Item 2. Properties
Item 2. Properties
MINING OPERATIONS
The following description of the Company’s mining operations is qualified in its entirety by reference to the Technical Report Summary for each of the operations included as exhibits to this Report and incorporated by reference into this Item 2. Operating statistics for mining operations are presented in the section entitled “Operating Statistics” below.
Mexico — Palmarejo
The Palmarejo complex, operated by our wholly-owned subsidiary, Coeur Mexicana, S.A. de C.V. (“Coeur Mexicana”), consists of: (1) the Palmarejo processing facility; (2) the Guadalupe underground mine; (3) the Independencia underground mine; (4) the La Nación underground mine; and (5) other nearby deposits and exploration targets. The Palmarejo complex is located approximately 260 miles southwest of Chihuahua, in the state of Chihuahua in Northern Mexico. The coordinates for the centroid of the project are 108° 21.8203’ W longitude and 27° 21.5547’ N latitude (760,781 mE, 3,028,984 mN). Specifically, the Guadalupe mine is located at 108º 21.899’ W longitude and 27º 20.996’ N latitude (760,672 mE, 3,027,949 mN); Independencia is located at 108º 21.752’ W longitude and 27 º 22.078’ N latitude (760,873 mE, 3,029,953 m N); and La Nación is located at 108º 21.809’ W longitude and 27º 21.591’ N latitude (760,797 mE, 3,029,051 mN). All coordinates are in the Universal Transverse Mercator (WSG 84), Zone 12. Access to the property is provided by air, rail, and all-weather paved and gravel roads from the state capitol of Chihuahua.
Stage: Production
Location: State of Chihuahua, Northern Mexico
Mine Type: Underground
Metals/Mineralization: Silver and Gold, classified as epithermal deposits and are hosted in multiple veins, breccias, and fractures
Product: Doré
Ownership: 100%
Land Position: 67,279 net acres
Mineral Tenure: 71 wholly-owned mining concessions
25
Key Permit Conditions: Authorizations are in place that regulate typical life of mine functions, including production facilities and utilities, mining operations, tailings and waste rock storage, exploration, surface disturbance, land use, vegetation and change in soil use, air emissions, water use, and reclamation. A permit to operate back-up generators during grid power interruptions was recently administratively revoked; however, we are appealing the revocation and also applying for a new permit. We have been granted the right to continue operating the back-up generators during the course of the appeal. Major authorizations were obtained through the completion of several MIAs (Manifestación de Impacto Ambiental), permits associated with forestry vegetation disturbance of change in soil use (Cambio de Uso de Suelo en Terrenos Forestales), and the required authorizations from the National Water Commission (Comisión Nacional del Agua or CONAGUA) for water use, effluent discharge, and to construct facilities in federal watersheds. Operational standards and best management practices (BMPs) have been established to maintain compliance with applicable regulatory standards and permits.
Other: Coeur Mexicana is obligated to sell 50% of Palmarejo gold production (excluding production from certain properties acquired in 2015) to a subsidiary of Franco-Nevada Corporation (“Franco-Nevada”) under a gold stream agreement for the lesser of $800 or spot price per ounce. Coeur Mexicana is subject to other royalty agreements for which there are no mineral resources or mineral reserves associated with them in the current life-of-mine plan.
USA (Nevada) — Rochester
The Rochester mine and associated heap leach facilities, operated by our wholly-owned subsidiary, Coeur Rochester, Inc. (“Coeur Rochester”), is an open pit silver and gold mine located in Pershing County, Nevada, approximately 13 miles northeast of the city of Lovelock. The mine consists of the main Rochester deposit and the adjacent Nevada Packard deposit, southwest of the Rochester mine. The centroid location for the Rochester site is 400600 E, 4460300 N and the centroid of Rochester pit is located at 4002045 E, 4460050 N and Nevada Packard open pit is located at 400600 E, 4456675 E. All coordinates are in Universal Transverse Mercator (WSG 84), Zone 11T. In November 2018, Coeur Rochester acquired the Lincoln Hill, Gold Ridge and Wilco projects adjacent to Rochester from Alio Gold. The Rochester mine is fully supported with electricity, supplied by a local power company. Ore is mined using conventional open pit methods, with gold and silver recovered by heap leaching of crushed open-pit ore placed on pads located within the Rochester mining area.
Rochester is currently undergoing commissioning and ramp-up of an expansion under POA 11. The expansion project included the construction of a new leach pad, a crushing facility equipped with two high-pressure grinding roll units and a prescreen, a Merrill-Crowe process plant, and related infrastructure to support the extension of Rochester’s mine life. Commissioning and ramp-up are expected to be completed in the first half of 2024.
Stage: Production
Location: Near Lovelock, Nevada (West-Central Nevada, USA)
Mine Type: Open Pit Heap Leach
Metals/Mineralization: Silver and Gold; mineralization is hosted in folded and faulted volcanic rocks of the Rochester Formation and overlying Weaver Formation. Silver and gold, consisting of silver sulfosalt minerals, argentite, silver-bearing tetrahedrite and minor native gold, are contained in zones of multiple quartz veins and veinlets (vein, vein swarms and stockworks) with variable amounts of pyrite
Product: Doré
Ownership: 100%
Land Position & Mineral Tenure Coeur Rochester lands, including the Lincoln Hill and related assets, consist of approximately 43,441 net acres
• 1,465 owned and 347 leased Federal unpatented lode claims and 6 owned federal unpatented placer claims, appropriating approximately 29,942 net acres of public land;
• 23 patented lode claims, consisting of approximately 392 acres;
• Interests owned in approximately 6,929 gross acres of additional real property; and
• Certain rights in and to approximately 6,182 acres, held either through lease, letter agreement or license.
26
Key Permit Conditions: The Rochester Mine has in place and operates subject to all necessary environmental permits and licenses from the appropriate local, state, and federal agencies for typical life of mine functions involving exploration, the open pit mines, heap leach pads, processing infrastructure, and all necessary support facilities. Operational standards and best management practices have been established to maintain compliance with applicable regulatory standards and permits. Major permits or approvals are in place from the U.S. Department of Interior Bureau of Land Management, Nevada Division of Water Resources, the Nevada Division of Environmental Protection, as well through other federal, state, and local entities. The environmental effects of the operation were comprehensively evaluated through the National Environmental Policy Act (“NEPA”) through Environmental Impact Statements. Monitoring programs are in place, and there is an approved reclamation and closure plan that reflects current mining, mitigation, and site facilities.
Other: • A security interest in the Rochester mine has been granted in favor of the lenders under the RCF (as defined below)
• Coeur Rochester is obligated to pay a net smelters return of up to 5% to ASARCO, the prior owner, when the average quarterly market price of silver equals or exceeds $29.79 per ounce indexed for inflation, with the condition that the Rochester mine achieves positive cash flow for the applicable year. If cash flow is negative in any calendar year, the maximum royalty payable is $250,000.
• Coeur Rochester is party to other royalty agreements for which there are no mineral resources or mineral reserves associated with them in the current life-of-mine plan.
USA (Alaska) — Kensington
The Kensington underground gold mine and associated milling facilities, operated by our wholly-owned subsidiary, Coeur Alaska, Inc. (“Coeur Alaska”), are located on the east side of the Lynn Canal about 45 miles north-northwest of Juneau, Alaska. The mine consists of the (i) Kensington Main deposit, (ii) Elmira, and (iii) other nearby deposits and exploration targets. The mine is accessed by a horizontal tunnel and utilizes conventional and mechanized underground mining methods. Coordinates for the project centroid are 0494796 E, 652068 N and the Kensington Portal is located at 0494796 E, 6530584 N. All coordinates are in Universal Transverse Mercator (NAD 1983), Zone 8V.
Kensington is currently undertaking a planned expansion under POA 1, which would increase tailings and waste rock storage capacity to support an expected longer mine life, reflecting positive exploration results, improved metal prices and ongoing operational efficiencies.
Stage: Production
Location: Juneau, Alaska (Southeast Alaska, USA)
Mine Type: Underground
Metals/Mineralization: Gold; gold-bearing mesothermal, quartz, carbonate and pyrite vein swarms and discrete quartz-pyrite veins hosted in Cretaceous-aged Jualin diorite. Most of the gold is contained in calaverite (AuTe2) that occurs in association with native gold as inclusions in and interstitial to pyrite grains and in microfractures in pyrite.
Product: Gold Concentrate
Ownership: 100%
27
Land Position & Mineral Tenure • The Kensington Group, totaling approximately 3,972 net acres, consists of 51 patented lode and patented mill site claims comprising approximately 766 net acres, 298 Federal unpatented lode claims covering approximately 3,222 net acres, and 13 State of Alaska mining claims covering approximately 95 net acres.
• The Jualin Group, totaling approximately 8,366 net acres, is comprised of 23 patented lode and patented mill site claims covering approximately 388 net acres, 444 Federal unpatented lode claims and 75 Federal unpatented mill site claims appropriating approximately 7,814 net acres, a State of Alaska upland mining lease comprising approximately 682 acres, one State of Alaska mining claim comprising approximately three acres and four State-selected mining claims covering approximately 60 acres.
• 14 of the 23 patented lode claims cover private surface estate only. The mineral estate to these 14 patented lode claims is owned by the State of Alaska, the mineral rights to which are secured by a State of Alaska upland mining lease.
• The Company controls properties comprising the Jualin Group, under a lease agreement with Hyak Mining Company, which is valid until August 5, 2035 and thereafter, provided mining and production are actively occurring within and from the leased premises.
Key Permit Conditions: The Kensington Mine has in place and operates subject to all necessary environmental permits and licenses from the appropriate local, state, and federal agencies for typical life of mine functions involving mine operations and production/processing facilities and infrastructure, tailings and waste rock storage, exploration, surface disturbance, air emissions, water use, marine transport, and reclamation. Operational standards and best management practices have been established to maintain compliance with applicable regulatory standards and permits. Major permits or approvals are in place from the U.S. Department of Agriculture National Forest Service, U.S. Army Corps of Engineers, U.S. Fish and Wildlife Service, National Oceanic and Atmospheric Administration, State of Alaska, as well through other federal, state, and local entities. The environmental effects of the operation were comprehensively evaluated through the National Environmental Policy Act (NEPA) through Environmental Impact Statements. Monitoring programs are in place, and there is an approved reclamation and closure plan that reflects current mining, mitigation, and site facilities.
Other: • A security interest in the Kensington mine has been granted in favor of the lenders under the RCF.
• Coeur Alaska is obligated to pay the royalty holder a scaled net smelter return royalty on 1 million troy ounces of gold production from certain deposits, after Coeur Alaska recoups the $32.5 million purchase price, plus construction and development expenditures and certain operating, exploration, and development costs. The royalty ranges from a rate of 1% at $400/oz gold prices to a maximum of 2.5% rate at gold prices above $475/oz.
• Coeur Alaska is obligated to pay Hyak Mining Company (“Hyak”) annually, during the initial term of the mining lease, an advance minimum royalty of $231,000, which amount is adjusted every three years in accordance with changes in the Consumer Price Index as published by the U.S. Department of Commerce for all Urban Consumers, City of Anchorage, Alaska. If production occurs from the leased Hyak premises, a 5% net returns royalty on production as defined by the lease, is due, unless the amount of the net returns royalty is less than the adjusted advance minimum royalty.
USA (South Dakota) — Wharf
The Wharf mine, operated by our wholly-owned subsidiaries, Wharf Resources (U.S.A.) Inc. (“Wharf”) and Golden Reward Mining Limited Partnership (“Golden Reward”), is located in the northern Black Hills of western South Dakota, approximately four miles southwest of the city of Lead, South Dakota. Coordinates for the project centroid are 44°20’03”N Latitude, 103°50’06”W Longitude and the Wharf Mine coordinates are 44°20’39”N Latitude, 103°51’02”W Longitude. All coordinates are in Universal Transverse Mercator (WSG 84). Access is established by paved road with power supplied by a local power company.
Stage: Production
Location: Lead, South Dakota, USA
Mine Type: Open Pit Heap Leach
Metals/Mineralization: Gold and Silver by-product; a structurally controlled disseminated gold deposit
Product: Electrolytic Cathodic Sludge
28
Ownership: 100%
Land Position & Mineral Tenure • The Wharf Group is comprised of 362 patented lode claims, 35 government lots, 123 subdivided lots, and 59 federal unpatented lode claims. These interests cover approximately 3,585 net surface acres, 652 net mineral acres where both the Precambrian and younger formations are owned or controlled, 3,243 net mineral acres of non-Precambrian mineral estate, 1,603 net mineral acres of Precambrian mineral estate and 287 net acres of federal unpatented lode claims.
• The Golden Reward Group encompasses 218 patented lode claims, 14 government lots, 19 subdivided lots and 34 federal unpatented lode claims. The Golden Reward Group is comprised of approximately 1,564 net acres of surface estate, 2,988 net mineral acres of mineral estate where both the Precambrian and younger formations are owned or controlled, 357 net mineral acres of Non-Precambrian mineral estate, 153 net mineral acres of Precambrian mineral estate and 25 net acres of federal unpatented lode claims.
Key Permit Conditions: The Wharf Mine has in place and operates subject to all necessary environmental permits and licenses from the appropriate local, state, and federal agencies for typical life of mine functions involving exploration, the open pit mines, heap leach pads, processing infrastructure, and all necessary support facilities. Operational standards and best management practices have been established to maintain compliance with applicable state and federal regulatory standards and permits. Major permits or approvals are in place from the South Dakota Department of Agriculture and Natural Resources, Lawrence County, as well through other federal, state, and local entities. Monitoring programs are in place, and there is an approved reclamation and closure plan that reflects current mining, mitigation, and site facilities.
Other: • A security interest in the Wharf mine has been granted in favor of the lenders under the RCF.
• Wharf is obligated to pay a royalty related to a mineral lease on 34 patented lode claims. During the term of the mineral lease, the lessors were also entitled to a royalty on production, if any, of 3% of the net smelter returns of all silver and gold ores, together with other ores and minerals. In addition, there is an advance minimum royalty due the lessors of $5,000 per year unless and until Wharf Resources identifies and publishes a reserve encompassing the leased premises, at which point the advance minimum royalty increases to $25,000 per year.
• Wharf is obligated to pay a sliding scale production royalty of 0%-2% on the gross value of all gold in saleable form to Royal Gold, Inc. This royalty encumbers most of the lands comprising the Wharf, together with a small portion of the lands encompassing the Golden Reward, and wholly excludes the Precambrian Mineral Estate. Wharf is obligated to pay a 3% non-participating royalty on gold that is produced from ores mined and delivered to heap leach pads or recovered from tailings. This royalty encumbers the mineral estate, including the Precambrian Mineral Estate, of much of the lands held by Wharf.
• Wharf is party to other royalty agreements for which there are no mineral resources or mineral reserves associated with them in the current life-of-mine plan
EXPLORATION PROJECTS
Canada (British Columbia) — Silvertip
The Silvertip silver-zinc-lead exploration property owned by our wholly-owned subsidiary, Coeur Silvertip Ltd. (“Coeur Silvertip”), is an underground project located in northern British Columbia, Canada just south of the Yukon border. The project centroid coordinates in UTM (NAD 27) are 6,643,900 N and 425,200 E. The project is accessible via a 25-kilometer mine access road off the Alaska Highway.
Stage: Exploration
Location: Northern British Columbia, Canada (10 miles south of the Yukon Territory Border)
Mine Type: Underground
Metals/Mineralization: Silver, Zinc and Lead; carbonate-hosted massive sulfide deposit
Product: Concentrate
Ownership: 100%
29
Land Position & Mineral Tenure: • Sixty-six (66) contiguous mineral claims containing approximately 39,375 hectares (97,298 acres) and two mining leases containing approximately 1,528 hectares (3,777 acres). In total, the Silvertip mine covers an area of approximately 40,904 hectares (101,076 acres)
Other: • Suspended operating activities in February 2020; ongoing exploration and technical work to evaluate and support a potential expansion and restart
• Silvertip is obligated to pay a 2.5% net smelter return royalty payable to the royalty holder on all mineral products produced from the Silvertip property, payable quarterly.
• Silvertip is party to an agreement with the Kaska Nation which, among other things, provides for annual payments to the Kaska Nation calculated based on the financial performance of the Silvertip property and the average price of silver for the relevant calendar year.
OTHER PROPERTIES
The Company has leased or owned real property for office space.
OPERATING STATISTICS
Palmarejo Rochester
2023 2022 2021 2023 2022 2021
Gold produced (oz.) 100,605 106,782 109,202 38,775 34,735 27,051
Silver produced (oz.) 6,591,590 6,708,689 6,820,589 3,391,530 3,061,924 3,158,017
Kensington Wharf
2023 2022 2021 2023 2022 2021
Gold produced (oz.) 84,789 109,061 121,140 93,502 79,768 91,136
MINERAL RESERVES AND MINERAL RESOURCES
Internal Controls
The Company’s internal controls are designed to provide reasonable assurance that information and processes utilized in assessing its exploration results as well as mineral resource and reserve estimation are reasonable and in line with industry best practices. These internal controls include quality assurance and quality control (“QA/QC”) programs in the collection, analysis, verification, storage, reporting and use of drillhole, assay, metallurgical and other technical and scientific information, including the following:
• Third-party fully certified labs are used for assays used in public disclosure or resource models;
• Drill programs include insertion of blank, duplicate, and certified reference materials;
• QA/QC program with sufficient results for the analytical programs;
• All core and reverse-circulation samples have been cataloged and stored in secure and designated areas on company property;
• Data is subject to validation, which includes checks on downhole surveys, collar coordinates, geological data, and assay data;
• Prior to use in mineral resource or mineral reserve estimation, the selected data to support estimation are downloaded from the database into a project file and reviewed for improbable entries and high values;
• Written procedures and guidelines are used to support estimation methods and approaches;
• Completion of annual technical statements on each mineral resource and mineral reserve estimate by qualified persons. These technical statements include evaluation of modifying and technical factors, incorporate available reconciliation data, and are based on a cashflow analysis; and
• Internal reviews of block models, mineral resources and mineral reserves using a “layered responsibility” approach with Qualified Person involvement at the site and corporate levels.
30
Internal controls are discussed where required in the relevant chapters of the technical report summary. The following sub-sections summarize the types of procedures, protocols, guidance and controls that Coeur has in place for its exploration and mineral resource and reserve estimation efforts, and the type of risk assessments that are undertaken.
Exploration and Drilling
Coeur has the following internal controls protocols in place for exploration data:
• Written procedures and guidelines to support preferred sampling methods and approaches, with periodic compliance reviews of adherence to such written procedures and guidelines;
• Maintenance of a complete chain-of-custody, ensuring the traceability and integrity of the samples at all handling stages from collection, transportation, sample preparation and analysis to long-term sample storage;
• Geological logs are checked and verified, and there is a physical sign-off to attest to the validation protocol required;
• Quality control checks on collar and downhole survey data for errors or significant deviations;
• Third-party fully certified labs are used for assays used in public disclosure or resource models;
• Appropriate types of quality control samples are inserted into the sample stream at appropriate frequencies to assess analytical data quality;
• Regular inspection of analytical and sample preparation facilities by appropriately experienced Coeur personnel;
• QA/QC data are regularly verified to ensure that outliers, sample mix-ups, contamination, or laboratory biases during the sample preparation and analysis steps are correctly identified, mitigated or remediated. Changes to database entries are required to be documented; and
• Database upload and verification procedures to ensure the accuracy and integrity of the data being entered into the project database(s). These are typically performed using software data-checking routines. Changes to database entries are required to be documented. Data are subject to regular backups.
Mineral Resource and Mineral Reserve Estimates
Coeur has the following internal controls protocols in place for mineral resource and mineral reserve estimation:
• Prior to use in mineral resource or mineral reserve estimation, the selected data to support estimation are downloaded from the database into a project file and reviewed for improbable entries and high values;
• Written procedures and guidelines are used to support estimation methods and approaches;
• Completion of annual technical statements on each mineral resource and mineral reserve estimate by qualified persons. These technical statements include evaluation of modifying and technical factors, incorporate available reconciliation data, and are based on a cashflow analysis; and
• Internal reviews of block models, mineral resources and mineral reserves using a “layered responsibility” approach with qualified person involvement at the site and corporate levels.
Development of our mineral resource and mineral reserve estimates use tools and processes such as mine design, scheduling and geostatistical tools that conform to industry best practices and are regularly reviewed and reconciled by internal and external parties. There are internal and external audit processes for mineral resource and mineral reserve estimation.
Mineral resources and mineral reserves are estimates that contain inherent risk and depend upon geologic interpretation and statistical inferences drawn from drilling and sampling analysis, which may prove to be unreliable. See Risk Factors in Item 1A for additional information.
31
MINERAL RESERVES
Summary Gold Mineral Reserves at End of the Fiscal Year Ended December 31, 2023 (1)(2)(3)(8)
Proven Mineral Reserves Probable Mineral Reserves Total Mineral Reserves
Coeur
Ownership Tons (000s) Grade (oz./ton) Ounces
(000s) Tons (000s) Grade (oz./ton) Ounces
(000s) Tons (000s) Grade (oz./ton) Ounces
(000s)
Mexico
Palmarejo (4)
100% 4,203 0.060 252 8,580 0.060 517 12,783 0.060 769
United States
Rochester (5)
100% 465,919 0.002 1,135 44,524 0.002 104 510,443 0.002 1,239
Kensington (6)
100% 1,009 0.186 188 1,109 0.201 223 2,118 0.194 411
Wharf (7)
100% 5,931 0.032 188 21,318 0.027 575 27,249 0.028 763
Total Gold 477,062 0.004 1,763 75,531 0.019 1,419 552,593 0.006 3,182
Summary Silver Mineral Reserves at End of the Fiscal Year Ended December 31, 2023 (1)(2)(3)(8)
Proven Mineral Reserves Probable Mineral Reserves Total Mineral Reserves
Coeur
Ownership Tons (000s) Grade (oz./ton) Ounces
(000s) Tons (000s) Grade (oz./ton) Ounces
(000s) Tons (000s) Grade (oz./ton) Ounces
(000s)
Mexico
Palmarejo (4)
100% 4,203 4.21 17,698 8,580 3.88 33,283 12,783 3.99 50,981
United States
Rochester (5)
100% 465,919 0.38 177,472 44,524 0.35 15,413 510,443 0.38 192,885
Total Silver 470,122 0.42 195,170 53,104 0.92 48,696 523,226 0.47 243,866
(1) Certain definitions:
The term “reserve” means that part of a mineral deposit that can be economically and legally extracted or produced at the time of the reserve determination. The term “proven (measured) reserves” means reserves for which (a) quantity is computed from dimensions revealed in outcrops, trenches, workings or drill holes, grade and/or quality are computed from the results of detailed sampling; and (b) the sites for inspection, sampling and measurements are spaced so closely and the geologic character is sufficiently defined that size, shape, depth and mineral content of reserves are well established. The term “probable (indicated) reserves” means reserves for which quantity and grade and/or quality are computed from information similar to that used for proven (measured) reserves, but the sites for inspection, sampling and measurement are farther apart or are otherwise less adequately spaced. The degree of assurance, although lower than that for proven (measured) reserves, is high enough to assume continuity between points of observation. The term “cutoff grade” means the lowest grade of mineralized material considered economic to process. Cutoff grades vary between deposits depending upon prevailing economic conditions, mineability of the deposit, by-products, amenability of the mineralized material to silver or gold extraction and type of milling or leaching facilities available.
(2) Assumed metal prices for 2023 Mineral Reserves were $21.00 per ounce of silver, $1,600 per ounce of gold, $1.15 per pound of zinc, $0.95 per pound of lead, except for Kensington at $1,850 per ounce of gold.
(3) The Mineral Reserve estimates are current as of December 31, 2023, are reported using the definitions in Item 1300 of Regulation S-K and were prepared by the Company’s technical staff.
(4) Mineral Reserve estimates use the following key input parameters: assumption of conventional longhole underground mining; reported above a variable gold equivalent cut-off grade that ranges from 2.11–2.97 g/t AuEq and an incremental development cut-off grade ranging from 1.16–1.55 g/t AuEq; metallurgical recovery assumption of 92.0% for gold and 83.0% for silver; mining dilution assumes 0.4–1.1 meter of hanging/foot wall waste dilution; mining loss of 15% was applied; variable mining costs that range from US$44.72–US$85.71/tonne, surface haulage costs of US$4.92/tonne, process costs of US$32.70/tonne, general and administrative costs of US$14.06/tonne, and surface/auxiliary support costs of US$3.18/tonne. Excludes the impact of the Franco-Nevada gold stream agreement at Palmarejo in calculation of Mineral Reserves. No assurances can be given that all mineral reserves will be mined, as mineralized material that may qualify as reserves under applicable standards by virtue of having positive economics may not generate attractive enough returns to be included in our mine plans, due to factors such as the impact of the gold stream at Palmarejo. As a result, we may elect not to mine portions of the mineralized material reported as reserves.
(5) Mineral Reserve estimates are tabulated within a confining pit design and use the following input parameters: Rochester oxide variable recovery Au = 77.7–85.9% and Ag = 59.4-61.0%; Rochester sulfide variable recovery Au = 15.2–77.7% and Ag = 0.0–59.4%; with a net smelter return cutoff of $3.01/st oxide and US$3.11/st sulfide; Nevada Packard oxide recovery Au = 92.0% and Ag = 61.0%; with a net smelter return cutoff of $5.51/st for oxide, where the NSR is calculated as resource net smelter return (NSR) = silver grade (oz/ton) * silver recovery (%) * (silver price ($/oz) - refining cost ($/oz)) + gold grade (oz/ton) * gold recovery (%) * (gold price ($/oz) - refining cost ($/oz)); variable pit slope angles that approximately average 48º over the life-of-mine.
(6) Mineral Reserve estimates use the following key input parameters: assumption of conventional underground mining; gold price of $1,850/oz; reported above a gold cut-off grade of 0.135 oz/st Au; metallurgical recovery assumption of 93.5%; gold payability of 97.5%; mining dilution of 20%; mining loss of 12% was applied; mining costs of US$103.67/ton mined; process costs of US$55.06/ton processed; general and administrative costs of US$55.37/ton processed; Sustaining capital US$4.50/ton processed; and concentrate refining and shipping costs of US$108.67/oz sold.
(7) Mineral Reserve estimates use the following key input parameters: assumption of conventional open pit mining; reported above a gold cut-off grade of 0.010 oz/ton Au; average metallurgical recovery assumption of 79.0%; royalty burden of US$64/oz Au; pit slope angles that vary from 34–50º; mining costs of US$2.44/ton mined, process costs of US$11.71/ton processed (includes general and administrative costs).
(8) Rounding of short tons, grades, and troy ounces, as required by reporting guidelines, may result in apparent differences between tons, grades, and contained metal contents.
32
MINERAL RESOURCES
Summary Gold Mineral Resources at End of the Fiscal Year Ended December 31, 2023 (1)(2)(3)(11)
Measured Mineral Resources Indicated Mineral Resources Measured + Indicated Mineral Resources Inferred Mineral Resources
Coeur
Ownership Tons (000s) Grade (oz./ton) Ounces
(000s) Tons (000s) Grade (oz./ton) Ounces
(000s) Tons (000s) Grade (oz./ton) Ounces
(000s) Tons (000s) Grade (oz./ton) Ounces
(000s)
Mexico
Palmarejo Mine, Mexico (4)
100% 5,674 0.070 396 15,500 0.060 926 21,174 0.062 1,322 4,207 0.091 381
United States
Rochester Mine, USA (7)
100% 110,460 0.002 200 27,170 0.002 47 137,630 0.002 247 135,104 0.002 267
Kensington Mine, USA (5)
100% 1,653 0.289 477 1,278 0.268 342 2,931 0.279 819 1,567 0.248 388
Wharf Mine, USA (6)
100% 1,666 0.024 40 22,150 0.021 458 23,816 0.021 498 7,125 0.021 149
Lincoln Hill Project, USA (9)
100% 4,642 0.012 58 27,668 0.011 306 32,310 0.011 364 22,952 0.011 255
Wilco Project, USA (10)
100% — — — — — — — — — 25,736 0.021 531
Total Gold 124,095 0.009 1,171 93,766 0.022 2,079 217,861 0.015 3,250 196,691 0.010 1,971
Summary Silver Mineral Resources at End of the Fiscal Year Ended December 31, 2023 (1)(2)(3)(11)
Measured Mineral Resources Indicated Mineral Resources Measured + Indicated Mineral Resources Inferred Mineral Resources
Coeur
Ownership Tons (000s) Grade (oz./ton) Ounces
(000s) Tons (000s) Grade (oz./ton) Ounces
(000s) Tons (000s) Grade (oz./ton) Ounces
(000s) Tons (000s) Grade (oz./ton) Ounces
(000s)
Mexico
Palmarejo Mine, Mexico (4)
100% 5,674 4.56 25,875 15,500 3.85 59,701 21,174 4.04 85,576 4,207 4.50 18,933
United States
Rochester Mine, USA (7)
100% 110,460 0.29 31,587 27,170 0.41 11,237 137,630 0.31 42,824 135,104 0.34 45,959
Lincoln Hill Project, USA (9)
100% 4,642 0.34 1,592 27,668 0.31 8,655 32,310 0.32 10,247 22,952 0.36 8,163
Wilco Project, USA (10)
100% — — — — — — — — — 25,736 0.13 3,346
Canada
Silvertip Mine, Canada (8)
100% 734 10.56 7,749 6,418 7.78 49,919 7,152 8.06 57,668 2,345 6.86 16,084
Total Silver 121,510 0.55 66,803 76,756 1.69 129,512 198,266 0.99 196,315 190,344 0.49 92,485
Summary Zinc Mineral Resources at End of the Fiscal Year Ended December 31, 2023 (1)(2)(3)(11)
Measured Mineral Resources Indicated Mineral Resources Measured + Indicated Mineral Resources Inferred Mineral Resources
Coeur
Ownership Tons (000s) Grade (%) Pounds
(000s) Tons (000s) Grade (%) Pounds
(000s) Tons (000s) Grade (%) Pounds
(000s) Tons (000s) Grade (%) Pounds
(000s)
Canada
Silvertip Mine, Canada (8)
100% 734 9.9 % 145,703 6,418 10.7 % 1,371,074 7,152 10.6 % 1,516,777 2,345 10.3 % 481,791
Summary Lead Mineral Resources at End of the Fiscal Year Ended December 31, 2023 (1)(2)(3)(11)
Measured Mineral Resources Indicated Mineral Resources Measured + Indicated Mineral Resources Inferred Mineral Resources
Coeur
Ownership Tons (000s) Grade (%) Pounds
(000s) Tons (000s) Grade (%) Pounds
(000s) Tons (000s) Grade (%) Pounds
(000s) Tons (000s) Grade (%) Pounds
(000s)
Canada
Silvertip Mine, Canada (8)
100% 734 7.9 % 115,648 6,418 5.1 % 653,008 7,152 5.4 % 768,656 25,736 4.3 % 199,815
33
(1) Certain definitions:
The term “resource” means that it is a concentration or occurrence of material of economic interest in or on the Earth’s crust in such form, grade or quantity that there are reasonable prospects for economic extraction. Inferred, Indicated, and Measured resources are in order of increasing confidence based on level of underlying geological evidence. The term ‘inferred resource’ is that part of a mineral resource for which quantity and grade or quality are estimated on the basis of limited geological evidence and sampling. The term “limited geological evidence” means evidence that is only sufficient to establish that geological and grade or quality continuity is more likely than not. The level of geological uncertainty associated an inferred mineral resource is too high to apply relevant technical and economic factors likely to influence the prospects of economic extraction in a manner useful for evaluation of economic viability and must have a reasonable expectation that the majority of inferred mineral resources could be upgraded to indicated or measured mineral resources with continued exploration. In addition, no assurances can be given that any mineral resource estimate will ultimately be reclassified as proven or probable mineral reserves or that inferred resources will be upgraded to measured or indicated resources.
(2) Mineral Resource estimates are reported exclusive of mineral reserves, are current as of December 31, 2023, are reported using definitions in Item 1300 of Regulation S-K and were prepared by the Company’s technical staff.
(3) Assumed metal prices for 2023 estimated Mineral Resources were $25.00 per ounce of silver, $1,800 per ounce of gold, $1.30 per pound of zinc, $1.00 per pound of lead, unless otherwise noted.
(4) Mineral Resource estimates use the following key input parameters: Assumption of conventional longhole underground mining; reported above a variable gold equivalent cut-off grade that ranges from 1.87–2.64 g/t AuEq; metallurgical recovery assumption of 92.0% for gold and 83.0% for silver; variable mining costs that range from US$44.72–US$85.71/tonne, surface haulage costs of US$4.92/tonne, process costs of US$32.70/tonne, general and administrative costs of US$14.06/tonne, and surface/auxiliary support costs of US$3.18/tonne. Excludes the impact of the Franco-Nevada gold stream agreement at Palmarejo in calculation of Mineral Resources.
(5) Mineral Resource estimates use the following key input parameters: metal price of $2,000 per ounce gold, assumption of conventional longhole underground mining; reported above a variable gold cut-off grade of 0.124 oz/ton Au; metallurgical recovery assumption of 93.5%; gold payability of 97.5%, mining costs of US$103.67/ton mined; process costs of US$55.06/ton processed; general and administrative costs of US$55.37/ton processed; Sustaining capital US$4.50/ton processed; and concentrate refining and shipping costs of US$108.67/oz sold.
(6) Mineral Resource estimates use the following key input parameters: assumption of conventional open pit mining; reported above a gold cut-off grade of 0.010 oz/ton Au; average metallurgical recovery assumption of 79.0% across all rock types; royalty burden of US$72/oz Au; pit slope angles that vary from 34–50º; mining costs of $2.44/ton mined, process costs of US$11.71/ton processed (includes general and administrative costs).
(7) Mineral Resource estimates are tabulated within a confining pit shell and use the following input parameters: Rochester oxide variable recovery Au = 77.7–85.9% and Ag = 59.4%; Rochester sulfide variable recovery Au = 15.2–77.7% and Ag = 0.0–59.4%; with a net smelter return cutoff of $3.01/st oxide and US$3.11/st sulfide; Nevada Packard oxide recovery Au = 92.0% and Ag = 61.0%; with a net smelter return cutoff of $5.51/st for oxide, where the NSR is calculated as resource net smelter return (NSR) = silver grade (oz/ton) * silver recovery (%) * (silver price ($/oz) - refining cost ($/oz)) + gold grade (oz/ton) * gold recovery (%) * (gold price ($/oz) - refining cost ($/oz)); variable pit slope angles that approximately average 48º over the life-of-mine.
(8) Underground Mineral Resource estimates are reported using a net smelter return (“NSR”) cutoff of US$130/tonne. Mineral Resources are reported insitu using the following assumptions: The estimate use the following key input parameters: lead recovery of 89-90%, zinc recovery of 82-83% and silver recovery of 83-84%. Lead concentrate grade of 53-54%; zinc concentrate grade of 56-57%; mining costs of US$68.77/tonne; processing costs of US$58.20/tonne and US$46.49/tonne, where the NSR ($/tonne) = tonnes x grade x metal prices x metallurgical recoveries – royalties – TCRCs – transport costs over the life of the mine.
(9) Open Pit Mineral Resource estimates are reported in-situ and are contained within a confining pit shell and use the following key input parameters: reported above an oxide gold equivalent cutoff of 0.15 ounces per ton and 0.20 oz ounces per ton assuming a silver to gold ratio of 60:1; gold recoveries of 64%; silver recoveries of 59%; mining costs of US$3.10/ton; process costs of US$3.60/ton; general and administrative costs of $1.50/ton processed; average pit slope angles of 45º over the life-of-mine. The technical and economic parameters are those that were used in the 2018 Resource Estimation. Based on the QPs review of the estimate, there would be no material change to the Mineral Resource if a gold price of US$1,700/oz, a silver price of US$22/oz or economic parameters were updated. Therefore the 2018 Mineral Resource is considered current and is presented unchanged.
(10) Open Pit Mineral Resource estimates are reported using an equivalent gold cutoff of 0.20 ounces per ton assuming a silver to gold ratio of 60:1. Resources are reported in-situ and contained withed a conceptual measured, indicated and inferred optimized pit shell. Silver price of US$20/oz, gold price of US$1,400/oz. Average oxide and sulfide gold recovery is 70%, average carbonaceous gold recovery is 50%. Average oxide and sulfide gold recovery is 60%. Average carbonaceous silver recovery is 50%. Open pit mining cost is US$1.50/ton, processing and processing and G&A cost is US$5.46/ton; average pit slope angles of 50º. The technical and economic parameters are those that were used in the 2018 Resource Estimation. Based on the QPs review of the estimate, there would be no material change to the mineral resources if a gold price of US$1,700/oz, a silver price of US$22/oz or economic parameters were updated. Therefore the 2018 Mineral Resource report is considered current and is presented unchanged.
(11) Rounding of short tons, grades, and troy ounces, as required by reporting guidelines, may result in apparent differences between tons, grades, and contained metal contents.