−Removed: Company headquarters is maintained through a
−Removed: lease at 330 Bay Street, Suite 1400, Toronto, Ontario, Canada M5H 2S8.
−Removed: An operations facility is rented at 31617 Hwy
−Removed: 90 Road, Nucla, Colorado, USA 81424 which houses the Kinetic Separation units and an office.
−Removed: The diagram below illustrates the location of
−Removed: the Company’s properties:
+Added: Company headquarters is maintained through a lease at 330 Bay Street,
+Added: Suite 1400, Toronto, Ontario, Canada M5H 2S8.
+Added: An operations facility is rented at 31617 Hwy 90 Road, Nucla, Colorado,
+Added: USA which houses the Kinetic Separation units and a shop office.
+Added: In 2022, the rental of a new mining operations office was added at 31525
+Added: Hwy 90 Road, Nucla, Colorado, USA.
+Added: The diagram below illustrates the location of the Company’s properties:
Sunday Mine Complex
1 unchanged sentence
Bullen Property (Weld County)
−Removed: Western Uranium & Vanadium Corp is engaged
−Removed: in the business of exploring, developing, mining and production from its uranium and vanadium resource properties.
−Removed: On September 16, 2015, in connection with the
−Removed: Black Range Transaction, the Company acquired additional mineral properties.
−Removed: The mining assets acquired through Black Range included
−Removed: assets in the states of Colorado, Wyoming, and Alaska.
+Added: Western Uranium & Vanadium Corp is engaged in the business of exploring,
+Added: developing, mining and production from its uranium and vanadium resource properties.
+Added: On September 16, 2015, in connection with the Black Range Transaction,
+Added: the Company acquired additional mineral properties.
+Added: The mining assets acquired through Black Range included assets in the states of Colorado,
+Added: Wyoming, and Alaska.
None of these mining assets are operational at this time.
−Removed: As these properties
−Removed: have not formally established proven or probable reserves, there may be greater inherent uncertainty as to whether or not any mineralized
−Removed: material can be economically extracted as originally planned and anticipated.
−Removed: The Company’s mining properties acquired
−Removed: on August 18, 2014 that the Company retains as of December 31, 2021, include:
−Removed: Rafael Uranium Project located in Emery County, Utah
−Removed: Sunday Mine Complex located in western San Miguel County, Colorado
−Removed: Van 4 Mine located in western Montrose County, Colorado
−Removed: Sage Mine project located in San Juan County, Utah and San Miguel County, Colorado
−Removed: Project located in San Juan County, Utah.
−Removed: The Company’s mining properties acquired
−Removed: on September 16, 2015 that the Company retains as of December 31, 2021, include:
−Removed: North Hansen, High Park, and Hansen Picnic Tree, located in Fremont and Teller Counties,
−Removed: Keota Uranium project acreage located in Weld County, Colorado
−Removed: Haggerty located in Carbon County, Wyoming
−Removed: The Company has a 100% interest in all of these
−Removed: properties except for the Hansen/Taylor Ranch, of which the company owns 49%.
−Removed: Although we have established the existence of
−Removed: mineralized materials on our uranium properties, we have not established any measured, indicated or inferred mineral resources or any
−Removed: proven or probable reserves through the completion of a feasibility study for any of our uranium properties and we have no current plans
−Removed: to seek to do so, as it would not serve a business purpose at the present time.
−Removed: The near term plan for the Company’s resources
−Removed: is to initially mine at the Sunday Complex.
−Removed: The Sunday Mine Complex is an advanced stage property with a significant drilling and production
+Added: As these properties have not formally established proven
+Added: or probable reserves, there may be greater inherent uncertainty as to whether or not any mineralized material can be economically extracted
+Added: as originally planned and anticipated.
+Added: The Company’s mining properties acquired on August 18, 2014 that
+Added: the Company retains as of December 31, 2022, include:
+Added: ● San Rafael Uranium Project located in Emery County, Utah
+Added: ● The Sunday Mine Complex located in western San Miguel County, Colorado
+Added: ● The Van 4 Mine located in western Montrose County, Colorado
+Added: ● The Sage Mine project located in San Juan County, Utah and San Miguel County, Colorado
+Added: ● Dunn Project located in San Juan County, Utah.
+Added: The Company’s mining properties acquired on September 16, 2015
+Added: that the Company retains as of December 31, 2022, include:
+Added: ● Hansen, North Hansen, High Park, and Hansen Picnic Tree, located in Fremont and Teller Counties, Colorado
+Added: ● The Keota Uranium project acreage located in Weld County, Colorado
+Added: ● Ferris Haggerty located in Carbon County, Wyoming
+Added: The Company has a 100% interest in all of these properties except for
+Added: the Hansen/Taylor Ranch, of which the company owns 49%.
+Added: Although we have established the existence of mineralized materials
+Added: on our uranium properties, we have not established any measured, indicated or inferred mineral resources or any proven or probable reserves
+Added: through the completion of a feasibility study for any of our uranium properties and we have no current plans to seek to do so, as it would
+Added: not serve a business purpose at the present time.
+Added: The near term plan for the Company’s resources is to initially
+Added: mine at the Sunday Complex.
+Added: The Sunday Mine Complex is an advanced stage property with a significant drilling and production history.
Mining and drilling occurred contemporaneously from the 1950’s through the mid 1980’s.
−Removed: From the 1980’s to
−Removed: the present, mining and drilling occurred only sporadically, typically when uranium or vanadium prices were high.
−Removed: The last previous mining
−Removed: interval was from 2006 to 2009.
+Added: From the 1980’s to the present,
+Added: mining and drilling occurred only sporadically, typically when uranium or vanadium prices were high.
+Added: The last previous mining interval
+Added: was from 2006 to 2009.
Based on the available records, only in 2009 did any surface drilling take place since mid-1980.
−Removed: operators have generated abundant geologic and mining data, and there are open faces underground that show mineralized zones.
−Removed: exploration is not needed because the underground infrastructure has been already developed.
+Added: Past operators
+Added: have generated abundant geologic and mining data, and there are open faces underground that show mineralized zones.
+Added: Near term exploration
+Added: is not needed because the underground infrastructure has been already developed.
Mining Properties
−Removed: Set forth below are details regarding our mining
−Removed: properties operated by us, which have been prepared in accordance with the requirements of S-K 1300.
+Added: Set forth below are details regarding our mining properties operated
+Added: by us, which have been prepared in accordance with the requirements of S-K 1300.
Sunday Mines Complex
−Removed: The Sunday Mine Complex
−Removed: is located in western San Miguel County and is part of the Uravan Mineral Belt.
−Removed: The property is situated 25 miles north of Dove Creek,
−Removed: Colorado, on the north flank of Disappointment Valley and portions of Big Gypsum Valley.
+Added: The Sunday Mine Complex is
+Added: located in western San Miguel County and is part of the Uravan Mineral Belt.
+Added: The property is situated 25 miles north of Dove Creek, Colorado,
+Added: on the north flank of Disappointment Valley and portions of Big Gypsum Valley.
Energy Fuels Resources (USA) Inc.
−Removed: acquired the property in June 2012 from Denison Mines Corp.
−Removed: The complex consists of five individual mines with mine workings located
−Removed: along a two mile stretch of the southern side of Big Gypsum Valley, with underground workings extending generally south, with associated
−Removed: vents and surface facilities.
+Added: (“EFR”) acquired
+Added: the property in June 2012 from Denison Mines Corp.
+Added: The complex consists of five individual mines with mine workings located along a two
+Added: mile stretch of the southern side of Big Gypsum Valley, with underground workings extending generally south, with associated vents and
+Added: surface facilities.
The mines are, from east to west:
Sunday, Carnation, Saint Jude, West Sunday, and Topaz.
−Removed: mines were previously actively mined from 2007 to 2009, by a prior owner.
−Removed: In 2017, the mines were re-opening for a project involving
−Removed: exploration, development, and mining.
−Removed: The property consists
−Removed: of 221 unpatented claims on public land managed by the U.S.
−Removed: Bureau of Land Management (“BLM”) Tres Rios
−Removed: Field Office, covering approximately 3,800 acres.
−Removed: The area covers parts of sections 10, 13, 14, 15, 23, 24, and 26 T44N
−Removed: R18W, and sections 18, 19, 20, and 30 T44N R17W.
−Removed: Total annual BLM claim maintenance fees are approximately $34,255 due
−Removed: September 1st each year.
+Added: The mines were
+Added: previously actively mined from 2007 to 2009, by a prior owner.
+Added: In 2017, the mines were re-opening for a project involving exploration,
+Added: development, and mining.
+Added: The property consists of 221 unpatented
+Added: claims on public land managed by the U.S.
+Added: Bureau of Land Management (“BLM”) Tres Rios Field Office, covering approximately 3,800 acres.
+Added: The area covers parts of sections 10, 13, 14, 15, 23, 24, and 26 T44N R18W, and sections 18,
+Added: 19, 20, and 30 T44N R17W.
+Added: Total annual BLM claim maintenance fees are approximately $34,255 due September 1st each
The property has access to grid power and has a natural underground source of water due to an aquifer.
−Removed: As a mine that has produced in the recent past, the Sunday Mine Complex has a robust infrastructure.
−Removed: The roads are all-weather, electric
−Removed: power is grid-tied, surface facility structures that meet Colorado State standards exist, and water is present.
−Removed: During 2019, a mine re-opening
−Removed: project was implemented at the Sunday Mine Complex to identify high-grade vanadium ore, followed by bulk sampling and development drilling.
−Removed: Active mining was conducted and the extracted ore was stock piled underground in the mine.
−Removed: Each of the five associated mining permits
−Removed: are in Temporary Cessation status.
+Added: As a mine that has produced
+Added: in the recent past, the Sunday Mine Complex has a robust infrastructure.
+Added: The roads are all-weather, electric power is grid-tied, surface
+Added: facility structures that meet Colorado State standards exist, and water is present.
+Added: During 2019, a mine re-opening project was implemented
+Added: at the Sunday Mine Complex to identify high-grade vanadium ore, followed by bulk sampling and development drilling.
+Added: Active mining was
+Added: conducted and the extracted ore was stock piled underground in the mine.
+Added: Each of the five associated mining permits are in Temporary Cessation
GMG, Sunshine, and Patsun claims
1 unchanged sentence
Accessibility
−Removed: The property is best
−Removed: accessed from Colorado.
−Removed: Access from Colorado is via State Highway 141 east out of Naturita, CO for about 3.7 mi (6 km) until the 141/145
−Removed: Highway junction, then about 22.4 mi (36 km) south on Hwy 141, then about 6.2 mi (10 km) northwest on County Road 20R (Gypsum Valley
−Removed: The State Highway 141 is a paved all-weather road and the County Road 20R is a gravel road passable in all but the worst weather.
−Removed: The Sunday Mine Complex
−Removed: consists of six different mines.
+Added: The property is best accessed from Colorado.
+Added: Access from Colorado is via State Highway 141 east out of Naturita, CO for about 3.7 mi (6 km) until the 141/145 Highway junction, then
+Added: about 22.4 mi (36 km) south on Hwy 141, then about 6.2 mi (10 km) northwest on County Road 20R (Gypsum Valley Road).
+Added: The State Highway
+Added: 141 is a paved all-weather road and the County Road 20R is a gravel road passable in all but the worst weather.
+Added: The Sunday Mine Complex consists of six different
These are the Topaz, West Sunday, Sunday, St.
Jude, Carnation, and the GMG.
−Removed: The mines have had a number
−Removed: of owners and operators.
−Removed: Maps and documents made available to the author show that the following companies have been involved in the
−Removed: all or parts of the property prior to WUC acquisition of the SMC in April 2014:
−Removed: Matterhorn Mining (1950’s-1960’s, Climax
−Removed: Uranium 1960’s, Union Carbide Corporation (UCC) 1970’s-1980’s, Atlas Minerals (1980’s), Energy Fuels Nuclear
−Removed: (early 1990’s), International Uranium Corp.
+Added: The mines have had a number of owners and operators.
+Added: Maps and documents made available to the author show that the following companies have been involved in the all or parts of the property
+Added: prior to WUC acquisition of the SMC in April 2014:
+Added: Matterhorn Mining (1950’s-1960’s, Climax Uranium 1960’s, Union Carbide
+Added: Corporation (UCC) 1970’s-1980’s, Atlas Minerals (1980’s), Energy Fuels Nuclear (early 1990’s), International Uranium
(1990’s-2000’s), Denison Mines (USA) (2000’s), and Energy Fuels (2010’s).
−Removed: The documents are incomplete as so this list may be as well.
+Added: The documents are incomplete as
+Added: so this list may be as well.
Since UCC days, the ownership has been clear.
−Removed: In 1983 Union Carbide transferred
−Removed: its mineral interests to UMETCO, a wholly-owned subsidiary.
−Removed: For the sake of consistency, the name Union Carbide will be used even if
−Removed: technically the ownership was UMETCO at the time.
−Removed: Records made available
−Removed: by the Company and a search of public documents on-line indicates exploration drilling starting on the property in the early 1950’s.
−Removed: Two Defense Minerals Exploration Administration (DMEA) reports, one on the Sunday area and the other on the Topaz area, indicated some
−Removed: drilling and minor surface extraction had occurred by the mid 1950’s (DMEA, 1953 & 1956).
−Removed: Additionally, historic maps of the
−Removed: area show the Sunday mines in operation in the 1950’s (Denison Mines, 2008).
−Removed: The records & anecdotal
−Removed: evidence indicate that from the mid-1960’s until the early 1980’s, the SMC produced material from relatively steady ongoing
−Removed: mining operations.
+Added: In 1983 Union Carbide transferred its mineral interests to
+Added: UMETCO, a wholly-owned subsidiary.
+Added: For the sake of consistency, the name Union Carbide will be used even if technically the ownership
+Added: was UMETCO at the time.
+Added: Records made available by the Company and
+Added: a search of public documents on-line indicates exploration drilling starting on the property in the early 1950’s.
+Added: Two Defense Minerals
+Added: Exploration Administration (DMEA) reports, one on the Sunday area and the other on the Topaz area, indicated some drilling and minor surface
+Added: extraction had occurred by the mid 1950’s (DMEA, 1953 & 1956).
+Added: Additionally, historic maps of the area show the Sunday mines
+Added: in operation in the 1950’s (Denison Mines, 2008).
+Added: The records & anecdotal evidence indicate
+Added: that from the mid-1960’s until the early 1980’s, the SMC produced material from relatively steady ongoing mining operations.
These ceased in 1984 when Union Carbide closed their Uravan mill.
−Removed: Since then, the property has been idle, with the
−Removed: exception of brief periods in the late 1980’s when UCC mined for a short time during a spike in vanadium prices, in the mid-1990’s
−Removed: with International Uranium Corporation and another one in 2006-2009 when Denison Mines extracted ore from the mine.
−Removed: During all three
−Removed: periods, the ore was processed at the White Mesa Mill located just south of Blanding, UT.
−Removed: Exploration and development
−Removed: drilling on the property was contemporaneous with the mining.
−Removed: The available database records show that at least 1,419 holes have been
−Removed: drilled on the property.
−Removed: This is an incomplete list, as an examination of the available maps and cross-sections show a number of holes
−Removed: that are not in the database.
+Added: Since then, the property has been idle, with the exception of brief
+Added: periods in the late 1980’s when UCC mined for a short time during a spike in vanadium prices, in the mid-1990’s with International
+Added: Uranium Corporation and another one in 2006-2009 when Denison Mines extracted ore from the mine.
+Added: During all three periods, the ore was
+Added: processed at the White Mesa Mill located just south of Blanding, UT.
+Added: Exploration and development drilling on the
+Added: property was contemporaneous with the mining.
+Added: The available database records show that at least 1,419 holes have been drilled on the property.
+Added: This is an incomplete list, as an examination of the available maps and cross-sections show a number of holes that are not in the database.
A best estimate for total distance drilled is about 850,100 ft (259,175 m).
−Removed: Anecdotal evidence and some
−Removed: maps also give evidence that underground long holes (test holes drilled from the mine workings anywhere from 50 ft (15 m) to 300 ft (91
−Removed: m) long) were used extensively throughout the mined areas.
−Removed: The 2-D digitized mine
−Removed: workings, done by Denison Mines show extensive stopping and drifting within parts of the SMC.
−Removed: Generational mine maps indicate that more
−Removed: mine workings exist than are shown in the digital database.
−Removed: A very conservative rough estimate of the linear mine workings based on the
−Removed: digital database is in excess of 50,000 ft (15,244 m) with many stopes.
+Added: Anecdotal evidence and some maps also give evidence that underground
+Added: long holes (test holes drilled from the mine workings anywhere from 50 ft (15 m) to 300 ft (91 m) long) were used extensively throughout
+Added: the mined areas.
+Added: The 2-D digitized mine workings, done by Denison
+Added: Mines show extensive stopping and drifting within parts of the SMC.
+Added: Generational mine maps indicate that more mine workings exist than
+Added: are shown in the digital database.
+Added: A very conservative rough estimate of the linear mine workings based on the digital database is in
+Added: excess of 50,000 ft (15,244 m) with many stopes.
Figure 6.2.1 shows the known drill hole and mine working locations.
−Removed: Based on the records
−Removed: and on field inspection, it is evident that the Property has a significant history of drill exploration and mine development.
−Removed: Geol., LLC was commissioned by the Company to prepare a technical report compliant with NI 43-101 on the Sunday Mine Complex Uranium
−Removed: (SMC) Project (the “Sunday Mine Report”).
−Removed: The Sunday Mine Report was finalized on July 7, 2015 and filed on sedar.com on
−Removed: July 16, 2015.
−Removed: The Sunday Mine Report is an historic estimate
−Removed: of measured and indicated resources (not reserves) under NI 43-101.
−Removed: However, the Company is not treating the historical estimate as current
−Removed: mineral resources, and S-K 1300 does not permit such historic estimates to be disclosed in Form 10-K annual reports.
−Removed: There is no more recent data available on the
−Removed: Sunday Mine Complex project resource than that of the Sunday Mine Report.
−Removed: In order to disclose a resource estimate as current, the Company
−Removed: would need to engage a qualified person (as defined under 43-101 and S-K 1300) to, among other things, take account of any exploration
−Removed: or other work on the Sunday Mine Complex since the date of the historical estimate and produce a technical report compliant with NI 43-101
−Removed: and a feasibility study compliant with S-K 1300.
−Removed: The Company currently does not intend to commission such a technical report or feasibility
+Added: Based on the records and on field inspection,
+Added: it is evident that the Property has a significant history of drill exploration and mine development.
+Added: Geol., LLC was commissioned
+Added: by the Company to prepare a technical report compliant with NI 43-101 on the Sunday Mine Complex Uranium (SMC) Project (the “Sunday
+Added: Mine Report”).
+Added: The Sunday Mine Report was finalized on July 7, 2015 and filed on sedar.com on July 16, 2015.
+Added: The Sunday Mine Report is an historic estimate of measured and indicated
+Added: resources (not reserves) under NI 43-101.
+Added: However, the Company is not treating the historical estimate as current mineral resources, and
+Added: S-K 1300 does not permit such historic estimates to be disclosed in Form 10-K annual reports.
+Added: There is no more recent data available on the Sunday Mine Complex project
+Added: resource than that of the Sunday Mine Report.
+Added: In order to disclose a resource estimate as current, the Company would need to engage a
+Added: qualified person (as defined under 43-101 and S-K 1300) to, among other things, take account of any exploration or other work on the Sunday
+Added: Mine Complex since the date of the historical estimate and produce a technical report compliant with NI 43-101 and a feasibility study
+Added: compliant with S-K 1300.
+Added: The Company currently does not intend to commission such a technical report or feasibility study.
Project Geology
−Removed: Geologically, the main hosts for uranium-vanadium
−Removed: mineralization in the Sunday Mine Complex are fluvial sandstone beds assigned to the upper part of the Salt Wash Member of the Jurassic
−Removed: Morrison Formation, with minor production coming from conglomeratic sandstones assigned to the lower portion of the Brushy Basin Member
−Removed: of the Morrison Formation.
−Removed: Mineralization from both members is present at the property, with the mine production coming from the Salt
−Removed: Beds generally strike NW-SE and dip SW, with some exceptions within fault bounded blocks adjacent to Big Gypsum Valley.
+Added: Geologically, the main hosts for uranium-vanadium mineralization in
+Added: the Sunday Mine Complex are fluvial sandstone beds assigned to the upper part of the Salt Wash Member of the Jurassic Morrison Formation,
+Added: with minor production coming from conglomeratic sandstones assigned to the lower portion of the Brushy Basin Member of the Morrison Formation.
+Added: Mineralization from both members is present at the property, with the mine production coming from the Salt Wash Member.
+Added: Beds generally
+Added: strike NW-SE and dip SW, with some exceptions within fault bounded blocks adjacent to Big Gypsum Valley.
Restoration and Reclamation
−Removed: Each of the mines
−Removed: are permitted separately with the DRMS and are considered to be in temporary cessation status.
−Removed: The mines and their permitted acres and
−Removed: financial warranties are, from east to west, the Sunday (60 acres, $330,242), Carnation (9.8 acres, $40,245), Saint Jude (9.8
−Removed: acres, $69,828), West Sunday (12.1 acres, $85,036), and Topaz (30 acres, $99,893).
+Added: Each of the mines are permitted separately
+Added: with the DRMS and are considered to be in temporary cessation status.
+Added: The mines and their permitted acres and financial warranties are,
+Added: from east to west, the Sunday (60 acres, $330,242), Carnation (9.8 acres, $40,245), Saint Jude (9.8 acres, $69,828), West Sunday (12.1
+Added: acres, $85,036), and Topaz (30 acres, $99,893).
Permitting Status
1 unchanged sentence
being renewed with APCD.
−Removed: A Stormwater permit is in place with the WQCD and a Stormwater Management Plan is in
−Removed: However, a mine water treatment plant will need to be permitted for treating mine water, as there is currently 55 million
−Removed: gallons of water in the lower portion of the mine where most of the remaining resource is located.
−Removed: This will require a discharge
−Removed: permit with the WQCD and revisions to the Plan of Operations, EPP, and one of the DRMS mine permits.
−Removed: Special Use Permits are also in
−Removed: place with San Miguel County, which mainly address road maintenance and transportation issues with some limitations in effect on
−Removed: when and how many trucks may be used for ore haulage to the mill.
−Removed: On February 4, 2020, the Colorado DRMS sent a Notice of Hearing to
−Removed: Declare Termination of Mining Operations to Western for the Sunday Mine Complex.
−Removed: At issue is the application of an unchallenged
−Removed: Colorado Court of Appeals Opinion for a separate mine, with very different facts that is retroactively modifying DRMS rules and
−Removed: The Company maintains that it was timely in meeting existing rules and regulations.
−Removed: A permit hearing was scheduled for
−Removed: October 21, 2020 to determine temporary cessation status.
−Removed: In a unanimous vote, the MLRB approved temporary cessation status for each
−Removed: of the five Sunday Mine Complex permits (Sunday, West Sunday, St.
+Added: A Stormwater permit is in place with the WQCD and a Stormwater Management Plan is in effect.
+Added: However, a mine water treatment plant will need to be permitted for treating mine water, as there is currently 55 million gallons of water
+Added: in the lower portion of the mine where most of the remaining resource is located.
+Added: This will require a discharge permit with the WQCD and
+Added: revisions to the Plan of Operations, EPP, and one of the DRMS mine permits.
+Added: Special Use Permits are also in place with San Miguel County,
+Added: which mainly address road maintenance and transportation issues with some limitations in effect on when and how many trucks may be used
+Added: for ore haulage to the mill.
+Added: On February 4, 2020, the Colorado DRMS sent a
+Added: Notice of Hearing to Declare Termination of Mining Operations to Western for the Sunday Mine Complex.
+Added: At issue is the application of an
+Added: unchallenged Colorado Court of Appeals Opinion for a separate mine, with very different facts that is retroactively modifying DRMS rules
+Added: and regulations.
+Added: The Company maintains
+Added: that it was timely in meeting existing rules and regulations.
+Added: A permit hearing was scheduled for October 21, 2020 to determine temporary
+Added: cessation status.
+Added: In a unanimous vote, the MLRB approved temporary cessation status for each of the five Sunday Mine Complex permits (Sunday,
+Added: West Sunday, St.
Jude, Carnation, and Topaz).
−Removed: On October 9, 2020, the MLRB issued a
−Removed: board order which finalized the findings of the July 22, 2020 permit hearing.
−Removed: On November 10, 2020, the MLRB issued a board order
−Removed: which finalized the findings of the October 21, 2020 permit hearing.
−Removed: On November 6, 2020, the MLRB signed an order placing the five
−Removed: Sunday Mine Complex mine permits into Temporary Cessation.
−Removed: On November 12, 2020, a coalition of environmental groups (the
−Removed: “Plaintiffs”) filed a complaint against the MLRB seeking a partial appeal of the July 22, 2020 decision by requesting
−Removed: termination of the Topaz Mine permit.
−Removed: On December 15, 2020, the same coalition of environmental groups amended their complaint
−Removed: against the MLRB seeking a partial appeal of the October 21, 2020 decision requesting termination of the Topaz Mine permit.
−Removed: Company has joined with the MLRB in defense of their July 22, 2020 and October 21, 2020 decisions.
−Removed: On May 5, 2021, the Plaintiff in
−Removed: the Topaz Appeal filed an opening brief with the Denver District Court seeking to overturn the July 22, 2020 and October 21, 2020
+Added: On October 9, 2020, the MLRB issued a board order which finalized the findings of the July
+Added: 22, 2020 permit hearing.
+Added: On November 10, 2020, the MLRB issued a board order which finalized the findings of the October 21, 2020 permit
+Added: On November 6, 2020, the MLRB signed an order placing the five Sunday Mine Complex mine permits into Temporary Cessation.
+Added: November 12, 2020, a coalition of environmental groups (the “Plaintiffs”) filed a complaint against the MLRB seeking a partial
+Added: appeal of the July 22, 2020 decision by requesting termination of the Topaz Mine permit.
+Added: On December 15, 2020, the same coalition of environmental
+Added: groups amended their complaint against the MLRB seeking a partial appeal of the October 21, 2020 decision requesting termination of the
+Added: Topaz Mine permit.
+Added: The Company has joined with the MLRB in defense of their July 22, 2020 and October 21, 2020 decisions.
+Added: On May 5, 2021,
+Added: the Plaintiff in the Topaz Appeal filed an opening brief with the Denver District Court seeking to overturn the July 22, 2020 and October
21, 2020 MLRB permit hearing decisions on the Topaz Mine permit.
−Removed: The MLRB and the Company were to respond with an answer brief within 35 days
−Removed: on or before June 9, 2021, but instead sought a settlement.
−Removed: The judicial review process was delayed as extensions were put in place
−Removed: until August 20, 2021.
+Added: The MLRB and the Company were to respond with an answer brief within
+Added: 35 days on or before June 9, 2021, but instead sought a settlement.
+Added: The judicial review process was delayed as extensions were put in
+Added: place until August 20, 2021.
A settlement was not reached and the MLRB and the Company submitted answer briefs on August 20, 2021.
2 unchanged sentences
orders regarding the Topaz Mine and remanded the case back to MLRB for further proceedings consistent with its order.
−Removed: by the District Court has an appeal window of 49 days.
−Removed: The Company is also working toward the completion of an updated Topaz mine
−Removed: Plan of Operations which is a separate federal requirement of the BLM for the conduct of mining activities on federal land.
−Removed: Major permits currently in place at the
−Removed: Sunday Complex include:
−Removed: Sunday 112d Mine Permit
−Removed: M-1977-285 (DRMS)
−Removed: Jude 110d Mine Permit
−Removed: M-1978-039-HR (DRMS)
−Removed: West Sunday 112d
−Removed: Mine Permit M-1981-021 (DRMS)
−Removed: Carnation 110d Mine Permit
−Removed: M-1977-416 (DRMS)
−Removed: Topaz 112d Mine Permit
−Removed: M-1980-055-HR (DRMS)
−Removed: West Sunday Plan
−Removed: of Operations COC 52049 (BLM)
−Removed: Jude and Carnation
−Removed: Plan of Operations COC-53227 (BLM)
−Removed: Resolution #1997-18
−Removed: Mine Permit (San Miguel County)
−Removed: Resolution 2007-34 Topaz
−Removed: and Sunday Expansion (San Miguel County)
−Removed: Resolution 2008-41 Increased
−Removed: Ore Haulage (San Miguel County)
−Removed: Road & Bridge Special
−Removed: Construction Permit (SCP) 06-14 (San Miguel County)
−Removed: The San Rafael Uranium Project land position
−Removed: is comprised of a contiguous claim block covered by 136 BM unpatented federal lode mining claims and 10 Hollie unpatented federal lode
−Removed: mining claims.
−Removed: The San Rafael Project is located in the historic
−Removed: Tidwell District about 10 miles west of Green River, Utah.
+Added: The Company and
+Added: the MLRB had until April 19, 2022 to appeal the Denver District Court’s ruling.
+Added: Neither the Company nor the MLRB appealed the Denver
+Added: District Court ruling.
+Added: Subsequently on March 20, 2023, the MLRB issued a board order for the Company to commence final reclamation, which
+Added: upon completion will terminate mining operations at the Topaz Mine.
+Added: Reclamation is to commence immediately at the Topaz Mine and is to
+Added: be completed within five years by March 2028.
+Added: The Company is currently working toward the completion of an updated Topaz Mine Plan of
+Added: Operations which is a separate federal requirement of the BLM for the conduct of mining activities on the federal land at the Topaz Mine
+Added: and needed to re-permit the Topaz Mine with Colorado’s DRMS.
+Added: Major permits currently in place at the Sunday Complex include:
+Added: Sunday 112d Mine Permit M-1977-285 (DRMS)
+Added: Jude 110d Mine Permit M-1978-039-HR (DRMS)
+Added: West Sunday 112d Mine Permit M-1981-021 (DRMS)
+Added: Carnation 110d Mine Permit M-1977-416 (DRMS)
+Added: Topaz 112d Mine Permit M-1980-055-HR (DRMS)
+Added: West Sunday Plan of Operations COC 52049 (BLM)
+Added: Jude and Carnation Plan of Operations COC-53227 (BLM)
+Added: Resolution #1997-18 Mine Permit (San Miguel County)
+Added: Resolution 2007-34 Topaz and Sunday Expansion (San Miguel County)
+Added: Resolution 2008-41 Increased Ore Haulage (San Miguel County)
+Added: Road & Bridge Special Construction Permit (SCP) 06-14 (San Miguel County)
+Added: The San Rafael Uranium Project land position is comprised of a contiguous
+Added: claim block covered by 136 BM unpatented federal lode mining claims and 10 Hollie unpatented federal lode mining claims.
+Added: The San Rafael Project is located in the historic Tidwell District
+Added: about 10 miles west of Green River, Utah.
Most of the property is north of Interstate Highway 70 at the Hanksville exit.
−Removed: Energy Fuels became operator of the San Rafael
−Removed: Project when it acquired Magnum Minerals in June 2009.
+Added: Energy Fuels became operator of the San Rafael Project when it acquired
+Added: Magnum Minerals in June 2009.
It consisted of two core uranium deposits, the Deep Gold and the Down Yonder.
−Removed: In January 2011, EFR acquired the 10 Hollie claims from Titan Uranium.
−Removed: These claims covered the eastern portion of the Deep Gold deposit,
−Removed: greatly increasing resources.
+Added: In January 2011, EFR acquired
+Added: the 10 Hollie claims from Titan Uranium.
+Added: These claims covered the eastern portion of the Deep Gold deposit, greatly increasing resources.
WUC acquired the property from Energy Fuels and currently holds the 146 claims in the project area.
−Removed: The San Rafael Uranium Project is currently being
−Removed: held as a property that is exploratory in nature with no identified reserves.
−Removed: Exploration and mining plans have not been prepared for
−Removed: The Company has not yet undertaken any development work at the property.
−Removed: Power and water sources have not yet been formally
−Removed: Magnum’s acquisition of the claims and
−Removed: some of the data Magnum purchased encumbers the claims.
−Removed: This includes a 2% Net Smelter Return royalty to Uranium One, successor to Energy
−Removed: Metals for claims acquired by Magnum as earn-in to a JV, and a 2% net sales price royalty to Kelly Dearth on the BM claims.
−Removed: no royalty on the Hollie claims.
−Removed: The unpatented claims are located on approximately
−Removed: 2,900 acres of land administered by the U.S.
−Removed: Bureau of Land Management in sections 13, 14, 23, 24, 25, 26, and 35, T21S, R14E, SLPM,
−Removed: Emery County, Utah.
−Removed: Holding cost $22,630 due to BLM for claim maintenance fees prior to September 1 each year.
+Added: The San Rafael Uranium Project is currently being held as a property
+Added: that is exploratory in nature with no identified reserves.
+Added: Exploration and mining plans have not been prepared for the project.
+Added: has not yet undertaken any development work at the property.
+Added: Power and water sources have not yet been formally assessed.
+Added: Magnum’s acquisition of the claims and some of the data Magnum
+Added: purchased encumbers the claims.
+Added: This includes a 2% Net Smelter Return royalty to Uranium One, successor to Energy Metals for claims acquired
+Added: by Magnum as earn-in to a JV, and a 2% net sales price royalty to Kelly Dearth on the BM claims.
+Added: There is no royalty on the Hollie claims.
+Added: The unpatented claims are located on approximately 2,900 acres of land
+Added: administered by the U.S.
+Added: Bureau of Land Management in sections 13, 14, 23, 24, 25, 26, and 35, T21S, R14E, SLPM, Emery County, Utah.
+Added: cost $22,630 due to BLM for claim maintenance fees prior to September 1 each year.
Accessibility
−Removed: The property is located on the eastern side of
−Removed: the San Rafael Swell in east-central Utah, approximately 140 air miles southeast of Salt Lake City.
−Removed: The little desert community of Green
−Removed: River, Utah is located about ten miles to the east.
−Removed: In a general sense the San Rafael Uranium Project property position lies within a
−Removed: wedge shaped area, roughly bound along its northeast edge by US Highway 6-50 and along its southeast edge by Interstate 70.
−Removed: Concerning additional local access features,
−Removed: Highway 6-50 crosses just north of the greater San Rafael Uranium Project area in a northwesterly direction and is roughly paralleled
−Removed: by the regional railroad line.
−Removed: Access to the property is generally good year around, except for periods of heavy snowstorms during December
−Removed: through February and increased monsoon rains and summer cloudburst storms during August through October.
−Removed: Access for drilling and other
−Removed: exploration activity is excellent, except during occasional heavy rainy periods which can create heavy flash flooding and roads mudding-up
−Removed: and becoming impassable.
−Removed: The Deep Gold deposit was originally discovered
−Removed: by Continental Oil Company (Conoco) and Pioneer Uravan geologists in the late 1960s and 1970s to early 1980s, respectively.
−Removed: drilling was conducted just east of the core of the Tidwell Mineral Belt and north-northeast of the Acerson Mineral Belt.
−Removed: The area containing
−Removed: the deposits was considered to contain highly prospective paleo trunk stream channel trends.
−Removed: Some of the larger historic producing mines
−Removed: in the area were Atlas Minerals’ Snow, Probe, and Lucky Mines.
−Removed: The deposit in the San Rafael Project is an open concordant, channel-controlled,
−Removed: sandstone-hosted, trend type, with mineralization hosted in the upper sandstone sequence of the Salt Wash Member of the Upper Jurassic
−Removed: Morrison Formation.
−Removed: In addition to Conoco, Pioneer Uravan, and Atlas
−Removed: Minerals, the US Atomic Energy Commission (AEC) and other companies (Union Carbide, Energy Fuels Nuclear, and others) conducted exploration
−Removed: drilling and mining in the area.
−Removed: Some of these companies performed historic resource estimates on the Deep Gold deposits, but they are
−Removed: not considered compliant with NI 43-101 standards.
−Removed: Depth to mineralization at the Deep Gold deposit
−Removed: in Section 23 averages 800 feet, with hole depths averaging approximately 1,000 feet.
−Removed: Magnum purchased and otherwise acquired most of
−Removed: the available historic exploration data produced by the previous operators.
−Removed: A 100 hole, 100,000 foot drilling program is warranted to
−Removed: discover and define additional uranium resources.
−Removed: Total cost for this work would be $US 1.3 million to $US 1.5 million, based on an all-inclusive
−Removed: cost of $US 15/foot.
+Added: The property is located on the eastern side of the San Rafael Swell
+Added: in east-central Utah, approximately 140 air miles southeast of Salt Lake City.
+Added: The little desert community of Green River, Utah is located
+Added: about ten miles to the east.
+Added: In a general sense the San Rafael Uranium Project property position lies within a wedge shaped area, roughly
+Added: bound along its northeast edge by US Highway 6-50 and along its southeast edge by Interstate 70.
+Added: Concerning additional local access features, U.S.
+Added: Highway 6-50 crosses
+Added: just north of the greater San Rafael Uranium Project area in a northwesterly direction and is roughly paralleled by the regional railroad
+Added: Access to the property is generally good year around, except for periods of heavy snowstorms during December through February and
+Added: increased monsoon rains and summer cloudburst storms during August through October.
+Added: Access for drilling and other exploration activity
+Added: is excellent, except during occasional heavy rainy periods which can create heavy flash flooding and roads mudding-up and becoming impassable.
+Added: The Deep Gold deposit was originally discovered by Continental Oil
+Added: Company (Conoco) and Pioneer Uravan geologists in the late 1960s and 1970s to early 1980s, respectively.
+Added: Exploration drilling was conducted
+Added: just east of the core of the Tidwell Mineral Belt and north-northeast of the Acerson Mineral Belt.
+Added: The area containing the deposits was
+Added: considered to contain highly prospective paleo trunk stream channel trends.
+Added: Some of the larger historic producing mines in the area were
+Added: Atlas Minerals’ Snow, Probe, and Lucky Mines.
+Added: The deposit in the San Rafael Project is an open concordant, channel-controlled, sandstone-hosted,
+Added: trend type, with mineralization hosted in the upper sandstone sequence of the Salt Wash Member of the Upper Jurassic Morrison Formation.
+Added: In addition to Conoco, Pioneer Uravan, and Atlas Minerals, the US Atomic
+Added: Energy Commission (AEC) and other companies (Union Carbide, Energy Fuels Nuclear, and others) conducted exploration drilling and mining
+Added: Some of these companies performed historic resource estimates on the Deep Gold deposits, but they are not considered compliant
+Added: with NI 43-101 standards.
+Added: Depth to mineralization at the Deep Gold deposit in Section 23 averages
+Added: 800 feet, with hole depths averaging approximately 1,000 feet.
+Added: Magnum purchased and otherwise acquired most of the available historic
+Added: exploration data produced by the previous operators.
+Added: A 100 hole, 100,000 foot drilling program is warranted to discover and define additional
+Added: uranium resources.
+Added: Total cost for this work would be $US 1.3 million to $US 1.5 million, based on an all-inclusive cost of $US 15/foot.
The Tidwell Mineral Belt and the San Rafael Uranium
1 unchanged sentence
million pounds of vanadium produced.
−Removed: Production from the Snow, immediately up dip of the Deep Gold deposit, which produced for nine
−Removed: years, starting in March 1973 and ending in January, 1982 consisted of 650,292 pounds of U 3 O 8 contained in 173,330
−Removed: tons of material at an average grade of 0.188% U 3 O 8 (Wilbanks, 1982).
+Added: Production from the Snow, immediately up dip of the Deep Gold deposit, which produced for nine years,
+Added: starting in March 1973 and ending in January, 1982 consisted of 650,292 pounds of U3O8 contained in 173,330 tons of material at an average
+Added: grade of 0.188% U3O8 (Wilbanks, 1982).
Jay Gatten, P.
−Removed: LLC was commissioned by the Company to prepare an independent technical report compliant with NI 43-101 on the San Rafael Uranium Project
−Removed: (including the:
−Removed: Deep Gold Uranium Deposit and the Down Yonder Uranium Deposit) (the “San Rafael Report”).
−Removed: The San Rafael
−Removed: Report was finalized on November 19, 2014 and filed on sedar.com on November 20, 2015.
−Removed: The San Rafael Report is an historic estimate
−Removed: of indicated and inferred uranium resources (not measured resources or reserves) under NI 43-101.
−Removed: However, the Company is not treating
−Removed: the historical estimate as current mineral resources, and S-K 1300 does not permit such historic estimates to be disclosed in Form 10-K
−Removed: annual reports.
−Removed: There is no more recent data available on the
−Removed: San Rafael Uranium Project property than that of the San Rafael Report.
−Removed: In order to disclose a resource estimate as current, the Company
−Removed: would need to engage a qualified person (as defined under 43-101 and S-K 1300) to produce a technical report compliant with NI 43-101
−Removed: and a feasibility study compliant with S-K 1300.
−Removed: The Company currently does not intend to commission such a technical report or feasibility
+Added: Geol., LLC was commissioned
+Added: by the Company to prepare an independent technical report compliant with NI 43-101 on the San Rafael Uranium Project (including the:
+Added: Gold Uranium Deposit and the Down Yonder Uranium Deposit) (the “San Rafael Report”).
+Added: The San Rafael Report was finalized on
+Added: November 19, 2014 and filed on sedar.com on November 20, 2015.
+Added: The San Rafael Report is an historic estimate of indicated and inferred
+Added: uranium resources (not measured resources or reserves) under NI 43-101.
+Added: However, the Company is not treating the historical estimate as
+Added: current mineral resources, and S-K 1300 does not permit such historic estimates to be disclosed in Form 10-K annual reports.
+Added: There is no more recent data available on the San Rafael Uranium Project
+Added: property than that of the San Rafael Report.
+Added: In order to disclose a resource estimate as current, the Company would need to engage a qualified
+Added: person (as defined under 43-101 and S-K 1300) to produce a technical report compliant with NI 43-101 and a feasibility study compliant
+Added: with S-K 1300.
+Added: The Company currently does not intend to commission such a technical report or feasibility study.
Project Geology
3 unchanged sentences
Restoration and Reclamation
−Removed: All exploration permits have been terminated
−Removed: and all bonds released.
+Added: All exploration permits have been terminated and all bonds released.
An EA was completed by BLM in 2008 for drilling up to 150 holes.
−Removed: A large area has been surveyed for cultural
−Removed: and paleontological resources which would expedite future exploration permits.
+Added: A large area has been surveyed for cultural and paleontological resources
+Added: which would expedite future exploration permits.
No mine permitting activities have yet occurred.
Permitting Status
−Removed: All exploration permits have been terminated
−Removed: and all bonds released.
+Added: All exploration permits have been terminated and
+Added: all bonds released.
An EA was completed by BLM in 2008 for drilling up to 150 holes.
−Removed: A large area has been surveyed for cultural
−Removed: and paleontological resources which would expedite future exploration permits.
+Added: A large area has been surveyed for cultural and paleontological
+Added: resources which would expedite future exploration permits.
No mine permitting activities have yet occurred.
2 unchanged sentences
Mineral Belt.
−Removed: The 94 unpatented claims are located
−Removed: on approximately 1,942 acres land administered by the U.S.
−Removed: Bureau of Land Management in sections 34 and 35, T32S, R26E, SLPM, San Juan
−Removed: County, Utah and sections 25 and 26, T43N, R20W, NMPM, and sections 19, 29, 30, 31, and 32, T43N, R19W, NMPM San Miguel County, Colorado.
−Removed: cost is $14,370 due to BLM for claim maintenance fees prior to September 1 each year.
−Removed: The property has access to grid power,
−Removed: however, no source of industrial water has yet been identified.
+Added: The 94 unpatented claims are located on approximately 1,942
+Added: acres land administered by the U.S.
+Added: Bureau of Land Management in sections 34 and 35, T32S, R26E, SLPM, San Juan County, Utah and sections
+Added: 25 and 26, T43N, R20W, NMPM, and sections 19, 29, 30, 31, and 32, T43N, R19W, NMPM San Miguel County, Colorado.
+Added: is $14,370 due to BLM for claim maintenance fees prior to September 1 each year.
+Added: The property has access to grid power, however,
+Added: no source of industrial water has yet been identified.
The Sage Mine Project is currently being held as a property that is exploratory
4 unchanged sentences
Accessibility
−Removed: The Sage Plain Project property can be accessed
−Removed: from the north, south, and east on paved, all-weather county roads.
−Removed: The nearest towns with stores, restaurants, lodging, and small industrial
−Removed: supply retailers are Monticello, Utah, 26 road miles to the west, and Dove Creek, Colorado, 20 road miles to the southeast.
−Removed: Larger population
−Removed: centers with more supplies and services are available farther away at Moab, Utah (61 road miles to the north) and Cortez, Colorado (54
−Removed: road miles to the southeast).
−Removed: Highway 491 connects Monticello, Utah to
−Removed: Dove Creek and Cortez, Colorado.
+Added: The Sage Plain Project property can be accessed from the north, south,
+Added: and east on paved, all-weather county roads.
+Added: The nearest towns with stores, restaurants, lodging, and small industrial supply retailers
+Added: are Monticello, Utah, 26 road miles to the west, and Dove Creek, Colorado, 20 road miles to the southeast.
+Added: Larger population centers with
+Added: more supplies and services are available farther away at Moab, Utah (61 road miles to the north) and Cortez, Colorado (54 road miles to
+Added: the southeast).
+Added: Highway 491 connects Monticello, Utah to Dove Creek and Cortez,
There are two routes north from this highway to the project.
−Removed: At one mile west of the Colorado/Utah state
−Removed: line (16 miles east of Monticello or 10 miles west of Dove Creek), San Juan County Road 370 goes north for 10 miles to the Calliham Mine
−Removed: portal site drive way.
+Added: At one mile west of the Colorado/Utah state line (16 miles east
+Added: of Monticello or 10 miles west of Dove Creek), San Juan County Road 370 goes north for 10 miles to the Calliham Mine portal site drive
The mine portal is one-half mile east of Road 370, on a private road.
−Removed: An alternate route is to turn north on Colorado
−Removed: Highway 141(2 miles west of Dove Creek) for 9.5 miles to Egnar, Colorado, then turn west on San Miguel County.
−Removed: Road H1 for 1.2 miles
−Removed: before intersecting San Juan County Road 370.
+Added: An alternate route is to turn north on Colorado Highway 141(2
+Added: miles west of Dove Creek) for 9.5 miles to Egnar, Colorado, then turn west on San Miguel County.
+Added: Road H1 for 1.2 miles before intersecting
+Added: San Juan County Road 370.
Road 370 would be taken north for 4 miles to the Calliham Mine portal site driveway.
−Removed: H1 from Egnar would also be used if one was traveling to the project on Highway 141 from farther north in Colorado, such as Naturita,
−Removed: Colorado (a total of 62 miles away).
−Removed: The property includes the historic producing
−Removed: Sage Mine and boarders the famous Deremo Mine and the Calliham Mine (combined historic production of over 8 million lbs.
−Removed: 70 million lbs.
−Removed: The uranium-vanadium deposits occur in the upper and middle sandstones of the
−Removed: Salt Wash Member of the Morrison Formation.
−Removed: WUC is in possession of historic mine and drill
−Removed: About 200 historic holes were drilled on the claims at the Sage Mine.
−Removed: A considerable, but unknown amount of drilling occurred historically
−Removed: on the eastern (Colorado) part of the claims along the benches of Summit and Bishop Canyons.
−Removed: Historic production from several small mines
−Removed: occurred on the Colorado claims (Red Ant, Black Spider, etc.).
−Removed: The Sage Mine was developed, operated, and permitted
−Removed: by Atlas Minerals in the 1970s.
−Removed: It closed in 1982 and was ultimately sold and the permit transferred to Butt Mining Company under a Small
−Removed: Jim Butt operated the mine for a short time in the early 1990s when vanadium prices were high;
−Removed: however, the mine has been idle
−Removed: since that time.
+Added: Road H1 from Egnar would
+Added: also be used if one was traveling to the project on Highway 141 from farther north in Colorado, such as Naturita, Colorado (a total of
+Added: 62 miles away).
+Added: The property includes the historic producing Sage
+Added: Mine and boarders the famous Deremo Mine and the Calliham Mine (combined historic production of over 8 million lbs.
+Added: and 70 million lbs.
+Added: The uranium-vanadium deposits occur in the upper and middle sandstones of the Salt Wash Member of
+Added: the Morrison Formation.
+Added: WUC is in possession of historic mine and drill maps.
+Added: About 200 historic
+Added: holes were drilled on the claims at the Sage Mine.
+Added: A considerable, but unknown amount of drilling occurred historically on the eastern
+Added: (Colorado) part of the claims along the benches of Summit and Bishop Canyons.
+Added: Historic production from several small mines occurred on
+Added: the Colorado claims (Red Ant, Black Spider, etc.).
+Added: The Sage Mine was developed, operated, and permitted by Atlas Minerals
+Added: in the 1970s.
+Added: It closed in 1982 and was ultimately sold and the permit transferred to Butt Mining Company under a Small Mine NOI.
+Added: Butt operated the mine for a short time in the early 1990s when vanadium prices were high;
+Added: however, the mine has been idle since that
In the fall of 2011, Colorado Plateau Partners
5 unchanged sentences
the mine to the western mineralized body intercepted 2.0 feet of 0.407% eU3O8.
−Removed: Another hole intercepted mineralization
−Removed: greater than 1.0 foot of 0.16% eU 3 O 8 .
−Removed: Prior to the Company’s acquisition of the
−Removed: Sage Mine property, Energy Fuels, Colorado Plateau Partners (a Joint Venture between Energy Fuels and Lynx-Royal) completed a NI 43-101
−Removed: technical report on the Sage Plain Project (Technical Report on Colorado Plateau Partners LLC (Energy Fuel Resources Corporation/Lynx-Royal
−Removed: JV) Sage Plain Project, San Juan County, Utah and San Miguel County, Colorado by Douglas C.
−Removed: Peters, Certified Professional Geologist,
−Removed: Peters Geosciences Golden, Colorado December 16, 2011) (the “Sage Mine Energy Fuels Report”).
−Removed: The Sage Mine Energy Fuels Report resource is
−Removed: an historic estimate of mineral resources (not reserves) under NI 43-101.
−Removed: The Company is not treating the historical estimate as current
−Removed: mineral resources, and S-K 1300 does not permit such historic estimates to be disclosed in Form 10-K annual reports.
−Removed: Energy Fuels submitted an Exploration NOI to
−Removed: the BLM in March 2013 for the site thereby establishing a nominal permit for the facility.
−Removed: Permitting for mine expansion was started
−Removed: in 2012, but was discontinued due to other priorities.
−Removed: This work included installing 3 monitoring wells around a proposed portable water
−Removed: treatment plant (exploration permit E/037/0188;
+Added: Another hole intercepted mineralization greater than 1.0
+Added: foot of 0.16% eU3O8.
+Added: Prior to the Company’s acquisition of the Sage Mine property,
+Added: Energy Fuels, Colorado Plateau Partners (a Joint Venture between Energy Fuels and Lynx-Royal) completed a NI 43-101 technical report on
+Added: the Sage Plain Project (Technical Report on Colorado Plateau Partners LLC (Energy Fuel Resources Corporation/Lynx-Royal JV) Sage
+Added: Plain Project, San Juan County, Utah and San Miguel County, Colorado by Douglas C.
+Added: Peters, Certified Professional Geologist, Peters Geosciences
+Added: Golden, Colorado December 16, 2011) (the “Sage Mine Energy Fuels Report”).
+Added: The Sage Mine Energy Fuels Report resource is an historic estimate
+Added: of mineral resources (not reserves) under NI 43-101.
+Added: The Company is not treating the historical estimate as current mineral resources,
+Added: and S-K 1300 does not permit such historic estimates to be disclosed in Form 10-K annual reports.
+Added: Energy Fuels submitted an Exploration NOI to the BLM in March 2013
+Added: for the site thereby establishing a nominal permit for the facility.
+Added: Permitting for mine expansion was started in 2012, but was discontinued
+Added: due to other priorities.
+Added: This work included installing 3 monitoring wells around a proposed portable water treatment plant (exploration
+Added: permit E/037/0188;
bond $16,020) and conducting baseline studies (archeology, biology, groundwater).
−Removed: baseline groundwater sampling events have been completed, which will allow for submittal of a complete groundwater discharge permit application
−Removed: Other than offsetting some of the historic drill
−Removed: holes and use of gamma logs where available, no verification of the historical data has been conducted.
−Removed: No core is available at the present
−Removed: time from the earlier exploration or production work.
−Removed: There is no more recent data available on the
−Removed: Sage Mine project resource than that of the Sage Mine Energy Fuels Report.
−Removed: In order to disclose a resource estimate as current, the Company
−Removed: would need to engage a qualified person (as defined under 43-101 and S-K 1300) to produce a technical report compliant with NI 43-101
−Removed: and a feasibility study compliant with S-K 1300.
−Removed: The Company currently does not intend to commission such a technical report or feasibility
+Added: Eight baseline groundwater sampling
+Added: events have been completed, which will allow for submittal of a complete groundwater discharge permit application to DWQ.
+Added: Other than offsetting some of the historic drill holes and use of gamma
+Added: logs where available, no verification of the historical data has been conducted.
+Added: No core is available at the present time from the earlier
+Added: exploration or production work.
+Added: There is no more recent data available on the Sage Mine project resource
+Added: than that of the Sage Mine Energy Fuels Report.
+Added: In order to disclose a resource estimate as current, the Company would need to engage
+Added: a qualified person (as defined under 43-101 and S-K 1300) to produce a technical report compliant with NI 43-101 and a feasibility study
+Added: compliant with S-K 1300.
+Added: The Company currently does not intend to commission such a technical report or feasibility study.
Project Geology
−Removed: The Sage Plain and nearby Slick Rock and Dry
−Removed: Valley/East Canyon districts uranium vanadium deposits are a similar type to those elsewhere in the Uravan Mineral Belt.
−Removed: and shape of mineralized deposits are largely controlled by the permeability of the host sandstone.
−Removed: Most mineralization is in trends
−Removed: where Top Rim sandstones are thick, usually 40 feet or greater.
−Removed: The Sage Plain District appears to be a large
−Removed: channel of Top Rim sandstone which trends northeast, as one of the major trunk channels that is fanning into distributaries in the southern
−Removed: portion of the Uravan Mineral Belt.
−Removed: The Calliham/Crain/Skidmore (Calliham Mine) and Sage Mine deposits, as well as nearby Deremo and
−Removed: Wilson/Silverbell mines appear to be controlled by meandering within this main channel.
−Removed: The Morrison sediments accumulated as oxidized
−Removed: detritus in the fluvial environment.
−Removed: During early burial and diagenesis, the through-flowing ground water within the large, saturated
−Removed: pile of Salt Wash and Brushy Basin material remained oxidized, thereby transporting uranium in solution.
−Removed: When the uranium-rich waters
−Removed: encountered the zones of trapped reduced waters, the uranium precipitated.
−Removed: Vanadium may have been leached from the detrital iron-titanium
−Removed: mineral grains and subsequently deposited along with or prior to the uranium.
−Removed: The thickness, the gray color, and pyrite and
−Removed: carbon contents of sandstones, along with gray or green mudstone, were recognized by early workers as significant and still serve as
−Removed: exploration guides.
−Removed: Much of the Top Rim sandstone in the Sage Plain Project area exhibits these favorable features;
−Removed: therefore, portions
−Removed: of the property with only widely spaced drill holes hold potential.
−Removed: However, without the historic drill data, it cannot be determined
−Removed: where sedimentary facies are located (e.g., channel sandstones thin and pinch-out, or sandstone grades and interfingers into pink and
−Removed: red oxidized sandstone and overbank mudstones).
−Removed: Furthermore, locations of interface zones of the oxidized and reduced environments are
−Removed: hard to predict.
−Removed: Until more historic data are obtained and/or more drilling occurs on the property away from the historic mines, these
−Removed: outlying areas remain exploration targets.
+Added: The Sage Plain and nearby Slick Rock and Dry Valley/East Canyon districts
+Added: uranium vanadium deposits are a similar type to those elsewhere in the Uravan Mineral Belt.
+Added: The location and shape of mineralized deposits
+Added: are largely controlled by the permeability of the host sandstone.
+Added: Most mineralization is in trends where Top Rim sandstones are thick,
+Added: usually 40 feet or greater.
+Added: The Sage Plain District appears to be a large channel of Top Rim sandstone
+Added: which trends northeast, as one of the major trunk channels that is fanning into distributaries in the southern portion of the Uravan Mineral
+Added: The Calliham/Crain/Skidmore (Calliham Mine) and Sage Mine deposits, as well as nearby Deremo and Wilson/Silverbell mines appear
+Added: to be controlled by meandering within this main channel.
+Added: The Morrison sediments accumulated as oxidized detritus in the fluvial
+Added: During early burial and diagenesis, the through-flowing ground water within the large, saturated pile of Salt Wash and Brushy
+Added: Basin material remained oxidized, thereby transporting uranium in solution.
+Added: When the uranium-rich waters encountered the zones of trapped
+Added: reduced waters, the uranium precipitated.
+Added: Vanadium may have been leached from the detrital iron-titanium mineral grains and subsequently
+Added: deposited along with or prior to the uranium.
+Added: The thickness, the gray color, and pyrite and carbon contents of sandstones,
+Added: along with gray or green mudstone, were recognized by early workers as significant and still serve as exploration guides.
+Added: Top Rim sandstone in the Sage Plain Project area exhibits these favorable features;
+Added: therefore, portions of the property with only widely
+Added: spaced drill holes hold potential.
+Added: However, without the historic drill data, it cannot be determined where sedimentary facies are located
+Added: (e.g., channel sandstones thin and pinch-out, or sandstone grades and interfingers into pink and red oxidized sandstone and overbank mudstones).
+Added: Furthermore, locations of interface zones of the oxidized and reduced environments are hard to predict.
+Added: Until more historic data are obtained
+Added: and/or more drilling occurs on the property away from the historic mines, these outlying areas remain exploration targets.
Restoration and Reclamation
2 unchanged sentences
Permitting Status
−Removed: Although the mine is permitted (S/037/0058) and
−Removed: bonded ($40,124) for reclamation it is not permitted for mining.
−Removed: Because of its location on BLM managed land, an Environmental Impact
−Removed: Assessment will need to be prepared for the site by a third-party contractor once a Plan of Operations is submitted for the mine operation.
−Removed: An amendment to the Small Mine Reclamation NOI will also be needed with Utah Division of Oil Gas and Mining to allow for mine expansion.
+Added: Although the mine is permitted (S/037/0058) and bonded ($40,124) for
+Added: reclamation it is not permitted for mining.
+Added: Because of its location on BLM managed land, an Environmental Impact Assessment will need
+Added: to be prepared for the site by a third-party contractor once a Plan of Operations is submitted for the mine operation.
+Added: An amendment to
+Added: the Small Mine Reclamation NOI will also be needed with Utah Division of Oil Gas and Mining to allow for mine expansion.
Existing permits include:
2 unchanged sentences
Basis of Disclosure
−Removed: The scientific and technical information provided
−Removed: in this Form 10-K on the Sage Mine, as well all data and exploration information reported in this Form 10-K on the Sage Mine, is based
−Removed: on the information reported in the Sage Mine Energy Fuels Report.
−Removed: The 11 unpatented claims are located on approximately
−Removed: 220 acres of land administered by the BLM in sections 14 and 15, T32S, R25E, SLPM, San Juan County, Utah.
−Removed: Holding costs of the 11 claims
−Removed: will be $1,705 due to BLM before September 1 each year.
−Removed: The Dunn Project is currently being held as a
−Removed: property that is exploratory in nature with no identified reserves.
+Added: The scientific and technical information provided in this Form 10-K
+Added: on the Sage Mine, as well all data and exploration information reported in this Form 10-K on the Sage Mine, is based on the information
+Added: reported in the Sage Mine Energy Fuels Report.
+Added: The 11 unpatented claims are located on approximately 220 acres of
+Added: land administered by the BLM in sections 14 and 15, T32S, R25E, SLPM, San Juan County, Utah.
+Added: Holding costs of the 11 claims will be $1,705
+Added: due to BLM before September 1 each year.
+Added: The Dunn Project is currently being held as a property that is exploratory
+Added: in nature with no identified reserves.
Exploration and mining plans have not been prepared for the project.
−Removed: Western Uranium & Vanadium Corp.
+Added: Western Uranium & Vanadium
has not yet undertaken any development work at the property.
−Removed: Power and water sources have not yet
−Removed: been formally assessed.
+Added: Power and water sources have not yet been formally assessed.
Accessibility
−Removed: The property lies in Bear Trap Canyon, a tributary
−Removed: at the head of East Canyon.
+Added: The property lies in Bear Trap Canyon, a tributary at the head of East
This is midway between the EFR Rim Mine and the Calliham/Sage mine area.
−Removed: Access to the Dunn project
−Removed: is from West Summit Road (San Juan County Road 313), 10.8 miles north of the junction with U.S.
−Removed: West Summit Road is a two-lane
−Removed: paved road that is well maintained year round.
−Removed: At 10.8 miles, a graveled Class D County Road (unnamed), spurs off of West Summit Road,
−Removed: passes through the leased lands and terminates at the Dunn Portal at approximately 2.1 miles from the spur.
−Removed: The nearest town to the Dunn
−Removed: project is Monticello, Utah which is approximately 65 miles away.
−Removed: The closest commercial airport facilities are located in Cortez, Colorado,
−Removed: approximately 65 miles to the southeast, and Moab, Utah approximately 65 miles to the northwest;
−Removed: both airports have daily commercial
−Removed: flights to-and-from Denver International Airport.
−Removed: The first discovery of uranium-vanadium mineralization
−Removed: within close proximity to the Dunn project was by Homestake Mining Company in the late 1960s at what would eventually become the Wilson
−Removed: Mine 4 miles to the east.
−Removed: Mineralization associated with the Dunn mine was discovered by Gulf Oil Corporation in the late 1960s, which
−Removed: was subsequently acquired by Homestake, followed by Atlas Minerals in the 1970’s.
−Removed: Between 1975 and 1983 Atlas completed 243 drill
−Removed: holes at the Dunn project with an average total depth of 724 feet.
−Removed: By 1981, Atlas had delineated a resource that could justify the construction
−Removed: of a 3,825 foot decline.
−Removed: The decline successfully reached the perimeter of delineated mineralization, but before any production-mining,
−Removed: Atlas ceased operations in 1983 when faced with financial setbacks that required them to divert funds.
−Removed: In July 2013, Energy Fuels Resources acquired
−Removed: the Dunn Mine property from American Strategic Minerals Corporation and Kyle Kimmerle.
+Added: Access to the Dunn project is from West Summit Road
+Added: (San Juan County Road 313), 10.8 miles north of the junction with U.S.
+Added: West Summit Road is a two-lane paved road that is
+Added: well maintained year round.
+Added: At 10.8 miles, a graveled Class D County Road (unnamed), spurs off of West Summit Road, passes through the
+Added: leased lands and terminates at the Dunn Portal at approximately 2.1 miles from the spur.
+Added: The nearest town to the Dunn project is Monticello,
+Added: Utah which is approximately 65 miles away.
+Added: The closest commercial airport facilities are located in Cortez, Colorado, approximately 65
+Added: miles to the southeast, and Moab, Utah approximately 65 miles to the northwest;
+Added: both airports have daily commercial flights to-and-from
+Added: Denver International Airport.
+Added: The first discovery of uranium-vanadium mineralization within close
+Added: proximity to the Dunn project was by Homestake Mining Company in the late 1960s at what would eventually become the Wilson Mine 4 miles
+Added: Mineralization associated with the Dunn mine was discovered by Gulf Oil Corporation in the late 1960s, which was subsequently
+Added: acquired by Homestake, followed by Atlas Minerals in the 1970’s.
+Added: Between 1975 and 1983 Atlas completed 243 drill holes at the Dunn
+Added: project with an average total depth of 724 feet.
+Added: By 1981, Atlas had delineated a resource that could justify the construction of a 3,825
+Added: foot decline.
+Added: The decline successfully reached the perimeter of delineated mineralization, but before any production-mining, Atlas ceased
+Added: operations in 1983 when faced with financial setbacks that required them to divert funds.
+Added: In July 2013, Energy Fuels Resources acquired the Dunn Mine property
+Added: from American Strategic Minerals Corporation and Kyle Kimmerle.
Project Geology
The Dunn project occurs on structurally unaffected
−Removed: terrain between the gently folded Boulder Knoll anticline to the southwest and the more prominent salt-cored Lisbon Valley anticline
−Removed: to the northeast.
−Removed: The strata beneath the project are relatively flat, and no major faults or folds are expected to disrupt bedding or
−Removed: unit contacts.
+Added: terrain between the gently folded Boulder Knoll anticline to the southwest and the more prominent salt-cored Lisbon Valley anticline to
+Added: the northeast.
+Added: The strata beneath the project are relatively flat, and no major faults or folds are expected to disrupt bedding or unit
Uranium-vanadium mineralization at the Dunn is
9 unchanged sentences
Basis of Disclosure
−Removed: The scientific and technical information provided
−Removed: in this Form 10-K on the Dunn Project American Strategic Mineral Corporation is based on information provided in a NI 43-101 technical
−Removed: report prepared by American Strategic Minerals Corporation (the previous owner of the Dunn Project) entitled Technical Report on American
−Removed: Strategic Minerals Corporation’s Dunn Project, San Juan County, Utah by Dr.
+Added: The scientific and technical information provided in this Form 10-K
+Added: on the Dunn Project American Strategic Mineral Corporation is based on information provided in a NI 43-101 technical report prepared by
+Added: American Strategic Minerals Corporation (the previous owner of the Dunn Project) entitled Technical Report on American Strategic Minerals
+Added: Corporation’s Dunn Project, San Juan County, Utah by Dr.
Gonzales, PhD, PG, Durango, Colorado March 23, 2012.
−Removed: Gonzales is a qualified person for purposes of NI 43-101.
−Removed: However, none of the data, other exploration information or other
−Removed: results reported in that report are being incorporated into this Form 10-K.
−Removed: The Van#4 is located in the Uravan Mineral Belt
−Removed: on Monogram Mesa in Montrose County, Colorado.
+Added: is a qualified person for purposes of NI 43-101.
+Added: However, none of the data, other exploration information or other results reported in
+Added: that report are being incorporated into this Form 10-K.
+Added: The Van #4 is located in the Uravan Mineral Belt on Monogram Mesa in
+Added: Montrose County, Colorado.
The property had been held by Denison and its predecessors for many years.
−Removed: consists of 80 unpatented mining claims covering the mine site and long-known deposit to the east, plus two large claim groups to the
−Removed: north, east, and south with exploration potential.
−Removed: The 80 unpatented claims are located
−Removed: on approximately 1,900 acres land administered by the U.S.
−Removed: Bureau of Land Management in sections 27, 28, 29, 33, and 34, T48N,
−Removed: R17W, NMPM, and some in section 3, T47N, R17W, Montrose County, Colorado.
−Removed: The Holding costs of the 80 claims will be $12,400 due
−Removed: to BLM before September 1 each year.
+Added: The property consists of 80 unpatented
+Added: mining claims covering the mine site and long-known deposit to the east, plus two large claim groups to the north, east, and south with
+Added: exploration potential.
+Added: The 80 unpatented claims are located on approximately 1,900 acres
+Added: land administered by the U.S.
+Added: Bureau of Land Management in sections 27, 28, 29, 33, and 34, T48N, R17W, NMPM, and some in section 3, T47N,
+Added: R17W, Montrose County, Colorado.
+Added: The Holding costs of the 80 claims will be $12,400 due to BLM before September 1 each
There are no royalties encumbering these claims.
−Removed: The property includes the Van #4 shaft and associated
−Removed: surface facilities, which need renovation.
−Removed: The mine is connected to the Ura decline on claims in Bull Canyon to the southwest,
−Removed: not owned by WUC.
−Removed: It has been on standby for many years.
+Added: The property includes the Van #4 shaft and associated surface facilities,
+Added: which need renovation.
+Added: The mine is connected to the Ura decline on claims in Bull Canyon to the southwest, not owned by WUC.
+Added: has been on standby for many years.
Denison completed reclamation of two of the ventilation holes in 2008 and 2010.
−Removed: The property has access to grid power;
+Added: The property has access
+Added: to grid power;
however, no source of industrial water has been identified yet.
−Removed: The Van 4 mine is currently
−Removed: being held as a property that is exploratory in nature.
+Added: The Van 4 mine is currently being held as a property that
+Added: is exploratory in nature.
Exploration and mining plans have not been prepared for the project.
−Removed: Uranium & Vanadium Corp.
−Removed: has not yet undertaken any development work at the property.
+Added: Western Uranium & Vanadium Corp.
+Added: not yet undertaken any development work at the property.
Power and water sources have not yet been assessed.
A prior owner of the Van 4 Mine had been granted
−Removed: a first Temporary Cessation from reclamation of the mine by the Colorado Mined Land Reclamation Board (“MLRB”) which was
−Removed: set to expire June 23, 2017.
+Added: a first Temporary Cessation from reclamation of the mine by the Colorado Mined Land Reclamation Board (“MLRB”) which was set
+Added: to expire June 23, 2017.
Prior to its expiration, PRM formally requested an extension through a second Temporary Cessation.
3 unchanged sentences
who pursue environmental and conservation objectives filed a brief objecting to the extension.
−Removed: The MLRB board members voted to grant
−Removed: a second five-year Temporary Cessation for the Van 4 Mine.
+Added: The MLRB board members voted to grant a
+Added: second five-year Temporary Cessation for the Van 4 Mine.
Thereafter, the three objecting parties filed a lawsuit on September 18, 2017.
15 unchanged sentences
On January 22, 2020,
−Removed: 2020, the MLRB held a hearing and on March 2, 2020, the MLRB issued an order vacating the Van 4 Temporary Cessation, revoking the permit
−Removed: and ordered commencement of final reclamation, which must be completed within five (5) years.
−Removed: The Company commenced reclamation of the
−Removed: Van 4 Mine but progress has been delayed both by COVID-19 restrictions and countywide fire and open flame restrictions.
−Removed: The reclamation
−Removed: cost is fully covered by the reclamation bonds posted with the state of Colorado.
+Added: the MLRB held a hearing and on March 2, 2020, the MLRB issued an order vacating the Van 4 Temporary Cessation, revoking the permit and
+Added: ordered commencement of final reclamation, which must be completed within five (5) years.
+Added: The Company commenced reclamation of the Van
+Added: 4 Mine but progress has been delayed both by COVID-19 restrictions and countywide fire and open flame restrictions.
+Added: The reclamation cost
+Added: is fully covered by the reclamation bonds posted with the state of Colorado.
Our mining operations team has made significant progress
−Removed: on the reclamation as all surface structures have been disassembled and removed with the exception of the head frame.
+Added: on the reclamation as all surface structures have been disassembled and the head-frame has been disassembled and moved offsite.
Accessibility
1 unchanged sentence
Roads year-round.
−Removed: The Van#4 was initially permitted in the late
−Removed: 1970s and early 1980s by Union Carbide as part of a number of small mines named the Thunderbolt Group.
+Added: The Van#4 was initially permitted in the late 1970s and early 1980s
+Added: by Union Carbide as part of a number of small mines named the Thunderbolt Group.
Energy Fuels Nuclear, Inc.
−Removed: acquired the mine in 1984 and then transferred the mine and permits to International Uranium Corporation (IUC) in 1997.
−Removed: IUC re-permitted
−Removed: the mine with DRMS (then known as the Division of Minerals and Geology) in 1999 because the previous permit had included other mines
−Removed: in the area that were not acquired by IUC.
+Added: (EFN) acquired the mine in
+Added: 1984 and then transferred the mine and permits to International Uranium Corporation (IUC) in 1997.
+Added: IUC re-permitted the mine with DRMS
+Added: (then known as the Division of Minerals and Geology) in 1999 because the previous permit had included other mines in the area that were
+Added: not acquired by IUC.
Mine Permit M-1997-032 with DRMS is currently in good standing and bonded for $75,057.
−Removed: Amendment AM-1, which incorporated the approved EPP, was issued on May 30, 2012.
−Removed: The permit has been transferred over the years from
−Removed: IUC to Denison Mines (USA) Corp.
+Added: Amendment AM-1, which
+Added: incorporated the approved EPP, was issued on May 30, 2012.
+Added: The permit has been transferred over the years from IUC to Denison Mines (USA)
to Energy Fuels Resources (USA) Inc.
4 unchanged sentences
Deposits in this part of the Uravan Mineral Belt have a moderate
−Removed: U 3 O 8 ratio.
−Removed: The Company is in possession of much historic mine and drill data
−Removed: (former Union Carbide/Umetco property), as well as up-to-date mine maps.
−Removed: Denison drilled most recently (summer 2008) 21
−Removed: wide-spaced exploration holes in sections 27 and 34.
+Added: The Company is in possession of much historic mine and drill data (former Union Carbide/Umetco property), as
+Added: well as up-to-date mine maps.
+Added: Denison drilled most recently (summer 2008) 21 wide-spaced exploration holes in sections 27 and 34.
All have been reclaimed and the permit terminated.
3 unchanged sentences
Permitting Status
−Removed: Permit compliance is currently limited to an
−Removed: annual stormwater inspection;
−Removed: stormwater improvement work was completed in 2010 and 2012.
−Removed: The air permit with APCD
−Removed: was recently allowed to lapse, as the company does not have any immediate development or operation plans for the mine.
−Removed: The mine does
−Removed: not have EPA approval for radon emissions;
−Removed: however, this approval may not be needed to restart mining, as the life-of-mine production
−Removed: will likely be less than 100,000 tons.
−Removed: The DRMS mining permit was put into Temporary Cessation in February, 2014.
−Removed: Existing major permits
−Removed: at the mine include:
−Removed: BLM Plan of Operations
−Removed: COC-62522 (same as DRMS Permit M-97-032)
−Removed: DRMS 110d (Small Mine,
−Removed: DMO) Mine Permit M-97-032
+Added: Permit compliance is currently limited to an annual stormwater inspection;
+Added: stormwater improvement
+Added: work was completed in 2010 and 2012.
+Added: The air permit with APCD was recently allowed to lapse, as the company does not have any immediate
+Added: development or operation plans for the mine.
+Added: The mine does not have EPA approval for radon emissions;
+Added: however, this approval may not be
+Added: needed to restart mining, as the life-of-mine production will likely be less than 100,000 tons.
+Added: The DRMS mining permit was put into Temporary
+Added: Cessation in February, 2014.
+Added: Existing major permits at the mine include:
+Added: Plan of Operations COC-62522 (same as DRMS Permit M-97-032)
+Added: 110d (Small Mine, DMO) Mine Permit M-97-032
Hansen/Taylor Ranch
−Removed: Within the Project area, Black Range has mining
−Removed: agreements, owns fee minerals, holds options to purchase fee mineral rights, holds federal unpatented mining claims and mineral leases
−Removed: with the State of Colorado, and has in place surface access agreements, including:
+Added: Within the Project area, Black Range has mining agreements, owns fee
+Added: minerals, holds options to purchase fee mineral rights, holds federal unpatented mining claims and mineral leases with the State of Colorado,
+Added: and has in place surface access agreements, including:
- 1 x private Mineral Lease
- 1 x State Mineral Lease (UR3324)
−Removed: - 1 x option to purchase 100% of the Hansen and
−Removed: Picnic Tree Deposits
+Added: - 1 x option to purchase 100% of the Hansen and Picnic Tree Deposits
- 108 Federal unpatented mining claims
−Removed: The Hansen/Taylor Ranch Project is currently
−Removed: being held as a property that is exploratory in nature with no identified reserves.
−Removed: Neither exploration plans nor a mining plan exist
−Removed: for the project.
−Removed: Black Range Minerals has not undertaken development work at the property since groundwater well installation in 2013.
−Removed: Power and water sources have not yet been formally assessed.
−Removed: Notably a portion of the Hansen/Taylor deposit
−Removed: was in dispute during 2017.
−Removed: On September 16, 2015, in connection with the Company’s acquisition of Black Range, the Company assumed
−Removed: an option and exploration agreement (the “Option and Exploration Agreement”) with STB Minerals, LLC, a Colorado limited liability
−Removed: company (“STB”).
−Removed: The Option and Exploration Agreement gives the Company the right to purchase 51% of the mineral rights of
−Removed: specific areas of the Hansen and Picnic Tree deposits (for which the Company already holds 49% of the rights).
−Removed: If the Company were to
−Removed: exercise its option under the Option and Exploration Agreement, it would require the Company to (a) make a cash payment of $2,500,000
−Removed: immediately upon exercise;
−Removed: (b) issue common shares to STB amounting to a value of $3,750,000 immediately upon exercise;
−Removed: and (c) issue
−Removed: common shares to STB amounting to a value of $3,750,000 on the date that is 180 days following exercise.
−Removed: The Option and Exploration Agreement
−Removed: was scheduled to expire by its terms on July 28, 2017 if not exercised.
−Removed: The Option and Exploration Agreement provided
−Removed: an extension for an “event of force majeure”.
−Removed: Under this clause, the Company would receive an extension of the period during
−Removed: which it could exercise its option if it experiences an unreasonable delay outside its control that prevents it from exercising the option.
−Removed: On May 10, 2017, the Company provided to STB a notice that it was exercising the force majeure clause due to the delay by government
−Removed: regulators in licensing the Company’s Kinetic Separation and permitting mining at the Hansen property.
−Removed: STB has contested the Company’s
−Removed: finding that an event of force majeure has occurred.
−Removed: Ongoing negotiations continued until September 21, 2017 when the Company and STB
−Removed: agreed to settle the matter through the pre-established arbitration mechanism.
−Removed: Prior to the commencement of arbitration, a settlement
−Removed: was agreed to on February 28, 2018 through the execution of an Amendment of Option and Exploration Agreement.
−Removed: As consideration, the Company
−Removed: paid STB a $20,000 extension payment and granted STB the right to seek a bona fide written offer over the remaining term, and agreed
−Removed: to the removal of the force majeure clause from the agreement.
−Removed: The Company received an extension until July 28, 2019 and a right of first
−Removed: refusal to match any bona fide written offer.
−Removed: Hence the Company already owned 49% of the resource property and retained an option to
−Removed: purchase the 51% of the resource property that the Company did not already own for the duration of the agreement.
−Removed: Further the Company
−Removed: believes the execution of this agreement was without financial implications, and as such, the Company has not made any adjustment to
−Removed: these consolidated financials related to this matter.
−Removed: Prior to July 28, 2019, the Company decided not
−Removed: to exercise the option to purchase the remaining 51% of the mineral rights of specific areas of the Hansen and Picnic Tree deposits,
−Removed: and thus the option has expired unexercised.
+Added: The Hansen/Taylor Ranch Project is currently being held as a property
+Added: that is exploratory in nature with no identified reserves.
+Added: Neither exploration plans nor a mining plan exist for the project.
+Added: Minerals has not undertaken development work at the property since groundwater well installation in 2013.
+Added: Power and water sources have
+Added: not yet been formally assessed.
+Added: Notably a portion of the Hansen/Taylor deposit was in dispute during
+Added: On September 16, 2015, in connection with the Company’s acquisition of Black Range, the Company assumed an option and exploration
+Added: agreement (the “Option and Exploration Agreement”) with STB Minerals, LLC, a Colorado limited liability company (“STB”).
+Added: The Option and Exploration Agreement gives the Company the right to purchase 51% of the mineral rights of specific areas of the Hansen
+Added: and Picnic Tree deposits (for which the Company already holds 49% of the rights).
+Added: If the Company were to exercise its option under the
+Added: Option and Exploration Agreement, it would require the Company to (a) make a cash payment of $2,500,000 immediately upon exercise;
+Added: issue common shares to STB amounting to a value of $3,750,000 immediately upon exercise;
+Added: and (c) issue common shares to STB amounting
+Added: to a value of $3,750,000 on the date that is 180 days following exercise.
+Added: The Option and Exploration Agreement was scheduled to expire
+Added: by its terms on July 28, 2017 if not exercised.
+Added: The Option and Exploration Agreement provided an extension for an “event
+Added: of force majeure”.
+Added: Under this clause, the Company would receive an extension of the period during which it could exercise its option
+Added: if it experiences an unreasonable delay outside its control that prevents it from exercising the option.
+Added: On May 10, 2017, the Company
+Added: provided to STB a notice that it was exercising the force majeure clause due to the delay by government regulators in licensing the Company’s
+Added: Kinetic Separation and permitting mining at the Hansen property.
+Added: STB has contested the Company’s finding that an event of force
+Added: majeure has occurred.
+Added: Ongoing negotiations continued until September 21, 2017 when the Company and STB agreed to settle the matter through
+Added: the pre-established arbitration mechanism.
+Added: Prior to the commencement of arbitration, a settlement was agreed to on February 28, 2018 through
+Added: the execution of an Amendment of Option and Exploration Agreement.
+Added: As consideration, the Company paid STB a $20,000 extension payment
+Added: and granted STB the right to seek a bona fide written offer over the remaining term, and agreed to the removal of the force majeure clause
+Added: from the agreement.
+Added: The Company received an extension until July 28, 2019 and a right of first refusal to match any bona fide written
+Added: Hence the Company already owned 49% of the resource property and retained an option to purchase the 51% of the resource property
+Added: that the Company did not already own for the duration of the agreement.
+Added: Further the Company believes the execution of this agreement was
+Added: without financial implications, and as such, the Company has not made any adjustment to these consolidated financials related to this
+Added: Prior to July 28, 2019, the Company decided not to exercise the option
+Added: to purchase the remaining 51% of the mineral rights of specific areas of the Hansen and Picnic Tree deposits, and thus the option has
+Added: expired unexercised.
Accessibility
−Removed: The Project is located in Fremont County, in
−Removed: South Central Colorado approximately 30 miles northwest of the city of Canon City.
−Removed: Canon City is the closest population center, and had
−Removed: a population of 16,400 in 2010.
−Removed: The largest metropolitan area in close proximity to the Project is Colorado Springs which is located
−Removed: approximately 46 miles northeast of Canon City and has a population of approximately 416,000.
−Removed: Figure 1 shows the locations of these population
−Removed: centers with respect to the Project.
−Removed: For ground travel, Canon City is best accessed
−Removed: from Denver/Colorado Springs via I-25 south to State Highway 115 which intersects Highway 50 just east of Canon City.
−Removed: For air travel,
−Removed: alternatives include the Colorado Springs Municipal Airport (COS), which is a 16-gate facility served by 14 airlines and Denver’s
−Removed: International Airport (DEN), which is 149 miles from Canon City.
−Removed: There is a small airport, Fremont County Airport (CNE), located in Canon
−Removed: City, which is open to private flights.
+Added: The Project is located in Fremont County, in South Central Colorado
+Added: approximately 30 miles northwest of the city of Canon City.
+Added: Canon City is the closest population center, and had a population of 16,400
+Added: The largest metropolitan area in close proximity to the Project is Colorado Springs which is located approximately 46 miles northeast
+Added: of Canon City and has a population of approximately 416,000.
+Added: Figure 1 shows the locations of these population centers with respect to
+Added: For ground travel, Canon City is best accessed from Denver/Colorado
+Added: Springs via I-25 south to State Highway 115 which intersects Highway 50 just east of Canon City.
+Added: For air travel, alternatives include
+Added: the Colorado Springs Municipal Airport (COS), which is a 16-gate facility served by 14 airlines and Denver’s International Airport
+Added: (DEN), which is 149 miles from Canon City.
+Added: There is a small airport, Fremont County Airport (CNE), located in Canon City, which is open
+Added: to private flights.
The property has access to grid power;
−Removed: however, no source of industrial water has been identified
−Removed: Uranium mineralization was discovered in the
−Removed: Tallahassee Creek District in 1954 by two groups of prospectors.
−Removed: Between 1954 and 1972, 16 small open pit and underground mines were
−Removed: operated in the district.
−Removed: Discoveries, and most producing mines and production were in the Tallahassee Creek Conglomerate, with one mine,
−Removed: the Smaller Mine, producing from the Echo Park Formation.
−Removed: Exploration efforts were minimal until Rampart Exploration Company (Rampart),
−Removed: under contract to Cyprus, explored the Taylor Ranch area beginning in 1974 and discovered the Hansen Uranium Deposit along with other
−Removed: uranium deposits in the district.
−Removed: Cyprus took the Hansen and Picnic Tree deposits through a positive final feasibility analysis in 1980
−Removed: for an open-pit mining and conventional uranium milling operation, and secured all necessary operating permits in 1981.
−Removed: of the uranium market led to Cyprus abandoning the project which lay dormant until Black Range Minerals began activities in late 2006.
−Removed: Black Range Mineral’s Taylor Ranch Project,
−Removed: CO, consists of a combination of private, BLM and State Section minerals, and private, BLM and State Section surface rights.
−Removed: of the private minerals and surface has mainly been by local ranchers.
+Added: however, no source of industrial water has been identified yet.
+Added: Uranium mineralization was discovered in the Tallahassee Creek District
+Added: in 1954 by two groups of prospectors.
+Added: Between 1954 and 1972, 16 small open pit and underground mines were operated in the district.
+Added: and most producing mines and production were in the Tallahassee Creek Conglomerate, with one mine, the Smaller Mine, producing from the
+Added: Echo Park Formation.
+Added: Exploration efforts were minimal until Rampart Exploration Company (Rampart), under contract to Cyprus, explored
+Added: the Taylor Ranch area beginning in 1974 and discovered the Hansen Uranium Deposit along with other uranium deposits in the district.
+Added: took the Hansen and Picnic Tree deposits through a positive final feasibility analysis in 1980 for an open-pit mining and conventional
+Added: uranium milling operation, and secured all necessary operating permits in 1981.
+Added: The collapse of the uranium market led to Cyprus abandoning
+Added: the project which lay dormant until Black Range Minerals began activities in late 2006.
+Added: Black Range Mineral’s Taylor Ranch Project, CO, consists of a
+Added: combination of private, BLM and State Section minerals, and private, BLM and State Section surface rights.
+Added: Ownership of the private minerals
+Added: and surface has mainly been by local ranchers.
Western Nuclear held a portion of the property briefly in 1968.
−Removed: Cyprus gained control of mineral and surface rights during the period 1975-1978.
−Removed: In 1993, Cyprus sold their Tallahassee Creek
−Removed: holdings to Noah (Buddy) and Diane Taylor who had managed ranching activities on the property.
−Removed: The Taylors were not able to make the
−Removed: final payment to Cyprus and sold the southern portion of their holdings which included the Hansen and Picnic Tree deposits to New Mexico
−Removed: and Arizona Land (now NZ Minerals) in 1996 who, in 1998, sold the property to South T-Bar Ranch, a subsidiary of Colorado developer Land
−Removed: Properties, while reserving a 49% interest in the minerals.
−Removed: This part of Cyprus’ prior holdings was
−Removed: subdivided, mainly into 35-acre parcels.
−Removed: Beginning in December 2006, through various purchases, leases and option agreements, Black Range
−Removed: Minerals has obtained mineral rights to most of the original Cyprus holdings.
−Removed: Prior to the Hansen/Taylor Project being acquired
−Removed: by WUC, a mineral resource for the Hansen/Taylor Ranch Project for Black Range Minerals Limited.
−Removed: Black Range Reported a JORC compliant
−Removed: indicated uranium resources.
−Removed: This historic resource estimate was originally reported to Black Range Minerals Limited by Tetra Tech in
−Removed: four resource memos (collectively, the “Tetra Tech Reports”):
−Removed: 1) High Park Kriging Resources – Taylor Ranch Uranium
−Removed: Project, April 25, 2008;
+Added: Cyprus gained control of
+Added: mineral and surface rights during the period 1975-1978.
+Added: In 1993, Cyprus sold their Tallahassee Creek holdings to Noah (Buddy)
+Added: and Diane Taylor who had managed ranching activities on the property.
+Added: The Taylors were not able to make the final payment to Cyprus and
+Added: sold the southern portion of their holdings which included the Hansen and Picnic Tree deposits to New Mexico and Arizona Land (now NZ
+Added: Minerals) in 1996 who, in 1998, sold the property to South T-Bar Ranch, a subsidiary of Colorado developer Land Properties, while reserving
+Added: a 49% interest in the minerals.
+Added: This part of Cyprus’ prior holdings was subdivided, mainly into
+Added: 35-acre parcels.
+Added: Beginning in December 2006, through various purchases, leases and option agreements, Black Range Minerals has obtained
+Added: mineral rights to most of the original Cyprus holdings.
+Added: Prior to the Hansen/Taylor Project being acquired by WUC, a mineral
+Added: resource for the Hansen/Taylor Ranch Project for Black Range Minerals Limited.
+Added: Black Range Reported a JORC compliant indicated uranium
+Added: This historic resource estimate was originally reported to Black Range Minerals Limited by Tetra Tech in four resource memos
+Added: (collectively, the “Tetra Tech Reports”):
+Added: 1) High Park Kriging Resources – Taylor Ranch Uranium Project, April 25, 2008;
2) North Hansen, Boyer Kriging Resources – Taylor Ranch Uranium Project, April 29, 2009;
−Removed: Memorandum – Boyer, Hansen and Picnic Tree Area Kriging Resources – Taylor Ranch Uranium Project, August 24, 2009;
−Removed: Technical Memorandum – Boyer, Hansen and Picnic Tree Area Kriging Resources – Taylor Ranch Uranium Project (Updated 2010),
−Removed: August 12, 2010.
−Removed: These memos were originally prepared by Rex Bryan of Tetra Tech, a qualified person under NI 43-101.
−Removed: The results reported
−Removed: in the Tetra Tech Reports are historical estimates under NI 43-101.
−Removed: However, the Company is not treating the historical estimate as current
−Removed: mineral resources, and S-K 1300 does not permit such historic estimates to be disclosed in Form 10-K annual reports.
−Removed: The historic Black Range Minerals resource reported
−Removed: in the Tetra Tech Reports uses JORC indicated and inferred resource categories and does not contain reserves.
−Removed: There is no more recent
−Removed: data available on the Hansen/Taylor Project resource than that of the Tetra Tech Reports.
−Removed: In order to disclose a resource estimate as
−Removed: current, the Company would need to engage a qualified person (as defined under 43-101 and S-K 1300) to produce a technical report compliant
−Removed: with NI 43-101 and a feasibility study compliant with S-K 1300.
−Removed: The Company currently does not intend to commission such a technical
−Removed: report or feasibility study.
+Added: 3) Technical Memorandum – Boyer,
+Added: Hansen and Picnic Tree Area Kriging Resources – Taylor Ranch Uranium Project, August 24, 2009;
+Added: and 4) Technical Memorandum –
+Added: Boyer, Hansen and Picnic Tree Area Kriging Resources – Taylor Ranch Uranium Project (Updated 2010), August 12, 2010.
+Added: were originally prepared by Rex Bryan of Tetra Tech, a qualified person under NI 43-101.
+Added: The results reported in the Tetra Tech Reports
+Added: are historical estimates under NI 43-101.
+Added: However, the Company is not treating the historical estimate as current mineral resources, and
+Added: S-K 1300 does not permit such historic estimates to be disclosed in Form 10-K annual reports.
+Added: The historic Black Range Minerals resource reported in the Tetra Tech
+Added: Reports uses JORC indicated and inferred resource categories and does not contain reserves.
+Added: There is no more recent data available on
+Added: the Hansen/Taylor Project resource than that of the Tetra Tech Reports.
+Added: In order to disclose a resource estimate as current, the Company
+Added: would need to engage a qualified person (as defined under 43-101 and S-K 1300) to produce a technical report compliant with NI 43-101
+Added: and a feasibility study compliant with S-K 1300.
+Added: The Company currently does not intend to commission such a technical report or feasibility
Project Geology
−Removed: The deposits that make up the Project are tabular
−Removed: sandstone deposits associated with redox interfaces.
−Removed: The mineralisation is hosted in Tertiary sandstones and/or clay bearing conglomerates
−Removed: within an extinct braided stream, fluvial system or palaeochannel.
−Removed: Mineralisation occurred post sediment deposition when oxygenated uraniferous
−Removed: groundwater moving through the host rocks came into contact with redox interfaces, the resultant chemical change caused the precipitation
−Removed: of uranium oxides.
−Removed: The most common cause of redox interfaces is the presence of carbonaceous material that was deposited simultaneously
−Removed: with the host sediments.
−Removed: In parts of the Project the palaeochannel has been covered by Tertiary volcanic rocks and throughout the Project
−Removed: basement consists of Pre-Cambrian plutonics and metamorphic rocks.
−Removed: The volcanic and Pre-Cambrian rocks are believed to be the source
−Removed: of the uranium.
+Added: The deposits that make up the Project are tabular sandstone deposits
+Added: associated with redox interfaces.
+Added: The mineralisation is hosted in Tertiary sandstones and/or clay bearing conglomerates within an extinct
+Added: braided stream, fluvial system or palaeochannel.
+Added: Mineralisation occurred post sediment deposition when oxygenated uraniferous groundwater
+Added: moving through the host rocks came into contact with redox interfaces, the resultant chemical change caused the precipitation of uranium
+Added: The most common cause of redox interfaces is the presence of carbonaceous material that was deposited simultaneously with the
+Added: host sediments.
+Added: In parts of the Project the palaeochannel has been covered by Tertiary volcanic rocks and throughout the Project basement
+Added: consists of Pre-Cambrian plutonics and metamorphic rocks.
+Added: The volcanic and Pre-Cambrian rocks are believed to be the source of the uranium.
Restoration and Reclamation
−Removed: During the fourth quarter of 2021, the Company
−Removed: received notice from the State of Colorado that its surety release request on the Hansen Picnic Tree property had been approved, and
−Removed: as such, this property is no longer subject to reclamation treatment.
−Removed: As the property wasn’t a current development priority, Western
−Removed: completed reclamation on the property.
−Removed: The Company recorded a discontinuation of the Hansen Picnic Tree property’s present value
−Removed: of $44,793 during the fourth quarter of 2021.
−Removed: On December 29, 2021, the Company moved the $154,936 restricted cash deposit into its cash
−Removed: after receiving payment from the state of Colorado.
+Added: During the fourth quarter of 2021, the Company received notice from
+Added: the State of Colorado that its surety release request on the Hansen Picnic Tree property had been approved, and as such, this property
+Added: is no longer subject to reclamation treatment.
+Added: As the property wasn’t a current development priority, Western completed reclamation
+Added: on the property.
+Added: The Company recorded a discontinuation of the Hansen Picnic Tree property’s present value of $44,793 during the
+Added: fourth quarter of 2021.
+Added: On December 29, 2021, the Company moved the $154,936 restricted cash deposit into its cash after receiving payment
+Added: from the state of Colorado.
Permitting Status
−Removed: The project currently has an exploration permit
−Removed: through the Colorado Division of Reclamation, Mining and Safety as well as a Conditional Use Permit with the Fremont County Planning
−Removed: and Zoning Department.
+Added: The project currently has an exploration permit through the Colorado
+Added: Division of Reclamation, Mining and Safety as well as a Conditional Use Permit with the Fremont County Planning and Zoning Department.
Basis of Disclosure
−Removed: The scientific and technical information provided
−Removed: in this Form 10-K on the Hansen/Taylor Ranch Project, as well all data and exploration information reported in this Form 10-K on the
−Removed: Hansen/Taylor Ranch Project, is based on the information reported in the Tetra Tech Reports.
+Added: The scientific and technical information provided in this Form 10-K
+Added: on the Hansen/Taylor Ranch Project, as well all data and exploration information reported in this Form 10-K on the Hansen/Taylor Ranch
+Added: Project, is based on the information reported in the Tetra Tech Reports.
Bullen Property (Weld County)
−Removed: The Bullen Property is a private land parcel
−Removed: located in Weld County Colorado and is inclusive of 139 surface acres and 160 mineral acres.
−Removed: The property location is Township 9 North,
−Removed: Range 60 West, 6 th P.M., Section 34:NW/4.
+Added: The Bullen Property is a private land parcel located
+Added: in Weld County Colorado and is inclusive of 139 surface acres and 160 mineral acres.
+Added: The property location is Township 9 North, Range
+Added: 60 West, 6 th P.M., Section 34:NW/4.
Accessibility
9 unchanged sentences
Property was the only acreage retained in Weld County by virtue of its outright ownership.
−Removed: In 2017, the Company signed a three year oil
−Removed: and gas lease which in 2020 was extended for an additional three year term or the end of continuous operations.
−Removed: The consideration was
−Removed: in the form of upfront bonus payments and backend production royalty payments.
−Removed: Additional right-of-way easement agreements were signed
−Removed: which allowed for the development of a pipeline.
−Removed: The lease agreement allows the Company to retain property rights to vanadium, uranium,
−Removed: and other mineral resources.
−Removed: In early 2020 Bison Oil & Gas traded this
−Removed: lease to Mallard Exploration (“Mallard”), Mallard subsequently filed an application with the Colorado Oil & Gas Conservation
−Removed: Commission (COGCC) to update the permitting to create a new pooled unit.
+Added: In 2017, the Company signed a three year oil and
+Added: gas lease which in 2020 was extended for an additional three year term or the end of continuous operations.
+Added: The consideration was in the
+Added: form of upfront bonus payments and backend production royalty payments.
+Added: Additional right-of-way easement agreements were signed which
+Added: allowed for the development of a pipeline.
+Added: The lease agreement allows the Company to retain property rights to vanadium, uranium, and
+Added: other mineral resources.
+Added: In early 2020 Bison Oil & Gas (“Bison”)
+Added: traded this lease to Mallard Exploration (“Mallard”), Mallard subsequently filed an application with the Colorado Oil &
+Added: Gas Conservation Commission (COGCC) to update the permitting to create a new pooled unit.
In late 2020 Mallard began development of the
−Removed: By March 31, 2021, the drilling portion of the project had been completed for the eight horizontal wells named Blue Teal
−Removed: Seven wells were drilled to a 2.5 miles lateral length and one well was drilled to a 3.0 mile lateral length.
−Removed: These DJ-Basin wells
−Removed: target the Niobrara formation.
−Removed: During 2021, the operator completed all well development stages and each of the eight (8) Blue Teal Fed
−Removed: wells commenced oil and gas production by mid-August 2021.
−Removed: The first royalty payment was made in January 2022 and monthly royalty payments
−Removed: have been received subsequently.
−Removed: These wells continue to rank among the top Colorado producing wells.
−Removed: Due to the success of the first
−Removed: 8 wells, the operator has decided to develop a second set of 8 wells within Western’s royalty area during 2022.
+Added: These DJ-Basin wells target the Niobrara formation.
+Added: During 2021, the operator completed all well development stages and eight
+Added: (8) wells commenced oil and gas production by August 2021.
+Added: The first royalty payment was made in January 2022.
+Added: During 2022, the operator
+Added: completed all well development stages on a second set of eight (8) wells which commenced oil and gas production by August 2022.
+Added: monthly royalty payment including production from the new wells was made in January 2023.
+Added: Monthly royalty payments are ongoing.
+Added: In January 2023, Mallard was acquired by Bison.
Project Geology
10 unchanged sentences
have been permitted in the Unit.
+Added: In 2021, the first set of 8 permitted wells were put into production.
+Added: In 2022, the second set of 8 permitted
+Added: wells were put into production.
+Added: Thus all permitted wells in the pooled unit have been put into production and are paying monthly royalties.
Ferris Haggerty
1 unchanged sentence
Accessibility
−Removed: The reclamation project is accessible 4 to 6
−Removed: months out of the year due to snow and closed access.
+Added: The reclamation project is accessible 4 to 6 months out of the year
+Added: due to snow and closed access.
Take Wyoming Highway west from Encampment, Wyoming for approximately 11 miles.
−Removed: Once across the divide, to the northeast there is a pullout for Medicine Bow National Forest recreation.
−Removed: Follow 4 wheel drive route 412
−Removed: (Continental Divide Trail) for approximately 5 miles to the Haggerty creek watershed.
−Removed: Turn southwest onto a steep 4 wheel drive rout
−Removed: and travel for approximately 1.5 miles until you are at the property.
−Removed: The Ferris-Haggerty Mine Site was one
−Removed: of the richest components of the Grand Encampment Mining District in Carbon County, Wyoming.
−Removed: The site was first exploited
−Removed: by Ed Haggerty, a prospector from Whitehaven, England, in 1897, when he established the Rudefeha Mine on a rich deposit of copper
−Removed: Haggerty was backed by George Ferris and other investors, of whom all but Ferris dropped out.
−Removed: The partners sold an interest to Willis
−Removed: George Emerson, who raised investment funding for improvements to the mine.
−Removed: These facilities included a 16-mile (26 km) aerial tramway
−Removed: from Grand Encampment over the Continental Divide to the smelter in Encampment and a 4-mile (6.4 km) pipeline to
−Removed: The mine’s assets were eventually acquired by the North American Copper Company for $1 million.
−Removed: By 1904 the mine had
−Removed: produced $1.4 million in copper ore, and was sold to the Penn-Wyoming Copper Company.
−Removed: However, even with copper prices peaking in 1907,
−Removed: the company had difficulty making a profit from the remove mine site.
−Removed: The company was over-capitalized and under-insured, and was suffered
−Removed: devastating fires at the mine site in March 1906 and May 1907 which halted production.
−Removed: Business disputes and a fall in copper prices
−Removed: prevented re-opening of the mine even after it was rebuilt.
+Added: Once across the divide,
+Added: to the northeast there is a pullout for Medicine Bow National Forest recreation.
+Added: Follow 4 wheel drive route 412 (Continental Divide Trail)
+Added: for approximately 5 miles to the Haggerty creek watershed.
+Added: Turn southwest onto a steep 4 wheel drive rout and travel for approximately
+Added: 1.5 miles until you are at the property.
+Added: The Ferris-Haggerty Mine Site was one of the richest components
+Added: of the Grand Encampment Mining District in Carbon County, Wyoming.
+Added: The site was first exploited by Ed Haggerty, a prospector
+Added: from Whitehaven, England, in 1897, when he established the Rudefeha Mine on a rich deposit of copper ore.
+Added: Haggerty was backed
+Added: by George Ferris and other investors, of whom all but Ferris dropped out.
+Added: The partners sold an interest to Willis George Emerson, who
+Added: raised investment funding for improvements to the mine.
+Added: These facilities included a 16-mile (26 km) aerial tramway from Grand Encampment
+Added: over the Continental Divide to the smelter in Encampment and a 4-mile (6.4 km) pipeline to the mine.
+Added: The mine’s assets
+Added: were eventually acquired by the North American Copper Company for $1 million.
+Added: By 1904 the mine had produced $1.4 million in copper ore,
+Added: and was sold to the Penn-Wyoming Copper Company.
+Added: However, even with copper prices peaking in 1907, the company had difficulty making a
+Added: profit from the remove mine site.
+Added: The company was over-capitalized and under-insured, and was suffered devastating fires at the mine site
+Added: in March 1906 and May 1907 which halted production.
+Added: Business disputes and a fall in copper prices prevented re-opening of the mine even
+Added: after it was rebuilt.
Machinery was salvaged after a foreclosure in 1913.
−Removed: of $2 million in copper ore was extracted from the mine during its life.
+Added: A total of $2 million in copper ore was extracted
+Added: from the mine during its life.
Project Geology
−Removed: The Deposit is a tabular injection of magmatic
−Removed: metal differentiation product at the margins of an ultramafic intrusive of early Archean age (2.2 billion years ago).
−Removed: This intrusive
−Removed: was injected into pre-existing high siliceous sandstones and shales of massive thickness (+2,000 ft).
−Removed: Mineralization at the Ferris-Haggarty
−Removed: mine consists of disseminated pyrite and chalcopyrite grains that occur along bedding planes of the host quartzite.
−Removed: However, the massive
−Removed: ore body mined at the Ferris-Haggarty was described by Spencer (1904) to lie along quartzite-Schist contacts and to cross cut foliation.
−Removed: Based on the historic description, the ore may have been remobilized from the host quartzite during regional metamorphism and emplaced
−Removed: along the quartzite-schist contact by way of permeable fractures.
−Removed: The impermeable hanging wall schist may have formed a natural barrier
−Removed: to the ore solutions and produced an unusually rich ore body.
+Added: The Deposit is a tabular injection of magmatic metal differentiation
+Added: product at the margins of an ultramafic intrusive of early Archean age (2.2 billion years ago).
+Added: This intrusive was injected into pre-existing
+Added: high siliceous sandstones and shales of massive thickness (+2,000 ft).
+Added: Mineralization at the Ferris-Haggarty mine consists of disseminated
+Added: pyrite and chalcopyrite grains that occur along bedding planes of the host quartzite.
+Added: However, the massive ore body mined at the Ferris-Haggarty
+Added: was described by Spencer (1904) to lie along quartzite-Schist contacts and to cross cut foliation.
+Added: Based on the historic description,
+Added: the ore may have been remobilized from the host quartzite during regional metamorphism and emplaced along the quartzite-schist contact
+Added: by way of permeable fractures.
+Added: The impermeable hanging wall schist may have formed a natural barrier to the ore solutions and produced
+Added: an unusually rich ore body.
Restoration and Reclamation
−Removed: Grass must grow on the drill pad disturbance
−Removed: areas from drilling which took place in 2007.
−Removed: These drill pads are located at 10,000 feet above sea level on the north face of a mountain
−Removed: on the Continental Divide.
−Removed: During the first quarter of 2021, the Company received notice that
−Removed: its Ferris Haggerty property was no longer considered to be subject to reclamation treatment.
−Removed: On April 29, 2021, the Company moved the
−Removed: Ferris Haggerty $10,000 restricted cash deposit into its cash after receiving payment from the state of Wyoming.
+Added: Grass must grow on the drill pad disturbance areas
+Added: from drilling which took place in 2007.
+Added: These drill pads are located at 10,000 feet above sea level on the north face of a mountain on
+Added: the Continental Divide.
+Added: During the first quarter of 2021, the Company
+Added: received notice that its Ferris Haggerty property was no longer considered to be subject to reclamation treatment.
+Added: On April 29, 2021,
+Added: the Company moved the Ferris Haggerty $10,000 restricted cash deposit into its cash after receiving payment from the state of Wyoming.
INFRASTRUCTURE
1 unchanged sentence
plant and equipment is as follows:
−Removed: Company holds a license to use Kinetic Separation, a proven technology that we anticipate will improve the efficiency of the sandstone
−Removed: hosted uranium mining process, although there are some uncertainties about whether the anticipated benefits will be realized.
−Removed: 1, “Business – The Kinetic Separation Process.” Kinetic Separation is a low cost, purely physical method of uranium
−Removed: and vanadium ore extraction.
−Removed: Kinetic Separation has been initially tested in order to understand the hydro and mechanical separation
−Removed: The Company used a prototype Kinetic Separation test system to test several different samples of uranium ore from the Sunday
−Removed: Mine Complex and the Hansen/Taylor Ranch properties.
−Removed: In all cases, uranium ore that was entered into the Kinetic Separation pilot test
−Removed: system appeared to concentrate most of the uranium into the post kinetically separated material consisting of a fraction of the original
−Removed: mass, leaving most of the post kinetically separated materials which did not contain any uranium.
−Removed: The results of these tests have not
−Removed: yet been validated by a qualified person.
+Added: The Company holds a license to use Kinetic Separation, a proven technology
+Added: that we anticipate will improve the efficiency of the sandstone hosted uranium mining process, although there are some uncertainties about
+Added: whether the anticipated benefits will be realized.
+Added: See Item 1, “Business – Corporate History” and “Business –
+Added: Our Strategy – Uranium/Vanadium Production”.
+Added: The Kinetic Separation Process.” Kinetic Separation is a low cost, purely
+Added: physical method of uranium and vanadium ore extraction.
+Added: Kinetic Separation has been initially tested in order to understand the hydro
+Added: and mechanical separation processes.
+Added: The Company used a prototype Kinetic Separation test system to test several different samples of
+Added: uranium ore from the Sunday Mine Complex and the Hansen/Taylor Ranch properties.
+Added: In all cases, uranium ore that was entered into the Kinetic
+Added: Separation pilot test system appeared to concentrate most of the uranium into the post kinetically separated material consisting of a
+Added: fraction of the original mass, leaving most of the post kinetically separated materials which did not contain any uranium.
+Added: of these tests have not yet been validated by a qualified person.
During 2016, the Company submitted documentation to the Colorado Department
23 unchanged sentences
Pinon Ridge Properties
−Removed: On August 18, 2014, the Company purchased mining
−Removed: assets from Energy Fuels Holding Corp.
+Added: On August 18, 2014, the Company purchased mining assets from Energy
+Added: Fuels Holding Corp.
in an arm’s length transaction.
−Removed: The mining assets include both owned and leased land in
−Removed: the states of Utah and Colorado.
−Removed: All of the mining assets represent properties which have previously been mined to different degrees
−Removed: As some of the properties have not formally established proven or probable reserves, there may be greater inherent uncertainty
−Removed: as to whether or not any mineralized material can be economically extracted as originally planned and anticipated.
+Added: The mining assets include both owned and leased land in the states of Utah and Colorado.
+Added: All of the mining assets represent properties which have previously been mined to different degrees for uranium.
+Added: As some of the properties
+Added: have not formally established proven or probable reserves, there may be greater inherent uncertainty as to whether or not any mineralized
+Added: material can be economically extracted as originally planned and anticipated.
The Company’s mining properties acquired
5 unchanged sentences
Black Range Properties
−Removed: On September 16, 2015, in connection with the
−Removed: Black Range Transaction, the Company acquired additional mineral properties.
−Removed: The mining assets acquired through Black Range include leased
−Removed: land in the states of Colorado, Wyoming and Alaska.
+Added: On September 16, 2015, in connection with the Black Range Transaction,
+Added: the Company acquired additional mineral properties.
+Added: The mining assets acquired through Black Range include leased land in the states of
+Added: Colorado, Wyoming and Alaska.
None of these mining assets were operational at the date of acquisition.
−Removed: properties have not formally established proven or probable reserves, there may be greater inherent uncertainty as to whether or not
−Removed: any mineralized material can be economically extracted as originally planned and anticipated.
−Removed: The Company’s mining properties acquired
−Removed: on September 16, 2015 which the Company still retains as of December 31, 2020, include Hansen, North Hansen, High Park, Hansen Picnic
−Removed: Tree, Taylor Ranch, located in Fremont County, Colorado.
+Added: As these properties have not formally
+Added: established proven or probable reserves, there may be greater inherent uncertainty as to whether or not any mineralized material can be
+Added: economically extracted as originally planned and anticipated.
+Added: The Company’s mining properties acquired on September 16, 2015
+Added: which the Company still retains as of December 31, 2020, include Hansen, North Hansen, High Park, Hansen Picnic Tree, Taylor Ranch, located
+Added: in Fremont County, Colorado.
The Company also acquired Keota located in Weld County, Wyoming.
−Removed: In connection with the Black Range Transaction,
−Removed: Western assumed a mortgage secured by land, building and improvements at 1450 North 7 Mile Road, Casper, Wyoming, with interest payable
−Removed: at 8.00% and payable in monthly payments of $11,085 with the final balance of $1,044,015 due as a balloon payment on January 16, 2016.
−Removed: The Company did not pay the mortgage on its due date.
−Removed: On May 26, 2016, the Company executed agreements with the mortgage holder whereby
−Removed: in an equal exchange the mortgage was exchanged for the land, building and improvements on which it was secured, pursuant to which no
−Removed: further financial consideration is required.
−Removed: During the second quarter of 2016, the
−Removed: Company initiated actions to cancel its coal mining leases in Alaska.
−Removed: In connection therewith, the Company notified the state of
−Removed: Alaska of its intent to forfeit the posted bond in satisfaction of the reclamation liabilities at the site.
−Removed: In response to the
−Removed: Company’s notification, the Company received notification that the state of Alaska was initiating forfeiture of the
−Removed: Company’s performance bond for reclamation.
−Removed: However, the notice indicated an additional surety bond of $150,000 in excess of
−Removed: the $210,500 cash bond, which had been posted by the Company upon purchase of the property.
−Removed: The Company and its advisors do not
−Removed: believe that it is obligated for this additional amount of claimed reclamation obligation.
−Removed: The Company is working with its legal
−Removed: counsel and the State of Alaska to resolve this matter.
−Removed: The Company has not recorded an additional $150,000 obligation as the
−Removed: Company does not expect, based on the advice of legal counsel, to be obligated to an amount greater than that presently reflected in
−Removed: the reclamation liability.
−Removed: During the year ended December 31, 2016, the Company adjusted the fair value of its reclamation
−Removed: obligation and for the Alaska mine, accreted $183,510 to bring its reclamation liability to face value.
−Removed: The portion of the
−Removed: reclamation liability related to the Alaska mine, and its related restricted cash are included in current liabilities, and current
+Added: In connection with the Black Range Transaction, Western assumed a mortgage
+Added: secured by land, building and improvements at 1450 North 7 Mile Road, Casper, Wyoming, with interest payable at 8.00% and payable in monthly
+Added: payments of $11,085 with the final balance of $1,044,015 due as a balloon payment on January 16, 2016.
+Added: The Company did not pay the mortgage
+Added: on its due date.
+Added: On May 26, 2016, the Company executed agreements with the mortgage holder whereby in an equal exchange the mortgage was
+Added: exchanged for the land, building and improvements on which it was secured, pursuant to which no further financial consideration is required.
+Added: During the second quarter of 2016, the Company initiated actions to
+Added: cancel its coal mining leases in Alaska.
+Added: In connection therewith, the Company notified the state of Alaska of its intent to forfeit the
+Added: posted bond in satisfaction of the reclamation liabilities at the site.
+Added: In response to the Company’s notification, the Company received
+Added: notification that the state of Alaska was initiating forfeiture of the Company’s performance bond for reclamation.
+Added: notice indicated an additional surety bond of $150,000 in excess of the $210,500 cash bond, which had been posted by the Company upon
+Added: purchase of the property.
+Added: The Company and its advisors do not believe that it is obligated for this additional amount of claimed reclamation
+Added: The Company is working with its legal counsel and the State of Alaska to resolve this matter.
+Added: The Company has not recorded
+Added: an additional $150,000 obligation as the Company does not expect, based on the advice of legal counsel, to be obligated to an amount greater
+Added: than that presently reflected in the reclamation liability.
+Added: During the year ended December 31, 2016, the Company adjusted the fair value
+Added: of its reclamation obligation and for the Alaska mine, accreted $183,510 to bring its reclamation liability to face value.
+Added: of the reclamation liability related to the Alaska mine, and its related restricted cash are included in current liabilities, and current
assets, respectively, at a value of $215,976 and $215,976.
−Removed: On January 20, 2017, the State of Alaska notified the Company that its
−Removed: reclamation bond had been forfeited to be used to satisfy the reclamation obligation.
−Removed: However, no amount had yet been determined in
−Removed: respect to the final cost of the reclamation obligation.
−Removed: As the properties are not in production, they
−Removed: are not covered by various types of insurance including property and casualty, liability and umbrella coverage.
−Removed: We have not experienced
−Removed: any material uninsured or under insured losses related to our properties in the past and believe our approach sufficient given the inactivity.
+Added: On January 20, 2017, the State of Alaska notified the Company that its reclamation
+Added: bond had been forfeited to be used to satisfy the reclamation obligation.
+Added: However, no amount had yet been determined in respect to the
+Added: final cost of the reclamation obligation.
+Added: As the properties are not in production, they are not covered by various
+Added: types of insurance including property and casualty, liability and umbrella coverage.
+Added: We have not experienced any material uninsured or
+Added: under insured losses related to our properties in the past and believe our approach sufficient given the inactivity.
Compared sentence by sentence after normalising whitespace, quotation marks, case and digits, so re-formatting and restated figures do not read as changed language. Wording changes appear as one removal and one addition. The current filing and the prior one are authoritative.