Item 2. Properties
ITEM 2. PROPERTIES
The following table presents our interests in net electric generating capacity by station at December 31, 2024:
Station (a)
Location No. of
Units Percent
Owned (b)
Primary
Fuel Type Primary
Dispatch
Type (c)
Net Generation
Capacity (MWs) (d)
Midwest
Braidwood Braidwood, IL 2 Uranium Baseload
2,386
Byron Byron, IL 2 Uranium Baseload
2,350
LaSalle Seneca, IL 2 Uranium Baseload
2,320
Dresden Morris, IL 2 Uranium Baseload
1,845
Quad Cities Cordova, IL 2 75 Uranium Baseload
1,403
Clinton Clinton, IL 1 Uranium Baseload
1,092
Michigan Wind 2 Sanilac County, MI
50 51 (e)
Wind Intermittent 46
Beebe Gratiot County, MI
34 51 (e)
Wind Intermittent 42
Michigan Wind 1 Huron County, MI
46 51 (e)
Wind Intermittent 35
Harvest 2 Huron County, MI
33 51 (e)
Wind Intermittent 30
Harvest Huron County, MI
31 51 (e)
Wind Intermittent 26
Beebe 1B Gratiot County, MI
21 51 (e)
Wind Intermittent 26
CP Windfarm Faribault County, MN
2 51 (e)
Wind Intermittent 2
Clinton Battery Storage Blanchester, OH 1 Energy Storage Peaking 5
Total Midwest 11,608
Mid-Atlantic
Limerick Sanatoga, PA 2 Uranium Baseload
2,315
Calvert Cliffs Lusby, MD 2 Uranium Baseload
1,789
Peach Bottom Delta, PA 2 50 Uranium Baseload
1,324
Salem Lower Alloways
Creek Township, NJ 2 42.59 Uranium Baseload
989
Conowingo Darlington, MD 11 Hydroelectric Baseload
497
Criterion Oakland, MD 28 51 (e)
Wind Intermittent 36
Fair Wind Garrett County, MD 12 Wind Intermittent 30
Fourmile Ridge Garrett County, MD 16 51 (e)
Wind Intermittent 20
Solar Horizons Emmitsburg, MD 1 51 (e)
Solar Intermittent 8
Solar New Jersey 3 Middle Township, NJ 4 51 (e)
Solar Intermittent 1
Muddy Run Drumore, PA 8 Hydroelectric Intermediate 1,058
Eddystone 3, 4 Eddystone, PA 2 Oil/Gas Peaking 760 (h)
Perryman Aberdeen, MD 5 Oil/Gas Peaking 404 (i)
Croydon West Bristol, PA 8 Oil Peaking 391
Handsome Lake Kennerdell, PA 5 Gas Peaking 268
Richmond Philadelphia, PA 2 Oil Peaking 98
Philadelphia Road Baltimore, MD 4 Oil Peaking 60
44
Table of Contents
Station (a)
Location No. of
Units Percent
Owned (b)
Primary
Fuel Type Primary
Dispatch
Type (c)
Net Generation
Capacity (MWs) (d)
Eddystone Eddystone, PA 4 Oil Peaking 60
Delaware Philadelphia, PA 4 Oil Peaking 56
Southwark Philadelphia, PA 4 Oil Peaking 52
Falls Morrisville, PA 3 Oil Peaking 51
Moser Lower Pottsgrove Township, PA
3 Oil Peaking 51
Chester Chester, PA 3 Oil Peaking 39
Schuylkill Philadelphia, PA 2 Oil Peaking 30
Total Mid-Atlantic 10,387
ERCOT
STP
Bay City, TX 2 44 (j)
Uranium Baseload
1,162
Whitetail Webb County, TX 57 51 (e)
Wind Intermittent 47
Sendero Jim Hogg and Zapata Counties, TX
39 51 (e)
Wind Intermittent 40
Colorado Bend II Wharton, TX 3 Gas Intermediate 1,143
Wolf Hollow II Granbury, TX 3 Gas Intermediate 1,103
Handley 3 Fort Worth, TX 1 Gas Intermediate 375
Handley 4, 5 Fort Worth, TX 2 Gas Peaking 870
Total ERCOT 4,740
New York
NMP
Scriba, NY 2 (f)
Uranium Baseload
1,675
FitzPatrick Scriba, NY 1 Uranium Baseload
842
Ginna Ontario, NY 1 Uranium Baseload
576
Total New York 3,093
Other
Antelope Valley Lancaster, CA 1 Solar Intermittent 242
Bluestem Beaver County, OK 60 51 (e)(g)
Wind Intermittent 101
Shooting Star Kiowa County, KS 65 51 (e)
Wind Intermittent 53
Bluegrass Ridge King City, MO 26 51 (e)
Wind Intermittent 29
Conception Barnard, MO 23 51 (e)
Wind Intermittent 26
Cow Branch Rock Port, MO 24 51 (e)
Wind Intermittent 26
Mountain Home Glenns Ferry, ID 20 51 (e)
Wind Intermittent 21
45
Table of Contents
Station (a)
Location No. of
Units Percent
Owned (b)
Primary
Fuel Type Primary
Dispatch
Type (c)
Net Generation
Capacity (MWs) (d)
High Mesa Elmore County, ID
19 51 (e)
Wind Intermittent 20
Echo 1 Echo, OR 21 50.49 (e)
Wind Intermittent 17
Sacramento PV Energy Sacramento, CA 4 51 (e)
Solar Intermittent 15
Cassia Buhl, ID 13 51 (e)
Wind Intermittent 14
Wildcat Lovington, NM 13 51 (e)
Wind Intermittent 14
Echo 2 Echo, OR 9 51 (e)
Wind Intermittent 9
Tuana Springs Hagerman, ID 8 51 (e)
Wind Intermittent 9
Greensburg Greensburg, KS 10 51 (e)
Wind Intermittent 6
Threemile Canyon
Boardman, OR 6 51 (e)
Wind Intermittent 5
Loess Hills Rock Port, MO 4 Wind Intermittent 5
Denver Airport Solar Denver, CO 1 51 (e)
Solar Intermittent 2
Hillabee Alexander City, AL
3 Gas Intermediate 753
Wyman 4 Yarmouth, ME 1 5.9 Oil Intermediate 35
West Medway II West Medway, MA 2 Oil/Gas Peaking 188
West Medway West Medway, MA 3 Oil Peaking 123
Grand Prairie Alberta, Canada 1 Gas Peaking 105
Framingham Framingham, MA 3 Oil Peaking 30
Total Other 1,848
Total 31,676
__________
(a) All nuclear stations are boiling water reactors except Braidwood, Byron, Calvert Cliffs, Ginna, Salem, and STP units which are pressurized water reactors.
(b) 100%, unless otherwise indicated.
(c) Baseload units are those that normally operate to take all or part of the minimum continuous load of a system and, consequently, produce electricity at an essentially constant rate. Intermittent units are those with output controlled by the natural variability of the energy resource rather than dispatched based on system requirements. Intermediate units are those that normally operate to take load of a system during the daytime higher load hours and, consequently, produce electricity by cycling on and off daily. Peaking units consist of lower-efficiency, quick response steam units, gas turbines and diesels normally used during the maximum load periods.
(d) Net generation capacity is stated at proportionate ownership share. For nuclear stations, capacity reflects the annual mean rating. All other facilities reflect a summer rating.
(e) Reflects the prior sale of 49% of CRP to a third party. See Note 21 — Variable Interest Entities of the Combined Notes to Consolidated Financial Statements for additional information.
(f) We wholly own NMP Unit 1 and have an 82% undivided ownership interest in NMP Unit 2.
(g) CRP owns 100% of the Class A membership interests and a tax equity investor owns 100% of the Class B membership interests of the entity that owns the Bluestem generating assets.
(h) Eddystone units 3 and 4 will be retiring in June 2025.
(i) In July 2024, we submitted a deactivation notice with PJM with intent to deactivate one of the Perryman 6 units (unit 1) with approximately 54.9 MW of installed capacity on or about May 31, 2025.
(j) Within the 44% undivided ownership interest in STP, 2% interest was recorded as held for sale as of December 31, 2024. See Note 2 — Mergers, Acquisitions, and Dispositions of the Combined Notes to Consolidated Financial Statements for additional information.
The net generation capability available for operation at any time may be less due to regulatory restrictions, transmission congestion, fuel restrictions, efficiency of cooling facilities, level of water supplies, or generating units being temporarily out of service for inspection, maintenance, refueling, repairs, or modifications required by regulatory authorities.
We also own EMT, which is a liquefied natural gas import facility located on the Mystic River in Everett, MA. EMT connects to two interstate pipeline systems as well as a local gas utility's distribution system.
We maintain property insurance against loss or damage to our principal plants and properties by fire or other perils, subject to certain exceptions. For additional information on insurance specific to our nuclear facilities, see
46
Table of Contents
Note 18 — Commitments and Contingencies of the Combined Notes to Consolidated Financial Statements. For our insured losses, we are self-insured to the extent that any losses are within the policy deductible or exceed the amount of insurance maintained. Any such losses could have a material adverse effect on our consolidated financial statements.