−Removed: We are a United States ("U.S.") designer, developer, and operator of next-generation digital infrastructure across North America.
−Removed: We provide digital infrastructure solutions and cloud services to the rapidly growing industries of High-Performance Computing ("HPC") and Artificial Intelligence ("AI").
−Removed: We operate in three distinct business segments,
−Removed: including, Blockchain data center hosting (the "Data Center Hosting Business"), cloud services through a wholly owned subsidiary (the "Cloud Services Business") and HPC data center hosting (the "HPC Hosting Business"), as further discussed below.
−Removed: We completed our initial public offering in April 2022 and our common stock began trading on the Nasdaq Global Select Market (“Nasdaq”) on April 13, 2022.
−Removed: In November 2022, we changed our name from Applied Blockchain, Inc.
−Removed: to Applied Digital Corporation.
+Added: We are a United States ("U.S.") designer, developer, and operator of next-generation data center infrastructure across North America.
+Added: We provide data center infrastructure solutions to the rapidly growing industries of high-performance computing ("HPC") and artificial intelligence ("AI").
+Added: We operate in two distinct business segments, blockchain data center hosting (the "Data Center Hosting Business") and HPC data center hosting (the "HPC Hosting Business"), as further discussed below.
+Added: During the fiscal year 2025, we determined that the Cloud Services Business met the criteria to be classified as “held for sale” on our consolidated balance sheets as the Board of Directors approved plans for the sale of the segment.
+Added: The potential sale of the Cloud Services Business, which was previously included as a reportable segment, represents a strategic shift in our operations and financial results and as such, we have excluded the results of this business from both continuing operations and segment results and presented them in discontinued operations on the consolidated statements of operations for all periods presented.
Data Center Hosting Business
1 unchanged sentence
Our custom-designed data centers allow customers to rent space based on their power requirements.
−Removed: We currently serve seven crypto mining customers, all of which have entered into contracts with us ranging from three to five years.
−Removed: This business segment accounts for the majority of the revenue we generate from our operations (approximately 83% for the fiscal year ended May 31, 2024).
−Removed: We currently operate sites in Jamestown and Ellendale, North Dakota, with a total hosting capacity of approximately 286 MW:
+Added: We currently serve one crypto mining customer with a remaining contractual term of two and a half years.
+Added: This business segment accounts for all of the revenue we generated from our continuing operations for the fiscal year ended May 31, 2025.
+Added: We currently operate sites in Jamestown and Ellendale, North Dakota, with a total hosting capacity of approximately 286 MW as follows:
• Jamestown, North Dakota:
2 unchanged sentences
180 MW facility.
−Removed: In March 2021, we executed a strategy planning and portfolio advisory services agreement (the "Services Agreement") with GMR Limited, a British Virgin Island limited liability company ("GMR"), Xsquared Holding Limited, a British Virgin Island limited liability company ("SparkPool") and Valuefinder, a British Virgin Islands limited liability company ("Valuefinder" and, together with GMR and SparkPool, the "Service Provider(s)").
−Removed: Under the Services Agreement, the Service Providers agreed to provide crypto asset mining management and analysis and assist us in securing difficult-to-obtain mining equipment.
−Removed: Under the terms of the Services Agreement, we issued 7,440,148 shares of our common stock to each of GMR and SparkPool and 3,156,426 shares of our common stock to Valuefinder.
−Removed: In June 2022, SparkPool ceased all operations and forfeited 4,965,432 shares of our common stock back to us.
−Removed: In March 2022, we decided to terminate our crypto mining operations, shifting our focus and our business strategy to developing the HPC Hosting Business and our other two business segments (including the Data Center Hosting Business).
−Removed: Each Service Provider advised us concerning the design and buildout of our hosting operations.
−Removed: We continue to partner with GMR, and other providers as they remain our strategic equity investors.
−Removed: Our partners have strong relationships across the cryptocurrency ecosystem, which we may leverage to identify leads for the expansion of our operations and business segments.
−Removed: Compared to our previous mining operations, co-hosting revenues are less subject to volatility related to the underlying crypto-asset markets.
−Removed: We have a contractual ceiling for our energy costs through our Amended and Restated Electric Service Agreement, entered into in September 2023 with a utility in the upper Midwest (the "Electric Service Agreement").
−Removed: One of the main benefits of the Electric Service Agreement is the low cost of power for mining.
−Removed: Even before the recently imposed crypto mining restrictions in China, power capacity available for Bitcoin mining was scarce, especially at scalable sites with over 100 MW of potential capacity.
−Removed: This scarcity of mining power allows us to realize attractive hosting rates in the current market.
−Removed: The Electric Service Agreement has also enabled us to launch our hosting business with long-term customer contracts.
−Removed: In March 2024, we announced that we entered into a definitive agreement to sell our 200 MW campus in Garden City, TX, to Mara Garden City LLC, a Delaware limited liability company and subsidiary of Marathon Digital Holdings (Nasdaq:
−Removed: We completed the sale transaction on April 1, 2024.
−Removed: Cloud Services Business
−Removed: We officially launched our Cloud Services Business in May 2023.
−Removed: We operate our Cloud Services Business through our wholly owned subsidiary, Applied Digital Cloud Corporation ("Applied Digital Cloud"), which provides cloud services to customers, such as AI and machine learning developers.
−Removed: Our Cloud Services Business specializes in providing GPU computing solutions to empower customers in executing critical workloads related to AI, machine learning ("ML"),
−Removed: rendering, and other HPC tasks.
−Removed: Our managed hosting cloud service allows customers to sign service contracts, utilizing our Company-provided equipment for seamless and cost-effective operations.
−Removed: We are rolling out multiple GPU clusters, each comprising 1,024 GPUs, which are available for lease by our customers.
−Removed: Additionally, we have secured contracts with colocation service providers to ensure secure space and energy for our hosting services.
−Removed: Our strategy is to utilize a blend of third-party colocation and our own HPC data centers to deliver cloud services to our customers.
−Removed: We currently rely on a few major suppliers for our products in this business segment:
−Removed: ("NVIDIA"), Super Micro Computer Inc.
−Removed: ("Super Micro"), Hewlett Packard Enterprise ("HPE") and Dell Technologies Inc.
−Removed: In May 2023, we partnered with Super Micro, a renowned provider of Application-Optimized Total IT Solutions.
−Removed: Together, we aim to deliver the Company’s cloud services to our customers.
−Removed: Super Micro’s high-performance server and storage solutions are designed to address a wide range of computational-intensive workloads.
−Removed: Their next-generation GPU servers are incredibly power-efficient, which is vital for data centers as the power requirements for large-scale AI models continue to increase.
−Removed: Optimizing the Total Cost of Ownership ("TCO") and Total Cost to Environment ("TCE") is critical for data center operators to ensure sustainable operations.
−Removed: In June 2023, we announced a partnership with HPE, a global company specializing in edge-to-cloud technology.
−Removed: As part of this collaboration, HPE will provide its powerful and energy-efficient supercomputers to support large-scale AI through our cloud service.
−Removed: HPE has been supportive in core design considerations and engineering of Company-owned facilities which will support Applied Digital Cloud’s infrastructure.
−Removed: In addition, we have supply agreements with Dell for delivery of AI and GPU servers.
−Removed: By May 31, 2024, the Company had received and deployed a total of 6,144 GPUs;
−Removed: 4,096 GPUs were actively recognizing revenue and 2,048 GPUs were pending customer acceptance to start revenue recognition.
−Removed: The Cloud Services Business currently serves two customers and accounted for approximately 17% of our revenue in fiscal year 2024.
−Removed: As we ramp up operations in this business segment, we expect to acquire and deploy additional GPUs, increase revenue from the Cloud Services Business and increase the percentage of our revenue produced by our Cloud Services Business.
HPC Hosting Business
−Removed: Our HPC Hosting Business specializes in designing, constructing, and managing data centers tailored to support HPC applications, including AI.
−Removed: The Company is currently building two HPC focused data centers.
−Removed: The first facility, which is nearing completion, is a 7.5 MW facility in Jamestown, ND location adjacent to the Company's 106 MW Data center hosting facility.
−Removed: The Company also broke ground on a 100 MW HPC data center in project in Ellendale, ND, on land located adjacent to its existing 180 MW Data center hosting facility.
−Removed: These separate and unique buildings, designed and purpose-built for GPUs, will sit separate from the Company's current buildings and host more traditional HPC applications, such as natural language processing, machine learning, and additional HPC developments.
−Removed: The Company has entered into exclusivity and executed a letter of intent with a US-based hyperscaler for a 400 MW capacity lease, inclusive of our current 100 MW facility and two forthcoming buildings in Ellendale, North Dakota.
−Removed: On July 26, 2024, the Company extended the initial exclusivity period under the previously announced letter of intent with the U.S.
−Removed: based hyperscaler for leasing the HPC Ellendale Facility.
−Removed: The Company is in advanced discussions with traditional financing counterparties for this investment-grade tenant.
−Removed: We anticipate that this business segment will begin generating meaningful revenues once the HPC Ellendale Facility becomes operational, which is expected in calendar year 2025.
−Removed: As a company operating data centers, we face significant competition from various cloud competitors and data center providers in the U.S.
−Removed: Our primary competitors in the cloud services market are cloud service providers, such as Coreweave, Crusoe Energy, and Lambda Labs.
−Removed: Additionally, we compete with several prominent data center providers, including Digital Realty, Equinix, Inc., NTT, and various private operators in the U.S.
+Added: Our HPC Hosting Business specializes in designing, constructing, and operating data centers tailored to support high power density applications like HPC and AI.
+Added: We are currently building a HPC focused campus comprised of three data centers, which are the first AI focused facilities in our Polaris Forge portfolio, in Ellendale, North Dakota.
+Added: We are under construction on the first two buildings:
+Added: a 100 MW and a 150 MW data center, respectively.
+Added: These facilities are purpose built for high power density GPUs and along with a third 150 MW data center, will comprise our Polaris Forge 1 campus.
+Added: On May 28, 2025, the Company entered into two lease agreements for the first two buildings, totaling 250 MWs.
+Added: We anticipate that this business segment will begin generating meaningful revenues once the first building within Polaris Forge 1 becomes operational, which is expected in calendar year 2025.
+Added: Discontinued Operations
+Added: Cloud Services Business
+Added: The Cloud Services Business, which is operated through our wholly owned subsidiary, Applied Digital Cloud Corporation ("Applied Digital Cloud"), has locations in three states:
+Added: Colorado, Minnesota and Utah.
+Added: This business provides cloud
+Added: services to customers, such as AI and machine learning developers by renting space at third party co-location centers and providing the customers with access to its cloud computing equipment.
+Added: As a company designing, constructing, and operating data centers, we face significant competition from various data center providers in the U.S.
+Added: We compete with several prominent data center providers in the US, including Digital Realty, Equinix, Inc., NTT, and various private operators.
These competitors own or operate properties similar to our data centers.
−Removed: Specifically, within our Data Center Hosting Business, we compete against Core Scientific,
−Removed: Bitdeer Technologies Group, and Riot Platforms, amongst other private operators.
+Added: Specifically, within our Data Center Hosting Business, we compete against Bitdeer Technologies Group and Riot Platforms, amongst other private operators.
As we navigate this competitive landscape, we strive to innovate and differentiate our services to attract and retain customers.
Many of our competitors offer more locations in more markets worldwide and have well-established international operations.
−Removed: Many of our competitors may have significant advantages over us, including greater name recognition, longer operating histories and higher operating margins, pre-existing relationships with current or potential customers, the capacity to provide the same or additional products and services at a lower cost, more significant marketing budgets and other financial and operational resources, more robust internal controls and systems, and better established, more extensive scale and lower cost suppliers and supplier relationships.
−Removed: We face significant competition from our competitors, and we expect such competition to continue to increase, which could significantly harm our business, financial condition, and results of operations.
−Removed: If we cannot compete successfully against our current and future competitors, we may not be able to retain and grow our customer base, and our business and prospects may be harmed.
+Added: Many of our competitors may have significant advantages over us, including greater name recognition, longer operating histories, higher operating margins, pre-existing relationships with current or potential customers, the capacity to provide the same or additional products and services at a lower cost, more significant marketing budgets and other financial and operational resources, more robust internal controls and systems, and better established, more extensive scale and lower cost suppliers and supplier relationships.
Industry Trends
2 unchanged sentences
Companies require robust, reliable and scalable solutions to process, analyze and store vast amounts of data in real-time, and data centers play a crucial role in meeting these needs.
−Removed: Cloud adoption, particularly hybrid cloud solutions, drives data center demand significantly.
−Removed: Hybrid cloud infrastructure offers businesses the flexibility to scale their IT resources while maintaining the security and privacy of sensitive data.
−Removed: As more companies migrate their applications and data to the cloud, data center capacity requirements will continue to grow.
−Removed: Edge computing is another key trend shaping the data center industry.
−Removed: The proliferation of internet devices and the need for real-time data processing are driving the deployment of data centers closer to the network edge.
−Removed: This approach reduces latency, improves application performance, and optimizes IT infrastructure costs and complexity.
Sustainability and energy efficiency are increasingly important considerations in the data center industry.
4 unchanged sentences
Developing more advanced AI systems, such as large language models and generative AI, has raised concerns about potential misuse, bias, and the displacement of human workers.
−Removed: Companies operating in AI are under increasing pressure to address these issues and ensure the responsible development and deployment of their technologies.
−Removed: Providers offering comprehensive power, space, and connectivity solutions globally while prioritizing sustainability and energy efficiency will be best positioned to capitalize on the increasing demand for data center services.
+Added: Companies operating in AI are under increasing pressure to address these issues and ensure responsible development and deployment of their technologies.
+Added: We believe substantial growth in the data center industry will be driven by AI which requires high power density, changing the power and cooling requirements of the data center design.
+Added: The explosive growth of generative AI combined with the demand for a different type of data center infrastructure has led us to pursue a core specialization in AI focused data centers.
+Added: We believe that providers offering comprehensive power, space and connectivity solutions globally while prioritizing sustainability and energy efficiency will be best positioned to capitalize on the increasing demand for data center services.
Materials and Suppliers
−Removed: Maintaining key supplier relationships is crucial to our business operations, as we rely on these relationships, such as with Dell, HPE, NVIDIA, and Super Micro, to secure essential computing hardware, infrastructure components, and other materials.
−Removed: The complexity of developing HPC and cloud hardware at scale limits the number of suppliers capable of meeting our requirements.
−Removed: Consequently, we have established purchase orders with leading hardware manufacturers, which include extended delivery schedules spanning several months before the hardware is delivered to our facilities.
−Removed: These fluctuations in delivery timelines necessitate careful planning and advanced purchasing strategies to ensure we can acquire hardware well before their anticipated deployment.
−Removed: Developing the HPC Ellendale Facility demands significant electrical infrastructure components and construction raw materials.
−Removed: We proactively procure these materials from our suppliers in sufficient quantities to facilitate hardware
−Removed: deployment at scale and on accelerated timelines.
−Removed: To mitigate potential supply chain disruptions and ensure the smooth operation of our facilities, we have established long-term contracts and agreements with key suppliers.
−Removed: These arrangements give us greater certainty regarding the availability and pricing of essential components and materials.
+Added: Developing Polaris Forge 1 demands significant electrical infrastructure components and construction raw materials, including some that may be impacted by tariffs.
+Added: While we proactively procure these materials from our suppliers in sufficient quantities to facilitate hardware deployment at scale and on accelerated construction timelines, we cannot yet predict the effect of the recently imposed U.S.
+Added: tariffs on imports, or the extent to which other countries will impose quotas, duties, tariffs, taxes or other similar restrictions upon the import or export of construction materials and specialized electricity distribution equipment in the future, as discussed under "Risk Factors" below.
+Added: To mitigate potential supply chain disruptions and any impact of tariffs and to ensure the smooth operation of our facilities, we have established long-term contracts and agreements with key suppliers.
+Added: These arrangements give us greater certainty regarding the availability and
+Added: pricing of essential components and materials.
Furthermore, we continuously monitor market trends and maintain open lines of communication with our suppliers to anticipate and address potential supply chain challenges.
By proactively managing our supplier relationships, securing necessary materials in advance and closely monitoring market conditions, we aim to minimize the impact of supply chain fluctuations on our operations.
−Removed: This approach enables us to maintain a steady pace of hardware deployments and facility development, ultimately supporting our goal of expanding our HPC and cloud capabilities and maximizing shareholder value.
+Added: This approach enables us to maintain a steady pace of hardware deployments and facility development, ultimately supporting our goal of expanding our HPC capabilities and maximizing shareholder value.
However, we rely on a limited number of vendors for certain products and services for our data center facilities, and some of our contracts provide a single source of materials.
2 unchanged sentences
Global Logistics
−Removed: Global supply logistics have caused delays across all distribution channels, impacting the HPC and AI markets.
−Removed: Delivery schedules for specialized equipment, such as high-performance computing systems, AI hardware, and necessary infrastructure components, have been affected due to constraints on globalized supply chains.
+Added: Global supply logistics have caused delays across all distribution channels, impacting the markets we serve.
+Added: Delivery schedules for specialized equipment, such as power and cooling systems for HPC data centers, including AI focused data centers, have been affected due to constraints on globalized supply chains and have and may be further impacted by tariffs.
These constraints extend to procuring construction materials and specialized electricity distribution equipment required to develop HPC and AI facilities.
2 unchanged sentences
To help address global supply logistics and pricing concerns, we have implemented proactive measures such as procuring and holding required materials.
−Removed: We continuously monitor developments in the global supply chain which is necessary to assess their potential impact on the Company’s expansion plans within the HPC and AI markets.
−Removed: The regulatory landscape surrounding HPC, cloud, and blockchain hosting services is evolving rapidly, and we anticipate increased scrutiny and potential regulation in the near and long term.
−Removed: These developments may significantly impact our business and operations in ways that are difficult to predict.
+Added: We continuously monitor developments in the global supply chain which is necessary to assess their potential impact on the Company’s expansion plans within the HPC market.
+Added: The regulatory landscape surrounding HPC and blockchain hosting services is evolving rapidly, and we anticipate increased scrutiny and potential regulation in the near and long term.
+Added: Any such developments may significantly impact our business and operations in ways that are difficult to predict.
In the realm of cloud computing, there are growing concerns about the ethical implications and potential misuse of these technologies, particularly in association with AI and machine learning.
Governments and regulatory bodies are considering measures to ensure the responsible development and deployment of AI systems, including transparency, accountability, and fairness guidelines.
−Removed: As a company operating in this space, we closely monitor these developments and attempt to adhere to any forthcoming regulations or industry best practices.
−Removed: The amount of energy used for crypto mining and colocation services has recently received increased attention.
+Added: The amount of energy used for crypto mining and colocation services has also received significant attention.
In January 2024, the U.S.
1 unchanged sentence
This indicates that more focus is being placed on the energy usage of these activities.
−Removed: It is unclear how the information collected will be used for future regulations, but it is expected that energy efficiency and sustainability will become more critical factors regulating this industry.
−Removed: Furthermore, using digital assets, including Bitcoin, in illicit financial activities has become a significant concern for regulators and lawmakers.
+Added: It is unclear how the information collected will be used for future regulations, but it is expected that energy efficiency and sustainability will be critical factors regulating this industry.
+Added: Furthermore, using digital assets, including Bitcoin, in illicit financial activities has been a significant concern for regulators and lawmakers.
Leaders in the U.S.
5 unchanged sentences
In January 2024, the SEC approved a series of spot Bitcoin exchange-traded funds ("ETFs"), marking a significant milestone in the mainstream adoption of digital assets.
+Added: Later in 2024 the SEC also approved multiple spot Ethereum ETFs.
However, the regulatory landscape for digital asset markets remains complex and uncertain, with various agencies and lawmakers proposing different approaches to oversight and regulation.
−Removed: As a company operating at the intersection of data center, cloud and HPC hosting services, we are committed to maintaining a proactive and adaptive approach to regulatory compliance.
−Removed: We closely monitor legislative and regulatory developments and engage in dialogue with relevant stakeholders to ensure our business practices align with the evolving legal and regulatory framework.
−Removed: Despite the uncertainties posed by the changing regulatory landscape, we remain committed to delivering innovative and responsible solutions in the data center, cloud and HPC hosting markets while prioritizing compliance and risk management.
+Added: As a company operating at the intersection of data center and HPC hosting services, we are committed to maintaining a proactive and adaptive approach to regulatory compliance.
+Added: We closely monitor legislative and regulatory developments and engage in dialogue with relevant stakeholders to ensure our business practices align with the evolving legal and regulatory
+Added: Despite the uncertainties posed by the changing regulatory landscape, we remain committed to delivering innovative and responsible solutions in the data center and HPC hosting markets while prioritizing compliance and risk management.
However, if we fail to comply with applicable laws and regulations, we may be subject to significant liabilities, including fines and penalties, and our business, financial condition, or results of operations could be adversely affected.
Employees and Human Capital Resources
−Removed: During 2023 and 2024, we invested significantly in our workforce to retain and attract top-tier employees.
+Added: During the fiscal year 2025, we invested significantly in our workforce to retain and attract top-tier employees.
We expanded our employee base and promoted individuals internally to critical positions.
−Removed: As of May 31, 2024, we employed approximately 150 full-time employees across various departments, including engineering, IT, operations, construction, administration, finance, and communications.
+Added: As of May 31, 2025, we employed approximately 205 full-time employees across various departments, including design, engineering, IT, operations, construction, administration, finance, and marketing.
We also engage consultants and contractors as needed to supplement our permanent workforce.
Our human capital strategy aligns employee interests with our long-term success drivers.
−Removed: We implemented a long-term performance incentive program, granting eligible employees service-based restricted stock awards that vest over three years and performance-based restricted stock awards that vest upon achieving specific performance milestones.
−Removed: This performance program is a key employee incentive, aligning their long-term interests with the Company’s objectives.
+Added: We implemented a long-term incentive program, granting eligible employees service-based restricted stock awards that vest over three years and performance-based restricted stock awards that vest upon achieving specific performance milestones.
+Added: This program is a key employee incentive, aligning their long-term interests with the Company’s objectives.
In addition to the long-term incentive program and competitive cash compensation, we provide employees comprehensive health benefits, paid parental leave, paid time off, and additional benefits.
12 unchanged sentences
We conduct rigorous evaluations, benchmarking salary and wages against quantitative metrics, and adjust monetary compensations to ensure competitive alignment with employee roles, skill levels, tenure, and geographic considerations.
−Removed: Our commitment to pay equity is reinforced by a robust process that facilitates merit-based increases in incentives and compensations tied to performance.
+Added: Our commitment to pay equity is reinforced by a robust process that facilitates merit-based increases in incentives and compensation tied to performance.
Furthermore, our benefits portfolio encompasses various offerings, including medical, dental, and vision insurance coverage for employees and their dependents, various paid and unpaid leave options, and life and disability/accident insurance coverage.
1 unchanged sentence
Continued expansion of businesses
−Removed: We have started expansion into hosting for HPC applications.
−Removed: We have current plans to expand our HPC hosting capacity up to 400 MW through build outs at existing and future locations.
−Removed: Further, we launched our Cloud Services Business
−Removed: through Applied Digital Cloud and are currently serving customers through our colocations.
−Removed: The Cloud Services Business accounted for approximately 17% of our revenue in fiscal year 2024.
−Removed: Leverage leading equipment vendors to grow operations while minimizing risk.
−Removed: We believe that the signing of our initial customers for our Cloud Services Business will help us elevate our profile within the market.
−Removed: Further, we are working with Super Micro and HPE, which are both leading vendors in the AI hosting space, and we believe that we will be able to leverage their networks to identify leads for the expansion of our Cloud Services Business and HPC Hosting Business.
+Added: We continue our expansion into hosting for AI workloads.
+Added: As such, we have plans to expand our HPC hosting capacity through build outs at existing and future locations.
+Added: The locations have been strategically selected for their power, fiber and land capabilities along with a specialized design for high density compute.
Secure scalable power sites
1 unchanged sentence
Through our build-out of our first North Dakota facility and the prior experience our leadership team brings to our initiatives, we believe that we have developed a repeatable power strategy to significantly scale our operations.
−Removed: In addition, we are currently focused on and will continue to target states that have favorable laws and regulations for HPC application industries, which we believe further minimizes the risks associated with the scaling of our operations.
+Added: In addition, we are currently focused on and will continue to target states that have favorable laws and regulations for AI workloads and HPC application industries, which we believe further minimizes the risks associated with the scaling of our operations.
Vertically integrate power assets
1 unchanged sentence
This also includes power generation assets, which longer-term could be used to reduce our cost of power.
−Removed: Our management team has experience not only in evaluating and acquiring power assets, but also in the conversion of power assets to crypto mining/hosting operations and the construction of data centers with the specific purpose of mining cryptocurrency assets.
+Added: Our management team has experience not only in evaluating and acquiring power assets, but also in the conversion of power assets to crypto mining/hosting operations and the construction of data centers.
Site Selection Criteria
To the extent we are building new facilities, our site selection criteria considers geographic diversity, attractive return on investment, and environmental impact.
−Removed: Geographic Diversity
−Removed: Geographic diversity minimizes the risk to us of any event in a particular region that may impact our facilities.
−Removed: We expect to choose locations in environments that are policy and regulation friendly, and find sites with less expensive stable energy.
+Added: There is no assurance that selection criteria will be met or that viable sites will be selected.
Environmental Impact
1 unchanged sentence
Further, because data centers like ours represent a unique power load, we believe our demand for renewable energy and entry into agreements with renewable energy providers will increase and accelerate the buildout of renewable energy infrastructures.
−Removed: There is no assurance that selection criteria will be met or that viable sites will be selected.
−Removed: We have material customer concentration in our crypto data center hosting business.
−Removed: We have entered into service contracts with all seven of our customers in this business segment, who have collectively contracted to use the entire capacity of our two Data Center Hosting facilities.
−Removed: In addition, one of our customers accounts for 62% of our revenue.
−Removed: As of May 31, 2024, GMR Limited (“GMR”) held more than 5% of our outstanding common stock.
−Removed: Guo Chen, a 50% owner and sole director of GMR, is also deemed to beneficially own shares of our common stock held by GMR.
−Removed: Chen also owns 60% of Alternity Fund Ltd., which owns 100% of GOI.
−Removed: Our hosting arrangements with Spring Mud and GOI are therefore considered related party transactions in the reporting period covered by this report.
−Removed: We have disclosed related party revenue in the accompanying footnotes to the financial statements.
−Removed: On July 25, 2024, GMR Limited reported that they have ceased to be the beneficial owner of more than 5% of our outstanding common stock.
−Removed: Our crypto hosting site-level strategy consists of having one key anchor tenant that has signed a 3 – 5 year long-term contract at the site and filling the rest of the facility with customers with 18 – 36 month terms.
−Removed: We currently serve seven crypto mining customers who have entered into contracts ranging from three to five years.
−Removed: We also have material customer concentrations in our Cloud Services Business, as we only have two customers.
−Removed: We announced that we had signed our first customer in our Cloud Services Business May 2023.
−Removed: If we acquire rights to additional properties and build additional facilities, we intend to use a mix of third-party colocation centers and our HPC data centers to deliver AI Cloud services to customers.
+Added: We have material customer concentration in our Data Center Hosting Business.
+Added: We currently serve one crypto mining customer with a remaining contract term of two and a half years.
+Added: We also have material customer concentration in our HPC Hosting Business.
+Added: We currently have one customer in this business segment, which is a party to two fifteen-year term leases with us.
Corporate Information
1 unchanged sentence
Our principal website address is www.applieddigital.com .
−Removed: We make available free of charge through the Investor Relations link on our website access to press releases and investor presentations, as well as all materials that we file electronically with the SEC, including our annual report on Form 10-K, quarterly reports on Form 10-Q, current reports on Form 8-K and amendments to those reports, filed or furnished pursuant to Section 13(a) or 15(d) of the Securities Exchange Act of 1934 (the “Exchange Act”) as soon as reasonably practicable after electronically filing such materials with, or furnishing them to, the SEC.
+Added: We make available free of charge through the Investor Relations link on our website access to press releases and investor presentations, as well as all materials that we file electronically with the Securities and Exchange Commission ("SEC"), including our annual report on Form 10-K, quarterly reports on Form 10-Q, current reports on Form 8-K and amendments to those reports, filed or furnished pursuant to Section 13(a) or 15(d) of the Securities Exchange Act of 1934 (the “Exchange Act”) as soon as reasonably practicable after electronically filing such materials with, or furnishing them to, the SEC.
In addition, the SEC maintains an Internet website, www.sec.gov, that contains reports, proxy and information statements and other information that we file electronically with the SEC.
−Removed: We are a “smaller reporting company” as defined in Rule 12b-2 of the Exchange Act and may rely on exemptions from certain disclosure requirements that are available to smaller reporting companies under the Exchange Act.