Item 2. Management’s Discussion and Analysis
Item 2.
Management’s Discussion and Analysis of Financial Condition and Results of Operations
You should read the following discussion of our financial condition and results of operations together with our condensed consolidated financial statements and the related
notes and other financial information included elsewhere in this report and our Annual Report on Form 10-K for the fiscal year ended December 31, 2021, or our Annual Report. The following discussion contains forward‑looking statements that reflect
our plans, estimates, and beliefs. Our actual results could differ materially from those discussed in the forward‑looking statements. Factors that could cause or contribute to these differences include those discussed in Part I, Item 1A. “Risk
Factors” in our Annual Report, as well as those discussed below and elsewhere in this report, particularly in the section titled “Item 1A. Risk Factors” in Part II below.
Overview
We supply advanced, innovative capital equipment developed for the global semiconductor industry. Fabricators of advanced integrated circuits, or chips, can use our wet-cleaning and other
front-end processing tools in numerous steps to improve product yield, even at increasingly advanced process nodes. We have designed these tools for use in fabricating foundry, logic and memory chips, including dynamic random-access memory, or
DRAM, and 3D NAND-flash memory chips. We also develop, manufacture and sell a range of advanced packaging tools to wafer assembly and packaging customers.
Revenue from wet cleaning and other front-end processing tools totaled $79.6 million, or 76.2% of total revenue, for the three months ended June 30, 2022, as compared to $46.0 million, or 85.4%
of total revenue, for the same period in 2021. Revenue from wet cleaning and other front-end processing tools totaled $111.3 million, or 75.9% of total revenue, for the six months ended June 30, 2022, as compared to $77.9 million, or 79.8% of total
revenue, for the same period in 2021. Selling prices for our wet-cleaning and other front-end processing tools range from $1 million to more than $5 million. Our customers for wet-cleaning and other front-end processing tools have included Huali
Microelectronics Corporation, The Huahong Group, Semiconductor Manufacturing International Corporation or SMIC, Shanghai SK Hynix Inc., Yangtze Memory Technologies Co., Ltd, and ChangXin Memory Technologies.
Revenue from advanced packaging, other back-end processing tools, services and spares totaled $24.8 million, or 23.8% of total revenue, for the three months ended June 30, 2022, as compared to
$7.9 million, or 14.6% of total revenue, for the same period in 2021. Revenue from advanced packaging, other back-end processing tools, services and spares totaled $35.3 million, or 24.1% of total revenue, for the six months ended June 30, 2022, as
compared to $19.7 million, or 20.2% of total revenue, for the same period in 2021. Selling prices for these tools range from $0.5 million to more than $4 million. Our customers for advanced packaging, and other processing tools have included
Jiangyin Changdian Advanced Packaging Co. Ltd., a PRC-based wafer bumping packaging house that is a subsidiary of JCET Group Co., Ltd.; Nantong Tongfu Microelectronics Co., Ltd., a PRC-based chip assembly and testing company that is a subsidiary of
Nantong Fujitsu Microelectronics Co., Ltd.; Nepes Co., Ltd., a semiconductor packaging company based in South Korea which acquired the operations of Deca Technologies’ Philippines manufacturing facility in 2020; and Wafer Works Corporation, a
PRC-based wafer supplier.
We estimate, based on third-party reports and on customer and other information, that our current product portfolio addresses approximately $8 billion of the global wafer equipment market. By
product line, we estimate an approximately $3.7 billion market opportunity is addressed by our wafer cleaning equipment, $2.9 billion by our furnace equipment, $730 million by our electro-chemical plating or ECP equipment, and more than $650
million by our stress-free polishing, advanced packaging, wafer processing, and other processing equipment. By major equipment segment, Gartner estimates a 2021 worldwide semiconductor wafer fab equipment, or WFE, market size of $88.1 billion, of
which $4.1 billion is for wafer cleaning equipment (auto wet stations, single-wafer spray processors, batch spray processors, and other clean process equipment), $3.4 billion is for furnace equipment (tube CVD, oxidation/diffusion furnace, and
batch atomic layer deposition), and $764 million is for electro-chemical deposition, or ECD. Based on Gartner’s estimates, total available global market for these equipment segments increased by 30.1% from $6.4 billion in 2020 to $8.3 billion in
2021, and is expected to increase by 8.3% to $8.9 billion in 2022. These segments are part of the worldwide semiconductor WFE market, which based on Gartner’s estimates increased by 35.6% from $64.9 billion in 2020 to $88.1 billion in 2021, and is
expected to increase by 10.7% to $97.5 billion in 2022.
35
Table of Contents
We have focused our selling efforts on establishing a referenceable base of leading foundry, logic and memory chip makers, whose use of our products can influence decisions by other
manufacturers. We believe this customer base has helped us penetrate the mature chip manufacturing markets and build credibility with additional industry leaders. We have used a “demo-to-sales” process to place evaluation equipment, or “first
tools,” with a number of selected customers.
Since 2009 we have delivered more than 290 wet cleaning and other front-end processing tools, more than 230 of which have been accepted by customers and thereby generated revenue to us. The
balance of the delivered tools are awaiting customer acceptance should contractual conditions be met. To date, a substantial majority of our sales of single-wafer wet cleaning equipment for front-end manufacturing have been to customers located in
Asia, and we anticipate that a substantial majority of our revenue from these products will continue to come from customers located in this region for the foreseeable future.
We have begun to add to our efforts to further address customers in North America, Western Europe and Southeast Asia by expanding our direct sales and services teams and increasing our global
marketing activities. Our U.S. operation includes sales, marketing and services personnel to expand and support major new customer initiatives for the products of ACM Shanghai to additional regions beyond mainland China. As of June 30, 2022, we
have delivered one tool for evaluation to a U.S. lab of a global semiconductor capital equipment vendor, and one tool for evaluation to the U.S. facility of a major U.S. semiconductor manufacturer. Both of these evaluations are supported by our
U.S. services team.
We are focused on building a strategic portfolio of intellectual property to support and protect our key innovations. Our tools have been developed using our key proprietary technologies:
●
Space Alternated Phase Shift, or SAPS, technology for flat and patterned (deep via or deep trench with stronger structure) wafer surfaces. SAPS technology employs
alternating phases of megasonic waves to deliver megasonic energy in a highly uniform manner on a microscopic level. We have shown SAPS technology to be more effective than conventional megasonic and jet spray technologies in removing
random defects across an entire wafer, with increasing relative effectiveness at more advanced production nodes.
●
Timely Energized Bubble Oscillation, or TEBO, technology for patterned wafer surfaces at advanced process nodes . TEBO technology has been developed to provide
effective, damage-free cleaning for 2D and 3D patterned wafers with fine feature sizes. We have demonstrated the damage-free cleaning capabilities of TEBO technology on patterned wafers for feature nodes as small as 1xnm (16 to 19
nanometers, or nm), and we have shown TEBO technology can be applied in manufacturing processes for patterned chips with 3D architectures having aspect ratios as high as 60‑to‑1.
●
Tahoe technology for cost and environmental savings. Tahoe technology delivers high cleaning performance using significantly less sulfuric acid and hydrogen peroxide
than is typically consumed by conventional high-temperature single-wafer cleaning tools.
●
ECP technology for advanced metal plating. Our Ultra ECP ap, or Advanced Packaging, technology was developed for back-end assembly processes to deliver a more uniform
metal layer at the notch area of wafers prior to packaging. Our Ultra ECP map, or Multi-Anode Partial Plating, technology was developed for front-end wafer fabrication processes to deliver advanced electrochemical copper plating for copper
interconnect applications. Ultra ECP map offers improved gap-filling performance for ultra-thin seed layer applications, which is critical for advanced nodes at 28nm, 14nm and beyond.
In 2020 we introduced and delivered a range of new tools intended to broaden our revenue opportunity with global semiconductor manufacturers. Product extensions include the Ultra SFP ap tool for
advanced packaging solutions, the Ultra C VI 18-chamber single wafer cleaning tool for advanced memory devices, and the Ultra ECP 3d platform for through-silicon-via, or tsv, application. New product lines include the Ultra fn Furnace, our first
dry processing tool, and a suite of semi-critical cleaning systems which include single wafer back side cleaning, scrubber, and auto bench cleaning tools.
36
Table of Contents
We have been issued more than 411 patents in the United States, the People’s Republic of China or PRC, Japan, Singapore, South Korea and Taiwan.
We conduct a substantial majority of our product development, manufacturing, support and services in the PRC, with additional product development and subsystem production in South Korea. Substantially all of our
integrated tools are built to order at our manufacturing facilities in the Pudong region of Shanghai, which now encompass a total of 236,000 square feet of floor space for production capacity, with 100,000 square feet having been added in 2021
with the lease of a second building in the Pudong region of Shanghai. In May 2020 ACM Shanghai, through its wholly-owned subsidiary Shengwei Research (Shanghai), Inc., entered into an agreement for a land use right in the Lingang region of
Shanghai. In 2020 Shengwei Research (Shanghai), Inc. began a multi-year construction project for a new 1,000,000 square foot development and production center that will incorporate state-of-the-art manufacturing systems and automation
technologies, and will provide floor space to support significantly increase production capacity and related research and development, or R&D, activities. Our experience has shown that chip manufacturers in the PRC and throughout Asia
demand equipment meeting their specific technical requirements and prefer building relationships with local suppliers. We will continue to seek to leverage our local presence in the PRC and South Korea through our subsidiaries to address the
growing market for semiconductor manufacturing equipment in the region by working closely with regional chip manufacturers to understand their specific requirements, encourage them to adopt our technologies, and enable us to design innovative
products and solutions to address their needs.
Corporate Background
ACM Research was incorporated in California in 1998 and redomesticated in Delaware in 2016. We perform strategic planning, marketing, and financial activities at our global
corporate headquarters in Fremont, California. ACM Research is neither a PRC operating company nor do we conduct our operations in the PRC through the use of VIEs.
Initially we focused on developing tools for chip manufacturing process steps involving the integration of ultra‑low‑K materials and copper. In the early 2000s we sold tools based on stress-free
copper polishing technology. In 2007 we began to focus our development efforts on single-wafer wet-cleaning solutions for the front-end chip fabrication process. Since that time, we have strategically built our technology base and expanded our
product offerings:
•
In 2009 we introduced SAPS megasonic technology, which can be applied in wet wafer cleaning at numerous steps during the chip fabrication process.
•
In 2016 we introduced TEBO technology, which can be applied at numerous steps during the fabrication of small node conventional two-dimensional and three-dimensional
patterned wafers.
•
In August 2018 we introduced the Ultra-C Tahoe wafer cleaning tool, which delivers high cleaning performance with significantly less sulfuric acid than typically
consumed by conventional high temperature single-wafer cleaning tools.
•
In March 2019 we introduced (a) the Ultra ECP AP or Advanced Wafer Level Packaging tool, a back-end assembly tool used for bumping, or applying copper, tin and nickel
to wafers at the die-level prior to packaging, and (b) the Ultra ECP MAP or Multi Anode Plating tool, a front-end process tool that utilizes our proprietary technology to deliver world-class
electrochemical copper planting for copper interconnect applications.
•
In April 2020 we introduced the Ultra Furnace , our first system developed for multiple dry processing applications.
•
In May 2020 we introduced the Ultra C Family of semi-critical cleaning systems, including the Ultra C b for backside clean,
the Ultra C wb automated wet bench, and the Ultra C s scrubber.
37
Table of Contents
To help us establish and build relationships with chip manufacturers in the PRC, in 2006 we moved our operational center to Shanghai and began to conduct our business through our subsidiary ACM
Shanghai. Since that time, we have expanded our geographic presence:
•
In 2011 we formed a wholly-owned subsidiary in the PRC, ACM Research (Wuxi), Inc. , which now is a wholly-owned subsidiary of ACM Shanghai, to manage sales and service
operations.
•
In June 2017 we formed a subsidiary in Hong Kong, CleanChip Technologies Limited , which now is a wholly-owned subsidiary of ACM Shanghai, to act on our behalf in
Asian markets outside the PRC by, for example, serving as a trading partner between ACM Shanghai and its customers, procuring raw materials and components, performing sales and marketing activities, and making strategic investments.
•
In December 2017 we formed a subsidiary in the Republic of Korea, ACM Research Korea CO., LTD. , which now is an indirect wholly-owned subsidiary of ACM Shanghai, to serve our customers based in the Republic of Korea and perform sales and marketing and R&D activities.
•
In March 2019 ACM Shanghai formed a wholly-owned subsidiary in the PRC, Shengwei Research (Shanghai), Inc ., or ACM Shengwei, to manage
activities related to addition of future long-term production capacity.
•
In June 2019 CleanChip Technologies Limited formed a wholly-owned subsidiary in California, ACM Research (CA), Inc., to provide procurement services on
behalf of ACM Shanghai.
•
In August 2021 we formed a wholly-owned subsidiary in Singapore, ACM Research (Singapore) PTE, Ltd., to perform sales, marketing, and other business development
activities.
•
In February 2022, ACM Shanghai formed a wholly-owned subsidiary in China, ACM Research (Beijing), Inc., to perform sales, marketing and other business development
activities.
•
In March 2022, ACM formed a wholly-owned subsidiary in South Korea, Hanguk ACM CO., LTD , to perform business development and other related activities.
We currently conduct the majority of our product development, support and services, and substantially all of our manufacturing, at ACM Shanghai. Our Shanghai operations position us to be near
many of our current and potential new customers in the PRC (including Taiwan), South Korea and throughout Asia, providing convenient access and reduced shipping and manufacturing costs.
•
ACM Shanghai’s initial factory is located in the Pudong Region of Shanghai and has a total of 36,000 square feet of available floor space.
•
ACM Shanghai’s second production facility is located in the Chuansha district of Pudong, approximately 11 miles from our initial factory. In September 2018 we announced the opening of the first building of the second production
facility. The first building initially had a total of 50,000 square feet of available floor space for production capacity, which was increased by 50,000 square feet in the second quarter of 2020. In February 2021 ACM Shanghai leased a
second building immediately adjacent to the second factory, which increased the available floor space for production by another 100,000 square feet, bringing to total available floor space for production capacity of second production
facility to 200,000 square feet.
•
In July 2020 ACM Shanghai began a multi-year construction project to build a development and production center in the Lingang region of Shanghai. The new facility is expected to have a total of 1,000,000
square feet of available floor space for production. capacity.
•
In January 2022 ACM Shanghai completed the purchase of a housing facility in the Lingang region of Shanghai to assist in employee retention and recruitment in connection with its new R&D center and
factory currently under construction.
38
Table of Contents
The following chart depicts our corporate organization as of June 30, 2022:
A detailed description of how cash is transferred through our organization is set forth under “Note 2 – Summary of Significant Accounting
Policies – Cash and Cash Equivalents” to the Consolidated Financial Statements of this report.
Risks Associated with Corporate Structure
We are subject to a number of legal and operational risks associated with our corporate structure, including as the result of a substantial
portion of our operations being conducted in the PRC. Consequences of any of those risks could result in a material adverse change in our operations or cause the value of ACM Research Class A common stock to significantly decline. Please
carefully read the information beginning on page 64 of this report and included in “Part II. Item 1A – Risk Factors,” in particular the risk factors addressing the following issues:
•
If any PRC central government authority were to determine that existing PRC laws or regulations require that ACM Shanghai obtain the authority’s permission or approval to continue the listing of ACM Research’s Class A common stock in
the United States or if those existing PRC laws and regulations, or interpretations thereof, were to change to require such permission or approval, ACM Shanghai may be unable to obtain any such permission or approval or may only be able
to obtain such permission or approval on terms and conditions that impose material new restrictions and limitations on the operations of ACM Shanghai, either of which could have a material adverse effect on our business, financial
condition, results of operations, reputation and prospects and on the trading price of ACM Research Class A common stock.
•
PRC central government authorities may intervene in, or influence, ACM Shanghai’s PRC-based operations at any time, and those authorities’ rules and regulations can change quickly with little or no advance notice.
•
The PRC central government may determine to exert additional control over offerings conducted overseas or foreign investment in PRC-based issuers, which could result in a material change in our operations and the value of ACM Research
Class A common stock.
Permissions or Approvals to Operate in the PRC
The business of ACM Shanghai is subject to complex laws and regulations in the PRC that can change quickly with little or no advance notice. To
date, beyond the COVID-19-related restrictions in 2022, we have not experienced such intervention or influence by PRC central government authorities or a change in those authorities’ rules and regulations that have had a material impact on ACM
Shanghai or ACM Research.
In the ordinary course of business, ACM Shanghai has obtained all of the permits and licenses it believes are necessary for it to operate in the PRC. From time to time the PRC government issues new regulations, which
may require additional actions on the part of ACM Shanghai to comply.
39
Table of Contents
See “Part II. Item 1A - Risk Factors - The PRC central government may intervene in, or influence, ACM Shanghai’s PRC-based operations at any time, and the rules and regulations in the PRC can change quickly with
little or no advance notice.”
Our Independent Registered Public Accounting Firm
Our independent registered public accounting firm for the year ending December 31, 2022 is Armanino LLP, which is registered with the Public
Company Accounting Oversight Board, or the PCAOB. The U.S. Holding Foreign Companies Accountable Act, or the HFCA Act, requires that the PCAOB determine whether it is unable to inspect or investigate completely registered public accounting
firms located in a non-U.S. jurisdiction because of a position taken by one or more authorities in that jurisdiction. BDO China Shu Lun Pan Certified Public Accountants LLP, or BDO China, had been our independent registered public accounting
firm in recent years including for the year ended December 31, 2021. On December 16, 2021, the PCAOB issued a report on its determinations that the PCAOB is unable to inspect or investigate completely registered public accounting firms
headquartered in the PRC and Hong Kong because of positions taken by PRC authorities in those jurisdictions, including BDO China. On March 30, 2022, ACM Research was transferred to the SEC’s “Conclusive list of issuers identified under the
HFCA.” See “Item 1A, “Risk Factors— We could be adversely affected if we are unable to comply with recent and proposed legislation and regulations regarding improved access
to audit and other information and audit inspections of accounting firms, including registered public accounting firms, such as our audit firm since our initial public offering in 2017, operating in the PRC.” of Part II of our Quarterly Report
on Form 10-Q for the quarter ended March 31, 2022 for more information. On June 30, 2022, stockholders of ACM Research ratified the appointment of Armanino LLP as our independent auditor for the fiscal year ending December 31, 2022. Armanino
LLP is neither headquartered in the PRC or Hong Kong nor is it subject to the determinations announced by the PCAOB.
Recent Developments
COVID–19
The worldwide COVID-19 health pandemic and related government and private sector responsive actions have adversely affected the economies and
financial markets of many countries and specifically have negatively impacted the Company’s business operations, including in the PRC and the United States. The continuation of the COVID-19 pandemic could continue to result a in economic
uncertainty and global economic policies that could reduce demand for the Company’s products and its customers’ chips and have a material adverse impact on the Company’s business, operating results and financial condition. For an explanation of
some of the risks we potentially face, please read carefully the information provided under “Item 1A. Risk Factors—Risks Related to the COVID–19 Pandemic,” of part I of this report.
The following summary reflects our expectations and estimates based on information known to us as of the date of this filing:
•
Operations : We conduct substantially all of our product development, manufacturing, support and services in the PRC through ACM Shanghai, and
those activities have been directly impacted by COVID–19 and related restrictions on transportation and public appearances.
In March 2022, several regions in China began to experience elevated levels of COVID-19 infections, and the PRC government instituted policies
to restrict the spread of the virus. The policies began with an increase of “spot quarantines,” under which a positive polymerase chain reaction (PCR) or other test would result in the quarantining of individual buildings, groups of buildings,
or even full neighborhoods. The policies were later expanded to full-city quarantines, including in the City of Shanghai, where substantially all of ACM Shanghai’s operations are located. COVID-19 related restrictions in Shanghai began to limit
employee access to, and logistics activities of, ACM Shanghai’s offices and production facilities in the Pudong district of Shanghai in March 2022, and therefore limited ACM Shanghai’s ability to ship finished products to customers and to
produce new products. Spot quarantines in mid-March 2022 began to impact a number of ACM Shanghai’s employees and led to a closure of ACM Shanghai’s administrative and R&D offices in Zhangjiang in the Pudong district. A subsequent
quarantine of the entire Pudong region of Shanghai was imposed in late March 2022 and impacted the operation of ACM Shanghai’s Chuansha production facility. Furthermore, a number of our customers have substantial operations based in operations
areas of the PRC, including in the City of Shanghai, subject to the full-city restrictions, which began limiting the operations of those customers since the first quarter of 2022, including inhibiting their ability to receive, implement and
operate new tools for their manufacturing facilities. As a result, in some cases, ACM Shanghai has been required to defer shipments of finished products to these customers because of operational and logistics limitations affecting customers
rather than, or in addition to, ACM Shanghai. In late April 2022, ACM Shanghai began to resume some operations at the Chuansha manufacturing site using the “closed loop method,” in which a limited collection of workers remains together as a
group between a single hotel, the ACM Shanghai facility, and a dedicated bus transportation route, also referred to as “two spots and one line,” and had resumed substantially all of its Chuansha manufacturing site operations by the end of the
second quarter of 2022. In mid-June 2022, substantially all of ACM Shanghai’s R&D and administrative employees at its ZhangJiang facility were allowed to return to work under strict safety protocols after a period of restricted access to
the building that for many employees was partially mitigated by being able to work from home. ACM Shanghai has established several policies to help avoid or limit future outbreaks among employees and thus protect employee safety and limit the
possibility of a facility reclosing. We anticipate that the effects of the PRC restrictions may continue for several months, with a gradual return of PRC operations, production capacity, and global logistics as Shanghai and other areas in the
PRC begin to reopen. We cannot assure that closures or reductions of PRC operations or production, whether of ACM Shanghai or of some of its key customers, may not be extended in upcoming months as the result of business interruptions arising
from protective measures being taken by the PRC and other governmental agencies or of other consequences of COVID-19.
40
Table of Contents
Our corporate headquarters are located in Alameda County in the San Francisco Bay Area and are the subject of a number of state and county public health directives and orders.
These actions have not negatively impacted our business to date, however, because of the limited number of employees at our headquarters and the nature of the work they generally perform. To date we have not experienced absenteeism of management or
other key employees, other than certain of our executive officers being delayed in traveling between the PRC, our California office, and other global locations.
•
Customers: Our customers’, including the customers of ACM Shanghai, business operations have been, and are continuing to be, subject to business interruptions arising
from the COVID–19 pandemic. Historically substantially all of our revenue has been derived from customers located in the PRC and surrounding areas that have been impacted by COVID–19. Two customers that accounted for 48.9% of our revenue in
2021 are based in the PRC, and three customers that accounted for 75.8% of our revenue in 2020, and 73.8% of our revenue in 2019 are based in the PRC and South Korea. One of those customers, Yangtze Memory Technologies Co., Ltd. — which
accounted for 20.2% of our 2021 revenue, 26.8% of our 2020 revenue, and 27.5% of our 2019 revenue — is based in Wuhan. While Yangtze Memory Technologies Co., Ltd. and other key customers continued to operate their fabrication facilities
without interruption during and after the first quarter of 2020, some customers have been forced to restrict access of service personnel and deliveries to and from their facilities. We have experienced longer and in some cases more costly
shipping expenses in the delivery of tools to certain customers.
•
Suppliers : Our global supply chain includes components sourced from the PRC, Japan, Taiwan, the United States and Europe. While, to date, we have not experienced
material issues with our supply chain beyond the logistics related to the Shanghai facilities of ACM Shanghai, supply chain constraints have intensified due to COVID-19, contributing to global shortages in the supply of semiconductors and
other materials, and in some cases the pricing of materials used in the production of our own tools. As with our customers, we continue to be in close contact with our key suppliers to help ensure we are able to identify any potential
supply issues that may arise.
•
Projects : Our strategy includes a number of plans to support the growth of our core business, including ACM Shanghai’s acquisition of a land use right in the Lingang
area of Shanghai where ACM Shanghai began construction of a new R&D center and factory in July 2020. The extent to which COVID–19 impacts these projects will depend on future developments that are highly uncertain, but to date, the
timing of these ongoing projects has not been delayed or significantly disrupted by COVID–19 or related government measures.
For the first six months of 2022, ACM Shanghai experienced a negative impact to revenue and shipments as a result of restricted access and
logistics to its Shanghai-based production and administrative facilities. Thirteen tools amounting to $13 million in revenue and $24 million in shipments that could not be shipped to customers in the three-months ended March 30, 2022 were
subsequently shipped in the three months ended June 30, 2022. As a result of the restrictions, we experienced a modest increase to operational costs due to increased logistics costs and inefficiencies that resulted from the restrictions, an
increase in cash used in operations due in part to an increase in accounts receivables that resulted from a shift of shipments towards the latter part of the period, and general administrative inefficiencies.
41
Table of Contents
PRC Government Research and Development Funding
ACM Shanghai has received seven special government grants. The first grant, which was awarded in 2008, relates to the development and commercialization of 65nm to 45nm stress-free polishing
technology. The second grant was awarded in 2009 to fund interest expense on short-term borrowings. The third grant was made in 2014 and relates to the development of electro copper-plating technology. The fourth grant was made in June 2018 and
related to development of polytetrafluoroethylene. The fifth grant was made in 2020, and relates to the development of Tahoe single bench cleaning technologies. As of December 31, 2021, the fourth and fifth grants had been fully utilized. The
sixth grant was made in 2020, and relates to the development of other cleaning technologies. The seventh grant was made in 2021, and relates to the development of the R&D and production center in the Lin-gang Special Area of Shanghai. These
governmental authorities provide significant funding, although ACM Shanghai and ACM Shengwei is also required to invest certain amounts in the projects.
The governmental grants contain certain operating conditions, and we are required to go through a government due diligence process once the project is complete. The grants therefore are recorded
as long-term liabilities upon receipt, although we are not required to return any funds ACM Shanghai receives. Grant amounts are recognized in our statements of operations and comprehensive income as follows:
●
Government subsidies relating to current expenses are recorded as reductions of those expenses in the periods in which the current expenses are recorded. For the six months ended June 30, 2022 and 2021,
related government subsidies recognized as reductions of relevant expenses in the consolidated statements of operations and comprehensive income were $0.1 million and $4.2 million, respectively.
●
Government subsidies related to depreciable assets are credited to income over the useful lives of the related assets for which the grant was received. For the six months ended June 30, 2022 and 2021, related
government subsidies recognized as other income in the consolidated statements of operations and comprehensive income were $155,000 and $80,000, respectively.
Unearned government subsidies received are deferred for recognition and recorded as other long-term liabilities (see note 13 in the Notes to Condensed Consolidated Financial Statements included
herein under “Item 1. Financial Statements.”) in the balance sheet until the criteria for such recognition are satisfied.
Net Income Attributable to Non-Controlling Interests
In 2019 ACM Shanghai sold a total number of shares representing 8.3% of its outstanding ACM Shanghai shares, after which ACM Research held the remaining 91.7% of ACM Shanghai’s outstanding
shares. In 2021 ACM Shanghai sold a total number shares representing an additional 10% of its outstanding ACM Shanghai shares in its STAR IPO, after which ACM Research held the remaining 82.5% of ACM Shanghai’s outstanding shares. As a result, we
reflect the portion of our net income allocable to the minority holders of ACM Shanghai shares as net income attributable to non-controlling interests.
Critical Accounting Policies and Estimates
There were no significant changes in our critical accounting policies or significant judgments or estimates during the three months ended June 30, 2022 to augment the critical accounting
estimates disclosed under the heading “Management’s Discussion and Analysis of Financial Condition and Results of Operations” in our Annual Report, other than those described in the notes to the condensed consolidated financial statements included
in this report. For information regarding the impact of recently adopted accounting standards, refer to note 2 to the condensed consolidated financial statements included in this report.
42
Table of Contents
Recent Accounting Pronouncements
A discussion of recent accounting pronouncements is included in our Annual Report and is updated in note 2 to the condensed consolidated financial statements included in this report.
Results of Operations
The following table sets forth our results of operations for the periods presented, as percentages of revenue.
Three Months Ended June 30,
Six Months Ended June 30,
2022
2021
2022
2021
Revenue
100.0
%
100.0
%
100.0
%
100.0
%
Cost of revenue
57.7
59.8
56.4
59.3
Gross margin
42.3
40.2
43.6
40.7
Operating expenses:
Sales and marketing
7.3
10.7
9.8
11.4
Research and development
10.9
14.7
19.6
13.8
General and administrative
4.9
6.7
6.8
7.6
Total operating expenses, net
23.1
32.2
36.2
32.7
Income from operations
19.2
8.0
7.3
8.0
Interest income (expense), net
1.8
(0.3
)
2.3
(0.3
)
Unrealized gain (loss) on trading securities
(0.4
)
7.0
(2.9
)
2.8
Other income (expense), net
2.4
(1.7
)
1.9
(0.4
)
Equity income in net income of affiliates
0.5
0.5
0.3
0.6
Income before income taxes
23.5
13.6
8.9
10.7
Income tax benefit (expense)
(7.4
)
(0.0
)
(2.5
)
2.8
Net income
16.1
13.6
6.4
13.5
Less: Net income attributable to non-controlling interests
4.3
1.4
1.9
1.1
Net income attributable to ACM Research, Inc.
11.8
%
12.2
%
4.3
%
12.3
%
43
Table of Contents
Comparison of Three Months Ended June 30, 2022 and 2021
Revenue
Three Months Ended June 30,
2022
2021
% Change
2022 v 2021
Absolute Change
2022 v 2021
(in thousands)
Revenue
$
104,395
$
53,864
93.8
%
$
50,531
Single wafer cleaning, Tahoe and semi-critical cleaning equipment
$
72,583
$
45,461
59.7
%
$
27,122
ECP (front-end and packaging), furnace and other technologies
20,500
-
NM
20,500
Advanced packaging (excluding ECP), services & spares
11,312
8,403
34.6
%
2,909
Total Revenue by Product Category
$
104,395
$
53,864
93.8
%
$
50,531
Wet cleaning and other front-end processing tools
$
79,553
$
45,974
73.0
%
$
33,579
Advanced packaging, other processing tools, services and spares
24,842
7,890
214.9
%
16,952
Total Revenue Front and Back-End
$
104,395
$
53,864
93.8
%
$
50,531
Revenue increased by $50.5 million in the three months ended June 30, 2022 as compared to the same period in 2021. The increase was driven
by higher demand from our current customers, incremental contribution from new customers, growth from our cleaning and advanced packaging products, incremental contribution from newer ECP products, and the shipment of finished tools that
could not be shipped in the prior quarter due to COVID-19-related restrictions on our Shanghai operations which contributed $12.9 million during the period. The increased demand from China based customers is due in part to their increased
investments in production capacity amidst global shortages of semiconductor components.
Cost of Revenue and Gross Margin
Three Months Ended June 30,
2022
2021
% Change
2022 v 2021
Absolute Change
2022 v 2021
(in thousands)
Cost of revenue
$
60,238
$
32,184
87.2
%
$
28,054
Gross profit
44,157
21,680
103.7
%
22,477
Gross margin
42.3
%
40.2
%
1.95
(9.4
)%
Cost of revenue increased $28.1 million and gross profit increased $22.5 million in the three months ended June 30, 2022 as compared to the
corresponding period in 2021 due to the increased sales volume, and a 195 basis point increase in gross margin that reflected differences in product mix.
Gross margin may vary from period to period, primarily related to the level of utilization and the timing and mix of purchase orders. We expect gross margin to be between 40.0% and 45.0% for the
foreseeable future, with direct manufacturing costs approximating 50.0% to 55.0% of revenue and overhead costs totaling 5.0% of revenue.
44
Table of Contents
Operating Expenses
Three Months Ended June 30,
2022
2021
% Change
2022 v 2021
Absolute Change
2022 v 2021
(in thousands)
Sales and marketing expense
$
7,664
$
5,789
32.4
%
$
1,875
Research and development expense
11,367
7,933
43.3
%
3,434
General and administrative expense
5,091
3,627
40.4
%
1,464
Total operating expenses
$
24,122
$
17,349
39.0
%
$
6,773
Sales and marketing expense increased by $1.9 million
in the three months ended June 30, 2022 as compared to the corresponding period in 2021, and reflected increases of $0.8 million of personnel costs related to additional resources to our global sales and services teams to scale our business in
mainland China and the United States, an increase of $0.9 million due to supplies and spare parts, commissions and travel and entertainment costs, an increase of $0.1 million in stock-based compensation, and an increase of $0.1 million in
professional services.
Sales and marketing expense consists primarily of:
•
compensation of personnel associated with pre- and after-sale services and support and other sales and marketing activities, including stock-based compensation;
•
sales commissions paid to independent sales representatives;
•
fees paid to sales consultants;
•
cost of trade shows;
•
costs of tools built for promotional purposes for current or potential new customers;
•
travel and entertainment; and
•
allocated overhead for rent and utilities.
Research and development expense increased by $3.4 million in the three months ended June 30, 2022 as compared to the corresponding period in 2021,
reflecting an increase of $3.0 million in personnel costs due to the additional of employees and higher salaries to support new product development, and an increase of $0.4 million in stock based compensation.
Research and development expense represented 10.9% and 14.7% of our revenue in the three months ended June 30, 2022 and 2021, respectively.
Without reduction by grant amounts received from PRC governmental authorities (see “—Government Research and Development Funding”), gross research and development expense totaled $11.4 million, or 10.9% of total revenue, in the three months
ended June 30, 2022 as compared to $9.4 million, or 17.3% of revenue, in the corresponding period in 2021. Research and development expense relates to the development of new products and processes and encompasses our research, development and
customer support activities. Research and development expense consists primarily of:
•
compensation of personnel associated with our research and development activities, including stock based compensation;
•
costs of components and other research and development supplies;
•
costs of tools built for product development purposes;
•
travel expense associated with the research of technical requirements for product development purposes and testing of concepts under consideration;
•
amortization of costs of software used for research and development purposes; and
•
allocated overhead for rent and utilities.
45
Table of Contents
General and administrative expense increased $1.5 million in the three months ended June 30, 2022 as compared to the corresponding period in 2021. General and administrative
expense consists primarily of:
•
compensation of executive, accounting and finance, human resources, information technology, and other administrative personnel, including stock-based compensation;
•
professional fees, including accounting and corporate legal and defense fees;
•
other corporate expenses including insurance; and
•
allocated overhead for rent and utilities.
We expect that, for the foreseeable future, general and administrative expenses will increase in dollars, as we incur additional costs associated
with growing our business, ACM Research operating a public company in the United States and ACM Shanghai operating as a public company in the PRC.
Income from Operations
Three Months Ended June 30,
2022
2021
% Change
2022 v 2021
Absolute Change
2022 v 2021
(in thousands)
Income from operations
$
20,035
$
4,331
362.6
%
$
15,704
Income from operations increased by $15.7 million during the three months ended June 30, 2022 as compared to the prior year period, due to
increased revenue and gross profit, partly offset by an increase in operating expenses in absolute dollars and as a percentage of total revenue.
Interest income (expense), net, Other Income (expense), net
Three Months Ended June 30,
2022
2021
% Change
2022 v 2021
Absolute Change
2022 v 2021
(in thousands)
Interest Income
$
2,144
$
31
6816.1
%
$
2,113
Interest Expense
(306
)
(194
)
57.7
%
(112
)
Interest Income (expense), net
$
1,838
$
(163
)
(1227.6
)%
$
2,001
Other income (expense), net
$
2,505
$
(897
)
(379.3
)%
$
3,402
Interest income (expense), net consists of interest earned on our cash and equivalents and restricted cash accounts, offset by interest expense
incurred from outstanding short-term borrowings. We realized $1.8 million of interest income (expense), net in the three months ended June 30, 2022 as compared to an expense of $163,000 of interest income (expense), net in the corresponding
period in 2021. The significant change from the year-ago-period resulted from a higher balance of cash and equivalents and time deposits, higher interest rates on these balances, and a lower combined balance of short-term and long-term bank
loans.
Other income (expense), net primarily reflects (a) gains or losses recognized from the impact of exchange rates on our foreign currency-denominated working-capital transactions and (b)
depreciation of assets acquired with government subsidies, as described under “—Government Research and Development Funding” above. We realized $2.5 million of other income (expense) in the three months ended June 30, 2022, as compared to a loss of
($0.9) million in the corresponding period in 2021. The variance was due primarily to the impact to transactions that resulted from changes in the RMB-to-U.S. dollar exchange rate during the respective periods.
46
Table of Contents
Unrealized loss from trading securities and equity income in net income of affiliates.
Three Months Ended June 30,
2022
2021
% Change
2022 v 2021
Absolute Change
2022 v 2021
(in thousands)
Unrealized gain (loss) on trading securities
$
(423
)
$
3,783
(111.2
)%
$
(4,206
)
Equity income in net income of affiliates
$
472
$
295
60.0
%
$
177
We recorded an unrealized loss of $0.4 million for the three months ended June 30, 2022, as compared to an unrealized gain of $3.8 million for the same period in 2021, based on a change in market
value of ACM Shanghai’s indirect investment in SMIC shares on the STAR Market as is described in note 15 to the condensed consolidated financial statements included in this report. Equity income in net income of affiliates increased by $0.2
million for the three months ended June 30, 2022.
Income Tax Benefit (Expense)
The following presents components of income tax benefit (expense) for the indicated periods:
Three Months Ended June 30,
2022
2021
(in thousands)
Total income tax benefit (expense)
$
(7,679
)
$
(15
)
We recognized a tax expense of $7.7 million for the three months ended June 30, 2022 as compared to a tax expense of $15,000 for prior year
period. The increased tax expense in 2022 primarily resulted from the tax effect of increased operating profit generated and an increase in our effective income tax rate. The increase in our effective income tax rate for the three months ended
June 30, 2022 compared to the same period of the prior year was primarily due to a new requirement to capitalize and amortize previously deductible research and experimental expenses resulting from a change in Section 174 made by the U.S. Tax
Cuts and Jobs Act of 2017, or the TCJA, which became effective on January 1, 2022, and a decrease in discrete tax benefits associated with stock-based compensation deductions. The capitalization of overseas R&D expenses resulted in a
significant increase in our global intangible low-taxed income inclusion. Congress is considering legislation, but legislation has not passed, that would defer the capitalization requirement to later years.
Our effective tax rate differs from statutory rates of 21% for U.S. federal income tax purposes and 12.5% to 25% for Chinese income tax
purposes due to the treatment of stock-based compensation including the impact from stock option exercises and non-US research expenses. Our two PRC subsidiaries, ACM Shanghai and ACM Research (Wuxi), Inc., are liable for PRC corporate income taxes
at the rates of 12.5% and 25%, respectively. Pursuant to the Corporate Income Tax Law of the PRC, our PRC subsidiaries generally would be liable for PRC corporate income taxes at a rate of 25%. According to Guoshuihan 2009 No. 203, an entity
certified as an “advanced and new technology enterprise” is entitled to a preferential income tax rate of 15%. ACM Shanghai was certified as an “advanced and new technology enterprise” in 2012 and again in 2016 and 2018, with an effective period of
three years. In 2021, ACM Shanghai was certified as an eligible integrated circuit production enterprise and is entitled to a preferential income tax rate of 0% from January 1, 2018 to December 31, 2019 and 12.5% from January 1, 2020 to December
31, 2022 instead of 15%.
We file income tax returns in the United States and state and foreign jurisdictions. Those federal, state and foreign income tax returns are under the statute of limitations subject to tax
examinations for 1999 through 2021. To the extent we have tax attribute carryforwards, the tax years in which the attribute was generated may still be adjusted upon examination by the Internal Revenue Service or state or foreign tax authorities to
the extent utilized in a future period.
47
Table of Contents
Net Income Attributable to Non-Controlling Interests
Three Months Ended June 30,
2022
2021
% Change
2022 v 2021
Absolute Change
2022 v 2021
(in thousands)
Net income attributable to non-controlling interests
$
4,512
$
767
488.3
%
$
3,745
In 2019 ACM Shanghai sold a total number of shares representing 8.3% of its outstanding ACM Shanghai shares, after which ACM Research held the remaining 91.7% of ACM Shanghai’s outstanding
shares. In 2021 ACM Shanghai sold a total number shares representing an additional 10% of its outstanding ACM Shanghai shares in its STAR IPO, after which ACM Research held the remaining 82.5% of ACM Shanghai’s outstanding shares. As a result, we
reflect, the portion of our net income allocable to the minority holders of ACM Shanghai shares as net income attributable to non-controlling interests. In the three months ended June 30, 2022, this amount totaled $4.5 million as compared to $0.7
million in the corresponding period in 2021.
Foreign currency translation adjustment
Three Months Ended June 30,
2022
2021
% Change
2022 v 2021
Absolute Change
2022 v 2021
(in thousands)
Foreign currency translation adjustment
$
(40,372
)
$
3,000
(1,445.7
)%
$
(43,372
)
We recorded a foreign currency translation adjustment of ($40.4) million for the three months ended June 30, 2022, as compared to $3.0
million for the same period in 2021, based on the net effect of RMB to dollar exchange rate fluctuations for the period on the converted value of ACM Shanghai’s RMB-denominated balances to U.S. dollar equivalents. The amount was especially large
due to a significant weakening of the RMB versus the U.S. dollar during the period.
48
Table of Contents
Comparison of Six Months Ended June 30, 2022 and 2021
Revenue
`
Six Months Ended June 30,
2022
2021
% Change
2022 v 2021
Absolute Change
2022 v 2021
`
(in thousands)
Revenue
$
146,581
$
97,596
50.2
%
$
48,985
Single wafer cleaning, Tahoe and semi-critical cleaning equipment
$
98,616
$
77,874
26.6
%
$
20,742
ECP (front-end and packaging), furnace and other technologies
32,748
5,550
490.1
%
27,198
Advanced packaging (excluding ECP), services & spares
15,217
14,172
7.4
%
1,045
Total Revenue By Product Category
$
146,581
$
97,596
50.2
%
$
48,985
Wet cleaning and other front-end processing tools
$
111,254
$
77,874
42.9
%
$
33,380
Advanced packaging, other processing tools, services and spares
35,327
19,722
79.1
%
15,605
Total Revenue Front-end and Back-End
$
146,581
$
97,596
50.2
%
$
48,985
Revenue increased by $49.0 million in the six months ended June 30, 2022 as compared to the same period in 2021. Revenue for the period was
impacted by COVID-19 related restrictions which reduced production output and logistics to and from our facilities for several months. The increase versus the prior year period was driven by higher demand from current and new customers, growth
from our cleaning and advanced packaging products, and incremental contribution from our newer ECP products. The increased demand from China based customers is due in part to increased investments in production capacity amidst global shortages
of semiconductor components.
Cost of Revenue and Gross Margin
Six Months Ended June 30,
2022
2021
% Change
2022 v 2021
Absolute Change
2022 v 2021
(in thousands)
Cost of revenue
$
82,738
$
57,871
43.0
%
$
24,867
Gross profit
$
63,843
$
39,725
60.7
%
$
24,118
Gross margin
43.6
%
40.7
%
2.9
%
2.85
%
Cost of revenue increased $24.9 million and gross profit increased $24.1 million in the six months ended June 30, 2022 as compared to the corresponding period in 2021 due to the increased sales
volume, and a 285 basis point increase in gross margin, that reflected differences in product mix.
Gross margin may vary from period to period, primarily related to the level of utilization and the timing and mix of purchase orders. We expect gross margin to be between 40.0% and 45.0% for the
foreseeable future, with direct manufacturing costs approximating 50.0% to 55.0% of revenue and overhead costs totaling 5.0% of revenue.
Operating Expenses
Six Months Ended June 30,
2022
2021
% Change
2022 v 2021
Absolute Change
2022 v 2021
(in thousands)
Sales and marketing expense
$
14,361
$
11,097
29.4
%
$
3,264
Research and development expense
28,713
13,437
113.7
%
15,276
General and administrative expense
10,040
7,410
35.5
%
2,630
Total operating expenses
$
53,114
$
31,944
66.3
%
$
21,170
Sales and marketing expense increased by $3.3 million in the six months ended June 30, 2022 as compared to the corresponding period in 2021 and reflected
increases of $1.6 million of personnel costs related to additional resources to our global sales and services teams to scale our business in mainland China and the United States, and an increase of $1.4 million due to supplies and spare parts,
commissions and travel and entertainment costs, an increase of $0.1 million in stock-based compensation, and an increase of $0.1 million in professional services.
49
Table of Contents
Sales and marketing expense consists primarily of:
•
compensation of personnel associated with pre- and after-sale services and support and other sales and marketing activities, including stock-based compensation;
•
sales commissions paid to independent sales representatives;
•
fees paid to sales consultants;
•
cost of trade shows;
•
costs of tools built for promotional purposes for current or potential new customers;
•
travel and entertainment; and
•
allocated overhead for rent and utilities.
Research and development expense increased by $15.3 million in the six months ended June 30, 2022 as compared to the corresponding period in 2021,
reflecting an increase of $5.6 million in personnel costs due to the additional of employees and higher salaries to support new product development, an increase of $6.3 million for to cost of tools built for product development purposes, an
increase of $2.8 million for other items including travel and entertainment, professional services and other items, and an increase of $0.6 million in stock based compensation.
Research and development expense represented 19.6% and 13.8% of our revenue in the six months ended June 30, 2022 and 2021, respectively. Without reduction by grant amounts received from PRC
governmental authorities (see “—Government Research and Development Funding”), gross research and development expense totaled $28.8 million, or 19.6% of total revenue, in the six months ended June 30, 2022 and $15.7 million, or 16.0% of revenue, in
the corresponding period in 2021. Research and development expense relates to the development of new products and processes and encompasses our research, development and customer support activities. Research and development expense consists
primarily of:
•
compensation of personnel associated with our research and development activities, including stock based compensation;
•
costs of components and other research and development supplies;
•
costs of tools built for product development purposes;
•
travel expense associated with the research of technical requirements for product development purposes and testing of concepts under consideration;
•
amortization of costs of software used for research and development purposes; and
•
allocated overhead for rent and utilities.
General and administrative expense increased $2.6 million in the six months ended June 30, 2022 as compared to the corresponding period in 2021. General and administrative
expense consists primarily of:
•
compensation of executive, accounting and finance, human resources, information technology, and other administrative personnel, including stock-based compensation;
•
professional fees, including accounting and corporate legal and defense fees;
•
other corporate expenses including insurance; and
•
allocated overhead for rent and utilities.
We expect that, for the foreseeable future, general and administrative expenses will increase in dollars, as we incur additional costs associated
with growing our business, ACM Research operating a public company in the United States and ACM Shanghai operating a public company in the PRC.
50
Table of Contents
Income from operations
Six Months Ended June 30,
2022
2021
% Change
2022 v 2021
Absolute Change
2022 v 2021
(in thousands)
Income from operations
$
10,729
$
7,781
37.9
%
$
2,948
Income from operations increased by $2.9 million for during the six months ended June 30, 2022 as compared to the prior year period, due to increased revenue and gross profit, partly offset by an
increase in operating expenses in absolute and as a percentage of total revenue.
Interest income (expense), net, Other Income (expense), net
Six Months Ended June 30,
2022
2021
% Change
2022 v 2021
Absolute Change
2022 v 2021
(in thousands)
Interest Income
$
3,949
$
80
(4,836.3
)%
$
3,869
Interest Expense
(567
)
(383
)
48.0
%
(184
)
Interest Income (expense), net
$
3,382
$
(303
)
(1,216.2
)%
$
3,685
Other income (expense), net
$
2,742
$
(428
)
(740.7
)%
$
3,170
Interest income (expense), net consists of interest earned on our cash and equivalents and restricted cash accounts, offset by interest expense incurred from outstanding short-term borrowings. We
realized $3.4 million of interest income (expense), net in the six months ended June 30, 2022 as compared to ($303,000) of interest income (expense), net in the corresponding period in 2021. The significant change from the year-ago-period resulted
from a higher balance of cash and equivalents and time deposits, and higher interest rates on these balances.
Other income, net primarily reflects (a) gains or losses recognized from the impact of exchange rates on our foreign currency-denominated working-capital transactions and (b) depreciation of
assets acquired with government subsidies, as described under “—Government Research and Development Funding” above. We realized $2.7 million of other income (expense) in the three months ended June 30, 2022, as compared to a loss of ($0.4) million
in the corresponding period in 2021. The variance was due primarily to the impact to transactions that resulted from changes in the RMB-to-U.S. dollar exchange rate during the respective periods.
Unrealized loss from trading securities and equity income in net income of affiliates
Six Months Ended June 30,
2022
2021
% Change
2022 v 2021
Absolute Change
2022 v 2021
(in thousands)
Unrealized gain (loss) on trading securities
$
(4,281
)
$
2,736
(256.5
)%
$
(7,017
)
Equity income in net income of affiliates
$
401
$
615
(34.8
)%
$
(214
)
We recorded an unrealized loss of $4.3 million for the six months ended June 30, 2022, as compared to an unrealized gain of $3.8 million for the same period in 2021, based on a change in market
value of ACM Shanghai’s indirect investment in SMIC shares on the STAR Market as is described in note 15 to the condensed consolidated financial statements included in this report. Equity income in net income of affiliates increased by $0.2 million
for the three months ended June 30, 2022.
51
Table of Contents
Income Tax Benefit (Expense)
The following presents components of income tax benefit (expense) for the indicated periods:
Six Months Ended June 30,
2022
2021
(in thousands)
Total income tax benefit (expense)
$
(3,668
)
$
2,755
We recognized a tax expense of $3.7 million for the six months ended June 30, 2022 as compared to a tax benefit of $2.8 million for prior year
period. The increased tax expense in 2022 primarily resulted from the tax effect of increased operating profit generated and an increase in our effective income tax rate. The increase in our effective income tax rate for the six months ended
June 30, 2022 compared to the same period of the prior year was primarily due to a new requirement to capitalize and amortize previously deductible research and experimental expenses resulting from a change in Section 174 made by the TCJA which
became effective on January 1, 2022, and a decrease in discrete tax benefits associated with stock-based compensation deductions. The capitalization of overseas R&D expenses resulted in a significant increase in our global intangible
low-taxed income inclusion. Congress is considering legislation, but legislation has not passed, that would defer the capitalization requirement to later years.
Our effective tax rate differs from statutory rates of 21% for U.S. federal income tax purposes and 12.5% to 25% for Chinese income tax
purposes due to the treatment of stock-based compensation including the impact from stock option exercises and non-US research expenses. Our two PRC subsidiaries, ACM Shanghai and ACM Research (Wuxi), Inc., are liable for PRC corporate income
taxes at the rates of 12.5% and 25%, respectively. Pursuant to the Corporate Income Tax Law of the PRC, our PRC subsidiaries generally would be liable for PRC corporate income taxes at a rate of 25%. According to Guoshuihan 2009 No. 203, an
entity certified as an “advanced and new technology enterprise” is entitled to a preferential income tax rate of 15%. ACM Shanghai was certified as an “advanced and new technology enterprise” in 2012 and again in 2016 and 2018, with an effective
period of three years. In 2021, ACM Shanghai was certified as an eligible integrated circuit production enterprise and is entitled to a preferential income tax rate of 12.5% from January 1, 2020 to December 31, 2022 instead of 15%.
We file income tax returns in the United States and state and foreign jurisdictions. Those federal, state and foreign income tax returns are under the statute of limitations subject to tax
examinations for 1999 through 2021. To the extent we have tax attribute carryforwards, the tax years in which the attribute was generated may still be adjusted upon examination by the Internal Revenue Service or state or foreign tax authorities to
the extent utilized in a future period.
52
Table of Contents
Net Income Attributable to Non-Controlling Interests
Six Months Ended June 30,
2022
2021
% Change
2022 v 2021
Absolute Change
2022 v 2021
(in thousands)
Net income attributable to non-controlling interests
$
2,855
$
1,119
155.1
%
$
1,736
In 2019 ACM Shanghai sold shares representing 8.3% of its outstanding ACM Shanghai shares, after which ACM Research held the remaining 91.7% of ACM Shanghai’s outstanding shares. In 2021 ACM
Shanghai sold a total number shares representing an additional 10% of its outstanding ACM Shanghai shares in its STAR IPO, after which ACM Research held the remaining 82.5% of ACM Shanghai’s outstanding shares. As a result, we reflect, the portion
of our net income allocable to the minority holders of ACM Shanghai shares as net income attributable to non-controlling interests.
In the six months ended June 30, 2022, this amount totaled $2.9 million as compared to $1.1 million in the corresponding period in 2021.
Foreign currency translation adjustment
Six Months Ended June 30,
2022
2021
% Change
2022 v 2021
Absolute Change
2022 v 2021
(in thousands)
Foreign currency translation adjustment
$
(37,918
)
$
1,668
(2,373.3
)%
$
(39,586
)
We recorded a foreign currency translation adjustment of ($37.9) million for the six months ended June 30, 2022, as compared to $1.7
million for the same period in 2021, based on the net effect of RMB to dollar exchange rate fluctuations for the period on the converted value of ACM Shanghai’s RMB-denominated balances to U.S. dollar equivalents. The amount was especially large
due to a significant weakening of the RMB versus the U.S. dollar during the period.
Liquidity and Capital Resources
Cash and Cash Equivalents
During the first six months of 2022, we funded our technology development and operations principally through our beginning global cash balances,
including the cash balances at ACM Shanghai, and borrowings by ACM Shanghai from local financial institutions. Cash and cash equivalents, short-term time deposits and long-term time deposits declined by $94.3 million for the six-months ended
June 30, 2022 primarily due to $61.3 million net cash used by operations, $22.2 million decrease due to the effect of foreign exchange on cash balances, $5.3 million in capital expenditures, and $5.0 million cash used by financing activities.
53
Table of Contents
June 30,
2022
December 31,
2021
(in thousands)
Cash and cash equivalents and time deposits:
Cash and cash equivalents
$
323,716
$
562,548
Short-term time deposits
70,030
-
Long-term time deposits
74,500
-
Total
$
468,246
$
562,548
We believe our existing cash and cash equivalents and short-term and long-term time deposits, our cash flow from operating activities, and
bank borrowings by ACM Shanghai will be sufficient to meet our anticipated cash needs for at least the next twelve months. Our anticipated cash needs for the next twelve months do not require receipt of any PRC government subsidies.
Our future working capital needs beyond the next twelve months will depend on many factors, including the rate of our business and revenue
growth, the payment schedules of our customers, the timing and magnitude of our capital expenditures, and the timing of investment in our research and development as well as sales and marketing. We believe our existing cash and cash equivalents
and short-term and long-term time deposits, our cash flow from operating activities, and bank borrowings by ACM Shanghai will be sufficient to meet our anticipated cash needs within our longer term planning horizon. To the extent our cash and
cash equivalents, cash flow from operating activities and short-term bank borrowings are insufficient to fund our future activities in accordance with our strategic plan, we may determine to raise additional funds through public or private debt
or equity financings or additional bank credit arrangements. We also may need to raise additional funds in the event we determine in the future to effect one or more acquisitions of businesses, technologies and products. If additional funding is
necessary or desirable, we may not be able to obtain bank credit arrangements or to affect an equity or debt financing on terms acceptable to us or at all.
Restrictions under PRC laws and regulations as well as restrictions under ACM Shanghai’s bank loan agreements, may significantly restrict ACM
Shanghai’s ability to transfer a portion of ACM Shanghai’s net assets to ACM Research, other subsidiaries of ACM Research and to holders of ACM Research Class A common stock. See “Item 1A. Risk Factors–Regulatory Risks–The PRC’s currency
exchange control and government restrictions on investment repatriation may impact our ability to transfer funds outside of the PRC, which could materially and adversely affect our ability to grow, make investments or acquisitions that could
benefit our business, otherwise fund and conduct our business, or pay dividends on our common stock.” in our Annual Report.
For the six months ended June 30, 2022 and 2021, no transfers, dividends, or distributions have been made between ACM Research, and its
subsidiaries, including ACM Shanghai, or to holders of ACM Research Class A common stock.
Off-Balance Sheet Arrangements
We do not have any off-balance sheet financing arrangements as defined in Item 303(a)(4) of Regulation S-K.
Contractual Obligations
Grant Contract for State-owned Construction Land Use Right in Shanghai City
In 2020 ACM Shanghai, through its wholly-owned subsidiary ACM Shengwei, entered into a Grant Contract for State-owned Construction Land Use Right
in Shanghai City (Category of R&D Headquarters and Industrial Projects), or the Grant Agreement, with the China (Shanghai) Pilot Free Trade Zone Lin-gang Special Area Administration, or the Grantor. ACM Shengwei obtained rights to use
approximately 43,000 square meters (10.6 acres) of land in the Lingang Heavy Equipment Industrial Zone of Lin-gang Special Area of China (Shanghai) Pilot Free Trade Zone, or the Land Use Right, for a period of fifty years, commencing on the date
of delivery of the land in July 2020, which we refer to as the Delivery Date.
In exchange for its land use rights, ACM Shengwei paid aggregate grant fees of RMB 61.7 million ($9.5 million), or the Grant Fees, and a
performance deposit of RMB 12.3 million ($1.9 million), which is equal to 20% of the aggregate grant fees, to secure its achievement of the following performance milestones:
•
the start of construction within 6 months after the Delivery Date (60% of the performance deposit), or Construction Start Milestone;
•
the completion of construction within 30 months after the Delivery Date (20% of the performance deposit), or Construction Completion
Milestone; and
•
the start of production within 42 months after the Delivery Date (20% of the performance deposit), or Production Start Milestone.
Upon satisfaction of a milestone, the portion of the performance deposit attributable to that milestone will be repayable to ACM Shengwei within
ten business days. If the achievement of any of the above milestones is delayed or abandoned, ACM Shengwei may be subject to additional penalties and may lose its rights to both the use of the granted land and any partially completed facilities
on that land.
54
Table of Contents
The status of the performance milestones for the period ending June 30, 2022 is as follows:
•
ACM Shengwei achieved the Construction Start Milestone and 60% of the performance deposit was refunded to ACM Shanghai in 2020.
•
The Construction Completion Milestone is required to be met prior to January 9, 2023. Although this date has not yet been reached, due
to COVID-19 related restrictions, ACM Shengwei has experienced delays and does not expect to meet the milestone, and plans to file a request for an extension in December 2022. We cannot guarantee the extension will be met or that ACM
Shengwei will be refunded this 20% portion of the performance deposit.
Contractual penalties in the case of a delay of Construction
Completion Milestone :
o
If ACM Shengwei fails to complete the construction pursuant to the date agreed under the Grant Agreement or any extended completion date approved by the Grantor, ACM Shengwei shall pay 50% of the deposit for
timely completion of construction as liquidated damages;
o
If the ACM Shengwei delays the completion for more than six months beyond the date agreed under the Grant Agreement, or beyond any extended completion date approved by the Grantor, it shall pay the total deposit for timely completion
of construction as liquidated damages.
o
If the delay is more than one year, the Grantor is entitled to terminate the Grant Agreement and take back the Land Use Right. In such case, the Grantor shall refund the Grant Fees for the remaining land use
term after deducting the deposit agreed under the Grant Agreement and refund the deposit for timely commencement of production and relevant bank interests in full to ACM Shengwei.
•
The Production Start Milestone is required to be met prior to January 9, 2024. Although this date has not yet been reached, ACM
Shengwei plans to also file a request for an extension of this milestone due to COVID-related delays. We cannot guarantee the extension will be met or that ACM Shengwei will be refunded this 20% portion of the performance deposit.
Contractual penalties in the case of a delay of Production Start
Milestone :
o
If ACM Shengwei fails to commence production pursuant to the date agreed under the Grant Agreement or any extended commencement date approved by the Grantor, ACM Shengwei shall pay the total deposits for
timely commencement of production as liquidated damages;
o
If ACM Shengwei fails to commence production pursuant to the extended commencement of production date, the Grantor is entitled to terminate the Grant Agreement and take back the Land Use Right. In such case,
the Grantor shall refund the Grant Fees for the remaining land use term after deducting the deposit agreed under the Grant Agreement to ACM Shengwei.
In addition to the milestones, covenants in the Grant Agreement require that, among other things, ACM Shengwei will be required to pay
liquidated damages in the event that:
(a) it does not make a total investment (including the costs of construction, fixtures, equipment and grant fees) of at least RMB 450.0 million ($63.4 million). ACM Shengwei shall pay the
liquidated damages equal to the same proportion of the Grant Fees as the proportion of the actual shortfall amount of investment in the total agreed investment amount or the investment intensity.
55
Table of Contents
(b) within six years after the Delivery Date, or prior to July 9, 2026, it does not (i) generate a minimum specified amount of annual sales of
products manufactured on the granted land or (ii) pay to the PRC at least RMB 157.6 million ($22.2 million) in annual total taxes (including value-added taxes, corporate income tax, personal income taxes, urban maintenance and construction taxes,
education surcharges, stamp taxes, and vehicle and shipping taxes) as a result of operations in connection with the granted land.
If the total tax revenue of the project tax fails to reach but is no less than 80% of the standard agreed under the Grant Agreement, ACM Shengwei shall pay 20% of the actual shortfall amount of
the tax revenue as liquidated damages. If the total tax revenue of the project fails to reach 80% of the standard agreed under the Grant Agreement within 1 month after the agreed date of reaching target production, the Grantor is entitled to
terminate this Contract, take back the Land Use Right, and shall refund the Grant Fees for the remaining Land Use Term to ACM Shengwei.
If the Grant Agreement is terminated because of breach of any terms above, the
Grantor shall take back the buildings, fixtures and auxiliary facilities on the land area and provide ACM Shengwei with corresponding compensation according to the residual value of the buildings, fixtures and auxiliary facilities when
they are taken back. The total of buildings and construction in progress related to ACM Shengwei amounted to $7.9 million and $5.6 million at June 30, 2022 and December 31, 2021, respectively.
Loan and Mortgage Contract for Lingang, Shanghai Housing Units
In connection with its financing the purchase of housing units in Lingang, Shanghai, or the Property, in November 2020 ACM Shengwei entered
into a Loan and Mortgage Contract, or the Loan Agreement, with China Merchants Bank Co., Ltd., Shanghai Pilot Free Trade Zone Lin-Gang Special Area Sub-branch, or the Lender, pursuant to which the ACM Shengwei obtained a loan in the aggregate
amount of $19.6 million. The loan under the Loan Agreement is secured by a pledge of the Property, which ACM Shangwei’s subsidiary received ownership of in January 2022, and is guaranteed by ACM Shanghai. Under the Loan Agreement, ACM Shengwei
must deliver the right certificate of the Property within sixty days of the execution of the Loan Agreement or the Lender has the right to, among other things, declare a breach of contract and enforce its remedies under the Loan Agreement,
which remedies include the ability to declare any borrowings outstanding, together with accrued and unpaid interest and fees, to be immediately due and payable. As of the date of this report, ACM Shengwei and its developer have been unable to
obtain the required right certificate of the Property due to administrative difficulties related to the COVID 19 pandemic and, as a result, the procedures of the formal pledge registration by the Lender have not been completed. The Lender
delivered a letter to ACM Shengwei on July 27, 2022 confirming that it is aware of the cause of the delay in ACM Shengwei’s delivery of the right certificate of the Property and as of the date of this report has not taken any action to date as
a result of the delay. The Lender could, however, assert at any time that the delay is a breach of contract and, among other remedies, could seek to declare the amounts owing under the Loan Agreement to be due and payable. The Shanghai Lingang
Industrial Zone Public Rental Housing Construction and Operation Management Co., Ltd., or the Developer, delivered a letter to ACM Shengwei on August 4, 2022, citing a force majeure delay due to the COVID-19-related restrictions in Shanghai for
the delay of the initial registration of the housing ownership, and that it expects to complete the initial registration of housing ownership by the end of August 2022. See “Risks Related to International Aspects of Our Business—As the result
of administrative delays in the PRC related to the COVID-19 pandemic, ACM Research’s indirect subsidiary ACM Shengwei has not been able to obtain the right certificate of property in Lingang, Shanghai as required by its Loan and Mortgage
Contract, and our liquidity, financial position and business would be adversely affected if the lender bank were to assert successfully that the failure to obtain the right certificate is a breach of the Loan and Mortgage Contract” in Item 1A.
Risk Factors” of Part II of this report.
56
Table of Contents
Sources of Funds
Equity and Equity-related Securities. During the six months
ended June 30, 2022, we received proceeds of $0.8 million from sales of ACM Research Class A common stock pursuant to option exercises.
Short-Term and Long-Term Loan Facilities. During the six months
ended June 30, 2022, ACM Shanghai paid $5 million to reduce the balance outstanding of our short-term and long-term borrowings. ACM Shanghai, together with its subsidiaries, has short-term and long-term borrowings with five banks, as follows:
Lender
Agreement Date
Maturity Date
Annual
Interest Rate
Maximum
Borrowing
Amount(1)
Amount
Outstanding
at June 30, 2022
(in thousands)
Bank of Shanghai Pudong Branch
June 2021
June 2022
RMB100,000
-
$
14,900
-
China Everbright Bank
July 2021
October 2022
1.95
%
RMB150,000
RMB22,875
$
22,350
$
3,408
Bank of Communications
July 2021
October 2022
3.85
%
RMB60,000
RMB10,000
$
8,940
$
1,490
China Merchants Bank
October 2021
October 2022
RMB100,000
-
$
14,900
-
China Merchants Bank
November 2020
Repayable by
installments and the last
installments repayable in
November 2030
4.65
%
RMB128,500
RMB111,909
$
19,147
$
16,675
Bank of China
June 2021
Repayable by
installments and the last
installments repayable in
June 2024
2.60
%
RMB10,000
RMB9,000
$
1,490
$
1,341
Bank of China
September, 2021
Repayable by
installments and the last
installments repayable in
September 2021
2.60
%
RMB35,000
RMB33,250
$
5,215
$
4,954
$
86,942
$
27,868
(1)
Converted from RMB to dollars as of June 30, 2022. All of the amounts owing under the line of credit with Bank of Shanghai Pudong Branch are guaranteed CleanChip Technologies LTD, a wholly-owned subsidiary of
ACM Shanghai. The loan from China Merchants Bank is secured by a pledge of the property of ACM Shengwei and guaranteed by ACM Shanghai, as described above under “—Contractual Obligations.”
Government Research and Development Grants. As described under “—Key Components of Results of Operations—PRC Government Research and Development Funding,”
ACM Shanghai has received research and development grants from local and central PRC governmental authorities. ACM Shanghai received no cash payments related to such grants in the first six months of 2022, as compared to cash receipts of $0.6
million in the same period of 2021. Not all grant amounts are received in the year in which a grant is awarded. Because of the nature and terms of the grants, the amounts and timing of payments under the grants are difficult to predict and vary
from period to period. In addition, we expect to apply for additional grants when available in the future, but the grant application process can extend for a significant period of time and we cannot predict whether, or when, we will determine to
apply for any such grants.
Advances from Customers. During the six-months ended June 30, 2022, advances from customers increased $41.6 million, due to an increase of payments made by customers for
first tools under evaluation, and an increase in pre-payments made by customers prior to delivery of repeat tools.
57
Table of Contents
Working Capital. The following table sets forth selected working capital information:
June 30, 2022
(in thousands)
Cash and cash equivalents
$
323,716
Accounts receivable, less allowance for doubtful amounts
154,627
Inventory
288,080
Working capital
$
766,423
Our cash and cash equivalents at June 30, 2022 were unrestricted and held for working capital purposes. ACM Shanghai, our only direct PRC subsidiary, is, however, subject to PRC restrictions on
distributions to equity holders. We currently intend for ACM Shanghai to retain all available funds any future earnings for use in the operation of its business and do not anticipate its paying any cash dividends. We have not entered into, and do
not expect to enter into, investments for trading or speculative purposes. Our accounts receivable balance fluctuates from period to period, which affects our cash flow from operating activities. Fluctuations vary depending on cash collections,
client mix, and the timing of shipment and acceptance of our tools.
We have never declared or paid cash dividends on our capital stock. We intend to retain all available funds and any future earnings to support the operation of and to finance the growth and
development of our business and do not anticipate paying any cash dividends in the foreseeable future.
Uses of Funds
Cash Flow from Operating Activities. Our operations used cash flow of $61.3 million in the first six months of 2022. Our cash flow from operating
activities is influenced by (a) the level of net income, (b) the amount of cash we invest in personnel and technology development to support anticipated future growth in our business, (c) increases in the number of customers using our products, and
(d) the amount and timing of payments by customers.
Capital Expenditures. We incurred $5.3 million in capital expenditures during the first six months of 2022, versus $2.4 million capital expenditures in
the same period of 2021. Capital expenditures in the six months ended June 30, 2022 were incurred principally for the addition of production capacity and general maintenance and improvements to our global facilities.
Effect of exchange rate fluctuations on cash and cash equivalents. The value of our cash, and cash equivalents declined $22.2 million during the first
six months of 2022 versus an increase of $0.3 million in the same period of 2021. The impact of fluctuations of the RMB to U.S. dollar currency exchange rate on a significant balance of these items held in RMB-denominated accounts (Note 2)
contributed to change.
How We Evaluate Our Operations
We present information below with respect to four measures of financial performance:
●
We define “shipments” of tools to include (a) a “repeat” delivery to a customer of a type of tool that the customer has previously accepted, for which we recognize revenue upon delivery, and (b) a
“first-time” delivery of a “first tool” to a customer on an approval basis, for which we may recognize revenue in the future if contractual conditions are met, or if a purchase order is received.
●
We define “adjusted EBITDA” as our net income excluding interest expense (net), income tax benefit (expense), depreciation and amortization, and stock-based compensation. We define adjusted EBITDA to also
exclude restructuring costs, although we have not incurred any such costs to date.
●
We define “free cash flow” as net cash provided by operating activities less purchases of property and equipment (net of proceeds from disposals).
●
We define “adjusted operating income (loss)” as our income (loss) from operations excluding stock-based compensation.
58
Table of Contents
These financial measures are not based on any standardized methodologies prescribed by accounting principles generally accepted in the United States, or GAAP, and are not necessarily comparable
to similarly titled measures presented by other companies.
We have presented shipments, adjusted EBITDA, free cash flow and adjusted operating income (loss) because they are key measures used by our management and board of directors to understand and
evaluate our operating performance, to establish budgets and to develop operational goals for managing our business. We believe that these financial measures help identify underlying trends in our business that could otherwise be masked by the
effect of the expenses that we exclude. In particular, we believe that the exclusion of the expenses eliminated in calculating adjusted EBITDA and adjusted operating income (loss) can provide useful measures for period-to-period comparisons of our
core operating performance and that the exclusion of property and equipment purchases from operating cash flow can provide a usual means to gauge our capability to generate cash. Accordingly, we believe that these financial measures provide useful
information to investors and others in understanding and evaluating our operating results, enhancing the overall understanding of our past performance and future prospects, and allowing for greater transparency with respect to key financial metrics
used by our management in its financial and operational decision-making.
Shipments, adjusted EBITDA, free cash flow and adjusted operating income (loss) are not prepared in accordance with GAAP, and should not be considered in isolation of, or as an alternative to,
measures prepared in accordance with GAAP.
Shipments
We consider shipments a key operating metric as it reflects the total value of products delivered to customers and prospective customers by our productive assets.
Shipments consist of two components:
●
a shipment to a customer of a type of tool that the customer has previously accepted, for which we recognize revenue when the tool is delivered; and
●
a shipment to a customer of a type of tool that the customer is receiving and evaluating for the first time, in each case a “first tool,” for which we may recognize revenue at a later date, subject to the
customer’s acceptance of the tool upon the tool’s satisfaction of applicable contractual requirements or subject to the costumer’s subsequent discretionary commitment to purchase the tool.
“First tool” shipments can be made to either an existing customer that has not previously accepted that specific type of tool in the past ─ for example, a delivery of a SAPS V tool to a customer
that previously had received only SAPS II tools ─ or to a new customer that has never purchased any tool from us.
Shipments in the three and six months ended June 30, 2022 totaled $112 million and $179 million, as compared to $82 million and $156 million for the
same periods in 2021. Repeat tool shipments in the three and six-months ended June 30, 2022 totaled $67 million and $97 million, as compared to $49 million and $87 million for the same periods in 2021. First tool shipments in the three- and
six-months ended June 30, 2022 totaled $45 million and $82 million, as compared to $34 million and $69 million for the same periods in 2021.
The dollar amount attributed to a “first tool” shipment is equal to the consideration we expect to receive if any and all contractual
requirements are satisfied and the customer accepts the tool, or if the customer subsequently determines in its discretion to purchase the tool. There are a number of limitations related to the use of shipments in evaluating our business,
including that customers have significant, or in some cases total, discretion in determining whether to accept or purchase our tools after evaluation and their decision not to accept or purchase delivered tools is likely to result in our
inability to recognize revenue from the delivered tools. “First tool” shipments reflect the value of incremental new products under evaluation delivered to our customers or prospective customers for a given period and is used as an internal key
metric to reflect future potential revenue opportunity. The cumulative cost of “first tool” shipments under evaluation at customers which have not been accepted by the customer is carried at cost and reflected in finished goods inventory (see
note 5 to the condensed consolidated financial statements included in this report). “First tool” shipments exclude deliveries to customers for which ACM does not have a basis to expect future revenue.
59
Table of Contents
Adjusted EBITDA
There are a number of limitations related to the use of adjusted EBITDA rather than net income (loss), which is the nearest GAAP equivalent. Some of these limitations are:
●
adjusted EBITDA excludes depreciation and amortization and, although these are non-cash expenses, the assets being depreciated or amortized may have to be replaced in the future;
●
we exclude stock-based compensation expense from adjusted EBITDA and adjusted operating income (loss), although (a) it has been, and will continue to be for the foreseeable future, a significant recurring
expense for our business and an important part of our compensation strategy and (b) if we did not pay out a portion of our compensation in the form of stock-based compensation, the cash salary expense included in operating expenses would be
higher, which would affect our cash position;
●
the expenses and other items that we exclude in our calculation of adjusted EBITDA may differ from the expenses and other items, if any, that other companies may exclude from adjusted EBITDA when they report
their operating results;
●
adjusted EBITDA does not reflect changes in, or cash requirements for, working capital needs;
●
adjusted EBITDA does not reflect interest expense, or the requirements necessary to service interest or principal payments on debt;
●
adjusted EBITDA does not reflect income tax expense (benefit) or the cash requirements to pay taxes;
●
adjusted EBITDA does not reflect historical cash expenditures or future requirements for capital expenditures or contractual commitments;
●
although depreciation and amortization charges are non-cash charges, the assets being depreciated and amortized will often have to be replaced in the future, and adjusted EBITDA does not reflect any cash
requirements for such replacements; and
●
adjusted EBITDA includes expense reductions and non-operating other income attributable to PRC governmental grants, which may mask the effect of underlying developments in net income, including trends in
current expenses and interest expense, and free cash flow includes the PRC governmental grants, the amount and timing of which can be difficult to predict and are outside our control.
The following table reconciles net income, the most directly comparable GAAP financial measure, to adjusted EBITDA:
Six Months Ended June 30,
2022
2021
% Change
2022 v 2021
Absolute
Change 2022
v 2021
(in thousands)
Adjusted EBITDA Data:
Net Income
$
9,305
$
13,156
(29.3
)%
$
(3,851
)
Interest expense (income), net
(3,382
)
303
(1,216.2
)%
(3,685
)
Income tax benefit
3,668
(2,755
)
(233.1
)%
6,423
Depreciation and amortization
2,555
1,031
147.8
%
1,524
Stock based compensation
3,343
2,545
31.4
%
798
Unrealized (gain) loss on trading securities
4,281
(2,736
)
(256.5
)%
7,017
Adjusted EBITDA
$
19,770
$
11,544
71.3
%
$
8,226
60
Table of Contents
The $8.2 million increase in adjusted EBITDA for the six months ended June 30, 2022 as compared to the same period in 2021 reflected a $3.9 million decrease in net income, a $7.0 million
increase in unrealized (gain) loss on trading securities, a $1.5 million increase in depreciation and amortization, and a $0.8 million increase in stock-based compensation, partly offset by a $3.4 million impact from an increase in interest income,
net, and a $6.4 million impact from a change in income tax benefit (expense)
We do not exclude from adjusted EBITDA expense reductions and non-operating other income attributable to PRC governmental grants because we consider and incorporate the expected amounts and
timing of those grants in incurring expenses and capital expenditures. If we did not receive the grants, our cash expenses therefore would be lower, and our cash position would not be affected, to the extent we have accurately anticipated the
amounts of the grants. For additional information regarding our PRC grants, please see “—Key Components of Results of Operations—PRC Government Research and Development Funding.”
Free Cash Flow
The following table reconciles net cash provided by (used in) operating activities, the most directly comparable GAAP financial measure, to free cash flow:
Six Months Ended June 30,
2022
2021
% Change
2022 v 2021
Absolute
Change 2022
v 2021
(in thousands)
Free Cash Flow Data:
Net cash provided by (used in) operating activities
$
(61,297
)
$
241
(25,534.4
)%
$
(61,538
)
Purchase property and equipment
(5,256
)
(2,353
)
123.4
%
(2,903
)
Free cash flow
$
(66,553
)
$
(2,112
)
3,051.2
%
$
(64,441
)
The $64.4 million decrease in free cash flow for the six months ended June 30, 2022 as compared to the same period in 2021 reflected the factors driving net cash provided by operating activities,
including increases in advances from customers, accounts payable, other payables and accrued expenses and net income, partly offset by increases in inventory, accounts receivables, and other liabilities. These were partly offset by an increase of
purchases of property and equipment and intangible assets. Consistent with our methodology for calculating adjusted EBITDA, we do not adjust free cash flow for the effects of PRC government subsidies, because we take those subsidies into account in
incurring expenses and capital expenditures. We do not adjust free cash flow for the effects of time-deposits, which for our internal purposes are considered as largely similar to cash.
Adjusted Operating Income
Adjusted operating income excludes stock-based compensation from income from operations. Although stock-based compensation is an important aspect of the compensation of our employees and
executives, determining the fair value of certain of the stock-based instruments we utilize involves a high degree of judgment and estimation and the expense recorded may bear little resemblance to the actual value realized upon the vesting or
future exercise of the related stock-based awards. Furthermore, unlike cash compensation, the value of stock options, which is an element of our ongoing stock-based compensation expense, is determined using a complex formula that incorporates
factors, such as market volatility, that are beyond our control. Management believes it is useful to exclude stock-based compensation in order to better understand the long-term performance of our core business and to facilitate comparison of our
results to those of peer companies. The use of non-GAAP financial measures excluding stock-based compensation has limitations, however. If we did not pay out a portion of our compensation in the form of stock-based compensation, the cash salary
expense included in operating expenses would be higher and our cash holdings would be less. The following tables reflect the exclusion of stock-based compensation, or SBC, from line items comprising income from operations:
61
Table of Contents
Six Months Ended June 30,
2022
2021
Actual
(GAAP)
SBC
Adjusted
(Non-
GAAP)
Actual
(GAAP)
SBC
Adjusted
(Non-GAAP)
(in thousands)
Revenue
$
146,581
$
-
$
146,581
$
97,596
$
-
$
97,596
Cost of revenue
(82,738
)
(253
)
(82,485
)
(57,871
)
(181
)
(57,690
)
Gross profit
63,843
(253
)
64,096
39,725
(181
)
39,906
Operating expenses:
Sales and marketing
(14,361
)
(928
)
(13,433
)
(11,097
)
(983
)
(10,114
)
Research and development
(28,713
)
(1,067
)
(27,646
)
(13,437
)
(508
)
(12,929
)
General and administrative
(10,040
)
(1,095
)
(8,945
)
(7,410
)
(873
)
(6,537
)
Income (loss) from operations
10,729
(3,343
)
14,072
7,781
(2,545
)
10,326
Adjusted operating income for the six months ended June 30, 2022 increased by $3.7 million, as compared with the same period in 2021, due to a $2.9 million increase in income from operations,
offset by a $0.8 million increase in stock-based compensation expense.