The first mortgage indentures for the Ohio Companies, Penn, MP, PE and WP constitute direct first liens on substantially all of the respective physical property, subject only to excepted encumbrances, as defined in the first mortgage indentures. See Note 9, "Capitalization," of the Notes to Consolidated Financial Statements for information concerning financing encumbrances affecting certain of the Utilities’ properties.
21
FirstEnergy controls the following generation sources as of December 31, 2021, shown in the table below, and operates in PJM. Except for the OVEC participation referenced in the footnotes to the table, the Regulated Distribution segment generating units are owned by MP.
Plant (Location) Unit Total Corp/Other Regulated Distribution
Net Demonstrated Capacity (MW)
Super-critical Coal-fired:
Harrison (Haywood, WV) 1-3 1,984 — 1,984
Fort Martin (Maidsville, WV) 1-2 1,098 — 1,098
3,082 — 3,082
Sub-critical and Other Coal-fired:
OVEC (Cheshire, OH) (Madison, IN) 1-11 78 (1) 67 11
Pumped-storage Hydro:
Bath County (Warm Springs, VA) 1-6 487 (2) — 487
Total 3,647 67 3,580
(1) Represents AE Supply's 3.01% and MP's 0.49% entitlement based on their participation in OVEC.
(2) Represents AGC's 16.25% undivided interest in Bath County. The station is operated by VEPCO.
As of December 31, 2021, FirstEnergy’s distribution and transmission circuit miles are located in PJM and were as follows:
Distribution
Line Miles (1)
Transmission
Line Miles
ATSI — 7,916
CEI 33,066 —
JCP&L 23,950 2,601
MAIT — 4,267
ME 19,072 —
MP 22,707 2,619
OE 68,002 —
PE 20,696 2,087
Penn 13,673 —
PN 27,766 —
TE 19,189 —
TrAIL — 262
WP 25,174 4,322
Total 273,295 24,074
(1) Includes overhead pole line and underground conduit carrying primary, secondary and street lighting circuits
ITEM 3. LEGAL PROCEEDINGS
Reference is made to Note 12, "Regulatory Matters," and Note 13, "Commitments, Guarantees and Contingencies," of the Notes to Consolidated Financial Statements for a description of certain legal proceedings involving FirstEnergy.
ITEM 4. MINE SAFETY DISCLOSURES