UNITED
STATES
SECURITIES
AND EXCHANGE COMMISSION
Washington,
D. C. 20549
FORM
10-K
(Mark
One)
☒
ANNUAL
REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934
For
the fiscal year ended June 30, 2022
OR
☐
TRANSITION
REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934
For
the transition period from to
Commission
file number: 000-55710
NioCorp
Developments Ltd.
(Exact
name of registrant as specified in its charter)
British
Columbia, Canada
98-1262185
(State
or other jurisdiction of incorporation or organization)
(I.R.S.
Employer Identification No.)
7000
South Yosemite Street , Suite 115 Centennial , CO
(Address
of principal executive offices)
80112
(Zip
Code)
Registrant’s telephone number, including area code: ( 855 ) 264-6267
Securities
registered pursuant to Section 12(b) of the Act:
Title
of each class
Trading
Symbol(s)
Name
of each exchange on which registered
Not
Applicable
Not
Applicable
Not
Applicable
Securities
registered pursuant to section 12(g) of the Act: Common Shares, without par value
Indicate
by check mark if the registrant is a well-known seasoned issuer, as defined in Rule 405 of the Securities Act.
Yes
☐ No ☒
Indicate
by check mark if the registrant is not required to file reports pursuant to Section 13 or Section 15(d) of the Act.
Yes
☐ No ☒
Indicate
by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange
Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports),
and (2) has been subject to such filing requirements for the past 90 days.
Yes ☒ No ☐
Indicate
by check mark whether the registrant has submitted electronically every Interactive Data File required to be submitted pursuant
to Rule 405 of Regulation S-T (§232.405 of this chapter) during the preceding 12 months (or for such shorter period that
the registrant was required to submit such files).
Yes ☒ No ☐
Indicate
by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, a smaller reporting
company, or an emerging growth company. See the definitions of “large accelerated filer,” “accelerated filer,”
“smaller reporting company,” and “emerging growth company” in Rule 12b-2 of the Exchange Act.
Large Accelerated Filer
☐
Accelerated Filer
☐
Non-Accelerated
Filer
☒
Smaller
Reporting Company
☒
Emerging Growth Company
☐
If
an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for
complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act.
☐
Indicate
by check mark whether the registrant has filed a report on and attestation to its management’s assessment of the effectiveness
of its internal control over financial reporting under Section 404(b) of the Sarbanes-Oxley Act (15 U.S.C. 7262(b)) by the registered
public accounting firm that prepared or issued its audit report.
☐
Indicate
by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act).
Yes ☐ No ☒
At December 31, 2021, the aggregate
market value of the registrant’s voting and non-voting common equity held by non-affiliates of the registrant was
$ 245.4 million based on the closing sale price
as reported on the Toronto Stock Exchange and the daily exchange rate as reported by the Bank of Canada for conversion of
Canadian dollars into U.S. dollars. There were 278,127,688
common shares outstanding on September 6, 2022.
DOCUMENTS
INCORPORATED BY REFERENCE
The
registrant incorporates by reference in Part III hereof portions of its definitive proxy statement on Schedule 14A for its 2022
annual general meeting of shareholders.
TABLE
OF CONTENTS
Contents
Glossary of Terms
i
S-K 1300 Definitions
iv
Metric Equivalents
vii
Currency and Exchange Rates
viii
PART I
1
ITEM 1.
BUSINESS
1
Introduction
1
Historical Development of the Business
1
Emerging Growth Company Status
2
Corporate Structure
2
Business Operations
2
Competitive Business Conditions
3
Cycles
3
Economic Dependence
4
Government Regulation
4
Human Capital
6
Forward-Looking Statements
6
Available Information
8
ITEM 1A.
RISK FACTORS
9
Risks Related to Our Business
9
Risks Related to Mining and Exploration
12
Risks Related to Government Regulation
17
Risks Related to Our Debt
19
Risks Related to the Common Shares
19
ITEM 1B.
UNRESOLVED STAFF COMMENTS
21
ITEM 2.
PROPERTIES
22
ITEM 3.
LEGAL PROCEEDINGS
40
ITEM 4.
MINE SAFETY DISCLOSURES
40
PART II
40
ITEM 5.
MARKET FOR REGISTRANT’S COMMON EQUITY, RELATED STOCKHOLDER MATTERS AND ISSUER PURCHASES OF EQUITY SECURITIES
40
Market Information
40
Holders
40
Dividends
41
Securities Authorized for Issuance Under Equity Compensation Plans
41
Purchases of Equity Securities by the Company
41
Recent Sales of Unregistered Securities
41
Exchange Controls
41
Certain Canadian Federal Income Tax Considerations for U.S. Residents
41
ITEM 6.
RESERVED
42
ITEM 7.
MANAGEMENT’S DISCUSSION AND ANALYSIS OF CONSOLIDATED FINANCIAL CONDITION AND RESULTS OF OPERATIONS
42
Summary of Consolidated Financial and Operating Performance
43
Results of Operations
43
Liquidity and Capital Resources
44
Cash Flow Considerations
46
Environmental
47
Forward-Looking Statements
47
Accounting Developments
47
Critical Accounting Estimates and Recent Accounting Pronouncements
47
Other
49
ITEM 7A.
QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK
49
Interest rate risk
49
Foreign currency exchange risk
49
Commodity price risk
49
ITEM 8.
FINANCIAL STATEMENTS AND SUPPLEMENTARY DATA
49
ITEM 9.
CHANGES IN AND DISAGREEMENTS WITH ACCOUNTANTS ON ACCOUNTING AND FINANCIAL DISCLOSURE.
71
ITEM 9A.
CONTROLS AND PROCEDURES
71
ITEM 9B.
OTHER INFORMATION
71
PART III
72
ITEM 10.
DIRECTORS, EXECUTIVE OFFICERS AND CORPORATE GOVERNANCE
72
ITEM 11.
EXECUTIVE COMPENSATION
72
ITEM 12.
SECURITY OWNERSHIP OF CERTAIN BENEFICIAL OWNERS AND MANAGEMENT AND RELATED STOCKHOLDER MATTERS
72
ITEM 13.
CERTAIN RELATIONSHIPS AND RELATED TRANSACTIONS, AND DIRECTOR INDEPENDENCE
72
ITEM 14.
PRINCIPAL ACCOUNTING FEES AND SERVICES
72
PART IV
73
ITEM 15.
EXHIBITS, FINANCIAL STATEMENT SCHEDULES
73
ITEM 16.
FORM 10–K SUMMARY
76
SIGNATURES
77
Glossary
of Terms
0896800
0896800
B.C. Ltd., a wholly owned subsidiary of the Company and 100% owner of ECRC
2019
NI 43-101 Elk Creek Technical Report
A
CIM-compliant NI 43-101 technical report for the Elk Creek Project filed on SEDAR on May 29, 2019, with an effective date
of April 16, 2019
2022
Elk Creek Feasibility Study
A
feasibility study prepared by qualified persons, the results of which are summarized in the 2022 NI 43-101 Elk Creek Technical
Report and the S-K 1300 Elk Creek Technical Report Summary.
2022
NI 43-101 Elk Creek Technical Report
A
CIM-compliant NI 43-101 technical report for the Elk Creek Project filed on SEDAR on June 28, 2022, with an effective date
of June 28, 2022
Air
Permit
A
State of Nebraska permit which describes all the prospective air emissions from a facility
CIM
Canadian
Institute of Mining and Metallurgy
Common
Shares
The
Common Shares, without par value, in the capital stock of NioCorp as the same are constituted on the date hereof, as traded
on the TSX
COVID-19
The
disease caused by a novel strain of coronavirus that the World Health Organization declared a global pandemic in March 2020
deposit
A
mineralized body which has been physically delineated by sufficient drilling, trenching, and/or underground work, and found
to contain a sufficient average grade of metal or metals to warrant further exploration and/or development expenditures. Such
a deposit does not qualify as a commercially mineable ore body or as containing reserves or ore, unless final legal, technical,
and economic factors are resolved.
diamond
drilling
A
type of rotary drilling in which diamond bits are used as the rock-cutting tool to produce a recoverable drill core sample
of rock for observation and analysis
Dodd-Frank
Act
The
United States Dodd-Frank Wall Street Reform and Consumer Protection Act of 2010
ECRC
Elk
Creek Resources Corp., a private Nebraska corporation and wholly owned subsidiary of 0896800
Elk
Creek Project
NioCorp’s
niobium, scandium, and titanium project located on the Elk Creek Property
Elk
Creek Property
NioCorp’s
Carbonatite property located in Southeast Nebraska, USA on which the Elk Creek Project is located
EPA
The
United States Environmental Protection Agency
Exchange
Act
United
States Securities Exchange Act of 1934, as amended
Ferroniobium
or FeNb
An
iron-niobium alloy, with a niobium content of 60-70%
i
grade
A
particular quantity of metal or mineral, relative to other constituents, in a specified quantity of rock
HSLA
steel
High-strength
low-alloy steel
Lind
III
Lind
Global Asset Management III, LLC, an entity managed by The Lind Partners, a New York based asset management firm
Lind
III Agreement
NioCorp’s
definitive convertible security funding agreement with Lind III dated February 16, 2021
Lind
III Convertible Security
a
convertible security dated as of February 16, 2021, issued to Lind III pursuant to the Lind III Agreement with a face value
of $11,700,000 (representing $10,000,000 in funding plus an implied 8.5% interest rate per annum for the term of the Lind
III Convertible Security)
Lind
III Warrants
8,558,000
Common Share purchase warrants, exercisable at a price per Common Share of C$0.97, expiring February 19, 2025, and issued
on February 19, 2021, to Lind III pursuant to the Lind III Agreement
LoM
Life
of Mine, the period from the beginning of construction to the end of mine life
Mark
Smith
Chief
Executive Officer, President, and Executive Chairman of NioCorp
NAAQS
The
U.S. National Ambient Air Quality Standards limits on atmospheric concentration of six pollutants that cause smog, acid rain,
and other health hazards, as established by the EPA
NDEE
Nebraska
Department of Environment and Energy
NI
43-101
National
Instrument 43-101 of the Canadian Securities Administrators entitled “Standards of Disclosure for Mineral Projects”
niobium
or Nb
The
element niobium (atomic number 41), a transition metal primarily used in the production of HSLA steel
Nb 2 O 5
Niobium
pentoxide, a commercial form of refined niobium
NioCorp,
we, us, our or the Company
NioCorp
Developments Ltd.
NSR
Net
Smelter Return, the net revenue that the owner of a mining property receives from the sale of the mine’s products less transportation
and refining costs
Nordmin
The
Nordmin Group of Companies
Nordmin
Note
A
convertible note in the principal amount of approximately $1,872,000 issued by the Company to Nordmin pursuant to a convertible
note and warrant subscription agreement, dated as of December 18, 2020, between NioCorp and Nordmin
Offtake
Agreement
An
agreement between NioCorp and a third party for the purchase and sale of products to be produced from the Elk Creek Project
OTP
An
option to purchase agreement between NioCorp’s wholly owned subsidiary ECRC and an individual landowner relating to
land and/or mineral rights
ii
Rare
earth elements, rare earths or REEs
A
group of 15 elements referred to as the lanthanide series in the periodic table of elements. Scandium and yttrium, while not
true REEs, are also included in this categorization because they exhibit similar properties to the lanthanides and are found
in the same ore bodies. Individual mineral deposits may not contain all REEs in economically recoverable quantities.
Rare
earth products
Commercial
rare earth products currently being examined for production by the Company, including neodymium-praseodymium oxide (sometimes
referred to as didymium oxide), dysprosium oxide, and terbium oxide. These are the primary rare earths compounds used to manufacture
the world’s most powerful permanent magnets.
scandium
or Sc
The
element scandium (atomic number 21), a transition metal used as an alloying agent with aluminum that provides high strength
and lower weight for aerospace industry components and other applications that need lightweight metals. It also is used in
the electrolyte layer of solid oxide fuel cells.
Sc 2 O 3
Scandium
trioxide, the primary form of refined scandium
SEC
United
States Securities and Exchange Commission
Securities
Act
United
States Securities Act of 1933, as amended
SEDAR
System
for Electronic Document Analysis and Retrieval, the electronic filing system for the disclosure documents of issuers across
Canada
S-K
1300
Subpart
1300 of Regulation S-K promulgated by the SEC
S-K
1300 Elk Creek Technical Report Summary
A
technical report summary for the Elk Creek Project that conforms to S-K 1300 reporting standards and filed as Exhibit 96.1
to this Annual Report on Form 10-K
Smith
Credit Agreement
A
non-revolving credit facility agreement with Mark Smith, dated January 16, 2017, as amended, of which $2.0 million is outstanding
at June 30, 2022 and $0.7 million remains available for borrowing.
titanium
or Ti
The
element titanium (atomic number 22), a transition metal which in its oxide form is a common pigment in paper, paint, and plastic.
In its metallic form, titanium is used in aerospace applications, armor, chemical processing applications, marine hardware
applications, medical implants, power generation, and in sporting goods.
TiO 2
Titanium
dioxide, a commercial form of refined titanium
TSF
An
engineered and lined tailings storage facility constructed as a permanent repository for wastes produced from mining and production
of niobium, scandium and titanium products
TSX
The
Toronto Stock Exchange
U.S.
The
United States of America
USACE
The
United States Army Corps of Engineers
U.S.
GAAP
United
States generally accepted accounting principles
USGS
The
United States Geological Service
iii
S-K
1300 Definitions
cut-off
grade
The
grade (i.e., the concentration of metal or mineral in rock) that determines the destination of the material during mining.
For purposes of establishing “prospects of economic extraction,” the cut-off grade is the grade that distinguishes
material deemed to have no economic value (it will not be mined in underground mining or if mined in surface mining, its destination
will be the waste dump) from material deemed to have economic value (its ultimate destination during mining will be a processing
facility). Other terms used in similar fashion as cut-off grade include net smelter return, pay limit, and break-even stripping
ratio.
development
stage issuer
An
issuer that is engaged in the preparation of mineral reserves for extraction on at least one material property
development
stage property
A
property that has mineral reserves disclosed, pursuant to Regulation S-K 1300, but no material extraction
economically
viable
When
used in the context of mineral reserve determination, means that the qualified person has determined, using a discounted cash
flow analysis, or has otherwise analytically determined, that extraction of the mineral reserve is economically viable under
reasonable investment and market assumptions
feasibility
study
A
comprehensive technical and economic study of the selected development option for a mineral
project, which includes detailed assessments of all applicable modifying factors, as
defined under S-K 1300, together with any other relevant operational factors, and detailed
financial analysis that are necessary to demonstrate, at the time of reporting, that
extraction is economically viable. The results of the study may serve as the basis for
a final decision by a proponent or financial institution to proceed with, or finance,
the development of the project.
(1)
A feasibility study is more comprehensive, and with a higher degree of accuracy, than a pre-feasibility study. It must
contain mining, infrastructure, and process designs completed with sufficient rigor to serve as the basis for an investment
decision or to support project financing.
(2)
The confidence level in the results of a feasibility study is higher than the confidence level in the results of a pre-feasibility
study. Terms such as full , final , comprehensive , bankable , or definitive feasibility
study are equivalent to feasibility study.
indicated
mineral resource
That
part of a mineral resource for which quantity and grade or quality are estimated on the basis of adequate geological evidence
and sampling. The level of geological certainty associated with an indicated mineral resource is sufficient to allow a qualified
person to apply modifying factors in sufficient detail to support mine planning and evaluation of the economic viability of
the deposit. Because an indicated mineral resource has a lower level of confidence than the level of confidence of a measured
mineral resource, an indicated mineral resource may only be converted to a probable mineral reserve.
inferred
mineral resource
That
part of a mineral resource for which quantity and grade or quality are estimated on the basis of limited geological evidence
and sampling. The level of geological uncertainty associated with an inferred mineral resource is too high to apply relevant
technical and economic factors likely to influence the prospects of economic extraction in a manner useful for evaluation
of economic viability. Because an inferred mineral resource has the lowest level of geological confidence of all mineral resources,
which prevents the application of the modifying factors in a manner useful for evaluation of economic viability, an inferred
mineral resource may not be considered when assessing the economic viability of a mining project, and may not be converted
to a mineral reserve.
iv
measured
mineral resource
That
part of a mineral resource for which quantity and grade or quality are estimated on the basis of conclusive geological evidence
and sampling. The level of geological certainty associated with a measured mineral resource is sufficient to allow a qualified
person to apply modifying factors, as defined in this section, in sufficient detail to support detailed mine planning and
final evaluation of the economic viability of the deposit. Because a measured mineral resource has a higher level of confidence
than the level of confidence of either an indicated mineral resource or an inferred mineral resource, a measured mineral resource
may be converted to a proven mineral reserve or to a probable mineral reserve.
mineral
reserve
An
estimate of tonnage and grade or quality of indicated and measured mineral resources that, in the opinion of the qualified
person, can be the basis of an economically viable project. More specifically, it is the economically mineable part of a measured
or indicated mineral resource, which includes diluting materials and allowances for losses that may occur when the material
is mined or extracted.
mineral
resource
A
concentration or occurrence of material of economic interest in or on the Earth’s crust in such form, grade or quality, and
quantity that there are reasonable prospects for economic extraction. A mineral resource is a reasonable estimate of mineralization,
taking into account relevant factors such as cut-off grade, likely mining dimensions, location or continuity, that, with the
assumed and justifiable technical and economic conditions, is likely to, in whole or in part, become economically extractable.
It is not merely an inventory of all mineralization drilled or sampled.
modifying
factors
The
factors that a qualified person must apply to indicated and measured mineral resources and then evaluate in order to establish
the economic viability of mineral reserves. A qualified person must apply and evaluate modifying factors to convert measured
and indicated mineral resources to proven and probable mineral reserves. These factors include, but are not restricted to:
mining; processing; metallurgical; infrastructure; economic; marketing; legal; environmental compliance; plans, negotiations,
or agreements with local individuals or groups; and governmental factors. The number, type and specific characteristics of
the modifying factors applied will necessarily be a function of and depend upon the mineral, mine, property, or project.
probable
mineral reserve
The
economically mineable part of an indicated and, in some cases, a measured mineral resource
production
stage issuer
An
issuer that is engaged in material extraction of mineral reserves on at least one material property
production
stage property
A
property with material extraction of mineral reserves
proven
mineral reserve
The
economically mineable part of a measured mineral resource and can only result from conversion of a measured mineral resource
qualified
person
An
individual who is:
(1) A
mineral industry professional with at least five years of relevant experience in the type of mineralization and type of deposit
under consideration and in the specific type of activity that person is undertaking on behalf of the registrant; and
v
(2) An
eligible member or licensee in good standing of a recognized professional organization at the time the technical report
is prepared. For an organization to be a recognized professional organization, it must:
(i)
Be either:
(A)
An organization recognized within the mining industry as a reputable professional association; or
(B)
A board authorized by U.S. federal, state or foreign statute to regulate professionals in the mining, geoscience or related
field;
(ii)
Admit eligible members primarily on the basis of their academic qualifications and experience;
(iii)
Establish and require compliance with professional standards of competence and ethics;
(iv) Require
or encourage continuing professional development;
(v)
Have and apply disciplinary powers, including the power to suspend or expel
a member regardless of where the member practices or resides; and
(vi) Provide a public list of members in good standing.
relevant
experience
For
purposes of determining whether a party is a qualified person, that the party has experience
in the specific type of activity that the person is undertaking on behalf of the registrant.
If the qualified person is preparing or supervising the preparation of a technical report
concerning exploration results, the relevant experience must be in exploration. If the
qualified person is estimating, or supervising the estimation of mineral resources, the
relevant experience must be in the estimation, assessment and evaluation of mineral resources
and associated technical and economic factors likely to influence the prospect of economic
extraction. If the qualified person is estimating, or supervising the estimation of mineral
reserves, the relevant experience must be in engineering and other disciplines required
for the estimation, assessment, evaluation and economic extraction of mineral reserves.
(1) Relevant
experience also means, for purposes of determining whether a party is a qualified person, that the party has experience
evaluating the specific type of mineral deposit under consideration (e.g., coal, metal, base metal, industrial mineral,
or mineral brine). The type of experience necessary to qualify as relevant is a facts and circumstances determination.
For example, experience in a high-nugget, vein-type mineralization such as tin or tungsten would likely be relevant experience
for estimating mineral resources for vein-gold mineralization, whereas experience in a low grade disseminated gold deposit
likely would not be relevant.
Note
1 to Paragraph (1) of the Definition of Relevant Experience : It is not always necessary for a person to have five years’ experience
in each and every type of deposit in order to be an eligible qualified person if that person has relevant experience in similar
deposit types. For example, a person with 20 years’ experience in estimating mineral resources for a variety of metalliferous
hard-rock deposit types may not require as much as five years of specific experience in porphyry-copper deposits to act as a qualified
person. Relevant experience in the other deposit types could count towards the experience in relation to porphyry-copper deposits.
vi
(2)
For a qualified person providing a technical report for exploration results or mineral resource estimates, relevant experience
also requires, in addition to experience in the type of mineralization, sufficient experience with the sampling and analytical
techniques, as well as extraction and processing techniques, relevant to the mineral deposit under consideration. Sufficient
experience means that level of experience necessary to be able to identify, with substantial confidence, problems that
could affect the reliability of data and issues associated with processing.
(3)
For a qualified person applying the modifying factors, as defined by this section, to convert mineral resources to mineral
reserves, relevant experience also requires:
(i) Sufficient
knowledge and experience in the application of these factors to the mineral deposit under consideration; and
(ii) Experience
with the geology, geostatistics, mining, extraction and processing that is applicable to the type of mineral and mining under
consideration.
Metric
Equivalents
For
ease of reference, the following factors for converting Imperial measurements into metric equivalents are provided:
To
convert from Imperial
To
metric
Multiply
by
Acres
Hectares
0.4047
Feet
(“ft”)
Meters
(“m”)
0.3048
Miles
Kilometers
(“km”)
1.6093
Tons
Tonnes
(“t”)
0.9072
1
mile = 1.6093 kilometers
1
acre = 0.4047 hectares
2,204.62
pounds = 1 metric tonne = 1 tonne
2000
pounds (1 short ton) = 0.9072 tonnes
Mineral
Reserves and Resources
Information
concerning our mining property in this Annual Report on Form 10-K has been prepared in accordance with the requirements of
S-K 1300, which first became applicable to us for the fiscal year ended June 30, 2022. All mineral resource and mineral reserve
estimates included in this Annual Report on Form 10-K have been prepared in accordance with S-K 1300. Previously, we prepared
our estimates of mineral resources and mineral reserves following only NI 43-101 and CIM. The 2022 NI 43-101 Elk Creek Technical
Report and S-K 1300 Elk Creek Technical Report Summary, filed as Exhibit 96.1 to this Annual Report on Form 10-K, are based on
the 2022 Elk Creek Feasibility Study and are substantively identical to one another except for internal references to the regulations
under which the report is made, and certain organizational differences. In addition, S-K 1300 requires us to disclose our
mineral resources, in addition to our mineral reserves, as of the end of our most recently completed fiscal year. You are cautioned
that mineral resources are subject to further exploration and development and are subject to additional risks and no assurance
can be given that they will eventually convert to future reserves. Inferred resources, in particular, have a great amount of uncertainty
as to their existence and their economic and legal feasibility. Investors are cautioned not to assume that any part or all of
the inferred resource exists or is economically or legally mineable. See Item 1A, Risk Factors.
vii
Currency
and Exchange Rates
All
dollar amounts in this Annual Report on Form 10-K are expressed in U.S. dollars unless otherwise indicated. The Company’s
accounts are maintained in U.S. dollars and the Company’s financial statements are prepared in accordance with U.S. GAAP.
Some of the Company’s material agreements use Canadian dollars and the Company’s Common Shares, as traded on the TSX,
are traded in Canadian dollars. As used herein, “C$” represents Canadian dollars.
The
following table sets forth the rate of exchange for the Canadian dollar, expressed in U.S. dollars in effect at the end of the
periods indicated, the average of exchange rates in effect during such periods, and the high and low exchange rates during such
periods based on the daily rate of exchange as reported by the Bank of Canada for conversion of Canadian dollars into U.S. dollars.
Fiscal
Year Ended June 30,
2022
2021
2020
Canadian
Dollars to U.S. Dollars
Rate
at end of period
0.7760
0.8068
0.7338
Average
rate for period
0.7900
0.7807
0.7453
High
for period
0.8111
0.8306
0.7710
Low
for period
0.7669
0.7344
0.6898
viii
PART
I
ITEM 1. BUSINESS
Introduction
NioCorp
was incorporated under the laws of the Province of British Columbia under the Business Corporations Act (British Columbia) on
February 27, 1987, under the name “IPC International Prospector Corp.” On May 22, 1991, we changed our name to
“Kingston Resources Ltd.” On June 29, 2001, we changed our name to “Butler Developments Corp.” On February
12, 2009, we changed our name to “Butler Resource Corp.” On March 4, 2010, we changed our name to “Quantum
Rare Earth Developments Corp.” On March 4, 2013, we changed our name to “NioCorp Developments Ltd.”
NioCorp
is a reporting issuer in British Columbia, Alberta, Saskatchewan, Ontario, and New Brunswick. Our registered and records office
is located at 595 Burrard Street, Suite 2600, Vancouver, British Columbia V7X 1L3 (ATTN: Blake, Cassels & Graydon LLP). Our
principal executive office is located at 7000 South Yosemite Street, Suite 115, Centennial, Colorado 80112.
Historical
Development of the Business
During
2009 and 2010, the Company commenced mineral exploration activities in the Elk Creek, Nebraska area, including negotiations with
local landowners for land access agreements. The acquisition of the Elk Creek Property was closed in December 2010 and involved
the purchase of all of the issued and outstanding common shares of 0859404 BC Ltd., a private British Columbia company, which
in turn held 100% of the issued and outstanding shares of ECRC and was signatory to the option agreements covering the Elk Creek
Property area. A new Canadian company, 0886338 BC Ltd. was formed to merge with 0859404 BC Ltd., and this merged entity was subsequently
amalgamated into 0896800.
The
Company commenced a field exploration program in 2011, which included verification of previous work which was completed on the
Elk Creek Property in the 1970s and 1980s, re-assaying of historic drill core, an airborne geophysical survey and the completion
of five new diamond drillholes. The available data for the Elk Creek Property was compiled into an updated NI 43-101 resource
estimate for the Elk Creek Project, which was issued in April 2012. Additional drilling and NI 43-101 technical reports, including
resource updates and preliminary economic assessments, were completed and issued by the Company in 2014 and 2015.
During
fiscal years 2016 and 2017, the Company focused on feasibility study development, and on June 30, 2017, we announced the completion
of a NI 43-101 technical report for the Elk Creek Project (the “2017 NI 43-101 Elk Creek Technical Report”). In connection
with a review by the Ontario Securities and Exchange Commission, on December 15, 2017, the Company filed a revised 2017 NI 43-101
Elk Creek Technical Report. This revised report contained no changes to any previously reported numbers or forecasted economic
returns of the Elk Creek Project from those contained in the originally filed 2017 NI 43-101 Elk Creek Technical Report.
During
fiscal year 2019, we received a new mine design based on detailed underground engineering conducted by Nordmin. On April 16, 2019,
we announced the results of the updated underground mine design and supporting infrastructure, the results of an update to the
Elk Creek Project, and the 2019 NI 43-101 Elk Creek Technical Report based on the new mine design. During fiscal year 2020, the
Company focused efforts on advancing detailed engineering of the surface and underground facilities and negotiating the follow-on
contracts associated with the planned construction of the surface and underground features of the project, as well as obtaining
the Air Permit. The Air Permit required the completion of an air quality model that demonstrates compliance with the NAAQS. The
final Air Permit was issued by the State of Nebraska on June 2, 2020, for the Elk Creek Project.
During
fiscal year 2021, we obtained funding which allowed us to purchase land and mineral rights at the Elk Creek Property and continue
early project execution activities. With the acquisition of the land and mineral rights, the Company now owns the surface land
on which the Elk Creek Project’s mine infrastructure and supporting operations will be located once sufficient project financing
is obtained, along with ownership of the mineral rights to more than 90% of the Elk Creek Project’s mineral resources and
mineral reserves.
1
During
fiscal year 2022, we focused efforts towards refining our Elk Creek Project mineral resource and mineral reserve estimates. This
work included additional assays of historical drill core to fill data gaps in the existing resource database and re-modeling of
the Elk Creek Project to include REEs. Based on this re-interpretation of the geologic data, an update to the mine plan was also
completed. Accordingly of this work, we issued the 2022 NI 43-101 Elk Creek Technical Report on June 28, 2022. Finally, to comply
with the regulations under S-K 1300, we are filing the S-K 1300 Elk Creek Technical Report Summary as an exhibit to this Annual
Report on Form 10-K.
During fiscal
year 2022 we also advanced our efforts to optimize our process design to contemplate the recovery and production of REEs, including
completion of bench and pilot scale testing on elements of the current metallurgical flowsheet as well as illustrating that NioCorp
can recover and produce high purity, fully separated magnetic rare earth products, such as neodymium-praseodymium oxide, dysprosium
oxide, and terbium oxide in addition to the niobium, scandium, and titanium products already planned for production by the Company,
once Project financing is secured and additional work has been completed on the technical and economic feasibility of adding REEs
to the Elk Creek Projects’ existing planned product suite. Following the success of this testing, the Company advanced the
construction of a demonstration-scale test plant (the “Demonstration Plant”) located in Trois-Rivières, Quebec.
Construction of the Demonstration Plant encountered supply chain delays which negatively impacted our estimation of the completion
date; however, as of September 6, 2022, construction of the Demonstration Plant was substantially completed, and commissioning
has been initiated. The Demonstration Plant is expected to confirm the results of the bench and pilot scale testing noted above,
as well as provide updated recovery percentages for the niobium, scandium, titanium and REEs we intend to produce. The Demonstration
Plant results would then be used to finalize the design of the optimized production plant for the Elk Creek Project along with
demonstrating potential metallurgical recoveries for the prospective magnetic rare earth products.
Information
regarding the Elk Creek Project is discussed below under Item 2., “Properties.”
Emerging
Growth Company Status
Prior
to June 30, 2022, we qualified as an “emerging growth company” as defined in Section 101 of the United States Jumpstart
Our Business Startups Act of 2012. We lost our status as an emerging growth company as of June 30, 2022, and are now subject to
Section 14A(a) and (b) of the Exchange Act beginning with our fiscal year starting July 1, 2022. However, notwithstanding the
loss of our status as an emerging growth company, we will continue to be exempt from Section 404(b) of the Sarbanes-Oxley Act
of 2002 for so long as we are neither a “large accelerated filer” nor an “accelerated filer” as those
terms are defined in Rule 12b-2 under the Exchange Act.
Corporate
Structure
The
Company’s business operations are conducted primarily through ECRC. The table below provides an overview of the Company’s
current subsidiaries and their activities.
Name
State/Province
of Formation
Ownership
Business
0896800
B.C. Ltd.
British
Columbia
100%
by the Company
The
only business of 0896800 is to hold the shares of ECRC
Elk
Creek Resources Corp.
Nebraska
100%
by 0896800
The
business of ECRC is the development of the Elk Creek Project
Business
Operations
NioCorp
is a mineral exploration company engaged in the acquisition, exploration, and development of mineral properties. NioCorp, through
ECRC, is developing a superalloy materials project that, if and when developed, will produce niobium, scandium, and titanium products.
Known as the “Elk Creek Project,” it is located near Elk Creek, Nebraska, in the southeast portion of the state.
● Niobium
is used to produce various superalloys that are extensively used in high performance
aircraft and jet turbines. It also is used in HSLA steel, a stronger steel used in automobiles,
bridges, structural systems, buildings, pipelines, and other applications that generally
enables those applications to be stronger and lighter in mass. This “lightweighting”
benefit often results in environmental benefits, including reduced fuel consumption and
material usage, which can result in fewer air emissions.
2
● Scandium
can be combined with aluminum to make super-high-performance alloys with increased strength
and improved corrosion resistance. Scandium also is a critical component of advanced
solid oxide fuel cells, an environmentally preferred technology for high-reliability,
distributed electricity generation.
● Titanium
is a component of various superalloys and other applications that are used for aerospace
applications, weapons systems, protective armor, medical implants and many others. It
also is used in pigments for paper, paint, and plastics.
During
fiscal year 2022, the Company also advanced work on the determination of the economic potential of expanding its currently planned
product suite from the Elk Creek Project to include REEs.
Our
primary business strategy is to advance our Elk Creek Project to commercial production. We are focused on obtaining additional
funds to carry out our near-term planned work programs associated with securing the project financing necessary to complete mine
development and construction of the Elk Creek Project.
Competitive
Business Conditions
There
is aggressive competition within the minerals industry to discover and acquire mineral properties considered to have commercial
potential. We compete for the opportunity to participate in promising exploration projects with other entities. In addition, we
compete with others in efforts to obtain financing to acquire and explore mineral properties, acquire and utilize mineral exploration
equipment, and hire qualified mineral exploration personnel. We may compete with other mining companies for mining claims in regions
adjacent to our existing claims, or in other parts of the world should we dedicate resources to doing so in the future. These
companies may be better capitalized than us and we may have difficulty in expanding our holdings through the staking or acquisition
of additional mining claims or other mineral tenures.
In
competing for qualified mineral exploration personnel, we may be required to pay compensation or benefits relatively higher than
those paid in the past, and the availability of qualified personnel may be limited in high-demand mining periods, such as was
the case in past years when the price of gold and other metals was higher than it is now.
Cycles
The
mining business is subject to mineral price cycles. The marketability of minerals and mineral concentrates is also affected by
worldwide economic cycles. At the present time, strong demand for some minerals in many countries is lifting commodity prices,
although it is difficult to assess how long such trends may continue. Fluctuations in supply and demand in various regions throughout
the world are common.
The
following table sets forth commodity prices for the last five calendar years for the ferroniobium, scandium trioxide and titanium
dioxide products the Company anticipates extracting from its Elk Creek Project. These pricing surveys may not be representative
of the pricing that the Company anticipates achieving for its products once commercial production begins from its Elk Creek Project.
Year
Ferroniobium
U.S. Price ($/kg-Nb) ( 1)
Sc 2 O 3
U.S. Price ($/kg) ( 2)
TiO 2
U.S. Price ($/kg) ( 3)
2021
$44
$2,200
$1.50
2020
37
3,800
1.18
2019
39
3,900
1.13
2018
38
4,600
1.03
2017
37
4,600
0.74
(1) Source:
Argus Metal Prices, average annual ending price, 2021. Ferroniobium 65% niobium content,
FOB U.S. warehouse.
(2) Source:
USGS Mineral Commodity Summary, 2022. Sc 2 O 3 , 99.99% purity, 5-kilogram
(“kg”) lot size.
(3) Source:
USGS Mineral Commodity Summary, 2022. Rutile mineral concentrate, bulk, minimum 95% TiO 2 ,
f.o.b. Australia.
3
As
NioCorp is a development stage issuer and has not yet generated any revenue from the operation of the Elk Creek Project, it is
not currently significantly affected by changes in commodity demand and prices, except to the extent that same impact the availability
of capital for mineral exploration and development projects. As it does not carry on production activities, NioCorp’s ability
to fund ongoing exploration is affected by the availability of financing, which is, in turn, affected by the strength of the economy
and other general economic factors.
Economic
Dependence
Other
than land and mineral right option agreements and the offtake agreements, NioCorp’s business is not substantially dependent
on any contract such as a contract to sell the major part of its product or services or to purchase the major part of its requirements
for goods, services or its raw materials, or any franchise or license or other agreement to use a patent, formula, trade secret,
process or trade name upon which its business depends.
Government
Regulation
The
exploration and development of a mining prospect is subject to regulation by a number of federal and state government authorities.
These include the EPA and the USACE as well as the various state and local environmental protection agencies. The regulations
address many environmental issues relating to air, soil, and water contamination, and apply to many mining related activities
including exploration, mine construction, mineral extraction, ore milling, water use, waste disposal, and use of toxic substances.
In addition, we are subject to regulations relating to labor standards, occupational health and safety, mine safety, general land
use, export of minerals, and taxation. Many of the regulations require permits or licenses to be obtained, the absence of which
and/or inability to obtain such permits or licenses will adversely affect our ability to conduct our exploration, development,
and operation activities. The failure to comply with the regulations and terms of permits and licenses may result in fines or
other penalties or in revocation of a permit or license or loss of a prospect.
General
While
none of the lands on which the Elk Creek Project is proposed to be built are owned by the U.S. Government, mining rights are governed
by the General Mining Law of 1872, as amended, which allows for the location of mining claims on certain federal lands upon the
discovery of a valuable mineral deposit and compliance with location requirements. The exploration of mining properties and development
and operation of mines is governed by both federal and state laws. Federal laws that govern mining claim location and maintenance
and mining operations on federal lands are generally administered by the Bureau of Land Management. Additional federal laws, governing
mine safety and health, also apply. State laws also require various permits and approvals before exploration, development or production
operations can begin. Among other things, a reclamation plan must typically be prepared and approved, with financial assurance
provided in the amount of projected reclamation costs. The financial assurance is used to ensure that proper reclamation takes
place and will not be released until that time. Local jurisdictions may also impose permitting requirements, such as conditional
use permits or zoning approvals.
Environmental
Regulation
Our
mineral projects are subject to various federal, state and local laws and regulations governing protection of the environment.
These laws are continually changing and, in general, are becoming more restrictive. The development, operation, closure, and reclamation
of mining projects in the U.S. requires numerous notifications, permits, authorizations, and public agency decisions. Compliance
with environmental and related laws and regulations requires us to obtain permits issued by regulatory agencies and to file various
reports and keep records of our operations. Certain of these permits require periodic renewal or review of their conditions and
may be subject to a public review process during which opposition to our proposed operations may be encountered. We are currently
operating under various permits for activities connected to mineral exploration, reclamation, and environmental considerations.
Our policy is to conduct business in a way that safeguards public health and the environment. We believe that our operations are
conducted in material compliance with applicable laws and regulations.
Changes
to current local, state, or federal laws and regulations in the jurisdictions where we operate could require additional capital
expenditures and increased operating and/or reclamation costs. Although we are unable to predict what additional legislation,
if any, might be proposed or enacted, additional regulatory requirements could impact the economics of our projects.
4
Environmental
Regulation - U.S. Federal Laws
The
Comprehensive Environmental, Response, Compensation, and Liability Act (“CERCLA”), and comparable state statutes,
impose strict, joint, and several liability on current and former owners and operators of sites and on persons who disposed of
or arranged for the disposal of hazardous substances found at such sites. It is not uncommon for the government to file claims
requiring clean-up actions and/or demands for reimbursement for government-incurred clean-up costs or natural resource damages.
It is also not uncommon for neighboring landowners and other third parties to file claims for personal injury and property damage
allegedly caused by hazardous substances released into the environment. The Resource Conservation and Recovery Act (“RCRA”),
and comparable state statutes, govern the disposal of solid waste and hazardous waste and authorize the imposition of substantial
fines and penalties for noncompliance, as well as requirements for corrective actions. CERCLA, RCRA, and comparable state statutes
can impose liability for clean-up of sites and disposal of substances found on exploration, mining and processing sites long after
activities on such sites have been completed.
The
Clean Air Act, as amended (“CAA”), restricts the emission of air pollutants from many sources, including mining and
processing activities. Any future mining operations by the Company may produce air emissions, including fugitive dust and other
air pollutants from stationary equipment, storage facilities, and the use of mobile sources such as trucks and heavy construction
equipment, which are subject to review, monitoring and/or control requirements under the CAA and state air quality laws. New facilities
may be required to obtain permits before work can begin, and existing facilities may be required to incur capital costs in order
to remain in compliance. In addition, permitting rules may impose limitations on our production levels or result in additional
capital expenditures in order to comply with the rules.
The
National Environmental Policy Act (“NEPA”) requires federal agencies to integrate environmental considerations into
their decision-making processes by evaluating the environmental impacts of their proposed actions, including issuance of permits
to mining facilities and assessing alternatives to those actions. If a proposed action could significantly affect the environment,
the agency must prepare either a detailed statement known as an Environmental Impact Statement (“EIS”), or a less
detailed statement known as an Environmental Assessment (“EA”). The EPA, other federal agencies, and any interested
third parties can review and comment on the scope of the EIS or EA and the adequacy of any findings set forth in the draft and
final EIS or EA. This process can cause delays in issuance of required permits or result in changes to a project to mitigate its
potential environmental impacts, which can in turn impact the economic feasibility of a proposed project.
The
Clean Water Act (“CWA”), and comparable state statutes, impose restrictions and controls on the discharge of pollutants
into waters of the U.S. The discharge of pollutants into regulated waters is prohibited, except in accordance with the terms of
a permit issued by the EPA or an analogous state agency. The CWA regulates storm water from mining facilities and requires a storm
water discharge permit or Stormwater Pollution Prevention Plan for certain activities. Such a permit requires the regulated facility
to monitor and sample storm water run-off from its operations. The CWA and regulations implemented thereunder also prohibit discharges
of dredged and fill material in wetlands and other waters of the U.S. unless authorized by an appropriately issued permit. The
CWA and comparable state statutes provide for civil, criminal, and administrative penalties for unauthorized discharges of pollutants,
and impose liability on parties responsible for those discharges for the costs of cleaning up any environmental damage caused
by the release and for natural resource damages resulting from the release.
The
Safe Drinking Water Act (“SDWA”) and the Underground Injection Control (“UIC”) program promulgated thereunder,
regulate the drilling and operation of subsurface injection wells. The EPA directly administers the UIC program in some states
and in others the responsibility for the program has been delegated to the state. The program requires that a permit be obtained
before drilling a disposal or injection well. Violation of these regulations and/or contamination of groundwater by mining-related
activities may result in fines, penalties, and remediation costs, among other sanctions and liabilities under the SDWA and state
laws. In addition, third-party claims may be filed by landowners and other parties claiming damages for alternative water supplies,
property damages, and bodily injury.
Environmental
Regulation − Nebraska
Nebraska
has a well-developed set of environmental regulations and responsible agencies but does not have clearly defined regulations with
respect to permitting mines. As such, review of the project and the issuance of permits by Nebraska agencies and regulatory bodies
could potentially impact the total time to market for our Elk Creek Project. Other Nebraska regulations govern operating and design
standards for the construction and operation of any source of air emissions and landfill operations. Any changes to these laws
and regulations could have an adverse impact on our financial performance and results of operations by, for example, requiring
changes to operating conditions, technical criteria, fees, or surety requirements. The most stringent permit related to air quality
is known as a Prevention of Significant Deterioration (“PSD”) Permit, which requires the applicant to demonstrate
compliance with NAAQS and Best Available Control Technology (“BACT”) for the control of air emissions. If the facility
exceeds the potential to emit thresholds for such a permit and is thus subject to PSD requirements, permanent construction at
the project site may not begin until the responsible agency issues the PSD Permit. For facilities in Nebraska with potential emissions
below PSD thresholds, a state air construction permit is needed. The state permit also requires a demonstration of compliance
with NAAQS but does not require a BACT demonstration and further allows construction at a subject facility to proceed ahead of
permit issuance through an established variance process.
5
Human
Capital
The
Company’s ability to continue to progress the Elk Creek Project will depend on its ability to attract and retain individuals
with (among other skills) financial, administrative, engineering, geological and mining skills, and knowledge of our industry
and targeted markets. Much of the necessary specialized skills and knowledge required by the Company as a mineral exploration
company are available from the Company’s current management team and Board of Directors. The Company retains outside consultants
if additional specialized skills and knowledge are required.
As
of June 30, 2022, we had eight full-time employees as well as one contract employee. In addition, we use consultants with specific
skills to assist with various aspects of our corporate affairs, project evaluation, due diligence, corporate governance and property
management.
Our
compensation programs are designed to align compensation of our employees with the Company’s performance and to provide
the proper incentives to attract, retain and motivate employees to achieve superior results. The structure of our compensation
programs balances competitive wages and benefits and incentive earnings for both short-term and long-term performance.
Our
priority to maintain a culture of ethical performance as a core value is reflected in the Company’s Code of Conduct (as
defined below) and other related policies. Oversight is provided by the Company’s Board of Directors and, for specific areas
of performance, by committees of the Board of Directors. Employees are required to review the Code of Conduct on a periodic basis.
Our compensation programs also include consideration of ethical performance in determining incentive awards.
The
Company also provides a robust suite of benefits to our employees, including 401(k) participation, medical-insurance options,
and programs to encourage and support the whole person.
Forward-Looking
Statements
This
Annual Report on Form 10-K and the exhibits attached hereto contain “forward-looking statements” within the meaning
of Section 27A of the Securities Act of 1933, as amended (the “Securities Act”), and Section 21E of the Securities
Exchange Act of 1934, as amended (the “Exchange Act”), and “forward-looking information” within the meaning
of applicable Canadian securities legislation (collectively, “forward-looking statements”). Such forward-looking statements
concern our anticipated results and developments in the operations of the Company in future periods, planned exploration activities,
the adequacy of the Company’s financial resources, and other events or conditions that may occur in the future.
Forward-looking
statements have been based upon our current business and operating plans, as approved by the Company’s Board of Directors;
our cash and other funding requirements and timing and sources thereof; results of feasibility studies; the accuracy of mineral
resource and reserve estimates and assumptions on which they are based; the results of economic assessments and exploration activities;
and current market conditions and project development plans. The material assumptions used to develop the forward-looking statements
and forward-looking information included in this Annual Report on Form 10-K include: our expectations of mineral prices; our forecasts
and expected cash flows; our projected capital and operating costs; accuracy of mineral resource estimates and resource modeling
and feasibility study results; expectations regarding mining and metallurgical recoveries; timing and reliability of sampling
and assay data; anticipated political and social conditions; expected national and local government policies, including legal
reforms; successful advancement of the Company’s required permitting processes; and the ability to successfully raise additional
capital.
6
Forward-looking
statements are frequently, but not always, identified by words such as “expects,” “anticipates,” “believes,”
“intends,” “estimates,” “potential,” “possible,” and similar expressions, or statements
that events, conditions, or results “will,” “may,” “could,” or “should” (or the
negative and grammatical variations of any of these terms) occur or be achieved. Any statements that express or involve discussions
with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions, or future events or performance
(often, but not always, using words or phrases such as “expects” or “does not expect,” “is expected,”
“anticipates” or “does not anticipate,” “plans,” “estimates,” or “intends,”
or stating that certain actions, events, or results “may,” “could,” “would,” “might,”
or “will” be taken, occur or be achieved) are not statements of historical fact and may be forward-looking statements.
Such forward-looking statements reflect the Company’s current views with respect to future events and are subject to certain
known and unknown risks, uncertainties, and assumptions. Many factors could cause actual results, performance, or achievements
to be materially different from any future results, performance, or achievements that may be expressed or implied by such forward-looking
statements, including, among others, risks related to the following:
Risks
Related to Our Business:
●
risks
related to our ability to operate as a going concern;
●
risks
related to our requirement of significant additional capital;
●
risks
related to our limited operating history;
●
risks
related to our history of losses;
●
risks
related to cost increases for our exploration and, if warranted, development projects;
●
risks
related to a disruption in, or failure of, our information technology (“IT”) systems, including those related
to cybersecurity;
●
risks
related to equipment and supply shortages;
●
risks
related to current and future offtake agreements, joint ventures, and partnerships;
●
risks
related to our ability to attract qualified management;
●
risks
related to the effects of the COVID-19 pandemic or other global health crises on our business plans, financial condition and
liquidity; and
●
risks
related to the ability to enforce judgment against certain of our directors.
Risks
Related to Mining and Exploration:
●
risks
related to estimates of mineral resources and reserves;
●
risks
related to mineral exploration and production activities;
●
risks
related to our lack of mineral production from our properties;
●
risks
related to the results of our metallurgical testing;
●
risks
related to the price volatility of commodities;
●
risks
related to the establishment of a reserve and resource for REEs and the development of a viable recovery process for REEs;
●
risks
related to the estimation of mineral resources and mineral reserves;
●
risks
related to changes in mineral resource and reserve estimates;
●
risks
related to competition in the mining industry;
●
risks
related to the management of the water balance at our Elk Creek Project;
●
risks
related to claims on the title to our properties;
●
risks
related to potential future litigation; and
●
risks
related to our lack of insurance covering all our operations.
7
Risks
Related to Government Regulations:
●
risks
related to our ability to obtain or renew permits and licenses for production;
●
risks
related to government and environmental regulations that may increase our costs of doing business or restrict our operations;
●
risks
related to changes in federal and/or state laws that may significantly affect the mining industry;
●
risks
related to the impacts of climate change, as well as actions taken or required by governments related to strengthening resilience
in the face of potential impacts from climate change; and
●
risks
related to land reclamation requirements.
Risks
Related to Our Debt:
●
risks
related to covenants contained in agreements with our secured creditors that may affect our assets; and
●
risks
related to the extent to which our level of indebtedness may impair our ability to obtain additional financing.
Risks
Related to Our Common Shares:
●
risks
related to qualifying as a “passive foreign investment company” under the U.S. Internal Revenue Code of 1986,
as amended; and
●
risks
related to our Common Shares, including price volatility, lack of dividend payments, dilution and penny stock rules.
This
list is not exhaustive of the factors that may affect our forward-looking statements. Some of the important risks and uncertainties
that could affect forward-looking statements are described further under the Item 1A., – “Risk Factors,” below.
Should one or more of these risks or uncertainties materialize, or should underlying assumptions prove incorrect, actual results
may vary materially from those anticipated, believed, estimated, or expected. We caution readers not to place undue reliance on
any such forward-looking statements, which speak only as of the date made. We disclaim any obligation subsequently to revise any
forward-looking statements to reflect events or circumstances after the date of such statements or to reflect the occurrence of
anticipated or unanticipated events, except as required by law.
Available
Information
We
maintain a website at http://www.niocorp.com. Our Common Shares are currently registered under Section 12(g) of the Exchange Act,
and we are currently required to file reports on Forms 10-K, 10-Q or 8-K. Our Annual Report on Form 10-K (which includes our audited
financial statements), Quarterly Reports on Form 10-Q, Current Reports on Form 8-K and amendments to reports filed or furnished
pursuant to Sections 13(a) and 15(d) of the Exchange Act, are available on our website, free of charge, as soon as reasonably
practicable after we electronically file such reports with, or furnish those reports to, the SEC. The SEC maintains an internet
site that contains reports, proxy and information statements, and other information regarding issuers that file electronically
with the SEC (http://www.sec.gov). We do not intend to send security holders a printed version of our Annual Report as it will
be available online.
We
maintain a Code of Business Conduct and Ethics for Directors, Officers and Employees (“Code of Conduct”). A copy of
our Code of Conduct may be found on our website in the “About Us” section under the main title “Corporate Governance.”
Our Code of Conduct contains information regarding whistleblower procedures.
We
are not including the information contained on or accessible through our website or the SEC’s website as a part of, or incorporating
it by reference into, this Annual Report on Form 10-K.
8
ITEM
1A. RISK FACTORS
Our
business activities are subject to significant risks, including those described below. You should carefully consider these risks.
If any of the described risks actually occurs, our business, financial position and results of operations could be materially
adversely affected. Such risks are not the only ones we face, and additional risks and uncertainties not presently known to us
or that we currently deem immaterial may also affect our business. This report contains forward-looking statements that involve
risks and uncertainties. Our actual results could differ materially from those anticipated in the forward-looking statements as
a result of a number of factors, including the risks described below. See “Forward-Looking Statements” under Item
1., “Business.”
Risks
Related to Our Business
Our
ability to operate as a going concern is in doubt.
The
notes that accompany our financial statements for the year ended June 30, 2022, disclose that substantial doubt exists as to our
ability to continue as a going concern. The financial statements included in this Annual Report on Form 10-K have been prepared
under the assumption that we will continue as a going concern. We are a development stage issuer and we have incurred losses since
our inception.
We
currently have no historical recurring source of revenue and our ability to continue as a going concern is dependent on our ability
to raise capital to fund our future exploration and working capital requirements or our ability to profitably execute our business
plan. Our plans for the long-term return to and continuation as a going concern include financing our future operations through
sales of our Common Shares and/or debt and the potential profitable exploitation of our Elk Creek Project. Additionally, capital
markets and general economic conditions in the U.S. and Canada may impose significant obstacles to raising the required funds.
As discussed further below, while we have been successful in doing so in the past, there can be no assurance we will be able to
raise funds in the future. These factors raise substantial doubt about our ability to continue as a going concern.
We
will require significant additional capital to fund our business plan.
We
will be required to expend significant funds to develop our existing properties and to identify and acquire additional properties
to diversify our property portfolio. We anticipate that we will be required to make substantial capital expenditures for the development
of our Elk Creek Project.
As
of June 30, 2022, the Company had cash of $5.3 million and working capital of $2.0 million, compared to cash of $7.3 million and
working capital of $3.4 million on June 30, 2021.
As
of June 30, 2022, the Company’s current planned operational needs are approximately $9.5 million through the end of fiscal
2023. From the date of this Annual Report on Form 10-K, the Company anticipates that it does not have sufficient cash to continue
to fund basic operations for the next twelve months. This includes general overhead costs, expected costs relating to securing
financing necessary for the Elk Creek Project, satisfying outstanding accounts payable, and potential retirement of our short-term
debt obligations. Access to additional funds will be utilized to fund basic operations as well as to further advance the Elk Creek
Project through substantive near-term milestones.
We
are actively pursuing such additional sources of debt and equity financing, and while we have been successful in doing so in the
past, there can be no assurance we will be able to do so in the future.
Our
ability to obtain necessary funding for these purposes, in turn, depends upon a number of factors, including the status of the
national and worldwide economy and the price of the products we intend to produce. We may not be successful in obtaining the required
financing or, if we can obtain such financing, such financing may not be on terms that are favorable to us.
9
Our
inability to access sufficient capital for our operations could have a material adverse effect on our financial condition, results
of operations, or prospects. Sales of substantial amounts of securities may have a highly dilutive effect on our ownership or
share structure. Sales of a large number of Common Shares in the public markets, or the potential for such sales, could decrease
the trading price of the Common Shares and could impair our ability to raise capital through future sales of Common Shares. We
have not yet commenced commercial production at any of our properties and, as such, have not generated positive cash flows to
date and have no reasonable prospects of doing so unless successful commercial production can be achieved at our Elk Creek Project.
We expect to continue to incur negative investing and operating cash flows until such time as we enter into successful commercial
production. This will require us to deploy our working capital to fund such negative cash flow and to seek additional sources
of financing. There is no assurance that any such financing sources will be available or sufficient to meet our requirements.
There is no assurance that we will be able to continue to raise equity capital or to secure additional debt financing, or that
we will not continue to incur losses.
We
have a limited operating history on which to base an evaluation of our business and prospects.
Since
our inception, we have had no revenue from operations. We have no history of producing products from any of our properties. Our
Elk Creek Project is a development stage property. Advancing our Elk Creek Project from a development stage property to a production
stage property will require significant capital and time, and successful commercial production from the Elk Creek Property will
be subject to permitting and construction of the mine, processing plants, roads, and other related works and infrastructure. As
a result, we are subject to all of the risks associated with developing and establishing new mining operations and business enterprises
including:
● the
timing and cost, which can be considerable, of further exploration, preparing feasibility
studies, permitting, engineering and construction of infrastructure, mining, and processing
facilities;
● the
availability and costs of drilling equipment, exploration personnel, skilled labor, and
mining and processing equipment, if required;
● the
availability and cost of appropriate smelting and/or refining arrangements, if required;
● compliance
with environmental and other governmental approval and permit requirements;
● the
availability of funds to finance exploration, development, permitting, and construction
activities, as warranted;
● potential
opposition from non-governmental organizations, local groups, or local residents that
may delay or prevent development activities;
● potential
increases in exploration, construction, and operating costs due to changes in the cost
of fuel, power, materials, and supplies; and
● potential
shortages of mining, mineral processing, hydrometallurgical, pyrometallurgical, construction,
and other facilities-related supplies.
The
costs, timing, and complexities of exploration, development, engineering and construction activities may be increased by the location
of our properties and competition from other mineral exploration and mining companies. It is common for exploration companies
to experience unexpected problems and delays during development, if commenced, including engineering, procurement, construction,
commissioning and ramp-up. Accordingly, our activities may not result in profitable operations and we may not succeed in establishing
operations or profitably producing products at any of our current or future properties, including our Elk Creek Project.
We
have a history of losses and expect to continue to incur losses in the future.
We
have incurred losses since inception, have negative cash flow from operating activities, and expect to continue to incur losses
in the future. We incurred the following losses from operations during each of the following periods:
● $9,929
for the year ended June 30, 2022;
● $4,390
for the year ended June 30, 2021; and
● $4,001
for the year ended June 30, 2020.
We
expect to continue to incur losses unless and until such time as one of our properties enters into commercial production and generates
sufficient revenues to fund continuing operations. We recognize that if we are unable to generate significant revenues from operations
and dispositions of our properties, we will not be able to earn profits or continue operations. At this early stage of our operation,
we also expect to face the risks, uncertainties, expenses, and difficulties frequently encountered by companies at the start-up
stage of their business development. We cannot be sure that we will be successful in addressing these risks and uncertainties
and our failure to do so could have a materially adverse effect on our financial condition.
10
Increased
costs could affect our financial condition.
We
anticipate that costs at our projects that we may explore or develop will frequently be subject to variation from one year to
the next due to a number of factors, such as changing ore grade, metallurgical performance, and revisions to mine plans, if any,
in response to the physical shape and location of the ore body. In addition, costs are affected by the price of commodities such
as fuel, steel, aluminum, iron, chemicals, natural gas, fresh water, electricity, and government actions such as tariffs. Such
commodities are at times subject to volatile price movements, including increases that could make production at certain operations
less profitable or not profitable at all. A material increase in costs at any significant location could have a significant effect
on our profitability.
A
disruption in, or failure of our third-party service providers’ IT systems, including those related to cybersecurity, could
adversely affect our business operations and financial performance.
We
rely on the accuracy, capacity and security of our third-party service providers’ IT systems for the operations of many
of our business processes and to comply with regulatory, legal and tax requirements. We are dependent on third parties to provide
important IT services relating to, among other things, operational technology at our facilities, human resources, electronic communications
and certain finance functions. Despite the security measures that our third-party service providers have implemented, including
those related to cybersecurity, their systems could be breached or damaged by computer viruses, natural or man-made incidents
or disasters, or unauthorized physical or electronic access. Though our third-party service providers have controls in place,
we cannot provide assurance that a cyber-attack will not occur. Furthermore, we may have little or no oversight with respect to
security measures employed by third-party service providers, which may ultimately prove to be ineffective at countering threats.
Failures of our third-party service providers’ IT systems, whether caused maliciously or inadvertently, may result in the
disruption of our business processes, or in the unauthorized release of sensitive, confidential or otherwise protected information
or result in the corruption of data, which could adversely affect our business operations and financial performance. In addition,
we may be required to incur significant costs to protect against and, if required, remediate the damage caused by such disruptions
or system failures in the future.
A
shortage of equipment and supplies could adversely affect our ability to operate our business.
We
are dependent on various supplies and equipment to carry out our mining exploration and, if warranted, project development operations.
The shortage of such supplies, equipment, and parts could have a material adverse effect on our ability to carry out our operations
and could therefore limit, or increase the cost of, production. Ongoing disruptions to the world’s economy, including issues
related to supply chains and the COVID-19 pandemic, may delay our ability to secure supplies and equipment for the Elk Creek Project
on a timely basis
Joint
ventures and other partnerships, including offtake arrangements, may expose us to risks.
We
have entered into three offtake agreements and one letter of intent related to our Elk Creek Project as well as agreements related
to the supply of natural gas and electricity to the project site, and may enter into joint ventures or partnership arrangements,
including additional offtake agreements, with other parties in relation to the exploration, development, and production of certain
of the properties in which we have an interest. Any failure of such other companies to meet their obligations to us or to third
parties, or any disputes with respect to the parties’ respective rights and obligations, or price fluctuations and termination
provisions related to such agreements, could have a material adverse effect on us, the development and production at our properties,
including the Elk Creek Project, the joint ventures, if any, or their properties and therefore could have a material adverse effect
on our results of operations, financial performance, cash flows and the price of the Common Shares.
We
may experience difficulty attracting and retaining qualified management to meet the needs of our anticipated growth, and the failure
to manage our growth effectively could have a material adverse effect on our business and financial condition.
We
are dependent on a relatively small number of key employees, including our Chief Executive Officer. The loss of any officer could
have an adverse effect on us. We have no life insurance on any individual, and we may be unable to hire a suitable replacement
for them on favorable terms, should that become necessary.
11
The
effect on the capital markets and the economy of recent global events, including the COVID-19 pandemic, could have an adverse
effect on NioCorp’s business plans, financial condition and liquidity.
As
a result of the ongoing COVID-19 pandemic and the Russian invasion of Ukraine, certain events have affected the global and United
States economies, including increased inflation, supply chain issues, additional volatility in commodity prices, and uncertain
capital markets with declines in leading market indexes. In addition, in the U.S., the Federal Reserve has begun raising interest
rates sharply, the continuation of which could lead to a recession with uncertain and potentially severe impacts upon most operating
sectors. We cannot predict how this will affect our business, but the impact may be adverse.
Although
it is not possible to predict the ultimate impact of the COVID-19 pandemic, or other global health crises, on NioCorp’s
business plans, financial position or liquidity, such impacts that may be material include, but are not limited to: (i) inability
to obtain necessary licenses or permits due to impacts on the operations of local, state and federal regulatory agencies, (ii)
delays in the completion of the mine and surface engineering designs and uncertainty regarding our ability to finalize necessary
Engineering, Procurement, and Construction (“EPC”) agreements as a result of disruptions in the businesses of our
engineering consultants and key contractors for the Elk Creek Project, (iii) reduced availability and productivity of our employees,
(iv) increased operational risks as a result of remote work arrangements, including the potential effects on internal controls,
as well as cybersecurity risks and increased vulnerability to security breaches, information technology disruptions and other
similar events, (v) a negative impact on our liquidity position, and (vi) increased costs and less ability to access funds under
our existing credit facility and the capital markets. The full extent to which the COVID-19 pandemic, or other global health crises,
and our precautionary measures may continue to impact our business will depend on future developments, which continue to be highly
uncertain and cannot be predicted at this time.
In
addition, we cannot predict the impact that the COVID-19 pandemic, or other global health crises, will have on our customers,
suppliers, vendors, and other business partners, and each of their financial conditions; however, any material effect on these
parties could adversely impact us. The impact of the COVID-19 pandemic, or other global health crises, may also exacerbate other
risks discussed herein, any of which could have a material effect on us. This situation is changing rapidly, and additional impacts
may arise that we are not aware of currently.
It
may be difficult to enforce judgments or bring actions outside the U.S. against us and certain of our directors.
We
are a Canadian corporation and, as a result, it may be difficult or impossible for an investor to do the following:
● enforce
in courts outside the U.S. judgments obtained in U.S. courts based upon the civil liability
provisions of U.S. federal securities laws against these persons and the Company; or
● bring
in courts outside the U.S. an original action to enforce liabilities based upon U.S.
federal securities laws against these persons and the Company.
Risks
Related to Mining and Exploration
We
face numerous uncertainties in estimating our mineral reserves and resources and inaccuracies in our estimates could result in
lower than expected revenues, higher than expected costs and decreased profitability.
A
mineral is economically recoverable when the price at which we may sell the mineral exceeds the costs and expenses of mining and
selling the mineral. Forecasts of our future performance are based on, among other things, estimates of our mineral reserves.
We base our reserve and resource information on engineering, economic and geological data assembled and analyzed by qualified
persons, which include various engineers and geologists on our staff and of third parties. Our estimates are also subject to SEC
regulations regarding classification of reserves and resources, including S-K 1300. Our reserve and resource estimates as to both
quantity and quality are updated from time to time to reflect additional information received. There are numerous uncertainties
inherent in estimating quantities and qualities of mineral reserves and resources, including many factors beyond our control.
12
Estimates
of mineral reserves and resources necessarily depend upon a number of variable factors and assumptions, any one of which may,
if incorrect, result in an estimate that varies considerably from actual results. These factors and assumptions include, but are
not limited to:
● geologic
and mining conditions, which may not be fully identified by available exploration data
and may differ from our experience;
● demand
for the minerals that we plan to produce;
● current
and future market prices for minerals and contractual arrangements;
● current
and future operating costs and capital expenditures may exceed estimates, notwithstanding
that, under S-K 1300, operating cost and capital expenditure estimates in feasibility
studies must have an accuracy level of at least ±15% and a contingency range not
exceeding 10%;
● severance
and excise taxes, royalties and development and reclamation costs;
● future
mining technology improvements;
● the
effects of regulation by governmental agencies;
● the
ability to obtain, maintain and renew all required permits;
● employee
health and safety; and
● historical
production from the area compared with production from other producing areas.
The
conversion of reported mineral resources to mineral reserves should not be assumed, and the reclassification of reported mineral
resources from lower to higher levels of geological confidence should not be assumed. As such, actual mineral tonnage recovered
from identified reserves, and revenues and expenditures with respect to our reserves, may vary materially from estimates. Thus,
these estimates may not accurately reflect our actual reserves. Any material inaccuracy in our estimates related to our reserves
could result in lower than expected revenues, higher than expected costs or decreased profitability, which could materially and
adversely affect our business, results of operations, financial position and cash flows.
The
nature of mineral exploration and production activities involves a high degree of risk and the possibility of uninsured losses.
Exploration
for and the production of minerals is highly speculative and involves much greater risk than many other businesses. Most exploration
programs do not result in the discovery of mineralization, and any mineralization discovered may not be of sufficient quantity
or quality to be profitably mined. Our operations are, and any future development or mining operations we may conduct will be,
subject to all of the operating hazards and risks normally incident to exploring for and developing mineral properties, such as,
but not limited to:
● economically
insufficient mineralized material;
● fluctuation
in production costs that make production uneconomical;
● labor
disputes;
● unanticipated
variations in grade and other geologic problems;
● environmental
hazards;
● water
conditions;
● difficult
surface or underground conditions;
● industrial
accidents;
● metallurgical,
pyrometallurgical, and other processing problems;
● mechanical
and equipment performance problems;
● failure
of dams, stockpiles, wastewater transportation systems, or impoundments;
● unusual
or unexpected rock formations; and
● personal
injury, fire, flooding, cave-ins, and landslides.
Any
of these risks can materially and adversely affect, among other things, the development of properties, production quantities and
rates, costs and expenditures, potential revenues, and production dates. We currently have very limited insurance to guard against
some of these risks. If we determine that capitalized costs associated with any of our mineral interests are not likely to be
recovered, we would incur a write-down of our investment in these interests. All of these factors may result in losses in relation
to amounts spent that are not recoverable, or that result in additional expenses.
13
We
have no history of producing commercial products from our current mining properties and there can be no assurance that we will
successfully establish mining operations or profitably produce minerals.
We
have no history of producing commercial products from our current mining properties. We do not produce commercial products and
do not currently generate operating earnings. While we seek to move our Elk Creek Project from a development stage property to
a production stage property, such efforts will be subject to all of the risks associated with establishing new mining operations
and business enterprises, including:
● the
timing and cost, which are considerable, of the construction of mining and processing
facilities;
● the
availability and costs of skilled labor and equipment;
● compliance
with environmental and other governmental approval and permit requirements;
● the
availability of funds to finance construction and development activities;
● potential
opposition from non-governmental organizations, local groups, or local residents that
may delay or prevent development activities; and
● potential
increases in construction and operating costs due to changes in the cost and availability
of labor, fuel, power, materials, equipment and supplies, and the time elapsed since
the most recent estimates of cost and availability were made.
It
is common in new mining and processing operations to experience unexpected problems and delays during engineering, procurement,
construction, commissioning, and initial operations. In addition, our management and workforce will need to be expanded, and sufficient
housing and other support systems for our workforce will have to be established. This could result in delays in the commencement
of production and increased costs of production. Accordingly, we cannot assure you that our activities will result in profitable
operations or that we will successfully establish mining and processing operations.
Results
of metallurgical testing by us may not be favorable to, or as expected by, us.
We
have completed significant bench, mini-pilot, and pilot scale metallurgical testing on material from the Elk Creek Project and
will continue to complete necessary metallurgical testing at the bench, mini-pilot, and pilot scale as the exploration and, if
warranted, development of the Elk Creek Project progresses. There can be no assurance that the results of such metallurgical testing
will be favorable to, or will be as expected by, us. Furthermore, there can be no certainty that metallurgical recoveries obtained
in bench or pilot scale tests will be achieved in either subsequent testing or commercial operations. The development of a complete
metallurgical process to produce saleable final products from the Elk Creek Project is a complex and resource-intensive undertaking
that may result in overall schedule delays and increased project costs for us.
Price
volatility could have dramatic effects on our results of operations and our ability to execute our business plan.
The
price of commodities varies on a daily basis. Niobium is a specialty metal and not a commonly traded commodity such as copper,
zinc, gold, or iron ore. The price of niobium tends to be set through a limited long-term offtake market, contracted between very
few suppliers and purchasers. The world’s largest supplier of niobium, Companhia Brasileira de Metalurgia e Mineração,
supplies approximately 85% of the world’s niobium. Any attempt to suppress the price of niobium by such supplier, or an
increase in production by any supplier in excess of any increased demand, would have negative consequences on the price of niobium
and, potentially, on our value. The price of niobium may also be reduced by the discovery of new niobium deposits, which could
not only increase the overall supply of niobium (causing downward pressure on its price) but could draw new firms into the niobium
industry that would compete with us.
Sc 2 O 3
is used in solid oxide fuel cells and has the potential to become a valuable alloy with aluminum in the aerospace and automotive
industries. Supply of scandium has been sporadic in recent years, and there are no primary scandium mines in the world at present.
Production primarily occurs as a by-product from existing metallurgical plants, primarily in Russia, Canada, the Philippines,
and China. Our management believes the Elk Creek Project would significantly increase the world’s supply of scandium trioxide.
Although the Company’s market studies indicate a positive outlook for demand, there is no assurance at present that the
Company could sell all of its production. In addition, the sale of scandium represents a significant portion of the Elk Creek
Project revenue; achieving the revenue projected in the Company’s studies is subject to market growth in scandium, which
is a developing market with a risk of oversupply and/or undersupply disrupting pricing.
14
Titanium
metal is used in various superalloys and other applications for aerospace applications, armor, and medical implants, and in oxide
form is a key component of pigments used in paper, paint, and plastics. The Elk Creek Project would produce a small quantity of
titanium dioxide relative to other producers. As a small producer, we would be subject to fluctuations in the price of TiO 2
that would result from normal variations in supply and demand for this commodity.
We
may not be able to establish a viable recovery process for REEs.
The
market for rare earth products requires particular levels of purity and chemical form, which are achieved through the extraction
and separation of individual REEs from each other as well as from the other constituents in the rare earth ore. At present, the
Company has not completed the engineering or testing of a process for producing commercial rare earth products and has further
not declared a REE reserve estimate for the Elk Creek deposit. The completion of the work necessary to demonstrate an economically
feasible rare earth recovery system will require significant expenditures of cash and considerable time to complete. There is
no guarantee that the Company will be successful in demonstrating positive economics for a rare earth recovery system tied to
the Elk Creek Project, nor is there any guarantee that once constructed, the rare earth recovery system will operate as designed
and produce saleable commercial products.
Estimates
of resources and reserves are subject to evaluation uncertainties that could result in project failure.
Our
exploration and future mining operations, if any, are and would be faced with risks associated with being able to accurately predict
the quantity and quality of resources/reserves within the earth using statistical sampling techniques. Estimates of any resources/reserves
on any of our properties would be made using samples obtained from appropriately placed trenches, test pits, underground workings,
and intelligently designed drilling. There is an inherent variability of assays between check and duplicate samples taken adjacent
to each other and between sampling points that cannot be reasonably eliminated. Additionally, there also may be unknown geologic
details that have not been identified or correctly appreciated at the current level of accumulated knowledge about our properties.
This could result in uncertainties that cannot be reasonably eliminated from the process of estimating resources/reserves. If
these estimates were to prove to be unreliable, we could implement an exploitation plan that may not lead to commercially viable
operations in the future.
Any
material changes in mineral resource/reserve estimates and grades of mineralization will affect the economic viability of placing
a property into production and a property’s return on capital.
Mineral
resource/reserve estimates may require adjustments or downward revisions. In addition, the grade of ore ultimately mined, if any,
may differ from that indicated by our feasibility studies and drill results. Minerals recovered in small scale tests may not be
duplicated in large scale tests under on-site conditions or at commercial production scale.
The
resource and reserve estimates included in the S-K 1300 Elk Creek Technical Report Summary and contained in this Annual Report
on Form 10-K have been determined based on assumed future prices, cut-off grades, and operating costs that may prove to be inaccurate.
Extended declines in market prices for our products may render portions of our resource/reserve estimates uneconomic and may result
in reduced reported resources/reserves or may adversely affect any commercial viability determinations we may reach. Any material
reductions in estimates of resources/reserves could have a material adverse effect on our Common Share price and on the value
of our properties.
We
face intense competition in the mining industry.
The
mining industry is intensely competitive in all of its phases. As a result of this competition, some of which is with large established
mining companies with substantial capabilities and with greater financial and technical resources than ours, we may be unable
to acquire additional properties, if any, or financing on terms we consider acceptable. We also compete with other mining companies
in the recruitment and retention of qualified managerial and technical employees. If we are unable to successfully compete for
qualified employees, our exploration and development programs may be slowed down or suspended. We compete with other companies
that produce our planned commercial products for capital. If we are unable to raise sufficient capital, our exploration and development
programs may be jeopardized or we may not be able to acquire, develop, or operate additional mining projects.
15
Difficulties
in water balance management at our Elk Creek Project could negatively affect our potential production and economics at the project.
The
Company has conducted three field investigations and two major technical studies into the hydrogeology of the Elk Creek carbonatite,
which is the geologic formation which hosts the mineralized material that would be extracted by the Company’s mining operations.
The Company expects to encounter significant amounts of water in the carbonatite, which will need to be pumped out of the formation
to facilitate a mining operation. Water quality analyses have demonstrated that this water will have elevated temperature and
salt content when compared to other water resources in the area. While the Company has developed plans to treat water produced
from the mine for use in its operations, there is no guarantee that the permits needed for the treatment of the water or the disposal
of the resultant waste products will be issued by the State of Nebraska, nor is there any guarantee that such permits will be
issued in a timely fashion. Further, based on such plans, the operations will rely on a water treatment system to achieve zero
discharge of wastewater, and there is no guarantee that this system will function as designed or achieve nameplate treatment capacity.
Title
to our properties may be subject to other claims that could affect our property rights and claims.
There
are risks that title to our properties may be challenged or impugned. Our Elk Creek Project is located in Nebraska and may be
subject to prior unrecorded agreements or transfers or native land claims, and title may be affected by undetected defects. Our
current leases give us an option to purchase additional property, which, along with the property we already own, will allow us
to construct the Elk Creek Project once sufficient project financing is obtained. The rights of the current owners to sell the
property subject to these options may be subject to prior unrecorded or unknown claims to title. We have investigated our rights
to explore and exploit the Elk Creek Project resource/reserve and, to the best of our knowledge, our rights in relation to lands
covering the Elk Creek Project resource/reserve are in good standing. However, there may be valid challenges to the title of our
properties that, if successful, could impair development and/or operations. Further, our current land agreements, which are important
for operations, are of fixed duration and expire between December 2024 and May 2040.
Our
properties and operations may be subject to litigation or other claims.
From
time to time our properties or operations may be subject to disputes that may result in litigation or other legal claims. We may
be required to assert or defend against these claims, which will divert resources and management time from operations. The costs
of these claims or adverse filings may have a material effect on our business and results of operations.
We
do not currently insure against all the risks and hazards of mineral exploration, development, and mining operations.
Exploration,
development, mining, and surface operations involve various hazards, including environmental hazards, industrial accidents, metallurgical
and other processing problems, unusual or unexpected rock formations, structural cave-ins or slides, flooding, fires, and periodic
interruptions due to inclement or hazardous weather conditions. These risks could result in damage to or destruction of mineral
properties, facilities, or other property, personal injury, environmental damage, delays in operations, increased cost of operations,
monetary losses, and possible legal liability. We may not be able to obtain insurance to cover these risks at economically feasible
premiums or at all. We may elect not to insure where premium costs are disproportionate to our perception of the relevant risks.
The payment of such insurance premiums and of such liabilities would reduce the funds available for exploration and production
activities.
16
Risks
Related to Government Regulation
We
may not be able to obtain or renew all required permits and licenses to place any of our properties into production.
Our
current and future operations, including development activities and commencement of production, if warranted, on the Elk Creek
Project, require permits from governmental authorities and such operations are and will be governed by laws and regulations governing
prospecting, development, mining, production, exports, taxes, labor standards, occupational health, waste disposal, toxic substances,
land use, environmental protection, mine safety, and other matters. Companies engaged in mineral property exploration and the
development or operation of mines and related facilities generally experience increased costs, as well as delays in production
and other schedules as a result of the need to comply with applicable laws, regulations, and permits. We cannot predict if all
permits that we may require for continued exploration, development, or construction of mining facilities and conduct of mining
operations will be obtainable or renewable on reasonable terms, if at all. Costs related to applying for and obtaining permits
and licenses may be prohibitive and could delay our planned exploration and development activities. Failure to comply with applicable
laws, regulations, and permitting requirements may result in enforcement actions, including orders issued by regulatory or judicial
authorities causing operations to cease or be curtailed, and may include corrective measures requiring capital expenditures, installation
of additional equipment, or remedial actions.
Facilities
associated with the Elk Creek Project, such as the mine, surface plant, tailings facilities, stockpiles and supporting infrastructure,
are likely to either temporarily or permanently impact waterbodies and wetlands that are subject to regulation by the USACE as
Waters of the United States (“WOUS”). We believe that we have obtained the necessary USACE permits to construct the
project, but changes to the design or layout of the facility may trigger the USACE to require us to obtain and maintain additional
permits for the Elk Creek Project. The duration of this permitting exercise is dictated by the USACE and would need to be completed
before facilities that would impact WOUS could be constructed. We may experience delays or additional costs in relation to obtaining
the necessary permits and these delays and additional costs could negatively affect the economics of the Elk Creek Project and
our results of operations.
Parties
engaged in mining operations may be required to compensate those suffering loss or damage by reason of the mining activities and
may have civil or criminal fines or penalties imposed for violations of applicable laws or regulations. Amendments to current
laws, regulations, and permits governing operations and activities of mining companies, or more stringent implementation thereof,
could have a material adverse impact on our operations and cause increases in capital expenditures or production costs or reduction
in levels of production at producing properties or require abandonment or delays in development of new mining properties.
We
are subject to significant governmental regulations that affect our operations and costs of conducting our business.
Our
current and future operations, including exploration and, if warranted, development of the Elk Creek Project, are and will be
governed by laws and regulations, including:
● laws
and regulations governing mineral concession acquisition, prospecting, development, mining,
and production;
● laws
and regulations related to exports, taxes, and fees;
● labor
standards and regulations related to occupational health and mine safety; and
● environmental
standards and regulations related to waste disposal, toxic substances, land use reclamation,
and environmental protection.
Companies
engaged in exploration activities often experience increased costs and delays in production and other schedules as a result of
the need to comply with applicable laws, regulations, and permits. Failure to comply with applicable laws, regulations, and permits
may result in enforcement actions, including the forfeiture of mineral claims or other mineral tenures, orders issued by regulatory
or judicial authorities requiring operations to cease or be curtailed, and may include corrective measures requiring capital expenditures,
installation of additional equipment, or costly remedial actions. We may be required to compensate those suffering loss or damage
by reason of our mineral exploration activities and may have civil or criminal fines or penalties imposed for violations of such
laws, regulations, and permits.
17
Existing
and possible future laws, regulations, and permits governing operations and activities of exploration companies, or more stringent
implementation, could have a material adverse impact on our business and cause increases in capital expenditures or require abandonment
or delays in exploration. Our Elk Creek Project is located in Nebraska, and while the State does have a comprehensive and modern
set of environmental regulations, it does not have specific regulations with respect to permitting or reclaiming mines which could
potentially impact the total time to market for the project.
Our
activities are subject to environmental laws and regulations that may change, thereby increasing our costs of doing business and
restricting our operations.
All
phases of our operations are subject to environmental regulation in the jurisdictions in which we operate. Environmental legislation
is evolving in a manner that may require stricter standards and enforcement, increased fines and penalties for non-compliance,
more stringent environmental assessments of proposed projects, and a heightened degree of responsibility for companies and their
officers, directors, and employees. These laws address emissions into the air, discharges into water, management of waste, management
of hazardous substances, protection of natural resources, antiquities and endangered species, and reclamation of lands disturbed
by mining operations. Compliance with environmental laws and regulations, and future changes in these laws and regulations, may
require significant capital outlays and may cause material changes or delays in our operations and future activities. It is possible
that future changes in these laws or regulations could have a significant adverse impact on our properties or some portion of
our business, causing us to re-evaluate those activities at that time.
Regulations
and pending legislation governing issues involving climate change could result in increased operating costs, which could have
a material adverse effect on our business.
A
number of governments or governmental bodies have introduced or are contemplating legislative and/or regulatory changes in response
to concerns about the potential impact of climate change. Legislation and increased regulation regarding climate change could
impose significant costs on us, on our future venture partners, if any, and on our suppliers, including costs related to increased
energy requirements, capital equipment, environmental monitoring and reporting, and other costs necessary to comply with such
regulations. Any adopted future climate change regulations could also negatively impact our ability to compete with companies
situated in areas not subject to such limitations. Given the emotion, political significance, and uncertainty surrounding the
impact of climate change and how it should be dealt with, we cannot predict how legislation and regulation will affect our financial
condition, operating performance, and ability to compete. Furthermore, even without such regulation, increased awareness and any
adverse publicity in the global marketplace about potential impacts on climate change by us or other companies in our industry
could harm our reputation. The potential physical impacts of climate change on our operations are highly uncertain and could be
particular to the geographic circumstances in areas in which we operate and may include changes in rainfall and storm patterns
and intensities, water shortages, changing sea levels, and changing temperatures. These impacts may adversely impact the cost,
production, and financial performance of our operations.
Land
reclamation requirements for our properties may be burdensome and expensive.
Although
variable depending on location and the governing authority, land reclamation requirements are generally imposed on mineral exploration
companies (as well as companies with mining operations) in order to minimize long-term effects of land disturbance.
Reclamation
may include requirements to:
● control
dispersion of potentially deleterious effluents;
● treat
ground and surface water to achieve water quality standards; and
● reasonably
re-establish pre-disturbance landforms and vegetation.
In
order to carry out reclamation obligations imposed on us in connection with our potential development activities, we must allocate
financial resources that might otherwise be spent on further exploration and development programs. We plan to set up a provision
for our reclamation obligations on our properties, as appropriate, but this provision may not be adequate. If we are required
to carry out unanticipated reclamation work, our financial position could be adversely affected.
18
Risks
Related to Our Debt
In
the event of certain breaches with our Secured Creditors, our assets may be affected.
We
have, in connection with the Smith Credit Agreement, granted security interests to Mark Smith (the “Secured Creditor”)
over all of the assets of the Company in consideration of the debt facilities provided by the Secured Creditor. In the event of
certain breaches of the terms of the Smith Credit Agreement, the Secured Creditor may be entitled to execute on its security interest
and seize or retain our assets, including the shares of 0896800 and ECRC, as well as any assets of either subsidiary. Certain
rights of the Secured Creditor to execute on its security interests are subject to notice and cure provisions in respect of default
by us; however, any such exercise could materially damage our value and our ability to retain or progress development of the Elk
Creek Project.
The
level of our indebtedness from time to time could impair our ability to obtain additional financing.
From
time to time, we may enter into transactions to acquire assets or the shares of other companies or to fund development of the
Elk Creek Project. These transactions may be financed partially or wholly with debt, which may increase our debt levels above
industry standards. Our articles of incorporation do not limit the amount of indebtedness that we may incur. Our indebtedness
could impair our ability to obtain additional financing in the future on a timely basis to take advantage of business opportunities
that may arise. Our ability to service our debt obligations will depend on our future operations, which are subject to prevailing
industry conditions and other factors, many of which are beyond our control.
Risks
Related to the Common Shares
We
believe that we may be a “passive foreign investment company” for the current taxable year and for one or more future
taxable years, which may result in materially adverse U.S. federal income tax consequences for U.S. investors.
We
generally will be designated as a “passive foreign investment company” under the meaning of Section 1297 of the U.S.
Internal Revenue Code of 1986, as amended (a “PFIC”) if, for a tax year, (a) 75% or more of our gross income for such
year is “passive income” (generally, dividends, interest, rents, royalties, and gains from the disposition of assets
producing passive income) or (b) at least 50% or more of the value of our assets produce, or are held for the production of, passive
income, based on the quarterly average of the fair market value of such assets. U.S. shareholders should be aware that we believe
we were classified as a PFIC during our tax years ended June 30, 2022 and 2021 and based on current business plans and financial
expectations, believe that we may be a PFIC for the current and one or more future taxable years. If we are a PFIC for any taxable
year during a U.S. shareholder’s holding period, then such U.S. shareholder generally will be required to treat any gain
realized upon a disposition of Common Shares or warrants, or any “excess distribution” received on its Common Shares,
as ordinary income, and to pay an interest charge on a portion of such gain or distribution. These consequences will be mitigated
with respect to the Common Shares, but not the warrants, if the shareholder makes a timely and effective “qualified electing
fund” or “QEF” election or a “mark-to-market” election with respect to the Common Shares. A U.S.
shareholder who makes a QEF election generally must include in income on a current basis for U.S. federal income tax purposes
its share of our net capital gain and ordinary earnings for any taxable year in which we are a PFIC, whether or not we distribute
any amount to our shareholders. A U.S. shareholder who makes a mark-to-market election generally must include as ordinary income
each year the excess of the fair market value of the Common Shares over the taxpayer’s basis therein. Each U.S. shareholder
should consult its own tax advisors regarding the PFIC rules and the U.S. federal income tax consequences of the acquisition,
ownership, and disposition of Common Shares and warrants.
Our
Common Share price may be volatile and as a result you could lose all or part of your investment.
In
addition to volatility associated with equity securities in general, the value of your investment could decline due to the impact
of any of the following factors upon the market price of the Common Shares:
● disappointing results from our exploration and/or, if warranted, project development efforts;
● decline in demand for Common Shares;
● downward
revisions in securities analysts’ estimates or changes in general market conditions;
● technological
innovations by competitors or in competing technologies;
19
● investor
perception of our industry or our prospects; and
● general
economic trends.
In
the past fiscal year, the trading price of our stock on the TSX has ranged from a low of C$0.76 to a high of C$1.75. In addition,
stock markets in general have experienced extreme price and volume fluctuations, and the market prices of securities have been
highly volatile. These fluctuations are often unrelated to operating performance and may adversely affect the market price of
the Common Shares. As a result, you may be unable to sell any Common Shares you acquire at a desired price.
We
have never paid dividends on the Common Shares.
We
have not paid dividends on the Common Shares to date, and we may not be in a position to pay dividends for the foreseeable future.
Our ability to pay dividends with respect to the Common Shares will depend on our ability to successfully develop one or more
properties and generate earnings from operations. Further, our initial earnings, if any, will likely be retained to finance our
operations. Any future dividends on Common Shares will depend upon our earnings, our then-existing financial requirements, and
other factors, and will be at the discretion of our Board of Directors.
Investors’
interests in the Company will be diluted and investors may suffer dilution in their net book value per Common Share if we issue
additional employee/Director/consultant options or if we sell additional Common Shares to finance our operations.
In
order to further expand the Company’s operations and meet our objectives, any additional growth and/or expanded exploration
activity will likely need to be financed through sale of and issuance of additional Common Shares, including, but not limited
to, raising funds to explore the Elk Creek Project. Furthermore, to finance any acquisition activity, should that activity be
properly approved, and depending on the outcome of our exploration programs, we likely will also need to issue additional Common
Shares to finance future acquisitions, growth, and/or additional exploration programs of any or all of our projects or to acquire
additional properties. We will also in the future grant to some or all of our directors, officers, and key employees and/or consultants,
options to purchase Common Shares as non-cash incentives. The issuance of any equity securities could, and the issuance of any
additional Common Shares will, cause our existing shareholders to experience dilution of their ownership interests.
If
we issue additional Common Shares or decide to enter into joint ventures with other parties in order to raise financing through
the sale of equity securities, investors’ interests in the Company will be diluted and investors may suffer dilution in
their net book value per Common Share depending on the price at which such securities are sold.
We
are subject to the continued listing criteria of the TSX and our failure to satisfy these criteria may result in delisting of
the Common Shares.
The
Common Shares are currently listed on the TSX. In order to maintain the listing, we must maintain certain financial and share
distribution targets, including maintaining a minimum number of public shareholders. In addition to objective standards, the TSX
may delist the securities of any issuer if, in the TSX’s opinion, the issuer’s financial condition and/or operating
results appear unsatisfactory; if it appears that the extent of public distribution or the aggregate market value of the security
has become so reduced as to make continued listing on the TSX inadvisable; if the issuer sells or disposes of principal operating
assets or ceases to be an operating company; if an issuer fails to comply with the listing requirements of the TSX; or if any
other event occurs or any condition exists which makes continued listing on the TSX, in the opinion of the TSX, inadvisable.
If
the TSX delists the Common Shares, investors may face material adverse consequences, including, but not limited to, a lack of
a trading market for the Common Shares, reduced liquidity, decreased analyst coverage of the Company, and an inability for us
to obtain additional financing to fund our operations.
The
issuance of additional Common Shares may negatively impact the trading price of our securities.
We
have issued Common Shares in the past and will continue to issue Common Shares to finance our activities in the future. In addition,
outstanding options, warrants, and broker warrants to purchase Common Shares may be exercised, resulting in the issuance of additional
Common Shares. The issuance by us of additional Common Shares would result in dilution to our shareholders, and even the perception
that such an issuance may occur could have a negative impact on the trading price of the Common Shares.
20
Broker-dealers
may be discouraged from effecting transactions in Common Shares because they are considered a penny stock and are subject to the
penny stock rules.
Our
Common Shares are currently considered a “penny stock.” The SEC has adopted Rule 15g-9 which generally defines “penny
stock” to be any equity security that has a market price (as defined) less than $5.00 per share or an exercise price of
less than $5.00 per share, subject to certain exceptions. The Common Shares are covered by the penny stock rules, which impose
additional sales practice requirements on broker-dealers who sell to persons other than established customers and “accredited
investors.” The term “accredited investor” refers generally to institutions with assets in excess of $5.0 million
or individuals with a net worth in excess of $1.0 million or annual income exceeding $200 or $300, jointly with their spouse.
The penny stock rules require a broker-dealer, prior to a transaction in a penny stock not otherwise exempt from the rules, to
deliver a standardized risk disclosure document in a form prepared by the SEC, which provides information about penny stocks and
the nature and level of risks in the penny stock market. The broker-dealer also must provide the customer with current bid and
offer quotations for the penny stock, the compensation of the broker-dealer and its salesperson in the transaction, and monthly
account statements showing the market value of each penny stock held in the customer’s account. The bid and offer quotations,
and the broker-dealer and salesperson compensation information, must be given to the customer orally or in writing prior to effecting
the transaction and must be given to the customer in writing before or with the customer’s confirmation. In addition, the
penny stock rules require that prior to a transaction in a penny stock not otherwise exempt from these rules, the broker-dealer
must make a special written determination that the penny stock is a suitable investment for the purchaser and receive the purchaser’s
written agreement to the transaction. These disclosure requirements may have the effect of reducing the level of trading activity
in the secondary market for the Common Shares. Consequently, these penny stock rules may affect the ability of broker-dealers
to trade in the Common Shares.
ITEM
1B. UNRESOLVED
STAFF COMMENTS
None.
21
ITEM 2. PROPERTIES
Elk
Creek Project, Nebraska
Our
principal mineral property is the Elk Creek Property, a niobium, scandium and titanium development stage property. The Elk Creek
Project has established indicated and inferred resources along with probable reserves and the Company has completed a feasibility
study for the project. The below information is in part summarized or extracted from our S-K 1300 Elk Creek Technical Report Summary,
which is filed as Exhibit 96.1 to this Annual Report on Form 10-K. The Company does not have any other material properties.
The qualified
persons responsible for preparing the S-K 1300 Elk Creek Technical Report Summary are Dahrouge Geological Consulting USA Ltd.;
Understood Mineral Resources Ltd.; Optimize Group; Tetra Tech; Adrian Brown Consultants Inc.; Metallurgy Concept Solutions; Magemi
Mining Inc.; L3 Process Development; A2GC; Scott Honan, M.Sc, SME-RM, NioCorp; Everett Bird, P.E., Cementation; Matt Hales, P.E., Cementation; Mahmood Khwaja, P.E., CDM Smith; Martin Lepage, P.Eng, Ing., Cementation; and Wynand
Marx, M.Eng, BBE Consulting. A matrix of the sections for which each qualified person is responsible is included in the S-K 1300
Elk Creek Technical Report Summary. Except for Scott Honan, none of the qualified persons is affiliated with the Company. Mr. Honan
is the Chief Operating Officer of the Company.
Property
Description and Location
The
Elk Creek Property is a carbonatite deposit located in Johnson County, southeast Nebraska, USA. The carbonatite contains elements
of economic significance, including niobium, titanium, and scandium, as well as potential economic significance for rare earth
products. The Elk Creek Property is situated as shown below and is located within the USGS Tecumseh Quadrangle Nebraska SE (7.5
minute series) mapsheet in Sections 1-6, 9-11; Township 3N; Range 11E and Sections 19-23, 25-36; Township 4N, Range 11E, at approximately
40°16’ north and 96°11’ west in the State of Nebraska, in central USA. The Elk Creek Property is approximately
45 miles southeast of Lincoln, Nebraska, the state capital of Nebraska.
22
Title
and Ownership
Land
in the project area is exclusively owned by private entities, and there is no federal or state land in the project area. The Company
has secured its rights to the project area by purchasing land from private landowners or by entering into agreements with the
landowners as described below.
The
Company currently owns one 226.43-acre parcel of land and associated mineral rights, and an additional 40 acres of mineral rights,
within the carbonatite footprint. The Elk Creek Project’s mine infrastructure and a portion of the supporting operations
is planned to be located on this land parcel. Ownership of the mineral rights discussed above includes a 2% NSR royalty and grants
us access to more than 90% of the Elk Creek Project’s mineral resources and mineral reserves.
As
of June 30, 2022, the total book value of the Elk Creek Property and associated buildings and equipment was $16.9 million.
The
Company also holds eight OTPs that are associated with the Elk Creek Project and one perpetual easement of a land parcel along
the Missouri River. The current optioned land package covers an area of 1,396 acres and is reflective of the land needed to secure
the remaining mineral resources and mineral reserves held under the OTPs along with the land needed for the development and operations
of the Elk Creek Project for its proposed 38-year operating life.
In
general, exercise of an OTP is accomplished by paying the greater of a fixed amount per acre or a multiple of the appraised value
at the time of purchase. If the land is not purchased by the Company during the term of the OTP and the land in question is needed
for the project, the Company will negotiate a new OTP with the landowner. The OTP is accompanied by a negotiated payment to the
landowner that is paid upon execution of the OTP by the Company and the landowner. As of June 30, 2022, the Company is obligated
to make payments totalling approximately $61 over the next 13 years to maintain our rights under these OTPs. Details on the current
OTPs held by the Company are shown in the table below.
Active
Lease Agreements (OTP’s) Covering the Elk Creek Project as of September 2022
Agreement
Identifier
Hectares
Acres
Agreement
Expiry
Beethe007
66.27
163.75
20-Jan-26
Heidemann005
79.55
196.57
16-Mar-25
Nielsen001
100.90
249.32
25-Jun-25
Nielsen002
11.91
29.43
25-Jun-25
Woltemath80S
32.37
80.00
4-Dec-24
Woltemath002
152.49
376.81
4-Dec-24
Woltemath003J
89.03
220.00
25-Mar-25
Shuey001
32.37
80.00
27-May-40
The
OTPs are between NioCorp’s wholly owned subsidiary ECRC and the individual landowners. Land subject to the OTP agreements
is currently used for agricultural purposes, including growing row crops (corn and soybeans) and pasturing livestock. The land
owned by ECRC houses the company drill core and geological sample repository in two steel core shed buildings and the company
maintains a cover crop (sorghum and rye) on portions of the property that were formerly used for growing row crops. The former
landowner maintains a residence and several outbuildings on the property subject to a life estate that accompanied the purchase
of the property by the Company in fiscal year 2021.
The
agreements that involve mineral rights include a 2% NSR royalty attached with the OTP. The OTPs grant the Company an exclusive
right to explore and evaluate the property for the term thereof, with an option to purchase the surface rights or a combination
of the mineral and surface rights at any time during the term. As the Woltemath80S agreement is limited to an option to purchase
the surface rights only, it does not contain an NSR provision.
23
Land
Tenure Map as of September 2022
The
current estimated mineral resource and reserve is wholly contained within land owned by the Company and parcel Woltemath003J.
The Company considers these two properties to be the only properties on which the Company’s development of the Elk Creek
Project is substantially dependent.
As
part of the OTPs, where required, the Company has also secured surface rights, which allow for access to the land for drilling
activities and associated mineral exploration and project development work.
Accessibility,
Physiography, Climate and Infrastructure
The
Elk Creek Property is easily accessible year-round as it is situated approximately 45 miles southeast of Lincoln, Nebraska, the
state capital, and approximately 68 miles south of Omaha, Nebraska. Access to the site can be completed via road or from one of
the regional airports. There are several regular flights to both Lincoln and Omaha; however, the Elk Creek Property is most easily
accessible from Lincoln. From Lincoln Municipal Airport, the Elk Creek Property is accessed via paved roads on the main network
and a secondary network of gravel roads. The drive from the Lincoln Municipal Airport to the property is typically 1 hour and
15 minutes, and from Omaha’s Eppley Airport, the drive is approximately 1 hour and 45 minutes.
The
Elk Creek Property is immediately adjacent to paved Nebraska state highway 50, and the mineral resource and mineral reserve are
centered in Township 4N, Range 11E, Section 33. This section is immediately southwest of the junction of Nebraska state highways
50 and 62. Rail access is available in the town of Elk Creek, which is located 3 miles east of the project area. Water is available
at the project site from a well, as well as from Elk Creek, which crosses Section 33. Water is also available from the Johnson
County Rural Water system, which has distribution infrastructure on the north side of the Section 33 and from the Pawnee County
Rural Water system, which has distribution infrastructure on the south side of Section 33. Electricity is provided at the Company’s
Core Storage sheds located on the west side of Section 33 on land owned by the Company from the Omaha Public Power District (“OPPD”).
Personnel are available from the local surrounding towns, including Elk Creek (3 miles east), Tecumseh (6 miles north), Steinauer
(5 miles south), Pawnee City (10 miles south) and Syracuse (20 miles north). Due to the project’s location in Nebraska,
there are no ports nearby.
24
Southeast
Nebraska is situated in a Humid Continental Climate (Dfa) on the Köppen climate classification system. In eastern Nebraska,
this climate is generally characterized by hot humid summers and cold winters. Average winter temperatures vary between 13°F
to 35°F. Average summer temperatures vary between 64°F to 90°F. Exploration, construction and operational activities
may be conducted all year round.
Average
monthly precipitation (rain and snowfall) varies between 0.9 and 5.0 inches. Average yearly precipitation is between 31 and 33
inches with an average yearly snowfall of approximately 28 inches. Nebraska is located within an area known for tornadoes which
runs through the central U.S. where thunderstorms are common in the spring and summer months. Tornadoes primarily occur during
the spring and summer and may occur into the autumn months.
There
are several local communities near the Elk Creek Property, including Elk Creek and Tecumseh, that will provide local housing for
the Elk Creek Project. There are a number of other communities within driving distance and the large cities of Lincoln and Omaha
are within reasonable driving distance. Mining activities currently taking place in the area are limited to limestone and aggregate
operations to support the local cement manufacturing and construction industries.
The
Elk Creek Project is expected to incorporate surface and underground infrastructure, as well as tailings storage facilities. The
offsite infrastructure is expected to include a new high voltage transmission line constructed by the local utility company and
providing power to an on-site primary sub-station and a natural gas pipeline built by the owner of the interstate pipeline. Water
used for all on-site process needs and activities will be supplied from mine dewatering activities, local groundwater wells and
from a local water utility. See “— 2022 Elk Creek Feasibility Study ” below for additional information
regarding proposed infrastructure related to the Elk Creek Project.
The
local topography of eastern Nebraska is relatively low-relief with shallow rolling hills intersected by shallow river valleys.
Elevation varies from about 1,066 to 1,280 ft above sea level. Bedrock outcrop exposure is nonexistent in the Elk Creek Project
area.
The
majority of the area around the Elk Creek Project is used for cultivation of corn and soybeans, along with uses as grazing land.
Native vegetation typical of eastern Nebraska is upland tall-grass, prairie and upland deciduous forests.
Geology
and Mineralization
Geology
The
Elk Creek Property includes a Carbonatite that has intruded older Precambrian granitic and low- to medium-grade metamorphic basement
rocks. The Carbonatite is an elliptical magmatic body with a northwest-trending long axis perpendicular to the strike of the 1.1
billion years ago Midcontinent Rift System, near the northern part of the Nemaha uplift. The Carbonatite consists predominantly
of dolomite, calcite and ankerite, with lesser chlorite, barite, phlogopite, pyrochlore, serpentine, fluorite, sulfides and quartz.
It is, however, believed from stratigraphic reconstruction based on drill core observation in the area that the carbonatite is
unconformably overlain by approximately 200 m of essentially flat-lying Palaeozoic marine sedimentary rocks, including carbonates,
sandstones and shales of Pennsylvanian age.
Mineralization
The
property hosts niobium, titanium, and scandium mineralization as well as REEs and barium mineralization that occurs within the
Elk Creek Carbonatite. The current known extents of the Carbonatite unit are approximately 950 m along strike, 300 m wide, and
750 m in dip extent, below the unconformity. Niobium, titanium and scandium are considered the main elements of interest.
The
deposit contains significant concentrations of niobium. Based on the metallurgical testwork completed to date at a number of laboratories
using QEMSCAN® analysis, the niobium mineralization is known to be fine grained, and that 77% of the niobium occurs in the
mineral pyrochlore, while the balance occurs in an iron-titanium-niobium oxide mineral of varying composition.
25
Within
the Elk Creek Carbonatite, a host of other elements exist with varying degrees of concentration. The Company has completed both
whole rock analysis and multi-element analysis on all samples for the 2014 drilling program, described below, plus resampling
of selected historical core/pulps between 2011 and 2014.
Historical
Exploration
Drilling
at the Elk Creek Property was conducted in three phases. The first was during the 1970’s and 1980’s by the Molybdenum
Company of America (“Molycorp”), the second in 2011 by Quantum Rare Earth Developments Corp (“Quantum”
- NioCorp under its former name), and the third and latest program from 2014 to 2016 by NioCorp. To date, 129 diamond core holes
have been completed for a total of 64,981 m over the entire geological complex. Of these, a total of 48 holes (33,909 m) have
been completed to date in the mineralized area and are used in the current mineral resource and reserve estimates. Five additional
holes, with a total length of 3,353.1 m, were drilled for hydrogeologic and geotechnical purposes in 2015. No sampling has been
completed of these five holes to date and therefore they have not been considered for the mineral resource or reserve estimates.
All
drilling has been completed using a combination of Tricone, Reverse Circulation (“RC”) or Diamond Drilling (“DDH”)
in the upper portion of the hole within the Pennsylvanian sediments. All drilling within the underlying Carbonatite has been completed
using DDH methods.
Summary
of Drilling Database within Elk Creek Deposit Area
Year
Company
Number
of Holes
Average Depth
(m)
Sum Length
(m)
1970-1980
Molycorp
27
596.6
16,108.2
2011
Quantum
3
772.6
2,317.7
2014-2015
NioCorp
18
845.4
15,482.8
Total
48
700.9
33,908.7
Molycorp,
1973-1986
Between
1973 and 1974, Molycorp completed six drillholes: EC-1 to EC-4, targeting the Elk Creek anomaly, and two other holes outside the
Elk Creek anomaly area. Drillholes were typically carried out by RC drilling through the overlying sedimentary rocks and diamond
drilling through the Ordovician-Cambrian basement rocks.
Molycorp
continued their drill program from 1977 and, in May 1978, Molycorp made its discovery of the current mineral resource with drillhole
EC-11. EC-11 is located on Section 33, Township 4N, and Range 11. The Carbonatite hosting the Elk Creek Project was intersected
at a vertical depth of 203.61 m (668 ft).
Molycorp
continued its drilling program through to 1984, which mainly centered on the Elk Creek Project within a radius of roughly 2 km.
By 1984, Molycorp had completed 57 drillholes within the Elk Creek gravity anomaly area, which included 25 drillholes over the
Elk Creek Project area.
From
1984 to 1986, drilling was focused on the Elk Creek gravity anomaly area. The anomaly area is roughly 7 km in diameter and drilling
was conducted on a grid pattern of approximately 610 m by 610 m (roughly 2,000 ft by 2,000 ft) with some closer spaced drillholes
in selected areas.
By
1986, a total of 106 drillholes were completed for a total of approximately 46,797 m (153,532 ft). The deepest hole reached a
depth of 1,038 m (3,406 ft) and bottomed in carbonatite.
Quantum,
2010-2011
In
April 2011, Quantum conducted a preliminary drill program (three holes) on the Elk Creek deposit and two REE exploration targets
(two holes), which have been excluded from the current mineral resource and reserve estimation, as they do not intersect the Nb 2 O 5 anomaly
and are located to the east. The objectives of the drill program over the Elk Creek Property were to verify the presence of higher-grade
niobium mineralization at depth, and to infill drill the known niobium deposit in order to upgrade the resource category of the
previous resource estimate and expand the known resource. The drill program was also established to collect sufficient sample
material for metallurgical characterization and process development studies of the niobium mineralization.
26
The
2011 program consisted of five inclined drillholes, totaling 3,420 m of NQ size diameter core. Inclusive of this total, three
drillholes, totaling 2,318 m, were drilled into the known Elk Creek deposit.
NioCorp,
2014 to present
NioCorp
commenced drilling on the Elk Creek Property using a three-phased program. The three-phased program was originally based on 14
drillholes for approximately 12,150 m (announced in a press release on April 29, 2014), but was subsequently expanded during the
program to 18 drillholes for approximately 15,482 m. Three of the 18 drillholes were drilled for the purpose of metallurgical
characterization and process development studies. Two of these drillholes, NEC14-MET-01 and NEC14-MET-02, were not assayed, while
NEC14-MET-03 was quarter cored with one quarter being assayed and the remainder used for metallurgical testwork. The drilling
has been orientated to intersect the geological model from the southwest and northeast (perpendicular to the strike), with the
exception of NEC14-011 and NEC14-012, which were oriented southeast and northwest, respectively.
During
fiscal year 2022, NioCorp collected a total of 1,095 samples originating from 18 diamond drill holes completed by MolyCorp, as
discussed above. These samples were collected, and subsequently assayed, in order to fill in gaps in our records regarding REE
grades and tonnage that may exist in the deposit. Assaying was conducted at Actlabs in Ancaster, Ontario. The assay results were
subjected to a Quality Assurance and Quality Control (“QA/QC”) program consistent with industry best practices.
A
list of the drillholes, sample storage location, and number of assay results, related to the records gaps noted above, are presented
below and are represented as blue drillhole intervals. Each sample represented a 5-foot section of drill core. All of the holes
noted below were drilled into the Elk Creek carbonatite in the vicinity of the mineral resource for the Elk Creek Project.
2021
Sampling Summary
Resource
Area Drillholes
Source
/ Storage Facility
Samples
selected for REE and Sc Assays
EC-011
Molycorp
Samples / Mead Core Warehouse
65
EC-014
Molycorp
Samples / Mead Core Warehouse
16
EC-015
Molycorp
Samples / Mead Core Warehouse
151
EC-016
Molycorp
Samples / Mead Core Warehouse
26
EC-018
Molycorp
Samples / Mead Core Warehouse
92
EC-019
Molycorp
Samples / Mead Core Warehouse
53
EC-020
Molycorp
Samples / Mead Core Warehouse
30
EC-021
Molycorp
Samples / Mead Core Warehouse
45
EC-022
Molycorp
Samples / Mead Core Warehouse
57
EC-024
Molycorp
Samples / Mead Core Warehouse
19
EC-026
Molycorp
Samples / Mead Core Warehouse
86
EC-027
Molycorp
Samples / Mead Core Warehouse
34
EC-029
Molycorp
Samples / Mead Core Warehouse
27
EC-030
Molycorp
Samples / Mead Core Warehouse
25
EC-031
Molycorp
Samples / Mead Core Warehouse
47
EC-032
Molycorp
Samples / Mead Core Warehouse
111
EC-034
Molycorp
Samples / Mead Core Warehouse
54
EC-037
Molycorp
Samples / Mead Core Warehouse
74
EC-054
Molycorp
Samples / Mead Core Warehouse
83
Total
1,095
27
Resource
Area Assay Distribution Showing REE Assays (Red) and REE Assay Gaps (Blue).
Internal
Controls
NioCorp
integrated a series of routine QA/QC procedures throughout the sampling and analytical analysis for drilling programs to ensure
the highest level of quality was maintained throughout the process leading to the estimate of mineral reserves and mineral resources
for the Elk Creek Project. This included the insertion of duplicate samples taken from various stages of the process, insertion
of known control samples (standard reference materials, certified reference materials (“CRM”), and blanks) and sending
third-party pulps to the secondary lab (SGS Canada Inc.).
Sample
tickets were assigned initially at the core shed using barcodes with duplicate tickets placed inside and on the outside of the
bag. Sample identification was confirmed using barcode labelling and visual sample type comparisons before sample shipment. The
use of barcoded samples ensured both shipment forms and analytical labs used accurate information. Multiple types of QC samples
were inserted at this stage of the process, which includes the following:
● Field
quartz blanks (1 in 20, or 5%) were inserted within or immediately after samples collected
from mineralized intervals, targeting zones of elevated visual mineralization, where
possible.
● CRMs
(1 in 20, or 5%) were inserted in the field with the sample sequence.
● Field
quarter-core duplicates (1 in 20, or 5%) were inserted to test mineralization and sampling
variability.
Additional
details on the QA/QC program can be found in Section 8 of the S-K 1300 Elk Creek Technical Report Summary.
Mineral
deposits, including the Elk Creek deposit, are inherently uncertain because of variability at all scales and sparse sampling.
In addition to uncertainty associated with estimation, there are specific risks and sources of uncertainty associated with the
Elk Creek deposit. See Item 1A, Risk Factors.
S-K
1300 and other similarly purposed International Codes (JORC, 2012; NI 43-101, 2014) are designed to require disclosure to the
public of risks relating to mineral resource and reserve estimation as identified and evaluated by a qualified person. The qualified
persons responsible for the S-K 1300 Elk Creek Technical Report Summary address the technical risks in various sections and consider
that no material technical risks are identified. Additional descriptions of the risks and uncertainty associated with reported
mineral reserves and resources can be found in Section 11 of the S-K 1300 Elk Creek Technical Report Summary.
28
2022
Elk Creek Feasibility Study
During
fiscal year 2022, the Company launched geological, metallurgical, engineering, and other analyses to assess the feasibility of
adding REE production to its plans once sufficient work has been completed. The Company and its consultants were required to complete
additional assays of historical drill core to fill data gaps in the existing resource database to establish an REE mineral resource.
The mine plan was also updated. To comply with S-K 1300 regulations, we are filing the S-K 1300 Elk Creek Technical Report Summary
as an exhibit to this Annual Report on Form 10-K, which was based on the economic and process results of the feasibility study
conducted by the qualified persons, which were also presented in the 2022 NI 43-101 Elk Creek Technical Report.
The Elk Creek Project
is planned as an underground mining operation using a long-hole stoping mining method and paste backfill, operating with a processing
rate of 2,764 tonnes per day. Expected total production over the 38-year mine life includes 171,140 tonnes of payable niobium,
3,676 tonnes of Sc 2 O 3 , and 431,793 tonnes of TiO 2 . Estimated up-front direct capital costs are
$760 million, in addition to indirect costs of $187 million, pre-production capital costs of $92 million, an overall contingency
of $102 million, and pre-production net revenue credit of $257 million.
Financial
Analysis Included in the 2022 Elk Creek Feasibility Study
The
metrics reported in the S-K 1300 Elk Creek Technical Report Summary are based on the cash flow model results. The metrics are
on both a pre-tax and after-tax basis, on a 100% equity basis with no Elk Creek Project financing inputs and are in first quarter
2019 U.S. constant dollars. Foreign exchange impacts were deemed negligible as most, if not all, costs and revenues are denominated
in U.S. dollars. Key criteria used in the analysis are discussed in detail throughout this section. “US$” refers to
whole U. S. Dollars.
Principal
Project Assumptions Included in the 2022 Elk Creek Feasibility Study
Description
Value
Pre-Production
Period
4
years
Process
Plant Life
38
years
Mine
Operating Days per Year
365
Mill
Operating Days per Year
365
Discount Rate, End of Period
@
8%
Commercial
Production Year
2025
29
Summary
of Key Evaluation Metrics Included in the 2022 Elk Creek Feasibility Study
Description
Value
Ore Mined (kt)
36,655
Ore Mining Rate (t/d)
2,764
Niobium Grade
0.81 %
Scandium Grade (parts per million, “ppm”)
70.2
TiO 2 Grade
2.92 %
Contained Nb 2 O 5 (kt)
297
Contained Sc (t)
2,573
Contained TiO 2 (kt)
1,071
Total Ore Processed (kt)
36,655
Processing Rate (kt/y)
1,009
Average Recovery, Nb 2 O 5
82.4 %
Average Recovery Sc
93.1 %
Average Recovery TiO 2
40.3 %
Recovered Nb 2 O 5 (kt)
245
Recovered Sc (t)
2,395
Recovered TiO 2 (kt)
432
Realized Market Prices
Nb (US$/kg)
$ 46.55
TiO 2 (US$/kg)
$ 0.99
Sc 2 O 3 (US$/kg)
$ 3,674
Payable Metal
Nb (t)
171,140
Sc 2 O 3 (t)
3,676
TiO 2 (t)
431,793
Summary
Projected Economic Results Included in the 2022 Elk Creek Feasibility Study
Description
Value ($000)
Total Gross Revenue
$ 21,899,726
Operating Costs:
Mining Cost
(1,553,325 )
Process Cost
(3,911,116 )
Site G&A Cost
(300,400 )
Concentrate Freight Cost
(10,472 )
Other Infrastructure Costs
(200,407 )
Water Management Cost
(609,195 )
Tailings Management Cost
(73,822 )
Property Tax
(217,540 )
Royalties
(300,503 )
Annual Bond Premium
(5,500 )
Total Operating Costs
(7,182,280 )
Operating Margin (EBITDA 1 )
14,717,445
Effective Tax Rate
16.42 %
Total Taxes
(2,246,186 )
Working Capital
-
Operating Cash Flow
$ 12,471,258
Totals
may not sum due to rounding.
1 The
term “EBITDA” refers to earnings before interest, taxes depreciation and amortization. See “Non-GAAP Financial
Performance Measures” below for a discussion of the use of non-GAAP financial measures.
30
Operating
Cost Estimates Included in the 2022 Elk Creek Feasibility Study
The
following LoM unit operating costs include the pre-production and first/last years of production.
Description
LoM US$/t ore
Mining Cost
$ 42.38
Process Cost
106.70
Water Management Cost
16.62
Site G&A Cost
8.20
Other Infrastructure
5.47
Tailings Management Cost
2.01
Other Expenses
6.22
Subtotal
187.59
Royalties/Annual Bond Premium
8.35
Total LoM Operating Costs
$ 195.94
Totals
may not sum due to rounding.
Capital
Cost Estimates Included in the 2022 Elk Creek Feasibility Study
The
following table shows the breakout in LoM initial capital and sustaining capital cost estimates (excluding closure and reclamation
of $44 million), which total $1,562 million. This includes a total initial capital cost of $1,141 million, including a 10% contingency.
($000,000)
Description
Initial
Sustaining
Total
Capitalized
Preproduction Expenses
$
77
$
-
$
77
Site
Preparation and Infrastructure
41
15
56
Processing
Plant
367
96
464
Water
Management and Treatment
74
24
97
Mining
Infrastructure
257
198
455
Tailings
Management
21
79
100
Site
Wide Indirects
7
-
7
Processing
Indirects
96
-
96
Mining
Indirects
41
-
41
Commissioning
15
-
15
Owner’s
Costs
34
-
34
Mine
Water Management Indirects
9
-
9
Contingency
102
9
111
Total
Capital Costs
$
1,141
$
422
$
1,562
Totals
may not sum due to rounding.
Planned
Mining Operations
The
Elk Creek Project is planned as an underground mining operation using a long-hole stoping mining method and paste backfill, with
shaft access to minimize development through water bearing horizons. The mine will utilize jumbo drills for lateral development
and tophammer and down-the-hole drills for vertical development and production stoping. Rock bolters will be used for ground support
and probe holes will be used to support mine grouting where required. Ore will be remotely mucked from the bottom stope accesses
using 14 tonne Load-Haul-Dump units (“LHD”). The LHDs will transport the ore to an ore pass directly or to remuck
bays to maximize the efficiency of the stope mucking operations. When needed, a second LHD and a fleet of 40 tonne haul trucks
will be used to transport ore from the remuck bays to the grizzly feeding the underground material handling system. Multiple remuck
bays are used on each level to avoid interference between the LHD and the haul trucks. The ore is fed through the grizzlys with
rock breakers into an underground crusher (the “Primary Crusher”) and via a material handling system to the surface.
Planned
Processing Operations
Planned
ore process operations include mineral processing, hydrometallurgical processing (“Hydromet”), and pyrometallurgical
processing (“Pyromet”) housed in separate buildings.
31
The
mineral processing building will house all of its equipment within a single large building. Ore from the Primary Crusher (located
in the underground mine) will be fed to the secondary cone crusher system, operating in closed circuit with a double deck screen.
The screen undersize from the cone crusher system will be fed to a high-pressure grinding roll unit (“HPGR”), operating
in closed circuit with another double deck screen. The HPGR screen undersize is the comminution product that will report to the
Hydromet process.
The
Hydromet plant building will be a multi-level engineered steel structure, which will house equipment on two levels. Ore from mineral
processing will be fed through 15 individual processes required to separate the three recoverable products. The purpose of the
Hydromet processing steps is to leach the pay metals into solution using two separate acid leaches (Hydrochloric Acid Leach and
Sulfuric Acid Bake), remove impurities, separate the three pay metals, and perform precipitation/processing to final solid oxide
forms. Outputs from the Hydromet Process include saleable TiO 2 and Sc 2 O 3 , with Nb 2 O 5
reporting to the Pyromet plant for final processing. The Hydromet plant will be supported by a Hydrochloric Acid Regeneration
plant and a Sulfuric Acid Plant.
The Pyromet building will house most of its equipment within a single building. The purpose of the Pyromet
plant is to reduce the Nb 2 O 5 coming from the Hydromet plant by converting it into a saleable FeNb metal.
Aluminum shots and iron oxide pellets will be introduced to an electric arc furnace on a continuous basis along with fluxing agents
and Nb 2 O 5 to produce a saleable ferroniobium metal.
Proposed
Production Plan and Schedule
Based on the 2022 Elk Creek Feasibility Study, the operating mine life is approximately 38 years with
a nominal processing rate of 2,764 tonnes per day. The Elk Creek Project timeline is based on 39 months to mechanical completion
after Authorization to Proceed, plus an additional six months of commissioning and ramp-up to 100% of production capacity for a
total of 45 months and assumes no financing constraints. The NioCorp board must approve a construction program and budget
before construction of the Elk Creek Project can begin. This approval, along with the receipt of all required governmental permits
and approvals and the completion of project financings, will determine whether and when construction of the Elk Creek Project can
begin.
Proposed
Tailings Storage
The tailings produced
by the process plant will consist of filtered water leach residue, calcined excess oxide, and slag. Four TSFs will be constructed
sequentially to contain the tailings over the life of the Elk Creek Project and would contain approximately 14.5 million
tonnes of tailings. The tailings facilities have been designed to incorporate two independent areas: a composite-lined tailings
solids storage area; and an area with double lined containment, including a leak collection and recovery system for management
of stormwater runoff and drainage from the tailings solids. The TSFs will store predominantly dry (i.e., not in a slurry consistency)
tailings from the plant with embankment construction based on a “downstream” construction method. Facility closure
is considered in the design.
Proposed
Salt Management
The crystalline salt
produced as a waste product of heating and evaporating brine from the reverse osmosis (“RO”) water treatment plant
will be transported by conveyor to the temporary salt staging area and then be transported by truck to the dedicated salt management
cells (“SMC”). Two SMCs will be constructed sequentially to contain the salt over the life of the project and would
contain approximately 1.63 million cubic meters of salt. The SMCs design will incorporate a composite-lined storage area with double-lined
containment including a leak collection and recovery system for management of stormwater runoff and drainage.
Proposed
Water Management
For
the first several years of construction, the advancement of the shaft and underground workings will require limited dewatering,
anticipated to be through lower-level sumping and pumping for surface collection and disposal. Initially, water will be stored
in the lined SMC #1 during construction or will be trucked off-site for treatment at a local publicly owned treatment works. Excess
water in the SMCs will be spray evaporated within the footprint of the SMC, to avoid the reintroduction of soluble salts into
the water treatment system. Temporary on-site storage or off-site shipment and disposal of the crystallizer solid waste may be
necessary until construction of SMC #1 is completed.
32
Once
full operations commence, we anticipate a shortfall of approximately 3,700 gallons per minute of operational and processing water,
as the underground mine dewatering is only expected to produce 1,000 gallons per minute. To make up this shortfall, we would purchase
fresh water from a local utility and from local landowners.
Once
tailings begin being deposited in the TSF, internal contact water (from residual moisture in the tailings and precipitation falling
within the impoundment footprint) will need to be actively managed. This water will be collected and treated using lime softening
to precipitate hydroxide and carbonate solid forms for many of the inorganic constituents. The treated water will be filtered
to remove the solids (which will be returned to the TSF for disposal), and the clean water will be pumped to the process plant
RO system for further treatment. The clean water from the process plant RO unit will be used in the process plant, and the reject
concentrate will be crystallized and deposited into the SMCs.
Proposed
Source of Power
The
local power utility (Omaha Public Power District) will provide power from nearby transmission lines to the site. This will require
that an approximate 18-mile transmission line be installed by the utility to provide the site sub-station with the required site
power demand. The local power utility will also design and install the main substation that will be owned and maintained by the
utility. This infrastructure will be paid back through rate charges on the electrical usage.
Proposed
Source of Natural Gas
Natural
gas, to be used throughout the Elk Creek Project during the construction and operation phases of the project, will be brought
to the site via pipeline from the local utility company. NioCorp has a natural gas transportation contract with Tallgrass Energy,
which operates the Rockies Express (“REX”) pipeline. Tallgrass will construct a 45 kilometer (28 mile) gas pipeline
lateral from the main REX pipeline system in Kansas to the project site. The lateral will be sized to provide a minimum of 27.5
dekatherms of gas per day. Natural gas will be distributed to all on-site facilities utilizing buried high-density polyethylene
natural gas distribution pipe. Natural gas piping above ground and located inside of facilities will consist predominately of
carbon steel pipe. Maximum on-site pipeline distribution pressure will be 100 pounds per square inch gauge. Natural gas will be
used for facility heating, water heating, and for gas-fired process equipment.
Markets
Market studies for niobium, TiO 2 and Sc 2 O 3 are an important part of the
proposed Elk Creek operation. These commodities, especially niobium and Sc 2 O 3 , are thinly traded without
an established publicly available price discovery mechanism. Hence, detailed third-party market studies provide the basis for assumptions
used in the economic analysis.
The
economic analysis in the 2022 Elk Creek Feasibility Study used the 2019 U.S. dollar base price of $47/kg Nb as the forward-looking
price for steel grade (65%) ferroniobium based on published independent third-party reports. The base price is adjusted to a realized
price to account for the discount provisions contained in the two ferroniobium offtake agreements that the Company has concluded.
NioCorp engaged OnG
Commodities LLC (“OnG”) to produce a market assessment in April 2017. The study examines current scandium production
trends (approximately 20 tons/year) from existing and emerging producers plus an outlook for supply to 2028. The outlook then
reviewed the current and emerging applications for scandium, including fuel cells, aerospace, industrial and other uses, plus an
outlook for demand to 2028. Based on these inputs, OnG provided pricing forecasts and global demand volumes by year to 2028 based
estimated production costs and supply-demand balances. The pricing sheet for the OnG Commodities report was updated for NioCorp
in 2019.
No
formal market study was done for TiO 2 as it only represents 2% of overall revenue in the economic analysis. All market
information for titanium and TiO 2 is derived from USGS Commodity Market Summaries (Bedinger, 2019).
33
Taxation
Rates Included in the 2022 Elk Creek Feasibility Study
Taxes
that may be levied on the Elk Creek Project include corporate income tax rates of 21% for federal and 5.84% for Nebraska. The
Elk Creek Project is eligible for federal depletion allowances and credits, as well as various state incentives. The calculated
effective income tax rate for the Elk Creek Project is 16.42%.
Design
Considerations for Environmental Performance
The
current mine design incorporates these following strategies and technologies designed to minimize environmental impacts of operation:
● Zero
Process Liquid Discharge: The Elk Creek facility will now operate as a “Zero Process
Liquid Discharge” facility, with no releases of process liquids. Instead, both
naturally occurring, brackish (slightly salty) water produced during mining operations,
and water used in ore processing, will be treated on site for use in operations. A solid
salt will be produced from water treatment operations which will be stored on site.
● Additional
Protection of Groundwater Resources Through Artificial Ground Freezing: The Elk Creek
Project’s new mine design will utilize artificial ground freezing as part of the
process of sinking the production and ventilation shafts. Artificial ground freezing
creates a temporary frozen barrier that helps to protect groundwater resources in the
area while shaft-sinking operations are underway.
● Avoidance
of Permanent Impacts to Federally Jurisdictional Waters: We designed the layout of the
Elk Creek Project to minimize or avoid permanent impacts to any federally jurisdictional
waters and/or wetlands on the property. This reduced the expected environmental impacts
and allowed the Elk Creek Project to secure a Clean Water Act Section 404 permit from
the USACE under the Nationwide Permit program, a much more efficient and less expensive
process than an individual Section 404 permit. No other NEPA-level federal permits are
now expected to be required for the Elk Creek Project.
● Recycling
of Reagents Used in Mineral Processing: Metallurgical and process breakthroughs that
we accomplished in 2016 and 2017 are expected to help reduce the volume of material planned
for disposal in the Elk Creek Project’s tailings storage areas. As more of this
material is recycled, the environmental footprint of the Elk Creek Project is reduced.
● Utilizing
Tailings as Underground Mine Backfill: We plan to fill underground voids concurrently
with mining operations using a paste backfill material that contains mine waste material
that typically would be stored in above-ground mine tailings storage areas.
The
Company has not identified any significant encumbrances to the property it owns or holds under OTP agreements. The Company has
not had any permit violations or fines since the filing of our Annual Report on Form 10-K for the fiscal year ended June 30, 2021.
Permitting
requirements for the project have been identified. The Company holds an Air Construction Permit from the State of Nebraska and
a Special Use Permit from Johnson County, both of which are necessary to allow the start of project construction. In addition,
the Elk Creek Project will be required to obtain a series of permits for operations from federal, state, and local agencies. The
majority of these permits are ministerial in nature and present minimal risk to the Company, and typically involve the completion
of an application and the payment of a nominal fee. Three permits from the state of Nebraska are discretionary in nature, where
an application and fee are provided to the state and the state must make a decision as to whether or not the permit will be granted.
While the risk involved in such permits is low, such discretionary permits require more processing time by the state and do require
the state agency to make a decision in favor of issuance of the permit. These three permits include the following:
● Solid
Waste Permit;
● Air
Operating Permit; and
● Radioactive
Materials License.
The
cost and schedule for obtaining both the discretionary and ministerial permits is included in the overall execution plan for the
Elk Creek Project. Additional details on the project’s permitting requirements can be found in Section 17 of the S-K 1300
Elk Creek Technical Report Summary.
34
Mineral
Reserves and Resources
The
mineral reserves and mineral resources disclosed below are based on the S-K 1300 Elk Creek Technical Report Summary. Mineral reserves
and mineral resources at the Elk Creek Project as of June 30, 2022 are summarized in the tables below. Further discussion and
background regarding the approaches used to establish mineral reserves and mineral resources is contained in Chapters 11 and 12
of the S-K 1300 Elk Creek Technical Report Summary.
Elk
Creek Project In Situ Mineral Resource Estimate (niobium, titanium, and scandium) excluding reserves as of June 30,
2022
Class
NSR
Cutoff
Tonnage
(Mt)
Indicated
US$180
151.7
Nb 2 O 5
(%)
Nb 2 O 5
(kt)
0.43
649.8
TiO 2
(%)
TiO 2
(kt)
2.02
3,067
Sc
(ppm)
Sc
(t)
56.42
8,558
Inferred
US$180
108.3
Nb 2 O 5
(%)
Nb 2 O 5
(kt)
0.39
426.6
TiO 2
(%)
TiO 2
(kt)
1.92
2,082
Sc
(ppm)
Sc
(t)
52.28
5,660
Elk
Creek Project In Situ Mineral Resource Estimate (rare earth oxides) excluding reserves as of June 30, 2022
Class
NSR
Cut-off
Tonnage
(Mt)
Indicated
US$180
151.7
La 2 O 3
(%)
La 2 O 3
(kt)
Ce 2 O 3
(%)
Ce 2 O 3
(kt)
Pr 2 O 3
(%)
Pr 2 O 3
(kt)
0.0766
116.2
0.1320
200.2
0.0140
21.3
Nd 2 O 3
(%)
Nd 2 O 3
(kt)
Sm 2 O 3
(%)
Sm 2 O 3
(kt)
Eu 2 O 3
(%)
Eu 2 O 3
(kt)
0.0511
77.5
0.0116
17.6
0.0040
6.0
Gd 2 O 3
(%)
Gd 2 O 3
(kt)
Tb 2 O 3
(%)
Tb 2 O 3
(kt)
Dy 2 O 3
(%)
Dy 2 O 3
(kt)
0.0096
14.6
0.0011
1.6
0.0044
6.7
Ho 2 O 3
(%)
Ho 2 O 3
(kt)
Er 2 O 3
(%)
Er 2 O 3
(kt)
Tm 2 O 3 (%)
Tm 2 O 3
(kt)
0.0006
1.0
0.0015
2.2
0.0002
0.3
Yb 2 O 3
(%)
Yb 2 O 3
(kt)
Lu 2 O 3
(%)
Lu 2 O 3
(kt)
Y 2 O 3
(%)
Y 2 O 3
(kt)
0.0010
1.5
0.0001
0.2
0.0187
28.4
LREO
(%)
LREO
(kt)
HREO
(%)
HREO
(kt)
TREO
(%)
TREO
(kt)
0.2737
415.2
0.0528
80.0
0.3265
495.2
Inferred
US$180
108.3
La 2 O 3
(%)
La 2 O 3
(kt)
Ce 2 O 3
(%)
Ce 2 O 3
(kt)
Pr 2 O 3
(%)
Pr 2 O 3
(kt)
0.0943
102.1
0.1576
170.6
0.0163
17.7
Nd 2 O 3
(%)
Nd 2 O 3
(kt)
Sm 2 O 3
(%)
Sm 2 O 3
(kt)
Eu 2 O 3
(%)
Eu 2 O 3
(kt)
0.0575
62.2
0.0116
12.6
0.0038
4.1
Gd 2 O 3
(%)
Gd 2 O 3
(kt)
Tb 2 O 3
(%)
Tb 2 O 3
(kt)
Dy 2 O 3
(%)
Dy 2 O 3
(kt)
0.0090
9.8
0.0010
1.1
0.0042
4.6
Ho 2 O 3
(%)
Ho 2 O 3
(kt)
Er 2 O 3
(%)
Er 2 O 3
(kt)
Tm 2 O 3 (%)
Tm 2 O 3
(kt)
0.0006
0.7
0.0014
1.5
0.0002
0.2
Yb 2 O 3
(%)
Yb 2 O 3
(kt)
Lu 2 O 3
(%)
Lu 2 O 3
(kt)
Y 2 O 3
(%)
Y 2 O 3
(kt)
0.0010
1.1
0.0001
0.1
0.0182
19.7
LREO
(%)
LREO
(kt)
HREO
(%)
HREO
(kt)
TREO
(%)
TREO
(kt)
0.3257
352.6
0.0512
55.5
0.3769
408.1
35
Notes:
a. Classification of mineral resources in the above tables is in accordance with the S-K 1300 classification
system. Mineral resources in this table are reported exclusive of mineral reserves.
b. Mineral
resources that are not mineral reserves do not have demonstrated economic viability.
c. The mineral resources are reported at a Diluted Net Smelter Return (NSR) Cut-off of US$180/tonne.
d. The
diluted NSR is defined as:
●
Diluted NSR (US$) =
Revenue
per block Nb 2 O 5 (diluted) + Revenue per block TiO 2 (diluted) + Revenue per
block Sc (diluted)
Diluted tonnes per
block
● The
diluted revenue from Nb 2 O 5 , TiO 2 , and Sc per block used
the following factors:
● Nb 2 O 5 Revenue: a 94% grade recovery, a 0.696 factor to convert Nb 2 O 5
to Nb, 82.36% assumption for plant recovery, and a US$39.60 selling price per kg of ferroniobium as of June 30, 2022.
● TiO 2
Revenue: a 94% grade recovery, a 40.31% assumption for plant recovery, and an US$0.88
selling price per kg of titanium oxide as of June 30, 2022.
● Sc Revenue: a 94% grade recovery, a 1.534 factor to convert Sc to Sc 2 O 3 , 93.14%
assumption for plant recovery, and a US$3,675 selling price per kg of scandium oxide as of June 30, 2022.
● The
diluted tonnes are a 6% increase in the total tonnes of the block.
e. Price
assumptions for FeNb, Sc 2 O 3 , and TiO 2 as shown in note
d, above, are based upon independent market analyses for each product.
f. Numbers
may not sum due to rounding. The rounding is not considered to be material.
g. Rare
Earth Oxides (REO) were evaluated as a potential by-product to the mining of niobium,
titanium, and scandium; thus, the estimated values of the REOs are reported using the
previously determined diluted NSR as derived from the Nb 2 O 5 , TiO 2 ,
and Sc mineral resources and are assigned a price of $0
h. The
stated Light Rare Earth Oxides (LREO) grade (%) is the summation of La 2 O 3
(%), Ce 2 O 3 (%), Pr 2 O 3 (%), and Nd 2 O 3
(%) estimates.
i. The
stated Heavy Rare Earth Oxides (HREO) grade (%) is the summation of Sm 2 O 3
(%), Eu 2 O 3 (%), Gd 2 O 3 (%), Tb 2 O 3
(%), Dy 2 O 3 (%), Ho 2 O 3 (%), Er 2 O 3
(%), Tm 2 O 3 (%), Yb 2 O 3 (%), Lu 2 O 3
(%), and Y 2 O 3 (%) estimates.
j. The
stated Total Rare Earth Oxide (TREO) grade (%) is the summation of LREO (%) and HREO
(%).
k. The effective date of the mineral resource, including by-products, is June 30, 2022.
Elk
Creek Project Underground In Situ Mineral Reserves Estimate for Elk Creek as of June 30, 2022
Classification
Tonnage
(kt)
Nb 2 O 5
Grade
(%)
Contained
Nb 2 O 5
(t)
Payable
Nb
(t)
TiO 2
Grade
(%)
Contained
TiO 2
(t)
Payable
TiO 2
(t)
Sc
Grade
(ppm)
Contained
Sc
(t)
Payable
Sc 2 O 3
(t)
Proven
-
-
-
-
-
-
-
-
-
-
Probable
36,656
0.81
297,278
170,409
2.92
1,071,182
431,793
70.2
2,573
3,677
Total
36,656
0.81
297,278
170,409
2.92
1,071,182
431,793
70.2
2,573
3,677
All
figures are rounded to reflect the relative accuracy of the estimates. Totals may not sum due to rounding.
● The Qualified Person for the mineral reserve estimate is Optimize Group Inc. The estimate has an effective
date of June 30, 2022.
● The
mineral reserve is based on the mine design, mine plan, and cash-flow model utilizing
an average cut-off grade of 0.679% Nb 2 O 5 with an NSR of US$180/mt.
● The
estimate of mineral reserves may be materially affected by metal prices, environmental,
permitting, legal, title, taxation, socio-political, marketing, infrastructure development,
or other relevant issues.
● The
economic assumptions used to define mineral reserve cut-off grade are as follows:
● Annual
life of mine (LOM) production rate of ~7,450 tonnes of FeNb/annum during the years of
full production.
● Initial
elevated five-year production rate ~ 7,500 tonnes of FeNb/annum when full production
is reached.
● Mining
dilution of ~6% was applied to all stopes and development, based on 3% for the primary
stopes, 9% for the secondary stopes, and 5% for ore development.
● Mining
recoveries of 95% were applied in longhole stopes and 62.5% in sill pillar stopes.
36
Parameter
Value
Unit
Mining
Cost
42.38
US$/t
mined
Processing
106.70
US$/t
mined
Water
Management and Infrastructure
16.62
US$/t
mined
Tailings
Management
2.01
US$/t
mined
Other
Infrastructure
5.47
US$/t
mined
General
and Administrative
8.91
US$/t
mined
Royalties/Annual
Bond Premium
8.34
US$/t
mined
Other
Costs
6.29
US$/t
mined
Total
Cost
196.72
US$/t
mined
Nb 2 O 5
to Niobium Conversion
69.60
%
Niobium
Process Recovery
82.36
%
Niobium
Price
39.60
US$/kg
TiO 2
Process Recovery
40.31
%
TiO 2
Price
0.88
US$/kg
Sc
Process Recovery
93.14
%
Sc
to Sc 2 O 3 Conversion
153.40
%
Sc
Price
3,675.00
US$/kg
● Price assumptions are as follows: FeNb US$39.60/kg Nb, Sc 2 O 3 US$3,675/kg, and TiO 2
US$0.88/kg. Price assumptions are based upon independent market analyses for each product as of June 30, 2022.
● Price
and cost assumptions are based on the pricing of products at the “mine-gate,”
with no additional down-stream costs required. The assumed products are ferroniobium
(metallic alloy shots consisting of 65%Nb and 35% Fe), a titanium dioxide product in
powder form, and scandium trioxide in powder form.
● The
mineral reserve has an average LOM NSR of US$563.06/tonne.
● Optimize
Group has provided detailed estimates of the expected costs based on the knowledge of
the style of mining (underground) and potential processing methods (by 3rd party Qualified
Persons).
● Mineral
reserve effective date is June 30, 2022. The financial model was run after the estimate
of the NSR above, which reflects a total cost per tonne of US$196.72 versus US$189.91.
This is not considered a material change.
● Price
variances for commodities are based on independent market studies versus earlier projected
pricing. The independent market studies do not have a negative effect on the reserve.
Comparison
of Mineral Resources and Mineral Reserves
The
following tables compares the Elk Creek Project mineral reserve estimate as of June 30, 2022, to the Elk Creek Project mineral
reserve estimate as of June 30, 2021.
Nb 2 O 5
Contained
Payable
TiO 2
Contained
Payable
Sc
Contained
Payable
Classification
Tonnage
(kt)
Grade
(%)
Nb2O5
(t)
Nb
(t)
Grade
(%)
TiO 2
(t)
TiO 2
(t)
Grade
(ppm)
Sc
(t)
Sc 2 O 3
(t)
Mineral
Reserve, as of June 30, 2022
Proven
-
-
-
-
-
-
-
-
-
-
Probable
36,656
0.81
297,278
170,409
2.92
1,071,182
431,793
70.2
2,573
3,677
Total
36,656
0.81
297,278
170,409
2.92
1,071,182
431,793
70.2
2,573
3,677
Mineral
Reserve, as of June 30, 2021
Proven
-
-
-
-
-
-
-
-
-
-
Probable
36,313
0.81
293,321
168,861
2.86
1,039,050
418,841
65.7
2,387
3,410
Total
36,313
0.81
293,321
168,861
2.86
1,039,050
418,841
65.7
2,387
3,410
Percentage
Change
Proven
-
-
-
-
-
-
-
-
-
-
Probable
1%
0%
1%
1%
2%
3%
3%
7%
8%
8%
Total
1%
0%
1%
1%
2%
3%
3%
7%
8%
8%
37
The minor increases in probable mineral reserves were based on changes
made to the overall mining plan, which impacted the estimation of the grade of ore to be mined and delivered to the surface production
plant.
The
reporting of our mineral resource under S-K 1300 is exclusive of our mineral reserve, whereas in the prior year under NI 43-101
guidelines, our mineral resource was reported inclusive of our mineral reserve. As the mineral resource as of June 30, 2022 and
2021, were calculated and reported under differing methodologies, no meaningful comparison is available.
Environmental
and Social
A
number of key permits and environmental management requirements have been identified for the Elk Creek Project, some of which
need to be implemented as soon as practicable in order to maintain the proposed Elk Creek Project schedule.
● While
not necessarily complex, the timing generally required to complete permitting through
any federal regulatory agency requires that NioCorp engage key agencies (in this case
the USACE and possibly the EPA) early on in Elk Creek Project development and consider
the siting and orientation of facilities carefully to minimize the risk of a protracted
National Environmental Policy Act analysis of the Elk Creek Project. At the present time,
the company believes that we have completed the major federal permitting actions needed
for project construction, although changes to the design or location of project facilities
may require that additional federal permits be obtained.
● Construction
at the facility requires the Air Permit from the State of Nebraska, which was issued
to the Company on June 2, 2020. The Air Permit describes all the prospective air emissions
from the facility and required the completion of an air quality model that demonstrates
compliance with the NAAQS. On April 15, 2022, the Company announced that the NDEE advised
the Company that periodic extensions to the Elk Creek Project’s Air Permit are
no longer required because the Company has met the regulatory definition of “construction,
reconstruction, or modification of the source” since the permit was issued.
● A
radioactive materials license will be needed from the Nebraska Department of Health and
Human Services (“NDHHS”), Office of Radiological Health. Because of their
limited experience with hard rock mining in the State of Nebraska, much less mining that
includes Naturally Occurring Radioactive Material, the NDHHS may require additional information
and more time to approve the Elk Creek Project under a Broad Scope License. The Company
has been working with NDHHS on this aspect of project permitting since 2014.
● Documentation
of existing baseline environmental conditions at the Elk Creek Project site was initiated
in 2014 and will continue as needed throughout the permitting process.
● Surface
water monitoring will continue throughout the permitting process and extend into construction
and operations as part of the Environmental Management System and likely State of Nebraska
permit requirements.
● A
wetland delineation and potential jurisdictional waters assessment was conducted in late
2014 to identify wetland and drainage features within the proposed Elk Creek Project
boundary which resulted in a formal JD being issued by the USACE on September 6, 2016.
● The
major land-use authorization for the project was received from Johnson County, Nebraska,
on December 24, 2019, in the form of a Special Use Permit for the project. This land-use
permit is a necessary precursor to any project-related construction activities. County
zoning permits will be required for individual buildings constructed at the site, and
the County requirement is that such applications must be submitted five days before construction
commences.
● Closure
costs for the Elk Creek Project have been estimated at just over $44 million, including
approximately $13.5 million for reclamation and closure of the TSFs and $16.6 million
for plant and building removal and reclamation.
● Community
engagement has occurred in parallel with Nebraska field operations and has included public
meetings, presentations to public agencies, communications with local and state politicians,
meetings with environmental groups, and one-on-one meetings with area landowners.
38
Other
Elk Creek Project Activities
On
August 9, 2021, the Company announced the completion of the first phase of testing of Elk Creek Project ore samples using HPGR
technology. Testing confirmed that the ore that NioCorp expects to mine from the Elk Creek Project site, subject to receipt of
necessary funding, can be successfully processed using HPGR technology, an energy efficient and low-emission alternative for reducing
the size of the ore to enable the recovery of niobium, scandium, and titanium.
During
the quarter ended September 30, 2021, NioCorp completed an engagement with Cementation US, Inc. (“Cementation”) to
provide a detailed cost estimate for the engineering associated with the temporary and permanent construction associated with
the Elk Creek Project’s underground mine, along with a series of technical reviews and optimization studies around key elements
of the existing mine design. Should project financing be obtained, this work will accelerate Cementation’s ability to mobilize
and commence mine construction and may result in cost savings during project execution should Cementation’s optimization
recommendations be adopted by the Company.
During
the quarter ended December 31, 2021, NioCorp engaged Olsson Associates to assist with the preparation of an Equator Principles
program for the Company, which includes an environmental and social assessment of the Elk Creek Project along with internal procedures
and management systems to formalize the Company’s longstanding commitment to leading Environmental and Social Governance
(“ESG”) practices. The Equator Principles are used by signatory financing entities to assess the ESG practices of
financing opportunities
At
present, the Company is maintaining the property in anticipation of obtaining project financing that will facilitate the construction,
commissioning, and operation of the Elk Creek Project. The property is characterized as a development stage property and is expected
to move to a production stage property should financing be obtained.
Proposed
Activities
Our
long-term financing efforts continued through fiscal year 2022. However, the COVID-19 pandemic and other recent worldwide events
have created general global economic uncertainty as well as uncertainty in capital markets, supply chain disruptions, increased
interest rates, and the potential for geographic recessions. During fiscal year 2022, these events continued to create uncertainty
with respect to overall project funding and timelines. The full extent to these events may continue to impact our business will
depend on future developments, which continue to be highly uncertain and cannot be predicted at this time.
As
funds become available through the Company’s fundraising efforts, we expect to undertake the following activities:
●
Continuation
of the Company’s efforts to secure federal, state and local permits;
●
Continued
evaluation of the potential to produce rare earth products;
●
Negotiation
and completion of offtake agreements for the remaining uncommitted production from the project;
●
Negotiation
and completion of engineering, procurement and construction agreements;
●
Completion
of the final detailed engineering for the underground portion of the Elk Creek Project;
●
Initiation
and completion of the final detailed engineering for surface project facilities;
●
Construction
of natural gas and electrical infrastructure under existing agreements to serve the Elk Creek Project site;
●
Completion
of water supply agreements and related infrastructure to deliver fresh water to the project site;
●
Initiation
of revised mine groundwater investigation and control activities;
●
Initiation
of long-lead equipment procurement activities; and
●
Construction
and operation of a small-scale demonstration plant to address process recommendations contained in the 2019 NI 43-101 Elk
Creek Technical Report and to quantify REE metallurgical performance.
39
Non-GAAP
Financial Performance Measures
Non-GAAP
financial performance measures are intended to provide additional information only and do not have any standard meaning prescribed
by U.S. GAAP. These measures should not be considered in isolation or as a substitute for performance measures prepared in accordance
with U.S. GAAP.
The
S-K 1300 Elk Creek Technical Report Summary uses non-GAAP financial performance measures, such as EBITDA, Averaged Annual
EBITDA, and Averaged EBITDA Margin, for purposes of projecting the economic results of the Elk Creek Project. We are unable
to provide a reconciliation of these forward-looking non-GAAP measures to the most comparable U.S. GAAP financial
performance measures because certain information needed to reconcile those non-GAAP measures to the most comparable U.S. GAAP
financial performance measures is dependent on future events, some of which are outside the control of the Company, such as
FeNb, Sc 2 O 3 and TiO 2 prices, interest rates and exchange rates. Moreover, estimating such
U.S. GAAP measures with the required precision necessary to provide a meaningful reconciliation is extremely difficult and
could not be accomplished without unreasonable effort.
Corporate
Headquarters
We
lease our principal executive office space at 7000 South Yosemite Street, Suite 115, Centennial, Colorado.
ITEM 3. LEGAL
PROCEEDINGS
As of September 6,
2022, we are not a party to any legal proceedings that could have a material adverse effect on the Company’s business, financial
condition or operating results. Further, to the Company’s knowledge, no such proceedings have been threatened against the
Company.
ITEM 4. MINE
SAFETY DISCLOSURES
Pursuant
to Section 1503(a) of the Dodd-Frank Act, issuers that are operators, or that have a subsidiary that is an operator, of a coal
or other mine in the U.S. are required to disclose specified information about mine health and safety in their periodic reports.
These reporting requirements are based on the safety and health requirements applicable to mines under the Federal Mine Safety
and Health Act of 1977 (the “Mine Act”) which is administered by the U.S. Department of Labor’s Mine Safety
and Health Administration (“MSHA”). During the fiscal year ended June 30, 2022, the Company and its subsidiaries and
their properties or operations were not subject to regulation by MSHA under the Mine Act and thus no disclosure is required under
Section 1503(a) of the Dodd-Frank Act.
PART
II
ITEM 5. MARKET
FOR REGISTRANT’S COMMON EQUITY, RELATED STOCKHOLDER MATTERS AND ISSUER PURCHASES
OF EQUITY SECURITIES
Market
Information
The
Common Shares were first listed and posted for trading on the Vancouver Stock Exchange on December 1, 1987. On March 9, 2015,
the Common Shares commenced trading on the TSX under the trading symbol “NB.” In addition, the Company trades on the
U.S. Over-the-Counter Bulletin Board and the OTCQX under the symbol “NIOBF” and on the Frankfurt Stock Exchange as
“BR3.”
The
over-the-counter market quotations reflect inter-dealer prices without retail mark-up, mark-down or commission and may not reflect
actual transactions.
Holders
As
of June 30, 2022, we had 18,490 holders of record of the Common Shares.
40
Dividends
We
have not paid any cash dividends on the Common Shares since our inception and do not anticipate paying any cash dividends in the
foreseeable future. We plan to retain our earnings, if any, to provide funds for the expansion of our business.
Securities
Authorized for Issuance Under Equity Compensation Plans
See Equity
Compensation Plan Information under Item 12. , “ Security Ownership of Certain Beneficial Owners and Management
and Related Stockholder Matters ,” for information on plans approved by our shareholders.
Purchases
of Equity Securities by the Company
We
did not make any repurchases in the quarter ended June 30, 2022.
Recent
Sales of Unregistered Securities
The
following Common Shares were issued pursuant to Section 3(a)(9) of the Securities Act, in connection with the voluntary conversion
of a portion of the amount outstanding under the Lind III Convertible Security and based upon representations and warranties of
Lind III in connection therewith.
Date
Conversion
Amount ($000)
Shares
Issued
Conversion
Price/Share
June
22, 2022
$600
1,088,808
$0.7132
July
27, 2022
600
1,025,796
0.7504
August
8, 2022
250
431,286
0.7496
Exchange
Controls
There
are no governmental laws, decrees, or regulations in Canada that restrict the export or import of capital, including foreign exchange
controls, or that affect the remittance of dividends, interest or other payments to non-resident holders of the securities of
NioCorp, other than Canadian withholding tax. See “Certain Canadian Federal Income Tax Considerations for U.S. Residents”
below.
Certain
Canadian Federal Income Tax Considerations for U.S. Residents
The
following summarizes certain Canadian federal income tax consequences generally applicable under the Income Tax Act (Canada) and
the regulations enacted thereunder (collectively, the “Canadian Tax Act”) and the Canada-U.S. Income Tax Convention
(1980) (the “Convention”) to the holding and disposition of Common Shares.
Comment
is restricted to holders of Common Shares each of whom, at all material times for the purposes of the Canadian Tax Act and the
Convention, (i) is resident solely in the U.S., (ii) is entitled to the benefits of the Convention, (iii) holds all Common Shares
as capital property, (iii) holds no Common Shares that are “taxable Canadian property” (as defined in the Canadian
Tax Act) of the holder, (iv) deals at arm’s-length with and is not affiliated with NioCorp, (v) does not and is not deemed
to use or hold any Common Shares in a business carried on in Canada, and (vi) is not an insurer that carries on business in Canada
and elsewhere (each such holder, a “U.S. Resident Holder”).
Certain
U.S.-resident entities that are fiscally transparent for U.S. federal income tax purposes (including limited liability companies)
may not in all circumstances be regarded by the Canada Revenue Agency (the “CRA”) as entitled to the benefits of the
Convention. Members of or holders of an interest in such an entity that holds Common Shares should consult their own tax advisers
regarding the extent, if any, to which the CRA will extend the benefits of the Convention to the entity in respect of its Common
Shares.
Generally,
a holder’s Common Shares will be considered to be capital property of the holder provided that the holder is not a trader
or dealer in securities, did not acquire, hold, or dispose of the Common Shares in one or more transactions considered to be an
adventure or concern in the nature of trade (i.e. speculation), and does not hold the Common Shares in the course of carrying
on a business.
41
Generally,
a holder’s Common Shares will not constitute “taxable Canadian property” of the holder at a particular time
at which the Common Shares are listed on a “designated stock exchange” (which currently includes the TSX) unless both
of the following conditions are true:
(i) at
any time during the 60-month period that ends at the particular time, 25% or more of the issued shares of any class of the capital
stock of NioCorp were owned by or belonged to one or any combination of:
a. the
holder,
b. persons
with whom the holder did not deal at arm’s length, and
c. partnerships
in which the holder or a person referred to in clause (B) holds a membership interest directly or indirectly through one or more
partnerships, and
(ii) at
any time during the 60-month period that ends at the particular time, more than 50% of the fair market value of the Common Shares
was derived directly or indirectly from, one or any combination of, real or immovable property situated in Canada, “Canadian
resource properties” (as defined in the Canadian Tax Act), “timber resource properties” (as defined in the Canadian
Tax Act), or options in respect of, or interests in any of the foregoing, whether or not the property exists.
This
summary is based on the current provisions of the Canadian Tax Act and the Convention in effect on the date hereof, all specific
proposals to amend the Canadian Tax Act and Convention publicly announced by or on behalf of the Minister of Finance (Canada)
on or before the date hereof, and the current published administrative and assessing policies of the CRA. It is assumed that all
such amendments will be enacted as currently proposed, and that there will be no other material change to any applicable law or
administrative or assessing practice, although no assurance can be given in these respects. Except as otherwise expressly provided,
this summary does not take into account any provincial, territorial, or foreign tax considerations, which may differ materially
from those set out herein.
This
summary is of a general nature only, is not exhaustive of all possible Canadian federal income tax considerations, and is not
intended to be and should not be construed as legal or tax advice to any particular U.S. Resident Holder. U.S. Resident Holders
are urged to consult their own tax advisers for advice with respect to their particular circumstances. The discussion below is
qualified accordingly.
A
U.S. Resident Holder who disposes or is deemed to dispose of one or more Common Shares generally should not thereby incur any
liability for Canadian federal income tax in respect of any capital gain arising as a consequence of the disposition.
A
U.S. Resident Holder to whom NioCorp pays or is deemed to pay a dividend on the holder’s Common Shares will be subject to
Canadian withholding tax, and NioCorp will be required to withhold the tax from the dividend and remit it to the CRA for the holder’s
account. The rate of withholding tax under the Canadian Tax Act is 25% of the gross amount of the dividend but should generally
be reduced under the Convention to 15% (or, if the U.S. Resident Holder is a company which is the beneficial owner of at least
10% of the voting stock of NioCorp, 5%) of the gross amount of the dividend. For this purpose, a company that is a resident of
the U.S. for purposes of the Canadian Tax Act and the Convention and is entitled to the benefits of the Convention shall be considered
to own the voting stock of NioCorp owned by an entity that is considered fiscally transparent under the laws of the U.S. and that
it is not a resident of Canada, in proportion to the Company’s ownership interest in that entity.
ITEM 6. RESERVED.
ITEM 7. MANAGEMENT’S
DISCUSSION AND ANALYSIS OF CONSOLIDATED FINANCIAL CONDITION AND RESULTS OF OPERATIONS
The
following Management’s Discussion and Analysis (“MD&A”) provides information that management believes is
relevant to an assessment and understanding of the consolidated financial condition and results of operations of NioCorp and subsidiaries.
This item should be read in conjunction with our Consolidated Financial Statements and the notes thereto included in this Annual
Report on Form 10-K. Discussions related to fiscal year 2021 performance as compared to fiscal 2020 performance can be found in
Item 7., “ Management’s Discussion and Analysis of Consolidated Financial Condition and Results of Operations”
of the Company’s Annual Report on Form 10-K for the year ended June 30, 2021.
42
Summary
of Consolidated Financial and Operating Performance
For the year ended June 30,
2022
2021
2020
($000)
Operating
expenses
$
7,796
$
4,092
$
3,432
Net
loss
9,929
4,390
4,001
Net
loss per share (basic and diluted)
0.04
0.02
0.02
The
Company’s net loss increased to $9.9 million for fiscal year 2022 from $4.4 million for fiscal year 2021. This increased
net loss in fiscal year 2022 as compared to fiscal year 2021 is primarily due to increased exploration expenditures associated
with process development costs and rare earth review costs, as well increased non-cash costs of our fiscal year 2022 Option grants,
which were fully vested and expensed on the grant dates.
The
Company had no revenues during the fiscal years presented below. Operating expenses incurred related primarily to performing exploration
and feasibility study related activities, as well as the activities necessary to support corporate and shareholder duties and
are detailed in the following table.
Results
of Operations
For
the year ended
June
30,
2022
2021
2020
($000)
Operating
expenses:
Employee
related costs
$
2,150
$
1,655
$
1,376
Professional
fees
684
386
327
Exploration
expenditures
3,309
1,056
1,201
Other
operating expenses
1,653
995
528
Total
operating expenses
7,796
4,092
3,432
Other
income
-
(208
)
-
Loss
on extinguishment
-
163
-
Change
in financial instrument fair value
-
(32
)
38
Foreign
exchange loss (gain)
221
(729
)
179
Interest
expense
1,906
1,113
354
Loss
(gain) on equity securities
6
(9
)
(2
)
Income
tax benefit
-
-
-
Net
Loss
$
9,929
$
4,390
$
4,001
Significant
items affecting operating expenses are noted below:
Employee
related costs for fiscal year 2022 increased as compared to fiscal year 2021 primarily due to increased share-based compensation
costs which primarily reflected the impact of increased Common Share values on the fair value calculations in the Black-Scholes
model, as well as the number of Options granted.
Professional
fees increased in fiscal year 2022 as compared to fiscal year 2021, primarily due to the timing of legal services related
to SEC filings, including our shelf registration statement on Form S-3 filed in November 2021.
Exploration
expenditures increased in fiscal year 2022 as compared to fiscal year 2021 reflecting work performed in fiscal year 2022 to
advance the development of a demonstration-scale test plant to verify process improvement efforts as well as to potentially incorporate
REEs into our planned production. Fiscal year 2021 expenditures primarily related to the ongoing personnel costs, as well as ongoing
engineering and metallurgical projects and project advancement activities.
43
Other
operating expenses include investor relations, general office expenditures, equity offering and proxy expenditures, board-related
expenditures, and other miscellaneous costs. These costs increased in fiscal year 2022 as compared to fiscal year 2021 primarily
due to increased financial advisory fees and investor relations fees associated with our ongoing financing efforts. In addition,
share-based compensation for directors and other advisors increased in fiscal year 2022 as compared to fiscal year 2021 due to
increased share-based compensation costs, which primarily reflected the impact of increased Common Share values in the Black Scholes
model. Options issued in both periods were fully vested upon issuance and expensed on the grant date.
Other
significant items impacting the change in the Company’s net loss are noted below:
Other
income for fiscal year 2021 represents the one-time forgiveness of the Company’s U.S. Small Business Administration
Loan, which occurred on November 18, 2020.
Loss
on extinguishment for fiscal year 2021 represents the one-time loss incurred in connection with the December 18, 2020, conversion
of the Nordmin Note.
Foreign
exchange (gain) loss is primarily due to changes in the U.S. dollar against the Canadian dollar rate as applied to U.S. dollar-denominated
debt instruments which are carried on the Canadian parent company books, and the fiscal year 2022 loss reflected the impacts of
a strengthened U.S. dollar to Canadian dollar, whereas the fiscal year 2021 gain primarily reflects the impact of a weakened U.
S. dollar.
Interest
expense increased in fiscal year 2022 as compared to fiscal year 2021 primarily due to the accretion of the Nordmin Note,
which was issued in December 2020, as well as accretion of the Lind III Convertible Security, which was issued in February 2021.
Liquidity
and Capital Resources
We
have no revenue generating operations from which we can internally generate funds. To date, our ongoing operations have been financed
by the sale of our equity securities by way of private placements, convertible securities issuances, and the exercise of incentive
stock options and share purchase warrants. While we believe we will be able to secure additional private placement financings
in the future, we cannot predict the size or pricing of any such financings. In addition, we may raise funds through the sale
of interests in our mineral properties, although current market conditions and the impacts of the COVID-19 pandemic have reduced
the number of potential buyers/acquirers of any such interests.
As
of June 30, 2022, the Company had cash of $5.3 million and working capital of $2.0 million, compared to cash of $7.3 million and
working capital of $3.4 million on June 30, 2021. The slight decline in working capital surplus for fiscal year 2022 is due to
the timing of cash inflows from financing activities and warrant exercises, as discussed below under “ Financing Activities ,”
and was partially offset by exploration-related expenditures and general corporate overhead expenditures.
We
expect that the Company will operate at a loss for the foreseeable future. The Company’s current planned operational needs
are approximately $9.5 million through June 30, 2023, inclusive of the repayment of amounts outstanding under the Smith Credit
Agreement which is due on June 30, 2023.
In addition to outstanding accounts payable and short-term liabilities, our average monthly expenditures
through June 30, 2023 are expected to be approximately $550 per month where approximately $295 is for corporate overhead, lease
extensions and estimated costs related to securing financing necessary for advancement of the Elk Creek Project. Approximately
$255 per month is planned for expenditures relating to the advancement of the Elk Creek Project by ECRC. The Company’s ability
to continue operations and fund our current work plan is dependent on management’s ability to secure additional financing.
44
The
Company anticipates that it may not have sufficient cash to continue to fund basic operations for the next twelve months, and
additional funds totaling $3.5 million to $4.5 million are likely to be necessary to continue advancing the project in the areas
of financing, permitting, and detailed engineering. Management is actively pursuing such additional sources of debt and equity
financing, and while it has been successful in doing so in the past, there can be no assurance it will be able to do so in the
future.
Elk
Creek property and lease commitments are $8 through June 30, 2023, exclusive of costs incurred to exercise our current land and
mineral right option agreements, which expire at various times between December 2024 and May 2040. To maintain its currently held
properties and fund its currently anticipated general and administrative costs and planned exploration and development activities
at the Elk Creek Project for the fiscal year ending June 30, 2023, the Company will likely require additional financing during
the current fiscal year. Should such financing not be available in that timeframe, we will be required to reduce our activities
and will not be able to carry out all our presently planned activities at the Elk Creek Project.
We
currently have no further material funding commitments or arrangements for additional financing at this time (other than the potential
exercise of options and warrants) and there is no assurance that we will be able to obtain additional financing on acceptable
terms, if at all. There is significant uncertainty that we will be able to secure any additional financing in the current equity
or debt markets. The quantity of funds to be raised and the terms of any proposed equity or debt financing that may be undertaken
will be negotiated by management as opportunities to raise funds arise. Management intends to pursue funding sources of both debt
and equity financing, including but not limited to the issuance of equity securities in the form of Common Shares, warrants, subscription
receipts, or any combination thereof in units of the Company pursuant to private placements to accredited investors or pursuant
to equity lines of credit or public offerings in the form of underwritten/brokered offerings, at-the-market offerings, registered
direct offerings, or other forms of equity financing and public or private issuances of debt securities including secured and
unsecured convertible debt instruments or secured debt project financing. Management does not currently know the terms pursuant
to which such financings may be completed in the future, but any such financings will be negotiated at arm’s-length. Future
financings involving the issuance of equity securities or derivatives thereof will likely be completed at a discount to the then-current
market price of the Company’s securities and will likely be dilutive to current shareholders.
Based
on the conditions described within, management has concluded and the audit opinion and notes that accompany our financial statements
for the year ended June 30, 2022, disclose that substantial doubt exists as to our ability to continue in business. The financial
statements included in this Annual Report on Form 10-K have been prepared under the assumption that we will continue as a going
concern. As defined under S-K 1300, we are a development stage issuer, and we have incurred losses since our inception. The Company
anticipates that it may not have sufficient cash, including warrant exercises subsequent to June 30, 2022, to continue to fund
basic operations for the next twelve months, therefore, additional funds are likely to be necessary to continue advancing the
project in the areas of financing, permitting, and detailed engineering. While the COVID-19 pandemic did negatively impact our
ability to obtain project financing during fiscal years 2021 and 2022, the full extent to which the COVID-19 pandemic and our
precautionary measures may continue to impact our business will depend on future developments, which continue to be highly uncertain
and cannot be predicted at this time. In addition, recent worldwide events have created general global economic uncertainty as
well as uncertainty in capital markets, supply chain disruptions, increased interest rates, and the potential for geographic recessions.
We believe that the going concern uncertainty cannot be alleviated with confidence until the Company has entered into a business
climate where funding of its planned ongoing operating activities is secured.
We
have no exposure to any asset-backed commercial paper. Other than cash held by our subsidiaries for their immediate operating
needs in Colorado and Nebraska, all of our cash reserves are on deposit with major U.S. and Canadian chartered banks. We do not
believe that the credit, liquidity, or market risks with respect thereto have increased as a result of the current market conditions.
However, in order to achieve greater security for the preservation of our capital, we have, of necessity, been required to accept
lower rates of interest, which has also lowered our potential interest income.
45
Operating
Activities
During
the year ended June 30, 2022, the Company’s operating activities consumed $6.2 million of cash (2021: $4.7 million). The
cash used in operating activities for fiscal year 2022 reflects the Company’s funding of losses of $9.9 million, partially
offset by non-cash adjustments and changes in working capital items. Overall, fiscal year 2022 operational outflows were higher
than fiscal year 2021 due primarily to increased exploration expenditures. Going forward, the Company’s working capital
requirements are expected to increase substantially in connection with the development of the Elk Creek Project.
Investing
Activities
During
the year ended June 30, 2022, the Company’s investing activities consumed $16 of cash (2021: $6.3 million). The cash used
in investing activities for fiscal year 2021 reflects the Company’s purchase of the land and mineral rights discussed above
under Part I., Item 2, “ Properties - Other Elk Creek Project Activities .”
Financing
Activities
Net
cash provided by financing activities was $4.3 million in fiscal year 2022 (2021: $18.1 million). This decrease in financing inflows
primarily reflect the timing of cash inflows from the Lind III Agreement, private placements, and warrant exercises during the
respective fiscal years.
The
following is a discussion of significant financing transactions for fiscal year 2022:
● On June 30, 2022, the Company closed a non-brokered private placement (the “June 2022 Private Placement”)
of units (the “Units”) of the Company. A total of 4,981,035 Units were issued at a price per 2022 Unit of C$0.96, for
total gross proceeds to the Company of approximately C$4.8 million. Each Unit consists of one Common Share and one common share
purchase warrant (“June 2022 Warrant”). Each June 2022 Warrant entitles the holder to acquire one Common Share at a
price of C$1.10 at any time prior to July 1, 2024. Proceeds of the June 2022 Private Placement will be used for continued advancement
of the Company’s Elk Creek Critical Minerals Project and for working capital and general corporate purposes. The Company
paid cash commissions of C$62 and 65,100 warrants (the “Finder Warrants”), having the same terms as the June 2022 Warrants,
to finders outside of the United States. The Finder Warrants were valued at C$18 using a risk-free rate of 3.2%, expected volatility
of 64% and expected life of two years.
● On
July 23, 2021, the Company repaid $358 to Mr. Smith, representing a partial principal
repayment of $318 on the Smith Credit Agreement plus accrued interest.
Cash
Flow Considerations
The
Company has historically relied upon equity financings, and to a lesser degree, debt financings, to satisfy its capital requirements
and will continue to depend heavily upon equity capital to finance its activities. The Company may pursue debt financing in the
medium term if it is able to procure such financing on terms more favorable than available equity financing; however, there can
be no assurance the Company will be able to obtain any required financing in the future on acceptable terms.
The
Company has limited financial resources compared to its proposed expenditures, no source of operating income, and no assurance
that additional funding will be available to it for current or future projects, although the Company has been successful in the
past in financing its activities through the sale of equity securities.
The
ability of the Company to arrange additional financing in the future will depend, in part, on the prevailing capital market conditions
and its success in developing the Elk Creek Project. Any quoted market for the Common Shares may be subject to market trends generally,
notwithstanding any potential success of the Company in creating revenue, cash flows, or earnings, and any depression of the trading
price of the Company’s Common Shares could impact its ability to obtain equity financing on acceptable terms.
46
Historically,
the Company has used net proceeds from issuances of Common Shares to provide sufficient funds to meet its near-term exploration
and development plans and other contractual obligations when due. However, further development and construction of the Elk Creek
Project will require substantial additional capital resources. This includes near-term funding and, ultimately, long-term funding
(including debt and equity financing) for Elk Creek Project construction and other costs.
Debt
Covenants
The
Lind III Convertible Security contains financial and non-financial covenants customary for a facility of this size and nature,
and includes a financial covenant defining an event of default as all present and future liabilities of the Company or any of
its subsidiaries, exclusive of related party loans, for an amount or amounts exceeding C$2.0 million, and which have not been
satisfied on time or within 90 days of invoice, or have become prematurely payable as a result of its default or breach. In addition,
The Smith Credit Agreement contains financial and non-financial covenants customary for a facility of its size and nature. The
Company was in compliance with these covenants as of June 30, 2022.
Environmental
Our
mining and exploration activities are subject to various federal and state laws and regulations governing the protection of the
environment. We have made, and expect to make in the future, expenditures to comply with such laws and regulations, but cannot
predict the full amount of such future expenditures. As of June 30, 2022 and 2021, we had accrued $48 and $48, respectively, related
to estimated environmental obligations.
Forward-Looking
Statements
The
foregoing discussion and analysis, as well as certain information contained elsewhere in this Annual Report on Form 10-K, contain
“forward-looking statements” within the meaning of Section 27A of the Securities Act and Section 21E of
the Exchange Act, and are intended to be covered by the safe harbor created thereby. See the discussion in “Forward-Looking
Statements” in Item 1., “Business.”
Accounting
Developments
For
a discussion of Recently Adopted Accounting Pronouncements and Recently Issued Accounting Pronouncements, see Note 3 to the
Consolidated Financial Statements.
Critical
Accounting Estimates and Recent Accounting Pronouncements
Our significant accounting
policies are described in Note 3 to the Consolidated Financial Statements included in this Annual Report on Form 10-K. As
described in Note 3, we are required to make estimates and assumptions that affect the reported amounts and related disclosures
of assets, liabilities, revenue, and expenses. Our estimates are based on our experience and our interpretation of economic, political,
regulatory, and other factors that affect our business prospects. Many of the inputs into our estimation process are subject to
uncertainty over time and therefore, actual results may differ significantly from our estimates. Note 3 also discloses recent accounting
pronouncements applicable to the Company.
We
believe that our most critical accounting estimates are related to the carrying value of our long term assets; accounting for
income taxes; and valuation of deferred tax assets, as they require us to make assumptions that are highly uncertain at the time
the accounting estimates are made and changes in them are reasonably likely to occur from period to period. Management has discussed
the development and selection of these critical accounting estimates with the Audit Committee of our board of directors, and the
Audit Committee has reviewed the disclosures presented below. In addition, there are other items within our financial statements
that require estimation, but are not deemed to be critical. However, changes in estimates used in these and other items could
have a material impact on our financial statements.
47
Carrying
Value of Long-Lived Assets
The
recoverability of the carrying values of mineral properties is dependent upon economic reserves being discovered or developed
on the properties, permitting, financing, start-up, and commercial production from, or the sale/lease of, or other strategic transactions
related to these properties. Development and/or start-up of a project will depend on, among other things, management’s ability
to raise sufficient capital for these purposes. We assess the carrying cost of our mineral properties for impairment whenever
information or circumstances indicate the potential for impairment. Key inputs include events and circumstances such as our inability
to obtain all the necessary permits, changes in the legal status of our mineral properties, government actions, the results of
exploration activities and technical evaluations and changes in economic conditions, including the price of commodities or input
prices. Many of these inputs are subjective and are subject to uncertainty over time. Such evaluations compare estimated future
net cash flows with our carrying costs and future obligations on an undiscounted basis. If it is determined that the estimated
future undiscounted cash flows are less than the carrying value of the property, an impairment loss will be recorded, measured
by the amount by which the carrying amount of the assets exceeds the fair value of the assets. Where estimates of future net cash
flows are not determinable and where other conditions indicate the potential for impairment, management uses available market
information and/or third-party valuation experts to assess if the carrying value can be recovered and to estimate fair value.
We
review and evaluate our long-lived assets, other than mineral properties, for impairment when events or changes in circumstances
indicate that the related carrying amounts may not be recoverable. An impairment loss is measured and recorded based on the estimated
fair value of the long-lived assets being tested for impairment and their carrying amounts.
Income
Taxes
We
account for income taxes using the liability method, recognizing certain temporary differences between the financial reporting
basis of our liabilities and assets and the related income tax basis for such liabilities and assets. This method generates a
net deferred income tax liability or asset, as measured by the statutory tax rates in effect. We derive our deferred income tax
expense or benefit by recording the change in the net deferred income tax liability or asset balance for the year. With respect
to the earnings we derive from the operations of our consolidated subsidiaries, in those situations where the earnings are indefinitely
reinvested, no deferred taxes have been provided on the unremitted earnings (including the excess of the carrying value of the
net equity of such entities for financial reporting purposes over the tax basis of such equity) of our consolidated subsidiaries.
We
are subject to reviews of our income tax filings and other tax payments, and disputes can arise with the taxing authorities over
the interpretation of its contracts or laws. We recognize and record potential tax liabilities and record tax liabilities for
anticipated tax audit issues in the U.S. and other tax jurisdictions based on our estimate of whether, and the extent to which,
additional taxes will be due. We adjust these reserves in light of changing facts and circumstances; however, due to the complexity
of some of these uncertainties, the ultimate resolution may result in a payment that is materially different from our current
estimate. If our estimate of tax liabilities proves to be different than the ultimate assessment, an additional expense or benefit
would result. We recognize interest and penalties, if any, related to unrecognized tax benefits in Income tax benefit (expense).
In certain jurisdictions, we must pay a portion of the disputed amount to the local government in order to formally appeal
the assessment. Such payment is recorded as a receivable if we believe the amount is ultimately recoverable.
Valuation
of Deferred Tax Assets
Our
deferred income tax assets include certain future tax benefits. We record a valuation allowance against any portion of those deferred
income tax assets when we believe, based on the weight of available evidence, it is more likely than not that some portion or
all of the deferred income tax asset will not be realized. We review the likelihood that we will realize the benefit of our deferred
tax assets and therefore the need for valuation allowances on a quarterly basis, or more frequently if events indicate that a
review is required. In determining the requirement for a valuation allowance, the historical and projected financial results of
the legal entity or consolidated group recording the net deferred tax asset is considered, along with all other available positive
and negative evidence.
48
Other
The Company
has one class of shares, being Common Shares. A summary of outstanding shares, share options, warrants, and convertible debt option
as of September 6, 2022, is set out below, on a fully diluted basis.
Common
Shares Outstanding
(fully
diluted)
Common
Shares
278,127,688
Stock
options 1
14,464,000
Warrants 1
18,516,253
Convertible
Debt 2
2,533,300
1 Each
exercisable into one Common Share
2 Represents Common Shares issuable on conversion of aggregate outstanding principal amounts of $1.6 million
of convertible debt as of September 6, 2022, assuming a market price per Common Share of $0.74 on that date.
ITEM 7A. QUANTITATIVE
AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK
Interest
rate risk
The
Company’s exposure to changes in market interest rates, relates primarily to the Company’s earned interest income
on cash deposits and short-term investments. The Company maintains a balance between the liquidity of cash assets and the interest
rate return thereon. The carrying amount of financial assets, net of any provisions for losses, represents the Company’s
maximum exposure to credit risk.
Foreign
currency exchange risk
The
company incurs expenditures in both U.S. and Canadian dollars. Canadian dollar expenditures are primarily related to engineering
and metallurgical exploration expenses, as well as certain professional services. As a result, currency exchange fluctuations
may impact the costs of our operating activities. To reduce this risk, we maintain sufficient cash balances in Canadian dollars
to fund expected near-term expenditures.
Commodity
price risk
The
Company is exposed to commodity price risk related to the elements associated with the Elk Creek Project. A significant decrease
in the global demand for these elements may have a material adverse effect on our business. The Elk Creek Project is not in production,
and the Company does not currently hold any commodity derivative positions.
ITEM 8. FINANCIAL
STATEMENTS AND SUPPLEMENTARY DATA
49
Report
of Independent Registered Public Accounting Firm
Shareholders
and Board of Directors
NioCorp
Developments Ltd.
Centennial,
Colorado
Opinion
on the Consolidated Financial Statements
We
have audited the accompanying consolidated balance sheets of NioCorp Developments, Ltd. (the “Company”) as of June
30, 2022 and 2021, the related consolidated statements of operations and comprehensive loss, shareholders’ equity, and cash
flows for each of the three years in the period ended June 30, 2022, and the related notes (collectively referred to as the “consolidated
financial statements”). In our opinion, the consolidated financial statements present fairly, in all material respects,
the financial position of the Company at June 30, 2022 and 2021, and the results of its operations and its cash flows for each
of the three years in the period ended June 30, 2022 , in conformity with accounting principles generally accepted in the
United States of America.
Going
Concern Uncertainty
The
accompanying consolidated financial statements have been prepared assuming that the Company will continue as a going concern.
As discussed in Note 4 to the consolidated financial statements, the Company has an accumulated deficit and suffered recurring
losses without any current revenue generating operations. These conditions raise substantial doubt about the Company’s ability
to continue as a going concern. Management’s plans in regard to these matters are also described in Note 4. The consolidated
financial statements do not include any adjustments that might result from the outcome of this uncertainty.
Basis
for Opinion
These
consolidated financial statements are the responsibility of the Company’s management. Our responsibility is to express an
opinion on the Company’s consolidated financial statements based on our audits. We are a public accounting firm registered
with the Public Company Accounting Oversight Board (United States) (“PCAOB”) and are required to be independent with
respect to the Company in accordance with the U.S. federal securities laws and the applicable rules and regulations of the Securities
and Exchange Commission and the PCAOB.
We
conducted our audits in accordance with the standards of the PCAOB. Those standards require that we plan and perform the audit
to obtain reasonable assurance about whether the consolidated financial statements are free of material misstatement, whether
due to error or fraud. The Company is not required to have, nor were we engaged to perform, an audit of its internal control over
financial reporting. As part of our audits we are required to obtain an understanding of internal control over financial reporting
but not for the purpose of expressing an opinion on the effectiveness of the Company’s internal control over financial reporting.
Accordingly, we express no such opinion.
Our
audits included performing procedures to assess the risks of material misstatement of the consolidated financial statements, whether
due to error or fraud, and performing procedures that respond to those risks. Such procedures included examining, on a test basis,
evidence regarding the amounts and disclosures in the consolidated financial statements. Our audits also included evaluating the
accounting principles used and significant estimates made by management, as well as evaluating the overall presentation of the
consolidated financial statements. We believe that our audits provide a reasonable basis for our opinion.
Critical
Audit Matters
Critical
audit matters are matters arising from the current period audit of the consolidated financial statements that were communicated
or required to be communicated to the audit committee and that: (1) relate to accounts or disclosures that are material to the
consolidated financial statements and (2) involved our especially challenging, subjective, or complex judgments. We determined
that there are no critical audit matters.
/s/
BDO USA LLP
We
have served as the Company's auditor since 2015.
Spokane,
Washington
September
6, 2022
50
NioCorp Developments Ltd.
Consolidated Balance Sheets
(expressed in thousands of U.S. dollars, except share data)
As of June 30,
Note
2022
2021
ASSETS
Current
Cash
$ 5,280
$ 7,317
Prepaid expenses and other
402
24
Total current assets
5,682
7,341
Non-current
Deposits
35
35
Investment in equity securities
10
16
Right-of-use assets
12
94
156
Land and buildings, net
6
850
837
Mineral properties
5
16,085
16,085
Total assets
$ 22,756
$ 24,470
LIABILITIES
Current
Accounts payable and accrued liabilities
7
$ 817
$ 408
Related party loan
10
2,000
2,318
Convertible debt, current portion
8
796
1,123
Operating lease liability
12
82
69
Total current liabilities
3,695
3,918
Non-current
Convertible debt, net of current
8
-
6,784
Operating lease liability
12
23
105
Total liabilities
3,718
10,807
Commitments and contingencies
3i, 12
SHAREHOLDERS’ EQUITY
Common stock, no par value, unlimited shares authorized; shares outstanding: 276,670,606 at June 30, 2022 and 256,379,931 at June 30, 2021
9
129,055
113,882
Accumulated deficit
( 109,005 )
( 99,076 )
Accumulated other comprehensive loss
( 1,012 )
( 1,143 )
Total shareholder equity
19,038
13,663
Total liabilities and equity
$ 22,756
$ 24,470
The accompanying notes are an integral part of these consolidated financial statements
51
NioCorp Developments Ltd.
Consolidated Statements of Operations and Comprehensive
Loss
(expressed in thousands of U.S. dollars, except share and per
share data)
For the year
ended June 30,
Note
2022
2021
2020
Operating expenses
Employee related costs
$ 2,150
$ 1,655
$ 1,376
Professional fees
684
386
327
Exploration expenditures
11
3,309
1,056
1,201
Other operating expenses
1,653
995
528
Total operating expenses
7,796
4,092
3,432
Change in financial instrument fair value
-
( 32 )
38
Other income
-
( 208 )
-
Loss on debt extinguishment
8
-
163
-
Foreign exchange loss (gain)
221
( 729 )
179
Interest expense
1,906
1,113
354
Loss (gain) on equity securities
6
( 9 )
( 2 )
Loss before income taxes
9,929
4,390
4,001
Income tax benefit
13
-
-
-
Net loss
$ 9,929
$ 4,390
$ 4,001
Other comprehensive loss:
Net loss
$ 9,929
$ 4,390
$ 4,001
Other comprehensive (gain) loss:
Reporting currency translation
( 131 )
788
( 171 )
Total comprehensive loss
$ 9,798
$ 5,178
$ 3,830
Loss per common share, basic and diluted
$ 0.04
$ 0.02
$ 0.02
Weighted average common shares outstanding
263,737,227
241,967,116
234,610,126
The accompanying notes are an integral part of these consolidated financial statements
52
NioCorp Developments Ltd.
Consolidated Statements of
Cash Flows
(expressed in thousands of U.S. dollars)
For the year
ended June 30,
2022
2021
2020
CASH FLOWS FROM OPERATING ACTIVITIES
Total loss for the period
$ ( 9,929 )
$ ( 4,390 )
$ ( 4,001 )
Adjustments for:
Noncash lease activity
( 7 )
30
-
Change in financial instrument fair value
-
( 32 )
38
Depreciation
3
-
-
Unrealized loss (gain) on equity securities
6
( 9 )
( 2 )
Accretion of convertible debt
1,696
670
-
Foreign exchange loss (gain)
294
( 665 )
144
Gain on debt forgiveness
-
( 196 )
-
Loss on debt extinguishment
-
163
-
Share-based compensation
1,745
797
153
Total
( 6,192 )
( 3,632 )
( 3,668 )
Change in working capital items:
Prepaid expenses
( 377 )
9
40
Accounts payable and accrued liabilities
419
( 1,103 )
579
Net cash used in operating activities
( 6,150 )
( 4,726 )
( 3,049 )
CASH FLOWS FROM INVESTING ACTIVITIES
Acquisition of mineral rights
-
( 5,468 )
-
Acquisition of land and buildings
( 16 )
( 837 )
Net cash used in investing activities
( 16 )
( 6,305 )
-
CASH FLOWS FROM FINANCING ACTIVITIES
Proceeds from issuance of capital stock
4,737
10,677
470
Share issue costs
( 118 )
( 174 )
-
Issuance of convertible debt, net of costs
-
9,477
-
Loan repayments
-
( 406 )
-
Related party debt draws
-
-
2,338
Related party debt repayments
( 318 )
( 1,500 )
-
Long term debt funding
-
-
196
Net cash provided by financing activities
4,301
18,074
3,004
Exchange rate effect on cash and cash equivalents
( 172 )
( 33 )
( 5 )
Change in cash and cash equivalents during period
( 2,037 )
7,010
( 50 )
Cash and cash equivalents, beginning of period
7,317
307
357
Cash and cash equivalents, end of period
$ 5,280
$ 7,317
$ 307
Supplemental cash flow information:
Amounts paid for interest
$ 252
$ 873
$ 64
Amounts paid for income taxes
-
-
-
Non-cash investing and financing transactions:
Conversion of debt for common shares
$ 8,807
$ 3,106
$ 980
Recognition of operating lease liabilities
-
231
-
Derecognition of operating lease liabilities
-
( 22 )
-
Accounts payable to note conversion
-
1,640
406
Value of warrants issued
-
1,795
-
The accompanying notes are an integral part of these consolidated financial statements
53
NioCorp Developments Ltd.
Consolidated Statements of Shareholders’ Equity
(expressed in thousands of U.S. dollars, except share data)
Common Shares Outstanding
Common Stock
Deficit
Accumulated other comprehensive income
Total
Balance, July 1, 2019
232,496,215
$ 96,063
$ ( 90,685 )
$ ( 526 )
$ 4,852
Exercise of warrants
664,549
338
-
-
338
Exercise of options
320,500
148
-
-
148
Debt conversions
2,444,420
980
-
-
980
Share-based compensation
-
153
-
-
153
Reporting currency presentation
-
-
-
171
171
Loss for the year
-
-
( 4,001 )
-
( 4,001 )
Balance, June 30, 2020
235,925,684
$ 97,682
$ ( 94,686 )
$ ( 355 )
$ 2,641
Exercise of warrants
9,106,283
5,338
-
-
5,338
Exercise of options
2,952,296
215
-
-
215
Fair value of warrants granted
-
1,795
-
-
1,795
Private placement – May 2021
4,334,157
5,124
-
-
5,124
Debt conversions
4,061,511
3,106
-
-
3,106
Share issuance costs
-
( 175 )
-
-
( 175 )
Share-based compensation
-
797
-
-
797
Reporting currency presentation
-
-
-
( 788 )
( 788 )
Loss for the year
-
-
( 4,390 )
-
( 4,390 )
Balance, June 30, 2021
256,379,931
$ 113,882
$ ( 99,076 )
$ ( 1,143 )
$ 13,663
Exercise of warrants
871,750
543
-
-
543
Exercise of options
2,051,533
483
-
-
483
Fair value of warrants granted
-
14
-
-
14
Private placement – June 2022
4,981,035
3,711
-
-
3,711
Debt conversions
12,386,357
8,807
-
-
8,807
Share issuance costs
-
( 130 )
-
-
( 130 )
Share-based compensation
-
1,745
-
-
1,745
Reporting currency presentation
-
-
-
131
131
Loss for the year
-
-
( 9,929 )
-
( 9,929 )
Balance, June 30, 2022
276,670,606
$ 129,055
$ ( 109,005 )
$ ( 1,012 )
$ 19,038
The accompanying notes are an integral part of these consolidated financial statements
54
NioCorp
Developments Ltd.
Notes
to Consolidated Financial Statements
June
30, 2022
(expressed
in thousands of U.S. dollars, except share and per share data)
1. DESCRIPTION
OF BUSINESS
NioCorp
Developments Ltd. (the “Company”) was incorporated on February 27, 1987, under the laws of the Province of British
Columbia and currently operates in one reportable operating segment consisting of exploration and development of mineral deposits
in North America, specifically, the Elk Creek niobium/scandium/titanium property (the “Elk Creek Project”) located
in Southeastern Nebraska.
These
consolidated financial statements have been prepared on a going concern basis that contemplates the realization of assets and
discharge of liabilities at their carrying values in the normal course of business for the foreseeable future. These financial
statements do not reflect any adjustments that may be necessary if the Company is unable to continue as a going concern.
The
Company currently earns no operating revenues and will require additional capital in order to advance the Elk Creek Project. These
matters raised substantial doubt about the Company’s ability to continue as a going concern, and the Company is dependent upon
the generation of profits from mineral properties, obtaining additional financing and maintaining continued support from its shareholders
and creditors.
2. BASIS
OF PREPARATION
a) Basis
of Preparation and Consolidation
These
consolidated financial statements have been prepared in conformity with generally accepted accounting principles of the U.S. (“U.S.
GAAP”). Certain transactions include reference to Canadian dollars (“C$”) where applicable.
These
consolidated financial statements include the accounts of the Company and the subsidiaries listed in the following table. All
intercompany transactions and balances have been eliminated.
Schedule of intercompany transactions and balances
Country
of incorporation
Ownership
at June 30,
2022
2021
0896800
BC Ltd. (“0896800”)
Canada
100 %
100 %
Elk
Creek Resources Corp. (“ECRC”)
USA
100 %
100 %
b) Use
of Estimates
The
preparation of consolidated financial statements in conformity with U.S. GAAP requires management to make estimates and assumptions
that affect the reported amounts of assets and liabilities and the disclosure of contingent assets and liabilities at the date
of the financial statements and the reported amounts of expenses during the reporting period. The Company regularly evaluates
estimates and assumptions related to the deferred income tax asset valuations and share-based compensation. The Company bases
its estimates and assumptions on current facts, historical experience and various other factors that it believes to be reasonable
under the circumstances, the results of which form the basis for making judgments about the other sources. The actual results
experienced by the Company may differ materially and adversely from the Company’s estimates. To the extent there are material
differences between estimates and the actual results, future results of operations will be affected.
3. SIGNIFICANT
ACCOUNTING POLICIES
a) Development
Stage Issuer
The
Company is considered to be a development stage issuer under Subpart 1300 of Regulation S-K of the United States Securities Act
of 1933, as amended (“ S-K 1300”), and it devotes substantially all of its efforts to acquiring and exploring mining
interests that management believes should eventually provide sufficient net profits to sustain the Company’s existence.
Until such interests are engaged in commercial production, the Company will continue to seek additional funding to support the
completion of its exploration and development activities. The Company’s activities are subject to significant risks and
uncertainties, including its ability to secure sufficient funding to continue operations, to obtain proven and probable reserves,
to comply with industry regulations and obtain permits necessary for development of the Elk Creek Project, as well as environmental
risks and market conditions.
55
NioCorp
Developments Ltd.
Notes
to Consolidated Financial Statements
June
30, 2022
(expressed
in thousands of U.S. dollars, except share and per share data)
b) Cash
and Cash Equivalents
Cash
and cash equivalents include cash on hand, cash in banks, investments in certificates of deposit with original maturities of 90
days or less, and money market funds.
c) Foreign
Currency Translation
Functional
and reporting currency
Items
included in the financial statements of each of the Company’s entities are measured using the currency of the primary economic
environment in which the entity operates (“the functional currency”). The functional currency of the Company is the
Canadian dollar and the functional currency for Elk Creek Resources Corp., a wholly owned subsidiary, is the U.S. dollar.
The
reporting currency for these consolidated financial statements is U.S. dollars.
Transactions
in foreign currency
Transactions
made in a currency other than the functional currency are remeasured to the functional currency at exchange rates at the dates
of the transactions. Monetary assets and liabilities denominated in foreign currencies at the reporting date are remeasured to
the functional currency at the exchange rate at that date and non-monetary assets and liabilities are remeasured at historical
rates. Foreign currency translation gains and losses are included in profit or loss.
Translation
to reporting currency
The
results and financial position of entities that have a functional currency different from the reporting currency are translated
into the reporting currency as follows:
• Assets
and liabilities for each statement of financial position presented are translated at
the closing rate at the end of the reporting date.
• Income
and expenses for each statement of income are translated at average exchange rates, unless
this average is not a reasonable approximation of the cumulative effect of the rates
prevailing on the transaction dates, in which case income and expenses are translated
at the rate on the dates of the transactions.
• All
resulting exchange differences are recognized in other comprehensive income.
d) Mineral
Properties
Mineral
property acquisition costs, including indirectly related acquisition costs, are capitalized when incurred. Acquisition costs include
cash consideration and the fair market value of Common Shares issued as consideration. Properties acquired under option agreements,
whereby payments are made at the sole discretion of the Company, are capitalized as mineral property acquisition costs at such
time as the payments are made. Exploration costs are expensed as incurred. When it is determined that a mining deposit can be
economically and legally extracted or produced based on established proven and probable reserves under S-K 1300, and the Board
of Directors has approved the commencement of formal development activities, development costs related to such reserves and incurred
after such board approval will be considered for capitalization. The establishment of proven and probable reserves is based on
results of feasibility studies, which indicate whether a property is economically feasible. Upon commencement of commercial production,
capitalized costs will be amortized over their estimated useful lives or units of production, whichever is a more reliable measure.
Capitalized amounts relating to a property that is abandoned or otherwise considered uneconomic for the foreseeable future are
written off.
The
recoverability of the carrying values of mineral properties is dependent upon economic reserves being discovered or developed
on the properties, permitting, financing, start-up, and commercial production from, or the sale/lease of, or other strategic transactions
related to these properties. Development and/or start-up of a project will depend on, among other things, management’s ability
to raise sufficient capital for these purposes. We assess the carrying cost of our mineral properties for impairment whenever
information or circumstances indicate the potential for impairment. This would include events and circumstances such as our inability
to obtain all the necessary permits, changes in the legal status of our mineral properties, government actions, the results of
exploration activities and technical evaluations and changes in economic conditions, including the price of commodities or input
prices. Such evaluations compare estimated future net cash flows with our carrying costs and future obligations on an undiscounted
basis. If it is determined that the estimated future undiscounted cash flows are less than the carrying value of the property,
an impairment loss will be recorded. Where estimates of future net cash flows are not determinable and where other conditions
indicate the potential for impairment, management uses available market information and/or third-party valuation experts to assess
if the carrying value can be recovered and to estimate fair value. There was no impairment recorded to mineral properties as of
June 30, 2022 or 2021, respectively.
56
NioCorp
Developments Ltd.
Notes
to Consolidated Financial Statements
June
30, 2022
(expressed
in thousands of U.S. dollars, except share and per share data)
e) Long
Lived Assets
Long-lived
assets, other than mineral properties, held and used by the Company are reviewed for impairment whenever events or changes in
circumstances indicate that the carrying amount of an asset may not be recoverable. For purposes of evaluating the recoverability
of long-lived assets, the recoverability test is performed using undiscounted net cash flows related to the long-lived assets.
If such assets are considered to be impaired, the impairment recognized is measured by the amount by which the carrying amount
of the assets exceeds the fair value of the assets. Assets to be disposed of are reported at the lower of the carrying amount
or fair value less costs to sell. There was no impairment recorded to long-lived assets as of June 30, 2022 or 2021, respectively.
f) Leases
Under
Accounting Standards Codification (“ASC”) 842, “Leases,” we determine if a contractual arrangement is,
or contains, a lease at the inception date. Right-of-use (“ROU”) assets and liabilities related to operating leases
are separately reported in the consolidated balance sheets. The Company currently has no finance leases.
ROU
assets and lease liabilities are recognized at the lease commencement date based on the present value of the future lease payments
over the lease term. When the rate implicit to the lease cannot be readily determined, we utilize our incremental borrowing rate
in determining the present value of the future lease payments. The incremental borrowing rate is derived from information available
at the lease commencement date and represents the rate of interest that a lessee would have to pay to borrow an amount equal to
the lease payments on a collateralized basis over a similar term in a similar economic environment. Operating lease ROU assets
also include any cumulative prepaid or accrued rent when the lease payments are uneven throughout the lease term. The ROU assets
and lease liabilities may include options to extend or terminate the lease when it is reasonably certain that we will exercise
that option.
Lease
liabilities are increased by interest and reduced by payments each period, and the ROU asset is amortized over the lease term.
For operating leases, interest on the lease liability and the amortization of the ROU asset result in straight-line rent expense
over the lease term. Variable lease expenses are recorded when incurred.
g) Financial
Instruments
The
Company’s financial instruments consist of cash, receivables, equity securities, accounts payable and accrued liabilities,
convertible debt and the related party loan. It is management’s opinion that the Company is not exposed to significant interest,
currency or credit risks arising from its financial instruments. The fair values of these instruments approximate their carrying
value unless otherwise noted.
h) Concentration
of Credit Risk
The
financial instrument which potentially subjects the Company to credit risk is cash and cash equivalents, The Company holds investments
or maintains available cash primarily in two commercial banks located in Vancouver, British Columbia and Santa Clara, California.
As part of its cash management process, the Company regularly monitors the relative credit standing of these institutions.
i) Asset
Retirement Obligation
The
Company is subject to various government laws and regulations relating to environmental disturbances caused by exploration and
evaluation activities. The estimated costs associated with environmental remediation obligations are accrued in the period in
which the liability is incurred if it is reasonably estimable or known. Until such time that a project life is established, the
Company records the corresponding cost as an exploration stage expense and has accrued $ 48 as an accrued liability related to
estimated obligations as of June 30, 2022 (2021 - $ 48 ).
57
NioCorp
Developments Ltd.
Notes
to Consolidated Financial Statements
June
30, 2022
(expressed
in thousands of U.S. dollars, except share and per share data)
Future
reclamation and environmental-related expenditures are difficult to estimate in many circumstances due to the early-stage nature
of the Elk Creek Project, the uncertainties associated with defining the nature and extent of environmental disturbance, the application
of laws and regulations by regulatory authorities and changes in reclamation or remediation technology. The Company periodically
reviews accrued liabilities for such reclamation and remediation costs as evidence indicating that the liabilities have potentially
changed becomes available. Changes in estimates are reflected in the consolidated statement of operations in the period an estimate
is revised.
j) Income
Taxes
Income
taxes are provided based upon the liability method of accounting pursuant to ASC 740-10-25, “Income Taxes – Recognition.”
Under the approach, deferred income taxes are recorded to reflect the tax consequences in future years of differences between
the tax basis of assets and liabilities and their financial reporting amounts at each year-end. A valuation allowance is recorded
against deferred tax assets if management does not believe the Company has met the “more likely than not” standard
imposed by ASC 740-10-25-5 to allow recognition of such an asset. ASC 740-10-50, “Income Taxes – Disclosure,”
requires the Company to evaluate its income tax positions and recognize a liability for uncertain tax positions that are not more
likely than not to be sustained by tax authorities. As of June 30, 2022 and 2021, the Company believes it had no income tax uncertainties
that required recognition of a liability. If the Company were to determine that uncertain tax positions meet the criteria for
recognition, an estimated liability and related interest and penalties would be recognized as income tax expense.
k) Basic
and Diluted Per Share Disclosure
Basic
net loss per share is computed by dividing net loss by the weighted average number of Common Shares outstanding during the period.
Diluted net loss per share is computed by dividing the net loss by the weighted-average number of Common Share equivalents outstanding
for the period determined using the treasury stock method or the if-converted method, as applicable. For purposes of this calculation,
options to purchase Common Shares (“Options”) and warrants to purchase Common Shares (“Warrants”) are
considered to be Common Share equivalents and are only included in the calculation of diluted net loss per share when their effect
is dilutive. The following shares underlying Options, Warrants, and outstanding convertible debt were antidilutive due
to a net loss in the periods presented and, therefore, were excluded from the dilutive securities computation for the years
ended June 30, 2022, 2021, and 2020, as indicated below.
Schedule of excluded from the dilutive securities
As
of June 30,
Excluded
potentially dilutive securities (1) :
2022
2021
2020
Options
14,464,000
15,965,000
19,129,409
Warrants
18,516,253
14,341,868
12,376,451
Convertible
debt
4,152,000
14,557,000
1,144,773
Total
potential dilutive securities
37,132,253
44,863,868
32,650,633
(1)
The
number of shares is based on the maximum number of shares issuable on exercise or conversion of the related securities as
of the period end. Such amounts have not been adjusted for the treasury stock method or weighted average outstanding
calculations as required if the securities were dilutive.
l) Share
Based Compensation
The
Company grants stock options to directors, officers, and employees. Option terms and vesting conditions are at the discretion
of the Board of Directors. The option exercise price is equal to the closing market price on the Toronto Stock Exchange on the
day preceding the date of grant.
The
Company estimates the fair value of stock options using the Black-Scholes option pricing model. The Company recognizes forfeitures
as they occur.
m) Recent
Accounting Standards
Issued
and Adopted
In
December 2019, the Financial Accounting Standards Board (the “FASB”) issued Accounting Standards Update (“ASU”)
2019-12, “Income Taxes (Topic 740): Simplifying the Accounting for Income Taxes” (“ASU 2019-12”). ASU
2019-12 removes certain exceptions to the general principles in ASC Topic 740. ASU 2019-12 is effective for public entities for
fiscal years beginning after December 15, 2020, with early adoption permitted. The Company adopted ASU 2019-12 on July 1, 2021,
with no material effect on the Company’ s current financial position, results of operations or financial statement disclosures.
58
NioCorp
Developments Ltd.
Notes
to Consolidated Financial Statements
June
30, 2022
(expressed
in thousands of U.S. dollars, except share and per share data)
Issued
and Not Effective
In August 2020, the FASB issued ASU No. 2020-06, “Debt—Debt with Conversion and Other Options
(Subtopic 470-20) and Derivatives and Hedging - Contracts in Entity’s Own Equity (Subtopic 815-40)” (“ASU 2020-06”),
which simplifies the accounting for convertible instruments. ASU 2020-06 removes certain accounting models which separate the embedded
conversion features from the host contract for convertible instruments. Either a modified retrospective method of transition or
a fully retrospective method of transition is permissible for the adoption of this standard. ASU 2020-06 is effective for fiscal
years beginning after December 15, 2021, including interim periods within those fiscal years. The Company will adopt ASU 2020-06
on July 1, 2022, and this adoption will not have any effect on the Company’ s current financial position, results of operations
or financial statement disclosures.
From
time to time, new accounting pronouncements are issued by the FASB that are adopted by the Company as of the specified effective
date. Unless otherwise discussed, management believes that the impact of recently issued standards did not or will not have a
material impact on the Company’s consolidated financial statements upon adoption.
4. GOING
CONCERN ISSUES
The
Company incurred a loss of $ 9,929 for the year ended June 30, 2022 (2021- $ 4,390 and 2020 - $ 4,001 ) and had an accumulated deficit
of $ 109,005 as of June 30, 2022. As a development stage issuer, the Company has not yet commenced its mining operations and accordingly
does not generate any revenue. As of June 30, 2022, the Company had cash of $ 5,280 which may not be sufficient to fund normal
operations for the next twelve months without deferring payment on certain liabilities or raising additional funds. In addition,
the Company will be required to raise additional funds for construction and commencement of operations. These factors raise substantial
doubt about the Company’s ability to continue as a going concern.
The
Company’s ability to continue operations and fund its expenditures, which have historically averaged approximately $1,160
per quarter, is dependent on management’s ability to secure additional financing. Management is actively pursuing additional
sources of financing, and while it has been successful in doing so in the past, there can be no assurance it will be able to do
so in the future. The Company did not have any further funding commitments or arrangements for additional financing as of June
30, 2022. These consolidated financial statements do not give effect to any adjustments required to realize the Company’s
assets and discharge its liabilities in other than the normal course of business and at amounts different from those reflected
in the accompanying financial statements.
Since
March 2020, several measures have been implemented in the United States, Canada, and the rest of the world in response to the
increased impact from the novel coronavirus (“COVID-19”) pandemic and subsequent COVID-19 variants. In addition, recent
worldwide events have created general global economic uncertainty as well as uncertainty in capital markets, supply chain disruptions,
increased interest rates, and the potential for geographic recessions. We believe this could have an adverse impact on our ability
to obtain financing, development plans, results of operations, financial position, and cash flows during the current fiscal year.
The full extent to which the COVID-19 pandemic and our precautionary measures may continue to impact our business will depend
on future developments, which continue to be highly uncertain and cannot be predicted at this time.
5. MINERAL
PROPERTIES
During
the year ended June 30, 2011, the Company completed the acquisition of the Elk Creek property through a share exchange agreement
with 0859404 BC Ltd, a Canadian company, which owned all the issued and outstanding shares of ECRC. The Company issued 18,990,539
Common Shares to acquire all of the issued and outstanding shares of 0859404 BC Ltd. and issued 1,034,348 Common Shares as a finder’s
fee with respect to the acquisition. The transaction did not meet the definition of a business acquisition, as set forth in ASC
805, “Business Combinations,” and therefore was accounted for as a purchase of assets. The acquisition price was based
on the market value of the Company’s Common Shares on the closing date and total consideration given was C$ 13,246 , including
associated deferred tax impacts of C$ 4,736 .
59
NioCorp
Developments Ltd.
Notes
to Consolidated Financial Statements
June
30, 2022
(expressed
in thousands of U.S. dollars, except share and per share data)
On
April 23, 2021, ECRC formally closed the purchase of two parcels of land and associated buildings and mineral rights in Johnson
County, Nebraska, associated with the Elk Creek Project, pursuant to an Amended and Restated Option to Purchase, dated as of April
29, 2020 (the “Option Agreement”). Pursuant to the terms of the Option Agreement, the Owner sold, transferred, conveyed
and assigned all of her rights, privileges, title and interest in and to the real property to ECRC, including any associated mineral
rights. The Option Agreement provided for a purchase price calculated based on the appraised value per acre of the parcels of
land, the mineral rights and the structures erected on the land. The purchase price was approximately $ 6,300 , including indirect
costs of $ 57 . Of this amount, $ 837 was allocated to land and buildings and the remaining $ 5,468 was allocated to mineral properties
as costs related to mineral rights acquisition.
In
addition to the land and mineral rights currently owned by the Company, the property interests of Elk Creek include eight prepaid
mineral exploration option-to-purchase agreements and include a pre-determined buyout for permanent ownership of the mineral and/or
surface rights. Terms of the agreements require no further significant payments, and the Company may negotiate lease extensions
or elect to purchase the mineral and/or surface rights any time. Agreements that allow for the purchase of mineral rights contain
provisions whereby the landowners would retain a 2 % net smelter return.
6. LAND
AND BUILDINGS, NET
Schedule
of properties
As
of June 30,
2022
2021
Cost
Accumulated
Depreciation
Net
Cost
Accumulated
Depreciation
Net
Land
$
811
$
-
$
811
$
811
$
-
$
811
Buildings
and other
45
6
39
29
3
26
$
856
$
6
$
850
$
840
$
3
$
837
7. ACCOUNTS
PAYABLE AND ACCRUED LIABILITIES
Schedule
of account payable and accrued liabilities
As
of June 30,
2022
2021
Accounts
payable, trade
$
115
$
163
Trade payable accruals
654
157
Environmental
accruals
48
48
Interest
payable to related party (see Note 10)
-
40
Total
accounts payable and accrued liabilities
$
817
$
408
8. CONVERTIBLE
DEBT
Schedule
of convertible debt
As
of June 30,
2022
2021
Current
Portion:
Lind
III convertible security
$
796
$
-
Nordmin
note
-
1,123
Total
current portion
$
796
$
1,123
Noncurrent
Portion:
Lind
III convertible security
$
-
$
6,784
60
NioCorp
Developments Ltd.
Notes
to Consolidated Financial Statements
June
30, 2022
(expressed
in thousands of U.S. dollars, except share and per share data)
Lind
III Convertible Security
On
February 19, 2021, the Company issued to Lind Global Asset Management III, LLC (“Lind III”), an entity managed by
The Lind Partners, a New York-based asset management firm (“The Lind Partners”), a convertible security (the “Lind
III Convertible Security”) pursuant to a definitive convertible security funding agreement, dated as of February 16, 2021
(the “Lind III Agreement”), between the Company and Lind III. The Lind III Convertible Security has a face value of
$ 11,700 (representing $10,000 in funding plus an implied 8.5 % interest rate per annum for the term of the Lind III Convertible
Security). After deducting a $ 350 commitment fee as set forth in the Lind III Agreement, NioCorp received net proceeds of $ 9,650
from the funding of the Lind III Convertible Security. As further discussed in Note 5, on April 23, 2021, the Company used a portion
of the proceeds from the funding of the Lind III Convertible Security to purchase a key land parcel associated with the Company’s
Elk Creek Project, with the remainder to be spent for general corporate purposes.
The
Lind III Convertible Security has a term of (i) 24
months or (ii) 30 calendar days after the date on which the face value of the Lind III Convertible Security is nil due to
such amount having been fully converted and/or fully repaid (including with any applicable premium) in accordance with the terms of
the Lind III Agreement, whichever is earlier. The Lind III Convertible Security constitutes the direct, general and unconditional
obligation of the Company and ranks pari-passu with the Company’s other indebtedness. The Lind III Convertible Security is
guaranteed on a secured basis by 0896800 and ECRC.
The
Lind III Convertible Security is secured by all of the assets and property of the Company and 0896800, including all of the issued
and outstanding shares of 0896800 pledged by the Company and all of the issued and outstanding shares of ECRC pledged by 0896800,
and certain real property and fixtures of ECRC. The liens securing the Lind III Convertible Security rank pari-passu with the
liens securing a non-revolving credit facility (the “Smith Credit Agreement”) with a limit of $ 3,500 with Mark Smith,
President, Chief Executive Officer (“CEO”) and Executive Chairman of NioCorp, pursuant to a Credit Facility Agreement,
dated January 16, 2017, between the Company and Mr. Smith, as amended from time to time. The liens securing the Lind III Convertible
Security rank senior to the liens securing the Smith Credit Agreement on any amount that is owed by the Company to Mr. Smith in
excess of $ 4,000 .
Pursuant
to the Lind III Agreement, Lind III is entitled to convert the Lind III Convertible Security into Common Shares in monthly installments
over its term at a price per Common Share equal to 85% of the volume-weighted average price Common Shares on the Toronto Stock
Exchange (“TSX”) for the five trading days immediately preceding to the date on which Lind III provides notice to
the Company of its election to convert. The Lind III Agreement provides that Common Shares issuable upon conversion, together
with the number of Common Shares issued upon exercise of Warrants, shall not exceed 43,588,000 Common Shares. Subject to certain
exceptions, the Lind III Agreement contains restrictions on how much of the Lind III Convertible Security may be converted in
any particular month. The Lind III Agreement also provides NioCorp with the option to buy back the remaining face amount of the
Lind III Convertible Security in cash at any time; provided that, if the Company exercises such option, Lind III will have the
option to convert up to 33.33% of the remaining face amount into Common Shares at the price described above . In addition, Lind
III is entitled to accelerate its conversion right to the full amount of the face value of the Lind III Convertible Security or
demand repayment thereof in cash upon the occurrence of an event of default and other designated events described in the Lind
III Agreement.
On
February 19, 2021, in connection with the funding and issuance of the Lind III Convertible Security, the Company issued 8,558,000
Common Share purchase warrants, exercisable at a price per Common Share of C$ 0.97 , expiring February 19, 2025 (the “Lind
III Warrants”), to Lind III pursuant to the Lind III Agreement.
The
Company identified embedded derivatives in the Lind III Convertible Security that were evaluated to be immaterial at both the
closing date and at June 30, 2022.
The
Company allocated the net proceeds of $ 9,477 from the Lind III Convertible Security as follows:
● $1,712
was allocated to Common Stock, representing the fair value of the Lind III Warrants based on the Black Scholes pricing model using
a risk-free interest rate of 0.40 %, an expected dividend yield of 0 %, a volatility of 51.60 %, and an expected life of 4.0 years.
61
NioCorp
Developments Ltd.
Notes
to Consolidated Financial Statements
June
30, 2022
(expressed
in thousands of U.S. dollars, except share and per share data)
●
$7,938
was allocated to the convertible debt liability. Transaction costs of $ 173 , in addition to a commitment fee of $ 350 , were
recognized as a direct deduction from the debt liability, resulting a net opening balance of $7,765. This balance will be
accreted up to face value of the Lind III Convertible Security at maturity using the effective interest method and recorded
as non-cash interest expense in the consolidated statement of operations.
Based
on the Company’s closing Common Share price of C$ 0.90 as of June 30, 2022, conversion of the remaining Lind III Convertible
Security balance, including accrued interest, would require the issuance of approximately 4,152,000 Common Shares. For each C$ 0.01
change in the fair value of one Common Share, the total shares the Company would be obligated to issue would change by approximately
47,000 shares.
Changes
in the Lind III Convertible Security are as follows:
For
the year ending June 30,
2022
2021
Beginning
balance
$
6,784
$
7,765
Conversions
( 7,635
)
( 1,600
)
Accretion
expense
1,647
619
Balance,
end of period
$
796
$
6,784
The
Lind III Convertible Security contains financial and non-financial covenants customary for a facility of this size and nature,
and includes a financial covenant defining an event of default as all present and future liabilities of the Company or any of
its subsidiaries, exclusive of related party loans, for an amount or amounts exceeding C$ 2.0 million , and which have not been
satisfied on time or within 90 days of invoice, or have become prematurely payable as a result of its default or breach. The Company
was in compliance with these covenants as of June 30, 2022.
Nordmin
Note
On
December 18, 2020, the Company issued a convertible note in the principal amount of approximately $ 1,872 (the “Nordmin Note”)
and 500,000 Common Share purchase warrants, exercisable at a price per Common Share of $0.80, expiring December 18, 2022 (the
“Nordmin Warrants”) to Nordmin Engineering Ltd. (“Nordmin”) pursuant to a convertible note and warrant
subscription agreement, dated December 18, 2020 (the “Nordmin Agreement”), between the Company and Nordmin. Under
the Nordmin Agreement, Nordmin agreed to subscribe for and purchase the Nordmin Note and Nordmin Warrants for a subscription price
of approximately $ 1,804 . This amount was set off against the amount owed to Nordmin by NioCorp for past services.
The
Nordmin Note matured on December 18, 2021, and had no stated interest rate, an implied interest rate of 5 % per annum and, subject
to certain terms and conditions, was convertible into up to 4,500,000 Common Shares at a conversion price of 92% of the five-day
volume-weighted average price of the Common Shares on the TSX at the time of conversion. The Nordmin Note contains restrictions
on how much of the principal amount may be converted in any 30-day period. The Nordmin Note also provides the Company with the
option to prepay, in whole or in part, any outstanding principal amount thereunder, upon three days’ notice to Nordmin.
In addition, Nordmin is entitled to accelerate the maturity of the Nordmin Note and require the Company to prepay the outstanding
principal amount upon the occurrence of an event of default and other designated events described in the Nordmin Note. The Nordmin
Note constitutes the direct, general and unconditional obligation of the Company. The Nordmin Note is unsecured and ranks effectively
junior to the Company’s secured indebtedness, including under the Lind III Convertible Security and the Smith Credit Agreement,
to the extent of the value of the assets securing such indebtedness.
Pursuant
to the terms of the Nordmin Agreement, on December 18, 2020, the Company issued 836,551 Common Shares to Nordmin upon an initial
conversion of $ 450 in principal amount of the Nordmin Note at a conversion price of C$ 0.684 per share.
62
NioCorp
Developments Ltd.
Notes
to Consolidated Financial Statements
June
30, 2022
(expressed
in thousands of U.S. dollars, except share and per share data)
The
Company accounted for this transaction as a debt extinguishment under Accounting Standards Codification 470, Debt. Accordingly,
the Company wrote off the value of the existing obligation, calculated the fair value of the Nordmin Note and recorded a loss
of $ 163 on the difference in the consolidated statement of operations. This loss included $63 related to the fair value of the
Nordmin Warrants at closing. The fair value of the Nordmin Warrants was estimated based on the Black Scholes pricing model using
a risk-free interest rate of 0.32 %, an expected dividend yield of 0 %, a volatility of 43.16 %, and an expected life of 2.0 years.
The
Company initially recorded the Nordmin Note at a fair value of $1,740. The remaining initial fair value balance will be accreted
up to net face value of the Nordmin Note over the remaining time until maturity using the effective interest method. In addition,
transaction costs of $ 25 were expensed at closing.
Changes
in the Nordmin Note are as follows:
Convertible
Note
Extinguishment
of accounts payable
$
1,740
Conversions
( 668
)
Accretion
expense
51
Balance,
June 30, 2021
$
1,123
Conversions
( 1,172
)
Accretion
expense
49
Balance,
June 30, 2022
-
9. COMMON
STOCK
a) Issuances
Fiscal
Year 2022 Issuances
On
June 30, 2022, the Company closed a non-brokered private placement (the “June 2022 Private Placement”) of units (the
“Units”) of the Company. A total of 4,981,035 Units were issued at a price per Unit of C$ 0.96 , for total gross proceeds
to the Company of approximately C$ 4.8 million . Each Unit consists of one Common Share and one common share purchase warrant (“June
2022 Warrant”). Each June 2022 Warrant entitles the holder to acquire one Common Share at a price of C$ 1.10 at any time
prior to July 1, 2024. Proceeds of the June 2022 Private Placement will be used for continued advancement of the Company’s
Elk Creek Critical Minerals Project and for working capital and general corporate purposes. The Company paid cash commissions
of C$ 62 and 65,100 warrants (the “Finder Warrants”), having the same terms as the June 2022 Warrants, to finders outside
of the United States. The Finder Warrants were valued at C$ 18 using a risk-free rate of 3.2 %, expected volatility of 64 % and expected
life of two years.
Fiscal
Year 2021 Issuances
On
May 10, 2021, the Company closed a non-brokered private placement (the “April 2021 Private Placement”) of Units of
the Company. A total of 4,334,157 Units were issued at a price per Unit of C$ 1.43 , for total gross proceeds to the Company of
C$ 6,198 . Each Unit consisted of one Common Share and one warrant (“April 2021 Warrant”). Each April 2021 Warrant entitles
the holder thereof to purchase one additional Common Share at a price of C$ 1.63 for a period of two years from the date of issuance.
Proceeds of the April 2021 Private Placement were used for continued advancement of the Elk Creek Project, including ongoing detailed
engineering efforts, conducting technical assessments of potentially adding rare earth products to the planned product offering,
and for working capital and general corporate purposes. The Company paid cash commissions of C$ 111 and issued 77,961 broker warrants
(“Broker Warrants”), having the same terms as the April 2021 Warrants, to brokers outside of the United States. The
broker warrants were valued at C$ 24 using a risk-free rate of 0.28 %, expected volatility of 55 % and expected life of two years.
63
NioCorp
Developments Ltd.
Notes
to Consolidated Financial Statements
June
30, 2022
(expressed
in thousands of U.S. dollars, except share and per share data)
b) Stock
Options
On
November 5, 2020, the Company’s shareholders voted to approve an amendment and restatement of its long term incentive plan
(the “2017 Amended Long-Term Incentive Plan”) and the granting of incentive securities thereunder until November 5,
2023. Under the 2017 Amended Long-Term Incentive Plan, the Board may, in its discretion from time to time, grant Options and share
units (in the form of restricted share units and performance share units) to directors, employees and certain other service providers
(as defined in the 2017 Amended Long-Term Incentive Plan) of the Company and affiliated entities selected by the Board.
Subject
to adjustment as described in the 2017 Amended Long-Term Incentive Plan, the aggregate number of Common Shares that may be reserved
for issuance to participants under the 2017 Amended Long-Term Incentive Plan, together with all other security-based compensation
arrangements of the Company, may not exceed 10% of the issued and outstanding Common Shares from time to time, and the Common
Shares reserved for issuance upon settlement of share units will not exceed 5% of the issued and outstanding Common Shares from
time to time. The 2017 Amended Long-Term Incentive Plan limits the maximum number of Common Shares issued to insiders (as defined
under TSX rules for this purpose) within any one-year period, or issuable to insiders at any time, in the aggregate, under all
security-based compensation arrangements (including the 2017 Amended Long-Term Incentive Plan) to 10% of the then issued and outstanding
Common Shares. The 2017 Amended Long-Term Incentive Plan also limits the aggregate number of Common Shares that may be reserved
for issuance to any one participant under the 2017 Amended Long-Term Incentive Plan, together with all other security-based compensation
arrangements of the Company, to 5% of the then issued and outstanding Common Shares (on a non-diluted basis). Subject to the adjustment
provisions of the 2017 Amended Long-Term Incentive Plan, the aggregate number of Common Shares actually issued or transferred
by the Company upon the exercise of Incentive Stock Options will be limited as described above.
The
Board has power over the granting, amendment, administration or settlement of any award.
Stock
option transactions are summarized as follows:
Number of Options
Weighted Average Exercise Price
Balance July 1, 2019
19,449,909
C$ 0.62
Exercised
( 320,500 )
C$ 0.62
Balance June 30, 2020
19,129,409
C$ 0.62
Granted
3,700,000
C$ 0.78
Exercised
( 2,952,296 )
C$ 0.61
Cancelled/expired
( 3,912,113 )
C$ 0.64
Balance June 30, 2021
15,965,000
C$ 0.65
Granted
4,475,000
C$ 1.33
Exercised
( 2,051,533 )
C$ 0.70
Cancelled/expired
( 3,924,467 )
C$ 0.77
Balance June 30, 2022
14,464,000
C$ 0.83
The
following table summarizes the weighted average information and assumptions used to determine option costs:
Schedule of information and assumptions used to determine option costs
Year ended June 30,
2022
2021
2020
Fair value per option granted during the period (C$)
$ 0.49
$ 0.25
-
Risk-free interest rate
1.33 %
0.26 %
-
Expected dividend yield
0 %
0 %
-
Expected stock price volatility (historical basis)
54.4 %
54.1 %
-
Expected option life in years
3.0
3.0
-
64
NioCorp
Developments Ltd.
Notes
to Consolidated Financial Statements
June
30, 2022
(expressed
in thousands of U.S. dollars, except share and per share data)
The
following table summarizes information about stock options outstanding at June 30, 2022:
Schedule of information about stock options outstanding
Exercise
Price
Expiry
Date
Number
Outstanding
Aggregate
Intrinsic Value
Number
Exercisable
Aggregate
Intrinsic Value
C$0.47
November
9, 2022
2,804,000
C$ 1,206
2,804,000
C$ 1,206
C$0.84
September
18, 2023
1,050,000
63
1,050,000
63
C$0.54
November
15, 2023
3,785,000
1,362
3,785,000
1,362
C$0.75
December
14, 2023
1,825,000
274
1,825,000
274
C$0.75
December
16, 2023
525,000
79
525,000
79
C$1.36
December
17, 2024
3,975,000
-
3,975,000
-
C$1.10
May
30, 2025
500,000
-
500,000
-
Balance
June 30, 2022
14,464,000
C$ 2,984
14,464,000
C$ 2,984
The
aggregate intrinsic value in the preceding table represents the total intrinsic value, based on the Company’s closing stock
price of C$ 0.90 as of June 30, 2022, which would have been received by the option holders had all option holders exercised their
options as of that date. The total number of in-the-money options vested and exercisable as of June 30, 2022, was 9,989,000 . The
total intrinsic value of options exercised during the year ended June 30, 2022, was C$ 973 .
As
of June 30, 2022, there was no unrecognized compensation cost related to unvested share-based compensation arrangements granted.
c) Warrants
Warrant
transactions are summarized as follows:
Schedule of warrant transactions
Warrants
Weighted Average Exercise Price
Balance July 1, 2019
21,374,801
C$ 0.78
Exercised
( 664,549 )
C$ 0.69
Expired
( 8,333,801 )
C$ 0.86
Balance June 30, 2020
12,376,451
C$ 0.74
Granted:
Nordmin warrants
500,000
C$ 0.80
Lind III Warrants
8,558,000
C$ 0.97
April 2021 private placement
4,412,118
C$ 1.63
Exercised
( 9,106,283 )
C$ 0.75
Expired
( 2,398,418 )
C$ 0.73
Balance June 30, 2021
14,341,868
C$ 1.16
Granted:
June 2022 private placement
5,046,135
C$ 1.10
Exercised
( 871,750 )
C$ 0.78
Balance June 30, 2022
18,516,253
C$ 1.16
At
June 30, 2022, the Company has outstanding exercisable warrants, as follows:
Schedule of outstanding exercisable warrants
Number
Exercise
Price
Expiry
Date
500,000
C$ 0.80
December
18, 2022
4,412,118
C$ 1.63
May
10, 2023
5,046,135
C$ 1.10
June
30, 2024
8,558,000
C$ 0.97
February
19, 2025
18,516,253
65
NioCorp
Developments Ltd.
Notes
to Consolidated Financial Statements
June
30, 2022
(expressed
in thousands of U.S. dollars, except share and per share data)
10. RELATED
PARTY TRANSACTIONS AND BALANCES
The
Company had a loan with Mark Smith, President, Chief Executive Officer (“CEO”) and Executive Chairman of NioCorp (the
“Original Smith Loan”), that bore an interest rate of 10%, was secured by the Company’s assets pursuant to a
concurrently executed general security agreement (the “General Security Agreement”) and was subject to both a 2.5 %
establishment fee and 2.5 % prepayment fee. On April 30, 2021, the Company repaid $ 1,000 to Mr. Smith to retire all of the outstanding
balance of the Original Smith Loan. During fiscal year 2021, the Company paid a total of $ 272 representing accrued interest through
the retirement date. Mr. Smith waived the prepayment fee in connection with the retirement of the Original Smith Loan.
The
Company has a non-revolving credit facility agreement (the “Smith Credit Agreement”) with an original amount of $ 2,000
with Mr. Smith. The Smith Credit Agreement bears an interest rate of 10% and drawdowns from the Smith Credit Agreement are subject
to a 2.5 % establishment fee. Amounts outstanding under the Smith Credit Agreement are secured by all of the Company’s assets
pursuant to the General Security Agreement. The Smith Credit Agreement contains financial and non-financial covenants customary
for a facility of its size and nature.
On
January 17, 2020, the Company entered into an amending agreement to the Smith Credit Agreement, increasing the limit of the non-revolving
credit facility to $ 2,500 from the previous limit of $2,000. On April 3, 2020, the Smith Credit Agreement was amended to increase
the limit of the non-revolving credit facility to $ 3,000 and on June 10, 2020, the Smith Credit Agreement was amended to increase
the limit of the non-revolving credit facility to $ 3,500 and the maturity date for loans made under the Smith Credit Agreement
was extended to December 15, 2020. On December 14, 2020, the maturity date for the Smith Credit Agreement was extended to December
15, 2021, on December 13, 2021, the maturity date for the Smith Credit Agreement was extended from December 15, 2021, to June
30, 2022, and on June 29, 2022, the maturity date was extended to June 30, 2023.
Changes
in the Smith Credit Agreement principal balance are as follows:
Schedule
of related party balances
For
the year ending June 30,
2022
2021
Beginning
balance
$
2,318
$
3,818
Repayments
( 318
)
( 1,500
)
Balance,
end of period
$
2,000
$
2,318
During
fiscal year 2022 and 2021, the Company paid a total of $ 535 and $ 252 , respectively, representing accrued interest on the Smith
Credit Agreement.
Accounts
payable and accrued liabilities as of June 30, 2022, include nil accrued interest payable to Mr. Smith under the Smith Credit
Agreement.
11. EXPLORATION
EXPENDITURES
Schedule of exploration expenditures
For the year ended June 30,
2022
2021
2020
Feasibility study and engineering
$ 334
$ 79
$ 40
Field management and other
569
656
985
Metallurgical
2,218
272
176
Geologists and field staff
188
49
-
Total
$ 3,309
$ 1,056
$ 1,201
66
NioCorp
Developments Ltd.
Notes
to Consolidated Financial Statements
June
30, 2022
(expressed
in thousands of U.S. dollars, except share and per share data)
12. LEASES
Effective
August 1, 2020, the Company entered into a three-year corporate office lease extension and recognized the corresponding ROU asset
and lease liability associated with this lease extension, along with two existing building leases located at the Elk Creek Project.
The Company has applied a discount rate of 16 %. In connection with the purchase of land, building and mineral rights discussed
in Note 5, the Company reversed the remaining ROU asset and lease liability associated with the Elk Creek building leases. There
was no gain or loss on this reversal.
As
of June 30, 2022, the Company has one corporate office lease with a remaining lease term of 1.3 years. During the year ended June
30, 2022 and 2021, operating cash flows included cash payments of $ 90 and $ 64 , respectively related to the measurement of lease
liabilities.
The
Company incurred lease costs as follows:
For the year ended June 30,
2022
2021
2020 1
Operating Lease Cost:
Fixed rent expense
$ 83
$ 106
$ 114
Variable rent expense
12
7
-
Short term lease cost
16
13
12
Sublease income
( 26 )
( 18 )
( 12 )
Net lease cost
$ 85
$ 108
$ 114
Lease cost – other operating expense
$ 85
$ 89
$ 98
Lease cost – exploration expenditures
-
19
16
Net lease cost
$ 85
$ 108
$ 114
1 Fixed
rent expense for fiscal year 2020 represents rental costs associated with contracts with
de minimis ROU and lease liability balances.
The
maturity of lease liabilities is as follows at June 30, 2022:
Fiscal
Year Lease Maturities
2023
$
92
2024
23
Total
lease payments
115
Less
amount of payments representing interest
( 10
)
Present
value of lease payments
105
Less
current portion of operating lease liability
( 82
)
Noncurrent
operating lease liability
$
23
13. INCOME
TAXES
Domestic
and foreign components of loss before income taxes for the years ended June 30, 2022, 2021 and 2020 are as follows:
For the year ended June 30,
2022
2021
2020
Canada
$ 5,960
$ 2,928
$ 2,473
United States
3,969
1,462
1,528
Total
$ 9,929
$ 4,390
$ 4,001
67
NioCorp
Developments Ltd.
Notes
to Consolidated Financial Statements
June
30, 2022
(expressed
in thousands of U.S. dollars, except share and per share data)
The
following table is a reconciliation of income taxes at statutory rates:
For the year ended June 30,
2022
2021
2020
Loss before income taxes
$ 9,929
$ 4,390
$ 4,001
Combined federal and provincial statutory income tax rate
27 %
27 %
27 %
Income tax benefit at statutory tax rates
2,681
1,185
1,080
Foreign rate differential
( 72 )
( 31 )
( 30 )
Share based compensation
( 462 )
( 212 )
( 41 )
Change in estimates related to prior years
( 440 )
739
( 4 )
Accretion expense
( 457 )
-
-
Capital loss rate differential
( 38 )
182
-
Change in valuation allowance
( 1,238 )
( 1,882 )
( 946 )
Other
26
19
( 59 )
Income tax benefit
$ -
$ -
$ -
Deferred
income taxes reflect the net tax effects of temporary differences between the carrying amounts of assets and liabilities for financial
reporting purposes and the amounts used for income tax purposes. The significant components of deferred taxes are as follows:
As of June 30,
2022
2021
Deferred tax assets
Mineral interests
$ 9,477
$ 8,658
Net operating losses available for future periods
8,543
7,921
Capital losses available for future periods
420
643
Other
74
54
Total deferred tax assets
18,514
17,276
Valuation allowance
( 18,514 )
( 17,276 )
Net deferred tax assets
$ -
$ -
During the years ended June 30,
2022 and 2021, we identified errors in the recognition of capital losses related to realized mineral property write downs and foreign
exchange gains and losses in Canada which resulted in changes to capital losses available for future periods, net operating loss
carryforwards, and other of $ ( 221 ) , $ nil and $ ( 3 ) , respectively, for fiscal year 2022 and $ 660 , $ 61 , and $ 30 , respectively, for
fiscal year 2021. These changes primarily related to adjustments to deferred tax assets recorded during fiscal year 2021. In addition,
during the year ended June 30, 2022, we identified an error in the recognition of net operating losses related to disallowed interest
expense for the prior year which resulted in a decrease to net operating loss carryforwards of $186. After evaluation and consideration
of the full valuation allowance historically applied against total deferred tax assets, we determined that the impact of the adjustments
was not material to the previously issued financial statements, nor are the out of period adjustments material to the estimated
results for the year ended June 30, 2022 or 2021, respectively.
Changes
in the valuation allowance are as follows:
For the year ended June 30,
2022
2021
Valuation allowance, beginning of year
$ ( 17,276 )
$ ( 15,394 )
Current year additions
( 1,238 )
( 1,882 )
Valuation allowance, end of year
$ ( 18,514 )
$ ( 17,276 )
The
Company establishes a valuation allowance against future income tax assets if, based on available information, it is more likely
than not that all of the assets will not be realized. The valuation allowance of $ 18,514 at June 30, 2022, relates mainly to net
operating loss carryforwards in Canada and mineral interests due to deferred exploration expenditures in the United States, where
the utilization of such attributes is not more likely than not.
68
NioCorp
Developments Ltd.
Notes
to Consolidated Financial Statements
June
30, 2022
(expressed
in thousands of U.S. dollars, except share and per share data)
The
Company has the following cumulative net operating losses for Canadian and U.S. income tax purposes and these carryforwards will
generally expire between 2026 and 2041. As a result of the Tax Cuts and Jobs Act of 2017, U.S. tax losses incurred for tax years
commencing in 2018 have no expiration.
As of June 30,
Jurisdiction
2022
2021
Canada
$ 29,967
$ 28,896
United States
2,460
2,179
Total
$ 32,427
$ 31,075
In
addition, the Company has a Canadian capital loss carryforward of $ 3,456 as of June 30, 2022, which has no expiration date and
can be used to offset future capital gains.
The
Company had no unrecognized tax benefits as of June 30, 2022 or 2021. The Company recognizes interest accrued related to unrecognized
tax benefits and penalties in its income tax provision. The Company has not recognized any interest or penalties in the fiscal
years presented in these financial statements. The Company is subject to income tax in the U.S. federal jurisdiction and Canada.
Certain years remain subject to examination but there are currently no ongoing exams in any taxing jurisdictions.
14. FAIR VALUE MEASUREMENTS
The
Company measures the fair value of financial assets and liabilities based on U.S. GAAP guidance which defines fair value, establishes
a framework for measuring fair value, and expands disclosures about fair value measurements.
The
Company classifies financial assets and liabilities as held-for-trading, available-for-sale, held-to-maturity, loans and receivables
or other financial liabilities depending on their nature. Financial assets and financial liabilities are recognized at fair value
on their initial recognition.
Financial
assets and liabilities classified as held-for-trading are measured at fair value, with gains and losses recognized in net income.
Financial assets classified as held-to-maturity, loans and receivables, and financial liabilities other than those classified
as held-for-trading are measured at amortized cost, using the effective interest method of amortization. Financial assets classified
as available-for-sale are measured at fair value, with unrealized gains and losses being recognized in income.
Financial
instruments, including receivables, accounts payable and accrued liabilities, and related party loans are carried at amortized
cost, which management believes approximates fair value due to the short-term nature of these instruments.
The
following tables present information about the assets and liabilities that are measured at fair value on a recurring basis as
of June 30, 2022 and 2021, and indicates the fair value hierarchy of the valuation techniques the Company utilized to determine
such fair value. In general, fair values determined by Level 1 inputs utilize quoted prices (unadjusted) in active markets for
identical instruments. Fair values determined by Level 2 inputs utilize data points that are observable such as quoted prices,
interest rates, and yield curves. Fair values determined by Level 3 inputs are unobservable data points for the financial instrument,
and included situations where there is little, if any, market activity for the instrument:
Schedule of fair values determined by level 3 inputs are unobservable data
As
of June 30, 2022
Total
Level
1
Level
2
Level
3
Assets:
Cash
and cash equivalents
$
5,280
$
5,280
$
-
$
-
Investment
in equity securities
10
10
-
-
Total
$
5,290
$
5,290
$
-
$
-
Liabilities
$
-
$
-
$
-
$
-
69
NioCorp
Developments Ltd.
Notes
to Consolidated Financial Statements
June
30, 2022
(expressed
in thousands of U.S. dollars, except share and per share data)
As
of June 30, 2021
Total
Level
1
Level
2
Level
3
Assets:
Cash
and cash equivalents
$
7,317
$
7,317
$
-
$
-
Investment
in equity securities
16
16
-
-
Total
$
7,333
$
7,333
$
-
$
-
Liabilities
$
-
$
-
$
-
$
-
As
discussed in Note 8, the Nordmin Note and Lind III Convertible Security were initially recorded at fair value, which represents
a nonrecurring fair value measurement using a Level 3 input. These loans are privately held with no public market for this debt
and therefore were initially classified as a Level 3 fair value measurement. The significant unobservable valuation inputs for
the Nordmin Note and Lind III Convertible Security included an expected return of 7 % and 21 %, respectively.
At
June 30, 2022, the estimated fair value if the Lind III Convertible Security was $2,166. At June 30, 2021, the estimated fair
value of both the Lind III Convertible Security and the Nordmin Note approximated carrying value given that the instruments were
issued in fiscal year 2021 and had short time periods until maturity.
70
ITEM 9. CHANGES
IN AND DISAGREEMENTS WITH ACCOUNTANTS ON ACCOUNTING AND FINANCIAL DISCLOSURE.
None.
ITEM 9A. CONTROLS
AND PROCEDURES
Evaluation
of Disclosure Controls and Procedures
The
management of NioCorp Developments Ltd. has evaluated, under the supervision and with the participation of our Chief Executive
Officer and Chief Financial Officer, the effectiveness of our disclosure controls and procedures as of June 30, 2022.
Based
on that evaluation, the Chief Executive Officer and Chief Financial Officer have concluded that, as of June 30, 2022, our disclosure
controls and procedures (as defined in Rules 13a-15(e) and 15d-15(e) under the Exchange Act), were effective and
designed to provide reasonable assurance that (i) information required to be disclosed in our reports filed under the Exchange
Act is recorded, processed, summarized and reported within the time periods specified in the SEC’s rules and forms,
and (ii) information is accumulated and communicated to management, including the Chief Executive Officer and Chief Financial
Officer, as appropriate to allow timely decisions regarding required disclosures.
The
management of NioCorp Developments Ltd., including the Chief Executive Officer and Chief Financial Officer, does not expect that
our disclosure controls and procedures or our internal control over financial reporting will prevent all errors and all fraud.
A control system, no matter how well conceived and operated, can provide only reasonable, not absolute, assurance that the objectives
of the control system are met.
Further,
the design of a control system must reflect the fact that there are resource constraints, and the benefits of controls must be
considered relative to their costs. Because of the inherent limitations in all control systems, no evaluation of controls can
provide absolute assurance that all control issues and instances of fraud, if any, within the Company have been detected.
Management’s
Report on Internal Control over Financial Reporting
Management
is responsible for establishing and maintaining adequate internal control over financial reporting for the Company. Our management
assessed the effectiveness of our internal control over financial reporting as of June 30, 2022. In making this assessment, our
management used the criteria set forth in the Internal Control -Integrated Framework (2013) issued by the Committee of Sponsoring
Organizations of the Treadway Commission (COSO). Based on our management assessment, we have concluded that, as of June 30, 2022,
our internal control over financial reporting was effective.
Changes
in Internal Control over Financial Reporting
There
has been no change in our internal control over financial reporting during the year ended June 30, 2022, that has materially affected,
or is reasonably likely to materially affect, our internal control over financial reporting.
ITEM 9B. OTHER
INFORMATION
None.
71
PART
III
ITEM
10. DIRECTORS,
EXECUTIVE OFFICERS AND CORPORATE GOVERNANCE
Incorporated
by reference from the information in our proxy statement for the 2022 Annual Meeting of Stockholders or amendment to this Annual
Report on Form 10-K, which we will file with the SEC within 120 days of the end of the fiscal year to which this report relates.
ITEM
11. EXECUTIVE
COMPENSATION
Incorporated
by reference from the information in our proxy statement for the 2022 Annual Meeting of Stockholders or amendment to this Annual
Report on Form 10-K, which we will file with the SEC within 120 days of the end of the fiscal year to which this report relates.
ITEM
12. SECURITY
OWNERSHIP OF CERTAIN BENEFICIAL OWNERS AND MANAGEMENT AND RELATED STOCKHOLDER MATTERS
Incorporated
by reference from the information in our proxy statement for the 2022 Annual Meeting of Stockholders or amendment to this Annual
Report on Form 10-K, which we will file with the SEC within 120 days of the end of the fiscal year to which this report relates.
ITEM
13. CERTAIN
RELATIONSHIPS AND RELATED TRANSACTIONS, AND DIRECTOR INDEPENDENCE
Incorporated
by reference from the information in our proxy statement for the 2022 Annual Meeting of Stockholders or amendment to this Annual
Report on Form 10-K, which we will file with the SEC within 120 days of the end of the fiscal year to which this report relates.
ITEM
14. PRINCIPAL
ACCOUNTING FEES AND SERVICES
Incorporated
by reference from the information in our proxy statement for the 2022 Annual Meeting of Stockholders or amendment to this Annual
Report on Form 10-K, which we will file with the SEC within 120 days of the end of the fiscal year to which this report relates.
72
PART
IV
ITEM
15. EXHIBITS,
FINANCIAL STATEMENT SCHEDULES
The
following documents are filed as a part of this report:
(a) Financial
Statements
(1) The Consolidated Financial Statements, together with the reports thereon of BDO USA, LLP dated September
6, 2022, are included as part of Item 8, “Financial Statements and Supplementary Data,” commencing on page 49
above.
Page
Reports of Independent Registered Public Accounting Firms
(BDO USA, LLP; Spokane, Washington; PCAOB ID# 243 )
50
Consolidated Balance Sheets
51
Consolidated Statements of Operations and Comprehensive Loss
52
Consolidated Statements of Cash Flows
53
Consolidated Statements of Equity
54
Notes to Consolidated Financial Statements
55
(a) Exhibits
Exhibit
No.
Title
3.1(1)
Notice of Articles dated April 5, 2016
3.2(1)
Articles, as amended, effective as of January 27, 2015
4.1(6)
Form of Subscription Agreement in respect of units of the Company issued in July 2017
4.4(17)
Subscription Agreement, dated as of December 18, 2020, between the Company and Nordmin Engineering Ltd.
4.2(17)
Form of Nordmin Note
4.3(17)
Form of Nordmin Warrant Certificate
4.5(19)
Convertible Security Funding Agreement, dated February 26, 2021, between the Company and Lind Global Asset Management III, LLC
4.5(19)
Form of Lind Warrant Certificate, in respect of Lind III Warrants
4.6(20)
Form of Subscription Agreement in respect of units of the Company issued in June 2022
4.6(23)
Amendment #1 to Convertible Security Funding Agreement, dated December 2, 2021, between the Company and Lind Global Asset Management III, LLC
4.7(19)
Form of Lind Warrant Certificate, in respect of Lind III Warrants
4.8(20)
Form of Subscription Agreement in respect of units of the Company issued in May 2021
4.9(21)
Form of Warrant Certificate in respect of warrants issued in May 2021
4.10(21)
Non-Transferable Broker Warrant Certificate, dated May 10, 2021, in respect of non-transferable broker warrants issued to Research Capital Corporation
4.11(24)
Form of Subscription Agreement in respect of units of the Company issued in June 2022
4.12(24)
Form of Warrants in respect of warrants issued in June 2022
4.13
Non-Transferable
Broker Warrant Certificate, dated June 30, 2022, in respect of non-transferable broker warrants issued to Research Capital
Corporation
4.14
Non-Transferable
Broker Warrant Certificate, dated June 30, 2022, in respect of non-transferable broker warrants issued to Red Cloud Securities,
Inc.
4.15
Description of Securities
10.1#(8)
NioCorp Developments Ltd. Long Term Incentive Plan, effective as of November 9, 2017
10.2#(1)
Consulting Agreement, dated May 13, 2014, between the Company and KMSmith, LLC
73
10.3#(14)
Amendment to Contract, dated September 1, 2019, between the Company and KMSmith, LLC
10.4#(14)
Contract Assignment and Novation Agreement, dated as of August 31, 2020, among the Company, KMSmith, LLC and 76 Resources, Inc.
10.5#
Contract Assignment and Novation Agreement, dated as of August 1, 2021, among the Company, 76 Resources, Inc. and 76 Resources, LLC
10.6(2)**
Offtake agreement, dated June 13, 2006, between the Company and CMC Cometals, a division of Commercial Metals Company
10.7(7)
Offtake agreement with ThyssenKrupp Metallurgical Products GmbH
10.8(14)**, ***
Woltemath 003J Amended and Restated Option to Purchase, dated January 4, 2017, among ECRC and Victor L. and Juanita E. Woltemath
10.9(14)**, ***
Woltemath 003J Extension to Option to Purchase, dated December 23, 2019, among ECRC and Victor L. and Juanita E. Woltemath
10.10(3)
Smith Credit Agreement
10.11(4)
Amending Agreement to Smith Credit Agreement, dated March 20, 2017, between the Company and Mark Smith
10.12(9)
Amending Agreement to Smith Credit Agreement, dated April 6, 2018, between the Company and Mark Smith
10.13(10)
Amending Agreement to Smith Credit Agreement, dated May 31, 2019, between the Company and Mark Smith
10.14(11)
Amending Agreement to Smith Credit Agreement, dated January 17, 2020, between the Company and Mark Smith
10.15(12)
Amending Agreement to Smith Credit Agreement, dated April 3, 2020, between the Company and Mark Smith
10.16(13)
Amending Agreement to Smith Credit Agreement, dated June 10, 2020, between the Company and Mark Smith
10.17(16)
Amending Agreement to Smith Credit Agreement, dated December 14, 2020, between the Company and Mark Smith
10.18(22)
Amending Agreement to Smith Credit Agreement, dated December 13, 2021, between the Company and Mark Smith
10.19(24)
Amending Agreement to Smith Credit Agreement, dated June 29, 2022, between the Company and Mark Smith
10.20(5)
Security Agreement, dated June 17, 2015, from the Company to Mark Smith
10.21(15)
NioCorp Developments Ltd. Long Term Incentive Plan, as amended
21.1(1)
Subsidiaries of NioCorp Developments Ltd.
23.1
Consent of BDO USA, LLP
23.2
Consent of Dahrouge Geological Consulting USA Ltd.
23.3
Consent of Understood Mineral Resources Ltd.
23.4
Consent of Optimize Group Inc.
23.5
Consent of Tetra Tech
23.6
Consent of Adrian Brown Consultants Inc.
23.7
Consent of Magemi Mining Inc.
23.8
Consent of L3 Process Development
23.9
Consent of Olsson
23.10
Consent of A2GC
23.11
Consent of Metallurgy Concept Solutions
23.12
Consent of Scott Honan, M.Sc., SME-RM, NioCorp
23.13
Consent of Everett Bird, P.E., Cementation
23.14
Consent of Matt Hales, P.E., Cementation
23.15
Consent of Mahmood Khwaja, P.E., CDM Smith
23.16
Consent of Martin Lepage, P.Eng., Ing., Cementation
23.17
Consent of Wynand Marx, M.Eng., BBE Consulting
31.1
Certification
of the Chief Executive Officer pursuant to Exchange Act Rules 13a-14(a) and 15d-14(a), as adopted pursuant to Section 302
of the Sarbanes-Oxley Act of 2002
31.2
Certification
of the Chief Financial Officer pursuant to Exchange Act Rules 13a-14(a) and 15d-14(a), as adopted pursuant to Section 302
of the Sarbanes-Oxley Act of 2002
74
32.1
Certification
of the Chief Executive Officer pursuant to 18 U.S.C. Section 1350, as adopted pursuant to Section 906 of the Sarbanes-Oxley
Act of 2002
32.2
Certification
of the Chief Financial Officer pursuant to 18 U.S.C. Section 1350, as adopted pursuant to Section 906 of the Sarbanes-Oxley
Act of 2002
96.1
S-K
1300 Elk Creek Technical Report Summary
101.INS(25)
XBRL
Instance Document
101.SCH(25)
XBRL
Taxonomy Extension – Schema
101.CAL(25)
XBRL
Taxonomy Extension – Calculations
101.DEF(25)
XBRL
Taxonomy Extension – Definitions
101.LAB(25)
XBRL
Taxonomy Extension – Labels
101.PRE(25)
XBRL
Taxonomy Extension – Presentations
104
Cover
Page Interactive Data File (formatted as Inline XBRL and contained in Exhibit 101)
#
Management
compensation plan, arrangement or agreement.
**
Portions
of this exhibit have been omitted pursuant to Item 601(b)(10)(iv) of Regulation S-K, which portions will be furnished to the
Securities and Exchange Commission upon request.
***
Certain
exhibits to this agreement have been omitted pursuant to Item 601(a)(5) of Regulation S-K. A copy of any omitted exhibit will
be furnished to the Securities and Exchange Commission upon request.
(1)
Previously
filed as an exhibit to the Company’s Draft Registration Statement on Form S-1 (Registration No. 377-01354) submitted
to the SEC on July 26, 2016 and incorporated herein by reference.
(2)
Previously
filed as an exhibit to the Company’s Registration Statement on Form S-1 (Registration No. 333-213451) filed with the
SEC on September 2, 2016 and incorporated herein by reference.
(3)
Previously
filed as an exhibit to the Company’s Current Report on Form 8-K (File No. 000-55710) filed with the SEC on January 20,
2017 and incorporated herein by reference.
(4)
Previously
filed as an exhibit to the Company’s Current Report on Form 8-K (File No. 000-55710) filed with the SEC on March 24,
2017 and incorporated herein by reference.
(5)
Previously
filed as an exhibit to the Company’s Registration Statement on Form S-1 (Registration No. 333-217272) filed with the
SEC on April 12, 2017 and incorporated herein by reference.
(6)
Previously
filed as an exhibit to the Company’s Current Report on Form 8-K (File No. 000-55710) filed with the SEC on August 1,
2017 and incorporated herein by reference.
(7)
Previously
filed as an exhibit to the Company’s Annual Report on Form 10-K (File No. 000-55710) filed with the SEC on August 29,
2017 and incorporated herein by reference.
(8)
Previously
filed as an exhibit to the Company’s Current Report on Form 8-K (File No. 000-55710) filed with the SEC on November
13, 2017 and incorporated herein by reference.
(9)
Previously
filed as an exhibit to the Company’s Current Report on Form 8-K (File No. 000-55710) filed with the SEC on April 9,
2018 and incorporated herein by reference.
(10)
Previously
filed as an exhibit to the Company’s Current Report on Form 8-K (File No. 000-55710) filed with the SEC on June 5, 2019
and incorporated herein by reference.
(11)
Previously
filed as an exhibit to the Company’s Current Report on Form 8-K (File No. 000-55710) filed with the SEC on January 17,
2020 and incorporated herein by reference.
(12)
Previously
filed as an exhibit to the Company’s Current Report on Form 8-K (File No. 000-55710) filed with the SEC on April 3,
2020 and incorporated herein by reference
75
(13)
Previously
filed as an exhibit to the Company’s Current Report on Form 8-K (File No. 000-55710) filed with the SEC on June 10,
2020 and incorporated herein by reference.
(14)
Previously
filed as an exhibit to the Company’s Annual Report on Form 10-K (File No. 000-55710) filed with the SEC on September
16, 2020 and incorporated herein by reference.
(15)
Previously
filed as an exhibit to the Company’s Current Report on Form 8-K (File No. 000-55710) filed with the SEC on November
6, 2020 and incorporated herein by reference.
(16)
Previously
filed as an exhibit to the Company’s Current Report on Form 8-K (File No. 000-55710) filed with the SEC on December
14, 2020 and incorporated herein by reference.
(17)
Previously
filed as an exhibit to the Company’s Current Report on Form 8-K (File No. 000-55710) filed with the SEC on December
18, 2020 and incorporated herein by reference.
(18)
Previously
filed as an exhibit to the Company’s Current Report on Form 8-K (File No. 000-55710) filed with the SEC on January 25,
2021 and incorporated herein by reference.
(19)
Previously
filed as an exhibit to the Company’s Current Report on Form 8-K (File No. 000-55710) filed with the SEC on February
17, 2021 and incorporated herein by reference.
(20)
Previously
filed as an exhibit to the Company’s Current Report on Form 8-K (File No. 000-55710) filed with the SEC on May 12, 2021
and incorporated herein by reference.
(21)
Previously
filed as an exhibit to the Company’s Registration Statement on Form S-3 (File No. 333-257195) filed with the SEC on
June 21, 2021 and incorporated herein by reference.
(22)
Previously
filed as an exhibit to the Company’s Current Report on Form 8-K (File No. 000-55710) filed with the SEC on December
13, 2021 and incorporated herein by reference.
(23)
Previously
filed as an exhibit to the Company’s Current Report on Form 10-Q (File No. 000-55710) filed with the SEC on February
4, 2022 and incorporated herein by reference.
(24)
Previously
filed as an exhibit to the Company’s Current Report on Form 8-K (File No. 000-55710) filed with the SEC on June 30,
2022 and incorporated herein by reference.
(25)
Submitted
Electronically Herewith. Attached as Exhibit 101 to this report are the following formatted in XBRL (Extensible Business Reporting
Language): (i) the Consolidated Balance Sheets at June 30, 2022 and June 30, 2021, (ii) the Consolidated Statements of Operations
and Comprehensive Loss for the years ended June 30, 2022, 2021 and 2020, (iii) the Consolidated Statements of Cash Flows for
the years ended June 30, 2022, 2021 and 2020, (iv) the Consolidated Statements of Changes in Equity for the years ended June
30, 2022, 2021 and 2020, (v) the Notes to the Consolidated Financial Statements.
ITEM 16. FORM
10–K SUMMARY
None.
76
SIGNATURES
Pursuant
to the requirements of Section 13 or 15(d) of the Securities Exchange Act of 1934, the registrant has duly caused this report
to be signed on its behalf by the undersigned, thereunto duly authorized.
NIOCORP
DEVELOPMENTS LTD.
By:
/s/Neal
Shah
Neal
Shah
Chief
Financial Officer
September 6, 2022
Pursuant to the requirements
of the Securities Exchange Act of 1934, this report has been signed below by the following persons on behalf of the registrant
and in the capacities indicated on September 6, 2022.
Signature
Title
/s/
Mark A. Smith
President,
Chief Executive Officer (Principal
Mark
A. Smith
Executive
Officer and Authorized U.S. Representative)
and
Chairman of the Board of Directors
/s/
Neal Shah
Chief
Financial Officer (Principal Financial and
Neal
Shah
Accounting
Officer)
/s/
Michael Morris
Director
Michael
Morris
/s/
David C. Beling
Director
David
C. Beling
/s/
Anna Castner Wightman
Director
Anna
Castner Wightman
/s/
Nilsa Guerrero-Mahon
Director
Nilsa
Guerrero-Mahon
/s/
Fernanda Fenga
Director
Fernanda
Fenga
/s/
Peter Oliver
Director
Peter
Oliver
77
/stocks — the workspaceLOADING