2 unchanged sentences
UEC is working towards fueling the global demand for carbon-free nuclear energy, a key solution to climate change, and energy source for the low-carbon future.
−Removed: UEC is a pure-play uranium company and is advancing its next generation of low-cost, environmentally friendly, in-situ recovery (“ISR”) mining uranium projects.
+Added: UEC is a pure-play uranium company and is advancing its next generation of low-cost, in-situ recovery (“ISR”) mining uranium projects, and which ISR mining process is expected to reduce the impact on the environment as compared to conventional mining.
The Company has two extraction ready ISR hub and spoke platforms in South Texas and Wyoming, anchored by fully licensed and operational processing capacity at its Hobson and Irigaray plants.
UEC also has seven U.S.
−Removed: ISR uranium projects with all of their major permits in place, with additional diversified holdings of uranium assets across the U.S., Canada and Paraguay.
+Added: ISR uranium projects with all of their major permits in place, with additional diversified holdings of uranium assets across the U.S., Canada and the Republic of Paraguay.
We believe nuclear energy will continue to be an important part of the energy transition and the energy mix of a future low carbon economy.
7 unchanged sentences
Effective February 28, 2006, we completed a forward stock split of our common stock on the basis of 1.5 shares for each outstanding share and amended our Articles of Incorporation to increase our authorized capital from 75,000,000 shares of common stock, with a par value of $0.001 per share, to 750,000,000 shares of common stock, with a par value of $0.001 per share.
−Removed: In June 2007 we changed our fiscal year end from December 31 st to July 31 st (in each instance our “Fiscal”
+Added: In June 2007 we changed our fiscal year end from December 31 st to July 31 st (in each instance our “Fiscal” year now).
On December 31, 2007, we incorporated a wholly-owned subsidiary, UEC Resources Ltd., under the laws of the Province of British Columbia, Canada.
On December 18, 2009, we acquired a 100% interest in the South Texas Mining Venture, L.L.P.
−Removed: (“STMV”), a Texas limited liability partnership, from each of URN Resources Inc., a subsidiary of Uranium One Inc., and Everest Exploration, Inc.
+Added: (“STMV”), a Texas limited liability partnership, from each of URN Resources Inc., a subsidiary of Uranium One Inc.
+Added: (“Uranium One”), and Everest Exploration, Inc.
On September 3, 2010, we incorporated a wholly-owned subsidiary, UEC Paraguay Corp., under the laws of the State of Nevada.
1 unchanged sentence
On September 9, 2011, we acquired a 100% interest in Concentric Energy Corp.
−Removed: (“Concentric”), a private company incorporated in the State of Nevada. 
+Added: (“Concentric”), a private company incorporated in the State of Nevada.
On March 30, 2012, we acquired a 100% interest in Cue Resources Ltd.
−Removed: (“Cue”), a formerly publicly-traded company incorporated in the Province of British Columbia, Canada.
+Added: (“Cue”), a formerly publicly-traded company incorporated in the Province of British Columbia, Canada.
On March 4, 2016, we acquired a 100% interest in JDL Resources Inc., a private company incorporated in the Cayman Islands.
1 unchanged sentence
On August 9, 2017, we acquired a 100% interest in AUC Holdings (US), Inc.
−Removed: (“AUC”).
On January 31, 2018, we incorporated a wholly-owned subsidiary, UEC Resources (SK) Corp.
−Removed: (“UEC SK”), under the laws of the Province of Saskatchewan, Canada. On December 17, 2021, we acquired a 100% interest in Uranium One Americas, Inc.
−Removed: (“U1A”) (now UEC Wyoming Corp.). On August 19, 2022, we, through UEC 2022 Acquisition Co.
−Removed: (“UEC Acquisition Co.”) (now UEX Corporation), acquired all of the issued and outstanding common shares of UEX Corporation (“UEX”), which we did not already own, by way of a statutory plan of arrangement (the “Arrangement”) under the 
−Removed: Canada Business Corporations Act .
+Added: (“UEC SK”), under the laws of the Province of Saskatchewan, Canada.
+Added: On December 17, 2021, we acquired a 100% interest in Uranium One Americas, Inc.
+Added: (“U1A”) (now UEC Wyoming Corp.
+Added: (“UEC Wyoming”)).
+Added: On August 19, 2022, we, through UEC 2022 Acquisition Co.
+Added: (“UEC Acquisition Co.”) (now UEX Corporation), acquired all of the issued and outstanding common shares of UEX Corporation (“UEX”), which we did not already own, by way of a statutory plan of arrangement (the “Arrangement”) under the Canada Business Corporations Act .
As part of the final steps of the Arrangement, UEC Acquisition Co.
1 unchanged sentence
UEX Corporation holds a development stage uranium property portfolio in Saskatchewan, Canada, and Nunavut, Canada.
−Removed: On October 14, 2022, we acquired, through UEC SK, Roughrider Mineral Holdings Inc., a Saskatchewan corporation and wholly-owned subsidiary of Rio Tinto Fer Et Titane Inc., which, in turn, owns all of the issued and outstanding shares of Roughrider Mineral Assets Inc., also a Saskatchewan corporation, that holds certain mineral leases totaling approximately 598 hectares in northern Saskatchewan that is commonly referred to as the “Roughrider Project”
−Removed: located in the Athabasca Basin in Saskatchewan, Canada.
−Removed: Our principal executive office (U.S.
−Removed: corporate headquarters) is located at 500 North Shoreline, Ste.
−Removed: 800, Corpus Christi, Texas, 78401, and our administrative office (Canadian corporate headquarters) is located at 1188 West Georgia Street, Suite 1830, Vancouver, British Columbia, Canada, V6E 4A2.
+Added: On October 14, 2022, we acquired, through UEC SK, Roughrider Mineral Holdings Inc., a Saskatchewan corporation and wholly-owned subsidiary of Rio Tinto Fer Et Titane Inc., which, in turn, owns all of the issued and outstanding shares of Roughrider Mineral Assets Inc., also a Saskatchewan corporation, that holds certain mineral leases totaling approximately 598 hectares in northern Saskatchewan that is commonly referred to as the “Roughrider Project” located in the Athabasca Basin in Saskatchewan, Canada.
+Added: Our principal executive office and corporate headquarters in the U.S.
+Added: is located at 500 North Shoreline, Ste.
+Added: 800, Corpus Christi, Texas, 78401, and our principal executive office and corporate headquarters in Canada is located at 1188 West Georgia Street, Suite 1830, Vancouver, British Columbia, Canada, V6E 4A2.
General Business
−Removed: UEC’s goal is to provide the much needed fuel for the global energy transition.
+Added: UEC’s goal is to provide the much needed fuel for the global energy transition.
The International Energy Outlook projects that worldwide electricity generation will grow by 1.8% per year, through to 2050.
−Removed: As the global community calls on all governments and industries to curb their carbon emissions to stop the effects of climate change, there is growing need to combine intermittent renewable energy sources, such as wind and solar, with one or more “firm”
−Removed: zero-carbon sources, such as nuclear energy, to ensure the affordability and accessibility of the net-zero electricity grid.
−Removed: We are predominantly engaged in uranium mining and related activities, including exploration, pre-extraction, extraction and processing, on uranium projects located in the United States, Canada and the Republic of Paraguay. 
+Added: As the global community calls on all governments and industries to curb their carbon emissions to stop the effects of climate change, there is growing need to combine intermittent renewable energy sources, such as wind and solar, with one or more “firm” zero-carbon sources, such as nuclear energy, to ensure the affordability and accessibility of the net-zero electricity grid.
+Added: We are primarily engaged in uranium mining and related activities, including exploration, pre-extraction, extraction and processing, on uranium projects located in the United States, Canada and the Republic of Paraguay.
We utilize ISR mining where possible which we believe, when compared to conventional open pit or underground mining, requires lower capital and operating expenditures with a shorter lead time to extraction and a reduced impact on the environment.
−Removed: We do not expect, however, to utilize ISR mining for all of our uranium projects in which case we would expect to rely on conventional open pit and/or underground mining techniques. 
+Added: We do not expect, however, to utilize ISR mining for all of our uranium projects in which case we would expect to rely on conventional open pit and/or underground mining techniques.
We have one uranium mine located in the State of Texas, our Palangana Mine, which utilizes ISR mining and commenced extraction of U 3 O 8 , or yellowcake, in November 2010.
−Removed: We have one uranium processing facility located in the State of Texas, our Hobson Processing Facility, which processes material from our ISR Mines into drums of U 3 O 8 , our only sales product and source of revenue, for shipping to a third-party storage and sales facility. 
+Added: We have one uranium processing facility located in the State of Texas, our Hobson Processing Facility, which processes material from our ISR Mines into drums of U 3 O 8 , our only sales product and source of revenue, for shipping to a third-party storage and sales facility.
Since commencement of uranium extraction from our ISR Mines in November 2010 to July 31, 2024, our Hobson Processing Facility has processed 578,000 pounds of U 3 O 8 .
−Removed: As at July 31, 2023, we had no uranium supply or “off-take”
−Removed: agreements in place. Future sales of U 3 O 8 are therefore expected to generally occur through the uranium spot market, with any fluctuations in the market price continuing to have a direct impact on our revenues and cash flows.
−Removed: Our fully-licensed and 100%-owned Hobson Processing Facility forms the basis for our regional operating strategy in the State of Texas, specifically in the South Texas Uranium Belt, where we utilize ISR mining.
−Removed: We utilize a “hub-and-spoke”
−Removed: strategy whereby the Hobson Processing Facility acts as the central processing site (the “hub”) for our Palangana Mine and future satellite uranium mining activities, such as our Burke Hollow and Goliad Projects, located within the South Texas Uranium Belt (the “spokes”).
−Removed: The Hobson Processing Facility has a physical capacity to process uranium-loaded resins up to a total of two million pounds of U 3 O 8 annually and is licensed to process up to four million pounds of U 3 O 8 annually.
−Removed: With the acquisition of U1A in Fiscal 2022, the Irigaray Processing Facility forms the focus of our regional operating strategy in the Powder River and Great Divide uranium districts in the state of Wyoming.
−Removed: The Irigaray plant has a licensed capacity of 2.5 million pounds of U 3 O 8  per year, with the potential to process uranium from eleven satellite ISR projects in the state, including four fully permitted projects.
−Removed: Recently, we acquired a substantial portfolio of projects in Canada, with the purchase of UEX and the Roughrider Project from a subsidiary of Rio Tinto plc (“Rio Tinto”).
+Added: As at July 31, 2024, we had no uranium supply or “off-take” agreements in place.
+Added: Future sales of U 3 O 8 are therefore expected to generally occur through the uranium spot market, with any fluctuations in the market price continuing to have a direct impact on our revenues and cash flows.
+Added: In Texas, our fully-licensed and 100% owned Hobson Processing Facility forms the basis for our regional operating strategy in the State of Texas, specifically the South Texas Uranium Belt where we utilize ISR mining.
+Added: We utilize a “hub-and-spoke” strategy whereby the Hobson Processing Facility, which has a physical capacity to process uranium-loaded resins up to a total of two million pounds of U 3 O 8 annually and is licensed to process up to four million pounds of U 3 O 8 annually, acts as the central processing site (the “hub”) for our Palangana Mine, and future satellite uranium mining activities, such as our Burke Hollow and Goliad Projects, located within the South Texas Uranium Belt (the “spokes”).
+Added: On January 16, 2024, we announced plans to restart uranium extraction at our fully permitted, and past producing, Christensen Ranch Mine ISR operation in Wyoming.
+Added: During August of 2024 we commenced the process for uranium extraction which is being funded with existing cash on the Company’s balance sheet.
+Added: Uranium recovered from the Christensen Ranch Mine ISR Project will be processed at our Irigaray central processing plant (“CPP”).
+Added: The Irigaray CPP is the hub central to our four fully permitted ISR projects located in the Powder River Basin of Wyoming, including our Christensen Ranch Mine, Reno Creek, Moore Ranch and Ludeman p rojects.
+Added: An application to increase the licensed capacity of the Irigaray CPP from the 2.5 million pounds U 3 O 8 per year to 4.0 million pounds U 3 O 8 per year was submitted to the Wyoming Department of Environmental Quality in November 2023;
+Added: and approval is expected later in 2024.
+Added: To enable a faster extraction restart, extensive preparations at the Christensen Ranch Mine wellfields and satellite processing plant were completed in 2023.
+Added: This included the re-installation of equipment, re-attachment of piping and a variety of electrical testing, repairs and upgrades to the existing facilities.
+Added: Since that time, additional work has progressed, including the hiring of additional operational personnel, preparation of a detailed wellfield startup plan, final preparations for plant and wellfield operations and the installation of cased wells in two new wellfield header houses in Mine Unit 10 (Modules 10-7 and 10-8).
+Added: In 2022, we acquired a substantial portfolio of projects in Canada, with the purchase of UEX and the Roughrider Project from a subsidiary of Rio Tinto plc (“Rio Tinto”).
The UEX portfolio consists of a mix of uranium deposits, primarily focused on the Athabasca Basin uranium district in Saskatchewan, Canada.
This includes interests in the Shea Creek, Christie Lake, Horseshoe Raven, Millennium and Wheeler River Projects.
−Removed: In addition to advancing its uranium development projects through its ownership interest in JCU (Canada) Exploration Company, Limited, UEX was advancing several other uranium deposits in the Athabasca Basin which include the Paul Bay, Ken Pen and Ōrora deposits at the Christie Lake Project, the Kianna, Anne, Colette and 58B deposits at its currently 49.1%-owned Shea Creek Project, and the Horseshoe and Raven deposits located on its 100%-owned Horseshoe-Raven Project.
+Added: In addition to advancing its uranium development projects through its ownership interest in JCU (Canada) Exploration Company, Limited (“JCU”), UEX was advancing several other uranium deposits in the Athabasca Basin which include the Paul Bay, Ken Pen and Ōrora deposits at the Christie Lake Project, the Kianna, Anne, Colette and 58B deposits at its currently 49.1%-owned Shea Creek Project, and the Horseshoe and Raven deposits located on its 100%-owned Horseshoe-Raven Project.
The Roughrider Project is an exploration stage asset, having been advanced by Rio Tinto over a decade of work.
−Removed: The acquisition brought in an exploration stage, high-grade, conventional asset into UEC’s portfolio that, along with the UEX acquisition, begins to develop a critical mass of 100% owned resources in the Athabasca Basin to accelerate extraction and/or production plans.
+Added: The acquisition brought in an exploration stage, high-grade, conventional asset into UEC’s portfolio that, along with the UEX acquisition, begins to develop a critical mass of 100% owned resources in the Athabasca Basin to accelerate extraction and/or production plans.
The two transactions provide a portfolio of medium to long term, high-grade, conventional projects that complement our nearer term, U.S.
−Removed: In August 2023, we acquired a portfolio of exploration-stage projects in the Athabasca Basin, Saskatchewan, Canada, for CAD$1.5 million from Rio Tinto Exploration Canada Inc., a subsidiary of Rio Tinto, whereby we acquired a 60% equity stake in the Henday Lake joint venture, 100% of the Milliken project and a 50% equity stake in the Carswell joint venture project. 
−Removed: With this transaction, we added an additional 44,444 acres of prospective ground in the Athabasca Basin to our existing portfolio.
−Removed: As at July 31, 2023, we hold certain mineral rights in various stages in the States of Arizona, Colorado, New Mexico, Texas and Wyoming, in Canada and in the Republic of Paraguay, many of which are located in historically successful mining areas and have been the subject of past exploration and pre-extraction activities by other mining companies.
−Removed: We do not expect, however, to utilize ISR mining for all of our uranium projects in which case we would expect to rely on conventional open pit and/or underground mining techniques.
−Removed: Our operating and strategic framework is based on expanding our uranium extraction activities, which includes advancing certain uranium projects with established mineralized materials towards uranium extraction, and establishing additional mineralized materials on our existing uranium projects or through acquisition of additional uranium projects.
+Added: In August 2023, we acquired a portfolio of exploration-stage projects in the Athabasca Basin for CA$1.5 million from Rio Tinto Exploration Canada Inc., a subsidiary of Rio Tinto Inc.
+Added: With this acquisition, we added an additional 44,444 acres of prospective ground in the Athabasca Basin to our existing portfolio.
+Added: As at July 31, 2024, we also hold certain mineral rights in various stages in the States of Arizona, New Mexico, Texas and Wyoming, in Canada and in the Republic of Paraguay, many of which are located in historically successful mining areas and have been the subject of past exploration and pre-extraction activities by other mining companies.
+Added: Our operating and strategic framework is to become a leading low-cost North American focused uranium supplier based on expanding our uranium extraction activities, which includes advancing certain uranium projects with established mineralized materials towards uranium extraction and establishing additional mineralized materials on our existing uranium projects or through acquisition of additional uranium projects.
Physical Uranium Program
−Removed: The Company is investing in building the next generation of low-cost and environmentally friendly uranium projects that will be competitive on a global basis.
+Added: The Company is investing in building the next generation of low-cost uranium projects that will be competitive on a global basis and which will use the ISR mining process which is expected to reduce the impact on the environment as compared to conventional mining.
Despite our focus on low cost ISR mining with its low capital requirements, we saw a unique opportunity to purchase drummed uranium at prevailing spot prices which are below most global industry mining costs.
−Removed: Hence, we established a physical uranium portfolio (the “Physical Uranium Program”) and, as of July 31, 2023, we had entered into agreements to purchase 1,695,000 pounds of U.S.
−Removed: warehoused uranium from Fiscal 2024 to Fiscal 2026 at the ConverDyn conversion facility located in Metropolis, Illinois, at a volume weighted average price of approximately $42.78 per pound.
−Removed: During Fiscal 2023, we generated revenue of $164.0 million from sales of 3,150,000 pounds of uranium, which included $17.85 million from sales of 300,000 pounds of U.S.
−Removed: origin uranium concentrates to the U.S.
−Removed: Department of Energy.
+Added: Hence, we established a physical uranium portfolio (the “Physical Uranium Program”) and, as of July 31, 2024, we had 1,466,000 pounds of uranium and had entered into agreements to purchase 700,000 pounds of U.S.
+Added: warehoused uranium from Fiscal 2025 to Fiscal 2026 at the ConverDyn conversion facility located in Metropolis, Illinois, at a volume weighted average price of approximately $38.20 per pound.
Our Physical Uranium Program will support three objectives for our Company:
4 unchanged sentences
One such U.S.
−Removed: origin specific opportunity is the Company’s plan to participate in supplying the Uranium Reserve, as outlined in the Nuclear Fuel Working Group report published by the U.S.
−Removed: Department of Energy. 
+Added: origin specific opportunity is the Company’s plan to participate in supplying the Uranium Reserve, as outlined in the Nuclear Fuel Working Group report published by the U.S.
+Added: Department of Energy (“DOE”).
During Fiscal 2024, we made significant advancements in various aspects of our operations, including:
−Removed: we completed and filed TRS reports in accordance with S-K 1300 disclosing mineral resources for each of our Texas ISR Hub and Spoke, updated Wyoming ISR Hub and Spoke, Shea Creek, Horseshoe-Raven, Workman Creek and Roughrider Projects on August 11, 2022, September 14, 2022, January 13, 2023, January 24, 2023, March 16, 2023 and May 2, 2023, respectively;
−Removed: we completed the acquisition of UEX on August 19, 2022, making us one of the largest diversified North American focused uranium companies;
−Removed: we completed the acquisition of the Roughrider Project on October 14, 2022.
−Removed: The acquisition of the Roughrider Project represented an opportunity to scale-up in the high-grade Eastern Athabasca Basin of Saskatchewan, Canada;
−Removed: we generated revenue of $164.0 million from sales of 3,150,000 pounds of uranium, which included $17.85 million from sales of 300,000 pounds of U.S.
−Removed: origin uranium concentrates to the U.S.
−Removed: Department of Energy;
−Removed: we published our inaugural sustainability report;
−Removed: we expanded licensed capacity to four million pounds of U 3 O 8  annually at our Hobson Processing Facility, distinguishing the plant as having the largest licensed capacity in Texas and the second largest in the United States;
−Removed: we commenced a drilling campaign at our 82.77% owned Christie Lake Project and drilled 19,778.9 meters.
+Added: we completed and filed technical report summary reports (each, a “TRS”) in accordance with S-K 1300 disclosing mineral resources for each of our Alto Parana Titanium Project, located in Paraguay, and our updated Texas ISR Hub and Spoke Project, on November 13, 2023 and June 12, 2024, respectively;
+Added: we acquired a portfolio of exploration-stage projects in the Athabasca Basin on August 4, 2023, adding an additional 44,444 acres of prospective ground in the Athabasca Basin to our existing portfolio;
+Added: we announced restarting uranium extraction at our fully permitted, and past producing, Christensen Ranch Mine ISR operation in Wyoming during August 2024;
+Added: we published our fiscal year 2023 sustainability report, which includes the Company’s first disclosure aligned with the recommendations of the Task Force on Climate-Related Financial Disclosures and highlights the Company’s achievements related to environmental stewardship;
+Added: we reported drill results from our Roughrider Project and both exploration and metallurgical sample drilling have been successful at intersecting uranium mineralization.
Uranium Market Developments
−Removed: Over the past few years, global uranium market fundamentals have been improving as the market transitions from an inventory driven market to a production driven market.
−Removed: The spot market bottomed in November 2016 at about $17.75 per pound U 3 O 8  and stood at $56.25 per pound on July 31, 2023 (UxC U 3 O 8  Daily Spot Price).
−Removed: Production dropped to a multi-year low in 2020 at about 122 million pounds but began to recover in 2021 and totalled about 129 million pounds in 2022, still well below reactor requirements.
−Removed: Global supply and demand projections show a structural deficit between production and utility requirements averaging over 44 million pounds a year over the next 10 years and increasing thereafter (UxC 2023 Q2 Uranium Market Outlook).
−Removed: The current gap is being filled with secondary market sources, including finite inventory that is projected to decline in coming years.
−Removed: As secondary supplies diminish, and as existing mines deplete their resources, new production will be needed to meet utility demand.
−Removed: This will require higher prices to stimulate new mining investment but market prices are still below the incentive prices for many producers.
−Removed: Uranium supply has become more complicated due to Russia’s invasion of Ukraine as Russia is a significant supplier of nuclear fuel around the globe.
−Removed: Economic sanctions, transportation restrictions, pending legislation and buyer avoidance of Russian fuel is causing a fundamental change to the nuclear fuel markets.
−Removed: We believe this is resulting in a bifurcation of the uranium market, increasing an already notable supply gap for western utilities.
−Removed: More recently, the coup in Niger has raised questions about uranium supply from that country that provided about 25% of European supply this past year. 
+Added: The uranium market is currently being driven by a macro demand for more electricity generation and an unprecedented global push to decarbonize electrical grids, among other factors.
+Added: New demand projections outlined from the "US Data Center Power Outlook" report issued in July 2024 showed new data center demand growth ranging from 60 to 90 gigawatt (“GW”) in 2023-2030.
+Added: There is a growing realization that the highly reliable, safe, baseload power nuclear energy provides should be a part of any clean energy platform.
+Added: Governments around the globe are also pursuing strategies to increase energy independence for national security interests that dovetail well with nuclear power as a key component in their energy mix.
+Added: Over the past few years, global uranium market fundamentals have improved as the market began a transition from being an inventory driven to a production driven market.
+Added: The spot market bottomed out in November 2016 at about $17.75 per pound U 3 O 8 , but has since shown appreciation, reaching $107.00 per pound U 3 O 8 on February 2, 2024.
+Added: During the three and twelve months ended July 31, 2024, uranium prices averaged $87.28 and $83.06 per pound U 3 O 8 , respectively.
+Added: As at July 31, 2024, the spot uranium price was $85.50 per pound, representing an approximate 52% increase from July 31, 2023 when the price was $56.25 per pound U 3 O 8 .
+Added: The period from May 2024 through July 2024 was marked by continued spot price fluctuations between $82.00 and $83.85 per pound U 3 O 8 (all price information is sourced from UxC LLC Historical Ux Daily Prices).
+Added: Underinvestment in uranium mining operations over the past decade has been a major factor contributing to a structural deficit between global production and uranium requirements.
+Added: Reduced production from existing uranium mines has also been a contributing factor with some large producers cutting back and/or unable to reach previously planned production levels.
+Added: In 2024 and 2025 the mid-case gap between production and requirements is projected to be more than 68 million pounds of U 3 O 8 , and by 2034 accumulates to a total above 370 million pounds of U 3 O 8 (UxC 2024 Q2 Uranium Market Outlook).
+Added: For context, the U.S.
+Added: utilities purchased 51.6 million pounds of U 3 O 8 in 2023 (U.S.
+Added: Energy Information Administration, June 6, 2024 - Uranium Marketing Annual Report).
+Added: The current gap is being filled with secondary market sources, including finite inventory that has been declining and is projected to decline further in coming years.
Secondary supply is also likely to be further reduced with western enrichers reversing operations from underfeeding to overfeeding that requires more uranium to increase the production of enrichment services.
−Removed: While these situations are still unfolding, new trends appear to be pointing towards U.S.
−Removed: and European utilities beginning to shift more focus to security of supply with production from areas of low geopolitical risk.
−Removed: On the demand side of the equation, the global nuclear energy industry continues robust growth, with 69 new reactors connected to the grid since 2013 and another 59 reactors under construction as of August 2023 (PRIS and WNA August 2023 data). 
−Removed: In October 2022, World Nuclear News reported that:
−Removed: “The International Energy Agency projects more than a doubling of nuclear generation by 2050 with at least 30 countries increasing their use of nuclear power, in the Net Zero Emissions by 2050 scenario of its latest World Energy Outlook”.
−Removed: Additional upside market pressure is also emerging as utilities return to a longer-term contracting cycle to replace expiring contracts;
−Removed: something the market has not experienced for several years. 
−Removed: Increasing demand has also occurred with financial entities and various producers, including our Company, purchasing significant quantities of drummed uranium inventory, further removing excess near term supplies.
+Added: As secondary supplies continue to diminish, and as existing mines deplete resources, new production will be needed to meet existing and future utility demand.
+Added: The timeline for new mining projects can be 10 years or longer and will require prices high enough to stimulate new mining investments.
+Added: Since 2022, uranium supply has become more complicated due to Russia's invasion of Ukraine with its State Atomic Energy Corporation, Rosatom, being a significant supplier of nuclear fuel around the globe.
+Added: Economic sanctions, transportation restrictions and recent U.S.
+Added: legislation banning the importation of Russian nuclear fuel is causing a fundamental change to the nuclear fuel markets.
+Added: Additionally, the 2023 coup in Niger, and the new government’s demand for the U.S.
+Added: and France to vacate the country, as well as the revocation of Canadian and French companies mining rights, and operating permits, has underscored jurisdictional risk.
+Added: Niger is the world's seventh largest producer and accounted for about 5% of global uranium production and about 14% of European Union supply in 2023 (Euratom Supply Agency, World Nuclear Association - Uranium in Niger July 23, 2024, World Nuclear News).
+Added: As a result of the instability and assurance of supply risks, U.S.
+Added: and European utilities are shifting more focus to production from areas of low geopolitical risk.
+Added: On the demand side of the equation, the global nuclear energy industry continues robust growth, with 69 new reactors connected to the grid in 2014 through July of 2024, and with another 61 reactors under construction.
+Added: Thus far in 2024, four new reactors have been connected to the grid and two reactors have been permanently shut down (International Atomic Energy Association Power Reactor Information System - August 15, 2024).
+Added: Total nuclear generating capacity for the world’s 439 operable reactors as of August 15, 2024, stands at 395 GWe (World Nuclear Association).
+Added: At COP28 United Nations Climate Change Conference, 22 countries, including the U.S., Canada, France, Japan and the United Kingdom, signed a declaration to triple nuclear energy by 2050, further supporting additional growth for the nuclear industry and uranium demand.
+Added: In the U.S., H.R.
+Added: 1042, The Prohibiting Russian Uranium Imports Act was signed into law and went into effect on August 11, 2024 and extends through 2040.
+Added: The legislation bans Russian uranium imports but allows a U.S.
+Added: DOE waiver process through 2027 in the event no alternative viable source of low-enriched uranium (“LEU”) is available to:
+Added: (i) sustain the continued operation of a nuclear reactor or a U.S.
+Added: nuclear energy company;
+Added: or (ii) importation of Russian LEU is determined to be in the national interest.
+Added: In a separate but related action, The Nuclear Fuel Security Act (“NFSA”) was enacted as part of the National Defense Authorization Act in December of 2023 and was designed to help rebuild the domestic nuclear fuel cycle, including uranium production, conversion and enrichment.
+Added: The passage of H.R.
+Added: 1042 unlocks $3.4 billion in funding under the NFSA and will be used by the DOE to acquire LEU and High Assay Low Enriched Uranium (“HALEU”) for advanced reactors.
+Added: Under this program DOE will acquire LEU and HALEU with priority given to domestic sources of produced uranium, conversion and enrichment.
+Added: In combination, the passage of these bills will help rebuild and restore a robust domestic fuel cycle in the U.S.
+Added: Additional upside market pressure is also occurring as utilities continue their return to a longer-term contracting cycle to replace expiring contracts.
+Added: Cumulative uncommitted demand through 2034 is almost 900 million pounds U 3 O 8 (UxC Uranium Market Overview Q2 2024).
+Added: This utility demand, along with that from financial entities and various producers, as well as the increasing interest in nuclear energy for data centers, are adding to the strong fundamentals supporting the uranium market.
Titanium (TiO2) Industry Updates
−Removed: During Fiscal 2023, the market fundamentals for titanium dioxide remained positive although some softening is expected during the latter part of 2023.
+Added: During 2024, the market fundamentals for titanium dioxide remained robust.
+Added: Titanium dioxide is used in many “quality of life” products for which demand historically has been linked to global gross domestic product (“GDP”), ongoing urbanization trends and discretionary spending.
There is no economical substitute or environmentally safe alternative to titanium dioxide.
−Removed: Titanium dioxide is used in many “quality of life”
−Removed: products for which demand historically has been linked to global gross domestic product (“GDP”), ongoing urbanization trends and discretionary spending. 
−Removed: 90% of all the mined titanium feedstocks are used to manufacture pure titanium dioxide –
−Removed: a pigment that enhances brightness and opacity in paints, inks, paper, plastics, food products and cosmetics.
−Removed: The remaining 10% of supply is used in the production of titanium metal and steel fabrication.
−Removed: Demand for titanium feedstocks, such as ilmenite, is closely tied to titanium dioxide pigment demand.
−Removed: The global titanium pigment demand fundamentals are underpinned by urbanization and rising living standards and as such the long-term demand fundamentals remain robust.
−Removed: Demand for titanium pigment is expected to soften during the latter half of 2023 mainly due to slower growth in China.
−Removed: During 2023, China has seen increasing competition for pigment sales in both the domestic and export markets which has led to reduced pigment production from some operations and in turn has impacted the demand for ilmenite during the first part of the year.
−Removed: Longer-term, China, the world’s largest feedstock market, is becoming increasingly more reliant on higher quality imported feedstocks. Chinese domestic ilmenite is mainly unsuitable for processing under the stricter environmental regulations and, as such, the long-term global shift towards chloride pigment production will continue to drive overall high-quality feedstock demand and prices.  
−Removed: In our view, what appear to be longer-term supply and demand fundamentals and, more specifically, the long-term global shift towards higher grade feedstocks, have the potential to keep upward pressure on high-quality feedstock prices and hence the potential product from the Alto Parana Project.
+Added: The majority of all the mined titanium feedstocks are used to manufacture pure titanium dioxide – a pigment that enhances brightness and opacity in paints, inks, paper, plastics, food products and cosmetics.
+Added: The remaining approximately 10% of supply is used in the production of titanium metal and steel fabrication.
+Added: Demand for titanium feedstocks, such as ilmenite and titanium slag, is closely tied to titanium dioxide pigment demand with most feedstock produces reporting a robust demand for feedstocks with increasing global pigment production.
+Added: Ilmenite prices remained steady in the period, but short-term outlook became more cautious due to macroeconomic conditions.
+Added: Chinese TiO2 pigment production continued at record levels during the most recent quarter and towards the end there was an increase in operating rates among pigment producers in Europe and the U.S.
+Added: to meet stronger underlying demand.
+Added: While current global supply of titanium feedstocks remains sufficient to meet demand, new supplies from Chinese producers in African countries shipping concentrates to China for processing are being partially offset by the suspension of operations in Sierra Leone and Kenya.
+Added: Indications are that in the medium to long term supply constraints will lead to global demand for titaniferous feedstocks exceeding supply, requiring the development of new sources of supply.
+Added: What appear to be longer-term supply and demand fundamentals and, more specifically, the long-term global shift towards higher grade feedstocks, have the potential to keep upward pressure on high-quality feedstock prices and hence the potential product from our Alto Parana Project.
In-Situ Recovery (ISR) Mining
9 unchanged sentences
The uranium-rich solution is pumped from an ore zone to the surface and circulated through a series of ion exchange columns located at the mine site.
−Removed: The solution flows through resin beds inside an ion exchange column where the uranium bonds to small resin beads.
+Added: The solution flows through resin beads inside an ion exchange column where the uranium bonds to small resin beads.
As the solution exits the ion exchange column, it is mostly void of uranium and is re-circulated back to the wellfield and through the ore zone.
1 unchanged sentence
The stripped resin beads are then transported back to the mine and reused in the ion exchange columns.
−Removed: The uranium solution, now free from the resin, is precipitated out and concentrated into a slurry mixture and fed to a filter press to remove unwanted solids and contaminants.
+Added: The uranium solution, now free from the resin, is precipitated out and concentrated into a slurry mixture and fed to a filter press to remove unwanted solids and contaminants.
The slurry is then dried in a zero-emissions rotary vacuum dryer, packed in metal drums and shipped out as uranium concentrates, or yellowcake, to a conversion facility for storage and sales.
−Removed: Each project is divided into a mining unit, known as a Production Area Authorization (“PAA”), which lies inside an approved Mine Permit Boundary.
+Added: Each project is divided into a mining unit, known as a Production Area Authorization (“PAA”), which lies inside an approved Mine Permit Boundary.
Each PAA will be developed, extracted and restored as one unit and will have its own set of monitor wells.
7 unchanged sentences
On December 18, 2009, we acquired the Hobson Processing Facility as part of our acquisition of STMV.
−Removed: With a physical capacity to process uranium-loaded resins up to a total of two million pounds of U 3 O 8 annually and licensed to process up to four million pounds of U 3 O 8 annually, our fully-licensed and 100%-owned Hobson Processing Facility forms the basis for our “hub-and-spoke”
−Removed: strategy in the State of Texas, specifically in the South Texas Uranium Belt, where we utilize ISR mining.
+Added: With a physical capacity to process uranium-loaded resins up to a total of two million pounds of U 3 O 8 annually and licensed to process up to four million pounds of U 3 O 8 annually, our fully-licensed and 100%-owned Hobson Processing Facility forms the basis for our “hub-and-spoke” strategy in the State of Texas, specifically in the South Texas Uranium Belt, where we utilize ISR mining.
Palangana Mine
−Removed: We hold various mining lease and surface use agreements generally having an initial five-year term with extension provisions, granting us the exclusive right to explore, develop and mine for uranium at our Palangana Mine, a 6,969-acre property located in Duval County, Texas, approximately 100 miles south of the Hobson Processing Facility.
+Added: We hold various mining lease and surface use agreements generally having an initial five-year term with extension provisions, granting us the exclusive right to explore, develop and mine for uranium at our Palangana Mine, a 6,969-acre property located in Duval County, Texas, approximately 100 miles south of our Hobson Processing Facility.
These agreements are subject to certain royalty and overriding royalty interests indexed to the sales price of uranium.
−Removed: On December 18, 2009, we acquired the Palangana Mine as part of our acquisition of STMV.
−Removed: In November 2010, the Palangana Mine commenced uranium extraction utilizing ISR mining and in January 2011 the Hobson Processing Facility began processing resins received from the Palangana Mine.
Material Relationships Including Long-Term Delivery Contracts
−Removed: As at July 31, 2023, we had no uranium supply or “off-take”
−Removed: agreements in place.
−Removed: Given that there are up to approximately 60 different companies as potential buyers in the uranium market, we are not substantially dependent upon any single customer to purchase uranium extracted by us.
+Added: As at July 31, 2024, we had no uranium supply or “off-take” agreements in place.
The timing of our uranium concentrate sales is dependent upon factors such as extraction results from our mining activities, cash requirements, contractual requirements and perception of the uranium market.
8 unchanged sentences
Remediation of a property is required in accordance with regulatory standards, which may include the posting of reclamation bonds.
−Removed: In Arizona, Colorado, New Mexico and Wyoming our mineral rights are held either exclusively or through a combination of federal mining claims and state and private mineral leases.
+Added: In Arizona, New Mexico and Wyoming our mineral rights are held either exclusively or through a combination of federal mining claims and state and private mineral leases.
Remediation of a property is required in accordance with regulatory standards, which may include the posting of reclamation bonds.
Our federal mining claims consist of both unpatented lode and placer mining claims registered with the U.S.
−Removed: Bureau of Land Management (“BLM”) and the appropriate counties.
+Added: Bureau of Land Management (“BLM”) and the appropriate counties.
These claims provide for all mineral rights including surface access rights for an indefinite period.
−Removed: Annual maintenance requirements include BLM claim fees of $165 per claim due yearly on September 1 st . 
+Added: Annual maintenance requirements include BLM claim fees of $165 per claim due yearly on September 1 st .
Our state mineral leases are registered with their respective states.
3 unchanged sentences
These leases provide for uranium and certain other specified mineral rights only, including surface access rights, subject to production royalties, ranging from an initial term of five to seven years and renewal for a second five-year to seven-year term, and some of which have an initial term of 20 years.
−Removed: Under the mining laws of Saskatchewan, Canada, title to mineral rights for our projects in Saskatchewan is held through The Crown Minerals Act of the Province of Saskatchewan. 
+Added: Under the mining laws of Saskatchewan, Canada, title to mineral rights for our projects in Saskatchewan is held through The Crown Minerals Act of the Province of Saskatchewan.
In addition, The Mineral Resources Act, 1985 and The Mineral Tenure Registry Regulations affect the rights and administration of mineral tenure in Saskatchewan.
−Removed: Our lands of Saskatchewan projects are currently claimed as “Crown dispositions”
−Removed: or “mineral dispositions”.
+Added: The lands of our Saskatchewan projects are currently claimed as “Crown dispositions” or “mineral dispositions”.
Subject to section 19 of The Crown Minerals Act , a claim grants to the holder the exclusive right to explore for any Crown minerals that are subject to these regulations within the claim lands.
4 unchanged sentences
A claim may be converted to a mineral lease upon application and payment of a registration fee.
−Removed: Under the mining laws of the Republic of Paraguay, title to mineral rights for our Yuty Project is held through a “Mineral Concession Contract”
−Removed: approved by the National Congress and signed between the Government of the Republic of Paraguay and the Company, and titles to mineral rights for our Oviedo Project and our Alto Paraná
−Removed: Titanium Project are held through “Exploration Mining Permits”
−Removed: granted by the Ministry of Public Works and Communications (“MOPC”), the mining regulator in Paraguay.
+Added: Under the mining laws of the Republic of Paraguay, title to mineral rights for our Yuty Project is held through a Mineral Concession Contract approved by the National Congress and signed between the Government of the Republic of Paraguay and the Company, and titles to mineral rights for our Oviedo and Alto Paraná Titanium Projects are held through Exploration Mining Permits granted by the Ministry of Public Works and Communications (“MOPC”), the mining regulator in Paraguay.
These mineral rights provide for the exploration of metallic and non-metallic minerals and precious and semi-precious gems within the territory of Paraguay for up to a six-year period, and for the exploitation of minerals for a minimum period of 20 years from the beginning of the production phase, extendable for an additional ten years.
8 unchanged sentences
This enterprise-wide policy can be found at https://www.uraniumenergy.com/about/corporate-governance/ .
−Removed: Topics covered in this policy include the management of hazardous waste, water, biodiversity and land use, air quality and pollutants, green-house gas (“GHG”) emissions and energy management.
−Removed: Adherence to and performance against this policy will be reviewed by our Board of Directors’
−Removed: (the “Board of Directors”
−Removed: or “Board”) Sustainability Committee annually.
+Added: Topics covered in this policy include the management of hazardous waste, water, biodiversity and land use, air quality and pollutants, green-house gas (“GHG”) emissions and energy management.
+Added: Adherence to and performance against this policy will be reviewed by our Board of Directors’ (the “Board of Directors” or “Board”) Sustainability Committee annually.
Environmental Regulations
−Removed: We believe that we comply with all federal, state and local applicable laws and regulations which govern environmental quality and pollution control. 
−Removed: Our operations are subject to stringent environmental regulation by state and federal authorities including the Railroad Commission of Texas (“RCT”), the Texas Commission on Environmental Quality (“TCEQ”), the Wyoming Department of Environmental Quality (“WDEQ”) Land, Water and Air Quality Divisions, the United States BLM(Wyoming) and the United States Environmental Protection Agency (“EPA”).
−Removed: In Texas, where the Company’s hub-and-spoke operations are anchored by the fully-licensed Hobson Processing Facility, surface extraction and exploration for uranium is regulated by the RCT, while ISR uranium extraction is regulated by the TCEQ.
+Added: We believe that we comply with all federal, state and local applicable laws and regulations which govern environmental quality and pollution control.
+Added: Our operations are subject to stringent environmental regulation by state and federal authorities including the Railroad Commission of Texas (“RCT”), the Texas Commission on Environmental Quality (“TCEQ”), the Wyoming Department of Environmental Quality (“WDEQ”) Land, Water and Air Quality Divisions, the United States BLM (Wyoming) and the United States Environmental Protection Agency (“EPA”).
+Added: In Texas, where the Company’s hub-and-spoke operations are anchored by our fully-licensed Hobson Processing Facility, surface extraction and exploration for uranium is regulated by the RCT, while ISR uranium extraction is regulated by the TCEQ.
An exploration permit is the initial permit granted by the RCT that authorizes exploration drilling activities inside an approved area.
3 unchanged sentences
As an example of the regulation that guides our industry, before ISR uranium extraction can begin in Texas, a number of permits must be granted by the TCEQ.
−Removed: A Mine Area Permit (“MAP”) application is required for submission to the TCEQ to establish a specific permit area boundary, aquifer exemption boundary and the mineral zones of interests or production zones.
+Added: A Mine Area Permit (“MAP”) application is required for submission to the TCEQ to establish a specific permit area boundary, aquifer exemption boundary and the mineral zones of interests or production zones.
The application also includes a financial surety plan to ensure funding for all plugging and abandonment requirements.
1 unchanged sentence
As at July 31, 2024, we held MAPs for our Palangana Mine and our Goliad and Burke Hollow Projects.
−Removed: A Radioactive Material License (“RML”) application is also required for submission to the TCEQ for authorization to operate a uranium recovery facility.
+Added: A Radioactive Material License (“RML”) application is also required for submission to the TCEQ for authorization to operate a uranium recovery facility.
The application includes baseline environmental data for soil, vegetation, surface water and groundwater along with operational sampling frequencies and locations.
8 unchanged sentences
As at July 31, 2024, we held four PAA permits for our Palangana Mine and one for our Goliad Project.
−Removed: An application for PAA-1 at Burke Hollow was submitted in February 2023.
+Added: An application for PAA-1 for the Burke Hollow Project was submitted in February 2023.
A Class I disposal well permit application is also required for submission to the TCEQ for authorization for deep underground wastewater injection.
1 unchanged sentence
This permit authorizes injection into a specific injection zone within a designated injection interval.
−Removed: The permit requires continuous monitoring of numerous parameters including injection flow rate, injection pressure, annulus pressure and injection/annulus differential pressure. 
−Removed: Mechanical integrity testing is required initially and annually to ensure the well is mechanically sound. 
+Added: The permit requires continuous monitoring of numerous parameters, including injection flow rate, injection pressure, annulus pressure and injection/annulus differential pressure.
+Added: Mechanical integrity testing is required initially and annually to ensure the well is mechanically sound.
Surety funding for plugging and abandonment of each well is in the form of cash or bonds, including 15% for contingencies and 10% for overhead, adjusted annually for inflation.
As at July 31, 2024, we held two Class I disposal well permits for each of our Hobson Processing Facility, Palangana Satellite Facility and Burke Hollow and Goliad Projects.
−Removed: The federal Safe Drinking Water Act (“SDWA”) creates a regulatory program to protect groundwater and is administered by the EPA.
−Removed: The SDWA allows states to issue underground injection control (“UIC”) permits under two conditions:
−Removed: the state’s program must have been granted primacy;
−Removed: and the EPA must have granted an aquifer exemption upon the state’s request (an “Aquifer Exemption”).
+Added: The federal Safe Drinking Water Act (“SDWA”) creates a regulatory program to protect groundwater and is administered by the EPA.
+Added: The SDWA allows states to issue underground injection control (“UIC”) permits under two conditions:
+Added: the state’s program must have been granted primacy;
+Added: and the EPA must have granted an aquifer exemption upon the state’s request (an “Aquifer Exemption”).
Texas, being a primacy state, is therefore authorized to grant UIC permits and makes the official requests for an Aquifer Exemption to the EPA.
1 unchanged sentence
As at July 31, 2024, we held an Aquifer Exemption for each of our Palangana Mine and our Goliad and Burke Hollow Projects.
−Removed: In Wyoming ISR mining activities are regulated by the Wyoming Department of Environmental Quality (“WDEQ”), Land Quality Division (“LQD”), under Wyoming Administrative Code §35-11-401 through §35-11-437.
+Added: In Wyoming ISR mining activities are regulated by the Wyoming Department of Environmental Quality (“WDEQ”), Land Quality Division (“LQD”), under Wyoming Administrative Code §35-11-401 through §35-11-437.
Before ISR uranium mining is allowed to proceed in Wyoming, certain permits and licenses must be granted by WDEQ, which are subject to financial assurance plans to ensure anticipated future costs for decontamination, decommissioning, reclamation, groundwater restoration, disposal or any other reclamation requirements are adequately funded.
−Removed: Bonding regulations for ISR facilities are discussed in §35-11-417 of the Wyoming Administrative Code and further in WDEQ/LQD regulations contained in Non-Coal Chapters 1 through 13.  
−Removed: There are two major permits/licenses required for ISR uranium mining in Wyoming. 
−Removed: The first is the Permit to Mine, issued by the WDEQ/LQD. 
+Added: Bonding regulations for ISR facilities are discussed in §35-11-417 of the Wyoming Administrative Code and further in WDEQ/LQD regulations contained in Non-Coal Chapters 1 through 13.
+Added: There are two major permits/licenses required for ISR uranium mining in Wyoming.
+Added: The first is the Permit to Mine, issued by the WDEQ/LQD.
The second is the RML, previously issued by the U.S.
−Removed: Nuclear Regulatory Commission (“NRC”), now issued by the WDEQ/LQD Uranium Recovery Program (“URP”).
−Removed: In 2018 the State of Wyoming became an NRC agreement state for the licensing of uranium recovery operations. 
−Removed: RMLs are now issued and regulated by the WDEQ/LQD/URP. 
−Removed: Annual financial surety updates are required on the Mine Permit anniversary date and are reviewed by both the WDEQ/LQD and WDEQ/LQD/URP as part of the approval process. 
−Removed: As at July 31, 2023, UEC held Permits to Mine and RMLs for each of its Christensen Ranch, Irigaray, Ludeman, Moore Ranch and Reno Creek Projects.   
+Added: Nuclear Regulatory Commission (“NRC”), now issued by the WDEQ/LQD Uranium Recovery Program (“URP”).
+Added: In 2018 the State of Wyoming became an NRC agreement state for the licensing of uranium recovery operations.
+Added: RMLs are now issued and regulated by the WDEQ/LQD/URP.
+Added: Annual financial surety updates are required on the Mine Permit anniversary date and are reviewed by both the WDEQ/LQD and WDEQ/LQD/URP as part of the approval process.
+Added: As at July 31, 2024, UEC held Permits to Mine and RMLs for each of its Christensen Ranch, Irigaray, Ludeman, Moore Ranch and Reno Creek Projects.
In Wyoming, a Class I disposal well permit is required for deep underground wastewater injection (same process as in Texas).
It is the primary method for disposing of excess fluid from the extraction areas and for reverse osmosis concentrate during the restoration phase.
−Removed: Permits for Class I Injection wells are authorized by the WDEQ Water Quality Division who has primacy for this program under EPA. 
−Removed: In Wyoming, as at July 31, 2023, UEC holds Class I Injection well permits for four disposal wells at the Christensen Ranch Project, two disposal wells at the Irigaray Project, four disposal wells at the Moore Ranch Project and four disposal wells at its Reno Creek Project. 
+Added: Permits for Class I Injection wells are authorized by the WDEQ Water Quality Division who has primacy for this program under EPA.
+Added: In Wyoming, as at July 31, 2024, UEC holds Class I Injection well permits for four disposal wells at the Christensen Ranch Project, two disposal wells at the Irigaray Project, four disposal wells at the Moore Ranch Project and four disposal wells at its Reno Creek Project.
Exploration drilling outside of areas within a Permit to Mine is regulated by the WDEQ LQD.
−Removed: To conduct exploration drilling, an application must be filed with LQD that provides location details of the areas to be explored, the number of drill holes anticipated, the methods of drill hole abandonment to be used;
−Removed: location of access roads to be used or constructed, and an estimate of the cost to reclaim all drill holes and surfaces impacted by the drilling program. 
−Removed: If approved, LQD will approve the reclamation cost estimate and the company will post a bond or other financial assurance instrument acceptable to LQD. 
−Removed: After the financial assurance instrument is approved by LQD, they will issue a Drilling Notification permit to the company to conduct the exploration drilling. 
−Removed: After reclamation is completed, LQD will inspect the drill hole sites and either approve the reclamation and release the bond, or make recommendations for further corrective action. 
−Removed: As at July 31, 2023, UEC holds three Drilling Notification Permits, two for various exploration projects in the Powder River Basin and one for exploration in the Great Divide Basin of Wyoming. 
−Removed: Under the WDEQ the Bonding Provisions (§35-11-417) and regulations for Financial Assurance Requirements for Closure, Post Closure, and Corrective Action outlines financial assurance for in-situ uranium sites to include costs relating to:
−Removed: decommissioning, decontamination, demolition and waste disposal for buildings, structures, foundations, equipment and utilities;
+Added: To conduct exploration drilling, an application must be filed with the LQD that provides location details of the areas to be explored, the number of drill holes anticipated, the methods of drill hole abandonment to be used, the location of access roads to be used or constructed and an estimate of the cost to reclaim all drill holes and surfaces impacted by the drilling program.
+Added: If approved, the LQD will approve the reclamation cost estimate and the Company will post a bond or other financial assurance instrument acceptable to the LQD.
+Added: After the financial assurance instrument is approved by the LQD, they will issue a Drilling Notification permit to the Company to conduct the exploration drilling.
+Added: After reclamation is completed, the LQD will inspect the drill hole sites and either approve the reclamation and release the bond, or make recommendations for further corrective action.
+Added: As at July 31, 2024, UEC holds three Drilling Notification Permits, two for various exploration projects in the Powder River Basin and one for exploration in the Great Divide Basin of Wyoming.
+Added: Under the WDEQ Bonding Provisions (§35-11-417) and the regulations for Financial Assurance Requirements for Closure, Post Closure and Corrective Action, they outline financial assurance for ISR uranium sites to include costs relating to:
+Added: decommissioning;
+Added: decontamination;
+Added: demolition and waste disposal for buildings;
+Added: equipment and utilities;
well plugging and abandonment;
−Removed: surface reclamation of operating areas, roads, wellfields and surface impoundments;
+Added: surface reclamation of operating areas;
+Added: wellfields and surface impoundments;
groundwater restoration in mining areas;
and radiological surveying for final release of the lands.
−Removed: Funding for the financial assurance is in the form of cash, reclamation bonds, letters of credit, and other mechanisms approved by the WDEQ. 
+Added: Funding for the financial assurance is in the form of cash, reclamation bonds, letters of credit and other mechanisms approved by the WDEQ.
The financial assurance calculations include an excess of 15% for contingencies and 10% for overhead, adjusted annually for inflation.
−Removed: As at July 31, 2023, UEC held reclamation bonds for all of the Permits to Mine and RMLs Licenses plus three Drilling Notifications (exploration by drilling permits). 
+Added: As at July 31, 2024, UEC held reclamation bonds for all of its Permits to Mine and RML licenses plus three Drilling Notifications (exploration by drilling permits).
As in Texas, the State of Wyoming is allowed to issue UIC permits under two conditions:
−Removed: the state’s program must have been granted primacy;
−Removed: and the EPA must have granted an aquifer exemption upon the state’s request (an Aquifer Exemption).
−Removed: Wyoming issues UIC Class I permits (disposal wells) and UIC Class III permits for ISR wells. 
+Added: the state’s program must have been granted primacy;
+Added: and the EPA must have granted an Aquifer Exemption upon the state’s request.
+Added: Wyoming issues UIC Class I permits (disposal wells) and UIC Class III permits for ISR wells.
Wyoming requests the official Aquifer Exemption from the EPA for these permits.
−Removed: As at July 31, 2023, UEC held Aquifer Exemptions for each of its Christensen Ranch, Irigaray, Ludeman, Moore Ranch and Reno Creek Projects, as well as the Christensen Ranch Class I disposal wells. 
+Added: As at July 31, 2024, UEC held Aquifer Exemptions for each of its Christensen Ranch, Irigaray, Ludeman, Moore Ranch and Reno Creek Projects, as well as the Christensen Ranch Class I disposal wells.
Canada Environmental Regulations
Uranium mining and milling projects in Canada are among the most heavily regulated types of projects in the country with full regulatory oversight from both the federal and provincial levels of government.
−Removed: That full regulatory oversight includes a strong, independent federal nuclear regulator, the Canadian Nuclear Safety Commission (“CNSC”), which is charged with regulating all aspects of nuclear activities in Canada.
+Added: That full regulatory oversight includes a strong, independent federal nuclear regulator, the Canadian Nuclear Safety Commission (“CNSC”), which is charged with regulating all aspects of nuclear activities in Canada.
Modern uranium mines, despite their strong safety and environmental protection record, operate in this heavily regulated environment effectively using integrated management systems maintain compliance and extensive reporting to demonstrate ongoing compliance.
−Removed: Monitoring includes community groups (e.g., North Environmental Quality Committee), First Nations, periodic state of the environment reporting and occasional independent third-party monitoring funded by the CNSC. 
+Added: Monitoring includes community groups (e.g., North Environmental Quality Committee), First Nations, periodic state of the environment reporting and occasional independent third-party monitoring funded by the CNSC.
For mining in Saskatchewan, a surface lease is required prior to work commencing on site.
The surface lease will generally cover all areas that are predicted to be disturbed and accrues annual fees per hectare.
−Removed: Surface leases are coordinated through the Ministry of Government Relations, Northern Engagement Branch, and the Ministry of Environment (“MOE”), Lands Branch, and includes input from other government agencies where appropriate.
−Removed: While negotiations can start early, and in parallel with a provincial Environmental Impact Assessment (“EIA”) process, a precondition of the issuance of a surface lease is the successful outcome of the EIA process.
−Removed: In Saskatchewan, the EIA and licensing process are sequential, as the EIA process must be completed prior to the issuance of specific leases, licenses and permits. 
−Removed: To require an EIA, a project must be deemed a Development per section 2(d) of the Saskatchewan Environmental Assessment Act (“EAA”) and a formal Ministerial Determination to that effect.
−Removed: The work required for an EIA includes any delegated Duty to Consult engagement and consultation along with environmental baseline work. 
−Removed: Once an EIA is submitted and the provincial internal reviews are finished, the EASB compiles the comments and produces the technical review comments (“TRC”) document.
+Added: Surface leases are coordinated through the Ministry of Government Relations, Northern Engagement Branch, and the Ministry of Environment (“MOE”), Lands Branch, and includes input from other government agencies where appropriate.
+Added: While negotiations can start early, and in parallel with a provincial Environmental Impact Assessment (“EIA”) process, a precondition of the issuance of a surface lease is the successful outcome of the EIA process.
+Added: In Saskatchewan, the EIA and licensing process are sequential, as the EIA process must be completed prior to the issuance of specific leases, licenses and permits.
+Added: To require an EIA, a project must be deemed a Development per section 2(d) of the Saskatchewan Environmental Assessment Act (“EAA”) and a formal Ministerial Determination to that effect.
+Added: The work required for an EIA includes any delegated Duty to Consult engagement and consultation along with environmental baseline work.
+Added: Once an EIA is submitted and the provincial internal reviews are finished, the EASB compiles the comments and produces a technical review comments (“TRC”) document.
If there are deficiencies in the EIA, the proponent will be required to address them before the TRC document and the final EIS are placed into public review.
Public review is generally 30 or 60 days.
−Removed: When the public comments period is complete, EASB will produce an EIA decision document for the Minister of Environment.
+Added: When the public comments period is complete, the EASB will produce an EIA decision document for the Minister of Environment.
While there are three outcomes possible, the likely outcome for a project that gets to this stage is approval of the EIA with conditions.
−Removed: With approval of the EIA, licensing and permitting can be completed. 
+Added: With approval of the EIA, licensing and permitting can be completed.
While the EIA is in progress, the proponent can develop the surface lease application, and other provincial licensing packages for review by the government, although approval of these cannot occur until the EIA process is completed and a positive outcome obtained.
2 unchanged sentences
Overall, a number of permissions, of one form or another, are required to complete the project, but when compared to the EIA process, they are rarely material to the schedule or budget if organized properly.
−Removed: Most ministries will indicate their interest and the need for any permits at the Technical Proposal and EIA review stages and those comments will come forward in the TRC.  
−Removed: The federal Impact Assessment Act, 2019 (“IAA”) and the need to produce an Impact Assessment (“IA”) can be triggered in two ways.
−Removed: The first is by triggering one of the activity thresholds in the Physical Activities Regulations, 2019 , and the second is that the project can be designated by the federal Minister of Environment and Climate Change (the “Minister”) in response to a request to designate the project and a supporting recommendation from the Canadian Impact Assessment Agency (“CIAA”).
−Removed: Currently, the proposed project does not trigger any thresholds in the Physical Activities Regulations. 
−Removed: The CNSC and Saskatchewan MOE have historically worked closely together and the CNSC will have the ability to review the provincial EIA.
+Added: Most ministries will indicate their interest and the need for any permits at the Technical Proposal and EIA review stages and those comments will come forward in the TRC.
+Added: The federal Impact Assessment Act, 2019 (“IAA”) and the need to produce an Impact Assessment (“IA”) can be triggered in two ways.
+Added: The first is by triggering one of the activity thresholds in the Physical Activities Regulations, 2019 , and the second is that the project can be designated by the federal Minister of Environment and Climate Change (the “Minister”) in response to a request to designate the project and a supporting recommendation from the Canadian Impact Assessment Agency (“CIAA”).
+Added: Currently, our proposed project does not trigger any thresholds in the Physical Activities Regulations.
+Added: The CNSC and Saskatchewan MOE have historically worked closely together and the CNSC has the ability to review the provincial EIA.
The regulators have demonstrated recently that they can cooperate in their review of projects despite the expiration of their cooperation agreement.
1 unchanged sentence
In addition, the CNSC will act as a technical advisor and is a participant in the EIA process;
−Removed: however, the provincial EIA decision is independent of the federal government. 
+Added: however, the provincial EIA decision is independent of the federal government.
The main federal licensing agency for the project, the CNSC, will need to be satisfied that the environment, writ large, is protected.
−Removed: The CNSC will conduct an environmental protection review (“EPR”) for the license application in accordance with their mandate under the NSCA to ensure the protection of the environment and the health of persons.
−Removed: The CNSC follows the federal mandates with respect to Indigenous peoples and other initiatives such as Climate Change. 
−Removed: The CNSC and Saskatchewan MOE have historically worked closely together and the CNSC will have the ability to review the provincial EIA.
−Removed: The regulators have demonstrated recently that they can cooperate in their review of projects despite the expiration of their cooperation agreement.
−Removed: The CNSC can review and provide comments on any submission to EASB.
−Removed: In addition, the CNSC will act as a technical advisor and is a participant in the EIA process;
−Removed: however, the provincial EIA decision is independent of the federal government. 
−Removed: Per the NSCA, a project needs to initiate the licensing process in order to have meaningful discussions with the CNSC and early discussions with the CNSC on the licensing process, engagement and consultation expectations, and the scope of the Project’s licensing are meaningful to help advance a project.
+Added: The CNSC will conduct an environmental protection review (“EPR”) for the license application in accordance with their mandate under the NSCA to ensure the protection of the environment and the health of persons.
+Added: The CNSC follows the federal mandates with respect to Indigenous peoples and other initiatives such as climate change.
+Added: Per the NSCA, a project needs to initiate the licensing process in order to have meaningful discussions with the CNSC and early discussions with the CNSC on the licensing process, engagement and consultation expectations, and the scope of the project’s licensing are meaningful to help advance a project.
While the option of sequentially doing the provincial EIA and the CNSC licensing is available to the proponent, the CNSC suggests doing these two distinct processes in parallel to save time.
Effectively, while the EIA process is proceeding, the development and submission of the provincial and CNSC licensing packages can proceed in parallel.
−Removed: It is assumed that a successful outcome for the provincial EIA would be an important part of the CNSC’s EPR, which would be presented to the Commission Tribunal as part of the licensing reviews.
+Added: It is assumed that a successful outcome for the provincial EIA would be an important part of the CNSC’s EPR, which would be presented to the Commission Tribunal as part of the licensing reviews.
As for Saskatchewan, a positive environmental decision is required prior to the Commission approving any licensing packages.
−Removed: The CNSC’s licensing and oversight processes are done on a cost recovery basis through the Cost Recovery Fees Regulations. 
+Added: The CNSC’s licensing and oversight processes are done on a cost recovery basis through the Cost Recovery Fees Regulations .
In support of licensing, proponents are required to develop management systems complete with policies, systems/programs, procedures and monitoring commensurate with the proposed scope of activities.
−Removed: To protect human health and the environment, the CNSC focusses on their regulated areas of safety and control in their assessment of projects, including areas of higher risk such as quality management, occupational health and safety, environmental protection, radiation protection, tailings management, and safeguards and non-proliferation, to name a few. 
+Added: To protect human health and the environment, the CNSC focusses on their regulated areas of safety and control in their assessment of projects, including areas of higher risk such as quality management, occupational health and safety, environmental protection, radiation protection, tailings management and safeguards and non-proliferation, to name a few.
There may be a need to engage with Fisheries and Oceans Canada (under the Fisheries Act) regarding treated effluent discharge or pump stations for fresh water.
3 unchanged sentences
the need for a woodland caribou management plan) and the Migratory Birds Convention Act .
−Removed: It is not clear whether the proposed federal Policy on Biodiversity will have an impact on the project, but if enacted, it could mean more bio-physical offsets will be required for disturbed ground. 
+Added: It is not clear whether the proposed federal Policy on Biodiversity will have an impact on our project but, if enacted, it could mean more bio-physical offsets will be required for disturbed ground.
As part of the environmental assessment process, projects are required to develop conceptual decommissioning plans for inclusion in the EIA, which detail the steps to be taken to decommission project facilities and reclaim the land at the end of project life.
−Removed: As part of licensing, the conceptual plan is expanded into a more detailed Preliminary Decommissioning Plan (“PDP”) and a cost estimate for implementation is prepared from that:
−Removed: The Preliminary Decommissioning Cost (“PDC”).
+Added: As part of licensing, the conceptual plan is expanded into a more detailed Preliminary Decommissioning Plan (“PDP”) and a cost estimate for implementation is prepared from that;
+Added: the Preliminary Decommissioning Cost (“PDC”).
The Company will then be required to provide some form of surety or bond to cover the cost of carrying out the PDP.
−Removed: The surety is designed to cover the unlikely situation whereby the proponent is unable to complete the decommissioning and reclamation and the government must step in to complete the work in a ‘decommission tomorrow’
+Added: The surety is designed to cover the unlikely situation whereby the proponent is unable to complete the decommissioning and reclamation and the government must step in to complete the work in a ‘decommission tomorrow’ scenario.
While salvage of some materials is likely, these cannot be considered in the PDC.
The plan and costs are periodically reviewed and updated and can be scaled to reflect the current state of a project.
−Removed: As operations progress, progressive decommissioning is encouraged as it lowers close-out liabilities, which, in turn, can reduce the amount of a surety bond, and often reduces the cost of disturbed-land lease fees. 
+Added: As operations progress, progressive decommissioning is encouraged as it lowers close-out liabilities which, in turn, can reduce the amount of a surety bond, and often reduces the cost of disturbed-land lease fees.
For a uranium mining and milling project, once operations have stopped, the first step is to conduct systematic surveys to determine the extent of contamination, if any.
2 unchanged sentences
Material that cannot be decontaminated to release standards would be disposed of on site or at an approved off-site disposal facility.
−Removed: The remainder of the site will be decommissioned as the facilities are no longer required with the material salvaged for reuse, recycling, or disposal.  
+Added: The remainder of the site will be decommissioned as the facilities are no longer required with the material salvaged for reuse, recycling or disposal.
In Saskatchewan, reclaimed land can be returned to the Crown under The Reclaimed Industrial Sites Act and The Reclaimed Industrial Sites Regulations , which establish an Institutional Control Program.
2 unchanged sentences
For this to happen, the proponent pays a calculated sum into the Institutional Control Monitoring and Maintenance Fund, and the Institutional Control Unforeseen Events Fund for long term monitoring of the property and maintenance, if required.
−Removed: In the unlikely event that the site does not behave as predicted, the government can seek redress from the proponent if the costs exceed the funds available. 
−Removed: Indigenous Engagement  
−Removed: in Saskatchewan
+Added: In the unlikely event that the site does not behave as predicted, the government can seek redress from the proponent if the costs exceed the funds available.
+Added: Indigenous Engagement in Saskatchewan
For both the federal and provincial EIA and permitting/licensing processes, engagement and consultation are required with Indigenous groups.
−Removed: Engagement in Saskatchewan consists of the Crown’s Duty to Consult, a legal requirement, and interest-based engagement, which is essential to a Project’s social license.
−Removed: Both levels of government (‘the Crown’) have a Duty to Consult First Nations and Métis groups on any decision within their purview with the potential to affect Aboriginal or Treaty Rights.
+Added: Engagement in Saskatchewan consists of the Crown’s Duty to Consult, a legal requirement and interest-based engagement, which is essential to a project’s social license.
+Added: Both levels of government (‘the Crown’) have a Duty to Consult First Nations and Métis groups on any decision within their purview with the potential to affect Aboriginal or Treaty Rights.
As the project progresses through the regulatory process, several provincial and federal decisions will be made that must be informed by engagement and consultation.
Implementation of the Duty to Consult is guided by a combination of provincial and federal regulatory requirements and guidance documents (e.g.
−Removed: Section 35, The Constitution Act, 1982 ).  
+Added: Section 35, The Constitution Act, 1982 ).
Although the Duty to Consult lies with the federal and provincial governments, the procedural aspects of the Duty to Consult are frequently delegated to the proponent to undertake.
5 unchanged sentences
Waste Disposal
−Removed: The Resource Conservation and Recovery Act (“RCRA”) and comparable state statutes affect mineral exploration and production activities by imposing regulations on the generation, transportation, treatment, storage, disposal and cleanup of “hazardous wastes”
−Removed: and on the disposal of non-hazardous wastes.
+Added: The Resource Conservation and Recovery Act (“RCRA”) and comparable state statutes affect mineral exploration and production activities by imposing regulations on the generation, transportation, treatment, storage, disposal and cleanup of “hazardous wastes” and on the disposal of non-hazardous wastes.
Under the auspices of the EPA, the individual states administer some or all of the provisions of RCRA, sometimes in conjunction with their own, more stringent requirements.
Comprehensive Environmental Response, Compensation and Liability Act
−Removed: The federal Comprehensive Environmental Response, Compensation and Liability Act (“CERCLA”) imposes joint and several liability for costs of investigation and remediation and for natural resource damages, without regard to fault or the legality of the original conduct, on certain classes of persons with respect to the release into the environment of substances designated under CERCLA as hazardous substances (collectively, “Hazardous Substances”).
+Added: The federal Comprehensive Environmental Response, Compensation and Liability Act (“CERCLA”) imposes joint and several liability for costs of investigation and remediation and for natural resource damages, without regard to fault or the legality of the original conduct, on certain classes of persons with respect to the release into the environment of substances designated under CERCLA as hazardous substances (collectively, “Hazardous Substances”).
These classes of persons or potentially responsible parties include the current and certain past owners and operators of a facility or property where there is or has been a release or threat of release of a Hazardous Substance and persons who disposed of or arranged for the disposal of the Hazardous Substances found at such a facility.
3 unchanged sentences
Air Emissions
−Removed: Our operations are subject to local, state and federal regulations for the control of emissions of air pollution. 
+Added: Our operations are subject to local, state and federal regulations for the control of emissions of air pollution.
Major sources of air pollutants are subject to more stringent, federally imposed permitting requirements.
6 unchanged sentences
From exploration to restoration, water is the critical factor for ISR mining and responsibly managing that water is crucial to our business.
−Removed: At all UEC’s ISR projects the ore hosted groundwater does not meet either primary or secondary drinking water standards and should only be used for industrial or agricultural use without proper treatment.
−Removed: Water consumption at UEC’s ISR mining projects is primarily natural groundwater.
+Added: At all UEC’s ISR projects the ore hosted groundwater does not meet either primary or secondary drinking water standards and should only be used for industrial or agricultural use without proper treatment.
+Added: Water consumption at UEC’s ISR mining projects is primarily natural groundwater.
During the recovery process, water is pumped from the ore hosted aquifer and piped to the satellite facility.
The groundwater is filtered for solids, stripped of uranium, allowed to settle and then approximately 95% is reinjected or recirculated back into the same aquifer it was recovered from.
−Removed: This recycling process is an overwhelming advantage of ISR mining compared to other methods such as conventional or open pit.
+Added: This recycling process is an overwhelming advantage of ISR mining compared to other methods such as conventional or open pit.
In order to ensure appropriate water management, and to ensure our team can continuously make decisions to reduce our water usage, UEC closely monitors our water consumption.
1 unchanged sentence
Compliance with the Clean Water Act
−Removed: The Clean Water Act (“CWA”) imposes restrictions and strict controls regarding the discharge of wastes, including mineral processing wastes, into waters of the U.S., a term broadly defined.
+Added: The Clean Water Act (“CWA”) imposes restrictions and strict controls regarding the discharge of wastes, including mineral processing wastes, into waters of the U.S.;
+Added: a term broadly defined.
Permits must be obtained to discharge pollutants into federal waters.
6 unchanged sentences
Mining is an essential industry to enable the global transition to net-zero.
−Removed: Uranium mining, at the heart of UEC’s business, fuels nuclear energy, which is an essential carbon-free energy source.
+Added: Uranium mining, at the heart of UEC’s business, fuels nuclear energy, which is an essential carbon-free energy source.
Beyond this, we understand that our operational activities do contribute to climate change through the release of emissions.
Therefore, over the next several years we will begin a process to understand our emissions profile, as well as identify and implement opportunities to reduce emissions, where and when possible.
−Removed: In 2022, we have created an emissions inventory of all sources (mobile and stationary) for each Texas project, including tracking fuel consumption by individual source at each project. In Fiscal 2023, we expanded our emissions measurement approach to cover all sites, including Wyoming, Saskatchewan and Paraguay. Scope 1 emissions covers direct emissions from owned or controlled sources.
+Added: In 2022, we created an emissions inventory of all sources (mobile and stationary) for each Texas project, including tracking fuel consumption by individual source at each project.
+Added: In Fiscal 2024, we expanded our emissions measurement approach to cover all sites, including Wyoming, Saskatchewan and Paraguay.
+Added: Scope 1 emissions covers direct emissions from owned or controlled sources.
Scope 2 emissions covers indirect emissions from the generation of purchased electricity, steam, heating and cooling consumed by the Company.
−Removed: Through developing this inventory, we have been able to identify, assess and conduct a cost benefit analysis for emission reduction opportunities at UEC’s Texas projects. Such opportunities include exploring ways to upgrade our Hobson plant into a zero-emissions processing plant. 
−Removed: Aligned to responsibly managing our emissions in the short-term, we will look to purchase carbon offset credits for our Scope 1 and 2 emissions for our corporate sites.
+Added: Through developing this inventory, we have been able to identify, assess and conduct a cost benefit analysis for emission reduction opportunities at UEC’s Texas projects.
+Added: Such opportunities include exploring ways to upgrade our Hobson plant into a zero-emissions processing plant.
+Added: Aligned to responsibly managing our emissions in the short-term, we will look to purchase carbon offset credits for our Scope 1 and 2 emissions for our corporate sites.
Health and Safety
1 unchanged sentence
We pride ourselves on employing safe practices in all aspects of its work.
−Removed: In Fiscal 2022, UEC’s Board approved an Environmental, Health and Safety Policy that provides overall objectives and guidance for our health and safety management.
+Added: In Fiscal 2022, UEC’s Board approved an Environmental, Health and Safety Policy that provides overall objectives and guidance for our health and safety management.
Supporting this Policy, at each site, UEC has a number of operational policies and practices covering radiation safety and procedures, spills and leakage reporting, equipment training and emergency response procedures.
−Removed: There is also a company-wide Injury and Incident Policy covered in the employee handbook that all employees are familiar with and are required to comply against.
+Added: There is also a company-wide Injury and Incident Policy covered in the employee handbook that all employees are familiar with and are required to comply with.
Training for employees on health and safety protocols are essential to ensuring we employ best safety practices at all times.
−Removed: Although exact training hours have not been recorded for this fiscal year, UEC has provided training to staff on a variety of safety topics, including, but not limited to, the following topics:
+Added: In Fiscal 2024, UEC has provided training to staff on a variety of safety topics, including, but not limited to, the following topics:
Annual radiation safety training for all plant and wellfield employees;
5 unchanged sentences
Annual DOT Training/HazMat training.
−Removed: UEC’s health and safety practices are developed to ensure that all regulatory requirements are met.
+Added: UEC’s health and safety practices are developed to ensure that all regulatory requirements are met.
Across all of our sites, our employees are required to report all injuries to their supervisor.
−Removed: On an annual basis, all reports are analyzed and tracked as required by the Occupational Health and Safety Association (“OSHA”).
−Removed: Given the nature of UEC’s specialized industry, there are site-specific emergency procedures in place that identify the steps employees should take in the event of a health and safety emergency.
+Added: On an annual basis, all reports are analyzed and tracked as required by the Occupational Health and Safety Association (“OSHA”).
+Added: Given the nature of UEC’s specialized industry, there are site-specific emergency procedures in place that identify the steps employees should take in the event of a health and safety emergency.
The uranium industry is highly competitive, and our competition includes larger, more established companies with longer operating histories that not only explore for and produce uranium but also market uranium and other products on a regional, national or worldwide basis.
1 unchanged sentence
Additionally, these larger companies have greater resources to continue with their operations during periods of depressed market conditions.
−Removed: The global titanium market is highly competitive, with the top six producers accounting for approximately 60% of the world’s production capacity according to TZ Minerals International Pty.
+Added: The global titanium market is highly competitive, with the top six producers accounting for approximately 60% of the world’s production capacity according to TZ Minerals International Pty.
Competition is based on a number of factors, such as price, product quality and service.
6 unchanged sentences
Other services are provided by outsourcing and consulting and special purpose contracts.
−Removed: As of July 31, 2023, we had 83 persons employed on a full-time basis and 9 individuals providing services on a contractual basis.
+Added: As of July 31, 2024, we had 94 persons employed on a full-time basis and 10 individuals providing services on a contractual basis.
Human Capital
−Removed: As of July 31, 2023, our employee population consisted of 83 individuals working for us and our consolidated subsidiaries, 43 of whom were located in the United States, 25 in Canada and 15 in Paraguay.
−Removed: Our Company is committed to attracting and retaining talented and experienced individuals to manage and support our operations. 
−Removed: We engage in a variety of learning and development opportunities with our employees, including ongoing training, continuing education courses, workshops and seminars and membership in professional organizations relating to employees’
−Removed: projects areas of expertise.
+Added: As of July 31, 2024, our employee population consisted o f 94 i ndividuals working for us and our consolidated subsidiarie s, 65 of whom were located in the U.S., 25 in Canada and 4 in Paraguay.
+Added: Our Company is committed to attracting and retaining talented and experienced individuals to manage and support our operations.
+Added: We engage in a variety of learning and development opportunities with our employees, including ongoing training, continuing education courses, workshops and seminars and membership in professional organizations relating to employees’ projects areas of expertise.
We strive to fill employment openings through internal promotions or transfers of qualified employees, as appropriate.
Available Information
−Removed: The Company’s website address is www.uraniumenergy.com and our annual reports on Form 10-K and quarterly reports on Form 10-Q, and amendments to such reports, are available free of charge on our website as soon as reasonably practicable after such materials are filed or furnished electronically with the SEC.
−Removed: These same reports, as well as our current reports on Form 8-K, and amendments to those reports, filed or furnished electronically with the SEC are available for review at the SEC’s website at www.sec.gov .
+Added: The Company’s website address is www.uraniumenergy.com and our annual reports on Form 10-K and quarterly reports on Form 10-Q, and amendments to such reports, are available free of charge on our website as soon as reasonably practicable after such materials are filed or furnished electronically with the SEC.
+Added: These same reports, as well as our current reports on Form 8-K, and amendments to those reports, filed or furnished electronically with the SEC are available for review at the SEC’s website at www.sec.gov .
Printed copies of the foregoing materials are available free of charge upon written request by email at info@uraniumenergy.com .
1 unchanged sentence
Compared sentence by sentence after normalising whitespace, quotation marks, case and digits, so re-formatting and restated figures do not read as changed language. Wording changes appear as one removal and one addition. The current filing and the prior one are authoritative.