−Removed: Headquartered in Silicon Valley, California, Archer is developing the technologies and aircraft to power the future of advanced aviation.
−Removed: We plan to provide customers with advanced aircraft and related technologies and services in the United States and internationally in both the commercial and defense sectors.
−Removed: We unveiled our first planned production aircraft, an electric vertical take-off and landing (“eVTOL”) aircraft, Midnight, in November 2022.
−Removed: In December 2024, we launched Archer Defense, entering into a strategic partnership with Anduril Industries Inc.
−Removed: (“Anduril”) to jointly develop a next-generation aircraft for defense applications.
−Removed: In December 2024, we completed construction of our high-volume aircraft manufacturing facility, ARC, located in Covington, Georgia.
−Removed: We plan to start our initial production of aircraft at this facility in the first half of 2025 and ramp our production there to support our commercialization efforts.
−Removed: We are first and foremost working to commercialize our Midnight aircraft which is intended to be used in air taxi operations in and around major cities around the world.
−Removed: To do so, we are working with aviation authorities, countries, cities, and strategic partners in select locations globally to obtain certification of our Midnight aircraft and build out urban air mobility (“UAM”) networks that will utilize our Midnight aircraft in their operations.
−Removed: Our goal is to begin early commercial operations with our Midnight aircraft in Abu Dhabi in the United Arab Emirates (“UAE”) and ramp our operations from there.
−Removed: In parallel, we plan to continue to advance the development of our aircraft for Archer Defense, as well as other technologies to support the future of advanced aviation.
+Added: Archer is developing the technologies and aircraft to power the future of advanced aviation.
+Added: We are building a platform to deliver advanced aircraft, technologies and services to customers worldwide across commercial and defense sectors.
+Added: Midnight is our electric vertical take-off and landing (“eVTOL”) aircraft purpose-built for air taxi operations globally.
+Added: To prepare for commercial operations, we are working with aviation authorities, governments, and strategic partners in key U.S.
+Added: and international markets to certify Midnight and build out air taxi networks.
+Added: These planned networks will connect major population and business centers with key transportation hubs in select metropolitan areas through partnerships with airline operators to integrate eVTOL flights into passenger journeys and collaborations with infrastructure partners to develop vertiports.
+Added: • In the U.S., we have applied to participate in the eVTOL Integration Pilot Program (“eIPP”), a White House initiative to accelerate air taxi deployments in American cities.
+Added: We have partnered with cities across California, Florida, Texas, Georgia, and New York on multiple applications to launch initial air taxi operations under the eIPP later this year.
+Added: As part of broader commercialization strategy in the U.S., we recently acquired control of Hawthorne Municipal Airport (“Hawthorne Airport”) located near Los Angeles International Airport and Downtown Los Angeles.
+Added: We plan for the airport to serve as the operational hub for our Los Angeles network and an innovation hub for developing and commercializing next-generation AI-powered aviation technologies.
+Added: • Outside the U.S., through our Launch Edition program, we are offering aircraft, technologies, and services to governments and customers to support the commercialization of Midnight in select international markets with the United Arab Emirates (“UAE”) leading the way.
+Added: In the UAE, we have been working closely with the country’s federal aviation regulator, the General Civil Aviation Authority (“GCAA”), over the past year to establish the optimal regulatory pathway for commercial operations.
+Added: Following hot weather flight testing last year, we are on track to deliver additional Midnight aircraft this year in preparation for initial passenger operations and are working with strategic partners to build out a vertiport network across Abu Dhabi and the country.
+Added: Our commercial readiness progress is driving growing global demand across Europe, Middle East, Africa and Asia-Pacific for this new category of transportation.
+Added: We are also advancing a dual-use hybrid-electric, autonomous vertical take-off and landing (“VTOL”) aircraft platform for both defense and commercial customers.
+Added: Through our strategic partnership with Anduril Industries Inc.
+Added: (“Anduril”), this aircraft platform is intended to meet the vertical lift needs of the U.S.
+Added: and its Allies for decades to come.
+Added: For commercial customers, that aircraft can be tailored for cargo and medical evacuation.
+Added: To support certification and early commercial deployments, we are currently scaling production of our aircraft and electric powertrain at our "golden manufacturing lines" in Silicon Valley and our high-volume facility in Georgia.
+Added: We are also developing artificial intelligence (AI) and autonomy technologies to support the advancement of our air traffic control system from concept to a scalable reality.
Our Planned Lines of Business
−Removed: By maintaining an innovative and disciplined approach to new product and service development, manufacturing, and commercialization we believe that we can deliver advanced aviation technologies and solutions that can service a broad range of industries and applications.
+Added: By maintaining an innovative and disciplined approach to new product and service development, manufacturing, and commercialization we believe that we can deliver advanced aviation technologies and solutions that can service a broad range of industries and use cases.
We intend to operate in the following areas:
• Commercial :
−Removed: This is planned to consist of the sale of our commercial aircraft (“Archer Direct”), such as Midnight, to aircraft operators as well as technologies and services related thereto, including, commercial launch (i.e., certification, testing, training, demonstration, market survey and early trial operations), and maintenance and repair.
−Removed: In addition, we plan to provide direct-to-consumer aerial ride share services utilizing our aircraft and potentially others in select metropolitan areas around the world with consumers being able to book rides via an app-based platform (“Archer UAM”).
+Added: This is planned to consist of the sale of our commercial aircraft and related technologies and services, as well as providing direct-to-consumer air taxi services in select metropolitan areas worldwide.
This is planned to consist of the sale of next-generation aircraft and related technologies for defense applications.
−Removed: Our initial product is intended to be a hybrid-propulsion, vertical take-off and landing (“VTOL”) aircraft that we are jointly developing with Anduril.
−Removed: We have also been partnering with the Department of Defense (“DoD”) since 2021 on a series of projects through the United States Air Force’s (“USAF”) AFWERX program with the goal of helping the AFWERX Agility Prime program assess the transformational potential of the vertical flight market and eVTOL technologies for DoD purposes.
−Removed: We continue to advance this partnership and deliver under the related contracts we have entered into with the USAF, which include the delivery of our Midnight aircraft to the USAF, the sharing of additional flight test data and certification related test reports, pilot training, and the development of maintenance and repair operations.
−Removed: To date, we have not generated significant revenue from either of these planned areas.
−Removed: We will use our cash and cash equivalents for the foreseeable future as we continue to develop our commercial aircraft, defense aircraft, related technologies, manufacturing operations and work to commercialize our commercial and defense aircraft.
−Removed: The amount and timing of any future capital requirements will depend on many factors, including the pace and results of the design and development of our aircraft and manufacturing operations, as well as our progress in obtaining necessary aircraft certifications and other government approvals to begin commercial operations.
−Removed: For example, any significant delays in obtaining such certifications and other government approvals may require us to raise additional capital above our existing cash on hand and delay our generation of significant revenues.
−Removed: Our Midnight aircraft is designed around our proprietary 12-tilt-6 distributed electric propulsion platform.
−Removed: Midnight is the evolution of our demonstrator aircraft, Maker, which we developed and used to validate its aircraft configuration and key enabling technologies.
−Removed: Midnight is designed to carry four passengers plus a pilot, bring an enhanced level of safety and deliver on a reduced level of noise as compared to traditional helicopters.
−Removed: Our Midnight aircraft is built around key advanced aviation technologies we have developed, including what we believe to be cutting-edge electric propulsion and flight control systems.
−Removed: We have paired those with systems and components sourced from leading aerospace suppliers many of which are already being used on certified aircraft today, with the goal of reducing Midnight’s certification risk, as well as its development timelines and costs.
−Removed: The aircraft is purpose-built for its intended use case of air taxi operations in major cities across the globe, with its range and payload being optimized around back-to-back short distance trips of around 20-miles, with minimal charging time between trips.
−Removed: Our approach to designing Midnight focuses on combining high function and high emotion, with the goal of inspiring passengers to want to experience it, similar to the feeling that was evoked during the Golden Age of aviation in the 1950s.
−Removed: We continue to work to optimize our Midnight aircraft design for both manufacturing and certification.
−Removed: The development of an eVTOL aircraft that meets our business requirements demands significant design and development efforts on all facets of the aircraft.
−Removed: We believe that by bringing together a mix of talent with eVTOL, traditional commercial aerospace, as well as electric propulsion backgrounds, we have built a team that enables us to move through the design, development, and certification of our eVTOL aircraft, thus helping us to achieve our end goal of bringing to market our eVTOL aircraft as efficiently as possible.
−Removed: We continue to work to certify Midnight with certain aviation authorities around the globe so that it can be used in our planned commercial operations as soon as possible.
−Removed: Our aircraft under development for Archer Defense is planned to be a hybrid-propulsion, Midnight-like VTOL aircraft with both a low thermal and acoustic signature purpose built for next generation defense use cases.
−Removed: We are jointly developing this aircraft with Anduril.
−Removed: Our goal is to bring together our ability to rapidly develop advanced VTOL aircraft using existing commercial parts and supply chains and Anduril's deep expertise in artificial intelligence, missionization, and systems integration, to accelerate the speed to market for critical hybrid VTOL aircraft capabilities at a fraction of the cost of more traditional alternatives.
−Removed: To support this effort, we intend to invest in the development of our hybrid-propulsion platform, as well as in critical capabilities like the manufacturing of composites and battery cells needed for this aircraft and also potentially on our commercial aircraft.
−Removed: Manufacturing Operations & Supply Chain Build-Out
−Removed: We are in the process of developing the infrastructure necessary to manufacture our aircraft and propulsion systems reliably, at scale, and in a cost effective manner.
−Removed: That involves two main aspects:
−Removed: developing the necessary component supply chain and building out our manufacturing operations.
−Removed: With regards to the sourcing of our components, a key aspect of our strategy has been to focus our internal component development efforts on only the key enabling technologies like our electric and hybrid propulsion systems, flight control software and composites.
+Added: Our initial product is intended to be the hybrid-electric VTOL aircraft discussed earlier that we are jointly developing with Anduril.
+Added: Our team is advancing opportunities around at how we can bring the proprietary technologies we’ve built for our commercial aircraft to defense applications, such as our electric battery pack and electric engines.
+Added: In November 2025, we announced our first deal for third-party adoption of these technologies in the defense sector, with Anduril and EDGE Group choosing to use our electric powertrain to power their Omen autonomous air vehicle.
+Added: We have also been continuing to advance our partnership with the Department of Defense (“DoD”), which started in 2021, on a series of projects through the United States Air Force’s (“USAF”) AFWERX program with the goal of helping the AFWERX Agility Prime program assess the transformational potential of the vertical flight market and related technologies for DoD purposes.
+Added: Air Taxi Aircraft
+Added: Midnight is built on a proprietary 12-tilt-6 distributed electric propulsion platform and is designed to carry four passengers plus a pilot.
+Added: It prioritizes safety and delivers significantly reduced noise compared to traditional helicopters.
+Added: Midnight integrates key in-house developed advanced aviation technologies, including what we believe to be cutting-edge electric propulsion and flight control systems, with systems and components from leading aerospace suppliers, many of which are already used on certified aircraft, with the goal of reducing certification risk, development time and cost.
+Added: The aircraft is purpose-built for urban air taxi operations, with range and payload optimized for high-frequency, short distance trips of around 20-miles, supported by minimal charging time between trips.
+Added: Its design focuses on combining high function and high emotion, with the goal of inspiring a passenger experience reminiscent of the Golden Age of aviation in the 1950s.
+Added: Midnight’s design, with redundant electric motors and simpler propulsion systems than traditional helicopters, aims to reduce failure points and achieve high-assurance safety and reliability standards.
+Added: Our aircraft has engaged in extensive flight test campaigns that expand the flight envelope and collect safety‑critical data to support certification with the Federal Aviation Administration (“FAA”) and safe performance evaluation.
+Added: Dual-Use Cargo Aircraft
+Added: Our dual-use autonomous cargo VTOL aircraft is designed around both a low thermal and acoustic signature purpose built for next generation cargo and defense use cases.
+Added: Our goal is to bring together our ability to rapidly develop advanced VTOL aircraft using our existing commercial parts and supply chains and Anduril’s deep expertise in AI, missionization, and systems integration, to enable more efficient and effective deployment of critical advanced aviation capabilities than traditional alternatives.
+Added: To support this effort, we are investing in the development of our hybrid-propulsion platform, as well as in critical capabilities like the manufacturing of composites.
+Added: In 2025, we aimed to accelerate our development of this aircraft by acquiring key intellectual property, such as Overair Inc.’s patent portfolio and a license to Karem Aircraft’s tiltrotor and rotor technology.
+Added: Manufacturing Operations & Supply Chain
+Added: We continue to be focused in the near term on ramping our production capabilities across our manufacturing and test facilities in California and Georgia.
+Added: The Midnight aircraft we build during this new product introduction phase will be used in certification and early commercial deployments.
+Added: As part of our production certificate efforts, the FAA continues to conduct reviews and inspections of our manufacturing operations.
+Added: During this new product introduction phase, we are utilizing a “golden manufacturing line” approach at one of our Silicon Valley facilities for final assembly of our early Midnight builds and then applying lessons learned to inform the design and ramp of our high-volume manufacturing in Georgia.
+Added: A key aspect of our strategy has been to focus our internal component development efforts on the key enabling technologies like our electric and hybrid propulsion systems, flight control software and composites.
For those areas that are not differentiating technologies we aim to leverage the existing aerospace supply base to supply us with components many of which are already being used in certified aircraft today.
−Removed: We continued to mature our portfolio of suppliers that will provide us with components for the scaled manufacturing of our Midnight aircraft.
−Removed: We are dependent on the ability of a number of U.S.
−Removed: suppliers and service providers to meet performance specifications, quality standards and delivery schedules at our targeted costs as we work towards developing and manufacturing, and ultimately commercialization of, our aircraft.
−Removed: The most important raw materials used by our suppliers in the manufacturing of the components for our aircraft Midnight include aluminum and composites.
−Removed: With regards to our manufacturing operations, we currently have manufacturing facilities in Silicon Valley, California and Covington, Georgia.
−Removed: Our manufacturing facilities in Silicon Valley are being utilized to build certain of the initial Midnight aircraft used as part of our certification and early commercialization efforts, as well as the electric propulsion systems that are used in the Midnight aircraft and will be used in our production aircraft post-certification.
−Removed: Our manufacturing facility in Covington, ARC, is to be utilized for ramping manufacturing of our aircraft to a high rate.
−Removed: We completed construction of this facility in December 2024 and plan to begin manufacturing aircraft there in the first half of 2025 and ramp our production from there to support our commercialization efforts.
−Removed: This facility is a 350,000 square-foot facility that is designed to be capable of ramping up to support production of up to 650 aircraft per year.
−Removed: We have also designed that facility so that it can be expanded to approximately 900,000 square feet to support our longer-term production targets of over 2,000 aircraft per year.
−Removed: We are working to finalize our planned agreement with Stellantis N.V.
−Removed: (“Stellantis”) pursuant to which they will serve as the contract manufacturer of our Midnight aircraft at ARC with the goal of helping us scale Midnight’s manufacturing to 650 aircraft annually by 2030 through an obligation to cover manufacturing labor costs as well as certain capital expenditures.
−Removed: Pursuant to this planned arrangement, we expect to issue to Stellantis shares of our Class A common stock from time to time, with the number of such shares of Class A common stock to be based on the labor, capital expenditures and certain other costs incurred by Stellantis in connection with the contract manufacturing relationship.
−Removed: We expect that this facility will also be able to support the scaling of our defense aircraft that is under development.
+Added: We depend on U.S.
+Added: suppliers and service providers to meet quality, performance, cost and delivery requirements as we work towards developing and manufacturing, and ultimately commercialization of, our aircraft.
+Added: Key raw materials used for our aircraft include aluminum and composites.
The commercial aerospace and defense industries include many strong U.S.
and international competitors.
−Removed: Key characteristics of the commercial aerospace and defense industry include long development cycles and intense competition.
−Removed: Key competitive factors in developing products and services for the commercial and defense industries include technological innovation, safety, performance, quality, reliability, performance, serviceability, and cost.
+Added: Key competitive factors include long development cycles, rapid technological change, and intense competition.
In the defense industry specifically, it is typical to work on development programs in partnership with companies who may also be your competitors and involve a competitive bid process to be awarded a contract.
−Removed: Furthermore, for us, competition within our planned commercial air taxi service will include competition with ground based alternatives, such as personal automobiles and ride-sharing services, as well as existing aircraft and helicopter charter services.
−Removed: The market for these services is intensely competitive and characterized by rapid changes in technology, shifting levels of demand and frequent introduction of new services and offerings.
−Removed: Key competitive factors include safety, trip duration, technology, overall user experience, and cost.
−Removed: Our goal in the commercial area is to differentiate ourselves by delivering aircraft, and related technologies and services that deliver superior design and performance, safety, reliability and quality.
−Removed: Our goal in the defense area is to differentiate ourselves by delivering aircraft and related technologies and services that accelerate the time to market for critical advanced aviation technologies at a fraction of the cost of more traditional alternatives.
+Added: In our planned commercial air taxi service, we also compete with ground based alternatives, such as personal automobiles and ride-sharing services, as well as existing aircraft and helicopter charter services.
+Added: The market for these services is intensely competitive, with key differentiating factors including safety, trip duration, technology, overall user experience, and cost.
+Added: We seek to differentiate ourselves by delivering aircraft, advanced aviation technologies and services that deliver superior design and performance, safety, reliability and quality.
For additional information about competition, see “Risk Factors” in Item 1A of this Annual Report.
1 unchanged sentence
Globally, our commercial aircraft will be required to comply with regulations governing aircraft design, production and airworthiness.
−Removed: In the United States, the regulations are put forth by the Federal Aviation Administration (“FAA”) and Department of Transportation (“DOT”).
+Added: In the United States, the regulations are put forth by the FAA and Department of Transportation (“DOT”).
Outside the United States, similar requirements are generally administered by the national civil aviation and transportation authorities of each country.
−Removed: We continue to focus our efforts on obtaining certification from the FAA of our aircraft in the United States, the General Civil Aviation Authority (“GCAA”) of the UAE and engaging with key decision makers in the initial cities in the United States and UAE which we plan to operate our aircraft.
+Added: We continue to focus our efforts on obtaining certification from the FAA of our aircraft in the United States, the GCAA of the UAE and engaging with key decision makers in the initial cities in the United States and UAE which we plan to operate our aircraft.
We also work with similar government authorities in the other international markets where we are targeting commercialization.
1 unchanged sentence
• Designing our aircraft :
−Removed: Type certification in the United States is the FAA’s approval process for new aircraft designs and covers the design of the aircraft and all required components and parts.
−Removed: Our initial aircraft type certification will be required to meet the criteria set forth by the FAA through a “special class” definition under 14 CFR Part 21.17(b).
−Removed: In May 2024, the FAA published the Final Rule with the final airworthiness criteria for our Midnight aircraft and in June 2024, we then finalized our certification basis with the FAA.
−Removed: We are continuing to work with the FAA to agree on the Means of Compliance with the FAA, which is the detailed list of design, analysis and testing standards that will be used to demonstrate that the aircraft is safe and complies with the Airworthiness Criteria.
−Removed: We initially submitted a comprehensive proposal for Midnight’s Means of Compliance to the FAA back in December of 2021.
−Removed: We are continuing to work with the FAA to close out our remaining Means of Compliance with the FAA publication of our final rule Airworthiness Criteria and we do not see any significant design risks with the remaining Means of Compliance areas that have not yet been agreed to.
−Removed: Lastly, we are also working with the FAA to review and provide final acceptance of our subject specific certification plans (“SSCPs”).
−Removed: SSCPs provide precise detail on each of the specific tests and analyses that will be completed during the implementation phase of our Type Certification program, in which we actually demonstrate to the FAA that Midnight meets all relevant FAA requirements necessary to receive Type Certification.
+Added: Type certification in the United States is formalized by the FAA’s approval process for new aircraft designs and covers the design of the aircraft and all required components and systems.
+Added: The FAA outlines the process for type certification in Order 8110.4C, which defines the 4 phases that lead to type certification.
+Added: Our initial aircraft type certification is required to meet the criteria set forth by the FAA through a “special class” definition under 14 CFR Part 21.17(b).
+Added: In May 2024, the FAA published the Final Rule with the final airworthiness criteria for our Midnight aircraft and in June 2024, we then finalized our G-1 Issue Paper containing the certification basis with the FAA, which formally closed the FAA’s work in the second phase of our certification program.
+Added: In the third phase of our certification program, we collaborated with the FAA for full agreement on the Means of Compliance, which is the full set of details defining the methodology, design, analysis and testing standards that will be used to demonstrate that the aircraft is safe and complies with the Airworthiness Criteria.
+Added: We initially submitted a comprehensive proposal for Midnight’s Means of Compliance to the FAA back in December 2021 and in January 2026, Midnight’s Means of Compliance was fully FAA accepted.
+Added: As part of the third phase of our certification program, we are also working with the FAA to review and provide final acceptance of our subject specific certification plans (“SSCPs”).
+Added: SSCPs provide precise detail on each of the specific tests and analyses that must be completed during the fourth and final phase of our Type Certification program, known as the implementation phase, in which we actually demonstrate to the FAA that Midnight meets all relevant FAA requirements necessary to receive a Type Certificate.
+Added: In June 2025, we began the piloted test flight phase of our Midnight program and are preparing for formal type inspection authorization testing as part of the implementation phase.
+Added: We believe that we are now substantially complete with the third phase of our certification program and are largely focused on the fourth phase of the certification program, and we estimate that we have received approximately 15% of the compliance verification documents in that phase.
• Producing our aircraft :
Production certification is the FAA’s approval for us to be able to manufacture our Midnight aircraft as approved by the FAA per the Type Certified design.
−Removed: To obtain production certification from the FAA, we must demonstrate that our organization and our personnel, facilities, and quality system can produce our aircraft such that they conform to its approved design.
−Removed: As discussed above, we are working to develop the systems and processes we will need to obtain our FAA production certification with the goal of obtaining such certification shortly following receipt of Midnight’s Type Certification approval.
+Added: To obtain a Production Certificate from the FAA, we must demonstrate that our organization and our personnel, facilities, and quality system can produce our aircraft such that they conform to its approved type design.
+Added: We are working to develop the systems and processes we will need to obtain a FAA Production Certificate with the goal of obtaining such certification shortly following receipt of Midnight’s Type Certification.
• Selling our aircraft :
−Removed: Production certification is the FAA’s approval for us to be able to manufacture our Midnight aircraft as approved by the FAA per the Type Certified design.
−Removed: To obtain production certification from the FAA, we must demonstrate that our organization and our personnel, facilities, and quality system can produce our aircraft such that they conform to its approved design.
−Removed: As discussed above, we are working to develop the systems and processes we will need to obtain our FAA production certification with the goal of obtaining such certification shortly following receipt of Midnight’s Type Certification approval.
+Added: Airworthiness certification from the FAA signifies that an aircraft meets its approved design and is in a condition for safe operation in the U.S.
+Added: National Airspace System.
+Added: Each of the aircraft manufactured by us will need to be issued an airworthiness certificate.
+Added: We expect that the airworthiness certificates issued to each of our aircraft will be a Standard Airworthiness certificate in the Normal Category, as defined by the FAA.
• Operating our UAM service :
The FAA and the DOT have primary regulatory authority over air transportation operations in the United States.
−Removed: To operate our UAM service, we are required to hold a Part 135 Air Carrier and Operator Certificate and register as an air taxi operator with the DOT.
−Removed: In 2024, we obtained our Part 135 Air Carrier and Operator Certificate from the FAA, which allows us to begin operating aircraft commercially to refine our systems and procedures in advance of launching Midnight into commercial service.
+Added: To operate our UAM service, among other requirements, we are required to hold a Part 135 Air Carrier and Operator Certificate and.
+Added: In 2024, we obtained our Part 135 Air Carrier and Operator Certificate from the FAA, which allows us to begin operating aircraft commercially under Part 135 of the Federal Aviation Regulations to refine our systems and procedures in advance of launching Midnight into commercial service.
In February 2024, we received our Part 145 Repair Station Certificate, which lays the foundation for us to operate repair stations that perform maintenance, repair and overhaul services on our aircraft, and we received our Part 141 Certificate which enables us to train and qualify pilots in our training academy.
−Removed: We expect that as we build out our UAM service there will be additional federal, state and local laws, regulations and other requirements that will cover our operations.
−Removed: For example, take-off and landing locations (e.g., airports and heliports) typically require state and local approval for zoning and land use and their ongoing use are subject to regulations by local authorities in addition to the FAA requirements.
+Added: We expect that as we build out our UAM operations there will be additional federal, state and local laws, regulations and other requirements that will cover our operations.
+Added: For example, take-off and landing locations (e.g., airports and heliports) typically require state and local approval for zoning and land use and their ongoing use is subject to regulations by local authorities in addition to the FAA requirements.
Therefore, we have already begun, and will continue to grow, our engagement and collaboration with the cities in which we intend to operate our UAM service in an effort to ensure that it operates in a safe manner.
+Added: We have been working closely with the GCAA over the past year to determine the most appropriate regulatory pathway to support our planned early commercial operations there.
+Added: The GCAA has transitioned our Midnight aircraft into a Restricted Type Certification program, advancing the regulatory path for the aircraft's entry into service in the region.
+Added: Our work with the GCAA is designed to operate in parallel with our certification efforts in the U.S.
+Added: and other jurisdictions around the world.
+Added: The Restricted Type Certification approach is meant to offer a streamlined approach toward early-stage commercial operations specific to Midnight in the UAE.
+Added: Our operations at the Hawthorne Airport are regulated by the FAA, DOT, U.S.
+Added: Transportation Security Administration, U.S.
+Added: Environmental Protection Agency, state and local environmental agencies, the California Department of Transportation (“Caltrans”), and the City of Hawthorne.
+Added: The City of Hawthorne is the owner and FAA-recognized sponsor of Hawthorne Airport and operates the airport subject to federal, state, and local law and the city’s grant agreements with the FAA.
+Added: The airport is subject to regular inspection by Caltrans, environmental agencies, and local fire marshals.
+Added: In addition, property on the airport must comply with the applicable requirements of the Americans With Disabilities Act of 1990 (“ADA”) and related state statutes to the extent such property is a “public accommodation” as defined under the ADA.
We believe we are in material compliance with laws and regulations currently applicable to our business.
1 unchanged sentence
See Part I, Item 1A, “Risk Factors” in this Annual Report for a more comprehensive description of risks related to government regulation affecting our business.
−Removed: We are currently headquartered in Silicon Valley, California with additional offices, research and development facilities, and flight test facilities in the San Francisco Bay Area and Salinas, California.
−Removed: We have manufacturing facilities in both Silicon Valley, California and Covington, Georgia.
Our Employees and Human Capital
4 unchanged sentences
We believe our team and culture differentiates us versus our competitors and will be a key driver of our long-term success.
−Removed: Because we recognize that our people are critical for our continued success, we work hard to create an environment where employees can have fulfilling careers, and be happy, healthy, and productive.
+Added: Because we recognize that our people are critical for our continued success, we are committed to fostering an environment that supports employee wellbeing, development, and performance.
Furthermore, we are committed to making safety a part of everything we do.
13 unchanged sentences
and international trademarks, service marks and domain names.
−Removed: We have also filed patent applications in the United States and foreign countries covering certain of our technology.
+Added: We have also filed patent applications in the United States and foreign countries covering certain of our technology and intellectual property.
In general, our issued patents expire between 2040 and 2046.
−Removed: Business Combination
−Removed: We went public through a de-SPAC transaction in September 2021 as a result of the merger agreement that was entered into in February 2021 (the “Business Combination Agreement”) by Archer Aviation Inc., a Delaware corporation (that existed prior to the closing of the Business Combination (as defined below), “Legacy Archer”), Atlas Crest Investment Corp., a Delaware Corporation (“Atlas”) and Artemis Acquisition Sub Inc., a Delaware corporation and a direct, wholly-owned subsidiary of Atlas (“Merger Sub”).
−Removed: Pursuant to the terms of the Business Combination Agreement, a business combination of Legacy Archer and Atlas was effected by the merger of Merger Sub with and into Legacy Archer, with Legacy Archer surviving the merger as a wholly-owned subsidiary of Atlas (collectively with the other transactions described in the Business Combination Agreement, the “Business Combination”).
−Removed: Following the consummation of the Business Combination on September 16, 2021, Legacy Archer changed its name to Archer Aviation Operating Corp., and Atlas changed its name to Archer Aviation Inc.
−Removed: and it became the successor registrant with the Securities and Exchange Commission (“SEC”).
−Removed: Our Class A common stock and public warrants are listed on the NYSE under the symbols “ACHR” and “ACHR WS,” respectively.
−Removed: Our Class A common stock and public warrants are listed on the NYSE under the symbols “ACHR” and “ACHR WS,” respectively.
Available Information
7 unchanged sentences
• Facebook account (https://www.facebook.com/FlyArcher);
−Removed: • X (@ArcherAviation and @adamgoldstein13);
• LinkedIn (https://www.linkedin.com/company/flyarcher and https://www.linkedin.com/in/adam-goldstein-7b662121/);
−Removed: • Instagram (https://www.instagram.com/flyarcher/ and https://www.instagram.com/adamgoldstein.archer/) and
+Added: • Instagram (https://www.instagram.com/flyarcher/ and https://www.instagram.com/adamgoldstein.archer/);
+Added: • TikTok account (https://www.tiktok.com/@flyarcher);
+Added: • X (@flyarcher, @ArcherAviation, and @adamgoldstein13);
• YouTube (https://www.youtube.com/c/ArcherAviation).
3 unchanged sentences
Compared sentence by sentence after normalising whitespace, quotation marks, case and digits, so re-formatting and restated figures do not read as changed language. Wording changes appear as one removal and one addition. The current filing and the prior one are authoritative.