5 unchanged sentences
hardware and hosting contracts.
−Removed: As a result, since late 2023 and throughout 2024, our business activities primarily consisted of identifying
−Removed: and evaluating suitable acquisition transaction candidates, which led to our now-planned strategic transition from cryptocurrency mining
−Removed: to digital infrastructure colocation services and high-performance computing (“HPC”) hosting.
+Added: As a result, since late 2023 and throughout 2024 and 2025, our business activities primarily consisted
+Added: of identifying and evaluating suitable acquisition transaction candidates, which led to our now-planned strategic transition from cryptocurrency
+Added: mining to artificial intelligence (“AI”) data center and energy infrastructure development.
Effective April 7, 2025 (the “Effective
−Removed: Time” or “Closing Date”), Edgemode, Inc., Synthesis Analytics Production Ltd, an England and Wales private limited company
−Removed: (“SAPL”), and Adler Capital Limited, a company registered in Hong Kong, and the sole shareholder of SAPL, (“ACL”)
−Removed: closed on a Share Exchange Agreement dated April 7, 2025 (the “Share Exchange” or “Transaction”).
−Removed: In accordance
−Removed: with the Share Exchange, SAPL agreed to transfer 100% of SAPL’s outstanding capital stock to Edgemode in exchange for 1,260,246,354
−Removed: shares of Edgemode common stock, par value $0.001 per share, which represented approximately 55% of the Company’s outstanding common
−Removed: stock at the Effective Time.
−Removed: The Company accounted for the acquisition as an asset acquisition under ASC 805 as SAPL did not meet the
−Removed: definition of a business as it did not contain a full set of integrated inputs and outputs at the time of closing.
+Added: Time” or “Closing Date”), the Company and Synthesis Analytics Production, Ltd.
+Added: (“SAPL”) and Adler Capital
+Added: Limited (“ACL”) closed on a Share Exchange Agreement dated April 7, 2025 (the “Share Exchange”) and an employment
+Added: agreement between the Company and Mr.
+Added: Niclas Adler (the “Employment Agreement”).
+Added: In accordance with the Share Exchange, SAPL
+Added: agreed to transfer 100% of SAPL’s outstanding capital stock to Edgemode in exchange for 1,260,246,354 shares of Edgemode common
+Added: stock, par value $0.001 per share, which represented approximately 55% of the Company’s outstanding common stock at the Effective
+Added: The Company accounted for the acquisition as an asset acquisition under ASC 805 as SAPL did not meet the definition of a business
+Added: as it did not contain a full set of integrated inputs and outputs at the time of closing.
Following the closing of the Share Exchange, Edgemode,
−Removed: through SAPL, its wholly owned subsidiary, is now designing, building, and operating digital infrastructure for HPC with the goal of becoming
+Added: through SAPL, its wholly owned subsidiary, began designing, building, and operating digital infrastructure for HPC with the goal of becoming
a leading provider of digital colocation services.
−Removed: SAPL is an entity organized in 2022 under the laws of England and Wales.
−Removed: change its name to EdgeMode Europe Limited.
−Removed: The acquisition of SAPL has positioned us to enter
−Removed: the rapidly evolving HPC hosting market in an efficient and effective manner.
−Removed: The acquisition has enabled us to plan to leverage SAPL’s
−Removed: existing infrastructure and expertise to meet the growing demand for data center facilities for third-party customers focused on cloud
−Removed: computing as well as machine learning and artificial intelligence.
−Removed: The acquisition of SAPL will enable us to become
−Removed: a premier provider and operator of dedicated, purpose-built data center facilities for our third-party customers.
−Removed: We believe that opportunities
−Removed: for growth exist in various applications of our data centers, which is another factor as to why we decided to begin offering digital infrastructure
−Removed: colocation services to third parties engaged in HPC.
−Removed: Our goal is to utilize the assets we have acquired
−Removed: via the purchase of SAPL for HPC hosting operations which will provide consistent dollar-based revenue and which represent substantially
−Removed: less risk than our historical digital asset self-mining operations.
−Removed: Our intent is to focus our business on development and marketing efforts
−Removed: to build data centers and expand our foundational HPC hosting customer base.
+Added: The acquisition of SAPL enabled the Company to begin to leverage SAPL’s existing
+Added: infrastructure and expertise to meet the growing demand for data center facilities for third-party customers focused on cloud computing
+Added: as well as machine learning and artificial intelligence.
+Added: In or around May 2025, the Company discovered
+Added: that Synthesis Analytics Production Ltd.
+Added: and ACL breached material representations and warranties under the Share Exchange.
+Added: The Employment
+Added: Agreement was terminated on or about September 1, 2025, upon Dr.
+Added: Adler’s resignation.
+Added: Pursuant to a letter dated December 8, 2025
+Added: and a complaint filed by the Company in the United States District Court for the Southern District of Florida, the Company intends to
+Added: seek rescission of the Share Exchange and rescind the shares of Company common stock issued to ACL pursuant to the Share Exchange and
+Added: the Company has sent notice to Dr.
+Added: Adler for the termination of the option to purchase common stock issued to Dr.
+Added: Adler under the Employment
+Added: Agreement and the termination of such agreement for “cause” as defined under the agreement.
+Added: Among other material breaches,
+Added: without limitation, the Company has discovered that the real property and material assets of SAPL were encumbered at the time of the closing
+Added: of the Share Exchange and remain encumbered and subject to liens.
+Added: On October 15, 2025, the Company and Blackberry
+Added: AIF (“BAIF”) entered into a memorandum of understanding (the “MOU”) for the purposes of organizing DC Estate Solutions
+Added: Cayman Limited, a Cayman Island entity (“DC Estate Solutions”) which was organized by the Company on October 23, 2025.
+Added: November 6, 2025, DC Estate Solutions and BAIF entered into a share purchase agreement (the “SPV SPA”).
+Added: DC Estate Solutions
+Added: was initially owned and controlled 75% by the Company and 25% by BAIF.
+Added: The principal of BAIF is Jose Mora.
+Added: DC Estate Solutions has acquired
+Added: five property leases, which were previously assigned to and held by BAIF, consisting of 100 hectares of land each located in the Spain
+Added: cities of Malpica, Caceres, Vianos, Cordoba and Torrecampo (the “Spain Leases”).
+Added: The Spain Leases are held by wholly owned
+Added: subsidiaries of DC Estate Solutions.
+Added: The Spain Leases are for an average term of 35 years at an initial total average cost of $96,000
+Added: per month for all sites.
+Added: As a condition of each lease, the payments are subject to meeting certain milestones, such as obtaining a favorable
+Added: urban compatibility reports and connection points.
+Added: Under the terms of the Spain Leases, the Company will pay approximately $15,000 to
+Added: the owners of the Cordoba site in 2026.
+Added: No further payments are expected in 2026.
+Added: The Company and BAIF intend to use the Spain Leases
+Added: to develop and operate HPC data center sites.
+Added: The Company paid BAIF $250,000 upon execution of the MOU and an additional $250,000 on the
+Added: closing of the SPV SPA.
+Added: The Company intends to develop the sites as gas powered fully autonomous energy islands for Tier 3 level uptime
+Added: AI data centers.
+Added: The total capacity to be developed across the five sites is anticipated to be up to 1.8 Gigawatts.
+Added: We believe that since
+Added: the sites will be autonomous energy islands no grid connection is required and there will be no material reliance on grid infrastructure.
+Added: Thereby, subject to financing, reducing time to power for our data center clients to 18 months.
+Added: The total capacity of the sites is planned
+Added: to be 360 MW per site.
+Added: An application to connect to the local gas pipeline for gas supply has already been made and approval has been
+Added: The Company is negotiating a power purchase agreement with an energy company to develop a 360MW gas Solid Oxide Fuel Cell facility
+Added: to convert gas fuel into electricity.
+Added: The Company will need to secure fibre connections, environmental permits and all necessary contractor
+Added: The sites will then be classed at Ready to Build (“RTB”) as the Company intends to sell the sites on a RTB basis.
+Added: We estimate the Company will require $5 million of working capital to achieve full RTB status on all five sites.
+Added: Additional capital is
+Added: required to develop the sites and the further development of the data centers to RTB will require substantial capital.
+Added: There are no assurances
+Added: that the Company will receive sufficient capital or will receive capital on reasonable terms.
+Added: In addition, there are no assurances the
+Added: application and permits will be received or that agreements will be completed or the data centers ultimately developed and sold or become
+Added: The Company’s goal is to utilize the assets
+Added: we have acquired via the purchase of BAIF sites to develop AI data center and energy infrastructure, which will provide consistent dollar-based
+Added: revenue and which represent substantially less risk than our historical digital asset self-mining operations.
+Added: Our intent is to focus our
+Added: business on development and marketing efforts to build data centers and expand our AI data center customer base.
+Added: Subsequent to December 31, 2025, and effective
+Added: January 22, 2026, the Company entered into a Joint Venture Agreement (the “JVA”) by and among the Company, BAIF and DC Estate
+Added: Solutions, which (i) amends and restates the MOU and (ii) supplements the SPV SPA.
+Added: Pursuant to the SPA, DC Estate Solutions acquired the
+Added: equity interests of five special purpose vehicles (the “SPVs”):
+Added: (i) DC Estate Córdoba SL 300MW, (ii) DC Estate Cáceres
+Added: SL 300 MW, (iii) DC Estate Vianos SL 300 MW, (iv) DC Estate Malpica SL 300 MW and (v) DC Estate Torrecampo SL 300 MW.
+Added: As a result of the
+Added: acquisition of the SPVs, DC Estate Solutions also acquired the Spain Leases.
+Added: Pursuant to the JVA, DC Estate Solutions shall
+Added: be owned and controlled 50.1% by the Company and 49.9% by BAIF.
+Added: The purpose of the JVA is to manage and coordinate the development of
+Added: high-performance computing data center (the “Data Centers”) sites on the properties governed by the Spain Leases.
+Added: Substantially,
+Added: all material decisions of the JVA and Joint Venture Company shall require the unanimous consent of the Company and BAIF.
+Added: Under the JVA,
+Added: the Company agreed to fund DC Estate Solutions with $3,500,000 USD as follows:
+Added: (i) $250,000 USD, which was previously paid upon the execution
+Added: of the MOU, (ii) $250,000 USD, which was previously paid upon execution of the SPA, (iii) $375,000 USD paid on the effectiveness of a
+Added: notarial public deed in Spain in connection with the transfer of the SPVs to the JVA on the Effective Date, and (iv) $2,625,000 USD payable
+Added: in monthly installments of $125,000 USD commencing on March 1, 2026.
+Added: The funds shall be distributed by DC Estate Solutions to BAIF.
+Added: Company also agreed to grant to BAIF, or its assignee, a non-qualified option to purchase up to 250,000,000 shares of the Company’s
+Added: common stock (the “First Mora Option”) at an exercise price of $0.02 per share.
+Added: The First Mora Option is fully vested and
+Added: exercisable upon the grant date and terminates on the earlier of (i) five years following the date of the First Mora Option or (ii) the
+Added: termination of the JVA.
+Added: Additionally, pursuant to the JVA, DC Estate Solutions’
+Added: equity interests in the SPVs are subject to the Company making minimum aggregate cash payments and contributions to DC Estate Solutions
+Added: (including amount payable under the SPV SPA) in the amount of $8,750,000 USD, which shall be distributed to BAIF (the “BAIF Funding”).
+Added: If the Company fails to make such payments, BAIF may foreclose on the pro rata amount of equity interests in the SPVs.
+Added: In the event of
+Added: any sale or lease of a Data Center, profits of DC Estate Solutions shall be shared equally by and between the Company and BAIF.
+Added: event DC Estate Solutions develops the Data Centers and sells such Data Centers, BAIF will be entitled to a bonus as defined under the
+Added: Further, effective January 27, 2026, the Company,
+Added: BAIF and DC Estate Solutions entered into an addendum to the JVA (the “Addendum”) to account for the development of additional
+Added: Data Centers in (i) Villasequilla, Spain 600 MW, (ii) Tomelloso, Spain 450 MW (collectively, with the above-mentioned Spain Leases, the
+Added: “Spain Leases”) and (iii) Tocumen, Panama 1000 MW (the “Panama Lease”).
+Added: The Villasequilla and Tomelloso data centers
+Added: shall each be owned by Spanish special purpose vehicles, DC Villasequilla SL and DC Tomelloso SL, respectively, and shall subsequently
+Added: be assigned to DC Estate Solutions.
+Added: The Tocumen data center shall be owned by a Panamanian special purpose vehicle, DC Tocumen SA, which
+Added: shall subsequently be assigned to DC Estate Solutions.
+Added: The Company, in addition to the already agreed upon $125,000 USD monthly payments,
+Added: agreed to fund the development of the additional Data Centers by paying a minimum of $2,400,000 USD payable in monthly installments of
+Added: $100,000 USD monthly payments to DC Estate Solutions commencing on May 1, 2026 for a minimum of 24 months, thereby increasing the minimum
+Added: BAIF Funding amount to a total of $11,150,000 USD.
+Added: The funds shall be distributed by DC Estate Solutions to BAIF.
+Added: The Company also agreed
+Added: to grant to BAIF, or its assignee, an additional stock option to acquire 150,000,000 shares of the Company’s common stock (the “Second
+Added: Mora Option”) at an exercise price of $0.02 per share.
+Added: The Second Mora Option is fully vested and exercisable as of the grant date
+Added: and terminates on the earlier of (i) five years following the date of the Second Mora Option or (ii) the termination of the JVA.
+Added: On March 23, 2026, the Company, BAIF and DC Estate
+Added: Solutions entered into a second addendum (the “Second Addendum”) to the JVA.
+Added: Pursuant to the Second Addendum, the parties
+Added: (1) increase the capacity of the Spain-based data centers to 4,350 MW and (2) exchange the stock options to purchase an aggregate
+Added: of 400,000,000 shares of common stock of the Company issued to BAIF or its assignees issued under the JVA for 400,000,000 shares of the
+Added: Company’s restricted common stock to BAIF or its assignees with the such shares being fully paid and non-assessable on the date
+Added: of execution of the Second Addendum.
Business Strategy
−Removed: Our business strategy is to generate revenue and
+Added: Our business focus is to generate revenue and
achieve profitability by building large-scale data center infrastructure configured for specialized computers performing specific, high-value
−Removed: applications such as cloud computing, machine learning, and artificial intelligence and maximizing the use of assets acquired in the SAPL
+Added: applications such as cloud computing, machine learning, and artificial intelligence and maximizing the use of assets acquired in a recent
We intend to strategically develop and to work to make operational the infrastructure necessary to support our contractual
3 unchanged sentences
business using our knowledge, expertise, and existing and future infrastructure where favorable market opportunities exist.
+Added: yet generated any revenues to date and require significant financing to develop our business.
Our strategy is focused on hyperscale cloud-based
5 unchanged sentences
our customers are located or plan to be located in the future.
−Removed: Our business strategy requires immediate funding of approximately $2,000,000
−Removed: to enable us to commence our new operations and repay debt, as well as additional significant financing to develop and expand our new
−Removed: There are no assurances that we will raise sufficient capital to execute our business plan or satisfy our liabilities.
−Removed: “Risk Factors.”
+Added: There are no assurances that we will raise sufficient capital to execute
+Added: our business plan or satisfy our liabilities.
+Added: See “ Risk Factors .”
Products and Services
−Removed: High-Performance Computing Hosting
+Added: AI Data Center Infrastructure Development
HPC is a technology that uses clusters of powerful
4 unchanged sentences
HPC has involved an on-premises infrastructure, investing in supercomputers or computer clusters.
−Removed: Our HPC hosting revenue will be generated by licensing
−Removed: colocation data center space and related services to a licensee at our Marviken data center.
−Removed: These licensing agreements and orders include
−Removed: lease components, non-lease components (such as power delivery, physical security, maintenance and other billable expenses), as well as
−Removed: non-component elements such as taxes.
−Removed: Under these contracts, customers pay fixed payments (based on electric capacity) and variable payments
−Removed: on a recurring basis.
−Removed: HPC colocation leases may include all or portions of a data center, where customers may also lease office space
−Removed: to support their colocation operations where revenue is primarily based on power usage as well as square footage.
+Added: Our AI Data Center Infrastructure revenue will
+Added: be generated by licensing colocation data center space and related services to a licensee at the Data Centers in Spain and Panama.
+Added: may choose to acquire our sites at RTB or contract with us to build the data center on our site to their specification and enter into
+Added: a license agreement.
+Added: These licensing agreements and orders include lease components, non-lease components (such as power delivery, physical
+Added: security, maintenance and other billable expenses), as well as non-component elements such as taxes.
+Added: Under these contracts, customers
+Added: pay fixed payments (based on electric capacity) and variable payments on a recurring basis.
+Added: HPC colocation leases may include all or portions
+Added: of a data center, where customers may also lease office space to support their colocation operations where revenue is primarily based
+Added: on power usage as well as square footage.
+Added: On January 21, 2025, the Company entered into
+Added: the Master Services Agreement with Cudo Ventures Ltd, a cloud computing company (“Cudo”).
+Added: Under this agreement, the Company
+Added: agreed to provide Tier 3 data center hosting infrastructure and colocation services to Cudo.
+Added: The Master Services Agreement supported a
+Added: 1 MW capacity during a five year term at our previously planned Marviken data center.
+Added: On February 18, 2025, Cudo made an initial payment
+Added: of $303,549 to the Company consisting of a $227,662 deposit, which was intended to be refundable at the end of the term of the Master
+Added: Services Agreement, and the first month’s rental payment of $75,887.
+Added: The initial payment was primarily used to buildout the data
+Added: center, including installing electrical and other infrastructure in order to support Cudo’s hardware through the advance of $183,000
+Added: The Master Services Agreement term commenced on April 8, 2025 when Cudo’s hardware was delivered to our data center.
+Added: as a result of the Company’s intention to rescind the SAPL Share Exchange, the Master Services Agreement was terminated and the
+Added: Company is obligated to refund the deposit paid thereunder.
Competition and Market Conditions
−Removed: The HPC market is highly competitive.
−Removed: market, we compete with numerous established data center providers, including Equinix, Inc., Digital Realty Trust, NTT, Switch, Inc.,
−Removed: and Core Scientific, Inc., as well as private operators specializing in HPC or colocation services, and digital asset miners looking to
−Removed: convert existing digital mining facilities into HPC colocation facilities.
−Removed: Many of these competitors are better established, have better
−Removed: brand recognition, are well capitalized, and organized to take advantage of certain tax benefits for their investors, lowering their external
−Removed: cost of capital.
−Removed: Many of our competitors seek to establish data centers in the same geographic regions as we do and compete for the same
−Removed: sources of power, equipment, and customers as our Company.
−Removed: Competitors compete on price, facility location, reputation, and perceived
−Removed: skill with respect to performance.
−Removed: We believe that our ability to take advantage of our recently acquired assets to rapidly deliver scalable,
−Removed: purpose-built data centers, combined with cutting-edge, energy-efficient technologies, will enable us to compete favorably within the
−Removed: Dependence on Suppliers and Customers
−Removed: Our hosting activities will compete with many
−Removed: other hosting operations.
−Removed: Our success in our hosting operations depends on our ability to supply hosting space and power, our performance
−Removed: with respect to installation, operation, and repair of customer equipment, our ability to obtain replacement parts, the value of our service
−Removed: offering to our customers, and the availability of necessary equipment.
−Removed: To compete effectively as a hosting provider, we will market our
−Removed: services to large-scale third-party HPC customers that value our ability to host at scale and who are willing to pay a premium-hosting
−Removed: fee for our high up-time and operational expertise.
−Removed: Suppliers and Development Efforts
−Removed: Power Providers
−Removed: Through SAPL, and the agreement dated December
−Removed: 27, 2024, as amended on February 20, 2025, between SAPL and Marviken ONE AB, a company organized in Sweden (“Marviken One”),
−Removed: we have secured a 95MW power purchase agreement (the “Power Purchase Agreement”).
−Removed: We will continue to cultivate relationships
−Removed: with power providers and work to leverage our operating capabilities to take advantage of any potential cost saving opportunities.
+Added: The AI data center market is highly competitive.
+Added: In the AI data center market, we compete with numerous established data center providers, including Equinix, Inc., Digital Realty Trust,
+Added: NTT, Switch, Inc., and Core Scientific, Inc., as well as private operators specializing in HPC or colocation services, and digital asset
+Added: miners looking to convert existing digital mining facilities into HPC colocation facilities.
+Added: Many of these competitors are better established,
+Added: have better brand recognition, are well capitalized, and organized to take advantage of certain tax benefits for their investors, lowering
+Added: their external cost of capital.
+Added: Many of our competitors seek to establish data centers in the same geographic regions as we do and compete
+Added: for the same sources of power, equipment, and customers as our Company.
+Added: Competitors compete on price, facility location, reputation, and
+Added: perceived skill with respect to performance.
+Added: We believe that, subject to adequate financing, our ability to take advantage of our recently
+Added: acquired assets to rapidly deliver scalable, purpose-built data centers, combined with cutting-edge, energy-efficient technologies, will
+Added: enable us to compete favorably within the AI Data center market.
Facility Development
−Removed: Through our acquisition of SAPL, and SAPL’s
−Removed: agreement with Marviken One dated December 27, 2024, we acquired a 10-year lease on a 1,050 square meter (“sqm”) building
−Removed: space and 28 sqm of office space located in Marviken, Sweden (the “Building Lease”).
−Removed: Our initial intent is to use the 1,050
−Removed: sqm space to build a Tier 3 specification datacenter with a total of 16MW IT load capacity (a 20MW gross) (the “20MW Center”).
−Removed: The estimated cost to complete the 20MW Center is $70 million, which necessitates the need to raise further equity and debt capital to
−Removed: finance the build.
−Removed: Based on our acquisition, we have already secured our first client for an initial 1MW, which we plan to have operational
−Removed: in April 2025, and we are negotiating with another client for use of the remaining 15MW IT capacity.
−Removed: In addition to the acquisition of the Building
−Removed: Lease, we also obtained a 20,000 sqm plot of land in Marviken, Sweden (the “Marviken Property”), via a property purchase agreement
−Removed: entered into between SAPL and Marviken TWO AB, a company incorporated in Sweden (“Marviken Two”), on December 4, 2024 (the
−Removed: “Property Purchase”).
−Removed: The property is located at Marviken Kraftverk, 610 27 Vikbolandet, Sweden and we plan to build an additional
−Removed: datacenter with 75MW gross capacity (the “75MW Center”).
−Removed: The estimated cost to complete this development is between $400-470
−Removed: The Company will have to raise further equity and debt capital to finance the development and construction, but we anticipate
−Removed: that a significant amount of the cost will be borne by our clients.
−Removed: Regarding both the 20MW Center and the 75MW Center, we will not commence
−Removed: building until the clients are secured.
−Removed: We have also secured a cooling agreement (the
−Removed: “Cooling Agreement”) via the agreement dated December 27, 2024 between SAPL and Marviken One.
−Removed: Marviken One has water rights
−Removed: which provide access to the Baltic Sea.
−Removed: Through our relationship with Marviken One, we intend to supply power and cooling to the 20MW
−Removed: Center and 75MW Center.
−Removed: We also assumed a 5% promissory note in the principal
−Removed: amount of $1,750,000 issued by SAPL to Marviken Two on December 4, 2024 (the “Note”), which represents part of the purchase
−Removed: price for the Property Purchase.
−Removed: The Note, together with accrued interest, is due in full on or before December 3, 2027.
−Removed: SAPL raises any capital during 2025, a portion of the proceeds shall be used to pay down the Note.
−Removed: The Note is secured by the Marviken
−Removed: Marviken One and Marviken Two are entities beneficially owned and controlled by Dr.
−Removed: Further, from our acquisition of SAPL, we also
−Removed: received cooling systems, tanks, heat exchangers, dielectric fluids, and other necessary data center components.
−Removed: These components will
−Removed: be used to build out our data center infrastructure throughout the spaces we have acquired.
−Removed: For all facility development, we will rely heavily
−Removed: on the expertise of third parties, focusing on sourcing, evaluating, designing, engineering, and developing the facilities where we will
−Removed: host our customers’ HPC colocation needs.
−Removed: Our HPC hosting operations will generate revenue
−Removed: by providing colocation, cloud, and connectivity services to customers in exchange for a fee.
−Removed: The HPC hosting operation provides colocation,
−Removed: facilities operations, security, and other services to third-party HPC customers to support workloads for machine learning and artificial
−Removed: intelligence.
−Removed: Through the acquisition of SAPL we have secured approximately 95MW of contracted power capacity and operational capacity
−Removed: of approximately 68 MW IT Load.
+Added: The Company and BAIF entered
+Added: into the MOU for the purposes of organizing DC Estate Solutions which was organized by the Company on October 23, 2025.
+Added: On November 6,
+Added: 2025, DC Estate Solutions and BAIF entered into the SPV SPA.
+Added: Then, effective January 22, 2026, the Company entered into the JVA with BAIF
+Added: and DC Estate Solutions and, effective January 27, 2026, the Company, BAIF and DC Estate Solutions entered into the Addendum to account
+Added: for the development of the additional Spain and Panama-based Data Centers.
+Added: DC Estate Solutions is owned and controlled 50.1% by the Company
+Added: and 49.9% by BAIF.
+Added: The principal of BAIF is Jose Mora.
+Added: DC Estate Solutions has acquired the seven Spain Leases, consisting of 100 hectares
+Added: of land each located in the Spain cities of Malpica, Caceres, Vianos, Cordoba, Torrecampo, Villasequilla and Tomelloso and the Panama
+Added: Lease for the site located in Tocumen, Panama.
+Added: The Leases are held by wholly owned subsidiaries of DC Estate Solutions.
+Added: The Leases are
+Added: for an average term of 35 years at an initial total average cost of $96,000 per month for all sites.
+Added: As a condition of each lease, the
+Added: payments are subject to meeting certain milestones, such as obtaining a favorable urban compatibility reports and connection points.
+Added: the terms of the Spain Leases, the Company will pay approximately $15,000 to the owners of the Cordoba site in 2026.
+Added: No further payments
+Added: are expected in 2026.
+Added: The Company and BAIF intend to use the
+Added: Leases to develop and operate AI data center sites.
+Added: Under the JVA, the Company agreed to fund DC Estate Solutions with $3,500,000
+Added: USD as follows:
+Added: (i) $250,000 USD, which was previously paid upon the execution of the MOU, (ii) $250,000 USD, which was previously
+Added: paid upon execution of the SPA, (iii) $375,000 USD paid on the effectiveness of a notarial public deed in Spain in connection with
+Added: the transfer of the SPVs to the JVA on the Effective Date, and (iv) $2,625,000 USD payable in monthly installments of $125,000 USD
+Added: commencing on March 1, 2026.
+Added: Pursuant to the Addendum, the Company, in addition to the already agreed upon $125,000 USD monthly
+Added: payments, agreed to fund the development of the additional Data Centers by paying a minimum of $2,400,000 USD payable in monthly
+Added: installments of $100,000 USD monthly payments to DC Estate Solutions commencing on May 1, 2026 for a minimum of 24 months, thereby
+Added: increasing the minimum BAIF Funding amount to a total of $11,150,000 USD.
+Added: The funds shall be distributed by DC Estate Solutions to
+Added: The Company intends to develop the sites as gas powered
+Added: fully autonomous energy islands for Tier 3 level uptime AI data centers.
+Added: The total capacity to be developed across the eight sites is
+Added: anticipated to be up to 3.5 Gigawatts.
+Added: We believe that since the sites will be autonomous energy islands no grid connection is required
+Added: and there will be no material reliance on grid infrastructure.
+Added: Thereby, subject to financing, reducing time to power for our data center
+Added: clients to 18 months.
+Added: The total capacity of the sites located in Malpica, Caceres, Vianos, Cordoba, Torrecampo is planned to be 360 MW
+Added: per site while the total capacity of the sites in Villasequilla, Tomelloso and Tocumen is planned to be 600 MW, 450 MW and 1000 MW, respectively.
+Added: An application to connect to the local gas pipeline for gas supply has already been made and approval has been received.
+Added: The Company is
+Added: negotiating a power purchase agreement with an energy company to develop a 360MW gas Solid Oxide Fuel Cell facility to convert gas fuel
+Added: into electricity.
+Added: The Company will need to secure fibre connections, environmental permits and all necessary contractor permits.
+Added: will then be classed at RTB as the Company intends to sell the sites on a RTB basis.
+Added: We estimate the Company will require additional significant
+Added: working capital to develop the sites to achieve full RTB status on all eight sites.
+Added: There are no assurances that the Company will receive
+Added: sufficient capital or will receive capital on reasonable terms.
+Added: In addition, there are no assurances the application and permits will
+Added: be received or that agreements will be completed or the data centers ultimately developed and sold or become operational.
+Added: Revenue Opportunities
+Added: We intend to generate revenues through the sale
+Added: of our AI data center developments.
+Added: We intend to sell the projects at RTB.
+Added: We may enter into joint venture agreements with clients who
+Added: will finance the final build of the data center on our sites and we will then share in the revenue generated from the completed AI data
+Added: center development.
+Added: We require significant working capital to achieve RTB status.
Intellectual Property
−Removed: We have acquired the intellectual property (“IP”)
−Removed: consisting of trade secrets associated with the SAPL brand, as well as SAPL’s immersion cooling technology and heat exchange technology
−Removed: through an intellectual property and trade secrets agreement originally entered into between SAPL and ACL on August 31, 2024 (the “IP
−Removed: This IP may be used in the future to build and provide services to data center clients, however there is no immediate
−Removed: There is potential to provide heated water to local utility companies from the residual heat created by our data centers
−Removed: using the heat exchange technology and IP that we are acquiring.
+Added: We do not own any patents, trademarks or any
+Added: other intellectual property nor are we a party to any agreements relating to the ownership or licensing of intellectual
The regulatory landscape surrounding HPC services,
25 unchanged sentences
As of April 13, 2026, we had 2 full-time employees,
−Removed: including 2 of our executive officers, and 1 part time employee including one of our executive officers.
−Removed: We also intend to engage consultants
−Removed: and contractors to supplement our permanent workforce on an as needed basis.
−Removed: None of our employees are represented by a labor union or
−Removed: covered by collective bargaining agreements, and we have not experienced any work stoppages.
+Added: including 2 of our executive officers, and excluding DC Estate Solutions.
+Added: We hire consultants from time to time and currently engage 5
+Added: We also intend to engage additional consultants and contractors to supplement our permanent workforce on an as needed basis.
+Added: None of our employees are represented by a labor union or covered by collective bargaining agreements, and we have not experienced any
+Added: work stoppages.
Corporate Information
5 unchanged sentences
Not applicable to small reporting companies.
−Removed: our principal risk factors are described under “Management’s Discussions and Analysis of Financial Condition and Results of
+Added: our principal risk factors are described under “ Management’s Discussions and Analysis of Financial Condition and Results of Operations .”