Item 7. Management’s Discussion and Analysis
ITEM 7. MANAGEMENT'S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS
(Dollars in millions except where noted)
The following Management's Discussion and Analysis of Financial Condition and Results of Operations ("MD&A") is intended to help the reader understand the Tennessee Valley Authority ("TVA"), its operations, and its present business environment. The MD&A is provided as a supplement to, and should be read in conjunction with, TVA's consolidated financial statements and the accompanying notes thereto contained in Item 8, Financial Statements and Supplementary Data of this Annual Report on Form 10-K for the fiscal year ended September 30, 2020 (the "Annual Report"). See Item 7, Management's Discussion and Analysis of Financial Condition and Results of Operations in TVA's Annual Report on Form 10-K/A for the year ended September 30, 2019, filed with the Securities and Exchange Commission on November 15, 2019, for a discussion of variance drivers for the year ended September 30, 2019, as compared to the year ended September 30, 2018. The MD&A includes the following sections:
• Business and Mission — a general description of TVA's business, objectives, strategic priorities, and core capabilities;
• Executive Overview — a general overview of TVA's activities and results of operations for 2020;
• Results of Operations — an analysis of TVA's consolidated results of operations for 2019 and 2020;
• Liquidity and Capital Resources — an analysis of cash flows, a description of aggregate contractual obligations, and an overview of financial position;
• Key Initiatives and Challenges — an overview of current and future initiatives and challenges facing TVA;
• Critical Accounting Policies and Estimates — a summary of accounting policies that require critical judgments and estimates;
• Fair Value Measurements — a description of TVA's investments and derivative instruments and valuation considerations;
• Legislative and Regulatory Matters — a summary of laws and regulations that may impact TVA; and
• Risk Management Activities — a description of TVA's risk governance and exposure to various market risks.
Business and Mission
Business
TVA operates the nation's largest public power system. At September 30, 2020, TVA provided electricity to approximately 49 large industrial customers, seven federal agency customers, and 153 local power company customers ("LPCs") that serve approximately 10 million people in parts of seven southeastern states. TVA generates nearly all of its revenues from the sale of electricity, and in 2020 revenues from the sale of electricity totaled $10.1 billion. As a wholly-owned agency and instrumentality of the United States ("U.S."), however, TVA differs from other electric utilities in a number of ways:
• TVA is a government corporation.
• The area in which TVA sells power is limited by the Tennessee Valley Authority Act of 1933, as amended (the "TVA Act") under a provision known as the "fence"; however, another provision of federal law known as the "anti-cherrypicking" provision generally protects TVA from being forced to provide access to its transmission lines to others for the purpose of delivering power to customers within substantially all of TVA's defined service area.
• The rates TVA charges for power are set solely by the TVA Board of Directors ("TVA Board") and are not set or reviewed by another entity, such as a public utility commission. In setting rates, however, the TVA Board is charged by the TVA Act to have due regard for the primary objectives of the TVA Act, including the objective that power be sold at rates as low as feasible.
• TVA is not authorized to raise capital by issuing equity securities. TVA relies primarily on cash from operations and proceeds from power program borrowings to fund its operations and is authorized by the TVA Act to issue bonds, notes, or other evidences of indebtedness (collectively, "Bonds") in an amount not to exceed $30.0 billion outstanding at any given time. Although TVA's operations were originally funded primarily with appropriations from Congress, TVA has not received any appropriations from Congress for any activities since 1999 and, as directed by Congress, has funded essential stewardship activities primarily with power revenues.
50
Table of Contents
TVA's Mission of Service
TVA was built for the people, created by federal legislation, and charged with a unique mission - to improve the quality of life in a seven-state region through the integrated management of the region's resources. TVA's mission focuses on three key areas:
ENERGY ENVIRONMENT ECONOMIC DEVELOPMENT
• Energy — Delivering affordable, reliable power;
• Environment — Caring for the region's natural resources; and
• Economic Development — Creating sustainable economic growth.
While TVA's mission has not changed since it was established in 1933, the climate in which TVA operates continues to evolve. The business and economic environment has become more challenging due to economic conditions; tougher environmental standards; and the need to diversify its power supply and adapt to changing customer usage behaviors, new technologies, and emerging, non-traditional competition. To continue to deliver its mission of service while evolving for future success, TVA must realize five strategic priorities:
• Powerful Partnerships — Promoting progress through the shared success of TVA's customers and stakeholders;
• People Advantage — Amplifying the energy, passion, and creativity within each TVA employee;
• Operational Excellence — Building on TVA's best-in-class reputation for reliable service and competitively priced power;
• Igniting Innovation — Pursuing innovative solutions for TVA and its customers and communities; and
• Financial Strength — Investing in the future, while keeping energy costs as low as possible.
TVA's mission sets the stage for its strategic planning process that includes strategic objectives, initiatives, and scorecards for performance designed to provide clear direction for improving TVA's core business.
Linking the Mission to Performance
TVA has formulated key performance measures to support its strategic priorities. The intent of these measures is to align employees to TVA's mission by focusing its collective efforts on operational excellence, fiscal responsibility, economic
51
Table of Contents
development, and environmental stewardship. The measures are designed to promote teamwork, encourage high performance behaviors, and motivate TVA employees to achieve goals aligned with TVA's mission and values. The 2020 corporate results compared with targets for these key measures are reflected in the chart below, in addition to the 2021 corporate measures approved effective November 2020. See Item 11, Executive Compensation — Compensation Discussion and Analysis for information regarding how the measures are calculated.
2020 Corporate Measure Weight Actual Threshold Target Stretch
TVA total spending ($ millions) 40% $ 4,441 $ 4,987 $ 4,847 $ 4,707
Load not served (system minutes) 30% 2.7 4.8 3.9 3.5
Nuclear unit capability factor (UCF) (%) 15% 90.0 % 89.5 % 90.9 % 92.2 %
Combined cycle equivalent availability factor (%) 10% 84.0 % 72.6 % 77.6 % 85.4 %
Coal equivalent availability factor (%) 5% 79.4 % 56.8 % 61.8 % 80.8 %
2021 Corporate Measure Weight Threshold Target Stretch
TVA total spending ($ millions) 40% Budget
Load not served (system minutes) 30% 4.6 3.9 3.4
Nuclear unit capability factor (UCF) (%) 15% 91.3 % 92.0 % 93.7 %
Combined cycle equivalent availability factor (%) 10% 75.9 % 80.9 % 85.8 %
Coal equivalent availability factor (%) 5% 59.0 % 64.0 % 82.1 %
Executive Overview
TVA's operating revenues were $10.2 billion and $11.3 billion for the years ended September 30, 2020 and 2019, respectively. The decrease in operating revenue was primarily due to lower sales volume as a result of milder weather for the TVA service area and impacts from the COVID-19 pandemic, as well as lower fuel cost recovery revenue from lower fuel rates. Despite record-setting heat experienced during October 2019 and record-setting cold during November 2019, TVA's service territory experienced overall milder weather during the year ended September 30, 2020, which decreased energy sales. TVA also experienced lower energy sales as a result of the COVID-19 pandemic, driven by certain commercial and industrial customers curtailing operations in response to COVID-19 pandemic social distancing standards and economic conditions. TVA estimates base revenues were reduced by approximately $185 million for the year ended September 30, 2020, due to the impacts of COVID-19. Despite the reduction in revenue due to the COVID-19 pandemic, TVA was able to meet its financial targets, which would not have been possible without the financial discipline of TVA employees. TVA expects the COVID-19 pandemic to continue impacting revenue for 2021 and has planned for $10.0 billion in operating revenue. It is uncertain at this time the extent to which TVA's revenues may be impacted beyond 2021.
Fuel and purchased power expen se decreased $439 million for th e year ended September 30, 2020, as compared to the prior year. This decrease was primarily due to lower effective fuel rates and lower purchased power and fuel volume driven by decreased demand, resulting from overall milder weather and the COVID-19 pandemic. Operating and maintenance expense decreased $370 million for the year ended September 30, 2020, as compared to the prior year. This was primarily driven by prior year recovery of the regulatory asset for environmental cleanup costs related to the Kingston ash spill. Depreciation and amortization expense decreased $147 million for the year ended September 30, 2020, as compared to the same period of the prior year. This decrease was primarily due to a decrease in depreciation expense as a result of the decision in 2019 to accelerate the retirements of Bull Run Fossil Plant ("Bull Run") and Paradise Fossil Plant ("Paradise").
In March 2020, the World Health Organization declared the outbreak of COVID-19 to be a pandemic, which continues to be a serious challenge throughout the U.S. In addition to impacts to TVA, the COVID-19 pandemic has also created economic uncertainty for TVA's LPCs and the communities they serve. To support LPCs and strengthen the public power response to the COVID-19 pandemic, in March 2020, the TVA Board approved the Public Power Support and Stabilization Program, offering up to $1.0 billion of credit support to provide temporary financial relief for its LPCs in the form of deferred payments of power bills under certain circumstances. In addition, in August 2020, the TVA Board approved a $200 million Pandemic Relief Credit that will apply to service provided to TVA's LPCs, their large commercial and industrial customers, and TVA's directly served customers as a 2.5 percent monthly base rate credit during 2021. TVA continues to coordinate with LPCs and partners to understand the impact of the COVID-19 pandemic to its service territory.
52
Table of Contents
TVA's operations and delivery of energy to customers have not been materially impacted by the COVID-19 pandemic at this time. TVA experienced fluctuations related to its pension plan assets and other investment portfolios during the year ended September 30, 2020, which had substantially recovered as of September 30, 2020. In response to the reductions in revenue, TVA has implemented various cost savings initiatives, such as deferring and prioritizing certain capital projects and decreasing discretionary spending. Due to higher volatility in the financial markets associated with the COVID-19 pandemic, TVA increased its target balance of Cash and cash equivalents beginning in March 2020 and continued to hold higher target cash balances at September 30, 2020. TVA continues to monitor the situation and will adjust its response as necessary to ensure reliable service while protecting the safety and health of its workforce and sustaining business operations. See Key Initiatives and Challenges — Coronavirus Pandemic for an expanded discussion of the impact to TVA and related initiatives.
During 2020, TVA continued to achieve 99.999 percent reliability in delivering energy to its customers. TVA's reliability and economic development efforts continued to attract and encourage the expansion of business and industries in the Tennessee Valley, with over $8.6 billion in investments and approximately 67,000 jobs created or retained during the year.
Results of Operations
Sales of Electricity
Sales of electricity, which accounted for nearly all of TVA's operating revenues, were 151,251 and 158,443 million kilowatt hours ("kWh") in 2020 and 2019, respectively. TVA sells power at wholesale rates to LPCs who then resell the power to their customers at retail rates. TVA also sells power to directly served customers, consisting primarily of federal agencies and customers with large or nonstandard loads. In addition, power exceeding the TVA system's needs is sold under exchange power arrangements with certain other power systems.
The following chart compares TVA's sales of electricity by customer type for the years ended September 30, 2020 and 2019:
Sales of Electricity
For the years ended September 30
(millions of kWh)
53
Table of Contents
The following charts show a breakdown of TVA's energy load:
Note
Information included in the charts above was derived from energy usage of directly served customers and customers served by LPCs during calendar year 2019, and these graphs will continue to be updated on a calendar year basis.
Weather affects both the demand for TVA power and the price for that power. TVA uses degree days to measure the impact of weather on its power operations. Degree days measure the extent to which the TVA system 23-station average temperatures vary from 65 degrees Fahrenheit. Although weather is generally a primary driver of changes in demand for TVA power, the COVID-19 pandemic has also had a significant impact on sales of electricity for the year ended September 30, 2020.
Degree Days
2020 Normal Percent Variation 2019 Normal Percent Variation 2020 2019 Percent Change
Heating Degree Days 3,056 3,369 (9.3) % 3,219 3,360 (4.2) % 3,056 3,219 (5.1) %
Cooling Degree Days 1,688 1,691 (0.2) % 2,020 1,686 19.8 % 1,688 2,020 (16.4) %
Sales of electricity decreased approximately five percent for the year ended September 30, 2020, as compared to the prior year, primarily due to overall milder weather and the COVID-19 pandemic. Despite record-setting heat experienced during October 2019 and record-setting cold during November 2019, overall milder weather across TVA's service territory accounted for approximately 60 percent of the change in sales of electricity from the prior year. The remaining decrease in sales of electricity was predominantly due to COVID-19, driven by certain commercial and industrial customers curtailing operations in response to social distancing standards and economic conditions.
Financial Results
The following table compares operating results for 2020 and 2019:
Summary Consolidated Statements of Operations
2020 2019
Operating revenues $ 10,249 $ 11,318
Operating expenses 7,538 8,507
Operating income 2,711 2,811
Other income, net 36 62
Other net periodic benefit cost 253 258
Interest expense, net 1,142 1,198
Net income $ 1,352 $ 1,417
54
Table of Contents
Operating Revenues. Operating revenues for the years ended September 30, 2020 and 2019, consisted of the following:
Operating Revenues
For the years ended September 30
TVA's two largest LPCs — Memphis Light, Gas and Water Division ("MLGW") and Nashville Electric Service ("NES") — have contracts with a five-year and a 20-year termination notice period, respectively. Sales to MLGW and NES accounted for nine percent and eight percent, respectively, of TVA's total operating revenues during both the years ended September 30, 2020 and 2019. In May 2020, MLGW published a draft Integrated Resource Plan ("IRP") to guide energy choices in the future, and in July 2020, TVA made a proposal to MLGW that highlights the benefits of remaining a TVA customer. In August 2020, MLGW published a final IRP and announced their plan to issue requests for proposal ("RFPs") to validate the cost estimates included in the IRP. In addition, certain other LPCs are evaluating options for future energy choices.
TVA's rate structure uses pricing signals to indicate seasons and hours of higher cost to serve its customers and to capture a portion of TVA's fixed costs in fixed charges. The structure includes three base revenue components: time of use demand charges, time of use energy charges, and a grid access charge ("GAC"). The demand charges are based upon the customer's peak monthly usage and increase as the peak increases. The energy charges are based on time differentiated kWh used by the customer. Both of these components can be significantly impacted by weather. The GAC captures a portion of fixed costs and is offset by a corresponding reduction to the energy rates. The GAC also reduces the impact of weather variability to the overall rate structure.
Additionally, in 2019, the TVA Board approved a 20-year Partnership Agreement option that better aligns the length of LPC contracts with TVA's long-term commitments. Participating LPCs receive benefits including a 3.1 percent wholesale bill credit in exchange for their long-term commitment, which enables TVA to recover its long-term financial commitments over a commensurate period. As of November 16, 2020, 142 LPCs had signed the 20-year Partnership Agreement with TVA.
In addition to base revenues, the rate structure also includes a separate fuel rate that recovers the costs of natural gas, fuel oil, purchased power, coal, emission allowances, nuclear fuel, and other fuel-related commodities; realized gains and losses on derivatives purchased to hedge the costs of such commodities; and payments to states and counties in lieu of taxes ("tax equivalents") associated with the fuel cost adjustments. See Item 1, Business — Rates — Rate Methodology .
55
Table of Contents
The changes in revenue components are summarized below:
2020 2019 (2)
Change
Base revenue
Energy revenue $ 4,546 $ 5,128 $ (582)
Demand revenue (1)
3,426 3,609 (183)
Grid access charge (4)
597 257 340
Long-term partnership credits for LPCs (163) (14) (149)
Other charges and credits (3)
(616) (624) 8
Total base revenue 7,790 8,356 (566)
Fuel cost recovery 2,310 2,799 (489)
Off-system sales 4 4 —
Revenue from sales of electricity 10,104 11,159 (1,055)
Other revenue 145 159 (14)
Total operating revenues $ 10,249 $ 11,318 $ (1,069)
Notes
(1) Includes approximately $10 million in Back-to-Business credits in 2020 to provide relief to certain large customers affected by the COVID-19 pandemic.
(2) For the year ended September 30, 2019, $14 million previously classified as Other charges and credits (a component of Base revenue), has been reclassified to Long-term partnership credits for LPCs (a component of Base revenue) to conform with current year presentation.
(3) Includes economic development credits to promote growth in the Tennessee Valley, hydro preference credits for residential customers of LPCs, and demand response credits allowing TVA to reduce industrial customer usage in periods of peak demand to balance system demand. See Note 17 — Revenue.
(4) All LPCs were presented with the option to implement the GAC in October 2018 or defer the implementation until October 2019. Seventy-nine LPCs elected to implement in October 2018, while the remaining LPCs implemented the wholesale changes in October 2019.
Operating revenues decreased $1.1 billion for the year ended September 30, 2020, as compared to the prior year, primarily due to a $566 million decrease in base revenue and a $489 million decrease in fuel cost recovery revenue. The $566 million decrease in base revenue was driven by a decrease of $379 million attributable to lower sales volume and a decrease of $187 million attributable to lower effective rates. Lower sales volume resulted primarily from overall milder weather for the TVA service territory during year ended September 30, 2020 and from the COVID-19 pandemic. TVA estimates that the COVID-19 impact accounted for approximately $185 million of decreased base revenue. TVA expects the COVID-19 pandemic to continue impacting revenue for 2021 and has planned for $10.0 billion in operating revenue. It is uncertain at this time the extent to which TVA's revenues may be impacted beyond 2021. The $489 million decrease in fuel cost recovery revenue was driven by a $362 million decrease attributable to lower fuel rates and a $127 million decrease attributable to lower energy sales. The lower fuel rates experienced were primarily driven by lower market prices for natural gas.
See Sales of Electricity above for further discussion of the change in the volume of sales of electricity and Operating Expenses below for further discussion of the change in fuel expense.
Operating Expenses. Operating expense components as a percentage of total operating expenses for 2020 and 2019 consisted of the following:
56
Table of Contents
Operating Expenses
(in millions)
2020 2019 Change
Operating expenses
Fuel $ 1,584 $ 1,896 $ (312)
Purchased power 880 1,007 (127)
Operating and maintenance 2,720 3,090 (370)
Depreciation and amortization 1,826 1,973 (147)
Tax equivalents 528 541 (13)
Total operating expenses $ 7,538 $ 8,507 $ (969)
The following table summarizes TVA's expenses for various fuels for the years indicated:
Fuel Expense for TVA-Owned Facilities (1)
For the years ended September 30
Fuel Expense By Source Cost per kWh (4)
2020 2019 2020 2019
Coal (2)
$ 533 $ 744 2.69 2.66
Natural gas and/or oil-fired (3)
660 783 1.96 2.47
Nuclear fuel 378 369 0.58 0.58
Total fuel $ 1,571 $ 1,896 1.33 1.54
Notes
(1) Excludes effects of the fuel cost adjustment deferrals and amortization on fuel expense in the amount of $13 million for the year ended September 30, 2020. The effect on fuel expense from the fuel cost adjustment deferrals and amortization was less than $1 million for the year ended September 30, 2019, and therefore is not represented in the table above.
(2) Fuel expense related to oil consumed for startup at coal-fired facilities was $17 million and $25 million for the years ended September 30, 2020 and 2019, respectively.
(3) Fuel expense related to oil consumed for generation at natural gas and/or oil-fired facilities was $2 million for both the years ended September 30, 2020 and 2019.
(4) Total cost per kWh is based on a weighted average.
Fuel expense decreased $312 million for the year ended September 30, 2020, as compared to the prior year. This decrease was primarily due to lower effective fuel rates of $260 million resulting from lower natural gas prices. Also, the milder weather and COVID-19 pandemic reduced demand, resulting in a decrease in volume of $66 million. Partially offsetting these decreases was an increase of $14 million driven by variances in fuel rate recovery.
Purchased power expense decreased $127 million for the year ended September 30, 2020, as compared to the prior year. This was primarily due to a reduction in volume of $110 million driven by decreased demand, resulting from the milder weather and COVID-19 pandemic. Lower effective rates contributed an additional $18 million to the decrease resulting from lower market prices for natural gas.
Operating and maintenance expense decreased $370 million for the year ended September 30, 2020, as compared to the prior year. This was primarily driven by a decrease of $266 million of prior year recovery of the regulatory asset for environmental cleanup costs related to the Kingston ash spill. Additionally, project write-offs and materials and supplies inventory reserves and write-offs related to the retirement of Bull Run and Paradise decreased $157 million as compared to the prior year. Partially offsetting these decreases was $85 million of increased payroll and benefit costs due to labor escalation for cost of living increases and $28 million of increased contract labor related to the timing of nuclear outages, emergent work, and contract model transition.
Depreciation and amortization expense decreased $147 million for the year ended September 30, 2020, as compared to the prior year. This decrease was primarily driven by a net decrease in depreciation expense of $199 million related to the decision in 2019 to accelerate the retirements of Bull Run and Paradise. Paradise was fully depreciated in the second quarter of 2020. Partially offsetting this decrease was a $25 million increase in amortization expense of non-nuclear decommissioning costs recovered in rates. The remaining variance was due to depreciation of additions to Completed plant.
Tax equivalents expense decreased $13 million for the year ended September 30, 2020, as compared to the prior year. This change is primarily driven by a decrease in the tax equivalents collected in the fuel rate recovery.
57
Table of Contents
The following table shows TVA's generation and purchased power by generating source as a percentage of all electrical power generated and purchased (based on kWh) for the periods indicated:
Total Power Supply by Generating Source
For the years ended September 30
(millions of kWh)
2020 2019
Coal-fired 19,825 13 % 27,934 17 %
Nuclear 64,832 42 % 63,433 39 %
Hydroelectric 16,003 10 % 16,058 10 %
Natural gas and/or oil-fired 33,635 22 % 31,704 20 %
Total TVA-operated generation facilities (1)
134,295 87 % 139,129 86 %
Purchased power (non-renewable) (2)
11,592 8 % 14,105 9 %
Purchased power (renewable) (3)
7,934 5 % 7,840 5 %
Total purchased power 19,526 13 % 21,945 14 %
Total power supply 153,821 100 % 161,074 100 %
Notes
(1) Generation from TVA-owned non-hydroelectric renewable resources is less than one percent for all periods shown and therefore is not represented in the table above.
(2) Purchased power (non-renewable) includes generation from Caledonia Combined Cycle Plant ("Caledonia CC"), which is currently a leased facility operated by TVA. Generation from Caledonia CC was 4,229 million kWh and 4,181 million kWh for the years ended September 30, 2020 and 2019, respectively.
(3) Purchased power (renewable) includes power purchased from the following renewable sources: hydroelectric, solar, wind, and cogeneration.
Interest Expense . Interest expense and interest rates for 2020 and 2019, were as follows:
Interest Expense and Rates
For the years ended September 30
2020 2019 Percent Change
Interest expense (1)
$ 1,142 $ 1,198 (4.7) %
Average blended debt balance (2)
$ 21,978 $ 23,266 (5.5) %
Average blended interest rate (3)
5.05 % 4.92 % 2.6 %
Notes
(1) Includes amortization of debt discounts, issuance, and reacquisition costs, net.
(2) Includes average balances of long-term power bonds, debt of variable interest entities ("VIE"), and discount notes.
(3) Includes interest on long-term power bonds, debt of VIE, and discount notes.
Total interest expense decreased $56 million for the year ended September 30, 2020, as compared to the prior year. This was primarily driven by a decrease of $42 million due to lower average debt balances and $14 million due primarily to lower average short-term rates.
Other Income (Expense), Net
During 2020, Other income (expense), net decreased $26 million, primarily driven by $21 million of other income in 2019 related to a deposit liability received by TVA as a down payment on the sale of Bellefonte. The purchaser, Nuclear Development, LLC, failed to fulfill the requirements of the sales contract with respect to obtaining Nuclear Regulatory Commission ("NRC") approval of the transfer of required nuclear licenses and payment of the remainder of the selling price before the November 30, 2018 closing date. Additionally, Interest income decreased $7 million primarily as a result of lower interest rates. See Note 22 — Commitments and Contingencies — Legal proceedings for a discussion of the lawsuit filed by Nuclear Development, LLC.
Other Net Periodic Benefit Cost
Other net periodic benefit cost decreased $5 million for the year ended September 30, 2020, as compared to the prior year. Other net periodic benefit cost is subject to significant economic assumptions, such as changes in the discount rate used to measure the benefit plans, that can materially impact TVA. However, TVA uses regulatory accounting to recognize other net periodic benefit cost as a regulatory asset to the extent that the amount calculated under U.S. generally accepted accounting principles ("GAAP") as pension expense differs from the amount TVA contributes to the pension plan as pension plan contributions. See Note 21 — Benefit Plans . In 2020, U.S. GAAP pension expense exceeded contributions resulting in additional amounts deferred as a regulatory asset as compared to the prior year.
58
Table of Contents
Liquidity and Capital Resources
Sources of Liquidity
TVA depends on various sources of liquidity to meet cash needs and contingencies. TVA's primary sources of liquidity
are cash from operations and proceeds from the issuance of short-term debt in the form of discount notes, along with periodic
issuances of long-term debt. TVA's balance of short-term debt typically changes frequently as TVA issues discount notes to
meet short-term cash needs and pay scheduled maturities of discount notes and long-term debt. The periodic amounts of short-term debt issued are determined by near-term expectations for cash receipts, cash expenditures, and funding needs, while
seeking to maintain a target range of cash and cash equivalents on hand.
In addition to cash from operations and proceeds from the issuance of short-term and long-term debt, TVA's sources of liquidity include a $150 million credit facility with the United States Department of the Treasury ("U.S. Treasury"), four long-term revolving credit facilities totaling $2.7 billion, and proceeds from other financings. See Note 13 — Debt and Other Obligations — Credit Facility Agreements. Other financing arrangements may include sales of receivables, loans, or other assets.
The TVA Act authorizes TVA to issue Bonds in an amount not to exceed $30.0 billion outstanding at any time. Power bonds outstanding, excluding unamortized discounts and premiums and net exchange gains from foreign currency transactions, at September 30, 2020 and 2019, were $20.1 billion (including current maturities) and $21.4 billion (including current maturities), respectively. The balance of Bonds outstanding directly affects TVA's capacity to meet operational liquidity needs and to strategically use Bonds to fund certain capital investments as management and the TVA Board may deem desirable. Other options for financing not subject to the limit on Bonds, including lease financings (see Lease Financings below and Note 10 — Variable Interest Entities ), could provide supplementary funding if needed. Currently, TVA expects to have adequate capability to fund its ongoing operational liquidity needs and make planned capital investments over the next decade. See Lease Financings below, Note 10 — Variable Interest Entities , and Note 13 — Debt and Other Obligations for additional information.
TVA may from time to time seek to retire or purchase its outstanding debt through cash purchases and/or exchanges for securities, in open market purchases, privately negotiated transactions, or otherwise. Such repurchases or exchanges, if any, will depend on prevailing market conditions, TVA's liquidity requirements, contractual restrictions, and other factors. The amounts involved may be material.
Due to higher volatility in the financial markets associated with the COVID-19 pandemic, TVA increased its target balance of Cash and cash equivalents beginning in March 2020. TVA continued to hold higher target cash balances at September 30, 2020, and may hold higher balances in future periods due to potential market volatility. TVA has maintained continued debt market access since the outbreak of the pandemic. TVA successfully funded the maturity of $1.0 billion of power bonds in March 2020 with cash from operations and proceeds from the issuance of discount notes. In May 2020, TVA issued $1.0 billion of power bonds to take advantage of the historically low interest rate environment and to meet its ongoing funding needs. TVA's next significant power bond maturity of $1.5 billion is in February 2021.
Debt Securities . TVA's Bonds are not obligations of the U.S., and the U.S. does not guarantee the payments of principal or interest on Bonds. TVA's Bonds consist of power bonds and discount notes. Power bonds have maturities of between one and 50 years. At September 30, 2020, the average maturity of long-term power bonds was 15.3 years, and the weighted average interest rate was 4.56 percent. Discount notes have maturities of less than one year. Power bonds and discount notes have a first priority and equal claim of payment out of net power proceeds. Net power proceeds are defined as the remainder of TVA's gross power revenues after deducting the costs of operating, maintaining, and administering its power properties and payments to states and counties in lieu of taxes, but before deducting depreciation accruals or other charges representing the amortization of capital expenditures, plus the net proceeds from the sale or other disposition of any power facility or interest therein. In addition to power bonds and discount notes, TVA had long-term debt associated with certain VIEs outstanding at September 30, 2020. See Lease Financing below, Note 10 — Variable Interest Entities , and Note 13 — Debt and Other Obligations for additional information.
Power bonds and discount notes are both issued pursuant to Section 15d of the TVA Act and pursuant to the Basic Tennessee Valley Authority Power Bond Resolution adopted by the TVA Board on October 6, 1960, as amended on September 28, 1976, October 17, 1989, and March 25, 1992 (the "Basic Resolution"). The TVA Act and the Basic Resolution each contain two bond tests: the rate test and the bondholder protection test.
Under the rate test, TVA must charge rates for power which will produce gross revenues sufficient to provide funds for:
• Operation, maintenance, and administration of its power system;
• Tax equivalents;
• Debt service on outstanding Bonds;
• Payments to the U.S. Treasury in repayment of and as a return on the Power Program Appropriation Investment; and
59
Table of Contents
• Such additional margin as the TVA Board may consider desirable for investment in power system assets, retirement of outstanding Bonds in advance of maturity, additional reduction of the Power Program Appropriation Investment, and other purposes connected wit h TVA's pow er business, having due regard for the primary objectives of the TVA Act, including the objective that power shall be sold at rates as low as are feasible. See Note 18 — Proprietary Capital — Appropriation Investment .
TVA fulfilled its requirement to repay $1.0 billion of the Power Program Appropriation Investment in 2014; therefore, the repayment of this amount is no longer a component of rate setting.
The rate test for the one-year period ended September 30, 2020, was calculated after the end of 2020, and TVA met the test's requirements.
Under the bondholder protection test, TVA must, in successive five-year periods, use an amount of net power proceeds at least equal to the sum of the depreciation accruals and other charges representing the amortization of capital expenditures and the net proceeds from any disposition of power facilities, for either the reduction of its capital obligations (including Bonds and the Power Program Appropriation Investment) or investment in power assets.
The bondholder protection test for the five-year period ended September 30, 2020, was calculated after the end of 2020, and TVA met the test's requirements. TVA must next meet the bondholder protection test for the five-year period ending September 30, 2025, and expects to meet the test.
TVA uses proceeds from the issuance of discount notes, in addition to other sources of liquidity, to fund short-term cash needs and scheduled maturities of long-term debt.
The following table provides additional information regarding TVA's short-term borrowings.
Short-Term Borrowing Table
At September 30, 2020 For the year ended September 30, 2020 At September 30, 2019 For the year ended September 30, 2019
Gross Amount Outstanding (at End of Period) or Average Gross Amount Outstanding (During Period)
Discount notes $ 57 $ 812 $ 922 $ 1,610
Maximum Month-End Gross Amount Outstanding (During Period)
Discount notes N/A $ 1,875 N/A $ 2,390
Weighted Average Interest Rate
Discount notes 0.06 % 0.77 % 2.15 % 2.32 %
TVA ended the year at September 30, 2020, with a lower balance for both short-term debt and average short-term debt as compared to 2019. The decrease was primarily due to the decision to issue $1.0 billion of power bonds in 2020 and the timing of cash flows.
TVA generally uses proceeds from the issuance of power bonds to refinance maturing power bonds or other financing obligations, as necessary, or for other power system purposes. The total balance of power bonds may decline in periods where redemptions of power bonds exceed issuance due to net positive cash flow from operating and investing activities. In 2020, TVA achieved and surpassed its strategic goal of reducing debt to $21.8 billion by 2023.
TVA issued $1.0 billion of power bonds during 2020, and no power bonds were issued in 2019. TVA redeemed $1.5 billion and $1.1 billion of Bonds during 2020 and 2019, respectively. For additional information about TVA debt issuance activity and debt instruments issued and outstanding at September 30, 2020 and 2019, including rates, maturities, outstanding principal amounts, and redemption features, see Note 13 — Debt and Other Obligations — Debt Securities Activity and Debt Outstanding .
TVA Bonds are traded in the public bond markets and are listed on the New York Stock Exchange ("NYSE") except for TVA's discount notes, the 2009 Series B power bonds, and the power bonds issued under TVA's electronotes ® program. TVA's Putable Automatic Rate Reset Securities are traded on the NYSE under the exchange symbols "TVC" and "TVE." Other bonds listed on the NYSE are assigned various symbols by the exchange, which are noted on the NYSE's website. TVA has also listed certain bonds on foreign exchanges from time to time, including the Luxembourg, Hong Kong, and Singapore Stock Exchanges. See Item 1A, Risk Factors for additional information regarding the market for TVA's Bonds.
Although TVA Bonds are not obligations of the U.S., TVA, as a corporate agency and instrumentality of the U.S. government, may be impacted if the sovereign credit ratings of the U.S. are downgraded. Additionally, TVA may be impacted by how the U.S. government addresses situations of approaching its statutory debt limit. According to statements made by
60
Table of Contents
nationally recognized credit rating agencies, downward pressure on the ratings of the U.S. could eventually develop if there are no changes in current policies and budget deficits and the trajectory of debt continues to increase; additionally, current ratings factor in the prospect that debates over raising the debt ceiling of the U.S. government could continue to be protracted and difficult. The outlook on the ratings of the U.S. government is currently stable with two of the three agencies that provide ratings on TVA Bonds. In July 2020, Fitch Ratings downgraded the U.S.'s credit rating outlook to negative from stable reflecting the ongoing deterioration in U.S. public finances and the absence of a credible fiscal consolidation plan, worsened by the economic challenges from the COVID-19 pandemic. In August 2020, the outlook on the credit rating of TVA was subsequently changed by Fitch to negative from stable, reflecting the actions on the U.S. The outlook on the ratings of TVA is currently stable with two of three credit rating agencies. TVA's rated senior unsecured Bonds are currently rated Aaa, AAA, and AA+. TVA's short-term discount notes are not rated.
Lease Financings . TVA has entered into certain leasing transactions with special purpose entities ("SPEs") to obtain third-party financing for its facilities. These SPEs are sometimes identified as VIEs of which TVA is determined to be the primary beneficiary. TVA is required to account for these VIEs on a consolidated basis. See Note 10 — Variable Interest Entities and Note 13 — Debt and Other Obligations for information about TVA's lease financing activities. During 2017 and 2016, TVA acquired 100 percent of the equity interests in certain SPEs created for the purpose of facilitating lease financing. TVA may seek to enter into similar arrangements in the future. In March 2019, TVA made final rent payments under lease/leaseback transactions involving eight combustion turbine units ("CTs"), and in July 2019, these transactions were terminated. In May 2020, TVA made final rent payments under lease/leaseback transactions involving eight additional CTs and anticipate these transactions will be terminated in 2021. TVA will continue making rent payments under the remaining lease/leaseback transactions through 2022.
Summary Cash Flows
A major source of TVA's liquidity is operating cash flows resulting from the generation and sale of electricity. Cash, cash equivalents, and restricted cash were $521 million and $322 million at September 30, 2020 and 2019, respectively. A summary of cash flow components for years ended September 30 follows:
Cash provided by (used in):
Operating Activities . TVA's cash flows from operations are primarily driven by sales of electricity, fuel expense, and operating and maintenance expense. The timing and level of cash flows from operations can be affected by the weather, changes in working capital, commodity price fluctuations, outages, and other project expenses.
Net cash flows provided by operating activities decreased $84 million for 2020 compared to 2019, due to lower revenue collections from decreased sales of electricity driven predominantly by overall milder weather and the COVID-19 pandemic, in addition to lower effective rates as a result of the long-term partnership credits for LPCs. Increases in post-employment claims, asset retirement obligation ("ARO") settlements, and other payments due to timing also contributed to the decrease in cash flows from operations. These decreases were partially offset by lower fuel and purchased power payments as a result of lower natural gas prices and decreased electricity demand, lower interest payments, and decreased discretionary spend to mitigate COVID-19 financial impacts.
61
Table of Contents
Investing Activities . The majority of TVA's investing cash flows are due to investments to acquire, upgrade, or maintain generating and transmission assets, including environmental projects and the purchase of nuclear fuel. Nuclear fuel expenditures vary depending on the number of outages and the prices and timing of purchases of uranium and enrichment services.
Net cash flows used in investing activities decreased $228 million for 2020 compared to 2019, primarily driven by decreases in the number of nuclear fuel outages as compared to the prior year, deferral of certain capital project spend to mitigate COVID-19 financial impacts, and a reduction in capital expenditures for capacity expansion due primarily to the completion of the Browns Ferry Nuclear Plant ("Browns Ferry") extended power uprate in the prior year and the Pickwick South Embankment remediation project nearing completion. These decreases were partially offset by an increase in expenditures for the Boone Dam Embankment Remediation capacity expansion project.
Financing Activities . TVA's cash flows provided by or used in financing activities are primarily driven by the timing and level of cash flows provided by operating activities, cash flows used in investing activities, and net issuance and redemption of debt instruments to maintain a strategic balance of cash on hand.
Net cash flows used in financing activities decreased $55 million for 2020 compared to 2019. TVA's financing activities continue to reflect an overall reduction in debt driven by strong financial performance and execution of long-range financial plans to reduce debt and keep TVA's electric rates competitive.
Impact of COVID-19 to Liquidity
As a result of certain commercial and industrial customers curtailing operations in response to the COVID-19 pandemic, TVA experienced decreases in base revenue. TVA estimates base revenues were reduced by approximately $185 million for the year ended September 30, 2020 due to the impacts of COVID-19. TVA expects the COVID-19 pandemic to continue impacting revenue for 2021. It is uncertain at this time the extent to which TVA's revenues may be impacted beyond 2021. See Item 7, Management's Discussion and Analysis of Financial Condition and Results of Operations — Results of Operations — Financial Results — Operating Revenues . Due to reductions in TVA's revenue for the year ended September 30, 2020 and expected reductions in revenue in 2021 associated with the COVID-19 pandemic, TVA has and will continue to implement various cost savings initiatives such as deferring and prioritizing certain capital projects and decreasing discretionary spending. TVA may also experience an increase in interest cost, fuel cost, and other additional operating costs. The ultimate impact of the COVID-19 pandemic on TVA's financial condition depends on factors beyond TVA's knowledge or control, including the duration and severity of this outbreak, actions taken to contain its spread and mitigate its effects, and broader impacts of the COVID-19 pandemic on the country and region's economy.
The COVID-19 pandemic has also created economic uncertainty for TVA's LPCs and the communities they serve. To support LPCs and strengthen the public power response to the COVID-19 pandemic, TVA has created initiatives such as the Public Power Support and Stabilization Program, Back-to-Business Credit Program, Community Care Fund, and Pandemic Relief Credit. TVA has also provided regulatory flexibility for LPCs to halt disconnection of services. See Item 7, Management's Discussion and Analysis of Financial Condition and Results of Operations — Key Initiatives — Coronavirus Pandemic for an expanded discussion of these initiatives.
Cash Requirements and Contractual Obligations
Actual capital expenditures and future planned capital expenditures for property, plant, and equipment additions, including clean air projects and new generation, and nuclear fuel are as follows:
Capital Expenditures
For the year ended September 30
Actual Estimated Capital Expenditures (1)
2020 2021 2022 2023
Capacity expansion expenditures $ 224 $ 553 $ 922 $ 866
Environmental expenditures 310 145 134 74
Nuclear fuel 359 422 312 254
Transmission expenditures 404 525 510 400
Other capital expenditures (2)
761 949 903 916
Total capital expenditures $ 2,058 (3)
$ 2,594 $ 2,781 $ 2,510
Notes
(1) TVA plans to fund these expenditures with cash from operations and proceeds from power program financings. Estimated capital expenditures only include expenditures that are currently planned. Additional expenditures may be required, among other things, for TVA to meet growth in demand for power in its service area or to comply with new environmental laws, regulations, or orders.
62
Table of Contents
(2) Other capital expenditures are primarily associated with short lead time construction projects aimed at the continued safe and reliable operation of generating assets.
(3) The numbers above include construction in progress and nuclear fuel expenditures included in Accounts payable and accrued liabilities of $73 million.
TVA continually reviews its capital expenditures and financing programs. The amounts shown in the table above are forward-looking amounts based on a number of assumptions and are subject to various uncertainties. Amounts may differ materially based upon a number of factors, including, but not limited to, changes in assumptions about system load growth, environmental regulation, rates of inflation, total cost of major projects, and availability and cost of external sources of capital. See Forward-Looking Information and Item 1A, Risk Factors .
TVA has certain obligations and commitments to make future payments under contracts, including contracts executed in connection with certain of the planned construction expenditures. The following table sets forth TVA's estimates of future payments at September 30, 2020. See Note 7 — Leases , Note 10 — Variable Interest Entities , Note 11 — Other Long-Term Liabilities , Note 13 — Debt and Other Obligations , Note 21 — Benefit Plans , and Note 22 — Commitments and Contingencies for a further description of these obligations and commitments.
Commitments and Contingencies
Payments due in the year ending September 30
2021 2022 2023 2024 2025 Thereafter Total
Debt (1)
$ 1,917 $ 1,028 $ 29 $ 1,022 $ 1,022 $ 15,057 $ 20,075
Interest payments relating to debt (2)
1,001 950 929 928 898 13,057 17,763
Debt of VIEs (3)
41 43 40 36 37 900 1,097
Interest payments relating to debt of VIEs 50 49 47 45 47 403 641
Lease obligations
Finance (4)
92 93 92 87 86 592 1,042
Operating (5)
66 51 39 37 34 16 243
Purchase obligations
Power (6)
252 229 216 196 172 1,068 2,133
Fuel (7)
1,375 682 453 429 377 1,234 4,550
Other (8)
236 114 65 38 28 237 718
Environmental Agreements 2 2 2 1 1 3 11
Membership interests of VIEs subject to mandatory redemption 3 3 2 1 1 15 25
Interest payments related to membership interests of VIEs subject to mandatory redemption 2 2 1 1 1 6 13
Flood response commitment to NRC 1 26 — — — — 27
Unfunded loan commitments 1 — — — — — 1
Long-term monitoring costs - Kingston ash spill 1 1 — 1 — 9 12
Leaseback obligations (9)
207 25 — — — — 232
Retirement Plan (10)
300 300 300 300 300 3,300 4,800
Other contractual obligations 2 — — — — — 2
Total $ 5,549 $ 3,598 $ 2,215 $ 3,122 $ 3,004 $ 35,897 $ 53,385
Notes
(1) Does not include non-cash items of foreign currency exchange gain of $153 million, unamortized debt issue costs of $45 million, and net discount on sale of Bonds of $77 million.
(2) Includes the effects of interest rate derivatives employed to manage interest rate risk.
(3) Debt of VIEs does not include the non-cash item of unamortized debt issue costs of $8 million.
(4) Includes the interest component of finance leases based on the interest rates stated in the lease agreements and excludes certain related non-lease costs.
(5) Excludes commitments related to non-lease costs, which are included in purchase obligations.
(6) Includes commitments for energy and/or capacity under power purchase agreements from coal-fired, hydroelectric, diesel, renewable, and gas-fired facilities, as well as transmission service agreements to support purchases of power from the market. Certain power purchase agreements ("PPAs") are accounted for as leases and have lease and non-lease components. For these contracts, the lease component is included in lease obligations and the non-lease component is included in power.
(7) Includes commitments to purchase nuclear fuel, coal, and natural gas, as well as related transportation and storage services.
(8) Primarily includes long-term service contracts, contracts that contain minimum purchase levels for the purchase of limestone along with related storage and transportation, and contractual obligations related to load control programs.
(9) In 2020, Paradise Pipeline Financing Obligation was derecognized due to a modification of a contract. See Note 11 – Other Long-Term Liabilities – Paradise Pipeline Financing Obligation .
(10) Pursuant to amendments to the TVA Retirement System ("TVARS") Rules and Regulations that became effective October 1, 2016, TVA will contribute to TVARS for a period of 20 years (2017-2036) or, if earlier, through the fiscal year in which it is determined by actuarial valuation that TVARS has reached and remained at a 100 percent funded status, which is an amount not less than the greater of (a) the minimum required TVARS actuarial valuation contribution or (b) $300 million.
63
Table of Contents
EnergyRight ® Program. TVA purchases certain loans receivable from its LPCs in association with the EnergyRight ® program. Depending on the nature of the energy-efficiency project, loans may have a maximum term of five years or 10 years. The loans receivable are then transferred to a third-party bank with which TVA has agreed to repay in full any loan receivable that has been in default for 180 days or more or that TVA has determined is uncollectible. As of September 30, 2020, the total carrying amount of the loans receivable, net of discount, was approximately $87 million. Such amounts are not reflected in the Commitments and Contingencies table above. The total carrying amount of the financing obligation was approximately $97 million at September 30, 2020. See Note 8 — Other Long-Term Assets and Note 11 — Other Long-Term Liabilities for additional information.
Off-Balance Sheet Arrangements
At September 30, 2020, TVA had no off-balance sheet arrangements.
Key Initiatives and Challenges
COVID-19 Pandemic
In December 2019, a novel strain of coronavirus was reported in China. As this strain continued to spread across the globe, the World Health Organization declared the outbreak of the 2019 novel coronavirus a pandemic on March 11, 2020. TVA has performed risk analyses across the company to determine potential impacts and monitor performance throughout the situation and has implemented a company-wide pandemic plan to address specific aspects of the COVID-19 pandemic. TVA's pandemic plan continues to evolve based on medical guidance and federal, regional, and local requirements and guidelines.
Based on ongoing monitoring, COVID-19 continues to pose a significant risk in the U.S. and in the Tennessee Valley region, and as a result TVA has extended the timeframe for workforce reintegration and continues to limit non-essential travel. Mandatory telework has been implemented for those employees who do not have to be physically present at a TVA facility or office building to provide mission-essential activities or produce safe, reliable power. TVA continues to implement strong physical and cybersecurity measures to ensure that systems remain functional to keep employees, customers, and communities safe and enable TVA to continue achieving its mission to serve the people of the Valley. In addition to measures to protect its workforce, stakeholders, and critical operations, TVA is actively monitoring generation, transmission, and distribution functions. Operations and delivery of energy to customers have not been materially impacted by the COVID-19 pandemic at this time. Certain TVA recreation areas including TVA campgrounds, day use areas, trails, and undeveloped lands have reopened since TVA had initially closed them to slow the spread of the virus. However, for public and staff safety, restrooms and pavilions remain closed. These changes will continue until it is safe to resume full operations.
For the year ended September 30, 2020, TVA estimates base revenues were reduced by approximately $185 million due to the impacts of COVID-19. Certain commercial and industrial customers curtailed operations in response to COVID-19 pandemic social distancing standards and economic conditions. As a result, TVA experienced decreased energy demand from those customers in 2020. TVA expects the COVID-19 pandemic to continue impacting revenue for 2021. It is uncertain at this time the extent to which TVA's revenues may be impacted beyond 2021. See Item 7, Management's Discussion and Analysis of Financial Condition and Results of Operations — Results of Operations — Financial Results — Operating Revenues .
Due to reductions in TVA's revenue for the year ended September 30, 2020 and expected reductions in revenue in 2021 associated with the COVID-19 pandemic, TVA has and will continue to implement various cost savings initiatives, such as deferring and prioritizing certain capital projects and decreasing discretionary spending. In addition, TVA may also experience increases in interest cost, fuel cost, and other additional operating costs. The ultimate impact of the COVID-19 pandemic on TVA's financial condition depends on factors beyond TVA's knowledge or control, including the duration and severity of this outbreak, actions taken to contain its spread and mitigate its effects, and broader impacts of the COVID-19 pandemic on the country and region's economy.
TVA also continues to assess potential supplier performance risks, including procurement of fuel, parts, and services. If suppliers are unable to perform under TVA's existing contracts or if TVA is unable to obtain similar services from other vendors, TVA could experience delays, disruptions, additional costs, or other operational outcomes that may impact generation, maintenance, and capital programs. At this time, TVA has experienced minimal impacts due to force majeure events, with the exception of a manufacturing delay for a major turbine component. A mitigation strategy was developed by TVA and the vendor to reduce projected delays and impacts to TVA's outage schedule. TVA will continue to monitor the supply base and remain in contact with suppliers to identify potential risks.
Customer Pandemic Initiatives . The COVID-19 pandemic has created economic uncertainty for TVA's customers and the communities they serve. To support and strengthen the public power response to the COVID-19 pandemic, TVA announced the following initiatives in 2020:
Regulatory Flexibility . TVA provided regulatory flexibility for LPCs to halt disconnection of services and respond to the local needs of their customers and communities.
64
Table of Contents
Program Flexibility . In April 2020, TVA established flexibility provisions for certain economic development programs for participating customers impacted by the COVID-19 pandemic, as well as deferral options for EnergyRight ® program loan payments, through October 31, 2020, for customers experiencing financial hardship. See Note 8 — Other Long-Term Assets, Note 12 — Other Long-Term Liabilities , and Note 18 — Revenue .
Financial Support . In March 2020, the TVA Board approved the Public Power Support and Stabilization Program. Through this program, TVA is offering up to $1.0 billion of credit support to LPCs that demonstrate the need for temporary financial relief, through the deferral of a portion of LPCs' wholesale power payments owed to TVA. The program requires LPCs to apply for the deferral, which is subject to approval by TVA. If approved, TVA will establish and approve a repayment schedule with the LPC by December 31, 2020, with a repayment term not to exceed two years. The program is available through CY 2020, and as of November 16, 2020, $1 million of credit support has been approved under the program.
Back-to-Business Credit Program . TVA created the Back-to-Business Credit Program to enable TVA and LPCs the ability to provide relief to certain large customers affected by the COVID-19 pandemic by providing certain credits when returning to operations. As of September 30, 2020, TVA had provided approximately $10 million in Back-to-Business credits under this program.
Community Care Fund . TVA is also partnering with LPCs through the Community Care Fund by making available over $4 million in matching funds to support local initiatives that address hardships created by the COVID-19 pandemic. Over $2 million in matching funds had been provided as of September 30, 2020.
Pandemic Relief Credit . In August 2020, the TVA Board approved a $200 million Pandemic Relief Credit. The 2.5 percent base rate credit will be applied beginning in October 2020 and will remain in effect through the end of 2021. The credit will apply to service provided to TVA's LPCs, their large commercial and industrial customers, and TVA directly served customers.
These actions continue to show TVA's commitment to support the financial integrity of LPCs along with communities and customers across the Tennessee Valley during these challenging economic conditions caused by the COVID-19 pandemic. The COVID-19 pandemic is an evolving situation that may lead to extended disruption of economic activity and an adverse impact on TVA's results of operations. TVA is closely monitoring developments and will continue adjusting its response as necessary to ensure reliable service while protecting the safety and health of its workforce.
Distributed Energy Resources
Consumer desire for energy choice, among other things, is driving the expectation for flexible options in the electric industry. TVA and LPCs are working together to leverage the strengths of the Tennessee Valley public power model to provide distributed energy solutions that are economical, sustainable, and flexible. TVA will focus on the safety and reliability impacts of these resources as they are interconnected to the grid and will ensure that the pricing of electricity remains as low as feasible. Additional regulatory considerations and analysis may be required as the distributed energy resources ("DER") market, technologies, and programs evolve. TVA is working to develop pricing and regulatory structures with a deliberate and thoughtful analysis of each current and future program offering. This requires strong partnerships with LPCs to give customers choices and provide end-use consumers the flexibility they desire.
In 2017, the TVA Board authorized up to $300 million to be spent over the next 10 years, subject to annual budget availability and necessary environmental reviews, to build an enhanced fiber optic network that will better connect TVA's operational assets. Fiber is a vital part of TVA's modern communication infrastructure. The new fiber optic lines will improve the reliability and resiliency of the generation and transmission system while enabling the system to better accommodate DER as they enter the market. As of September 30, 2020 , TVA had spent $121 million on installation of the fiber optic lines and expects to spend an additional $179 million.
Changing Customer Preferences
As more consumers and businesses are demanding cleaner energy, the utility industry is evolving to meet those needs. As TVA also evolves, it will see impacts to the way it does business through the pricing of products, transmission of energy, and development of new products and services for its customers in support of changing customer preferences and its economic development efforts. End-use customers are becoming more technologically sophisticated and want greater control over their energy usage. Many companies are focusing on sustainability and requiring more energy efficiency and renewable energy options. The continuing challenge for TVA and others is finding ways to meet the needs and preferences of customers while successfully developing flexible pricing models to accommodate the evolving markets.
Low-Income Energy Efficiency Program. Through the Home Uplift Program, TVA is partnering with LPCs, state and local governments, non-profit agencies, energy efficiency advocates, and the Tennessee Valley Public Power Association to complete home evaluations and make high-impact home energy upgrades for qualifying homeowners. In addition, TVA and LPCs conduct workshops to educate homeowners about low and no-cost energy efficiency upgrades that improve their quality of life.
65
Table of Contents
Renewable Power Purchase Agreements . In order to meet customer preferences and requirements for cleaner energy, TVA has entered into certain power purchase agreements ("PPAs") with renewable resource providers. In 2019, as a result of TVA's 2017 request for proposals for renewable energy, TVA signed four solar PPAs for 674 megawatts ("MW") of solar generation at sites in Tennessee and Alabama. One of these four solar projects is expected to come online in 2021 and two of the projects are expected to come online in 2022. In 2020, one of the counterparties failed to comply with the terms of its PPA. TVA terminated the 150 MW agreement due to the counterparty's default and is evaluating its rights under the PPA and next steps. During 2020, as a result of TVA's 2019 request for proposals for renewable energy, TVA signed six additional PPAs for a total of 661 MW of solar generation with 50 MW of battery storage expected to come online in 2023. Due to transmission issues for one of the projects, the 661 MW will be decreased to 651 MW. TVA will procure the renewable energy and sell the resulting Renewable Energy Certificates ("RECs") to specific customers, allowing TVA to increase its renewable energy portfolio without additional costs to other Tennessee Valley customers. These agreements help to align the core values of TVA and the public power model with the desire of TVA's customers for renewable energy.
Further, TVA issued another request for proposal during the second quarter of 2020 for up to 200 MW of new renewable energy. The ultimate volume contracted will align to TVA customers' demand for renewable energy, allowing TVA to increase its renewable energy portfolio without additional costs to other Tennessee Valley customers. TVA anticipates making selections in CY 2020.
Renewable Power Solutions. TVA encourages renewable power through various current offerings. Offerings include the Green Switch Program that allows customers to support wind, solar, and biomass renewable resources through purchasing renewable energy generated in the Tennessee Valley, sold in 200 kWh blocks. TVA also offers the Green Flex Program, which gives commercial and industrial customers the ability to meet sustainability goals and to make renewable energy claims through RECs from wind generation located outside TVA's service area. In 2019, the TVA Board approved new renewable power solutions, including a utility-scale program and a mid-scale flexibility option, that better equip TVA and LPCs with the flexibility to meet changing end-use customer needs. The utility-scale program, Green Invest, aggregates demand through a competitive procurement process and is implemented through a renewable investment agreement. The goal of the Green Invest program is to meet the long-term sustainability needs of customers at scale. TVA may also construct its own renewable facilities to meet these needs. The mid-scale option, also known as the Flexibility Research Project, is a joint project with LPCs to enable solutions for situations where the end-use consumer needs onsite renewable or distributed generation. This project will allow TVA to gain market knowledge and operational insights.
Energy Exchange Market
TVA and other utilities across the southeastern United States are exploring the creation of a new automated energy exchange across the region, to facilitate more immediate and short-term power exchanges. The energy exchange would be an enhancement to TVA's existing trading program, and the creation of this energy exchange platform would require approval of the Federal Energy Regulatory Commission, which regulates transmission service and power transfers by jurisdictional public utilities. These discussions demonstrate TVA's commitment to maintaining and improving reliability in the Tennessee Valley in the least-cost manner.
Natural Resource Plan
In May 2020, the TVA Board of Directors accepted changes to TVA's Natural Resource Plan ("NRP") to support a more strategic, flexible, and comprehensive management approach to TVA's natural resource stewardship work. TVA published its Record of Decision to complete its environmental review process in July 2020. The updated plan enhances alignment with TVA's mission through economic development, energy, and environmental stewardship, and guides business planning. In the newly published NRP, TVA expanded from six resource areas to ten focus areas, ensuring the NRP provides a more comprehensive view of resource stewardship efforts.
Strategic Financial Plan
In 2019, the TVA Board approved an annual budget that reflects the first year of a new Strategic Financial Plan. The Strategic Financial Plan, which extends from 2020 through 2030, is flexible in aligning customer preferences and TVA's mission while at the same time establishing a long-term forecast of financial results. Key focus areas of the Strategic Financial Plan include maintaining rates as low as feasible, establishing better alignment between the length of LPC contracts and TVA's long-term commitments, stabilizing debt, assuming 100 percent long-term partner participation, maintaining a cash balance of $300 million, and pursuing operational efficiencies. As TVA executes the plan, key assumptions and performance may change estimated debt and cash balances. For example, TVA is continuing to evaluate its long-term asset needs. In addition, due to higher volatility in the financial markets associated with the COVID-19 pandemic, TVA increased its target balance of Cash and cash equivalents beginning in March 2020. TVA continued to hold higher target cash balances at September 30, 2020, and may hold higher balances in future periods due to potential market volatility.
66
Table of Contents
Generation Resources
Extreme Flooding Preparedness. Updates to the TVA analytical hydrology model completed in 2009 indicated that under "probable maximum flood" conditions, some of TVA's dams might not have been capable of regulating the higher flood waters. A "probable maximum flood" is an extremely unlikely event; however, TVA has a responsibility to provide protection for its nuclear plants against such events. As a result, TVA installed a series of modifications at four dams.
Since 2009, TVA has performed further hydrology modeling of portions of the TVA watershed using updated modeling tools. The revised hydrology models were reviewed and approved by the NRC for Watts Bar Nuclear Plant ("Watts Bar") Units 1 and 2. However, TVA identified an error in the modeling that will require the models for Watts Bar Units 1 and 2 to be resubmitted. TVA plans to resubmit models for Watts Bar Units 1 and 2 by the end of the first quarter of CY 2021. In addition, TVA submitted models for Sequoyah Nuclear Plant ("Sequoyah") Units 1 and 2 on January 14, 2020. TVA will subsequently address conditions at Browns Ferry as needed.
As of September 30, 2020, TVA had spent $154 million on the modifications and improvements related to extreme flooding preparedness. TVA is deferring the decision on the need for additional modifications until after the modeling work is complete.
NRC Seismic Assessments . In 2014, the NRC notified licensees of nuclear power reactors in the central and eastern U.S. of the results of seismic hazard screening and prioritization evaluations performed by unit owners and reviewed by the NRC staff. Because the seismic hazards for Browns Ferry, Sequoyah, and Watts Bar had increases in seismic parameters beyond the technical information available when the plants were designed and licensed, TVA must conduct seismic risk evaluations for these plants. TVA completed the risk evaluation for Watts Bar and submitted it to the NRC in 2017; the evaluation concluded that no additional actions were required. The NRC completed its review of the Watts Bar evaluation in 2018 and concluded that no further response or regulatory actions were required. The evaluation for Sequoyah was submitted on October 18, 2019, and the evaluation for Browns Ferry was submitted on December 17, 2019. The NRC completed its review of the Sequoyah and Browns Ferry evaluations in the fourth quarter of 2020 and concluded that no further response or regulatory actions were required.
Mitigation of Beyond-Design-Basis Events . NRC rulemaking has been developed to codify the requirements promulgated by orders related to beyond-design-basis flooding and seismic events discussed above. The NRC Commissioners approved the final rule in 2019. TVA plans to implement requirements for Sequoyah and Watts Bar by 2022 and for Browns Ferry by 2023. A gap review of the revised rule has been performed, and no new gaps to compliance were identified. Actions to complete flood and seismic assessments are still ongoing. See Extreme Flooding Preparedness and NRC Seismic Assessments above.
Work Environment at Nuclear Plants. In March 2016, the NRC issued a Chilling Effect Letter ("CEL") to TVA regarding work environment concerns identified at Watts Bar. In the mid-cycle assessment letter issued in June 2018, the NRC issued a Cross Cutting Issue in safety conscious work environment ("CCI") and outlined the closure criteria for both the CEL and CCI. In October 2019, TVA informed the NRC of its CEL and CCI closure criteria readiness, and the NRC completed its inspection, resulting in no additional findings with progress noted as documented in its December 2019 inspection report. In March 2020, the NRC issued its Annual Assessment Letter for Watts Bar noting TVA's progress in addressing the CEL and CCI while stating that the NRC continues to monitor TVA's activities as they deliberate on the appropriate time to close the CEL and CCI.
Apparent Violations of NRC Regulations . On March 2, 2020, the NRC issued a letter to TVA identifying four apparent violations of NRC regulations that prohibit licensees from retaliating against employees for their having raised protected nuclear safety concerns. In June 2020, TVA participated in a pre-decisional enforcement conference before the NRC, and on August 24, 2020, the NRC issued violations to TVA and a notice of proposed imposition of civil penalties in an amount less than $1 million. TVA submitted a written response to the NRC that denies the violations and opposes the imposition of civil penalties. On October 29, 2020, the NRC issued an order imposing civil penalties in an amount less than $1 million. TVA has until November 28, 2020, to request an evidentiary hearing before the NRC's Atomic Safety and Licensing Board.
On March 9, 2020, the NRC issued a letter to TVA identifying twelve apparent violations of NRC regulations: six relating to operational activities and six relating to NRC regulations governing the completeness and accuracy of information. TVA participated in a pre-decisional enforcement conference before the NRC in July 2020, and on November 6, 2020, the NRC issued five violations to TVA and a notice of proposed imposition of civil penalties in an amount less than $1 million. TVA is evaluating its options and must respond to the NRC by December 5, 2020.
Tritium-Producing Burnable Absorber Rods. TVA was a cooperating agency in the 2016 Department of Energy ("DOE") Final Supplemental Environmental Impact Statement for the Production of Tritium in a Commercial Light Water Reactor. In 2017, due to an anticipated need for more tritium-producing burnable absorber rods ("TPBARs"), the DOE announced its preferred alternative for irradiation services, which included use of an additional reactor. As a result of TVA's assessment and concurrence with the DOE's alternative, TVA submitted a license amendment request to the NRC to authorize the irradiation of TPBARs in Watts Bar Unit 2. The NRC approved the request in 2019. TVA is projecting to begin tritium production in Watts Bar Unit 2 in the fall of 2021. The DOE's decision also allows for irradiation of TPBARs at Sequoyah in the future; however, TVA does not have plans to employ Sequoyah units for tritium production in the near term.
67
Table of Contents
Extended Power Uprate . TVA has undertaken an extended power uprate ("EPU") project at Browns Ferry to increase the amount of electrical generation capacity of its reactors. The license for each reactor was amended to allow reactor operation at the higher power level. The Browns Ferry EPU license amendments were approved by the NRC in 2017, following a nearly two-year review.
The project involved extensive engineering analyses and modification and replacement of certain existing plant components to enable the units to produce the additional power requested by the license amendments. The project's total cost will be approximately $475 million. Physical work on all units was completed in 2019. The generating capacity is expected to increase by an estimated 465 MW that must be validated through operation of all units for four seasons and completion of additional testing. TVA is currently operating and testing the units through the required period to complete the validation of the increased generating capacity and will update the official capacity upon issuance of the engineering memos.
Plant Closures. Results of assessments performed at Paradise and Bull Run were presented to the TVA Board at its February 2019 meeting. The TVA Board approved the retirement of Paradise Unit 3 by December 2020 and Bull Run by December 2023. Subsequent to the TVA Board approval, TVA determined that Paradise would not be restarted after January 2020 due to the plant's material condition. Paradise Fossil Plant Unit 3 was taken offline on February 1, 2020, effectively retiring the plant. See Note 6 — Plant Closures .
Optimum Energy Portfolio . TVA must continuously evaluate all generating assets to ensure an optimal energy portfolio that provides safe, clean, and reliable power while maintaining flexibility and fiscal responsibility to the people of the Tennessee Valley. During 2019, the TVA Board approved the Integrated Resource Plan, which recommended an action to evaluate the engineering end-of-life of aging fossil units. These assessments consider material condition, plant performance, system flexibility needs, environmental impacts, grid support, and other factors. TVA is also considering plans for additional generating facilities to replace retiring or expiring capacity and to support a low cost, reliable, flexible, and increasingly clean power system. In addition, TVA will prepare Environmental Assessments ("EAs") pursuant to the National Environmental Policy Act ("NEPA") prior to retiring or building a plant.
Coal Combustion Residuals Facilities . TVA has committed to a programmatic approach for the elimination of wet storage of coal combustion residuals ("CCR") within the TVA service area. Under this program ("CCR Conversion Program"), TVA is converting all operational coal-fired plants to dry CCR storage and closing all wet storage facilities.
Dry generation and dewatering projects . Conversion of coal plant CCR wet processes to dry generation or dewatering is complete at Bull Run, Shawnee, and Kingston Fossil Plant ("Kingston"). Construction at Gallatin Fossil Plant ("Gallatin") was completed during 2020. Construction of dewatering and dry generation facilities is underway at Cumberland Fossil Plant ("Cumberland") and is scheduled for completion in the first quarter of 2021.
Landfills . TVA has made strategic decisions to build and maintain lined and permitted dry storage facilities on TVA-owned property at some TVA locations, allowing these facilities to operate beyond existing dry storage capacity. Lined and permitted landfills are completed and operational at Bull Run, Kingston, and Gallatin; a lined and permitted landfill at Shawnee is currently under construction with completion scheduled for January 2021; construction of a lined and permitted landfill at Cumberland is expected to start in 2021; and TVA is designing and permitting a lateral expansion of the existing landfill at Gallatin. TVA has withdrawn its permit applications for a new lined landfill at Bull Run and has stopped construction of a permitted lined landfill expansion at Kingston until TVA can determine its need for these landfills with certainty. Construction of additional lined and dry storage facilities may occur to support future business requirements.
Wet CCR impoundment closures . TVA is working to close wet CCR impoundments in accordance with federal and state requirements. Closure project schedules and costs are driven by the selected closure methodology (such as closure-in-place or closure-by-removal). Closure initiation dates are driven by environmental regulations. TVA's predominant closure methodology is closure-in-place, with exceptions at certain facilities. TVA issued an environmental impact statement ("EIS") in June 2016 that addresses the closure of CCR impoundments at TVA's coal-fired plants. TVA issued its associated Record of Decision in July 2016. Although the EIS was designed to be programmatic in order to address the mode of impoundment closures, it specifically addressed closure methods at 10 impoundments. TVA subsequently decided to close those impoundments. The method of final closure for each of these facilities will depend on various factors, including approval by appropriate state regulators. Additional site-specific NEPA studies will be conducted as other facilities are designated for closure. See Note 12 — Asset Retirement Obligations .
Groundwater monitoring . Compliance with the Environmental Protection Agency's ("EPA's") CCR rule ("CCR Rule") as well as other requirements will require additional engineering and analysis as well as implementation of a comprehensive groundwater monitoring program. As further analyses are performed, including evaluation of monitoring results, there is the potential for additional costs for investigation and/or remediation. TVA expects to continue to evaluate and update these cost estimates.
In compliance with the CCR Rule, TVA published the results of additional groundwater testing at TVA's CCR facilities on March 1, 2019. The results included values above groundwater protection standards for some constituents at several CCR units. Accordingly, TVA will have to cease sending CCR and non-CCR wastestreams to any impacted unlined CCR surface impoundments as soon as possible but no later than the applicable CCR Rule date. The EPA has published a final rule that
68
Table of Contents
changes the deadline to cease sending CCR and non-CCR wastestreams to unlined CCR impoundments and to initiate closure or retrofit the units from October 31, 2020 to April 11, 2021. The final rule establishes a process for a utility to seek site-specific approval from the EPA to continue to use the unlined CCR impoundment based on meeting certain criteria. TVA evaluated and published Assessment of Corrective Measures reports to its CCR website in August 2019. TVA is continuing to publish periodic reports on additional groundwater testing at its CCR facilities; the latest reports were published on February 28, 2020 and August 28, 2020. Under the CCR Rule, based on the results of the assessment of corrective measures, TVA is required to select a remedy as soon as feasible. TVA continues to investigate and evaluate remedies and will continue posting semi-annual progress reports on the status of remedy selection.
As of September 30, 2020, TVA had spent approximately $2.1 billion on its CCR Conversion Program. TVA expects to spend an additional $949 million on the CCR Conversion Program through 2025. These estimates may change depending on the final closure method selected for each facility. Once the CCR Conversion Program is completed, TVA will continue to undertake certain CCR projects, including building new landfill cells under existing permits and closing existing cells once they reach capacity.
TVA was involved in two lawsuits concerning the CCR facilities at Gallatin. One of these cases was decided in TVA's favor by the U.S. Court of Appeals for the Sixth Circuit, and the other case was resolved by the entry of a consent order that became effective July 24, 2019. Under the consent order, TVA agreed to close the existing wet ash impoundments by removal, either to an onsite landfill or to an offsite facility. TVA may also consider options for beneficial reuse of the CCR. TVA has submitted the removal plan to the Tennessee Department of Environment and Conservation ("TDEC") and other applicable parties pursuant to the consent order. See Note 12 — Asset Retirement Obligations for additional information.
In October 2019, TDEC released amendments to its regulations which govern solid waste disposal facilities, including TVA's active CCR facilities covered by a solid waste disposal permit and those which closed pursuant to a TDEC approved closure plan. Such facilities are generally subject to a 30-year post-closure care period during which the owner or operator must undertake certain activities, including monitoring and maintaining the facility. The amendments, among other things, add an additional 50-year period after the end of the post-closure care period, require TVA to submit recommendations as to what activities must be performed during this 50-year period to protect human health and the environment, and require TVA to submit revised closure plans every 10 years.
Potential Liability Associated with Workers' Exposure to CCR Materials. In response to the 2008 ash spill at Kingston, TVA hired Jacobs Engineering Group, Inc. ("Jacobs") to oversee certain aspects of the cleanup. After the cleanup was completed, Jacobs was sued in the U.S. District Court for the Eastern District of Tennessee ("Eastern District") by employees of a contractor involved in the cleanup and family members of some of the employees. The plaintiffs alleged that Jacobs had failed to take or provide proper health precautions and misled workers about the health risks associated with exposure to coal fly ash, which is a CCR material. The plaintiffs alleged that exposure to the fly ash caused a variety of significant health issues and illnesses, including in some cases death. The case was split into two phases, with the first phase considering, among other issues, general causation and the second determining specific causation and damages. On November 7, 2018, a jury hearing the first phase returned a verdict in favor of the plaintiffs, including determinations that Jacobs failed to adhere to its contract with TVA or the Site Wide Safety and Health Plan; Jacobs failed to provide reasonable care to the plaintiffs; and Jacobs's failures were capable of causing a list of medical conditions, ranging from hypertension to cancer. On January 11, 2019, the Eastern District referred the parties to mediation. Mediation has concluded, but the parties did not resolve the matter. The litigation will now proceed to the second phase on the question of whether Jacobs's breaches were the specific medical cause of the plaintiffs' alleged injuries and damages.
Further in 2019, an additional group of contractor employees and family members filed suit against Jacobs in the Circuit Court for Roane County, Tennessee. These plaintiffs have raised similar claims to those being litigated in the case referenced above.
While TVA is not a party to either of these lawsuits, TVA may potentially have an indemnity obligation to reimburse Jacobs for some amounts that Jacobs is required to pay. TVA will continue monitoring the litigation to determine whether these or similar cases could have broader implications for the utility industry. TVA does not expect any potential liability to have a material adverse impact on its results of operations or financial condition. See Note 22 — Commitments and Contingencies — Legal Proceedings.
River Management . Rainfall and runoff in the Tennessee Valley in 2020 were 150 percent and 156 percent of normal, respectively. Above normal rainfall and runoff have continued to help TVA meet its river system commitments, including managing minimum river flows for navigation, generating low-cost hydroelectric power, maintaining water quality and water supply, and providing recreational opportunities for the Tennessee Valley. In addition, having cool water available helps TVA to meet thermal compliance and support normal operation of TVA's nuclear and fossil-fueled plants, while oxygenating water helps fish species remain healthy.
Small Modular Reactors . In 2015, DOE entered into an Interagency Agreement with TVA to support site characterization activities and the development of an Early Site Permit Application ("ESPA") for a generic small modular reactor ("SMR"). The ESPA is based on the potential construction and operation of two or more SMR units at TVA's Clinch River Site in
69
Table of Contents
Oak Ridge, Tennessee. TVA submitted the ESPA for review by the NRC in 2016. NRC staff concluded their environmental review and issued a final EIS in April 2019, followed by the conclusion of the safety review and issuance of a final safety evaluation report in June 2019. The Commission held the statutorily required mandatory hearing for the ESPA in August 2019, and the permit was issued by the NRC in December 2019. The permit is valid through 2039 and therefore provides TVA a great deal of flexibility to make new nuclear decisions based on energy needs and economic factors.
TVA is in the process of evaluating new nuclear technology options and potential deployment scenarios. To assist in the evaluation of SMRs, TVA has entered into memorandums of understanding with Oak Ridge National Laboratory and the University of Tennessee. These partnerships allow for collaboration, exploring advanced reactor designs as a next-generation nuclear technology while leveraging advanced modeling and simulation tools to assist in determining the feasibility of SMRs. Any decision to construct an SMR would require approval by the TVA Board and the NRC. As of September 30, 2020, TVA had spent $81 million on work regarding SMRs, including work to complete the ESPA for the Clinch River Site, of which the DOE reimbursed TVA $28 million. Additional expenditures will be determined based on future project development.
System Operations Center . A new system operations center has been approved for $255 million. The new secured facility is being built to accommodate a new energy management system and to adapt to new regulatory requirements. The facility is expected to be constructed by 2022 and fully operational by 2024. As of September 30, 2020, TVA had spent approximately $37 million on the project and expects to spend an additional $218 million.
Dam Safety and Remediation Initiatives
Assurance Initiatives. TVA has an established dam safety program, which includes procedures based on the Federal Guidelines for Dam Safety, with the objective of reducing the risk of a dam safety event. The program is comprised of various engineering activities for all of TVA's dams including safety reassessments using modern industry criteria and the new probable maximum flood and site-specific seismic load cases. One aspect of the guidelines is that dam structures will be periodically assessed to assure that TVA's dams meet current design criteria. These assessments include material sampling of the dam and foundational structures and detailed engineering analysis. TVA will continue preventative and ongoing maintenance as a part of this safety program.
Boone Dam Remediation . In 2015, a sinkhole was discovered near the base of the earthen embankment at Boone Dam, and a small amount of water and sediment was found seeping from the river bank below the dam. TVA identified underground pathways contributing to the seepage and prepared a plan to repair the dam, which consists of the construction of a composite seepage barrier wall in the dam's earthen embankment. TVA has completed grouting and construction of an upstream and downstream buttress. Installation of the concrete cut-off wall elements is in process.
As construction of the embankment repair project continues, the estimated cost and duration continue to be refined. As of September 30, 2020, TVA had spent $251 million related to this project and expects to spend an additional $184 million through 2023. TVA expects the reservoir to return to normal operations in 2022 and is continuing to work with the community to help mitigate local impacts of the extended drawdown.
Pickwick South Embankment Remediation. Reassessments of Pickwick Landing Dam ("Pickwick") found low safety factors for post-earthquake stability indicating that the dam is at significant risk for slope stability failure following a seismic event in portions of the south embankment. Slope stability failure could lead to a breach of the south embankment and loss of the reservoir, resulting in loss of life and damage to property downstream, disruption to navigation, and loss of generation and recreation.
TVA is upgrading the south embankment by constructing berms on the upstream and downstream slopes. The design phase of the project began in 2017 and is now completed. Construction began in the spring of 2019, and the project is currently estimated to be completed in two years, but could take longer depending on successful construction sequencing. As of September 30, 2020, TVA had spent $118 million related to this project and expects to spend an additional $14 million through 2022.
Real Estate Portfolio
TVA continues to study its real estate portfolio and align its real estate holdings with TVA's strategic direction. A comprehensive assessment of its real estate portfolio has been completed. TVA will continue to develop and implement a strategy aimed at reducing cost and right-sizing its portfolio as part of the effort.
Knoxville Property . In 2016, TVA completed a comprehensive assessment of its real estate holdings in the Knoxville, Tennessee region including the Knoxville Office Complex ("KOC") and adjacent Summer Place Complex ("SPC"). As a result of this study and a subsequent Environmental Assessment in 2017, TVA has consolidated its Knoxville area employees into the West Tower of the KOC and the Greenway Drive Transmission Service Center, and is completing the centralized field offices in Norris, Tennessee. As part of this consolidation effort, TVA approved the conveyance of the SPC and the East Tower of the KOC and the transaction closed in August 2020.
70
Table of Contents
Regulatory Compliance
Steam-Electric Effluent Guidelines . In 2015, the EPA published a final rule revising the existing steam-electric effluent limitation guidelines ("ELGs"). The ELGs update the existing technology-based water discharge limitations for power plants. Compliance with new requirements is required in the 2018-2023 timeframe and will necessitate major upgrades to wastewater treatment systems at all coal-fired plants. Dry fly ash handling is mandated by the rule. The rule also requires either dry bottom ash handling systems or "no discharge" recycle of bottom ash transport waters, and new technology-based limits on flue gas desulfurization ("FGD") (scrubber) wastewater require primary physical/chemical treatment and secondary biological treatment to meet extremely low limits for arsenic, mercury, and selenium.
The EPA published a rule in 2017, postponing certain compliance/applicability dates to provide the EPA time to review and revise, as necessary, the 2015 ELGs for FGD wastewater and bottom ash transport water. The EPA delayed the compliance dates for these two waste streams from the 2018-2023 timeframe to 2020-2023. However, the 2018-2023 applicability dates and the accompanying requirements for fly ash transport water, flue gas mercury control wastewater, and gasification wastewater remain unchanged. While the EPA reconsiders the limits for FGD wastewater and bottom ash transport water, states have issued National Pollutant Discharge Elimination System ("NPDES") permits for all of TVA's active coal facilities based on the 2015 ELGs, recognizing that the permits may need to be reopened to incorporate modifications to those ELGs. The EPA proposed revised ELGs for bottom ash transport water and FGD wastewater on November 4, 2019. The final ELGs were published on October 13, 2020.
The primary impact of these regulations for TVA is on the operation of existing coal-fired generation facilities. The revised ELGs could impact long-term investment decisions being made relative to the long-term compliance and operability of these plants. The revisions may require TVA to install additional wastewater treatment systems for FGD wastewater and bottom ash transport water, and TVA could incur substantial costs to comply with the new rule. TVA currently has three plants with wet scrubbers that may be subject to new scrubber-related limits, the largest being Cumberland. Bull Run is exempt from the imposition of new scrubber-related limits due to the pending retirement of the plant prior to the regulatory deadline. The revision also includes a subcategory for which Cumberland would qualify that provides TVA greater flexibility in meeting the ELGs. Litigation of the final rule is anticipated which introduces additional uncertainty in what will be required at each facility.
Allen Groundwater Investigation . The CCR Rule required TVA to implement a comprehensive groundwater monitoring program at units subject to the rule. As a result of this groundwater monitoring program, TVA reported to TDEC in 2017 elevated levels of arsenic, lead, and fluoride in groundwater samples collected from two shallow-aquifer groundwater monitoring wells around the Allen East Ash Disposal Area. TVA, under the oversight of TDEC, conducted a remedial investigation into the nature and extent of the contamination. In 2018, TVA submitted a draft Remedial Investigation Report to TDEC which was revised after discussions with TDEC and additional investigation. TVA submitted the Final Updated Remedial Investigation Report to TDEC in 2019.
The remedial investigation confirmed that the high arsenic, fluoride, and lead concentrations are limited to the shallow alluvial aquifer in the north and south areas of the Allen East Ash Disposal Area. These areas are not adversely impacting the Memphis aquifer, which is the source of the public drinking water supply. All samples taken from the Memphis aquifer through TVA production wells were below the EPA drinking water standards. As the result of a pumping test conducted on TVA production wells at the nearby Allen Combined Cycle Plant ("Allen CC") by the United States Geological Survey and the University of Memphis, TVA is committed to not operating these production wells until additional data supports safe use. TVA constructed water tanks on site and is purchasing cooling water from Memphis Light, Gas and Water. The use of water tanks rather than the wells may impose some operational restrictions on the Allen CC due to the lower availability of cooling water.
TVA's Remedial Investigation/Interim Response Action Groundwater Monitoring Plan is reviewed and modified annually. The 2020 Remedial Investigation/Interim Response Action Groundwater Monitoring Plan was approved by TDEC on May 5, 2020. TVA has sampled the monitoring wells at the site as described by the plan quarterly. TVA prepares a memorandum after each quarterly event and prepares an annual report to evaluate the sampling results. The 2019 Remedial Investigation/Interim Response Action Groundwater Monitoring report was submitted to TDEC on July 2, 2020.
The Interim Response Action Plan to remediate the groundwater will include a groundwater extraction system and a groundwater treatment system. TVA will also continue to dewater the East Ash Disposal Area and treat the water before it is discharged to the NPDES outfall. A feasibility study to evaluate remedial actions for the site was submitted to TDEC on September 4, 2020.
TVA has evaluated closure options for the Allen East Ash Disposal Area, as well as the nearby West Ash Impoundment, through an EIS pursuant to NEPA. In March 2019, TVA released its public scoping report, which eliminated closure-in-place as an alternative. TVA published the final EIS on March 13, 2020 and its Record of Decision on April 14, 2020, which documents the final decision regarding the closure method for the CCR units at the Allen Fossil Plant. TVA has decided to remove CCR from the above identified areas to an existing permitted offsite landfill.
Federal Contracting and Hiring Practices . On August 3, 2020, President Trump issued an "Executive Order ("EO") on Aligning Federal Contracting and Hiring Practices With the Interests of American Workers". Among other things, the EO directs
71
Table of Contents
federal agencies to review contracts awarded in 2018 and 2019 to assess (i) whether temporary foreign labor was used and impacts from such use, and (ii) whether any offshoring occurred and its impacts. The EO also directs agencies to review employment policies for compliance with specific laws. TVA is conducting a review and will report a summary of its findings to the Office of Management and Budget ("OMB") by December 1, 2020.
Ratemaking
TVA, LPCs, and directly served industries have worked collaboratively in recent years to develop changes to rates that focus on TVA's long-term pricing efforts and the changing needs of customers in the Tennessee Valley. These changes have improved pricing by better aligning rates with underlying cost drivers and by sending improved pricing signals, while maintaining competitive industrial rates and keeping residential rates affordable.
In 2019, the TVA Board approved a 20-year Partnership Agreement option that better aligns the length of LPC contracts with TVA's long-term commitments. These agreements are automatically extended each year after their initial effective date, contingent upon certain circumstances, including limited rate increases going forward. Participating LPCs will receive benefits including a 3.1 percent wholesale bill credit in exchange for their long-term commitment, which enables TVA to recover its long-term financial commitments over a commensurate period. In June 2020, TVA provided participating LPCs a flexibility option that allows them to locally generate up to approximately five percent of average total hourly energy sales over the prior five years in order to meet their individual customers' needs. As of November 16, 2020, 142 LPCs had signed the 20-year Partnership Agreement with TVA, and 64 LPCs had signed a Flexibility Agreement.
Safeguarding Assets
Physical Security — Non-Nuclear Asset Protection. TVA utilizes a variety of security technologies, security awareness activities, and security personnel to prevent sabotage, vandalism, and thefts. Any of these activities could negatively impact the ability of TVA to generate, transmit, and deliver power to its customers. TVA's Police and Emergency Management personnel are active participants with numerous professional and peer physical security organizations in both the electric industry and law enforcement communities.
Physical attacks on transmission facilities across the country have heightened awareness of the need to physically protect facilities. TVA continues to work with the North American Electric Reliability Corporation ("NERC"), the SERC Reliability Corporation, the North American Transmission Forum, and other utilities to implement industry approved recommendations and standards.
Nuclear Security . Nuclear security is carried out in accordance with federal regulations as set forth by the NRC. These regulations are designed for the protection of TVA's nuclear power plants, the public, and employees from the threat of radiological sabotage and other nuclear-related terrorist threats. TVA has security forces to guard against such threats.
Cybersecurity. TVA operates in a highly regulated environment with respect to cybersecurity. TVA's cybersecurity program aligns or complies with the Federal Information Security Management Act, the NERC Critical Infrastructure Protection requirements, and the NRC requirements for cybersecurity, as well as industry best practices. As part of the U.S. government, TVA coordinates with and works closely with the U.S. Department of Homeland Security and the U.S. Computer Emergency Readiness Team ("US-CERT"). US-CERT functions as a liaison between the U.S. Department of Homeland Security and the public and private sectors to coordinate responses to security threats from the internet.
The risk of cybersecurity events such as malicious code attacks, unauthorized access attempts, and social engineering attempts continues to intensify. While TVA and its third-party vendors and service providers have been, and will likely continue to be, subjected to such attacks and attempts to disrupt operations, to date the attacks have not impacted TVA's ability to operate as planned. See Item 1A, Risk Factors — Cybersecurity Risks — TVA's facilities and information infrastructure may not operate as planned due to cyber threats to TVA's assets and operations .
Over the last few years, there has been an increase of malicious cyber activity across all industries, including the energy sector. TVA has observed a significant increase in malicious activity related to the COVID-19 pandemic including phishing campaigns and malicious websites. These types of malicious activity are occurring across the industry and have also been observed by TVA's external vendors, stakeholders, and partners. This activity has caused the need for heightened awareness and preparedness. TVA is leveraging federal and other partners to better identify, detect, protect, and respond to these potential attacks. While there have been incidents of phishing and attempted fraud against TVA and its vendors and service providers, these events have not had a significant or material impact on business or operations.
Transmission Assets . In addition to physical and cybersecurity attacks, TVA's transmission assets are vulnerable to various types of electrically charged energy disruptions such as those from geomagnetic disturbances ("GMDs") and electromagnetic pulses ("EMPs"). Because the effects of GMD and EMP are similar, they are often considered together. In September 2016, the Federal Energy Regulatory Commission ("FERC") approved a new standard to address GMD events, and in March 2020, FERC approved a revision to the standard. TVA has met the requirements of the original standard and subsequent revisions, and has evaluated the effects of solar storms ranging from NERC's reference case to possible extreme
72
Table of Contents
levels. TVA continues as an active participant with NERC in this field. The most serious threats from EMP are those caused by high-altitude nuclear explosions. Like others in the industry, TVA is coordinating with federal and state authorities, NERC, Electric Power Research Institute, and other grid owners and operators to address this concern.
Bulk-Power System Assets . On May 1, 2020, President Trump issued EO 13920, Securing the United States Bulk-Power System . Among other things, the EO prohibits the acquisition or installation of any bulk-power system electric equipment where the transaction (1) involves any property in which any foreign country or a national thereof has any interest and (2) poses an undue risk to the bulk-power system in, or national security of, the United States. Whether a bulk-power system electric equipment acquisition or installation is prohibited will depend on determinations by the Secretary of DOE that have not yet been made. At this time, it is uncertain to what extent this EO may impact TVA's operations.
Critical Accounting Policies and Estimates
TVA's consolidated financial statements are prepared in accordance with accounting principles generally accepted in the United States of America ("GAAP"), which require management to make estimates, judgments, and assumptions that affect the amounts reported in the consolidated financial statements and accompanying notes. Each of these estimates varies in regard to the level of judgment involved and its potential impact on TVA's financial results. Estimates are deemed critical either when a different estimate could have reasonably been used, or where changes in the estimate are reasonably likely to occur from period to period, and such use or change also would materially impact TVA's financial condition, results of operations, or cash flows. TVA's critical accounting policies are also discussed in Note 1 — Summary of Significant Accounting Policies of the Notes to Consolidated Financial Statements.
TVA believes that its most critical accounting policies and estimates relate to the following:
• Regulatory Accounting;
• AROs; and
• Pension and Other Post-Retirement Benefits.
Management has discussed the development, selection, and disclosure of critical accounting policies and estimates with the Audit, Risk, and Regulation Committee of the TVA Board. While TVA's estimates and assumptions are based on its knowledge of current events and actions it may undertake in the future, actual results may ultimately differ from these estimates and assumptions.
Regulatory Accounting
The TVA Board is authorized by the TVA Act to set rates for power sold to customers; thus, TVA is "self-regulated." Additionally, TVA's regulated rates are designed to recover its costs of providing electricity. In view of demand for electricity and the level of competition, TVA has assumed that rates, set at levels that will recover TVA's costs, can be charged and collected. As a result of these factors, TVA records certain assets and liabilities that result from the regulated ratemaking process that would not be recorded under GAAP for non-regulated entities. Regulatory assets generally represent incurred costs that have been deferred because such costs are probable of future recovery in customer rates. Regulatory liabilities generally represent obligations to make refunds to customers for previous collections of costs that are not likely to be incurred or deferral of gains that will be credited to customers in future periods. The timeframe over which the regulatory assets are recovered from customers or regulatory liabilities are credited to customers is subject to annual TVA Board approval. At September 30, 2020, TVA had $10.4 billion of Regulatory assets and $164 million of Regulatory liabilities.
TVA assesses whether the regulatory assets are probable of future recovery by considering factors such as applicable regulatory changes, potential legislation, and changes in technology. Based on these assessments, TVA believes the existing regulatory assets are probable of recovery. This determination reflects the current regulatory and political environment and is subject to change in the future.
In 2017, the TVA Board authorized management to accelerate amortization of certain regulatory assets to the extent actual net income in 2018 exceeded the budgeted amount, up to the aggregate amount of those certain regulatory assets. Assets included in this Board action include: deferred nuclear generating units, environmental cleanup costs related to the Kingston ash spill, and nuclear training costs related to the refurbishing and restarting of Browns Ferry Unit 1 and the construction of Watts Bar Unit 2. TVA recorded $857 million of accelerated amortization of the Deferred nuclear generating units and Nuclear training costs regulatory assets in 2018. The TVA Board authorized TVA to use the amount included in the 2019 rate action for these two regulatory assets, to the extent needed, to accelerate amortization of the Environmental cleanup costs - Kingston ash spill regulatory asset in 2019. TVA recorded $266 million of accelerated recovery for the Kingston ash spill regulatory asset in 2019. No accelerated amortization was recorded in 2020.
TVA does not believe there is a reasonable likelihood that there will be a material change in the estimates or assumptions used to record regulatory assets and liabilities. If future recovery of regulatory assets ceases to be probable, or any of the other factors described herein cease to be applicable, TVA would be required to write off these costs and recognize them in net income or other comprehensive income.
73
Table of Contents
Asset Retirement Obligations
TVA recognizes legal obligations associated with the future retirement of certain tangible long-lived assets. These obligations relate to TVA's generating facilities, including coal-fired, nuclear, hydroelectric, and natural gas and/or oil-fired. They also pertain to coal ash impoundments, transmission facilities, and other property-related assets. Activities involved with the retirement of these assets could include decontamination and demolition of structures, removal and disposal of wastes, and site restoration. TVA periodically reviews its estimated asset retirement obligation ("ARO") liabilities. Revisions to the ARO estimates are made whenever factors indicate that the timing or amounts of estimated cash flows have changed. Any change to an ARO liability is recognized prospectively as an equivalent increase or decrease in the carrying value of the capitalized asset. Any accretion or depreciation expense related to these liabilities and assets is charged to a regulatory asset. See Note 9 — Regulatory Assets and Liabilities — Nuclear Decommissioning Costs and Non-Nuclear Decommissioning Costs and Note 12 — Asset Retirement Obligations .
Nuclear Decommissioning . Utilities that own and operate nuclear plants are required to recognize a liability for legal obligations related to nuclear decommissioning. An equivalent amount is recorded as an increase in the carrying value of the capitalized asset and allocated to a regulatory asset over the useful life of the capitalized asset. The initial obligation is measured at its estimated fair value using various judgments and assumptions. Fair value is developed using an expected present value technique that is based on assumptions of market participants and that considers estimated retirement costs in current period dollars that are inflated to the anticipated decommissioning date and then discounted back to the date the ARO was incurred. Decommissioning cost studies are updated for each of TVA's nuclear units at least every five years. Changes in assumptions and estimates included within the calculations of the value of the AROs could result in significantly different results than those identified and recorded in the financial statements.
At September 30, 2020, the estimated future nuclear decommissioning cost recognized in the financial statements was $3.3 billion and was included in AROs, and the unamortized regulatory asset related to nuclear decommissioning ARO costs of $896 million was included in Regulatory assets.
The following key assumptions can have a significant effect on estimates related to the nuclear decommissioning costs reported in TVA's nuclear ARO liability:
Timing and Method – In projecting decommissioning costs, two assumptions must be made to estimate the timing of plant decommissioning. First, the date of the plant's retirement must be estimated. At Browns Ferry and Sequoyah, the estimated retirement date is based on the unit with the longest license period remaining. At Watts Bar, the estimated retirement date is based on each unit's license period. Second, an assumption must be made on the timing of the decommissioning. TVA has ascribed probabilities to two different decommissioning methods related to its nuclear decommissioning obligation estimate: the DECON method and the SAFSTOR method. The DECON method requires that radioactive contamination be removed from a site and safely disposed of or decontaminated to a level that permits the site to be released for unrestricted use shortly after it ceases operation. The SAFSTOR method allows nuclear facilities to be placed and maintained in a condition that allows the facilities to be safely stored and subsequently decontaminated to levels that permit release for unrestricted use. TVA bases its nuclear decommissioning estimates on site-specific cost studies, which are updated for each of TVA's nuclear units at least every five years, with the last study performed in 2017. Changes in probabilities ascribed to the assumptions or the timing of decommissioning can significantly change the present value of TVA's obligations.
Cost Estimates – There is limited experience with actual decommissioning of large nuclear facilities. Changes in technology and experience as well as changes in regulations regarding nuclear decommissioning could cause cost estimates to change significantly. TVA's cost studies assume current technology and regulations.
Cost Escalation Rate – TVA uses expected inflation rates over the remaining timeframe until the costs are expected to be incurred to estimate the amount of future cash flows required to satisfy TVA's decommissioning obligations.
Discount Rate – TVA uses its incremental borrowing rate over a period consistent with the remaining timeframe until the costs are expected to be incurred to calculate the present value of the weighted estimated cash flows required to satisfy TVA's decommissioning obligations.
The actual decommissioning costs may vary from the derived estimates because of changes in current assumptions, such as the assumed dates of decommissioning, changes in regulatory requirements, changes in technology, and changes in the cost of labor, materials, and equipment. A 10 percent change in TVA's ARO for nuclear decommissioning cost at September 30, 2020, would have affected the liability by approximately $328 million.
Non-Nuclear Decommissioning. At September 30, 2020, the estimated future non-nuclear decommissioning cost recognized in the financial statements was $3.5 billion and was included in AROs, and the unamortized regulatory asset related to non-nuclear decommissioning ARO costs of $2.5 billion was included in Regulatory assets. This decommissioning cost estimate involves estimating the amount and timing of future expenditures and making judgments concerning whether or not such costs are considered a legal obligation. Estimating the amount and timing of future expenditures includes, among other things, making projections of the timing and duration of the asset retirement process and predicting how costs will escalate with
74
Table of Contents
inflation. These costs are predominantly CCR closure, CCR post-closure care and monitoring, and plant powerhouse asbestos removal. CCR closure estimates are primarily closure-in-place except for specific ponds located at Allen and Gallatin, which are closure-by-removal. CCR post-closure care and monitoring primarily includes costs for grounds maintenance, cover system and mechanical maintenance, inspections, and groundwater monitoring costs. Asbestos removal is based on cost per square foot to remove and dispose of asbestos-containing materials. TVA revises estimates of CCR closure on a project by project basis when updated cost information becomes available that causes management's expectation of cost to change materially. CCR post-closure care and monitoring costs and asbestos removal are studied for revision at least every five years, but revised more frequently if updated cost information becomes available that causes management's expectation of cost to change materially. The following key assumptions can have a significant effect on estimates related to the non-nuclear decommissioning costs:
Timing and Method – In projecting non-nuclear decommissioning costs, the date of the asset's retirement must be estimated. In instances where the retirement of a specific asset will precede the retirement of the generating plant, the anticipated retirement date of the specific asset is used. Additionally, TVA expects to incur certain ongoing costs subsequent to the initial asset retirement. TVA develops its cost estimates based on likelihood of decommissioning method where options exist in fulfilling legal obligations (e.g. closure-in-place or closure-by-removal for coal ash impoundments). The decommissioning method is determined based on several factors including available technologies, environmental studies, cost factors, resource availability, and timing requirements. As these factors are considered and decommissioning methods are determined, the detailed project schedules and estimates are adjusted. See Note 8 — Regulatory Assets and Liabilities — Non-Nuclear Decommissioning Costs .
Technology and Regulation – Changes in technology and experience as well as changes in regulations regarding non-nuclear decommissioning could cause cost estimates to change significantly. TVA's cost estimates generally assume current technology and regulations. In April 2015, the EPA published its final rule governing CCR, which regulates landfill and impoundment location, design, and operations; dictates certain pond-closure conditions; and establishes groundwater monitoring and closure and post-closure standards. As a result of this ruling, in 2015 TVA made revisions to the assumptions and estimates used to calculate its CCR AROs. TVA continues to evaluate the impact of the rule on its operations, including cost and timing estimates of related projects. As a result, further adjustments to its ARO liabilities may be required as estimates are refined.
Cost Escalation Rate – TVA uses expected inflation rates over the remaining timeframe until the costs are expected to be incurred to estimate the amount of future cash flows required to satisfy TVA's decommissioning obligations.
Discount Rate – TVA uses its incremental borrowing rate over a period consistent with the remaining timeframe until the costs are expected to be incurred to calculate the present value of the weighted estimated cash flows required to satisfy TVA's decommissioning obligations.
The actual decommissioning costs may vary from the derived estimates because of changes in current assumptions, such as the assumed dates of decommissioning, changes in the discount or escalation rates, changes in regulatory requirements, changes in technology, and changes in the cost of labor, materials, and equipment. A 10 percent change in TVA's ARO for non-nuclear decommissioning costs at September 30, 2020, would have affected the liability by approximately $351 million.
Pension and Other Post-Retirement Benefits
TVA sponsors a defined benefit pension plan that is qualified under section 401(a) of the Internal Revenue Code and covers substantially all of its full-time annual employees hired prior to July 1, 2014. TVARS, a separate legal entity governed by its own board of directors, administers the qualified defined benefit pension plan. TVA also provides a Supplemental Executive Retirement Plan ("SERP") to certain executives in critical positions, which provides supplemental pension benefits tied to compensation levels that exceed limits imposed by IRS rules applicable to the qualified defined benefit pension plan. Additionally, TVA provides post-retirement health care benefits for most of its full-time employees who reach retirement age while still working for TVA.
TVA's pension and other post-retirement benefits contain uncertainties because they require management to make certain assumptions related to TVA's cost to provide these benefits. Numerous factors are considered including the provisions of the plans, changing employee demographics, various actuarial calculations, assumptions, and accounting mechanisms. Effects of the COVID-19 pandemic on the financial markets, regulations, and experience are uncertain and still evolving, creating an additional degree and complexity associated with the future occurrence or outcome of events and conditions underlying the significant accounting assumptions discussed below.
Key actuarial assumptions utilized include discount rates, projected health care cost trend rates, expected long-term rate of return on plan assets, rate of increase in future compensation levels, retirement rates, expected timing and form of payments, and mortality rates. Every five years, a formal actuarial experience study that compares assumptions to the actual experience is conducted. Additional ad-hoc experience studies are performed as needed to review recent experience and validate recommended changes to the actuarial assumptions used based upon TVA's last experience study in 2018.
75
Table of Contents
Expected Return on Plan Assets . The qualified defined benefit pension plan is the only plan that is funded with qualified plan assets. In determining the expected long-term rate of return on pension plan assets, TVA uses a process that incorporates actual historical asset class returns and an assessment of expected future performance and takes into consideration external actuarial advice, the current outlook on capital markets, the asset allocation policy, and the anticipated impact of active management. Based upon review of the current plan's asset target allocation mix, capital market outlooks, and the most recent studies, TVA management maintained its 6.75 percent expected long-term rate of return on plan assets assumption, which will be used to calculate the 2021 net periodic pension cost.
TVA recognizes the impact of asset performance on pension expense over a three-year phase-in period through a market-related value of assets calculation. The market-related value of assets recognizes investment gains and losses over a three-year period and is used in calculating the expected return on assets and the recognized net actuarial loss components of pension net periodic benefit cost.
A higher expected rate of return assumption decreases the net periodic pension benefit costs, whereas a lower expected rate of return assumption increases the net periodic pension benefit cost. The plan's actual rate of return for 2020 was 5.11 percent compared to the assumption of 6.75 percent. The difference between the expected and actual return on plan assets resulted in an actuarial loss of $91 million that is recognized as an increase in the related regulatory asset and an increase in the pension benefit obligation at September 30, 2020.
Discount Rate. TVA's discount rates are derived by identifying a theoretical settlement portfolio of high quality corporate bonds of Aa quality or higher sufficient to provide for the projected benefit payments. The model matches the present value of the projected benefit payments to the market value of the theoretical settlement bond portfolio with any resulting excess funds presumed to be reinvested and used to meet successive year benefit payments. A single equivalent discount rate is determined to align the present value of the required cash flow with the value of the bond portfolio. The resulting discount rates are reflective of both the current interest rate and the distinct liability of the pension and post-retirement benefit plans.
The discount rate is somewhat volatile because it is determined based upon the prevailing rate of long-term corporate bonds as of the measurement date. A higher discount rate decreases the plan obligations and correspondingly decreases the net periodic pension and net post-retirement benefit costs for those plans where actuarial losses are being amortized. Alternatively, a lower discount rate increases net periodic pension and net periodic post-retirement benefit costs. The discount rates used to determine the pension and post-retirement benefit obligations were 2.75 percent and 3.05 percent, respectively, at September 30, 2020.
Health Care Cost Trends. In establishing health care cost trend rates for the post-retirement obligation, TVA reviews actual recent cost trends and projected future trends considering health care inflation, changes in health care utilization, and changes in plan benefits and premium experience. The pre-Medicare current health care cost trend rate is 6.50 percent, the ultimate trend rate is 5.00 percent, and the year to reach the ultimate rate is 2027. The post-Medicare current health care cost trend rate and ultimate health care cost trend rate remained constant at zero percent and 4.00 percent, respectively, whereas the year to reach the ultimate rate was extended to 2024 from 2023 attributable to lower than expected premium increases on the private exchange. This change in the post-Medicare health care cost trend rate assumption resulted in a $15 million decrease in the post-retirement obligation at September 30, 2020.
Cost of Living Adjustments. Cost of living adjustments ("COLAs") are an increase in the benefits for eligible retirees to help maintain the purchasing power of benefits as consumer prices increase. This assumption is based on the long-term expected future rate of inflation based on the capital market outlooks, economic forecasts, and the Federal Reserve policy. See Note 21 — Benefit Plans — Plan Assumptions — Cost of Living Adjustment for further discussion on the calculation of the COLA. The actual COLA for CY 2020 was 1.54 percent. The CY 2021 COLA is assumed to be 1.00 percent, and for years thereafter is assumed to be 2.00 percent . A higher COLA increases the pension benefit obligation whereas a lower assumption decreases the obligation. The actual calendar year COLA and the long-term COLA assumption are used to determine the benefit obligation at September 30 and the net periodic benefit costs for the following fiscal year.
Mortality . TVA's mortality assumptions are based upon actuarial projections in combination with actuarial studies of the actual mortality experience of TVARS's pension and post-retirement benefit plan participants taking into consideration the Society of Actuaries ("SOA") mortality table and projection scales as of September 30, 2020. TVA continues to monitor the availability of updates to mortality tables, longevity improvement scales, and mortality reviews and experience studies to consider whether these updates should be reflected in the current year mortality assumption. In determining the benefit obligations at September 30, 2020, TVA adopted a modified version of the SOA PRI-2012 mortality table and a modified version of the MP-2019 projection scale based upon an updated mortality experience study. The change in TVA's mortality assumptions resulted in a $137 million decrease in the pension obligation and a $2 million increase in the post-retirement obligation at September 30, 2020.
76
Table of Contents
Sensitivity to Changes in Key Assumptions
The following tables illustrate the estimated effects of changing certain of the critical actuarial assumptions discussed above, while holding all other assumptions constant and excluding any impact for unamortized actuarial gains and losses:
Sensitivity to Certain Changes in Pension Assumptions
At September 30, 2020
Actuarial Assumption Current Assumption Change in Assumption Impact
Effect on 2020 pension expense:
Discount rate 3.20 % (0.25) % $ 17
Expected return on assets 6.75 % (0.25) % 18
COLA 2.00 % 0.25 % 30
Effect on benefit obligation
Discount rate 2.75 % (0.25) % 418
COLA 2.00 % 0.25 % 270
Sensitivity to Changes in Assumed Health Care Cost Trend Rates
At September 30, 2020
1% Increase 1% Decrease
Effect on total of service and interest cost components for the year $ 4 $ (4)
Effect on end-of-year accumulated post-retirement benefit obligation 70 (68)
Contributions. The minimum pension contribution for 2020 was $300 million and was paid in twelve monthly installments. TVA made contributions of $5 million to the SERP and $25 million, net of rebates and subsidies received, to the unfunded other post-retirement benefit plans. TVA expects to contribute $300 million to TVARS, $5 million to the SERP, and $28 million to the other post-retirement benefit plans in 2021.
Accounting Mechanisms. In accordance with current accounting guidance, TVA utilizes a number of accounting mechanisms that reduce the volatility of reported pension expense. Differences between actuarial assumptions and actual plan results are deferred and amortized into period expense only when the accumulated differences exceed 10 percent of the greater of the projected benefit obligation or the market-related value of plan assets. If necessary, the excess is amortized over the
average future expected working lifetime of participants expected to receive benefits, which is approximately 11 years for the pension plan and 12 years for the post-retirement plan. Additionally, TVA recognizes pension costs as regulatory assets to the extent that the amount calculated under U.S. GAAP as pension expense differs from the amount TVA contributes to the pension plan as pension plan contributions. As a result of recent plan design changes, future contributions are expected to exceed the expense calculated under U.S. GAAP. Accordingly, TVA will discontinue this regulatory accounting practice once all such deferred costs have been recovered, at which time it will recognize pension costs in accordance with U.S. GAAP. Furthermore, amortization of net prior service cost/(credit) resulting from a plan change is included as a component of period expense in the year first recognized and every year thereafter until it is fully amortized. The increase or decrease in the benefit obligation due to a plan change is amortized over the average remaining service period of participating employees expected to receive benefits under the plans. The pension and post-retirement plans currently have prior service costs/(credits) from plan changes made in 2009, 2010, 2016, 2018, 2019, and 2020 with remaining amortization periods of one to nine years.
Fair Value Measurements
Investments
Investment Funds. Investments classified as trading consist of amounts held in the Nuclear Decommissioning Trust ("NDT"), Asset Retirement Trust ("ART"), SERP, and Deferred Compensation Plan ("DCP"). These assets are generally measured at fair value based on quoted market prices or other observable market data such as interest rate indices. These investments are primarily U.S. and international equities, real estate investment trusts, fixed income investments, high-yield fixed income investments, U.S. Treasury Inflation-Protected Securities, treasuries, currencies, derivative instruments, and other investments. TVA has classified all of these trading securities as either Level 1, Level 2, or Investments measured at net asset value. See Note 16 — Fair Value Measurements — Valuation Techniques for a discussion of valuation levels of the investments.
Plan Investments. TVA's qualified benefit pension plan is funded with qualified plan assets. These investments are primarily global public equities, private equities, fixed income securities, public real assets, and private real assets. See Note 21 — Benefit Plans — Fair Value Measurements for disclosure of fair value measurements for investments held by TVARS that support TVA's qualified defined benefit pension plan.
77
Table of Contents
Pricing. Prices provided by third-parties for the assets in investment funds and plan investments are subjected to automated tolerance checks by the investment portfolio trustee to identify and avoid, where possible, the use of inaccurate prices. Any such prices identified as outside the tolerance thresholds are reported to the vendor that provided the price. If the prices are validated, the primary pricing source is used. If not, a secondary source price that has passed the applicable tolerance check is used (or queried with the vendor if it is out of tolerance), resulting in either the use of a secondary price, where validated, or the last reported default price, as in the case of a missing price. For monthly valued accounts, where secondary price sources are available, an automated inter-source tolerance report identifies prices with an inter-vendor pricing variance of over two percent at an asset class level. For daily valued accounts, each security is assigned, where possible, an indicative major market index, against which daily price movements are automatically compared. Tolerance thresholds are established by asset class. Prices found to be outside of the applicable tolerance threshold are reported and queried with vendors as described above.
For investment funds, TVA additionally performs its own analytical testing on the change in fair value measurements each period to ensure the valuations are reasonable based on changes in general market assumptions. TVA also performs pricing tests on various portfolios comprised of securities classified in Levels 1 and 2 on a quarterly basis to confirm accuracy of the values received from the investment portfolio trustee. For plan investments, TVARS reviews the trustee's Service Organization Controls report and the pricing policies of the trustee's largest pricing vendor.
Derivatives
TVA has historically entered into various derivative transactions, including commodity option contracts, forward contracts, swaps, swaptions, futures, and options on futures, to manage various market risks. Other than certain derivative instruments included in investment funds, it is TVA's policy to enter into these derivative transactions solely for hedging purposes and not for speculative purposes.
Currency and Interest Rate Derivatives. TVA has three currency swaps and four "fixed for floating" interest rate swaps. The currency swaps protect against changes in cash flows caused by volatility in exchange rates related to outstanding Bonds denominated in British pounds sterling. TVA uses interest rate swaps to fix variable short-term debt to a fixed rate. The currency and interest rate swaps are classified as Level 2 valuations as the rate curves and interest rates affecting the fair value of the contracts are based on observable data. The application of credit valuation adjustments ("CVAs") did not materially affect the fair value of these assets and liabilities at September 30, 2020.
Commodity Contracts . TVA enters into commodity contracts for coal and natural gas that require physical delivery of the contracted quantity of the commodity. During the fourth quarter of 2020, TVA discontinued derivative accounting for forward coal contracts because these contracts no longer meet the criteria of net settlement. As a result, the associated net derivative liabilities and regulatory assets have been derecognized. The natural gas derivative contracts are classified as Level 2 valuations based on market approaches which utilize short-term and mid-term market-quoted prices from an external industry brokerage firm. The application of CVAs did not materially affect the fair value of these assets and liabilities at September 30, 2020.
TVA maintains policies and procedures to value commodity contracts using what is believed to be the best and most relevant data available. In addition, TVA's risk management group reviews valuations and pricing data.
Fair Value Considerations
In determining the fair value of its financial instruments, TVA considers the source of observable market data inputs, liquidity of the instrument, credit risk, and risk of nonperformance of itself or the counterparty to the contract. The conditions and criteria used to assess these factors are described below.
Sources of Market Assumptions. TVA derives its financial instrument market assumptions from market data sources (e.g., CME and Moody's Investors Service, Inc. ("Moody's")). In some cases, where market data is not readily available, TVA uses comparable market sources and empirical evidence to derive market assumptions and determine a financial instrument's fair value.
Market Liquidity. Market liquidity is assessed by TVA based on criteria as to whether the financial instrument trades in an active or inactive market. A financial instrument is considered to be in an active market if the prices are fully transparent to the market participants, the prices can be measured by market bid and ask quotes, the market has a relatively high trading volume, and the market has a significant number of market participants that will allow the market to rapidly absorb the quantity of the assets traded without significantly affecting the market price. Other factors TVA considers when determining whether a market is active or inactive include the presence of government or regulatory control over pricing that could make it difficult to establish a market-based price upon entering into a transaction.
Nonperformance Risk. In determining the potential impact of nonperformance risk, which includes credit risk, TVA considers changes in current market conditions, readily available information on nonperformance risk, letters of credit, collateral, other arrangements available, and the nature of master netting arrangements. TVA is a counterparty to derivative instruments
78
Table of Contents
that subject TVA to nonperformance risk. Nonperformance risk on the majority of investments and certain exchange-traded instruments held by TVA is incorporated into the exit price that is derived from quoted market data that is used to value the investment.
Nonperformance risk for most of TVA's derivative instruments is an adjustment to the initial asset/liability fair value. TVA adjusts for nonperformance risk, both of TVA (for liabilities) and the counterparty (for assets), by applying a CVA. TVA determines an appropriate CVA for each applicable financial instrument based on the term of the instrument and TVA's or the counterparty's credit rating as obtained from Moody's. For companies that do not have an observable credit rating, TVA uses internal analysis to assign a comparable rating to the company. TVA discounts each financial instrument using the historical default rate (as reported by Moody's for CY 1983 to CY 2019) for companies with a similar credit rating over a time period consistent with the remaining term of the contract.
All derivative instruments are analyzed individually and are subject to unique risk exposures. The application of CVAs resulted in a less than $1 million decrease in the fair value of assets and a $1 million decrease in the fair value of liabilities at September 30, 2020.
Collateral . TVA's interest rate swaps and currency swaps contain contract provisions that require a party to post collateral (in a form such as cash or a letter of credit) when the party's liability balance under the agreement exceeds a certain threshold. See Note 15 — Risk Management Activities and Derivative Transactions — Other Derivative Instruments — Collateral for a discussion of collateral related to TVA's derivative liabilities.
New Accounting Standards and Interpretations
See Note 2 — Impact of New Accounting Standards and Interpretations for a discussion of recent accounting standards and pronouncements which were issued by the Financial Accounting Standards Board ("FASB"), became effective for TVA, or were adopted by TVA during the presented periods.
Legislative and Regulatory Matters
TVA continues to monitor how regulatory agencies are interpreting and implementing the provisions of the Dodd-Frank Wall Street Reform and Consumer Protection Act, which was enacted in July 2010. As a result, TVA has become subject to recordkeeping, reporting, and reconciliation requirements related to its derivative transactions. In addition, depending on how regulatory agencies interpret and implement the provisions, TVA's hedging costs may increase, and TVA may have to post additional collateral and margin in connection with its derivative transactions.
For additional discussion on legislative and regulatory matters, including a discussion of environmental legislation and regulation, see Item 1, Business — Environmental Matters, Item 1, Business — Regulation, and Item 7, Management's Discussion and Analysis of Financial Condition and Results of Operations — Key Initiatives and Challenges — Regulatory Compliance.
TVA does not engage, and does not control any entity that is engaged, in any activity listed under Section 13(r) of the Securities Exchange Act of 1934 (the "Exchange Act"), which requires certain issuers to disclose certain activities relating to Iran involving the issuer and its affiliates. Based on information supplied by each such person, none of TVA's directors and executive officers are involved in any such activities. While TVA is an agency and instrumentality of the U.S., TVA does not believe its disclosure obligations, if any, under Section 13(r) extend to the activities of any other departments, divisions, or agencies of the U.S.
Environmental Matters
See Item 1, Business — Environmental Matters, which discussion is incorporated by reference into this Item 7, Management's Discussion and Analysis of Financial Condition and Results of Operations.
Legal Proceedings
From time to time, TVA is a party to or otherwise involved in Legal Proceedings that have arisen in the ordinary course of conducting its activities, as a result of catastrophic events or otherwise. As of September 30, 2020, TVA had accrued approximately $14 million with respect to Legal Proceedings. No assurance can be given that TVA will not be subject to significant additional claims and liabilities. If actual liabilities significantly exceed the estimates made, TVA's results of operations, liquidity, and financial condition could be materially adversely affected.
For a discussion of certain current material Legal Proceedings, see Note 22 — Commitments and Contingencies — Legal Proceedings , which discussions are incorporated into this Item 7, Management's Discussion and Analysis of Financial Condition and Results of Operations .
79
Table of Contents
Risk Management Activities
TVA is exposed to various market risks. These market risks include risks related to commodity prices, investment prices, interest rates, currency exchange rates, inflation, and counterparty credit and performance risk. To help manage certain of these risks, TVA has entered into various derivative transactions, including commodity option contracts, forward contracts, swaps, swaptions, futures, and options on futures. Other than certain derivative instruments in its trust investment funds, it is TVA's policy to enter into these derivative transactions solely for hedging purposes and not for speculative purposes. See Note 15 — Risk Management Activities and Derivative Transactions .
Risk Governance
The Enterprise Risk Council ("ERC") is responsible for the highest level of risk oversight at TVA and is also responsible for communicating enterprise-wide risks with policy implications to the TVA Board or a designated TVA Board committee. The Enterprise Risk Council is comprised of the Enterprise Leadership Team ("ELT") and the Chief Risk Officer ("CRO") who acts as Chair. ERC members may invite additional attendees to meetings as non-voting participants. The ERC has also established subordinate committees, consisting of business unit leaders, to assist in the oversight of fuel and power procurement, DER programs and products, and general risk management.
TVA has a designated Enterprise Risk Management ("ERM") organization within its Financial Services organization responsible for (1) establishing enterprise risk management policies and guidelines, (2) developing an enterprise risk profile aligned with TVA's strategic objectives, (3) performing annual risk assessments across all TVA business units, (4) monitoring and reporting on identified enterprise risks and emerging risks, (5) facilitating enterprise risk discussions with the risk subject matter experts across the organization and at the ERC and TVA Board levels, and (6) developing and improving TVA's risk awareness culture. TVA has cataloged major short-term and long-term enterprise level risks across the organization. A discussion of significant risks is presented in Item 1A, Risk Factors.
Commodity Price Risk
TVA is exposed to effects of market fluctuations in the price of commodities that are critical to its operations, including electricity, coal, and natural gas. The magnitude of exposure to these risks is influenced by many factors including contract terms and market liquidity. TVA's commodity price risk is substantially mitigated by its cost-based rates, including its total fuel cost adjustment, and long-term fixed price commodity contracts.
TVA manages risk with commodity contracts for both coal and natural gas that require physical delivery of the contracted quantity. A hypothetical 10 percent decline in the market price of coal on September 30, 2019, would have resulted in a decrease of approximately $34 million in the fair value of TVA's coal derivative instruments at this date. TVA discontinued derivative accounting for forward coal contracts during the fourth quarter of 2020; therefore, a hypothetical 10 percent decline in the market price of coal on September 30, 2020, is not presented. A hypothetical 10 percent decline in the market price of natural gas on September 30, 2020 and 2019, would have resulted in decreases of approximately $84 million and $79 million, respectively, in the fair value of TVA's natural gas derivative instruments at these dates.
Investment Price Risk
TVA's investment price risk relates primarily to investments in TVA's NDT, ART, pension fund, SERP, and DCP.
Nuclear Decommissioning Trust. The NDT is generally designed to achieve a return in line with overall equity and debt market performance. The assets of the trust are invested in debt and equity securities, private partnerships, and certain derivative instruments including forwards, futures, options, and swaps, and through these investments the trust has exposure to U.S. equities, international equities, real estate investment trusts, natural resource equities, high-yield debt, domestic debt, U.S. Treasury Inflation-Protected Securities ("TIPS"), treasuries, private real assets, private equity, and private credit strategies. At September 30, 2020 and 2019, an immediate 10 percent decrease in the price of the investments in the trust would have reduced the value of the trust by $223 million and $211 million, respectively.
Asset Retirement Trust. The ART is presently invested to achieve a return in line with overall equity and debt market performance. The assets of the trust are invested in debt and equity securities, private partnerships, and certain derivative instruments including options, and through these investments the trust has exposure to U.S. equities, real estate investment trusts, natural resource equities, high-yield debt, domestic debt, TIPS, treasuries, private real assets, private equity, and private credit strategies. At September 30, 2020 and 2019, an immediate 10 percent decrease in the price of the investments in the trust would have reduced the value of the trust by $87 million and $77 million, respectively.
Due to higher volatility in the financial markets associated with the COVID-19 pandemic, TVA has experienced fluctuations related to its ART and NDT investment portfolio during 2020. The losses experienced during the three months ended March 31, 2020, have been recovered. For the year ended September 30, 2020, the NDT increased in value $123 million compared to the year ending September 30, 2019. Despite this volatility, TVA's NDT funding as of September 30, 2020, continues to be fully funded per the NRC funding requirements.
80
Table of Contents
Qualified Pension Plan . The TVARS asset allocation policy for qualified pension plan assets has targets of 40 percent equity including global public and private equity investments, 40 percent fixed income securities, and 20 percent real assets, including public and private real asset investments. TVARS has a long-term investment plan that contains a dynamic de-risking strategy which will allocate investments to assets that better match the liability, such as long duration fixed income securities, over time as improved funding status targets are met. Pursuant to the TVARS Rules and Regulations, any proposed changes in asset allocation that would change the system's assumed rate of investment return are subject to TVA's review and veto.
As set forth above, the qualified pension plan assets are invested across global public equity, private equity, safety oriented fixed income, opportunistic fixed income, public real assets, and private real assets. The TVARS asset allocation policy includes permissible deviations from these target allocations, and action can be taken, as appropriate, to rebalance the plan's assets consistent with the asset allocation policy. At September 30, 2020 and 2019, an immediate 10 percent decrease in the value of the net assets of the fund would have reduced the value of the fund by approximately $796 million and $798 million, respectively.
Supplemental Executive Retirement Plan . The SERP is a non-qualified defined benefit pension plan similar to those typically found in other companies in TVA's peer group and is provided to selected employees of TVA. TVA's SERP was created to recruit and retain key executives. The plan is designed to provide a competitive level of retirement benefits in excess of the limitations on contributions and benefits imposed by TVA's qualified defined benefit plan and Internal Revenue Code Section 415 limits on qualified retirement plans. The SERP currently targets an asset allocation policy for its plan assets of 64 percent equity securities, which includes U.S. and non-U.S. equities, and 36 percent fixed income securities. The SERP plan assets are presently invested to achieve a return in line with overall equity and debt market performance. At September 30, 2020 and 2019, an immediate 10 percent decrease in the value of the SERP investments would have reduced the value of the investments by $7 million and $6 million, respectively.
Deferred Compensation Plan. The DCP is designed to provide participants with the ability to defer compensation to future periods. The plan assists in the recruitment of top executive talent for TVA. As in other corporations, deferred compensation can be an integral part of a total compensation package. Assets currently include deferral balances. The default return on investment of the accounts is interest calculated based on the composite rate of all marketable U.S. Treasury issues. Executives may alternatively choose to have their balances adjusted based on the return of certain mutual funds. At both September 30, 2020 and 2019, an immediate 10 percent decrease in the value of the deferred compensation accounts would have reduced the value of the accounts by $3 million.
Interest Rate Risk
TVA's interest rate risk is related primarily to its short-term investments, short-term debt, long-term debt, and interest rate derivatives.
Investments. At September 30, 2020, TVA had $500 million of cash and cash equivalents, and the average balance of cash and cash equivalents for 2020 was $637 million. The average interest rate that TVA received on its short-term investments during 2020 was less than one percent. If the rates of interest that TVA received on its short-term investments during 2020 were zero percent, TVA would have received approximately $4 million less in interest from its short-term investments. At September 30, 2019, TVA had $299 million of cash and cash equivalents, and the average balance of cash and cash equivalents for 2019 was $336 million. The average interest rate that TVA received on its short-term investments during 2019 was 2.40 percent. If the rates that TVA received on its short-term investments during 2019 were 1.40 percent, TVA would have received approximately $3 million less in interest from its short-term investments. In addition to affecting the amount of interest that TVA receives from its short-term investments, changes in interest rates could affect the value the investments in its pension plan, ART, NDT, SERP, and DCP. See Risk Management Activities — Investment Price Risk above.
Short-Term Debt . At September 30, 2020, TVA's short-term borrowings were $57 million, and the current maturities of long-term debt were $1.8 billion. Based on TVA's interest rate exposure at September 30, 2020, an immediate one percentage point increase in interest rates would have resulted in an increase of $19 million in TVA's short-term interest expense. At September 30, 2019, TVA's short-term borrowings were $922 million, and the current maturities of long-term debt were $1.1 billion. Based on TVA's interest rate exposure at September 30, 2019, an immediate one percentage point increase in interest rates would have resulted in an increase of $20 million in TVA's short-term interest expense.
Long-Term Debt. At September 30, 2020 and 2019, the interest rates on all of TVA's outstanding long-term debt were fixed (or subject only to downward adjustment under certain conditions). Accordingly, an immediate one percentage point increase in interest rates would not have affected TVA's interest expense associated with its long-term debt. When TVA's long-term debt matures or is redeemed, however, TVA typically refinances debt in whole or in part by issuing additional debt. Accordingly, if interest rates are high when TVA issues this additional debt, TVA's cash flows, results of operations, and financial condition may be adversely affected. This risk is somewhat mitigated by the fact that TVA's debt portfolio is diversified in terms of maturities and has a long average life. At September 30, 2020 and 2019, the average life of TVA's debt portfolio was 15.3 years and 16.1 years, respectively. At September 30, 2020 and 2019, the average interest rate of TVA's debt portfolio was 4.56 percent and 4.65 percent, respectively. See Note 13 — Debt and Other Obligations — Debt Outstanding for a schedule of TVA's debt maturities.
81
Table of Contents
Interest Rate Derivatives. Changes in interest rates also affect the mark-to-market valuation of TVA's interest rate derivatives. See Note 15 — Risk Management Activities and Derivative Transactions — Derivatives Not Receiving Hedge Accounting Treatment — Interest Rate Derivatives . TVA had four interest rate swaps outstanding at September 30, 2020 and September 30, 2019. Net unrealized gains and losses on these instruments are reflected on TVA's Consolidated Balance Sheets in a regulatory asset account, and realized gains and losses are reflected in earnings. Based on TVA's interest rate exposure at September 30, 2020 and 2019, an immediate one-half percentage point decrease in interest rates would have increased the interest rate swap liabilities by $270 million and $253 million, respectively.
London Interbank Offered Rate . TVA has four "fixed for floating" interest rate swaps related to outstanding Bonds, and receives periodic payments under these swaps based on the floating London Interbank Offered Rate ("LIBOR") benchmark rate. TVA may also have additional contracts that could be impacted. LIBOR is expected to be discontinued after 2021. Various alternatives for LIBOR are being evaluated by market participants, with the Secured Overnight Financing Rate being the most widely-adopted alternative thus far. TVA may face risks related to the viability of an alternative benchmark over the remaining terms of its current contracts, or over the terms of any future contracts that rely on the benchmark rate.
Currency Exchange Rate Risk
Over the next several years, TVA plans to spend a significant amount of capital on clean air projects, capacity expansion, and other projects. A portion of this amount may be spent on contracts that are denominated in one or more foreign currencies. Additionally, TVA's three issues of Bonds denominated in British pounds sterling are hedged by currency swap agreements. The value of the U.S. dollar compared with other currencies has fluctuated widely in recent years, including fluctuations in the U.S. dollar to British pound sterling exchange rate primarily driven by the "BREXIT" vote for the United Kingdom to leave the European Union. If not effectively managed, foreign currency exposure could negatively impact TVA's counterparty risk, cash flows, results of operations, and financial condition.
Text extracted from the filing as submitted to EDGAR. Formatting, tables and exhibits are simplified for reading; the original document is authoritative for anything you rely on.