2 unchanged sentences
Royal Gold management periodically reviews the materiality of individual stream and royalty interests within our portfolio.
−Removed: As of December 31, 2024, we determined that four of our stream and royalty interests are material to our business or financial condition:
−Removed: Andacollo, Cortez, Mount Milligan, and Pueblo Viejo.
+Added: As of December 31, 2025, we determined that five of our stream and royalty interests are material to our business or financial condition:
+Added: Andacollo, Cortez, Kansanshi, Mount Milligan, and Pueblo Viejo.
We sometimes refer to these properties as our material, or principal, properties.
−Removed: In making this determination, management considers primarily the relative contribution of estimated future revenue and, to a lesser extent, historical revenue to our portfolio from each property.
−Removed: Estimated future revenue is based on several factors, including mineral resources and mineral reserves subject to our stream and royalty interests, production estimates, feasibility studies, technical reports, metal prices, and mine life assumptions.
+Added: In making this determination, management considers primarily the relative contribution of estimated future revenue.
+Added: Estimated future revenue is derived from multiple factors, including Net Asset Value, projected average annual attributable GEO production over the next five years, and resource and reserve attributable GEO expectations across life of mine assumptions.
Mineral Resources and Mineral Reserves
Under S-K 1300, disclosure of mineral resources and mineral reserves must be based on and accurately reflect information and supporting documentation prepared by a “qualified person,” as such term is defined in S-K 1300.
−Removed: A registrant is responsible for determining that a person meets the qualifications specified under the definition of qualified person and that the disclosure in the registrant’s filing accurately reflects the information provided by the qualified person.
−Removed: As a stream and royalty company, we have limited access to and information regarding the properties in which we hold interests, and because of these limitations, qualified persons acting on behalf of the Company are not able to arrive at sufficient findings and conclusions, or prepare adequate supporting documentation, for us to disclose mineral resources or mineral reserves under the standards for disclosure established by S-K 1300 for any of the properties in which we hold
+Added: A registrant is
+Added: responsible for determining that a person meets the qualifications specified under the definition of qualified person and that the disclosure in the registrant’s filing accurately reflects the information provided by the qualified person.
+Added: As a stream and royalty company, we have limited access to and information regarding the properties in which we hold interests, and because of these limitations, qualified persons acting on behalf of the Company are not able to arrive at sufficient findings and conclusions, or prepare adequate supporting documentation, for us to disclose mineral resources or mineral reserves under the standards for disclosure established by S-K 1300 for any of the properties in which we hold interests.
In addition, based on guidance from the staff of the SEC, we are not able to rely on disclosure of mineral resources and mineral reserves by the operators of the properties as a basis for our disclosure of mineral resources and mineral reserves under S-K 1300 because such disclosure does not constitute “required information” within the meaning of Item 1303(a)(3)(iii) or Item 1304(a)(2)(iii) of Regulation S-K, and the staff of the SEC further interprets S-K 1300 to preclude in SEC filings the supplemental disclosure of mineral resources and mineral reserves that do not satisfy the standards for disclosure established by S-K 1300.
3 unchanged sentences
Sources of Information
−Removed: Our disclosures in this Item 2 are based on information provided to us by the operators of the properties or disclosed by the operators in their public filings with the SEC or Canadian securities regulators, including technical reports filed with Canadian securities administrators pursuant to National Instrument 43-101 (“NI 43-101”), and the 2014 Canadian Institute of Mining, Metallurgy and Petroleum Definition Standards and 2019 Best Practice Guideline (“CIM Standards”).
+Added: Our disclosures in this Item 2 are based on information provided to us by the operators of the properties or disclosed by the operators in their public filings with the SEC or Canadian securities regulators, including technical reports filed with Canadian securities regulators pursuant to National Instrument 43-101 (“NI 43-101”), and the 2014 Canadian Institute of Mining, Metallurgy and Petroleum Definition Standards and 2019 Best Practice Guideline (“CIM Standards”).
We are providing this information because it represents information that we have in our possession and that we believe is responsive to the disclosure obligations set forth in S-K 1300.
In some cases, we refer to information for our principal properties as of periods earlier than December 31, 2025 because the operators did not yet disclose more current information by the time we finalized this report.
−Removed: Newmont Corporation (“Newmont”), a party to joint ventures with Barrick Gold Corporation (“Barrick”) on each of Pueblo Viejo and the mining operations operated by Nevada Gold Mines LLC, a joint venture between Barrick and Newmont with respect to their Nevada operations, which includes Cortez, has filed technical report summaries prepared under S-K 1300 for each of Pueblo Viejo and the Nevada Gold Mines operations.
−Removed: Such technical report summaries, while providing important information about the properties, do not provide information sufficient for qualified persons acting on behalf of the Company to be able to arrive at sufficient findings and conclusions, or prepare adequate supporting documentation, for us to disclose mineral resources or mineral reserves for such properties under the standards for disclosure established by S-K 1300 (see “Mineral Resources and Mineral Reserves” above).
+Added: Newmont Corporation (“Newmont”), a party to joint ventures with Barrick Mining Corporation (“Barrick”) on each of Pueblo Viejo and the mining operations operated by Nevada Gold Mines LLC (“NGM”), a joint venture with respect to their Nevada operations, which includes Cortez, has filed technical report summaries prepared under S-K 1300 for each of Pueblo Viejo and the collective Nevada Gold Mines operations.
+Added: Such technical report summaries, while providing important information about the properties, do not provide information sufficient for qualified persons acting on behalf of the Company to be able to arrive at sufficient findings and conclusions, or prepare adequate supporting documentation, for us to disclose mineral resources or mineral reserves for such properties under the standards for disclosure established by S-K 1300 (see “Mineral Resources and Mineral Reserves” above), and Barrick has denied our requests for such additional information.
Pueblo Viejo and Cortez are our only principal properties for which technical report summaries have been prepared by the operators under S-K 1300.
−Removed: For our other principal properties, we requested that the operators prepare technical report summaries under S-K 1300 or permit us the access and information necessary for us to prepare our own technical report summaries for filing with the SEC.
+Added: For our other principal properties, we requested that the operators either (i) designate qualified persons who would prepare technical report summaries under S-K 1300 for filing with the SEC and sufficiently coordinate with us to enable us to prepare disclosure of all required information under S-K 1300 relating to the properties, or (ii) provide qualified persons designated by us with site access and underlying technical data, reports, models, and other information sufficient for the qualified persons designated by us to prepare technical report summaries under S-K 1300 for filing with the SEC and enable us to prepare disclosure of all required information under S-K 1300 relating to the properties.
In each case, the operator denied our request.
3 unchanged sentences
While S-K 1300 generally requires registrants that hold royalty, streaming, or other similar rights to provide the same disclosure regarding properties as the operators of the properties, S-K 1300 also provides certain accommodations to registrants that hold royalty, streaming, or other similar rights.
−Removed: We rely on the accommodations set forth in Item 1303(a)(3) and Item 1304(a)(2) of Regulation S-K to omit information required under Items 1303 and 1304 to which we lack access, and in accordance with Item 1303(a)(3) and Item 1304(a)(2) of Regulation S-K, we (i) specify the information to which we lack access, (ii) explain that we do not have access to the required information because obtaining the information would result in an unreasonable burden or expense or we requested the information from the applicable operator and our request was denied, and (iii) provide all required information that we do possess or can acquire without incurring an unreasonable burden or expense.
+Added: We rely on the accommodations set forth in Item 1303(a)(3) and Item 1304(a)(2) of Regulation S-K to omit information required under Items 1303 and 1304 to which we lack access,
+Added: and in accordance with Item 1303(a)(3) and Item 1304(a)(2) of Regulation S-K, we (i) specify the information to which we lack access, (ii) explain that we do not have access to the required information because obtaining the information would result in an unreasonable burden or expense or we requested the information from the applicable operator and our request was denied, and (iii) provide all required information that we do possess or can acquire without incurring an unreasonable burden or expense.
Absent an exemption, a registrant must obtain a dated and signed technical report summary from a qualified person identifying and summarizing the information reviewed and conclusions reached by the qualified person about the mineral resources or mineral reserves determined to be on each material property.
−Removed: As noted above, we do not have sufficient access and information for qualified persons acting on behalf of the Company to arrive at sufficient findings and conclusions, or prepare adequate supporting documentation, for us to disclose mineral resources or mineral reserves under the standards for
−Removed: disclosure established by S-K 1300 for any of the principal or other properties in which we hold stream or royalty interests, and accordingly, we have not sought to obtain dated and signed technical report summaries from qualified persons pursuant to Item 1302(b)(1) of Regulation S-K.
+Added: As noted above, we do not have sufficient access and information for qualified persons acting on behalf of the Company to arrive at sufficient findings and conclusions, or prepare adequate supporting documentation, for us to disclose mineral resources or mineral reserves under the standards for disclosure established by S-K 1300 for any of the principal or other properties in which we hold stream or royalty interests, and accordingly, we have not sought to obtain dated and signed technical report summaries from qualified persons pursuant to Item 1302(b)(1) of Regulation S-K.
Applicable Internal Controls
6 unchanged sentences
In many cases, properties shown on the map are in close proximity and the individual properties are not separately identifiable.
−Removed: Aggregate annual production for all properties on which we hold interests during the years ended December 31, 2024, 2023 and 2022, is shown in the table below.
−Removed: The reported production relates to the amount of stream metal sales and sales
−Removed: attributable to our royalty interests and may differ from the operators' public reporting due to a number of factors, including timing of the operator's concentrate shipments, the delivery of metal to us and our subsequent sale of the delivered metal.
+Added: Aggregate annual production for all properties on which we hold stream or royalty interests during the years ended December 31, 2025, 2024 and 2023, is shown in the table below.
+Added: The reported production relates to the amount of stream metal sales and sales attributable to our royalty interests and may differ from the operators' public reporting due to a number of factors, including timing of the purchase of our interest (for example, Kansanshi), timing of the operator's concentrate shipments, the delivery of metal to us and our subsequent sale of the delivered metal.
Stream Metal December 31,
6 unchanged sentences
Silver (oz) 952,890 1,151,253 1,362,568
+Added: Kansanshi Gold (oz) 7,744 — —
Other Gold (oz) 525,634 495,446 503,390
Other Silver (oz) 1,698,441 1,751,266 1,937,089
+Added: Other Zinc (lb) 1,320,788 — —
Cortez Gold (oz) 743,329 720,135 890,702
8 unchanged sentences
Approximately 85% of our revenue for the year ended December 31, 2025 came from properties outside of the United States, and most of our operators are organized outside of the United States.
−Removed: Our material properties are located in Canada, Chile, the Dominican Republic, and the United States.
+Added: Our material properties are located in Canada, Chile, the Dominican Republic, the United States and Zambia.
Type and Amount of Ownership Interests
3 unchanged sentences
See “Certain Definitions” in Item 1, Business, for more information.
−Removed: As of December 31, 2024, we owned nine stream interests and 166 royalty interests.
+Added: As of December 31, 2025, we owned stream interests on 23 properties and royalty interests on 341 properties.
Identity of Operator or Operators
4 unchanged sentences
Titles, Mineral Rights, Leases, or Options and Acreage Involved
−Removed: The titles, mineral rights, leases, and options involved with our stream and royalty interests vary depending on the country and include exploitation concessions, unpatented and patented mining claims, fee lands, mining leases and prospecting and
−Removed: mining licenses.
−Removed: For information about the specific titles, mineral rights, leases, options and acreages involved at our material properties, refer to the section entitled “Material Properties” below.
−Removed: We have an undeterminable number of acres relating to our stream and royalty interests because our interests do not always cover 100% of each property, in some cases our interests extend to an area of interest beyond the original property boundaries, and because the operators will, from time to time, add or subtract acreage from individual properties, which can, in some cases, modify the land position covered by a stream or royalty.
+Added: The mineral rights covered by our stream and royalty interests vary depending on the country and include concessions, mining claims, fee lands, mining leases and mining licenses of varying stages depending upon the property.
+Added: For information about the specific mineral rights that relate to our material properties, refer to the section entitled “Material Properties” below.
+Added: It is difficult for us to assess the total number of acres related to our stream and royalty interests by references to operator disclosure or review of public records because our interests do not always cover the entirety of a property.
+Added: Also, in some cases, our interests extend to mineral rights acquired by an operator within an area of interest beyond the original property boundaries at the time of our investment, and the operators will, from time to time, add or subtract acreage from individual properties without notice to us.
Stage of the Properties (Exploration, Development, or Production)
6 unchanged sentences
Exploration stage properties, for which no mineral resources have been declared.
−Removed: As of December 31, 2024, we owned stream interests on seven production stage properties and two development stage properties.
+Added: As of December 31, 2025, we owned stream interests on 18 production stage properties and 5 development stage properties.
As of December 31, 2025, we owned royalty interests on 63 production stage properties, 24 development stage properties, and 254 exploration stage properties, of which we consider 76 to be evaluation stage properties.
Key Permit Conditions
−Removed: Operators of the mines that are subject to our stream and royalty interests must comply with environmental, mine safety, land use, water use, waste disposal, remediation and public health laws and regulations promulgated by federal, state, provincial and local governments in the United States, Canada, Chile, the Dominican Republic, and other countries where we hold interests.
+Added: Operators of the mines that are subject to our stream and royalty interests must comply with environmental, mine safety, land use, water use, waste disposal, remediation and public health laws and regulations promulgated by federal, state, provincial and local governments in the United States, Canada, Chile, the Dominican Republic, Zambia, and other countries where we hold interests.
Although we, as a stream or royalty interest owner, are not responsible for ensuring compliance with these laws and regulations, failure by the operators to comply with applicable laws, regulations and permits can result in injunctive action, orders to suspend or cease operations, damages, and civil and criminal penalties on the operators, which could have a material adverse effect on our results of operations and financial condition.
2 unchanged sentences
Mine Types and Mineralization Styles
−Removed: Our operating stream and royalty interests cover all types of mineralization styles in a number of primary commodities.
+Added: Our stream and royalty interests in operating mines cover all types of mineralization styles in a number of primary commodities.
Table 1 shows mine types and mineralization styles at our principal properties.
3 unchanged sentences
Cortez Open Pit & Underground Carlin-Type sediment-hosted gold
+Added: Kansanshi Open Pit Sediment and vein-hosted copper-gold
Mount Milligan Open Pit Porphyry copper-gold
2 unchanged sentences
Processing Plants and Other Available Facilities
−Removed: Facilities and infrastructure for our properties vary widely based on the stage of each property.
−Removed: Our Principal Properties are all production stage properties.
−Removed: As such, each of our Principal Properties has infrastructure and facilities appropriate to conduct mining and processing operations.
+Added: Facilities and infrastructure for the properties subject to our stream and royalty interests vary widely based on the stage of each property.
+Added: Our principal properties are all production stage mining properties.
+Added: As such, each of the mining properties to which our principal properties relate has infrastructure and facilities appropriate to conduct mining and processing operations.
A summary of key processing infrastructure is shown in Table 2.
3 unchanged sentences
Cortez 4.90 Mtpa cyanide leaching mill along with heap leaching facilities for lower-grade, oxide gold ores and offsite processing of refractory ores, producing a gold-silver doré
+Added: Kansanshi 7 Mtpa oxide circuit, 8 Mtpa mixed ore circuit, 13 Mtpa sulfide circuit, and 28 Mtpa sulfide circuit – total capacity 56 Mtpa.
+Added: On-site copper anode (smelting) and cathode (SX-EW) and gold dore production
Mount Milligan 21.9 Mtpa sulfide flotation mill producing a single concentrate containing copper, gold and silver
3 unchanged sentences
Summary of All Mineral Resources and Mineral Reserves
−Removed: As noted above under “Introduction—Mineral Resources and Mineral Reserves,” we have limited access to, and limited information regarding, the properties in which we hold interests, and because of these limitations, qualified persons acting on behalf of the Company are not able to arrive at sufficient findings and conclusions, or prepare adequate supporting documentation, for us to disclose mineral resources or mineral reserves under the standards for disclosure established by S-K 1300 for any of the properties in which we hold stream or royalty interests.
−Removed: We have requested that the operators of our Principal Properties prepare technical report summaries that we may file with the SEC or permit us the access and information necessary for qualified persons acting on behalf of the Company to be able to arrive at sufficient findings and conclusions, and prepare adequate supporting documentation, for us to disclose mineral resources or mineral reserves and prepare the related technical report summaries.
+Added: As noted above under “Introduction—Mineral Resources and Mineral Reserves,” we have limited access to, and limited information regarding, the properties to which our stream and royalty interests relate, and because of these limitations, qualified persons acting on behalf of the Company are not able to arrive at sufficient findings and conclusions, or prepare adequate supporting documentation, for us to disclose mineral resources or mineral reserves under the standards for disclosure established by S-K 1300 for any of these properties.
+Added: We have requested that the operators of our principal properties either (i) designate qualified persons who would prepare technical report summaries under S-K 1300 for filing with the SEC (if the operator has not already done so) and sufficiently coordinate with us to enable us to prepare disclosure of all required information under S-K 1300 relating to the properties, or (ii) provided qualified persons designed by us with site access and underlying technical data, reports, models, and other information sufficient for the qualified persons designed by us to prepare technical report summaries under S-K 1300 for filing with the SEC and enable us to prepare disclosure of all required information under S-K 1300 relating to the properties.
In each case, the operator denied our request, and as a result, we are omitting disclosure of mineral resources and mineral reserves from our summary disclosure and individual material property disclosure because we cannot provide such disclosure without incurring an unreasonable burden or expense.
4 unchanged sentences
There can be no assurance, and we cannot verify, that such third-party information is complete or accurate.
−Removed: We often refer to these material properties as “Principal Properties” in this report.
−Removed: The disclosures below regarding Carmen de Andacollo (“Andacollo”) are derived from the Technical Report dated July 12, 2006, pursuant to NI 43-101, as well as the Annual Information Form, dated February 23, 2024, of Teck Resources Limited (“Teck”), attached as Exhibit 99.1 to Teck’s Annual Report on Form 40-F for the year ended December 31, 2023.
−Removed: Teck presents mineral resource and mineral reserve updates pursuant to CIM Standards.
−Removed: Royal Gold requested information prepared in accordance with S-K 1300 or access to underlying technical data sufficient to prepare its own technical report summary, and the operator denied the request.
+Added: The disclosures below regarding the Carmen de Andacollo Mine (“Andacollo”) are derived from the Technical Report dated July 12, 2006, pursuant to NI 43-101, as well as the Annual Information Form, dated February 19, 2025, of Teck Resources Limited (“Teck”), attached as Exhibit 99.1 to Teck’s Annual Report on Form 40-F for the year ended December 31, 2024, as well as press releases issued by Teck.
+Added: Teck presents mineral resource and mineral reserve updates pursuant to
+Added: CIM Standards.
+Added: Royal Gold requested that the operator either (i) designate qualified persons who would prepare a technical report summary under S-K 1300 for filing with the SEC and sufficiently coordinate with us to enable us to prepare disclosure of all required information under S-K 1300 relating to the property, or (ii) provide qualified persons designated by us with site access and underlying technical data, reports, models, and other information sufficient for the qualified persons designated by us to prepare a technical report summary under S-K 1300 for filing with the SEC and enable us to prepare disclosure of all required information under S-K 1300 relating to the property, and the operator denied the request.
Andacollo is an open pit mine and milling operation located in central Chile, Coquimbo Region at 30.25°S latitude and 71.10°W longitude and is operated by Compañía Minera Teck Carmen de Andacollo (“CMCA”), a 90% owned subsidiary of Teck.
19 unchanged sentences
Area of Interest
−Removed: The stream interest of our wholly owned subsidiary, RGLD Gold AG (“RGLD Gold”), at Andacollo covers 1,225 exploitation mining concessions, including 1,174 concessions termed the “Mining Properties” and 51 concessions termed the “Dayton Concessions.” RGLD Gold’s interest also covers any additional claims held before the effective date of the stream agreement, as described below, or acquired after the effective date which are wholly or partially located within an approximately 1.5 km radius from the external boundary of the “Mining Properties,” any mining concessions held by CMCA or acquired following the effective date of the agreement which are wholly or partially located within approximately 1 km radius from certain boundaries laid out in the agreement, and any Dayton Concession held by CMCA as of the effective date of the agreement, or acquired after the effective date.
+Added: The stream interest of our wholly owned subsidiary, RGLD Gold AG (“RGLD Gold”), at Andacollo covers 1,225 exploitation mining concessions, including 1,174 concessions termed the “Mining Properties” and 51 concessions termed the “Dayton Concessions.” RGLD Gold’s interest also covers any additional mineral rights held by the operator before the effective date of the stream agreement, as described below, or acquired after the effective date which are wholly or partially located within an approximately 1.5 km radius from the external boundary of the “Mining Properties,” any mining concessions held by CMCA or acquired following the effective date of the agreement which are wholly or partially located within approximately 1 km radius from certain boundaries laid out in the agreement, and any Dayton Concession held by CMCA as of the effective date of the agreement, or acquired after the effective date.
Stream Agreement
39 unchanged sentences
Stream deliveries from Andacollo were approximately 24,500 ounces of gold during the year ended December 31, 2025, compared to approximately 19,300 ounces of gold during the year ended December 31, 2024.
−Removed: The decrease in deliveries resulted primarily from Andacollo experiencing lower gold grades and lower tonnage milled as a result of water restrictions caused by extreme drought conditions which impacted production.
+Added: The increase in deliveries resulted primarily from higher grades, recoveries and throughput, compared to the year ended December 31, 2024, when Andacollo experienced lower gold grades and lower tonnage milled as a result of water restrictions caused by extreme drought conditions, which impacted production.
Stream deliveries typically occur approximately six months after mine production and are based on a fixed payability factor of 89%.
−Removed: On January 21, 2025, Teck reported that Andacollo continues to operate in extreme drought conditions, and that risk mitigation plans to increase water availability through increased well field capacity were implemented in 2024, enabling mill throughput rates consistent with the mine plan through the second half of 2024.
−Removed: Further, Teck provided copper production guidance, and expects copper production to increase from approximately 39,700 tonnes in 2024 to a range of 45,000 and 55,000 tonnes per year in each of 2025, 2026 and 2027, before declining to a range of 35,000 to 45,000 tonnes in 2028.
−Removed: According to Teck, the annual production guidance reflects ongoing drought conditions that remain a risk to production.
+Added: On January 20, 2026, Teck provided copper production guidance, and expects copper production at Andacollo to range from 45,000 to 55,000 tonnes per year in each of 2026 and 2027, before declining to a range of 35,000 to 45,000 tonnes in 2028.
Gold and copper grades have been relatively well correlated at Andacollo and gold production has tended to track copper production, although there can be no assurance that these correlations will continue in the future.
−Removed: Production at Andacollo has trended lower since the beginning of 2021 due to lower ore grades, as anticipated in the mine plan.
−Removed: Teck has reported that the current life of mine for Andacollo is expected to continue until 2036 although additional permits or amendments will be required to execute the life of mine plan beyond 2031.
+Added: The disclosures below regarding Kansanshi are derived from the Technical Report dated effective December 31, 2023 pursuant to pursuant to NI 43-101 and CIM Standards, as well as press releases issued by First Quantum Ltd.
+Added: (“First Quantum”).
+Added: Royal Gold requested that the operator either (i) designate qualified persons who would prepare a technical report summary under S-K 1300 for filing with the SEC and sufficiently coordinate with us to enable us to prepare disclosure of all required information under S-K 1300 relating to the property, or (ii) provide qualified persons designated by us with site access and underlying technical data, reports, models, and other information sufficient for the qualified
+Added: persons designated by us to prepare a technical report summary under S-K 1300 for filing with the SEC and enable us to prepare disclosure of all required information under S-K 1300 relating to the property, and the operator denied the request.
+Added: The Kansanshi Mine is located in the North-Western Province of Zambia, at 12.10°S latitude and 24.43°E longitude, and is operated by Kansanshi Mining PLC (“KMP”), an 80% owned subsidiary of First Quantum.
+Added: The remaining 20% is owned by Zambian Consolidated Copper Mines – Investment Holdings (“ZCCM”), a listed company that is majority-owned by the Government of the Republic of Zambia.
+Added: The mine is located approximately 10 km north of the town of Solwezi, the capital of the Zambian North-Western Province.
+Added: The site is 18 km south of the Democratic Republic of Congo border.
+Added: Chingola, a major town in the Zambian Copper belt, is approximately 180 km to the southeast of Solwezi.
+Added: Infrastructure
+Added: The T5 national highway provides the primary road access to the Kansanshi mine site.
+Added: The highway is a sealed road linked to the Copperbelt towns to the south-east, and to the town of Mwinilungu to the west.
+Added: The closest airport is located in Solwezi, approximately 15 km from the Kansanshi mine site.
+Added: The nearest major population center is at nearby Solwezi.
+Added: The estimated population is approximately 200,000 people, most of whom live in rural areas surrounding the town.
+Added: Personnel can be and are recruited from this local community.
+Added: While the majority of local people are unskilled and require training, skilled artisans and professional people can be and are recruited from throughout northern Zambia.
+Added: Prior to First Quantum’s presence in Solwezi, the infrastructure in the area was poor.
+Added: The roads, airport, hospitals and schools were in need of significant upgrades.
+Added: As a result, First Quantum undertook a number of measures to improve infrastructure, including the construction of a new power line into Solwezi, and the upgrading of the main road between Solwezi and the Kansanshi mine site, both of which were completed in 2004.
+Added: The main sealed road from Chingola to Solwezi was repaired and upgraded in 2002, while the existing airstrip at Solwezi was equipped with a tower and radio control.
+Added: Over 200 houses in Solwezi have been provided for First Quantum personnel and families.
+Added: Improved power supply to the Kansanshi site is supplied through the parastatal company Zambia Electricity Supply Corporation Ltd (“ZESCO”).
+Added: Current KMP consumption of around 157 MVA is expected to increase to 230 MVA owing to the site expansion projects.
+Added: Hydroelectric generation from the Kariba South Bank Dam, the Kafue Gorge Dam and from
+Added: the Itezi Tezhi Dam, supplies power into the ZESCO grid.
+Added: A single 330 kV line runs from the Copperbelt to the KMP site from where a ZESCO substation transforms the power down to 33 kV for mine usage.
+Added: Area of Interest
+Added: At Kansanshi, RGLD Gold’s stream interest covers the entirety of the 7057-HQ-LML mining license, an area of 24,865 hectares, and includes any new mineral interest obtained by the operator or its affiliates within the same area.
+Added: The mining license was issued on March 7, 1997 as license No.
+Added: LML 16 and was most recently renewed in February 2022 for a period of 25 years, until March 6, 2047.
+Added: Stream Agreement
+Added: Under the Precious Metals Purchase Agreement, dated August 5, 2025, between FQM Gold Finance Ltd., RGLD Gold, First Quantum, FQM Finance B.V., Black Bark Investments B.V., Kansanshi Holdings Limited, and KMP, gold deliveries to RGLD Gold are indexed to the production of recovered copper to reduce exposure to metallurgy and processing variability for gold, and the stream rate will vary based on the following thresholds:
+Added: • 75 ounces of gold per million pounds of recovered copper produced until the delivery of 425,000 ounces;
+Added: • 55 ounces of gold per million pounds of recovered copper produced between the delivery of 425,001 ounces and 650,000 ounces;
+Added: • 45 ounces of gold per million pounds of recovered copper produced thereafter.
+Added: Recovered copper is produced in both concentrate and cathode form and the stream deliveries are not dependent on downstream smelter recoveries or gold production at the site.
+Added: The stream sets out two options for First Quantum to accelerate stream deliveries:
+Added: • Acceleration Option 1:
+Added: From the earlier of the achievement by First Quantum of a minimum ‘BB’ or equivalent senior unsecured debt rating from a rating agency, or a Net Debt/TTM EBITDA ratio of 2.25x or less over three consecutive quarters starting from March 31, 2026, it will have a one-year period to exercise the option and deliver gold worth up to $200 million over a 14-month period from the date of option exercise and, ratably, reduce the stream rates and related delivery thresholds by up to 20%.
+Added: • Acceleration Option 2:
+Added: If First Quantum achieves either a minimum ‘BBB-’ or equivalent senior unsecured debt rating from a rating agency, or shows a Net Debt/TTM EBITDA ratio of 1.25x or less over four consecutive quarters, and achieves certain operational conditions at site, it will have a one-year period to exercise the option and deliver gold worth up to $100 million over a 7-month period from the date of option exercise and, ratably, reduce the stream rates and related delivery thresholds by up to a further 10%.
+Added: Royal Gold pays 20% of the spot gold price for each ounce delivered.
+Added: Should First Quantum achieve a minimum ‘BB’ or equivalent senior unsecured debt rating from a rating agency, or a Net Debt/TTM EBITDA ratio of 2.25x or less over three consecutive quarters starting from March 31, 2026, Royal Gold will pay 35% of the spot gold price for each ounce delivered thereafter.
+Added: Property Description
+Added: Kansanshi is one of the largest copper mining and processing operations in Africa, with an annual average production of about 200,000 tonnes of recovered metal over the last ten years, and in respect of the Mineral Reserve processing schedule, has an estimated remaining life of 24 years from January 2026.
+Added: Conventional open pit mining has been carried out to date in two adjoining pits (Main and North West), with a third (South East Dome) pit started in 2025.
+Added: The current facilities can process multiple copper mineralization styles and produce cathode copper from SX-EW facilities and anode copper from an on-site smelter.
+Added: Gold production is also a significant revenue stream.
+Added: The increased sulfide ore processing capacity attributable to the sulfide expansion circuit (the “S3 Expansion”), and supported by mining expansion into the South East Dome deposit are expected to significantly increase the average annual copper production above 250,000 tonnes of recovered metal between 2030 and 2035.
+Added: Age and Condition of Infrastructure
+Added: Royal Gold does not have specific information as to the physical condition or age of the equipment and infrastructure.
+Added: Royal Gold is not permitted to disclose the operator’s book value or total cost detail for the property and associated plant and equipment.
+Added: Property History
+Added: Commercial open pit operations commenced at Kansanshi in 1977 when ZCCM began processing high grade copper oxide ore.
+Added: Mining and processing continued intermittently until 1986 when operations ceased due to prevailing economic conditions at that time.
+Added: Mining operations resumed around 1988 and ZCCM constructed a small sulfide flotation plant for the supply of concentrate to an offsite smelter.
+Added: In 1998, ZCCM formally ceased operations at Kansanshi and initiated closure and reclamation activities.
+Added: Cyprus Amax Minerals Corporation subsequently entered into an agreement with ZCCM to acquire 80% of the rights to the Kansanshi mine.
+Added: First Quantum then acquired the rights in August 2001.
+Added: Permitting and Encumbrances
+Added: Kansanshi has in place all applicable environmental and associated permits issued by the Zambian Environmental Management Agency (“ZEMA”) and other authorities.
+Added: Site environmental permits are issued every three years;
+Added: these set out requirements for the management of waste, water and air emissions, ozone depleting substances (“ODS”) and chemicals.
+Added: Relevant legislation includes the Mines and Minerals Development Act, 2015, Water Resources Management Act, 2011 and Environmental Management Act, 2011.
+Added: Twenty-five environmental impact assessments (“EIA”) for operational infrastructure at KMP have been submitted and approved by ZEMA in the last fifteen years.
+Added: The larger projects include:
+Added: • TSF2 – the design and construction of the new sulfide plant tailings dam facility
+Added: • Smelter – the design and construction of the on-site smelter
+Added: • Oxide expansion circuit – the design and construction of the oxide circuit expansion
+Added: • S3 Expansion – the design and construction of the sulfide circuit expansion
+Added: The 7057-HQ-LML mining license boundaries were expanded in November 2014.
+Added: The mining surface rights, within the mining license boundaries, are held by First Quantum under six Certificates of Title.
+Added: First Quantum can develop any part of the mining license outside of the area for which surface rights are held, unless that part of the license area is held under title by another party.
+Added: Under these circumstances, First Quantum would have to purchase the land from the current owner, or otherwise enter into an access agreement with that owner.
+Added: In the case of the latter, the owner cannot unreasonably refuse a request to develop the land under applicable law.
+Added: Property Geology
+Added: Regionally, the Kansanshi deposits (Main, North West and South East) are located within the deformed metasediments of the Nguba (formerly Lower Kundulungu) Group, which is part of the Katanga Supergroup in the Zambian Copperbelt.
+Added: Locally, the deposits are situated within domal structures along the crest of a regional antiform.
+Added: Deposit mineralization is closely associated with these domes and is localized to a structurally modified sequence of rock units comprised of dolomites, dolomitic marbles, various schists and phyllites.
+Added: Until mid-2023, mining had been restricted to the Main and North West deposits.
+Added: The dominant primary sulfide copper mineralization and geology may be summarized as follows:
+Added: • stratabound with mostly disseminated and veinlet style mineralization
+Added: • sub-vertically dipping, quartz-carbonate-sulfide veins that crosscut stratigraphy, and
+Added: • localized brecciated style of mineralization
+Added: The primary sulfide mineralization is influenced by weathering and oxidation with:
+Added: • near surface weathering in the saprolitic zone resulting in residual copper styles of mineralization
+Added: • around vertical veins, with oxide copper mineralization forming, such as malachite, tenorite and chrysocolla
+Added: • transitional weathering zones with mixed primary and secondary copper sulfide copper mineral assemblages
+Added: • pervasive shallow to deep weathering located along geological structures
+Added: Primary sulfide copper mineralization is mostly chalcopyrite, with minor bornite.
+Added: Oxide mineralization is mostly chrysocolla with malachite.
+Added: The transition zone contains mixed copper oxides, primary copper sulfides, secondary copper sulfides and minor native copper and tenorite.
+Added: Minor copper is hosted in clay and mica minerals, and is classified as refractory.
+Added: Gold is generally positively associated with copper mineralization.
+Added: Recent Developments
+Added: Stream deliveries from Kansanshi were approximately 7,700 ounces of gold during the year ended December 31, 2025, and we received the first delivery of approximately 2,300 ounces of gold from Kansanshi on October 3, 2025.
+Added: Going forward, deliveries at Kansanshi will lag mine production by approximately two months and are expected to be received monthly.
+Added: On October 28, 2025, First Quantum provided an update on production and the commissioning of the S3 Expansion.
+Added: According to First Quantum, the S3 Expansion project has been delivered and first concentrate was produced in August.
+Added: On January 15, 2026, First Quantum reported Kansanshi copper production of 181,000 tonnes for the full year, which was 10,000 tonnes higher than 2024, with 25,000 tonnes of production from the S3 Expansion.
+Added: The plant delivered milling rates and operating times above 80% of design capacity, supported by an average recovery of over 80%, marking a significant milestone for the project.
+Added: As a result of sustained operational stability, the S3 Expansion was declared to be in commercial production as of December 1, 2025.
+Added: Total copper production in Q4 2025 of 48,000 tonnes was in line with the same quarter of 2024 and marginally higher than Q3 2025 with the inclusion of 19,000 tonnes from the S3 Expansion.
+Added: Kansanshi copper production for 2025 was its highest annual copper production since 2021 and within the revised guidance range of 175,000 to 185,000 tonnes.
+Added: First Quantum expects Kansanshi copper production in 2026 to be between 175,000 and 205,000 tonnes, which is marginally below previous guidance due to an increase in ore hardness with a higher proportion of fresh ore compared to feed from stockpiles.
+Added: Copper production is expected to range between 210,000 and 240,000 tonnes in 2027 and between 230,000 and 260,000 tonnes in 2028.
+Added: The step up in copper production over the three-year guidance period is underpinned by the ramp-up and grade profile of S3 Expansion feed, which is expected to be sourced evenly from low-grade stockpiles and higher-grade ore from the South East Dome deposit.
+Added: From 2027 onward, the feed is expected to primarily consist of fresher ore with higher grades from the pit.
+Added: At the current stream rate of 75 ounces of gold per million pounds of recovered copper produced, this is expected to result in gold sales attributable to our interest of approximately 26,000 to 31,000 ounces in 2026, rising to 38,000 to 43,000 ounces in 2028.
+Added: First Quantum expects gold production to range between 110,000 and 120,000 ounces in 2026, 125,000 and 135,000 ounces in 2027 and 140,000 and 150,000 ounces in 2028.
+Added: The step up in gold production over the guidance period is driven by an improving grade profile.
+Added: The near-surface gold zone occurrences at South East Dome are not included within the Kansanshi mine plan or guidance.
Mount Milligan
−Removed: The disclosures below regarding Mount Milligan are derived from the Technical Report on the Mount Milligan Mine in North-Central British Columbia filed November 7, 2022, effective December 31, 2021, pursuant to NI 43-101 and CIM Standards, and from news releases, dated February 14, 2024, issued by Centerra Gold Inc.
+Added: The disclosures below regarding Mount Milligan are derived from the Technical Report on the Mount Milligan Mine in North-Central British Columbia filed October 17, 2025, effective June 30, 2025, pursuant to NI 43-101 and CIM Standards, and from press releases issued by Centerra Gold Inc.
(“Centerra”).
−Removed: Royal Gold requested information prepared in accordance with S-K 1300 or access to underlying technical data sufficient to prepare its own disclosure, and the operator denied the request.
+Added: Royal Gold requested that the operator either (i) designate qualified persons who would prepare a technical report summary under S-K 1300 for filing with the SEC and sufficiently coordinate with us to enable us to prepare disclosure of all required information under S-K 1300 relating to the property, or (ii) provide qualified persons designated by us with site access and underlying technical data, reports, models, and other information sufficient for the qualified persons designated by us to prepare a technical report summary under S-K
+Added: 1300 for filing with the SEC and enable us to prepare disclosure of all required information under S-K 1300 relating to the property, and the operator denied the request.
Mount Milligan is an open pit mine and is located within the Omenica Mining Division in North Central British Columbia, at 55.12°N latitude and 124.01°W longitude, approximately 155 km northwest of Prince George, 85 km north of Fort St.
19 unchanged sentences
Area of Interest
−Removed: At Mount Milligan, RGLD Gold’s stream interest covers Mining Lease 631503 and 110 mineral claims covering 51,078.2 hectares.
+Added: At Mount Milligan, RGLD Gold’s stream interest covers 110 mineral claims, including Mining Lease 631503, covering a total of 51,078.2 hectares.
Stream Agreement
4 unchanged sentences
On February 13, 2024, TCM, Centerra, and RGLD Gold entered into a Processing Cost Support Agreement (the “Cost Support Agreement”), whereby subject to certain conditions, RGLD Gold will provide cost support payments for gold and copper deliveries under the Milligan Stream Agreement in exchange for cash consideration of $24.5 million, 50,000 ounces of gold to be delivered in the future, and a free cash flow interest in Mount Milligan.
−Removed: Through approximately 2029, RGLD Gold will only provide cost support payments when the gold price is at or below $1,600 per ounce and the copper price is at or below $3.50 per pound.
−Removed: In such case, and only at Centerra’s election, RGLD Gold will provide cost support payments, in the case of gold, equal to the lower of either $415 or 66% of the gold spot price less $435 for each ounce of gold delivered, and in the case of copper, equal to 35% of the spot copper price for each pound of copper delivered.
−Removed: RGLD Gold will have the right to recover any such payments from future cash support payments beginning in approximately 2030 when metal prices are above $1,600 per ounce of gold and $3.50 per pound of copper.
−Removed: In addition, starting in approximately 2030, RGLD Gold will provide cost support payments, in the case of gold, equal to the lower of either $415 or 50% of the gold spot price less $435 for each ounce of gold delivered, and in the case of copper, equal to 35% of the spot copper price for each pound of copper delivered.
−Removed: Finally, starting in approximately 2036, RGLD Gold will provide cost support payments, in the case of gold, equal to the lower of either $615 or 66% of the gold spot price less $435 for each ounce of gold delivered, and in the case of copper, equal to 51% of the spot copper price for each pound of copper delivered.
+Added: Until either 375,000 ounces of gold or 30,000 tonnes of copper have been delivered with a bill of lading date on or after January 1, 2024 (estimated to occur in approximately 2030), RGLD Gold will only provide cost support payments when the gold price is at or below $1,600 per ounce and the copper price is at or below $3.50 per pound.
+Added: In such case, and only at Centerra’s election, RGLD Gold has agreed to provide cost support payments, in the case of gold, equal to the lower of either $415 or 66% of the gold spot price less $435 for each ounce of gold delivered, and in the case of copper, equal to 35% of the spot copper price for each pound of copper delivered.
+Added: RGLD Gold may recover any such payments from future cash support payments beginning after the delivery of either 375,000 ounces of gold or 30,000 tonnes of copper when metal prices are above $1,600 per ounce of gold and $3.50 per pound of copper.
+Added: In addition, after the delivery of either 375,000 ounces of gold or 30,000 tonnes of copper, RGLD Gold has agreed to provide cost support payments, in the case of gold, equal to the lower of either $415 or 50% of the gold spot price less $435 for each ounce of gold delivered, and in the case of copper, equal to 35% of the spot copper price for each pound of copper delivered.
+Added: Finally, following the delivery of 665,000 ounces of gold (estimated to occur in approximately 2036), RGLD Gold will provide cost support payments, in the case of gold, equal to the lower of either $615 or 66% of the gold spot price less $435 for each ounce of gold delivered, and following the delivery of 60,000 tonnes of copper (estimated to occur in approximately 2036), RGLD Gold has agreed to provide cost support payments, in the case of copper, equal to 51% of the spot copper price for each pound of copper delivered.
The Milligan Stream Agreement remains in place and is unaffected by the Cost Support Agreement.
1 unchanged sentence
Property Description
−Removed: Mount Milligan is a copper-gold porphyry deposit, consisting of two principal zones, the Main Zone and the Southern Star (SS) Zone.
+Added: Mount Milligan is a copper-gold porphyry deposit, consisting of two principal zones, the Main Zone and the Southern Star Zone.
The Main Zone includes four contiguous sub-zones:
32 unchanged sentences
Limited exploration activity was first recorded in 1937.
−Removed: In 1984, prospector Richard Haslinger (“Haslinger”) and BP Resources Canada Limited (“BP Resources”) located claims on the current site.
+Added: In 1984, prospector Richard Haslinger and BP Resources Canada Limited (“BP Resources”) located claims on the current site.
In 1986, Lincoln Resources Inc.
1 unchanged sentence
In the late 1980s, Lincoln reorganized, amalgamated with Continental Gold Corp.
−Removed: (“Continental Gold”) and continued ongoing drilling in a joint venture with BP Resources.
+Added: and continued ongoing drilling in a joint venture with BP Resources.
In 1991, Placer Dome Inc.
17 unchanged sentences
Permitting and Encumbrances
−Removed: As of the 2022 Technical Report, TCM held or was in the process of obtaining all permits required for the operation of Mount Milligan for the defined LOM.
−Removed: Mount Milligan was designed to use surface water and groundwater sources for processing.
−Removed: Stored water inventory is critical to the ability to process ore through the mill on a sustainable basis.
−Removed: In the winter months of 2018 and 2019, due to sustained periods of low precipitation in the preceding months and corresponding low levels of stored water inventory, Mount Milligan experienced a lack of sufficient water resources that caused temporary suspensions and reductions of processing operations.
−Removed: In February 2019, the British Columbia Environmental Assessment Office approved an amendment to the Mount Milligan environmental assessment certificate (EAC #M09-1) to permit access to additional sources of surface water and groundwater until November 30, 2021, which was subsequently extended in early 2021 to November 2023.
−Removed: In addition to accessing water from Rainbow Creek and Meadows Creek, Mount Milligan received approvals to pump water from Philip Lake during a portion of the spring run-off period.
−Removed: Mount Milligan continues to access groundwater from the Lower Rainbow Valley wellfield as well as other groundwater wells near the TSF.
−Removed: The operation has received approval to draw groundwater from within a 6 km radius of the operation for the LOM.
−Removed: On January 6, 2022, TCM received the approval of an amendment to EAC #M09-01 to utilize LOM surface water withdrawals external to the TSF during the open water season (April 1 to November 30) from either the Nation River as a single surface water source or Rainbow Creek and Philip Lake 1 as a combined surface water source.
+Added: As of the Technical Report published in 2025, TCM held or was in the process of obtaining all permits required for the operation of Mount Milligan for the defined LOM.
+Added: From 1991 to 2009, the project underwent several separate phases of mine planning and feasibility study, including two separate Environmental Assessment (“EA”) processes.
+Added: During those reviews, and in response to concerns from indigenous nations, regulators, and other stakeholders, the original 1993 mine plan was redesigned such that the footprint was reduced substantially resulting in the mine plan included in the 2008/2009 permit applications.
+Added: Mount Milligan Mine received an EA Certificate #M09-01 (EAC #M09-01) under the BC Environmental Assessment Act in March 2009.
+Added: The Mine subsequently received a Mines Act Permit M-236 from the Province of BC in September 2009 as well as permits under the Environmental Management Act for effluent discharge (Permit 104777), refuse discharge (Permit 104778), and air discharge (Permit 104779).
+Added: As Mount Milligan Mine included the deposition of PAG waste rock and mine tailings into King Richard Creek and in two headwater tributaries of Alpine Creek in the Rainbow Creek watershed, designation of King Richard Creek and Alpine Creek tributaries as a tailings impoundment area (“TIA”) under the Metal Mine Effluent Regulation (“MMER”) was required.
+Added: This designation was made in November 2010 when the Governor in Council amended Schedule 2 of the MMER to designate these waterbodies as a TIA (Canada Gazette Part II, Volume 144, Number 24).
+Added: The mine has been operating under these approvals and subsequent amendments since commencement.
+Added: EAC #M09-01 has since been amended 11 times and Permit M-236 has been amended 12 times.
+Added: In March 2025, Mount Milligan Mine submitted a joint Environmental Assessment Act / Mines Act / Environmental Management Act combined certificate and permit amendment application to allow for the continuation of its operations through 2035.
+Added: The application also included the 10% expansion in plant throughput and increased stockpile capacity needed for plant feed flexibility.
+Added: As at December 31, 2025, the security currently held with the BC Ministry of Mines was C$51.3 million, based on an approved 2019 Reclamation Plan.
+Added: An updated Reclamation Plan was submitted in March 2025 and approved by the province in January 2026.
+Added: As a result, the security currently held with the BC Ministry of Mines will be updated in 2026.
+Added: In May 2025, Mount Milligan Mine submitted Water Sustainability Act (“WSA”) Water Licence applications for additional groundwater wells under the existing licence for Lower Rainbow Valley Wellfield and a new licence for the
+Added: Phillip Lake Wellfield.
+Added: Groundwater over surface water withdrawals is prioritized due to the uncertainty caused by dry and drought climate conditions and climate change.
+Added: Prioritizing additional groundwater withdrawal over surface water will lower impacts to surface water impacts on fish and aquatic life and will assist in further protecting aquatic resources.
+Added: While the applications seek additional volume to be authorized for withdrawal from these aquifers, a threshold for the cumulative annual withdrawal from all WSA licences subject to the site-wide adaptive management and monitoring plan has also been introduced to reflect the intention to prioritize groundwater rather than seeking additional volume from the watershed.
+Added: Approvals were received in September 2025.
+Added: To construct the 2045 LOM plan, both provincial and federal approvals will be required.
+Added: Similar to the original 2008 permitting, the project will require updates to the EA Certificate, Mines Act Permit, Environmental Management Act permits, and an amendment to the Metal and Diamond Mining Effluent Regulation Schedule 2 designating Alpine Lake and other tributaries as storage facilities for mine waste.
+Added: Additional authorizations will be required under the Fisheries Act, Water Sustainability Act, Lands Act, Forest Act, Heritage Conservation Act, and Wildlife Act.
+Added: Following approvals for the LOM plan, the reclamation bonding for the site will be updated.
+Added: Application submissions to support the LOM plan are expected begin in 2028 with final approvals being received in 2031 prior to the start of construction of TSF #2.
+Added: Mineral tenure claims covering the LOM plan are currently in place, however they will require renewal in 2029.
+Added: On January 20, 2026, Centerra reported Mount Milligan received an amended environmental assessment and all related permits to allow for the continuation of its operations through 2035.
+Added: These authorizations include a 10% expansion in plant throughput beginning in 2028 and increased stockpile capacity needed for plant feed flexibility.
Property Geology
4 unchanged sentences
Recent Developments
−Removed: Gold stream deliveries from Mount Milligan were approximately 58,000 ounces during the year ended December 31, 2024, compared to approximately 56,800 ounces for the year ended December 31, 2023.
+Added: Gold stream deliveries from Mount Milligan were approximately 52,500 ounces during the year ended December 31, 2025, compared to approximately 58,000 ounces during the year ended December 31, 2024.
Copper stream deliveries from Mount Milligan were approximately 10.5 million pounds during the year ended December 31, 2025, compared to approximately 11.8 million pounds during the year ended December 31, 2024.
Gold and copper stream deliveries for the year ended December 31, 2025, relate to mine production during the approximate period August 2024 to July 2025.
−Removed: During this period Centerra reported the increase in production was primarily attributed to higher head grades and higher mill throughput.
−Removed: The increase in deliveries was primarily due to higher gold grade.
+Added: The decrease in gold and copper deliveries was primarily due to differences in the timing of shipments and settlements during the periods, as well as lower grades, recovery and throughput experienced at the mine.
Gold stream deliveries are based on a fixed payability factor of 97% and copper stream deliveries are based on a minimum payability factor of 95%.
−Removed: On February 13, 2024, we entered into the Cost Support Agreement described above to incentivize Centerra to continue to invest and maximize the value of the large mineral endowment at Mount Milligan.
−Removed: The Cost Support Agreement provided a basis for a reserve increase and extension of the Mount Milligan mine life to 2035 and may provide a basis for further extension of the mine life beyond 2035.
−Removed: On October 31, 2024, Centerra reported that work continued on the site-wide optimization program, and notable achievements during the first nine months of 2024 include an improved safety record, increased availability and utilization of the haul fleet, and consistent ore supply which has led to increased mill throughput per operating day.
−Removed: In addition, Centerra is progressing work on a preliminary economic assessment (“PEA”) to evaluate the substantial mineral resources at Mount Milligan with a goal to unlock additional value beyond its current 2035 mine life.
−Removed: Centerra expects the PEA to be completed towards the end of the first half of 2025.
−Removed: The disclosures below regarding Pueblo Viejo are derived from the Technical Report on the Pueblo Viejo Mine, Sánchez Ramírez Province, Dominican Republic dated March 17, 2023 in accordance with NI 43-101 and CIM Standards.
−Removed: Royal Gold requested information prepared pursuant to S-K 1300 or access to the underlying technical data sufficient to prepare its own technical report summary, and the operator denied the request.
+Added: On September 11, 2025, Centerra announced the results of a pre-feasibility study (“PFS”) for the Mount Milligan mine in British Columbia that confirms a LOM extension of approximately 10 years, to 2045, with the potential to increase the process plant throughput by approximately 10% in 2029.
+Added: The NI 43-101 technical report supporting the disclosure of the PFS results was filed on October 21, 2025.
+Added: According to Centerra, key highlights of the PFS include:
+Added: • Extended mine life with further growth potential.
+Added: The LOM is expected to be extended by approximately 10 years, to 2045.
+Added: Drilled inventory from recent step-out and infill drilling programs has confirmed the continuation of mineralization to the west of the current open pit, and a second TSF will be constructed in the first half of the 2030s.
+Added: Ongoing exploration continues to highlight the potential to further expand mineral resources and extend mine life beyond the updated plan, and the TSF footprint has been designed to accommodate future lifts to provide flexibility for potential further LOM extensions that could add multiple decades of capacity beyond the current mine life of 2045.
+Added: • Increased throughput and recovery.
+Added: In 2029, process plant throughput is expected to increase by 10%, from 60,000 tpd to approximately 66,300 tpd, by upgrading the ball mill motors.
+Added: Flotation capacity is also expected to increase, which should deliver a modest improvement in gold and copper recoveries of about 1%.
+Added: • Consistent gold and copper production.
+Added: Average annual production from 2026 to 2042, is expected to be approximately 150,000 ounces of gold and 69 million pounds of copper, followed by the processing of low-grade stockpiles from 2043 to 2045.
+Added: • Significantly increased gold and copper reserves.
+Added: An updated proven and probable mineral reserve totaling 483.2 million tonnes, with an average grade of 0.28 grams per tonne (“g/t”) gold and 0.16% copper, containing 4.4 million ounces of gold and 1.7 billion pounds of copper was included in the PFS.
+Added: This represents a 56% increase from the 2.8 million ounces of gold reserves and a 52% increase from the 1.2 billion pounds of copper reserves reported at the end of 2024, driven mainly by resource conversion related to increased tailings capacity and infill drilling.
+Added: On January 20, 2026, Centerra reported that it continues to progress engineering and other studies to support future permit authorizations required to achieve the extension of the Mount Milligan mine life to 2045 as outlined in the PFS.
+Added: In January 2025, Mount Milligan was selected by the Province of British Columbia as one of four mining projects which would qualify for expedited permitting to support economic development in the province.
+Added: The disclosures below regarding Pueblo Viejo are derived from the Technical Report on the Pueblo Viejo Mine, Sánchez Ramírez Province, Dominican Republic dated March 17, 2023 in accordance with NI 43-101 and CIM Standards, as well as press releases issued by Barrick.
+Added: Royal Gold requested that the operator either (i) designate qualified persons who would prepare a technical report summary under S-K 1300 for filing with the SEC and sufficiently coordinate with us to enable us to prepare disclosure of all required information under S-K 1300 relating to the property, or (ii) provide qualified persons designated by us with site access and underlying technical data, reports, models, and other information sufficient for the qualified persons designated by us to prepare a technical report summary under S-K 1300 for filing with the SEC and enable us to prepare disclosure of all required information under S-K 1300 relating to the property, and the operator denied the request.
The Pueblo Viejo mine is located in the province of Sánchez Ramírez, Dominican Republic, at 18.94°N latitude and 70.17°W longitude, approximately 100 km northwest of Santo Domingo, and is owned by a joint venture in which Barrick holds a 60% interest and is responsible for operations, and in which Newmont holds a 40% interest.
−Removed: Pueblo Viejo is accessed from Santo Domingo by traveling northwest on Autopista Duarte, Highway #1, approximately 77 km to Piedra Blanca and proceeding east for approximately 22.5 km on Highway #17 to the gatehouse for Pueblo Viejo.
+Added: Pueblo Viejo is accessed from Santo Domingo by traveling northwest on Autopista Duarte, Highway #1, approximately 77 km to Piedra
+Added: Blanca and proceeding east for approximately 22.5 km on Highway #17 to the gatehouse for Pueblo Viejo.
Both Highway #1 and Highway #17 are paved.
9 unchanged sentences
The Pueblo Viejo mine is supplied with electric power from two sources via two independent 230 kV transmission circuits.
−Removed: In 2013, Pueblo Viejo Dominicana Corporation (“PVDC”) commissioned a 218-megawatt (“MW”) Wartsila combined cycle reciprocating engine power plant, together with an approximately 72 km transmission line connecting the plant to the minesite.
+Added: In 2013, Pueblo Viejo Dominicana Corporation (“PVDC”) commissioned a 218-megawatt (“MW”) Wartsila combined cycle reciprocating engine power plant, together with an approximately 72 km transmission line connecting the plant to the mine site.
The power plant is located near the port city of San Pedro de Macoris on the south coast and provides the long-term power supply for the Pueblo Viejo mine.
15 unchanged sentences
Area of Interest
−Removed: At Pueblo Viejo, our stream interest covers a Special Lease Agreement of Mining Rights (“SLA”), as amended in November 2009 and in October 2013.
−Removed: The Lease has a term of 25 years with one extension by right for 25 years and a second 25 year extension at the mutual agreement of Barrick and the Dominican state, allowing a possible total term of 75 years.
+Added: At Pueblo Viejo, our stream interest covers a portion of the Special Lease Agreement of Mining Rights (“SLA”), as amended in November 2009 and in October 2013, covering 4,880 hectares.
+Added: The SLA has a term of 25 years with one extension by right for 25 years and a second 25 year extension at the mutual agreement of Barrick and the Dominican state, allowing a possible total term of 75 years.
Under the SLA, PVDC is obligated to make the following payments to the Dominican Republic:
−Removed: a net smelter return royalty of 3.2% based on gross revenues less some deductible costs (royalties do not apply to copper or zinc);
+Added: a NSR royalty of 3.2% based on gross revenues less some deductible costs (royalties do not apply to copper or zinc);
a net profits interest of 28.75% based on an adjusted taxable cash flow;
5 unchanged sentences
Under the Precious Metals Purchase and Sale Agreement dated August 5, 2015 between RGLD Gold and BGC Holdings Ltd., and Barrick, as amended, RGLD Gold owns the right to purchase 7.5% of Barrick’s interest in the gold produced from the Pueblo Viejo mine until 990,000 ounces of gold have been delivered, and 3.75% thereafter.
−Removed: The cash purchase price for gold is 30% of the spot price of gold per ounce delivered until 550,000 ounces of gold have been delivered, and 60% of the spot price of gold per ounce delivered thereafter.
−Removed: RGLD Gold also owns the right to purchase 75% of Barrick’s interest in the silver produced from the Pueblo Viejo mine, subject to a fixed silver recovery of 70%, until 50 million ounces of silver have been delivered, and 37.5% thereafter.
+Added: The cash purchase
+Added: price for gold is 30% of the spot price of gold per ounce delivered until 550,000 ounces of gold have been delivered, and 60% of the spot price of gold per ounce delivered thereafter.
+Added: RGLD Gold also owns the right to purchase 75% of Barrick’s interest in the silver produced from the Pueblo Viejo mine until 50 million ounces of silver have been delivered, and 37.5% thereafter, subject to delivery deferral mechanisms below contract specified recovery rates.
The cash purchase price for silver is 30% of the spot price of silver per ounce delivered until 23.1 million ounces of silver have been delivered, and 60% of the spot price of silver per ounce delivered thereafter.
17 unchanged sentences
The autoclave circuit was initially designed to oxidize approximately 1,750 tonnes of sulfide per day, which is equivalent to about 24,000 tonnes of run-of-mine ore at 7.5% of sulfide.
−Removed: The process plant expansion flowsheet includes an additional primary crusher, coarse ore stockpile and ore reclaim delivering to a new single stage semi-autogenous (SAG) mill, and a new flotation circuit that concentrates the bulk of the sulfide ore prior to oxidation.
−Removed: The concentrate is blended with fresh milled ore to feed the modified autoclave circuit, which has additional oxygen supplied from a new 3,000 tonnes per day facility.
+Added: The process plant expansion flowsheet includes an additional primary crusher, coarse ore stockpile and ore reclaim delivering to a new single stage semi-autogenous mill, and a new flotation circuit that concentrates the bulk of the sulfide ore prior to oxidation.
+Added: The concentrate is blended with fresh milled ore to feed the modified autoclave circuit, which has additional oxygen supplied from a new 3,000 tpd facility.
The existing autoclaves have been upgraded to increase the sulfur processing capacity of each autoclave through additional high-pressure cooling water and recycle flash capability using additional slurry pumping and thickening.
1 unchanged sentence
In conjunction with the plant expansion project, Barrick is currently advancing work on the new El Naranjo TSF.
−Removed: Barrick’s timeline for commissioning of the El Naranjo TSF is by late 2029, and Barrick expects the facility to provide storage capacity for 8 additional years beyond the current mine life, which is expected to be to 2046.
+Added: Barrick’s timeline for commissioning of the El Naranjo TSF is by late 2029, and Barrick expects the facility to provide storage capacity beyond the current mine life, which is expected to be to 2048.
Age and Condition of Infrastructure
26 unchanged sentences
The Ministry of Environment and Natural Resources enforces Law 64-00 and establishes the process of obtaining environmental permits.
−Removed: PVDC completed a Feasibility Study on the Mine in September 2005 and presented an Environmental Impact Assessment (“EIA”) to the Dominican state in November of the same year.
+Added: PVDC completed a Feasibility Study on the Mine in September 2005 and presented an EIA to the Dominican state in November of the same year.
The terms of reference for the Mine were approved by the Environmental Authority on May 30, 2005, and the Ministry of Environment approved the EIA in December 2006 and granted the Environmental License 101-06.
31 unchanged sentences
Gold stream deliveries from Pueblo Viejo were approximately 28,000 ounces for the year ended December 31, 2025, compared to approximately 26,500 ounces for the year ended December 31, 2024.
−Removed: The increase in gold production was primarily a result of increased throughput.
+Added: The increase in gold production was primarily a result of higher throughput and grades processed driven by mine and stockpile feed sequencing during the period.
Deliveries are quarterly and typically occur 1 to 3 months after mine production.
1 unchanged sentence
Silver stream deliveries were approximately 873,900 ounces for the year ended December 31, 2025, compared to 859,900 ounces for the year ended December 31, 2024.
−Removed: Silver stream deliveries are based on a fixed payability factor of 99.0%.
Deliveries are quarterly and typically occur 1 to 3 months after mine production.
+Added: Silver stream deliveries are based on a fixed payability factor of 99.0%.
During the year ended December 31, 2025, an additional 801,100 ounces of silver deliveries were deferred.
2 unchanged sentences
The stream agreement terms include a fixed 70% silver recovery rate but permits the deferral of ounces if recovery rates fall below 52.5%.
−Removed: On November 22, 2024, Barrick provided an update on the ramp-up of the plant expansion and a production outlook for Pueblo Viejo.
−Removed: Barrick outlined several projects that are intended to achieve planned throughput and recoveries, and Barrick expects plant throughput to increase steadily from 2024 and reach the expanded 14 million tonne per year capacity in 2028.
−Removed: As part of this throughput optimization, Barrick noted a planned 35-day impact to production in the first quarter of 2025 to complete a thickener optimization.
−Removed: Barrick expects gold recovery to increase from approximately 80% at the end of 2024 to 90% by the end of 2026, and Barrick reported that a project to improve silver recovery is expected to be complete by the fourth quarter of 2025.
−Removed: Barrick further reported that gold production is expected to increase steadily from approximately 600,000 ounces in 2024 to over 800,000 ounces in 2026 (100% basis).
−Removed: Barrick did not provide forecasts for silver production.
−Removed: In conjunction with the plant expansion project, Barrick reported that it is currently advancing the construction of the new El Naranjo TSF.
−Removed: Barrick also reported that the timeline for commissioning the El Naranjo TSF is by late 2029, with the facility expected to provide storage capacity for eight additional years beyond the current mine life, which is expected to be to 2046.
−Removed: On February 12, 2025, Barrick announced 2025 gold production guidance of 370,000 to 410,000 ounces for its 60% share of Pueblo Viejo.
−Removed: The disclosures below regarding Cortez are derived from the Technical Report on the Cortez Complex dated March 18, 2022 pursuant to NI 43-101 and CIM Standards, and from Barrick’s Annual Information Form, dated March 15, 2024, and Management’s Discussion and Analysis, dated February 13, 2024, pursuant to NI 43-101.
−Removed: Royal Gold requested information prepared pursuant to S-K 1300 or access to underlying technical data sufficient to prepare its own technical report summary, and the operator denied the request.
−Removed: Cortez is a series of large open pit and underground mines, utilizing mill and heap leach processing, which are operated by Nevada Gold Mines LLC (“NGM”), a joint venture between Barrick and Newmont with respect to their Nevada operations.
+Added: In the event silver recoveries do not exceed 52.5% in the future, no deferred silver ounces are required to be delivered.
+Added: On February 5, 2026, Barrick reported that activity related to the mine life extension continues to focus on housing, resettlement and the El Naranjo TSF.
+Added: According to Barrick, over 600 homes have been constructed, more than 300 families are resettled, and 70% of resettlement packages have now been accepted.
+Added: Barrick further reported that detailed engineering for the tailings water management system is now complete with permits expected in H1 of 2026 while the permitting package for the starter dam will be submitted within Q1 2026.
+Added: Barrick also reported that 2026 gold production on a 60%
+Added: basis is expected to range between 350,000 and 400,000 ounces, which compares to 379,000 ounces in 2025.
+Added: Barrick does not provide silver production guidance.
+Added: The disclosures below regarding Cortez are derived from the Technical Report on the Cortez Complex dated March 18, 2022 pursuant to NI 43-101 and CIM Standards, and from Barrick’s Annual Information Form, dated March 14, 2025, and Management’s Discussion and Analysis, dated February 5, 2026, pursuant to NI 43-101, as well as press releases issued by Barrick.
+Added: Royal Gold requested that the operator either (i) designate qualified persons who would prepare a technical report summary under S-K 1300 for filing with the SEC and sufficiently coordinate with us to enable us to prepare disclosure of all required information under S-K 1300 relating to the property, or (ii) provide qualified persons designated by us with site access and underlying technical data, reports, models, and other information sufficient for the qualified persons designated by us to prepare a technical report summary under S-K 1300 for filing with the SEC and enable us to prepare disclosure of all required information under S-K 1300 relating to the property, and the operator denied the request.
+Added: Cortez is a series of large open pit and underground mines, utilizing mill and heap leach processing, which are operated by NGM, a joint venture between Barrick and Newmont with respect to their Nevada operations.
We refer to the Cortez property and its multiple mines and projects as the Cortez Complex, and the terms “Cortez” and “Cortez Complex” are used interchangeably.
36 unchanged sentences
NGM does not provide guidance or production results for the individual mines within the Cortez Complex, and both of the NGM partners provide consolidated guidance and results for their respective interests.
−Removed: We have typically provided, and subject to approval by Barrick, expect to continue to provide, annual guidance for the total gold production subject to the Legacy Zone royalty interest.
+Added: We have typically provided, and subject to approval by Barrick, expect to continue to provide, annual guidance for the total gold production subject to the Legacy Zone royalty interests.
This guidance includes overlapping contributions from the Pipeline and Crossroads deposits in certain areas and is not directly comparable to actual production from these deposits.
4 unchanged sentences
Rio Tinto Royalty Idaho
+Added: Royalty Sandstorm
Royalty Applicable Royalty Rate Royalty Rate Royalty Rate 8
+Added: Royalty Rate 9
Royalty Rate Approximate Blended Rate 3
11 unchanged sentences
Goldrush SE Underground Roaster, autoclave 2.3% NVR2 1.0% NVR 6
−Removed: Robertson Open Pit Oxide mill, heap leach 0.5%
+Added: Robertson Open Pit Oxide mill, heap leach 2.6% 2.25% NSR
_______________________________
−Removed: Approximate equivalent royalty after blending the detailed royalty rates.
−Removed: Assumes total deduction to the Rio Tinto Royalty of 3% for the Legacy Royalties and the Idaho Royalty, and a 60% conversion from NVR to GSR rates.
+Added: Approximate equivalent royalty after blending the detailed royalty rates for the Cortez Complex production forecast for 2026-2035.
+Added: Assumes total deduction to the Rio Tinto Royalty of 4%, and a 65% conversion from NVR to GSR rates for the Legacy royalties.
Legacy Royalties are those royalties held by Royal Gold prior to August 2, 2022, and consist of overlapping royalties on the Pipeline and Crossroads deposits, with additional royalties covering a portion of the Goldrush deposit and other exploration areas.
+Added: Additional royalty interests were acquired at NVR1 and NVR1C in September, 2025.
The overlapping royalties in the Legacy Zone are equivalent to an approximate 8% GSR royalty on production subject to this interest.
9 unchanged sentences
(gold produced from Pipeline and Crossroads) x (gold price) x (0.689% GSR) +
−Removed: (gold produced from Cortez Hills, Cortez Pits, Goldrush, Fourmile and Robertson) x (gold price) x
−Removed: (1.2859% GSR) ]}
+Added: (gold produced from Cortez Hills, Cortez Pits, Goldrush, Fourmile and Robertson) x (gold price) x (1.2859% GSR) ]}
The total third-party royalty deduction for the Legacy Royalties and the Idaho Royalty can be approximated as 3% through 2032 and 1.4% thereafter.
Idaho Royalty rates are rounded.
+Added: 1.0-2.25% sliding scale NSR royalty acquired with the acquisition of Sandstorm Gold on October 20, 2025.
We also own two additional royalties in the Cortez area where there is currently no attributable production.
7 unchanged sentences
Inc., Royal Gold and Royal Crescent;
−Removed: that Third Amended Memorandum of Grant of Royalty dated December 17, 2001 between Cortez JV, Placer Dome U.S.
+Added: that Third Amended Memorandum of Grant of Royalty dated December 17, 2001 between
+Added: Cortez JV, Placer Dome U.S.
Inc., Royal Gold and Royal Crescent;
37 unchanged sentences
2007-211323 in Eureka County;
−Removed: that General Warranty Deed with Reservation of Royalty (South) dated December 11, 2007 from The Thomas and Volina Connolly Family Trust to Barrick Gold U.S.,
−Removed: recorded as Document No.
+Added: that General Warranty Deed with Reservation of Royalty (South) dated December 11, 2007 from The Thomas and Volina Connolly Family Trust to Barrick Gold U.S., recorded as Document No.
2007-211324 in Eureka County;
20 unchanged sentences
subject to certain special warranty deeds dated effective December 30, 2022.
+Added: Robertson Royalty - Mining Claim Deed with Reservation of Net Smelter Returns Royalty dated June 7, 2017 between Coral Resources, Inc.
+Added: and Barrick Cortez Inc., recorded as Document No.
+Added: 280679 in Lander County;
+Added: and Assignment and Assumption of Mining Leases and Option Agreement with Reservation of Net Smelter Returns Royalty dated June 7, 2017 between Coral Resources, Inc.
+Added: and Barrick Cortez Inc., recorded as Document No.
+Added: 280680 in Lander County.
Property Description
14 unchanged sentences
The active heap leach facilities are located at the Pipeline and Cortez Hills complexes.
−Removed: Milling activities at Cortez are conducted at the Pipeline complex, which includes crushing and grinding facilities, CIL circuits, reagent storage areas and a recovery/refining circuit.
+Added: Milling activities at Cortez are conducted at the Pipeline complex, which includes crushing and grinding facilities, CIL circuits, reagent storage areas and
+Added: a recovery/refining circuit.
Plant throughput can reach up to 16,300 tpd depending on the hardness of the ore being processed.
22 unchanged sentences
In 1998, the Cortez Pediment deposit was discovered, with the Cortez Hills discovery announced in April 2003.
−Removed: The Cortez Hills development was approved by Placer Dome and Kennecott, then joint venturers, in September 2005 and confirmed by Barrick in 2006.
+Added: The Cortez Hills development was approved by Placer Dome and Kennecott, then partners in a joint venture, in September 2005 and confirmed by Barrick in 2006.
Barrick obtained an interest in the Cortez property through its acquisition of Placer Dome in 2006.
39 unchanged sentences
The deepest significant intercept is currently at 1,435 m.
−Removed: The Goldrush system remains open to the north into Fourmile, to the southeast, and in multiple directions in the Ken Balleweg (KB) Domain.
+Added: The Goldrush system remains open to the north into Fourmile, to the southeast, and in multiple directions in the Ken Balleweg Domain.
Robertson is an igneous related gold system.
7 unchanged sentences
In its 2024 Annual Information Form issued in March 2025, Barrick reported that the Cortez open pit operation is expected to continue until 2034 and the underground operation until 2042, and the planned conversion of existing resources to reserves at Cortez has the potential to extend open pit and underground mining operations to at least 2038 and 2052, respectively.
−Removed: On November 22, 2024, Barrick provided an update on various projects currently underway, as well as a production outlook for the Cortez Complex.
−Removed: With respect to the near term, Barrick is expecting overall gold production from within the Cortez Complex to increase with the mining of ore in the Crossroads pit following waste stripping, as well as the continued ramp-up at the Goldrush underground mine, which is expected to produce 400,000 ounces of gold per year at full production levels.
−Removed: Barrick is forecasting production from the Cortez Complex of over one million ounces in 2027, largely driven by these increases.
−Removed: Relating to the longer-term potential within the Cortez Complex, Barrick reported several developments, including the receipt of the Record Of Decision for the Robertson Project in mid-November 2024, a significant increase in gold resources at the Fourmile Project after incorporating recent results from recent drilling, and further exploration progress at the Hanson target at Cortez Hills Underground and the Swift target to the west of the Pipeline deposit.
−Removed: According to Barrick, a PEA for the Fourmile Project, which covers approximately one-third of the known orebody as defined by drilling to date, indicates the potential for gold production levels exceeding 500,000 ounces per year.
−Removed: Barrick indicated that it intends to advance these projects with feasibility work ongoing for the Robertson open pit project, a pre-feasibility study planned to begin in 2025 at the Fourmile Project, and continued exploration at the Hanson and Swift targets.
−Removed: On February 12, 2025, Barrick announced 2025 gold production guidance of approximately 680,000 to 765,000 ounces (100% basis) at the Cortez Complex.
+Added: On September 16, 2025, Barrick released the results of a preliminary economic assessment (“PEA”) on the Fourmile Project, which is included in Royal Gold’s royalty interests covering the Cortez Complex.
+Added: According to Barrick, the PEA indicates the potential to achieve average annual gold production levels of approximately 600,000 to 750,000 ounces over a mine life exceeding 25 years.
+Added: Royal Gold’s royalty interests over the Fourmile Project are equivalent to an approximate 1.6% gross smelter return royalty rate.
+Added: On February 5, 2026, Barrick disclosed that it expects to continue exploration and studies at the Fourmile Project in 2026, including development of the twin surface portals in Crescent Valley late in the year, and complete a PFS in 2028.
+Added: Barrick reported that 2025 exploration drilling focused on resource definition drilling, extensional stepouts and satellite exploration targeting, and notable results provided for the extension of the Dorothy ore zone by 150 meters from prior drill intercepts, identification of potential mineralization along a 1 kilometer corridor below the Mill Canyon stock to the north, and the confirmation of mineralization more than 300 meters further downdip from prior intercepts at the Charlie area.
+Added: Further on February 5, 2026, Barrick provided 2026 gold production guidance for the Cortez Complex of approximately 700,000 to 780,000 ounces on a 100% basis, which compares to 738,000 ounces in 2025.
+Added: Our royalties overlap at Cortez and we expect the average blended royalty rate to range between 3.5% and 4% over this production in 2026.
Compared sentence by sentence after normalising whitespace, quotation marks, case and digits, so re-formatting and restated figures do not read as changed language. Wording changes appear as one removal and one addition. The current filing and the prior one are authoritative.