Item 2. Management’s Discussion and Analysis
Item
2. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS
The
following discussion of our financial condition and results of operations should be read in conjunction with our unaudited consolidated
financial statements and the notes to those financial statements appearing elsewhere in this Report.
This
discussion and analysis below include forward-looking statements that are subject to risks, uncertainties and other factors described
in the “Risk Factors” section that could cause actual results could differ materially from those anticipated in these forward-
looking statements as a result of various factors. Additionally, our historical results are not necessarily indicative of the results
that may be expected for any period in the future.
Overview
Atlas
Lithium Corporation is a mineral exploration and development company with lithium projects and multiple lithium exploration
properties. In addition, we own exploration properties in other battery minerals, including nickel, rare earths, graphite, and titanium .
Our current focus is the development from exploration to active mining of our hard-rock lithium project located in the state of Minas
Gerais State in Brazil at a well-known, premier pegmatitic district in Brazil, which has been recently denominated by the government
of Minas Gerais as “Lithium Valley”. We intend to mine and then process our lithium-containing ore to produce lithium concentrate
(also known as spodumene concentrate), a key ingredient for the battery supply chain.
We
are in the initial planning stages of planning to develop and own 100% of a processing facility capable of producing 300,000 tons of
lithium concentrate annually. However, there can be no assurance that we will have the necessary capital resources to develop such
facility or, if developed, that we will reach the production capacity necessary to commercialize our products and with the quality
needed to meet market demand.
All
of our mineral projects and properties are located in Brazil and our mineral rights portfolio for battery minerals includes
approximately 71.057 acres (288 km 2 ) for lithium in 58 mineral rights, 52,229 acres for nickel (211 km 2 ) in 14
mineral rights, 30,009 acres (121 km 2 ) for rare earths in seven mineral rights, 17,117 acres (69 km 2 ) for
titanium in seven mineral rights, and 9,663 acres (39 km 2 ) for graphite in two mineral rights. We believe that we hold
the largest portfolio of exploration properties for battery minerals in Brazil, a premier and well-established mining
jurisdiction.
We
are primarily focused on advancing and developing our hard-rock lithium project located in the state of Minas Gerais, Brazil, where
some of our high-potential mineral rights are adjacent to or near large lithium deposits that belong to Sigma Lithium Corporation
(Nasdaq: SGML). Our Minas Gerais Lithium Project (“MGLP”) is our largest project and consists of 51 mineral rights
spread over 54,791 acres (222 km 2 ) and predominantly located within the Brazilian Eastern Pegmatitic Province which has
been surveyed by the Brazilian Geological Survey and is known for the presence of hard rock formations known as pegmatites which
contain lithium-bearing minerals such as spodumene and petalite.
We
believe that we can increase our value by the acceleration of our exploratory work and quantification of our lithium mineralization.
Our initial commercial goal is to be able to enter production of lithium concentrate, a product which is highly sought after in
the battery supply chain for electric vehicles.
We
also have 100%-ownership of early-stage projects and properties in other minerals that are needed in the battery supply chain and high
technology applications such as nickel, rare earths, graphite, and titanium. We believe that the shift from fossil fuels to battery power
may yield long-term opportunities for us not only in lithium but also in such other minerals.
Additionally,
we have 100%-ownership of several mining concessions for gold and diamonds, two of which also include industrial sand. As our
lithium properties became our corporate focus, we stopped alluvial gold and diamond exploration efforts in 2018 and the sale of our industrial sand in
2022.
In addition to these projects, we own 45.11% of the shares of common stock of Apollo Resources, a private company primarily
focused on the development of its initial iron mine.
We
also own approximately 28.00% of the shares of common stock of Jupiter Gold, a company focused
on the exploration of two gold projects and a quartzite mine, and whose common stock are quoted on the OTCQB marketplace
under the symbol “JUPGF.” The quartzite mine started operations in June 2023.
Apollo
Resources and Jupiter Gold have not generated any revenues to date. The results of operations from both Apollo Resources and Jupiter
Gold are consolidated in our financial statements under U.S. GAAP.”
3
Table of Contents
Operational
Update
Exploration
Campaign
Our
ongoing drilling campaign is delineating the lithium resources of our 100%-owned Neves Project, a cluster of four lithium mineral rights
within MGLP. Our current geological team is comprised of 12 geologists, nine of which are employed full-time. To support the work of our geologists
we have 18 full-time field and support technicians and machinery operators. Our geological team and our exploration campaign is supervised
by Volodymyr Myadzel, Ph.D., a Qualified Person for lithium as such term is defined in Subpart
1300 of Regulation S-K promulgated by the Commission (“Regulation S-K 1300”) .
We
have engaged SGS Canada Inc. (“SGS”), and, in particular, their geologist Marc-Antoine Laporte, a Qualified Person for lithium
under Regulation S-K 1300 , to produce a mineral resource estimate report (the “Maiden
Resource Report”) for our Neves Project in accordance with Regulation S-K 1300. Mr. Laporte is the author of mineral resource reports
for two other companies which have hard-rock lithium projects in Lithium Valley, the general area where our Neves Project is located,
and has worked on lithium properties in Lithium Valley since 2017. Mr. Laporte visited our Neves Project between May 4 and May 6, 2023.
The Maiden Resource Report is expected to be completed during the third quarter of 2023.
The
Maiden Resource Report will update and replace our previously
filed SLR International Corporation’s technical report summary entitled “S-K 1300 Technical
Report Summary on the Das Neves Lithium Project” (the “Initial Exploration Report”), with an effective date of August
10, 2022, and a signature date of August 31, 2022. The Initial Exploration Report presented recommendations to us on further steps
necessary for the delineation of the lithium resources at our Neves Project. At the time of the Initial Exploration Report, we had one
drill on site and 1,213 meters drilled in total. Currently, we have 10 active drills operating and have drilled, as of June 30, 2023,
an aggregate of 33,664 meters. The current drilling campaign pace is approximately 7,400 meters drilled per month.
At
our Neves Project, our current focus is drilling within and around our flagship pegmatite, “Anitta,” a 2.3-kilometer formation
which remains open along strike and at depth, and has been proven to contain spodumene, a key lithium-bearing mineral.
Drilling
Campaign Highlights (drill holes in numerical sequence)
DHAB-11B:
1.57%
Li 2 O over 13.1m from 74.0m to 87.1m, which includes:
2.25%
Li 2 O over 4.0m from 76.7m to 80.8m, and
2.00%
Li 2 O over 3.1m from 84.0m to 87.1m
DHAB-12:
1.35%
Li 2 O over 5.02m from 83.41m to 88.43m
DHAB-15:
1.40%
Li 2 O over 15.0m from 60.5m to 75.5m, which includes:
1.83%
Li 2 O over 5.0m from 66.5m to 71.5m
4
Table of Contents
DHAB-18:
1.01%
Li 2 O over 9.95m from 82.66m to 92.61m, which includes:
2.17%
Li 2 O over 3.0m from 86.55m to 89.55m
DHAB-21:
1.33%
Li 2 O over 8.8m from 50.0m to 58.8m
DHAB-39B:
1.00%
Li 2 O over 9.1m from 107.4m to 116.6m
1.48%
Li 2 O over 9.0m from 119.2m to 128.2m
DHAB-41:
1.09%
Li 2 O over 22.2m from 83.0m to 105.2m, which includes:
1.72%
Li 2 O over 4.0m from 94.0m to 98.0m
DHAB-44:
1.30%
Li 2 O over 17.9m from 141.81m to 159.71m, which includes:
1.88%
Li 2 O over 9.0m from 150.0m to 159.0m
DHAB-47:
2.80%
Li 2 O over 9.87m from 54.18m to 64.05m
DHAB-57:
1.46%
Li 2 O over 13.0m from 92.2m to 105.2m
DHAB-64:
1.08%
Li 2 O over 10.6m from 119.5m to 130.1m
1.26%
Li 2 O over 11.0m from 132.1m to 143.1m, which includes:
2.09%
Li 2 O over 5.0m from 135.1m to 140.1m
DHAB-68:
1.36%
Li 2 O over 25.43m from 54.15m to 79.58m, which includes:
2.02%
Li 2 O over 6.5m from 54.15m to 60.15m,
4.40%
Li 2 O over 0.55m from 60.15m to 60.70m, and
1.89%
Li 2 O over 5.0m from 71.5m to 76.5m
DHAB-70:
1.16%
Li 2 O over 14.85m from 43.75m to 58.60m
1.20%
Li 2 O over 2.4m from 78.31m to 80.72m
DHAB-74:
1.01%
Li 2 O over 8.74m from 137.26m to 146.00m
DHAB-77:
1.08%
Li 2 O over 3.2m from 65.8m to 69.0m
1.46%
Li 2 O over 14.0m from 70.0m to 84.0m, which includes:
2.04%
Li 2 O over 5.0m from 70.01m to 75.0m
DHAB-85:
1.18%
Li 2 O over 47.0m from 7.0m to 54.0m, which includes:
2.12%
Li 2 O over 7.0m from 13.0m to 20.0m, and
1.88%
Li 2 O over 9.0m from 150.0m to 159.0m
DHAB-104:
1.47%
Li 2 O over 95.20 meters, which includes:
2.26%
Li2O over 2.7m from 97.9m to 100.6m,
1.71%
Li2O over 3.2m from 103.4m to 106.6m,
2.19%
Li2O over 5.1m from 127.0m to 132.1m,
1.95%
Li2O over 13.7m from 137.3m to 151.0m,
2.10%
Li2O over 14.6m from 155.0m to 169.6m, and
2.31%
Li2O over 9.1m from 176.2m to 185.3m
DHAB-144:
1.73%
Li 2 O over 8.0 meters, from 153.0m to 161.0m, which includes:
2.18%
Li2O over 3.0m from 154.0m to 157.0m
DHAB-145EX:
2.53%
Li 2 O over 11.50 meters from 242.55m to 254.00m, which includes:
3.34%
Li2O over 7.0m from 244.0m to 251.0m
DHAB-160:
1.82%
Li 2 O over 25.0 meters, which includes:
2.17%
Li2O over 8.0m from 217.0m to 225.0m, and
2.86%
Li2O over 8.0m from 225.0m to 233.0m
DHAB-162:
1.48%
Li 2 O over 30.0 meters from 186.0m to 217.0m, which includes:
2.03%
Li2O over 5.0m from 207.0m to 212.0m, and
3.73%
Li2O over 5.0m from 212.0m to 217.0m
1.58%
Li 2 O over 9.0 meters, from 240.0m to 249.0m which includes:
1.86%
Li2O over 4.0m from 240.0m to 244.0m
DHAB-178EX:
1.17%
Li 2 O over 35.2 meters from 235.0 to 278.2m, which includes:
1.50%
Li2O over 7.0m from 250.0m to 257.0m,
2.05%
Li2O over 9.0m from 260.0m to 269.0m, and
1.92%
Li2O over 3.0m from 269.0m to 272.0m
DHAB-181:
1.35%
Li2O over 8.0 meters from 263.0m to 272.2m, which includes:
2.11%
Li2O over 3.5m from 263.0m to 266.5m
DHAB-185:
2.06%
Li2O over 6.3 meters from 8.0m to 14.3m, which includes:
5.23%
Li2O over 1.1m from 9.2m to 10.3m,
3.19%
Li2O over 4.3 meters from 16.7m to 21.0m,
1.75%
Li2O over 5.8 meters from 38.0m to 43.8m, and
1.75%
Li2O over 5.4 meters from 54.8m to 60.2m
DHAB-187:
1.58%
Li2O over 6.0 meters from 172.0m to 178.0m
5
Table of Contents
Our
drilling and sampling follow strict best practices established under
QA/QC protocols. All lithium samples are analyzed at SGS-Geosol,
the premier analytical laboratory used by reputable mining companies in Brazil. Normally geochemical results are obtained from SGS-Geosol
three weeks after submission of the samples for analysis.
Metallurgical
Report
On
April 24, 2023, we announced the receipt of the metallurgical report (the “Metallurgical Report”) from SGS for studies performed
over several months on a representative ore sample from our Neves Project. The Metallurgical Report showed that a very high grade of
7.22% was achieved for heavy liquid separation. Commercial-grade lithium concentrate was obtained from our representative
sample using standard dense media separation, a gravity-based approach which does not use any harmful chemicals or
flotation. The Metallurgical Report also showed final lithium concentrate grading of 6.04% Li 2 O with only 0.53% Fe 2 O 3 ,
and a lithium recovery of 70%. Our desired target was the production of concentrate grading 6.0% Li 2 O with less than 1.0%
Fe 2 O 3 , and these targets were exceeded. SGS has been providing testing and analytical services to the mining industry
since 1941 and has earned the reputation as a leading provider of metallurgical services.
The
Metallurgical Report will become a chapter in the Maiden Resource Report described above. The Metallurgical Report also allows SGS to
begin work towards a Preliminary Economic Assessment of the Neves Project which is a technical study expected to be issued after the
Maiden Resource Report.
Business
Development
Mitsui
& Co., Ltd.
On
January 18, 2023, we announced that we had signed a Memorandum of Understanding (“MOU”) with Mitsui & Co., Ltd. (“Mitsui”)
with respect to Mitsui’s potential interest in acquiring the right to purchase our future lithium concentrate production. Mitsui
is one of the world’s most diversified comprehensive trading, investment, and service enterprises. Headquartered in Tokyo, Japan,
Mitsui maintains a global network of 128 offices in 63 countries and regions.
In
general terms, the MOU contemplates potential funding from Mitsui to us of up to $65 million (the “Offtake Funding”), in
tranches and subject to the achievement of specific milestones acceptable to Mitsui, that would give Mitsui the right to buy up to 100%
of our future production from our planned plant with output capacity of 150,000 tons of lithium concentrate per year (the “Plant”).
The Offtake Funding would be primarily used by us for the construction of the Plant. Lithium concentrate produced by the Plant would
then be available for purchase by Mitsui at a price generally based on the then-prevailing market price. The MOU is non-binding and non-exclusive
for both companies. During the three months ending June 30, 2023, we continued to engage in discussions with Mitsui regarding progress
toward achieving the milestones set forth in the MOU.
6
Table of Contents
Lithium
Royalty Corp.
On
May 2, 2023, we and Atlas Litio Brasil Ltda. (the “Company Subsidiary”), entered into a Royalty Purchase Agreement (the
“Purchase Agreement”) with Lithium Royalty Corp., a Canadian company listed on the Toronto Stock Exchange
(“LRC”), whereby the Company Subsidiary sold to LRC in consideration for $20,000,000 in cash, a royalty interest
equaling 3% of the future gross revenue (the “Royalty”) to be received by the Company Subsidiary from the sale of
products from certain 19 mineral rights and properties that are located in Brazil and held by the Company Subsidiary.
On
the same day, the Company Subsidiary and LRC entered into a Gross Revenue Royalty Agreement (the “Royalty Agreement”) pursuant
to which the Company Subsidiary granted LRC the Royalty and undertook to calculate and make royalty payment on a quarterly basis commencing
from the first receipt of the sales proceeds with respect to the products from the Property. The Royalty Agreement contains other customary
terms, including but not limited to, the scope of the gross revenue, the Company Subsidiary’s right to determine operations, and
LRC’s information and audit rights. Under the Royalty Agreement, the Company Subsidiary also granted LRC an option to purchase
additional royalty interest with respect to certain additional Brazilian mineral rights and properties on the same terms and conditions
as the Royalty, at a total purchase price of $5,000,000
The
principals at LRC are known for their experience in the lithium industry. A s part of LRC’s
due diligence, Mr. Ernie Ortiz, LRC’s President and CEO, visited our Neves Project between April 5, 2023, and April 7, 2023.
Results
of Operations
The
Three Months Ended June 30, 2023, Compared to the Three Months ended June, 2022
Net
loss for the three months ended June 30, 2023, totaled $9,126,649, compared to net of $871,016 during the three months ended June 30,
2022. The increase in loss is mainly due to:
●
Higher
general and administrative expenses in the period due to legal fees, traveling expenses and the cost of D&O insurance
for the quarter;
●
Increased compensation costs relate to the increase in employee headcount and bonus paid to management;
●
Stock-based compensation increase is due to the increase in our common stock share price and new members of the management team; and
Higher
exploration expenses for the period due the execution of the drilling program on our 100% owned Minas Gerais Lithium Project.
Six
Months Ended June 30, 2023 Compared to the Six Months ended June 30, 2022
Net
loss for the six months ended June 30, 2023, totaled $13,092,587, compared to net of $1,402,506 during the six months ended June 30,
2022. The increase in loss is mainly due to
●
Higher
general and administrative expenses in the period due to approximately $1,030,000 in non-recurring transaction costs associated with
our Offering in January 2023 in connection with the listing of our common stock on the Nasdaq Capital Market., including increased
legal fees, travelling and D&O insurance expenses.
●
Higher
compensation costs due to the increase in employee headcount and bonus paid to management
●
Stock-based compensation increase is due to the increase in our common stock share price and new members of the management team; and
●
Higher
exploration expenses for the period due the execution of the drilling program on our 100% owned Minas Gerais Lithium Project.
Liquidity
and Capital Resources
As
of June 30, 2023, we had cash and cash equivalents of $20,165,214 and net working capital, including cash, of $16,640,187.
Net
cash provided by operating activities totaled $11,783,491 for the six months ended June 30, 2023, compared to net cash used of $1,327,301
during the six months ended June 30, 2022, representing an increase of $13,110,792 or 987%. The said increase in net
cash generated by operating activities was mainly due to:
●
Royalty
sale of 3% of the gross revenue for $20,000,000. (refer to discussion in Note 3);
●
Increase
of our lithium exploration program costs of $5,671,904
●
Nasdaq
listing, non-recurrent expenses of approximately $1,030,000;
●
Increase
in compensation expenses due to the increase of management and exploration teams.
Net
cash used in investing activities totaled $2,679,812 for the six months ended June 30, 2023, compared to net cash used of $247,163 during
the six months ended June 30, 2022, representing an increase in cash used of $2,432,649 or 984%. The increase refers to the purchase
of lithium mining rights.
7
Table of Contents
Net
cash provided by financing activities totaled $10,675,118 for the six months ended June 30, 2023, compared to $1,910,960 during the six
months ended June 30, 2022, representing an increase in cash provided of $8,764,158 or 458%. The increase is mainly due to:
●
Our Offering which closed on January 12, 2023, with
aggregate gross proceeds of $4,657,500.
●
Securities Purchase Agreement with two investors, pursuant
to which we agreed to issue and sell to the Investors in a Regulation S private placement an aggregate of 640,000 restricted shares
of our common stock, par value $0.001 per share. The purchase price for the Shares was $6.25 per share, for total gross proceeds
of $4,000,000.
●
During the three months ended June, 2023, we also sold
an aggregate of 192,817 shares of our common stock to Triton Funds, L.P for total gross proceeds of $1,675,797 pursuant to a Common
Stock Purchase Agreement entered between us and Triton Funds, LP.
For
further information on three transactions mentioned above, please refer to Note 5 – stockholders´ equity.
We
have historically incurred net operating losses and have not yet received material revenues from the sale of products or services.
Our
primary sources of liquidity have been derived through proceeds from the (i) issuance of debt and (ii) sales of our equity and the
equity of one of our subsidiaries. For example, on January 12, 2023, we completed a firm underwritten public offering of 776,250
shares of our common stock (which includes the shares subject to the over-allotment option, exercised by the underwriter in full),
for aggregate gross proceeds of $4,657,500 (prior to deducting any underwriting discounts, commissions, and other offering
expenses). On January 30, 2023, and on July 18, 2023, we raised an aggregate of $4 million and $10 million, respectively, in gross
proceeds from the sale of our common stock in transaction exempt under Regulation S of the Securities Act of 1933, as amended (the
“Securities Act”), and (iii) sale of royalty interest. Lastly, on May 2, 2023, in connection with entering into the
Royalty Purchase Agreement, the Company received a cash payment of $20,000,000 (see discussion in Note 3 related to the Royalty
Purchase Agreement). We believe our cash on hand will be sufficient to meet our working capital and capital expenditure requirements
for a period of at least twelve months through March 2024.
Our
future short- and long-term capital requirements will depend on several factors, including but not limited to, the rate of our growth,
our ability to identify areas for mineral exploration and the economic potential of such areas, the exploration and other drilling campaigns
needed to verify and expand our mineral resources, the types of processing facilities we would need to install to obtain commercial-ready
products, and the ability to attract talent to manage our different business activities. To the extent that our current resources are
insufficient to satisfy our cash requirements, we may need to seek additional equity or debt financing. If the needed financing is not
available, or if the terms of financing are less desirable than we expect, we may be forced to scale back our existing operations and
growth plans, which could have an adverse impact on our business and financial prospects and could raise substantial doubt about our
ability to continue as a going concern.
Currency
Risk
Information
pertaining to currency risk can be found in “Item 1. Financial Statements, Note 7. Risks and Uncertainties,” to the interim
consolidated financial statements, and is incorporated by reference herein
We
currently have no off-balance sheet arrangements.
Critical
Accounting Policies and Estimates
Our
financial instruments consist of cash and cash equivalents and accrued expenses. The carrying amount of these financial instruments is
approximate of fair value due either to length of maturity or interest rates that approximate prevailing market rates unless otherwise
disclosed in our financial statements. If our estimate of the fair value is incorrect on June 30, 2023, it could negatively affect our
financial position and liquidity and could result in our having understated our net loss.
8
Table of Contents
Recent
Accounting Pronouncements
Our
consolidated financial statements are prepared in accordance with U.S. GAAP. Our significant accounting policies are described in Note
1 of the financial statements. We have reviewed all recent accounting pronouncements issued to the date of the issuance of these financial
statements, and we do not believe any of these pronouncements will have a material impact on us.
Item
3. QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK
The
information to be reported under this Item is not required of smaller reporting companies.
Text extracted from the filing as submitted to EDGAR. Formatting, tables and exhibits are simplified for reading; the original document is authoritative for anything you rely on.