Water is withdrawn from the Delaware & Raritan Canal at New Brunswick, New Jersey through our intake and pumping station, located on state-owned land bordering the canal.
−Removed: Water is transported through two raw water pipelines for treatment and distribution at our CJO Water Treatment Plant in Edison, New Jersey.
−Removed: The CJO Water Treatment Plant includes chemical storage and chemical feed equipment, two dual rapid mixing basins, four upflow clarifiers which are also called superpulsators, four underground reinforced chlorine contact tanks, twelve rapid filters containing gravel, sand and anthracite for water treatment and a steel washwater tank.
−Removed: The CJO Water Treatment Plant also includes a computerized Supervisory Control and Data Acquisitions system to monitor and control the CJO Water Treatment Plant and the water supply and distribution system in the Middlesex System.
−Removed: There is an on-site State of New Jersey certified laboratory capable of performing bacteriological, chemical, process control and advanced instrumental chemical sampling and analysis.
−Removed: The firm design capacity of the CJO Water Treatment Plant is 55 mgd (60 mgd maximum capacity).
+Added: Water is transported through two raw water pipelines for treatment and distribution at our CJO Plant in Edison, New Jersey.
+Added: The CJO Plant includes chemical storage and chemical feed equipment, two dual rapid mixing basins, four upflow clarifiers which are also called superpulsators, two ozone contactors, twelve rapid filters containing gravel, sand and anthracite for water treatment and a steel washwater tank.
+Added: The CJO Plant also includes a computerized Supervisory Control and Data Acquisitions system to monitor and control the CJO Plant and the water supply and distribution system in the Middlesex System.
+Added: There is a State of New Jersey certified on-site laboratory capable of performing bacteriological, chemical, process control and advanced instrumental chemical sampling and analysis.
+Added: The firm design capacity of the CJO Plant is 55 mgd (60 mgd maximum capacity).
The five electric motor-driven, vertical turbine pumps presently installed have an aggregate capacity of 85 mgd.
−Removed: In addition, there is a 15 mgd auxiliary pumping station located at the CJO Water Treatment Plant location.
+Added: In addition, there is a 15 mgd auxiliary pumping station on-site at the CJO Plant location.
It has a dedicated substation and emergency power supply provided by a diesel-driven generator.
It pumps from the 10 million gallon distribution storage reservoir directly into the distribution system.
−Removed: The transmission and distribution system is comprised of 746 miles of mains and includes 24,300 feet of 48-inch concrete transmission main and 23,400 feet of 42-inch ductile iron transmission main connecting the CJO Water Treatment Plant to our distribution pipe network and related storage facilities.
+Added: The transmission and distribution system is comprised of 746 miles of mains and includes 24,300 feet of 48-inch concrete transmission main and 23,400 feet of 42-inch ductile iron transmission main connecting the CJO Plant to our distribution pipe network and related storage facilities.
Also included are a 58,600 foot transmission main and a 38,800 foot transmission main, augmented with a long-term, non-exclusive agreement with East Brunswick to transport water through the East Brunswick system to several of our other contract customers.
−Removed: The Middlesex System’s storage facilities consist of a 10 million gallon reservoir at the CJO Water Treatment Plant, 5 million gallon and 2 million gallon reservoirs in Edison and a 2 million gallon reservoir at the Park Avenue Well Field.
−Removed: In New Jersey, we own the properties on which the Middlesex System’s 31 wells are located, the properties on which our storage tanks are located as well as the property where the CJO Water Treatment Plant is located.
+Added: The Middlesex System’s storage facilities consist of a 10 million gallon reservoir at the CJO Plant, 5 million gallon and 2 million gallon reservoirs in Edison and a 2 million gallon reservoir at the Park Avenue Well Field.
+Added: In New Jersey, we own the properties on which the Middlesex System’s 27 wells are located, the properties on which our storage tanks are located as well as the property where the CJO Plant is located.
We own our operations center located at 1500 Ronson Road, Iselin, New Jersey, consisting of a 27,000 square foot office building, 16,500 square foot maintenance facility and a 1.96 acre equipment and materials storage and staging yard.
18 unchanged sentences
Water is transported to its customers through our 4.2 mile distribution system.
−Removed: The TESI System is comprised of seven wastewater treatment systems in Southern Delaware.
−Removed: The treatment plants provide clarification, sedimentation, and disinfection.
−Removed: The combined total capacity of the plants is 0.7 mgd.
−Removed: TESI’s wastewater collection system is comprised of approximately 47.5 miles of sewer lines.
USA-PA, USA and White Marsh
Our non-regulated subsidiaries, namely USA-PA, USA and White Marsh, do not own utility plant property.
−Removed: LEGAL PROCEEDINGS.
−Removed: The Company is a defendant in lawsuits in the normal course of business.
−Removed: We believe the resolution of pending claims and legal proceedings will not have a material adverse effect on the Company’s consolidated financial statements.
−Removed: MINE SAFETY DISCLOSURES.
−Removed: Not applicable.