportation of fuel and defaults by natural gas and coal suppliers may cause Idaho Power to seek alternative, and potentially more costly, sources of fuel or rely on other generation sources or wholesale market power purchases, if available.
Idaho Power's failure to provide service due to such disruptions may also result in fines, penalties, or cost disallowances through the regulatory process.
1 unchanged sentence
Idaho Power’s power supply, transmission, and distribution facilities are subject to numerous operational risks unique to it and its industry, including circumstances causing power outages, injuries and property damage, loss of life, and fires .
−Removed: Operating risks associated with Idaho Power's power supply, transmission, and distribution facilities include equipment failures, volatility in fuel and transportation pricing, interruptions in fuel supplies, increased regulatory compliance costs, changes necessitated by environmental legislation or litigation, labor disputes or attrition, accidents and workforce safety matters, environmental damage, property damage, wildfires, acts of terrorism or war or sabotage (both cyber and asset-based), disruptions in supply chains or price increases resulting in the inability to obtain needed equipment or materials on reasonable terms or at all, the loss of cost-effective disposal options for solid waste such as coal ash, operator error, and the occurrence of
−Removed: catastrophic events at the facilities.
+Added: Operating risks associated with Idaho Power's power supply, transmission, and distribution facilities include equipment failures, volatility in fuel and transportation pricing, interruptions in fuel supplies, increased regulatory compliance costs, changes necessitated by environmental legislation or litigation, labor disputes or attrition, accidents and workforce safety matters, environmental damage, property damage, wildfires, acts of terrorism or war or sabotage (both cyber and asset-based), disruptions in supply chains or price increases resulting in the inability to obtain needed equipment or materials on reasonable terms or at all, the loss of cost-effective disposal options for solid waste such as coal ash, operator error, and the occurrence of catastrophic events at the facilities.
Idaho Power maintains business continuity and disaster recovery plans, but such plans may be inadequate or not function as anticipated, which could result in delayed recovery after any such events.
−Removed: Diminished availability or performance of those facilities could result in reduced customer satisfaction, reputational harm, liability to third parties (including tort liability), and regulatory inquiries and fines.
+Added: Diminished availability or performance of those facilities could result in reduced customer satisfaction, reputational harm, liability to third parties, and regulatory inquiries and fines.
Operation of Idaho Power's owned and co-owned generating stations below expected capacity levels, or unplanned outages at these stations, could cause reduced energy output and lower efficiency levels and result in lost revenues and increased expenses for alternative fuels or wholesale market power purchases.
Further, during high-load periods and other extraordinary events such as wildfires, the transmission system servicing Idaho Power's service area in the past has been, and in the future may be, constrained, limiting the ability to transmit electric energy within the service area and access electric energy from outside the service area.
−Removed: Idaho Power's transmission facilities are also interconnected with those of third parties, and thus operation of Idaho Power's and third-parties' facilities could be adversely affected by unexpected or uncontrollable events, such as wildfires.
These transmission constraints and events could result in failure to provide reliable service to customers and the inability to deliver energy from generating facilities to the power grid, and the inability to access lower cost sources of electric energy.
−Removed: Idaho Power also enters into agreements with third-party contractors to perform work on its power supply, transmission, and distribution facilities, and may in some circumstances retain liability for the quality and completion of those contractors’ work, potentially subjecting Idaho Power to penalties, liability for personal injury, loss of life, or property damage, reputational harm, or enforcement actions or liability if a contractor violates applicable laws, rules, regulations, or orders.
−Removed: Accidents, acts of terrorism or war, electrical contacts, fires, explosions, catastrophic failures, general system damage or dysfunction, intentional acts of destruction, uncontrolled release of water from hydropower dams, and other unplanned events related to Idaho Power's infrastructure would increase repair costs and may expose Idaho Power to liability for personal injury, loss of life, and property damage.
+Added: Idaho Power also enters into agreements with third-party contractors to perform work on its power supply, transmission, and distribution facilities, and may in some circumstances retain liability for the quality and completion of those contractors’ work, potentially subjecting Idaho Power to penalties, liability for personal injury, loss of
+Added: life, or property damage, reputational harm, or enforcement actions or liability if a contractor violates applicable laws, rules, regulations, or orders.
+Added: Accidents, electrical contacts, fires, explosions, catastrophic failures, general system damage or dysfunction, intentional acts of destruction, uncontrolled release of water from hydropower dams, and other unplanned events related to Idaho Power's infrastructure would increase repair costs and may expose Idaho Power to liability for personal injury, loss of life, and property damage.
Idaho Power maintains insurance coverage for such operating and event risks, but insurance coverage is subject to terms and limitations and may not be sufficient to cover Idaho Power’s ultimate liability.
4 unchanged sentences
Idaho Power comprises nearly all of IDACORP's operations, and Idaho Power's business is concentrated solely in the electric power industry.
−Removed: Furthermore, Idaho Power's provision of electric service to retail customers is conducted exclusively in its southern Idaho and eastern Oregon service area.
+Added: Furthermore, Idaho Power's provision of electric service to retail customers is conducted exclusively in its southern Idaho and eastern Oregon service area and, following completion of the Oregon Sale, will be conducted exclusively in its southern Idaho service area.
As a result, IDACORP's and Idaho Power's future performance, revenues, and collectability of revenues, as well as expenses, will be affected by regional economic conditions, regulatory and legislative activity, weather conditions, and other events and conditions in its service area and in the electric power industry.
8 unchanged sentences
In recent years, Idaho Power has experienced increased competition and rising prices for many forms of third-party vendor services.
−Removed: While Idaho Power does not rely entirely on third-party vendors for many of these business functions, the unavailability of such vendors at a reasonable cost
−Removed: or at all could adversely affect the quality and cost of Idaho Power's electric service and negatively impact its results of operation.
−Removed: Co-owners of Idaho Power’s generation and transmission assets may have unaligned goals and positions due to the effects of legislation, regulations, capital requirements, load growth amounts, changes in its industry, or other factors, which could at times adversely impact Idaho Power’s ability to construct and operate those facilities in a manner most suitable to Idaho Power.
−Removed: Idaho Power owns certain of its generation and transmission assets jointly with other owners, with varying ownership interests in such facilities, and Idaho Power plans to develop and own assets jointly in the future.
+Added: While Idaho Power does not rely entirely on third-party vendors for many of these business functions, the unavailability of such vendors at a reasonable cost or at all could adversely affect the quality and cost of Idaho Power's electric service and negatively impact its results of operation.
+Added: Co-owners of Idaho Power’s generation and transmission assets may have unaligned goals and positions due to the effects of legislation, regulations, capital requirements, load growth amounts, changes in its industry, or other factors, which could adversely impact Idaho Power’s ability to construct and operate those facilities in a manner most suitable to Idaho Power.
+Added: Idaho Power owns some of its generation and transmission assets jointly with other owners, with varying ownership interests in such facilities, and Idaho Power plans to develop and own assets jointly in the future.
While there are advantages to joint ownership of resources, there are also restrictions imposed by the joint ownership and operating agreements for those facilities that provide rights, but also restrictions, on when and how the facilities are constructed and on how they are operated.
Changes in the nature of Idaho Power’s industry and the economic viability of certain plants and facilities, including impacts resulting from types and availability of other resources, fuel costs, and legislation and regulation, together with timing considerations related to expiration of permits or leases or other agreements for such facilities and other factors, could result in unaligned positions among co-owners.
−Removed: While Idaho Power negotiates and enforces its rights and obligations thoughtfully, differences in the co-owners’ willingness or ability to continue their participation or the timing of facility construction, modification, or decommissioning could lead to restrictions and disruptions to operations, adverse financial impacts to Idaho Power, and/or uncertainty related to the resulting cost recovery of such assets.
+Added: While Idaho Power negotiates and enforces its rights and obligations thoughtfully, differences in
+Added: the co-owners’ willingness or ability to continue their participation or the timing of facility construction, modification, or decommissioning could lead to restrictions and disruptions to operations, adverse financial impacts to Idaho Power, and/or uncertainty related to the resulting cost recovery of such assets.
Legal and Compliance Risks
Legal and compliance risk relates to risks arising from government and regulatory action and from legal proceedings and compliance with applicable laws, rules, orders, regulations, policies, and procedures, including those related to financial reporting, environment, health, and safety, and potential changes in legal requirements.
−Removed: Changes in legislation, regulation, and government policy may have a material adverse effect on IDACORP’s and Idaho Power’s business in the future.
+Added: Changes in legislation, regulation, and government policy may have a material adverse effect on IDACORP’s and Idaho Power’s business.
Legislative and regulatory proposals and recently enacted legislation that could have a material impact on IDACORP and Idaho Power include, but are not limited to, changes in tax policy or utility regulation, carbon-reduction initiatives, infrastructure renewal programs, climate change and environmental regulation, and modifications to accounting and public company reporting requirements.
Further, the proposals and new legislation could have an impact on the rate of growth of Idaho Power’s customers and their willingness to expand operations and increase electric service requirements.
−Removed: Under the new Presidential Administration, Idaho Power expects laws, regulations, executive orders, and policies relating to environmental compliance, tax, and other matters to change from those of the previous Presidential Administration and could require IDACORP and Idaho Power and some of their customers to modify their business strategy, activities, and projects due to change or uncertainty in the regulatory environment.
−Removed: For example, in January 2025, the United States again opted out of the Paris Agreement on climate change that would require commitments related to GHG emissions, among other things.
−Removed: It is possible that a future Presidential Administration may cause the United States to adopt the Paris Agreement again or enter into a similar agreement.
−Removed: Many states and localities may continue to pursue climate policies in addition to federal mandates.
+Added: Under the current Presidential Administration, several laws, regulations, executive orders, and policies relating to environmental compliance, tax, and other matters have changed from those of the previous Presidential Administration, with further changes proposed.
+Added: These changes, in some cases, have required, and may in the future require, IDACORP and Idaho Power and some of their customers to modify their business strategy, activities, and projects.
Failure to comply with environmental laws and regulations, even if such non-compliance is caused by factors outside of Idaho Power's control, may result in the assessment of civil or criminal penalties or fines, or government enforcement actions.
Idaho Power could also become subject to climate change lawsuits and an adverse outcome could require substantial expenditures and could possibly require payment of damages.
−Removed: IDACORP and Idaho Power expect federal, state, and local governmental authorities to implement various recent and future executive orders from the new Presidential Administration and are unable to predict whether and to what extent such actions will meaningfully change existing legislative and regulatory environments relevant to the companies, or if any such changes would have a net positive or negative impact on the companies.
−Removed: Idaho Power is unable to estimate the costs of complying with such legislative or regulatory changes due to the uncertainties associated with the nature and implementation of the changes, and may not be able to recover the associated costs.
−Removed: To the extent that such changes have a negative impact on the companies or Idaho Power’s customers, including as a result of related uncertainty, these changes may materially and adversely impact IDACORP’s and Idaho Power’s business, financial condition, results of operations, and cash flows.
−Removed: Changes in income tax laws and regulations, or differing interpretation or enforcement of applicable laws by the U.S.
+Added: Idaho Power is unable to estimate the costs of complying with recent legislative and regulatory changes due to the uncertainties associated with the nature and implementation of the changes, and may not be able to recover the associated costs.
+Added: To the extent that such changes have a negative impact on the companies or Idaho Power’s customers, these changes may materially and adversely impact IDACORP’s and Idaho Power’s business, financial condition, results of operations, and cash flows.
+Added: Changes in tax laws and regulations, or differing interpretation or enforcement of applicable laws by the U.S.
Internal Revenue Service or other taxing jurisdictions, could have a material adverse impact on IDACORP’s or Idaho Power’s financial condition and results of operations .
3 unchanged sentences
Disputes over interpretations of tax laws may be settled with the taxing authority in examination, upon appeal, or through litigation.
−Removed: The outcome of potential future income tax
−Removed: proceedings or laws, or the state public utility commissions' treatment of those outcomes, could differ materially from the amounts IDACORP and Idaho Power record prior to conclusion of those proceedings, and the difference could negatively affect IDACORP’s and Idaho Power’s earnings and cash flows.
+Added: The outcome of potential future income tax proceedings or laws, or the state public utility commissions' treatment of those outcomes, could differ materially from the amounts IDACORP and Idaho Power record prior to conclusion of those proceedings, and the difference could negatively affect IDACORP’s and Idaho Power’s earnings and cash flows.
Further, in some instances, the treatment from a ratemaking perspective of any net income tax expense (including from increased tax rates) or benefit could be different than IDACORP or Idaho Power anticipate or request from applicable state regulatory commissions, which could have a negative effect on their financial condition and results of operations.
−Removed: The unavailability of expected tax credits or other tax benefits, whether due to a change in law, interpretation, or otherwise, could also have an adverse impact on the economic viability of certain of its planned or existing facilities.
+Added: The unavailability of expected tax credits or other tax benefits, whether due to a change in law, interpretation, or otherwise, could also have an adverse impact on the economic viability of certain of Idaho Power's planned or existing facilities.
In addition, Idaho Power uses the regulatory flow-through income tax accounting method as described in Note 1 - "Summary of Significant Accounting Policies" to the consolidated financial statements included in this report, and potential changes in income tax laws or interpretations may impact IDACORP's and Idaho Power's income taxes and reporting obligations differently than most other companies.
+Added: Changes in U.S.
+Added: trade policy and the impact of tariffs could have an adverse effect on Idaho Power's business and results of operations.
+Added: government has implemented and may continue to implement significant trade policy and tariff actions, including but not limited to tariffs on imported steel and aluminum products, tariffs on certain imports from China, Canada, and Mexico, and baseline tariffs on imports from many other countries.
+Added: If regulators do not deem prudent the increased costs for Idaho Power's projects or maintenance of its existing facilities resulting from tariffs or other trade policy, Idaho Power may be unable to recover those increased costs through rates in full or at all or on a timely basis.
+Added: Any inability of Idaho Power to recover increased costs could result in impairment or otherwise materially adversely affect IDACORP's and Idaho Power's financial condition and results of operations.
+Added: Further, if as a result of increased costs due to tariffs or other trade policies, other resources become more economical, Idaho Power may terminate uneconomical projects and seek to develop those other
+Added: If any projects are canceled because they are no longer economical, Idaho Power could incur significant cancellation penalties under purchase orders or construction contracts.
IDACORP's and Idaho Power’s businesses are subject to an extensive set of environmental laws, rules, and regulations, which could impact their operations and costs of operations, potentially rendering some generating units uneconomical to maintain or operate, and could increase the costs and alter the timing of major projects.
11 unchanged sentences
Furthermore, Idaho Power may not be able to obtain or maintain all environmental regulatory approvals necessary for operation of its existing infrastructure or construction of new infrastructure.
−Removed: In addition, some environmental regulations are currently subject to litigation or other uncertainty, including due to changes instituted by the new Presidential Administration.
+Added: In addition, some environmental regulations are currently subject to litigation or other uncertainty, including due to changes instituted by the current Presidential Administration.
As a result, approaches to comply with the regulations, including available control technologies or other allowed compliance measures, are unpredictable and Idaho Power cannot foresee the potential impacts these regulations would have on Idaho Power's operations or financial condition.
−Removed: In 2019, Idaho Power announced its long-term goal to serve customers with 100-percent clean energy by 2045, and Idaho Power has short-term and medium-term goals for CO 2 emission reductions, which could impact infrastructure resource decisions and costs.
+Added: Idaho Power has announced long-term, medium-term, and short-term goals for CO 2 emission reductions, which could impact infrastructure resource decisions and costs.
Idaho Power's ability to achieve these targets are subject to a number of risks and uncertainties, including the company's regulatory obligation to serve its customers, the availability and cost of new generation resources, legal and permitting requirements, system operation and energy integration, and grid balancing, among others.
2 unchanged sentences
For further discussion of environmental matters that may affect Idaho Power, see "Environmental Matters" in Item 7 - MD&A in this report.
−Removed: Obligations imposed in connection with hydropower license renewals and permitting may require large capital expenditures, increase operating costs, reduce hydropower generation, and negatively affect IDACORP's or Idaho Power's results of
−Removed: operations and financial condition .
+Added: Obligations imposed in connection with hydropower license renewals and permitting may require large capital expenditures, increase operating costs, reduce hydropower generation, and negatively affect IDACORP's or Idaho Power's results of operations and financial condition .
Since 2003, Idaho Power has been engaged in an effort to renew its federal license for its largest hydropower generation source, the HCC.
3 unchanged sentences
In addition, new agency requirements and new interpretations of existing laws and regulations could be adopted or become applicable to hydropower facilities, which could further increase required expenditures for flood control, marine life recovery and endangered species protection and may reduce the amount of hydropower generation available to meet Idaho Power’s generation requirements.
−Removed: Idaho Power cannot predict the requirements that might be imposed during the relicensing and permitting process, the financial impact of those requirements, whether a new multi-year license will ultimately be issued, and whether the IPUC or OPUC will allow recovery through rates of the substantial costs incurred in connection with the licensing process and subsequent compliance.
+Added: Idaho Power cannot
+Added: predict the requirements that might be imposed during the relicensing and permitting process, the financial impact of those requirements, whether a new multi-year license will ultimately be issued, and whether the IPUC or OPUC will allow recovery through rates of the substantial costs incurred in connection with the licensing process and subsequent compliance.
Imposition of onerous conditions in the relicensing and permitting processes could result in Idaho Power incurring significant capital expenditures, increase operating costs (including power purchase costs), and reduce hydropower generation, which could negatively affect results of operations and financial condition.
23 unchanged sentences
If recovery of these amounts ceases to be probable, if Idaho Power determines that it no longer meets the criteria for applying regulatory accounting or if accounting rules change to no longer provide for regulatory assets and liabilities, Idaho Power could be required to eliminate some or all of those regulatory assets or liabilities.
−Removed: circumstances could result in write-offs and have a material effect on IDACORP's and Idaho Power’s financial condition and results of operations.
+Added: Any of these circumstances could result in write-offs and have a material adverse effect on IDACORP's and Idaho Power’s financial condition and results of operations.
Financial and Investment Risks
Financial and investment risks relate to IDACORP's and Idaho Power's ability to meet financial obligations and mitigate exposure to market risks, including liquidity risks and the ability to raise capital and cost of funding, risks related to credit ratings, credit risk, liquidity, interest rates, and commodity prices.
−Removed: Volatility or disruptions in the financial markets, failure of IDACORP or Idaho Power to satisfy conditions necessary for obtaining loans or issuing debt securities, and denial of regulatory authority to issue debt or equity securities, may negatively affect IDACORP’s and Idaho Power’s ability to access capital and/or increase their cost of borrowing and ability to execute on their strategic plans .
+Added: Volatility or disruptions in the financial markets, failure of IDACORP or Idaho Power to satisfy conditions necessary for obtaining loans or issuing debt securities, and denial of regulatory authority to issue debt or equity securities, may negatively
+Added: affect IDACORP’s and Idaho Power’s ability to access capital and/or increase their cost of borrowing and ability to execute on their strategic plans .
IDACORP and Idaho Power use credit facilities, commercial paper markets, long-term debt, and equity securities as significant sources of liquidity and funding for operating and capital requirements and debt maturities not satisfied by operating cash flow.
+Added: IDACORP has over $600 million of FSAs outstanding from forward sales of its common stock.
+Added: Settlement of those FSAs is subject to the conditions specified in the FSAs, and there is a risk that the counterparties to the FSAs may not perform their obligations under the FSAs.
Credit facilities represent commitments by the participating banks to make loans and issue letters of credit.
15 unchanged sentences
In addition, IDACORP's or Idaho Power's credit ratings may change as a result of change in the methodologies used by the various rating agencies.
−Removed: Downgrades of IDACORP’s or Idaho Power’s credit ratings, or those affecting relationship banks, could limit the companies’ ability to access short- and long-term capital under reasonable terms or at all, reduce the pool of potential lenders, increase borrowing costs under the Credit Facilities, limit access to the commercial paper market, require the companies to pay a higher interest rate on their debt, limit the ability of IDACORP to declare and make dividends, and require the companies to post additional performance assurance collateral with transaction counterparties.
+Added: Downgrades of IDACORP’s or Idaho Power’s credit ratings, or those affecting relationship banks, could limit the companies’ ability to access short- and long-term capital under reasonable terms or at all, increase borrowing costs under the Credit Facilities, require the companies to pay a higher interest rate on their debt, limit the ability of IDACORP to declare and make dividends, and require the companies to post additional performance assurance collateral with transaction counterparties.
If access to capital were to become significantly constrained or costs of capital increased significantly due to lowered credit ratings, prevailing industry conditions, regulatory constraints, the volatility of the capital markets, or other factors, IDACORP's and Idaho Power's ability to pursue improvements or acquisitions (including generating capacity and transmission assets, which may be necessary for future growth), liquidity, financial condition, and results of operations could be adversely affected.
4 unchanged sentences
GHG emissions, including, most significantly CO 2 , could be further restricted in the future in response to additional state and federal regulatory requirements, increased scrutiny, and changing stakeholder expectations with respect to environmental and climate change programs, judicial decisions, and international accords.
−Removed: If new laws, regulations, or enforcement policies were to become effective, they could result in significant additional compliance and remediation costs that could negatively impact Idaho Power's future financial position, results of operations, and cash flows if such costs are not timely recovered through regulated rates.
+Added: If new laws, regulations, or enforcement policies were to
+Added: become effective, they could result in significant additional compliance and remediation costs that could negatively impact Idaho Power's future financial position, results of operations, and cash flows if such costs are not timely recovered through regulated rates.
In addition, the focus on climate change and regulatory and legal requirements may result in Idaho Power facing adverse reputational risks associated with certain of its operations producing GHG emissions.
7 unchanged sentences
In 2025, Idaho Power recorded losses on economic hedges of $37.7 million, compared with $63.3 million of losses in 2024.
−Removed: At times, Idaho Power’s energy risk management policy results in Idaho Power entering into economic hedges in an environment where prices are high, and if prices are lower at the time the economic hedge settles, Idaho Power will record losses on the economic hedges.
−Removed: Depending on the volume of economic hedges and the degree of price volatility, those losses can be substantial, and the power cost adjustment mechanisms generally provide that Idaho Power will incur a portion of those losses.
+Added: At times, Idaho Power’s energy risk management policy results in Idaho Power entering into economic hedges in an environment where prices are high, and if prices are lower at the time the economic hedge settles, Idaho Power will record losses on the economic hedges, which could be substantial.
+Added: The power cost adjustment mechanisms generally provide that Idaho Power will incur a portion of those losses.
Forecasts of future fuel needs and loads and available resources to meet those loads are inherently uncertain and may cause Idaho Power to over- or under-hedge actual resource needs, exposing the company to market risk on the over- or under-hedged position.
8 unchanged sentences
The Western EIM has collateral posting requirements based on established credit criteria, but there is no assurance the collateral will be sufficient to cover obligations that counterparties may owe each other in the Western EIM and any such credit losses could be socialized to all Western EIM participants, including Idaho Power.
−Removed: A significant failure of a participant in the Western EIM to make payments when due on its obligations could have a ripple effect on various Idaho Power counterparties in the power, gas, and derivative markets if those
−Removed: counterparties experience ancillary liquidity issues, and could generally result in a decline in the ability of Idaho Power’s counterparties to perform on their obligations.
+Added: A significant failure of a participant in the Western EIM to make payments when due on its obligations could have a ripple effect on various Idaho Power counterparties in the power, gas, and derivative markets if those counterparties experience ancillary liquidity issues, and could generally result in a decline in the ability of Idaho Power’s counterparties to perform on their obligations.
The performance of pension and postretirement benefit plan investments, increasing health care costs, and other factors impacting plan costs and funding obligations could adversely affect IDACORP's and Idaho Power's financial condition and results of operations - primarily cash flows and liquidity .
Idaho Power provides a noncontributory defined benefit pension plan covering most employees, as well as a defined benefit postretirement benefit plan (consisting of health care and death benefits) that covers eligible retirees.
−Removed: Costs of providing these benefits are based in part on the value of the plans' assets and, therefore, adverse investment performance for these assets or the failure to maintain sustained growth in pension investments over time could increase Idaho Power’s plan costs and funding requirements related to the plans.
−Removed: Idaho Power's self-insured costs of health care benefits for eligible employees and retirees have increased in recent years and Idaho Power believes that future legislative changes related to the provision of health care benefits and other external market conditions and factors, could cause such costs to continue to rise.
+Added: Costs of providing these benefits are based in part on the value of the plans' assets and, therefore, adverse investment performance for these assets or the failure to maintain sustained growth in pension investments over time
+Added: could increase Idaho Power’s plan costs and funding requirements related to the plans.
+Added: Idaho Power's self-insured costs of health care benefits for eligible employees and retirees have increased in recent years and Idaho Power believes that such costs could continue to rise.
As benefit costs continue to rise, there is no assurance that the IPUC and OPUC will continue to allow recovery.
34 unchanged sentences
These broad market fluctuations may adversely affect the market price of IDACORP's common stock.
−Removed: IDACORP's charter and bylaws and Idaho or Oregon law could delay or prevent a change in control that shareholders may favor.
+Added: IDACORP's charter and bylaws and various legal and regulatory factors could delay or prevent a change in control that shareholders may favor.
The terms of some of the provisions in IDACORP's articles of incorporation and bylaws and provisions of Idaho or Oregon law could delay or prevent a change in control that shareholders may favor or may impede the ability of shareholders to change IDACORP's management.
4 unchanged sentences
IDACORP is also subject to the provisions of the Idaho Control Share Acquisition Act and the Idaho Business Combination Act, which provide for certain procedures and restrictions in connection with acquisitions or business combinations.
−Removed: In addition, Oregon law requires shareholders to obtain advance approval from the OPUC before acquiring 5% stock ownership in an Oregon public utility.
+Added: In addition, Oregon law requires shareholders to obtain advance approval from the OPUC before acquiring 5% stock ownership in an Oregon public utility, which law Idaho Power expects to apply to it until such time, if any, as the Oregon Sale is consummated.
Any of the above provisions could delay or prevent a change in control of Idaho Power.
−Removed: Statutory and regulatory factors will limit another party’s ability to acquire IDACORP and could deprive shareholders of the opportunity to gain a takeover premium for their shares of common stock.
−Removed: Even if IDACORP's board of directors favors a sale of the company, a sale would require approval of a number of federal and state regulatory agencies, including the FERC, the IPUC, the OPUC, and the WPSC.
+Added: Even if IDACORP's board of directors were to favor a sale of the company, a sale would require approval of a number of federal and state regulatory agencies, including the FERC, the IPUC, OPUC, and WPSC.
The approval process could be lengthy and the outcome uncertain, which may deter otherwise interested parties from proposing or attempting a business combination.
Compared sentence by sentence after normalising whitespace, quotation marks, case and digits, so re-formatting and restated figures do not read as changed language. Wording changes appear as one removal and one addition. The current filing and the prior one are authoritative.