−Removed: In 2018, the SEC adopted amendments to the disclosure requirements for mining properties.
−Removed: Effective for fiscal years beginning on or after January 1, 2021, the disclosure requirements under the SEC’s Industry Guide 7 (“IG7”) have been replaced with new disclosure requirements under SK1300.
−Removed: The property disclosures in this Item 2 are presented in accordance with SK1300 subject to certain exemptions contained in the rule.
−Removed: This Item 2 provides summary information about our overall portfolio of stream and royalty interests, as well as more detailed information about our material properties.
−Removed: Royal Gold management periodically reviews the materiality of individual royalty and stream interests within our portfolio.
−Removed: As of December 31, 2023, we determined that six of our stream and royalty interests are material to our business under SK1300:
−Removed: Andacollo, Cortez, Khoemac a u, Mount Milligan, Peñasquito and Pueblo Viejo.
+Added: This Item 2 provides summary information about our portfolio of stream and royalty interests, as well as more detailed information about our material stream and royalty interests.
+Added: Principal Properties
+Added: Royal Gold management periodically reviews the materiality of individual stream and royalty interests within our portfolio.
+Added: As of December 31, 2024, we determined that four of our stream and royalty interests are material to our business or financial condition:
+Added: Andacollo, Cortez, Mount Milligan, and Pueblo Viejo.
We sometimes refer to these properties as our material, or principal, properties.
−Removed: In making this determination, management considers primarily estimated future revenue and, to a lesser extent, historical revenue.
−Removed: Estimated future revenue is based on several factors, including mineral reserves and resources subject to our stream and royalty interests, production estimates, feasibility studies, technical reports, metal price and mine life assumptions.
−Removed: Under SK1300, disclosures of material mineral reserves and resources must be based on a technical report summary prepared by a qualified person, absent an exemption.
−Removed: With respect to our material properties, our disclosures in this Item 2 are based on information provided to us by the operators of the properties or the operators’ public filings with the SEC or Canadian securities regulators including technical reports filed with Canadian securities administrators pursuant to National Instrument 43-101 (“NI 43-101”), 2014 Canadian Institute of Mining, Metallurgy and Petroleum Definition Standards and 2019 Best Practice Guideline (“CIM Standards”) and a technical report prepared under the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (“JORC Code”).
−Removed: As of the date of this disclosure, these operators of our material properties have not filed technical report summaries for the properties with the SEC for the year ended December 31, 2023.
−Removed: We are a stream and royalty company, and as further discussed below, we are relying on the exemption for stream and royalty companies set forth in Section 1302(b)(3)(i) and (ii) of Regulation S-K, which provides that a stream, royalty or similar company is not required to file a technical report summary with the SEC with respect to an underlying property where the producing mining registrant has filed a current technical report summary for the property or either (a) obtaining the information would result in an unreasonable burden or expense, or (b) the company requested the technical report summary from the owner, operator or other person possessing the technical report summary who denied the request.
−Removed: Our summary and individual property disclosures are also provided in accordance with Sections 1303(a)(3) and 1304(a)(2) of
−Removed: Regulation S-K, respectively, which provide that a registrant with a stream, royalty or other similar right may omit certain information required by the summary and individual property disclosure requirements if the registrant specifies the information to which it lacks access, explains the reason it lacks the required information and provides all required information that it does possess or which it can acquire without incurring an unreasonable burden or expense.
−Removed: Our agreements governing our material property interests do not require the operators to prepare technical report summaries or permit us the access and information sufficient to prepare our own technical report summaries under SK1300.
−Removed: For each of our material properties for which the operator has not filed a current technical report summary under SK1300, we requested that the operator prepare a technical report summary under SK1300 or permit us the access and information necessary for us to prepare our own technical report summary relating to the property for filing with the SEC.
+Added: In making this determination, management considers primarily the relative contribution of estimated future revenue and, to a lesser extent, historical revenue to our portfolio from each property.
+Added: Estimated future revenue is based on several factors, including mineral resources and mineral reserves subject to our stream and royalty interests, production estimates, feasibility studies, technical reports, metal prices, and mine life assumptions.
+Added: Mineral Resources and Mineral Reserves
+Added: Under S-K 1300, disclosure of mineral resources and mineral reserves must be based on and accurately reflect information and supporting documentation prepared by a “qualified person,” as such term is defined in S-K 1300.
+Added: A registrant is responsible for determining that a person meets the qualifications specified under the definition of qualified person and that the disclosure in the registrant’s filing accurately reflects the information provided by the qualified person.
+Added: As a stream and royalty company, we have limited access to and information regarding the properties in which we hold interests, and because of these limitations, qualified persons acting on behalf of the Company are not able to arrive at sufficient findings and conclusions, or prepare adequate supporting documentation, for us to disclose mineral resources or mineral reserves under the standards for disclosure established by S-K 1300 for any of the properties in which we hold
+Added: In addition, based on guidance from the staff of the SEC, we are not able to rely on disclosure of mineral resources and mineral reserves by the operators of the properties as a basis for our disclosure of mineral resources and mineral reserves under S-K 1300 because such disclosure does not constitute “required information” within the meaning of Item 1303(a)(3)(iii) or Item 1304(a)(2)(iii) of Regulation S-K, and the staff of the SEC further interprets S-K 1300 to preclude in SEC filings the supplemental disclosure of mineral resources and mineral reserves that do not satisfy the standards for disclosure established by S-K 1300.
+Added: As a result, we are unable to disclose mineral resources and mineral reserves for the properties in which we hold stream and royalty interests in our filings with the SEC.
+Added: However, we provide disclosure of resources and reserves for the properties in which we hold such interests, as provided to us by the operators or publicly disclosed by the operators, on our website at www.royalgold.com.
+Added: The information on our website is not part of this or any other report filed with or furnished to the SEC.
+Added: Sources of Information
+Added: Our disclosures in this Item 2 are based on information provided to us by the operators of the properties or disclosed by the operators in their public filings with the SEC or Canadian securities regulators, including technical reports filed with Canadian securities administrators pursuant to National Instrument 43-101 (“NI 43-101”), and the 2014 Canadian Institute of Mining, Metallurgy and Petroleum Definition Standards and 2019 Best Practice Guideline (“CIM Standards”).
+Added: We are providing this information because it represents information that we have in our possession and that we believe is responsive to the disclosure obligations set forth in S-K 1300.
+Added: In some cases, we refer to information for our principal properties as of periods earlier than December 31, 2024 because the operators did not yet disclose more current information by the time we finalized this report.
+Added: Newmont Corporation (“Newmont”), a party to joint ventures with Barrick Gold Corporation (“Barrick”) on each of Pueblo Viejo and the mining operations operated by Nevada Gold Mines LLC, a joint venture between Barrick and Newmont with respect to their Nevada operations, which includes Cortez, has filed technical report summaries prepared under S-K 1300 for each of Pueblo Viejo and the Nevada Gold Mines operations.
+Added: Such technical report summaries, while providing important information about the properties, do not provide information sufficient for qualified persons acting on behalf of the Company to be able to arrive at sufficient findings and conclusions, or prepare adequate supporting documentation, for us to disclose mineral resources or mineral reserves for such properties under the standards for disclosure established by S-K 1300 (see “Mineral Resources and Mineral Reserves” above).
+Added: Pueblo Viejo and Cortez are our only principal properties for which technical report summaries have been prepared by the operators under S-K 1300.
+Added: For our other principal properties, we requested that the operators prepare technical report summaries under S-K 1300 or permit us the access and information necessary for us to prepare our own technical report summaries for filing with the SEC.
In each case, the operator denied our request.
None of the operators is an affiliate of Royal Gold.
−Removed: As a result, we do not have sufficient rights or access to the information required for us to prepare a technical report summary for such properties.
−Removed: Mineral resources and mineral reserves discussed in Item 2 are as publicly disclosed or provided to us by the operators of the properties, as of the dates indicated in the disclosure.
−Removed: We do not attempt to account for mineral resource or mineral reserve depletion due to mining activities, nor for mineral resource or mineral reserve expansion due to exploration activities, because we do not have access under our agreements with our operators to the technical data required to account for this depletion or expansion.
−Removed: In accordance with Sections 1303(a)(3) and 1304(a)(4) of SK1300, we are providing all required information in our possession or which we can acquire without incurring an unreasonable burden or expense.
−Removed: The property information included herein contains information reported by our operators in their respective jurisdictions pursuant to SK1300, or applicable mining codes based on the Committee for Mineral Reserves International Reporting Standards (“CRIRSCO”), such as JORC Code and NI 43-101.
−Removed: The SEC’s disclosure regime under SK1300, while similar to other CRIRSCO-based codes used in other jurisdictions, does not permit the substitution or reciprocal recognition of resources and reserves determined under the mining disclosure regimes of other jurisdictions.
−Removed: We are providing this information because it represents information that we have in our possession that we consider to be material to our investors.
−Removed: While SK1300 definitions are substantially similar to those set forth in the CIM and JORC Code, there are variations.
−Removed: Therefore, the mineral resources, mineral reserves and other technical information included in this annual report on Form 10-K could vary if it had been determined by a mining operator required to comply with SK1300.
−Removed: Most of our principal properties are operated by companies that report mineral resources and reserves pursuant to regulatory standards other than SK1300.
−Removed: For example, Barrick as operator of each of Pueblo Viejo and Cortez, Teck Resources Limited (“Teck”) as operator of Andacollo, and Centerra as operator of Mount Milligan, as reporting companies under Canadian securities laws, are permitted under SK1300 to rely on Canadian property and mineral resource and reserve reporting standards required in their home jurisdiction (NI 43-101 in Canada), rather than those set forth in SK1300, under the SEC’s Multijurisdictional Disclosure System.
−Removed: Further, Canadian securities laws and regulations allow annual information forms covering the previous fiscal year to be filed within 90 days (or 120 days in some instances) after the applicable company’s fiscal year end.
−Removed: Khoemac a u is privately owned and is also not subject to SEC reporting.
−Removed: Newmont Corporation (“Newmont”), operator of Peñasquito and a party to a joint venture with Barrick on each of Pueblo Viejo and Nevada operations that include Cortez, has filed technical report summaries prepared under SK1300 for each of Peñasquito, Pueblo Viejo and the Nevada operations.
−Removed: Peñasquito, Pueblo Viejo and Cortez are our only principal properties for which property and technical reports are prepared under SK1300.
−Removed: Newmont’s annual report on Form 10-K is subject to the same deadline as this Form 10-K, and thus any new or updated technical report summaries are not filed in time for us to refer to them in this Form 10-K.
−Removed: As a result of the foregoing, in most cases, we refer to mineral resource and reserve information for our principal properties as of periods earlier than December 31, 2023, in reliance on the exception to SK1300 pertaining to royalty companies regarding information they do not have under 1302(b)(3), 1303(a)(3) and 1304(a)(2) of SK1300 as discussed above.
−Removed: Any references in this report to the technical report summaries or other information publicly disclosed by the operators of the properties shall not be deemed to incorporate such information by reference into this report or any future filing under the Securities Act of 1933, as amended, or Securities Exchange Act of 1934, as amended, except to the extent that the Company specifically incorporates such information by reference.
−Removed: Internal controls for determining and reporting the mineral resources and mineral reserves disclosed in Item 2 are the internal controls specific to the individual projects and are maintained by the operators.
−Removed: In general, mineral resources and
−Removed: mineral reserves are supported by technical studies relevant to the jurisdictions within which the operators conduct their financial disclosure, and qualified persons specified by the operators (as determined by the laws and disclosure rules in the applicable jurisdictions) have endorsed the quality of the work.
−Removed: Royal Gold’s agreements with its operators do not give Royal Gold access to underlying technical data sufficient to specifically confirm the opinion of the qualified persons for each mineral resource or mineral reserve or the status of the qualified persons as qualified persons under SK1300.
+Added: Any references in this report to the technical reports, technical report summaries, or other information publicly disclosed by the operators of the properties subject to our stream and royalty interests shall not be deemed to incorporate such information by reference into this report or any future filing under the Securities Act of 1933, as amended, or Securities Exchange Act of 1934, as amended, except to the extent that the Company specifically incorporates such information by reference.
+Added: Omission of Certain Information
+Added: While S-K 1300 generally requires registrants that hold royalty, streaming, or other similar rights to provide the same disclosure regarding properties as the operators of the properties, S-K 1300 also provides certain accommodations to registrants that hold royalty, streaming, or other similar rights.
+Added: We rely on the accommodations set forth in Item 1303(a)(3) and Item 1304(a)(2) of Regulation S-K to omit information required under Items 1303 and 1304 to which we lack access, and in accordance with Item 1303(a)(3) and Item 1304(a)(2) of Regulation S-K, we (i) specify the information to which we lack access, (ii) explain that we do not have access to the required information because obtaining the information would result in an unreasonable burden or expense or we requested the information from the applicable operator and our request was denied, and (iii) provide all required information that we do possess or can acquire without incurring an unreasonable burden or expense.
+Added: Absent an exemption, a registrant must obtain a dated and signed technical report summary from a qualified person identifying and summarizing the information reviewed and conclusions reached by the qualified person about the mineral resources or mineral reserves determined to be on each material property.
+Added: As noted above, we do not have sufficient access and information for qualified persons acting on behalf of the Company to arrive at sufficient findings and conclusions, or prepare adequate supporting documentation, for us to disclose mineral resources or mineral reserves under the standards for
+Added: disclosure established by S-K 1300 for any of the principal or other properties in which we hold stream or royalty interests, and accordingly, we have not sought to obtain dated and signed technical report summaries from qualified persons pursuant to Item 1302(b)(1) of Regulation S-K.
+Added: Applicable Internal Controls
+Added: We have in place procedures to gather certain limited information from operators concerning the properties over which we hold stream and royalty interests, including reviewing operator reports (mostly consisting of public filings by the operators, in most cases under foreign reporting regimes and not pursuant to S-K 1300), reviewing information provided to us by the operators under the terms of our stream or royalty agreements, and, in some cases, discussing the properties with operator personnel and reviewing information gained from site visits.
+Added: As noted above under “Mineral Resources and Mineral Reserves,” we do not disclose mineral resources and mineral reserves pursuant to S-K 1300 for the properties with respect to which we hold stream and royalty interests.
+Added: In addition, we do not engage in exploration efforts on those or any other properties.
+Added: As such, we do not use internal controls in any exploration and mineral resource and reserve estimation efforts within the meaning of Item 1305 of Regulation S-K.
We own a large portfolio of stream and royalty interests on properties at various stages of review and development.
1 unchanged sentence
In many cases, properties shown on the map are in close proximity and the individual properties are not separately identifiable.
−Removed: Aggregate annual production for all properties on which we hold interests during the years ended December 31, 2023, and 2022, the six months ended December 31, 2021, and fiscal year ended June 30, 2021 is shown in the table below.
−Removed: Six Months Ended
−Removed: Fiscal Year Ended
−Removed: Mount Milligan
+Added: Aggregate annual production for all properties on which we hold interests during the years ended December 31, 2024, 2023 and 2022, is shown in the table below.
+Added: The reported production relates to the amount of stream metal sales and sales
+Added: attributable to our royalty interests and may differ from the operators' public reporting due to a number of factors, including timing of the operator's concentrate shipments, the delivery of metal to us and our subsequent sale of the delivered metal.
+Added: Stream Metal December 31,
+Added: 2024 December 31,
+Added: 2023 December 31,
+Added: Mount Milligan Gold (oz) 164,248 165,844 193,696
+Added: Copper (lb) 63,066,689 62,985,699 78,742,419
+Added: Andacollo Gold (oz) 20,049 25,455 26,150
+Added: Pueblo Viejo Gold (oz) 332,184 360,931 442,592
+Added: Silver (oz) 1,151,253 1,362,568 1,622,221
+Added: Other Gold (oz) 495,446 503,390 470,167
+Added: Other Silver (oz) 1,751,266 1,937,089 1,322,674
+Added: Cortez Gold (oz) 720,135 890,702 414,117
+Added: Silver (oz) 87,690 105,836 126,792
+Added: Other Gold (oz) 2,428,155 1,905,190 2,549,930
+Added: Other Silver (oz) 35,152,754 19,538,810 32,554,090
+Added: Other Copper (lb) 203,990,454 173,165,799 207,707,394
+Added: Other Nickel (lb) 37,912,955 27,753,538 50,797,143
+Added: Other Lead (lb) 212,854,866 106,938,075 146,789,281
+Added: Other Zinc (lb) 544,744,965 222,457,704 373,148,732
Location of the Properties
−Removed: Approximately 80% of our revenue comes from properties outside of the United States, and most of our operators are organized outside of the United States.
−Removed: Our material properties are located in Botswana, Canada, Chile, the Dominican Republic, Mexico and the United States.
+Added: Approximately 83% of our revenue for the year ended December 31, 2024 came from properties outside of the United States, and most of our operators are organized outside of the United States.
+Added: Our material properties are located in Canada, Chile, the Dominican Republic, and the United States.
Type and Amount of Ownership Interests
A metal stream is a purchase agreement that provides, in exchange for an upfront deposit payment, the right to purchase all or a portion of one or more metals produced from a mine, at a price determined for the life of the transaction by the purchase agreement.
−Removed: See “Certain Definitions” in Item 1.
−Removed: Business for more information.
+Added: See “Certain Definitions” in Item 1, Business, for more information.
Royalties are non-operating interests in mining projects that provide the right to a percentage of revenue or metals produced from the project after deducting specified costs, if any.
−Removed: See “Certain Definitions” in Item 1.
−Removed: Business for more information.
−Removed: As of December 31, 2023, we owned 9 stream interests and 169 royalty interests.
+Added: See “Certain Definitions” in Item 1, Business, for more information.
+Added: As of December 31, 2024, we owned nine stream interests and 166 royalty interests.
Identity of Operator or Operators
−Removed: We work with 134 different operators at our stream and royalty properties;
−Removed: 64 are headquartered in Canada, 23 are headquartered in the United States, and 47 are headquartered outside of Canada and the United States.
+Added: We work with 132 different operators among our stream and royalty properties;
+Added: of these 65 are headquartered in Canada, 21 are headquartered in the United States, and 46 are headquartered outside of Canada and the United States.
In general, our operators are domiciled in the countries in which they operate.
1 unchanged sentence
Titles, Mineral Rights, Leases, or Options and Acreage Involved
−Removed: The titles, mineral rights, leases, and options involved with our stream and royalty interests vary depending on the country and include exploitation concessions, unpatented and patented mining claims, fee lands, mining leases and prospecting
−Removed: and mining licenses.
+Added: The titles, mineral rights, leases, and options involved with our stream and royalty interests vary depending on the country and include exploitation concessions, unpatented and patented mining claims, fee lands, mining leases and prospecting and
+Added: mining licenses.
For information about the specific titles, mineral rights, leases, options and acreages involved at our material properties, refer to the section entitled “Material Properties” below.
1 unchanged sentence
Stage of the Properties (Exploration, Development, or Production)
−Removed: SK1300 subdivides mineral properties into 3 stages.
+Added: S-K 1300 subdivides mineral properties into three stages.
Production stage properties
4 unchanged sentences
Exploration stage properties, for which no mineral resources have been declared.
−Removed: As of December 31, 2023, we owned stream interests on 8 production stage properties and 1 development stage property.
+Added: As of December 31, 2024, we owned stream interests on seven production stage properties and two development stage properties.
As of December 31, 2024, we owned royalty interests on 35 production stage properties, 16 development stage properties, and 115 exploration stage properties, of which we consider 50 to be evaluation stage properties.
Key Permit Conditions
−Removed: Operators of the mines that are subject to our stream and royalty interests must comply with environmental, mine safety, land use, water use, waste disposal, remediation and public health laws and regulations promulgated by federal, state, provincial and local governments in the United States, Canada, Chile, the Dominican Republic, Mexico, Botswana, and other countries where we hold interests.
+Added: Operators of the mines that are subject to our stream and royalty interests must comply with environmental, mine safety, land use, water use, waste disposal, remediation and public health laws and regulations promulgated by federal, state, provincial and local governments in the United States, Canada, Chile, the Dominican Republic, and other countries where we hold interests.
Although we, as a stream or royalty interest owner, are not responsible for ensuring compliance with these laws and regulations, failure by the operators to comply with applicable laws, regulations and permits can result in injunctive action, orders to suspend or cease operations, damages, and civil and criminal penalties on the operators, which could have a material adverse effect on our results of operations and financial condition.
−Removed: We have no decision-making authority regarding the development or operation of the mineral properties underlying our stream and royalty interests.
+Added: In general, we have no decision-making authority regarding the development or operation of the mineral properties underlying our stream and royalty interests.
Operators make all or substantially all development and operating decisions, including decisions about permitting, feasibility analysis, mine design and operation, processing, tailings storage facility (“TSF”) design and operation, plant and equipment matters, and temporary or permanent suspension of operations, as well as estimates of resources and reserves.
3 unchanged sentences
Table 1 Mine Type and Mineralization Style for Principal Properties
−Removed: Mineralization styles
−Removed: Porphyry Cu-Au
−Removed: Open Pit & Underground
−Removed: Carlin-Type Sediment-Hosted Au
−Removed: Sediment-Hosted Cu-Ag
−Removed: Mount Milligan
−Removed: Porphyry Cu-Au
−Removed: Breccia-Hosted Pb-Zn-Au-Ag
−Removed: High-Sulfidation Epithermal Au-Ag
−Removed: Chemical symbols are used to refer to metals of economic importance:
−Removed: gold (“Au”), silver (“Ag”), copper (“Cu”), lead (“Pb”), and zinc (“Zn”).
+Added: Property Mine Type Mineralization styles
+Added: Andacollo Open Pit Porphyry copper-gold
+Added: Cortez Open Pit & Underground Carlin-Type Sediment-Hosted gold
+Added: Mount Milligan Open Pit Porphyry copper-gold
+Added: Pueblo Viejo Open Pit High-Sulfidation Epithermal gold-silver
Additional specific information on the Principal Properties is available in the section entitled “Material Properties”, below.
5 unchanged sentences
Table 2 Key Process Infrastructure for Principal Properties
−Removed: 20.1 million tonne per annum (“Mtpa”) sulfide flotation mill producing a copper-gold concentrate
−Removed: Heap leach facilities for low grade oxide ore, 4.9 Mtpa carbon-in-leach (CIL) mill for medium and high grade oxide ore, and offsite processing of refractory ores by roaster and autoclave.
−Removed: Producing gold and silver doré
−Removed: 3.65 Mtpa sulfide flotation mill producing a copper-silver concentrate
−Removed: Mount Milligan
−Removed: 21.9 Mtpa sulfide flotation mill producing a single concentrate containing copper, gold and silver
−Removed: 39 Mtpa sulfide flotation plant producing separate lead and zinc concentrates and gold and silver doré from a pyrite leach circuit and from oxide ore dump leaching.
−Removed: The flotation plant has operated in the range of 35 to 36 Mtpa in recent years.
−Removed: 14 Mtpa whole ore and flotation pressure oxidation and cyanide leaching plant producing separate gold and silver doré products
−Removed: Measurement units presented in this document are generally metric units, with the exception that gold and silver quantities are reported in troy ounces and the content for copper, lead, and zinc are presented in pounds.
+Added: Property Processing
+Added: Andacollo 20.1 million tonne per annum (“Mtpa”) sulfide flotation mill producing a copper-gold concentrate
+Added: Cortez 4.90 Mtpa cyanide leaching mill along with heap leaching facilities for lower-grade, oxide gold ores and offsite processing of refractory ores, producing a gold-silver doré
+Added: Mount Milligan 21.9 Mtpa sulfide flotation mill producing a single concentrate containing copper, gold and silver
+Added: Pueblo Viejo 14 Mtpa whole ore and flotation pressure oxidation and cyanide leaching plant producing a gold and silver doré
+Added: Measurement units presented in this report are generally metric units, with the exception that gold and silver quantities are reported in troy ounces and the content for copper is presented in pounds.
There may be small rounding differences due to unit conversions.
−Removed: Additional specific information on the principal properties is available under Material Properties, below.
−Removed: Mineral Resources and Reserves
−Removed: Royal Gold controls metal streams and royalties for properties with a broad geographic distribution.
−Removed: Estimates of mineral resources and mineral reserves for these properties are tabulated based on the most recent disclosure presented by each of the individual operators of these properties, at dates and metal prices and grade and recovery assumptions specific to each mineral resource and mineral reserve estimate.
−Removed: It is not possible for Royal Gold to update or modify the individual mineral resource and mineral reserve statements because we do not have access to sufficient technical data required to do so.
−Removed: Table 3 is a summary of mineral resources exclusive of mineral reserves and aggregated by metal and by geographic area.
−Removed: Table 4 is a summary of mineral reserves aggregated by metal and by geographic area.
−Removed: Our material properties (Andacollo, Cortez, Khoemac a u, Mount Milligan, Peñasquito and Pueblo Viejo) and properties with mineral resources and mineral reserves that represent over 10% of the aggregate mineral resources or reserves that generate our stream or royalty interests (Red Chris) are listed individually.
−Removed: Mineral resources and mineral reserves are presented for the properties or portions of the properties that generate our stream and royalty interests without regard to the specific percentage of Royal Gold’s stream and royalty interest.
−Removed: In cases where our stream or royalty interest covers only a portion of a property, only the covered portion of the mineral resource or mineral reserve is included in the summary.
−Removed: Summary Mineral Resources (1),(2),(3),(4)
−Removed: Measured Mineral
−Removed: Indicated Mineral
−Removed: Indicated Mineral
−Removed: Inferred Mineral
−Removed: GOLD RESOURCES
−Removed: North America
−Removed: Red Chris (5)
−Removed: Mount Milligan
−Removed: 35% of payable gold
−Removed: Remainder of North America
−Removed: North America Total
−Removed: Central America
−Removed: 7.5% of payable gold
−Removed: Remainder of Central America
−Removed: Central America Total
−Removed: South America
−Removed: 100% of payable gold
−Removed: Remainder of South America
−Removed: South America Total
−Removed: Australia Total
−Removed: TOTAL GOLD RESOURCES
−Removed: SILVER RESOURCES
−Removed: North America
−Removed: Remainder of North America
−Removed: North America Total
−Removed: Central America
−Removed: 75% of payable silver
−Removed: Remainder of Central America
−Removed: Central America Total
−Removed: South America
−Removed: South America Total
−Removed: 100% of payable silver
−Removed: Remainder of Africa
−Removed: Australia Total
−Removed: TOTAL SILVER RESOURCES
−Removed: COPPER RESOURCES
−Removed: North America
−Removed: Mount Milligan
−Removed: 18.75% payable copper
−Removed: Red Chris (5)
−Removed: Remainder of North America
−Removed: North America Total
−Removed: Central America
−Removed: Central America Total
−Removed: South America
−Removed: South America Total
−Removed: Australia Total
−Removed: TOTAL COPPER RESOURCES
−Removed: The dates of the mineral resources range between December 31, 2014, and December 31, 2023.
−Removed: The information included in this table that relates to our material properties is dated December 31, 2022, except for Mount Milligan, Cortez and Pueblo Viejo, which are dated December 31, 2023.
−Removed: The metal prices for the gold resources range between $1,100 per ounce and $2,000 per ounce;
−Removed: the metal prices for the silver resources range between $17.00 per ounce and $25.00 per ounce;
−Removed: and the metal prices for the copper resources range between $2.50 per pound and $4.00 per pound.
−Removed: The metal prices, recoveries, and cut-off grades used for reporting of mineral resources are specific to each individual property and have been reviewed by qualified persons selected by the individual operators.
−Removed: Royal Gold has not made any determination that such persons are or are not “qualified persons” under SK1300.
−Removed: In certain cases, due to reporting constraints, we have omitted mineral resource information for properties other than our material properties.
−Removed: While the aggregate resources at Red Chris represent more than 10% of the aggregate mineral resources to which our royalty or stream interests apply, Royal Gold’s royalty interest in Red Chris is only a 1% NSR.
−Removed: Accordingly, we do not consider Red Chris to be a material property.
−Removed: Royal Gold owns multiple royalty interests at the Cortez Complex, some of which overlap.
−Removed: For purposes of simplified disclosure, Royal Gold has divided its royalty interests at the Cortez Complex into two zones:
−Removed: the Legacy Zone and the Cortez Complex Zone (the “CC Zone”).
−Removed: The “Legacy Zone” royalty consists of an approximate equivalent 9.4% GSR royalty rate over the Pipeline and Crossroads deposits.
−Removed: The CC Zone includes an approximate equivalent 1.6% GSR royalty over the Cortez Hills, Cortez Pits, Fourmile and Goldrush deposits, an approximate equivalent 2.2% GSR royalty rate over the Goldrush SE deposit, and a 0.45% GSR royalty rate over the Robertson deposit.
−Removed: Royal Gold owns royalty and stream interests in varying percentages on these properties.
−Removed: The resources listed are 100% of the resources to which the stream or royalty interest applies.
−Removed: Summary Mineral Reserves (1),(2),(3),(4)
−Removed: Proven Mineral
−Removed: Probable Mineral
−Removed: Total Mineral
−Removed: GOLD RESERVES
−Removed: North America
−Removed: Red Chris (5)
−Removed: Mount Milligan
−Removed: 35% of payable gold
−Removed: Remainder of North America
−Removed: North America Total
−Removed: Central America
−Removed: 7.5% of payable gold
−Removed: Remainder of Central America
−Removed: Central America Total
−Removed: South America
−Removed: 100% of payable gold
−Removed: Remainder of South America
−Removed: South America Total
−Removed: Australia Total
−Removed: TOTAL GOLD RESERVES
−Removed: SILVER RESERVES
−Removed: North America
−Removed: Remainder of North America
−Removed: North America Total
−Removed: Central America
−Removed: 75% of payable silver
−Removed: Remainder of Central America
−Removed: Central America Total
−Removed: South America
−Removed: South America Total
−Removed: 100% of payable silver
−Removed: Remainder of Africa
−Removed: Australia Total
−Removed: TOTAL SILVER RESERVES
−Removed: COPPER RESERVES
−Removed: North America
−Removed: Mount Milligan
−Removed: 18.75% payable copper
−Removed: Red Chris (5)
−Removed: Remainder of North America
−Removed: North America Total
−Removed: Central America
−Removed: Central America Total
−Removed: South America
−Removed: South America Total
−Removed: Australia Total
−Removed: TOTAL COPPER RESERVES
−Removed: The dates of the mineral reserves range between December 31, 2016, and December 31, 2023.
−Removed: The information included in this table that relates to our material properties is dated December 31, 2022, except for Mount Milligan, Cortez and Pueblo Viejo, which are dated December 31, 2023.
−Removed: The metal prices for the gold reserves range between $1,100 per ounce and $1,850 per ounce;
−Removed: the metal prices for the silver reserves range between $17.00 per ounce and $23.00 per ounce;
−Removed: and the metal prices for the copper reserves range between $2.50 per pound and $3.61 per pound.
−Removed: The metal prices and modifying factors used for reporting of mineral reserves are specific to each individual property and have been reviewed by qualified persons selected by the individual operators.
−Removed: Royal Gold has not made any determination that such persons are or are not “qualified persons” under SK1300.
−Removed: In certain cases, due to reporting constraints, we have omitted mineral reserve information for properties other than our material properties.
−Removed: While the aggregate mineral reserves at Red Chris represent more than 10% of the aggregate mineral reserves to which our royalty or stream interest applies, Royal Gold’s royalty interest in Red Chris is only 1% NSR.
−Removed: Accordingly, we do not consider Red Chris to be a material property.
−Removed: Royal Gold owns multiple royalty interests at the Cortez Complex, some of which overlap.
−Removed: For purposes of simplified disclosure, Royal Gold has divided its royalty interests at the Cortez Complex into two zones:
−Removed: the Legacy Zone and the Cortez Complex Zone (the “CC Zone”).
−Removed: The “Legacy Zone” royalty consists of an approximate equivalent 9.4% GSR royalty rate over the Pipeline and Crossroads deposits.
−Removed: The CC Zone includes an approximate equivalent 1.6% GSR royalty over the Cortez Hills, Cortez Pits, Fourmile and Goldrush deposits, an approximate equivalent 2.2% GSR royalty rate over the Goldrush SE deposit, and a 0.45% GSR royalty rate over the Robertson deposit.
−Removed: Royal Gold owns stream and royalty interests in varying percentages on these properties.
−Removed: The reserves listed are 100% of the reserves to which the royalty or stream interest applies.
−Removed: The operators of the properties in which we hold stream and royalty interests generally prepare production and mineral reserve estimates for the properties.
−Removed: We do not independently prepare or verify this information, and we do not have access to sufficient data to do so.
−Removed: There are numerous uncertainties inherent in these estimates, many of which are outside the operators’ control.
−Removed: As a result, production and mineral reserve estimates are subjective and necessarily depend upon a number of assumptions, including, among others, reliability of historical data, geologic and mining conditions, metallurgical recovery, metal prices, operating costs, capital expenditures, development and reclamation costs, mining technology improvements, and the effects of government regulation.
−Removed: If any of the assumptions that operators make in connection with production or mineral reserve estimates are incorrect, actual production could be significantly lower than the production or mineral reserve estimates, which could adversely affect our future revenue and the value of our investments.
−Removed: In addition, if operators’ estimates with respect to the timing of production are incorrect, we may experience variances in expected revenue from period to period.
−Removed: Some operators also report publicly, or to us estimates of mineral resources.
−Removed: Mineral resources are subject to future exploration and development and associated risks and may never convert to future reserves.
−Removed: In addition, estimates of mineral resources are subject to similar uncertainties and assumptions as discussed above with respect to mineral reserves .
+Added: Summary of All Mineral Resources and Mineral Reserves
+Added: As noted above under “Introduction—Mineral Resources and Mineral Reserves,” we have limited access to, and limited information regarding, the properties in which we hold interests, and because of these limitations, qualified persons acting on behalf of the Company are not able to arrive at sufficient findings and conclusions, or prepare adequate supporting documentation, for us to disclose mineral resources or mineral reserves under the standards for disclosure established by S-K 1300 for any of the properties in which we hold stream or royalty interests.
+Added: We have requested that the operators of our Principal Properties prepare technical report summaries that we may file with the SEC or permit us the access and information necessary for qualified persons acting on behalf of the Company to be able to arrive at sufficient findings and conclusions, and prepare adequate supporting documentation, for us to disclose mineral resources or mineral reserves and prepare the related technical report summaries.
+Added: In each case, the operator denied our request, and as a result, we are omitting disclosure of mineral resources and mineral reserves from our summary disclosure and individual material property disclosure because we cannot provide such disclosure without incurring an unreasonable burden or expense.
Material Properties
−Removed: The disclosures below regarding our principal properties are derived from publicly available reports of the operators and/or other reports provided to us under the terms of our stream or royalty agreements with the respective operators and have generally been prepared pursuant to the mining disclosure regime of the applicable jurisdiction in which the operator reports.
+Added: The disclosures below regarding our Principal Properties are derived from publicly available reports of the operators and/or other reports provided to Royal Gold under the terms of Royal Gold's stream or royalty agreements with the respective operators and have generally been prepared pursuant to the mining disclosure regime of the applicable jurisdiction in which the operator reports.
We do not independently prepare or verify this information and, as the holder of the stream or royalty interest, we do not have access to the properties or operations or to sufficient data to do so.
2 unchanged sentences
We often refer to these material properties as “Principal Properties” in this report.
−Removed: The disclosures below regarding Carmen de Andacollo (“Andacollo”) are derived from the Technical Report dated July 12, 2006, pursuant to NI 43-101, as well as Teck’s Annual Information Form, dated February 21, 2023, attached as Exhibit 99.1 to Teck’s Annual Report on Form 40-F for the year ended December 31, 2022.
+Added: The disclosures below regarding Carmen de Andacollo (“Andacollo”) are derived from the Technical Report dated July 12, 2006, pursuant to NI 43-101, as well as the Annual Information Form, dated February 23, 2024, of Teck Resources Limited (“Teck”), attached as Exhibit 99.1 to Teck’s Annual Report on Form 40-F for the year ended December 31, 2023.
Teck presents mineral resource and mineral reserve updates pursuant to CIM Standards.
−Removed: Royal Gold requested information prepared in accordance with SK1300 or access to underlying technical data sufficient to prepare its own technical report summary, and the operator denied the request.
+Added: Royal Gold requested information prepared in accordance with S-K 1300 or access to underlying technical data sufficient to prepare its own technical report summary, and the operator denied the request.
Andacollo is an open pit mine and milling operation located in central Chile, Coquimbo Region at 30.25°S latitude and 71.10°W longitude and is operated by Compañía Minera Teck Carmen de Andacollo (“CMCA”), a 90% owned subsidiary of Teck.
−Removed: The Andacollo mine is located in the foothills of the Andes Mountains approximately 2 kilometers (“km”) southwest of the town of Carmen de Andacollo, 55 km southeast from the regional capital of La Serena, and Santiago is approximately 350 km south by air.
+Added: The Andacollo mine is located in the foothills of the Andes Mountains approximately 2 kilometers (“km”) southwest of the town of Carmen de Andacollo, 55 km southeast from the regional capital of La Serena, and 350 km north of Santiago.
The mine property lies at the southern limit of the Atacama Desert at a mean elevation of 1,050 meters (“m”) above sea level.
1 unchanged sentence
The average annual temperature is 18.8°C with a range from -5°C in the winter to 32°C in the summer.
−Removed: Average annual rain fall is low (less than 100 millimeters (“mm”)) and concentrated within the months of May to August.
+Added: Average annual rainfall is low (less than 100 millimeters (“mm”)) and concentrated within the months of May to August.
Infrastructure
13 unchanged sentences
Area of Interest
−Removed: Our stream interest at Andacollo covers 1,225 exploitation mining concessions, including 1,174 concessions termed the “Mining Properties” and 51 concessions termed the “Dayton Concessions.” Our interest also covers any additional claims held before the effective date of the stream agreement, as described below, or acquired after the effective date which are wholly or partially located within an approximately 1.5 km radius from the external boundary of the “Mining Properties,” any mining concessions held by CMCA or acquired following the effective date of the agreement which are wholly or partially located within approximately 1 km radius from certain boundaries laid out in the agreement, and any Dayton Concession held by CMCA as of the effective date of the agreement, or acquired after the effective date.
+Added: The stream interest of our wholly owned subsidiary, RGLD Gold AG (“RGLD Gold”), at Andacollo covers 1,225 exploitation mining concessions, including 1,174 concessions termed the “Mining Properties” and 51 concessions termed the “Dayton Concessions.” RGLD Gold’s interest also covers any additional claims held before the effective date of the stream agreement, as described below, or acquired after the effective date which are wholly or partially located within an approximately 1.5 km radius from the external boundary of the “Mining Properties,” any mining concessions held by CMCA or acquired following the effective date of the agreement which are wholly or partially located within approximately 1 km radius from certain boundaries laid out in the agreement, and any Dayton Concession held by CMCA as of the effective date of the agreement, or acquired after the effective date.
Stream Agreement
−Removed: Under the Long Term Offtake Agreement dated July 9, 2015, between CMCA and our wholly owned subsidiary, RGLD Gold AG (“RGLD Gold”), we own the right to purchase 100% of the gold produced from the Andacollo copper-gold mine until 900,000 ounces of payable gold have been delivered, and 50% thereafter.
+Added: Under the Long Term Offtake Agreement, dated July 9, 2015, between CMCA and RGLD Gold, RGLD Gold owns the right to purchase 100% of the gold produced from the Andacollo copper-gold mine until 900,000 ounces of payable gold have been delivered, and 50% thereafter.
The cash purchase price equals 15% of the monthly average gold price for the month preceding the delivery date for all gold purchased.
−Removed: As of December 31, 2023, approximately 349,100 ounces of payable gold have been delivered to us.
−Removed: Although Andacollo is primarily a copper mine, our stream agreement covers only gold and not copper production.
−Removed: We provide certain information on copper resources and reserves and production methods in order to provide a better understanding of the operation.
+Added: As of December 31, 2024, approximately 368,500 ounces of payable gold have been delivered to RGLD Gold.
+Added: Although Andacollo is primarily a copper mine, RGLD Gold’s stream agreement covers only gold and does not cover copper production.
+Added: We provide certain information on copper production methods in order to provide a better understanding of the operation.
Property Description
The Andacollo operation consists of an open pit mine, sulfide concentrator, and an inactive copper heap leach facility.
−Removed: The open pit mine is designed with a 10-meter bench height and an average overall pit slope of 53 degrees.
+Added: The open pit mine is designed with a 10m bench height and an average overall pit slope of 53 degrees.
A conventional owner operated and maintained truck and shovel mining operation is used for exploiting the hypogene reserve.
13 unchanged sentences
Property History
−Removed: CMCA began mining the oxide and supergene enrichment zone of the Andacollo copper deposit in January 1996.
−Removed: Supergene and oxide ores were processed by heap leaching and production of copper cathode in an SX-EW plant.
+Added: A predecessor to CMCA began mining the oxide and supergene enrichment zone of the Andacollo copper deposit in January 1996.
+Added: Supergene and oxide ores were processed by heap leaching and production of copper cathode in a solvent extraction-electrowinning plant.
Beginning in 2010, the mine began processing hypogene ore (which underlies the supergene ore) through a mill and concentration plant at site producing concentrates for third-party offtake.
4 unchanged sentences
According to the operator, all major permits for current operations are in place and the operation is in material compliance with those permits.
−Removed: However, the operator discloses that the current life of mine for Andacollo is expected to continue until 2036 and that additional permitting or amendments will be required to execute the life of mine plan.
+Added: However, the operator discloses that the current life of mine for Andacollo is expected to continue until 2036 and that additional permitting or amendments will be required to execute the life of mine plan beyond 2031.
Property Geology
4 unchanged sentences
The original copper sulfides leached from this zone were re-deposited below the barren leached zone as a copper-rich zone comprised of copper silicates (chrysocolla) and supergene copper sulfides (chalcocite with lesser covellite).
−Removed: Mineral Resources and Mineral Reserves
−Removed: Table 1 Andacollo – Summary of Gold Mineral Resources at December 31, 2022,
−Removed: Based on $1,500 Au, $3.15 Cu (1),(2),(3),(4)
−Removed: Cut-Off Grade
−Removed: Metallurgical Recovery
−Removed: Measured Mineral Resources
−Removed: 0.15 to 0.21% Cu
−Removed: Indicated Mineral Resources
−Removed: 0.15 to 0.21% Cu
−Removed: Measured + Indicated Mineral Resources
−Removed: 0.15 to 0.21% Cu
−Removed: Inferred Mineral Resources
−Removed: 0.15 to 0.21% Cu
−Removed: Our metal stream on Andacollo pertains only to gold produced.
−Removed: Information on copper resources is included because the primary production from Andacollo is copper;
−Removed: the presentation of copper mineral resources is necessary to understanding the economics of the project.
−Removed: Reported mineral resource is as of December 31, 2022, the most recent available public disclosure.
−Removed: Teck reports mineral resources pursuant to CIM Standards.
−Removed: SK1300 does not permit reciprocal recognition of mineral resources determined under the mining disclosure regime of another jurisdiction.
−Removed: The amounts, grades and recovery of mineral resources determined under SK1300 could vary from the disclosure set forth here.
−Removed: While the SK1300 definitions are substantially similar to those set forth in the CIM Standards, there are variations.
−Removed: Mineral resources are presented exclusive of mineral reserves.
−Removed: Our stream interest at Andacollo is 100% of payable gold until 900,000 ounces are delivered, and 50% thereafter.
−Removed: The resources listed are 100% of the mineral resources to which our stream interest applies.
−Removed: Copper recovery assumptions range from 82% to 91.5%, averaging 88.7%.
−Removed: Gold recovery assumptions average 68.1%.
−Removed: Table 2 Andacollo – Summary of Gold Mineral Reserves at December 31, 2022,
−Removed: Based on $1,500 Au, $3.15 Cu (1),(2),(3)
−Removed: Cut-Off Grade
−Removed: Metallurgical Recovery
−Removed: Proven Mineral Reserves
−Removed: 0.15 to 0.21% Cu
−Removed: Probable Mineral Reserves
−Removed: 0.15 to 0.21% Cu
−Removed: Total Mineral Reserves
−Removed: 0.15 to 0.21% Cu
−Removed: Our metal stream on Andacollo pertains only to payable gold produced.
−Removed: Information on copper mineral reserves is included because the primary production from Andacollo is copper;
−Removed: the presentation of mineral reserves is necessary in understanding the economics of the project.
−Removed: Reported mineral reserve is as of December 31, 2022, the most recent available public disclosure.
−Removed: Teck reports reserves pursuant to CIM Standards.
−Removed: SK1300 does not permit reciprocal recognition of reserves determined under the mining disclosure regime of another jurisdiction.
−Removed: The amounts, grades and recovery of mineral reserves determined under SK1300 could vary from the disclosure set forth here.
−Removed: While the SK1300 definitions are substantially similar to those set forth in the CIM Standards, there are variations.
−Removed: Our stream interest at Andacollo is 100% of payable gold until 900,000 ounces are delivered, and 50% thereafter.
−Removed: The gold mineral reserves listed are 100% of the reserves to which our stream interest applies.
−Removed: Copper recovery assumptions range from 82% to 91.5%, averaging 88.7%.
−Removed: Gold recovery assumptions average 68.1%.
−Removed: Change in Mineral Resources and Mineral Reserves from Prior Year
−Removed: The previous mineral resources and mineral reserves reported by Teck were as of December 31, 2021.
−Removed: Gold mineral reserves decreased from 0.91 million ounces to 0.86 million ounces (5.1%) year over year.
−Removed: Gold mineral resources increased from 1.17 million ounces to 1.32 million ounces (12.5%) year over year.
−Removed: Teck reported that the reduction in mineral reserves was a result of depletion from normal mining activities.
−Removed: Teck reported that the increase in mineral resources was a result of improved economic assumptions related to operational costs and higher assumed copper prices.
Recent Developments
Stream deliveries from Andacollo were approximately 19,300 ounces of gold during the year ended December 31, 2024, compared to approximately 22,500 ounces of gold during the year ended December 31, 2023.
−Removed: The decrease in deliveries resulted primarily from Andacollo experiencing lower gold grades, lower gold recoveries and lower tonnage milled, as well as differences in the timing of shipments and settlements during the periods.
−Removed: On January 16, 2024, Teck reported that Andacollo continues to face extreme drought conditions, causing water restrictions which impact production, and Teck expects 2024 production to be similar to 2023.
−Removed: According to Teck, steps are being taken to mitigate these risks, with a solution likely to be in place in 2025.
−Removed: As a result, and with the benefit of higher grade ore, production is expected to increase between 2025 and 2027, compared to 2024.
−Removed: Gold and copper grades are relatively well correlated at Andacollo and gold production tends to track copper production.
+Added: The decrease in deliveries resulted primarily from Andacollo experiencing lower gold grades and lower tonnage milled as a result of water restrictions caused by extreme drought conditions which impacted production.
+Added: Stream deliveries typically occur approximately six months after mine production and are based on a fixed payability factor of 89%.
+Added: On January 21, 2025, Teck reported that Andacollo continues to operate in extreme drought conditions, and that risk mitigation plans to increase water availability through increased well field capacity were implemented in 2024, enabling mill throughput rates consistent with the mine plan through the second half of 2024.
+Added: Further, Teck provided copper production guidance, and expects copper production to increase from approximately 39,700 tonnes in 2024 to a range of 45,000 and 55,000 tonnes per year in each of 2025, 2026 and 2027, before declining to a range of 35,000 to 45,000 tonnes in 2028.
+Added: According to Teck, the annual production guidance reflects ongoing drought conditions that remain a risk to production.
+Added: Gold and copper grades have been relatively well correlated at Andacollo and gold production has tended to track copper production, although there can be no assurance that these correlations will continue in the future.
Production at Andacollo has trended lower since the beginning of 2021 due to lower ore grades, as anticipated in the mine plan.
−Removed: Teck has reported that the current life of mine for Andacollo is expected to continue until 2036 although additional permits or amendments will be required to execute the life of mine plan.
−Removed: The disclosures below regarding Khoemac a u are derived from the Preliminary Economic Assessment - NI 43-101 Technical Report dated May 14, 2012, prepared pursuant to NI 43-101, and non-public technical reports, mineral resource and mineral reserve updates provided by Khoemac a u Copper Mining (Pty.) Limited (“KCM”) prepared pursuant to the JORC Code.
−Removed: Royal Gold requested information prepared in accordance with SK1300 or access to underlying technical data sufficient to prepare its own technical report summary, and the operator denied the request.
−Removed: Khoemac a u is a copper-silver development project located within the Ngamiland District of Botswana and is owned by KCM.
−Removed: The project’s mining area, Zone 5, and ore processing facilities, Boseto, are separated by a distance of 35 km.
−Removed: The Zone 5 mine area is generally south-west of the town of Maun and approximately 23 km south of the town of Toteng, and the Boseto facility is located at 20.56°S latitude and 22.95°E longitude with an approximate elevation of 1,000 m.
−Removed: The climate of the project area is classified as semi-arid, with highly variable and unreliable rainfall.
−Removed: Rainfall is concentrated in the summer months from October to April and typically falls in high intensity convectional showers that are often highly localized.
−Removed: Winters are very dry, usually with no precipitation at all in July and August.
−Removed: Annual rainfall is normally less than 500 mm.
−Removed: Infrastructure
−Removed: Infrastructure to support the mining and processing operation is in place and fully supports the operation.
−Removed: Access to the Boseto mill site is via the paved Trans Kalahari Highway (Highway A3) from Maun 65 km southwest to just east of the town of Toteng, and a further 25 km by unpaved road to the south of Toteng.
−Removed: Zone 5 and the Boseto mill are connected by a 35 km divided, sealed road to support both mill vehicle traffic and ore transport.
−Removed: The city of Maun has an airport with connection within Botswana and several cities in South Africa.
−Removed: Electric power is provided by a 132 kV line from the Botswana Power Corporation grid via a 50 km overhead transmission line connection.
−Removed: A 132 kV transmission line also links the Boseto plant to Zone 5 allowing all operations to be supplied by grid power.
−Removed: Existing diesel generation capacity from the previous Boseto operations is being used as backup power.
−Removed: Water is being supplied from two wellfields, at the Boseto borefield, located 60 km from the Boseto plant, and the Haka borefield, connected to Zone 5 with a 40 km pipeline.
−Removed: Labor and supplies for most of the basic mining and exploration needs for the project can be obtained from Maun, which has a population of approximately 56,000 (2011 Census) and hosts a wide range of supplies, services and labor.
−Removed: Many skills required to operate a mechanized underground mine are not available in Botswana and are sourced internationally.
−Removed: Both Boseto and Zone 5 have accommodation facilities for workers during their rotation work period.
−Removed: Area of Interest
−Removed: KCM controls 4040 km 2 of mineral concessions of which our stream interest covers an area of interest surrounding Mining License 2015/015L with an area of 176 km 2 (17,600 hectares), measuring 8 km by 22 km, which covers all reserves and resources referred to as Zone 5.
−Removed: Our area of interest also includes the Mango NE deposit.
−Removed: Stream Agreement
−Removed: Under the Silver Purchase and Sale Agreement dated February 24, 2019, between KCM and RGLD Gold, as amended, we own the right to receive 100% of the payable silver produced from Khoemac a u until the delivery of 40.0 million silver ounces, and 50% thereafter.
−Removed: We pay a cash price equal to 20% of the spot silver price for each ounce delivered;
−Removed: however, if KCM achieves mill expansion throughput levels above 13,000 tpd (30% above current mill design capacity), we will pay a higher ongoing cash price for silver ounces delivered in excess of specific annual thresholds.
−Removed: As of December 31, 2023, approximately 2.7 million ounces of payable silver have been delivered to us.
−Removed: Property Description
−Removed: The Khoemac a u operation consists of a mechanized underground mine producing from the Zone 5 orebody and a sulfide ore flotation plant for ore processing at Boseto.
−Removed: The project completed construction in the second half of calendar 2021 and ramp-up of mining and processing operations to the target production rate of 3.65 Mtpa (10,000 tpd) was achieved in December 2022, as announced by KCM.
−Removed: The Zone 5 mine is a bulk mechanized mine, designed for a total production rate of 3.65 Mtpa from three decline systems, with a single decline system production rate between 1 to 2 Mtpa.
−Removed: The mine design is based on a longhole open stoping mining method.
−Removed: The first section of the mine incorporates rib and sill pillars for ground stability control and paste backfill will be used as depth increases to improve overall mineral resource recovery.
−Removed: Given that the orebody has a strike length of more than 4 km, it necessitated dividing the orebody into mining zones, with separate decline systems dedicated to servicing each zone.
−Removed: The twin decline layout allows for more than 1,000 meter coverage of strike extent of the orebody, while offering multiple ore zone access points, highly productive layouts, and significant redundancy.
−Removed: Two of the mining zones are equipped with twin declines, while one is equipped with a single decline.
−Removed: The Zone 5 site is equipped with all maintenance, warehousing, administration and personnel accommodation facilities to fully support underground mining activities.
−Removed: The mined ore is trucked approximately 35 km from the Zone 5 mine to the Boseto processing facility on a purpose built, fully sealed bitumen haul road, with a separate access road for light vehicles.
−Removed: At Boseto, ores are processed in the 3.65 Mtpa sulfide concentrator, producing a copper-silver concentrate, which is purchased by third parties.
−Removed: Concentrate is loaded into approximately 1 tonne fabric bags for transport by road to port, for shipping and sale on the international market.
−Removed: Tailings generated from the plant are deposited in a circular TSF, located south-west of the plant.
−Removed: Tailings are deposited mainly by spigot with a center decant tower for water recovery.
−Removed: The facility is designed as an upstream constructed facility, which enables concurrent rehabilitation to take place during operation.
−Removed: The Boseto site is equipped with all maintenance, warehousing, administration and personnel accommodation facilities to fully support ore processing activities.
−Removed: Age and Physical Condition of Infrastructure
−Removed: Underground mining equipment and mine infrastructure are new.
−Removed: The associated Boseto concentrator is a previously existing installation which underwent significant overhauls and refurbishment starting in 2018.
−Removed: Royal Gold does not have specific information as to the physical condition or the age of the equipment and infrastructure.
−Removed: The operator does not provide us with the operator’s book value or total cost detail for the property and associated plant and equipment.
−Removed: Property History
−Removed: The first exploration over the Khoemac a u area dates to the early 1960’s when Johannesburg Consolidated Investments was active in the area.
−Removed: Sporadic exploration over the project area between 1960 and 2008 consisted of geochemical, geophysical (airborne and ground) and diamond / RC drilling programs.
−Removed: KCM acquired the Zone 5 Licences in 2013.
−Removed: Other deposits on the same project lease have been previously mined by open pit methods.
−Removed: This most notably includes the North and South Plutus Pits, and the Zeta pit to the South.
−Removed: These pits were worked extensively between 2012 and 2015 by Discovery Copper Botswana (Pty) Limited (“DCB”), which was owned and operated by Discovery Metals Limited.
−Removed: Due to these previous operations, a processing plant and infrastructure was already in place at Boseto when KCM acquired DCB from provisional liquidation in 2015.
−Removed: Permitting and Encumbrances
−Removed: Approvals for the operation are divided into the Mining Licenses issued by the Department of Mines and environmental approvals issued by the Department of Environmental Affairs (“DEA”).
−Removed: The following list of approvals is a subset of a much larger group of approvals received for the exploration, project development and operation of KCM’s activities.
−Removed: Mine licenses have been issued by the Department of Mines as follows:
−Removed: ● Khoemac a u Copper Mining Zone 5 Mining License (ML 2015/05L) – issued in 2015 with a 20-year validity.
−Removed: Khoemac a u revised this Mine License to include the new surface infrastructure at Zone 5 on the footwall side of the deposit and for the potential future processing of ore from other deposits controlled by KCM;
−Removed: ● Discovery Copper Botswana Mining License (Discovery ML 2010/99L) – issued in 2010 with 15-year validity.
−Removed: This Mining License was amended in 2014 and 2015 to include exploitation of the Zeta and Zeta NE targets, respectively.
−Removed: This Mining License was also amended in 2017 to reflect the execution of the Starter Project (i.e., throughput at the mill of 3.65 Mtpa using ore sourced from Zone 5).
−Removed: Five DEA approvals were received for the project, each requiring an individual Environmental and Social Impact Statements:
−Removed: ● Boseto ML Amendment– including mill capacity increase from 3 to 3.65 Mtpa, repairs/modifications of surface infrastructure at the Boseto site, and sourcing of ore from Zone 5 (Authorized in November 2017);
−Removed: ● Zone 5 ML Amendment – including five additional boxcuts (to reflect the Zone 5 Expansion case) and construction of a 6 Mtpa processing facility at Zone 5, including TSF (Authorized in May 2018);
−Removed: ● Access Road/Haul Route – including service corridors for roads between A3, Boseto, and Zone 5.
−Removed: Also including emplacement of water pipelines from Haka, Boseto (Khoemac a u), and Zone 5 borefields as well as authorization of project power and communications line routing between Zone 5 and Boseto (Authorized in April 2017);
−Removed: ● BPC Powerline – including the powerline from the Legolthwane substation near Toteng village to Boseto (Authorized in May 2018);
−Removed: ● Communications Tower – a new cellular tower on an existing communications site in the Kwebe Hills (Authorized in May 2017).
−Removed: The submission of biannual monitoring reports to the DEA is a requirement of approval of the five separate Environmental Authorizations.
−Removed: Additional prospecting licenses are in place for active exploration areas.
−Removed: Property Geology
−Removed: The Khoemac a u Project area is located in the Kalahari copper belt, which stretches over approximately 800 km from central Namibia to the east of Botswana.
−Removed: The deposit is hosted within the Ghanzi-Chobe Fold Belt, a series of deformed metavolcanic and metasedimentary rocks.
−Removed: Deposits within the fold belt typically consist of stratiform copper mineralization within veins between specific rock units.
−Removed: Zone 5 has a deposit strike length of 4 km with mineralization dipping at 56 degrees to the south-east over an average thickness of 10 m.
−Removed: Mineralization is situated in the hanging wall sequence, 30 m above the contact between the D’Kar Formation and Ngwako Pan Formation.
−Removed: Mineralization is sub-parallel to lithology and typically cross-cuts host units from the lower D’Kar limestone unit in the south-west to the carbon rich siltstone unit and interbedded alternating siltstone and sandstone unit toward the north-east.
−Removed: The host rock assemblage is sandwiched between two competent sandstone units;
−Removed: the footwall Ngwako Pan quartzite sandstone and the hanging wall Marker sandstone.
−Removed: The down dip extension of mineralization has been drilled to a maximum depth of 1,200 m vertically below surface.
−Removed: The deposit remains open at depth (down dip) and partially along strike.
−Removed: Mineral boundaries were interpreted to distinguish areas that comprised overburden, oxide plus sulfide minerals and sulfide-only assemblages.
−Removed: The near surface mineralized zone was identified as a transitional sulfide zone that contained both oxide and sulfide minerals.
−Removed: The boundary between this zone and the sulfide only undulates parallel to topography between 60 and 75 m deep below the surface.
−Removed: This boundary was defined by acid soluble copper and total copper ratios, logged drill core and recorded specific gravity values.
−Removed: Common minerals found in this zone, in order of abundance, include malachite, bornite, chalcopyrite, native copper and minor chrysocolla.
−Removed: A small zone of deeper oxidation, with
−Removed: mineralization consisting dominantly of native copper, is located in the center portion of the deposit.
−Removed: This area shows strong brecciation and extends to depths of 400 m below the surface.
−Removed: Economic mineralization consists of massive bornite and chalcocite with accompanying chalcopyrite and silver.
−Removed: Locally, secondary massive chalcocite has replaced bornite in the Central portion of the deposit at the forereef slope.
−Removed: These minerals are largely vein hosted and make up greater than 1.0% Cu grade domain.
−Removed: The mineralization is hosted within an extensive system of quartz and quartz carbonate veins, shears and cleavages.
−Removed: Parallel and sub-parallel shearing continues for hundreds of feet and are likely influenced by subtle changes in lithology and structure.
−Removed: Within the more competent units, shearing is replaced by brittle deformation, generally in the form of brecciation.
−Removed: Localized parasitic folds, thrusts and shears have thickened the mineralization and repeated the stratigraphy resulting in enhanced copper and silver grades over very wide intervals.
−Removed: Structural data in the NE portion of the deposit suggests a gently plunging fold toward the south-west.
−Removed: The fold is overprinted in the center portion of the deposit by a vertically plunging facies change.
−Removed: These two areas have the highest grades and thickest intervals.
−Removed: The Mango deposit is situated 10 km southwest and along strike of the Zone 5 deposit on the southeast limb of a regional anticline.
−Removed: The deposit has defined mineralization over a total strike length of 5 km dipping at 65° to the southeast.
−Removed: The central portion of the deposit is host to economic mineralization (copper and silver) over a strike length of 1.5 km, with an average thickness of 8 m.
−Removed: The deposit has been drilled to 700 meters below surface and remains open both along strike and at depth.
−Removed: High-grade copper sulfide mineralization typically consists of chalcopyrite and bornite with minor chalcocite.
−Removed: Mineral Resources and Mineral Reserves
−Removed: Table 1 Khoemac a u – Summary of Silver Mineral Resources at December 31, 2022,
−Removed: Based on $21.35 Ag and $3.54 Cu (1),(2),(3),(4)
−Removed: Cut-Off Grades
−Removed: Metallurgical Recovery (5)
−Removed: Measured Mineral Resources
−Removed: 88.3% Cu / 84.1% Ag
−Removed: Indicated Mineral Resources
−Removed: 88.1% Cu / 83.9% Ag
−Removed: Measured + Indicated Mineral Resources
−Removed: 88.2% Cu / 84.0% Ag
−Removed: Inferred Mineral Resources
−Removed: 88.2% Cu /84.1% Ag
−Removed: Our metal stream on Khoemac a u pertains only to payable silver produced.
−Removed: Information on copper mineral resources is included because the primary production from Khoemac a u is copper;
−Removed: the presentation of copper mineral resources is necessary in understanding the economics of the project.
−Removed: (2) Reported mineral resource is as of December 31, 2022.
−Removed: Khoemac a u mineral resources are reported pursuant to the JORC code.
−Removed: SK1300 does not permit reciprocal recognition of mineral resources determined under the mining disclosure regime of another jurisdiction.
−Removed: The amounts, grades and recovery of mineral resources determined under SK1300 could vary from the disclosure set forth here.
−Removed: While the SK1300 definitions are substantially similar to those set forth in the JORC code, there are variations.
−Removed: Our metal stream on Khoemac a u pertains only to payable silver produced.
−Removed: (3) Mineral resources are presented exclusive of mineral reserves.
−Removed: Our stream interest at Khoemac a u is 100% of payable silver produced.
−Removed: The silver mineral resources listed are 100% of the resources to which our stream interest applies.
−Removed: Metallurgical recoveries for copper and silver vary based on the dominant copper mineral.
−Removed: Copper recoveries are generally 86-90%.
−Removed: Silver recoveries are 83.3-87.1%.
−Removed: Copper recoveries are reduced in areas where acid soluble copper is greater than 15% of total copper content.
−Removed: Table 2 Khoemac a u – Summary of Silver Mineral Reserves at December 31, 2022,
−Removed: $21.35 Ag and $3.54 Cu (1),(2),(3)
−Removed: Cut-Off Grades
−Removed: Metallurgical Recovery (4)
−Removed: Proven Mineral Reserves
−Removed: 88.3% Cu 84.2% Ag
−Removed: Probable Mineral Reserves
−Removed: 88.3% Cu 84.2% Ag
−Removed: Total Mineral Reserves
−Removed: 88.3% Cu 84.2% Ag
−Removed: Our metal stream on Khoemac a u pertains only to payable silver produced.
−Removed: Information on copper mineral reserves is included because the primary production from Khoemac a u is copper;
−Removed: the presentation of copper mineral reserves is necessary in understanding the economics of the project.
−Removed: Khoemac a u mineral reserves are reported at an effective date of December 31, 2022.
−Removed: Khoemac a u mineral reserves are reported pursuant to the JORC Code.
−Removed: SK1300 does not permit reciprocal recognition of mineral reserves determined under the mining disclosure regime of another jurisdiction.
−Removed: The amounts, grades and recovery of mineral reserves determined under SK1300 could vary from the disclosure set forth here.
−Removed: While the SK1300 definitions are substantially similar to those set forth in the JORC code, there are variations.
−Removed: Our stream interest at Khoemac a u is 100% of payable silver.
−Removed: The silver mineral reserves listed are 100% of the reserves to which our stream interest applies.
−Removed: Metallurgical recoveries for copper and silver vary based on the dominant copper mineral.
−Removed: Copper recoveries are generally 86-90%.
−Removed: Silver recoveries are 83.3-87.1%.
−Removed: Copper recoveries are reduced in areas where acid soluble copper is greater than 15% of total copper content.
−Removed: Treatment and refining charges are captured as a reduction in recoverable metal in the reserve model, 97% for copper and 90% for silver.
−Removed: Change in Mineral Resources and Mineral Reserves from Prior Year
−Removed: The previous mineral resources and mineral reserves reported by the operator were as of June 30, 2021.
−Removed: This disclosure was the basis for our December 31, 2021 reporting.
−Removed: The reported silver mineral reserve decreased by 2.4 million ounces (11.4%) between our year ended December 31, 2021 (reported by the operator as of June 30, 2021) and the year ended December 31, 2022, due to mining depletion and changes to the resource model.
−Removed: Measured and indicated silver mineral resources decreased by 1.5 million ounces (9.2%) due to changes in the resource model.
−Removed: Recent Developments
−Removed: Silver stream deliveries from Khoemac a u were 1.5 million ounces during the year ended December 31, 2023, compared to approximately 951,500 ounces during the year ended December 31, 2022.
−Removed: Increased stream deliveries resulted from operations running at full capacity during the year.
−Removed: Deliveries during the prior year were lower due to the ramp-up of mining and processing operations throughout 2022 after completion of project construction in 2021.
−Removed: According to KCM, operations at Khoemac a u continued at nameplate capacity through the year ended December 31, 2023, after the target production rate of 3.7 million tonnes per year (10,000 tonnes per day) was achieved in December 2022.
−Removed: As projected in the mine plan, KCM expects payable silver production in 2024 to range between 1.5 to 1.7 million ounces, which is slightly below the life of mine average due to lower silver grades in the upper portion of the Zone 5 deposit and the top-down mining sequence.
−Removed: On November 21, 2023, KCM announced that the shareholders of its parent company, Cuprous Capital Ltd (“Cuprous”), had entered into a share purchase agreement with MMG Limited (“MMG”), whereby MMG will acquire all the issued share capital of Cuprous.
−Removed: MMG is a large and well-capitalized base metal mining company listed on the Stock Exchange of Hong Kong, with operations and projects in Australia, the Democratic Republic of the Congo, Peru and Canada.
−Removed: MMG has reported that the parties have agreed to work towards completion of the transaction in the first quarter of 2024.
−Removed: During development of Khoemac a u, we made available a $25 million subordinated debt facility to KCM which is repayable at our option upon the occurrence of certain events, including a change of control.
−Removed: Including capitalized interest, the amount owing under this facility was approximately $35.7 million as of December 31, 2023.
+Added: Teck has reported that the current life of mine for Andacollo is expected to continue until 2036 although additional permits or amendments will be required to execute the life of mine plan beyond 2031.
Mount Milligan
−Removed: The disclosures below regarding Mount Milligan are derived from the Technical Report on the Mount Milligan Mine in North-Central British Columbia filed November 7, 2022, effective December 31, 2021, pursuant to NI 43-101 and CIM Standards, and from Centerra Gold’s news release dated February 14, 2024, pursuant to NI 43-101.
−Removed: Royal Gold requested information prepared in accordance with SK1300 or access to underlying technical data sufficient to prepare its own disclosure, and the operator denied the request.
+Added: The disclosures below regarding Mount Milligan are derived from the Technical Report on the Mount Milligan Mine in North-Central British Columbia filed November 7, 2022, effective December 31, 2021, pursuant to NI 43-101 and CIM Standards, and from news releases, dated February 14, 2024, issued by Centerra Gold Inc.
+Added: (“Centerra”).
+Added: Royal Gold requested information prepared in accordance with S-K 1300 or access to underlying technical data sufficient to prepare its own disclosure, and the operator denied the request.
Mount Milligan is an open pit mine and is located within the Omenica Mining Division in North Central British Columbia, at 55.12°N latitude and 124.01°W longitude, approximately 155 km northwest of Prince George, 85 km north of Fort St.
1 unchanged sentence
Infrastructure
−Removed: Infrastructure to support the mining and processing operation is in place and fully supports the project.
+Added: Infrastructure to support the mining and processing operation is in place and fully supports the operation.
The Mount Milligan mine is accessible by commercial air carrier to Prince George, British Columbia, then by vehicle from the east via Mackenzie on the Finlay Philip Forest Service Road and the North Philip Forest Service Road, and from the west via Fort St.
5 unchanged sentences
Stored water inventory at the Mount Milligan mine is critical to the ability to process ore through the process plant on a sustainable basis.
−Removed: Water supply and make-up sources for the project include precipitation runoff, recycling of water from
−Removed: the TSF supernatant pond, pit dewatering, groundwater wells, fresh water from Meadows Creek, Rainbow Creek (temporary approval) and Philip Lake (temporary approval).
+Added: Water supply and make-up sources for the project include precipitation runoff, recycling of water from the TSF supernatant pond, pit dewatering, groundwater wells, fresh water from Meadows Creek, Rainbow Creek, and Philip Lake.
Water required for ore processing operations is reclaimed from the TSF by a barge-mounted pump station and booster pump station.
2 unchanged sentences
James are within daily commuting distance of the Mount Milligan mine, and both communities are serviced by rail, which connects to the major western and eastern rail routes.
−Removed: Concentrate is transported by truck from the mine site to Mackenzie, transferred onto railcars of the Canadian National Railway to existing port storage facilities of Vancouver Wharves in North Vancouver and loaded as lots into bulk ore carriers.
+Added: Concentrate is transported by truck from the mine site to Mackenzie, transferred onto railcars of the Canadian National Railway to port storage facilities of Vancouver Wharves in North Vancouver, and loaded into bulk ore carriers.
Concentrate is then shipped to customers via ocean transport.
2 unchanged sentences
Area of Interest
−Removed: At Mount Milligan, our stream interest covers Mining Lease 631503 and 110 mineral claims covering 51,078.2 hectares.
+Added: At Mount Milligan, RGLD Gold’s stream interest covers Mining Lease 631503 and 110 mineral claims covering 51,078.2 hectares.
Stream Agreement
Under the Amended and Restated Purchase and Sale Agreement dated December 14, 2011, between Thompson Creek Metals Company Inc.
−Removed: (“TCM”), an indirect subsidiary of Centerra Gold Inc.
−Removed: (“Centerra”), and RGLD Gold (as amended, the “Milligan Stream Agreement”), we own the right to purchase 35% of the payable gold and 18.75% of the payable copper produced from the Mount Milligan mine.
+Added: (“TCM”), an indirect subsidiary of Centerra, and RGLD Gold (as amended, the “Milligan Stream Agreement”), RGLD Gold owns the right to purchase 35% of the payable gold and 18.75% of the payable copper produced from the Mount Milligan mine.
The cash purchase price for gold is equal to the lesser of $435 per ounce, with no inflation adjustment, or the prevailing market price when purchased.
The cash purchase price for copper is 15% of the spot price.
−Removed: On February 13, 2024, TCM, Centerra and RGLD Gold entered into a Processing Cost Support Agreement (the “Cost Support Agreement”), whereby subject to certain conditions, we will provide cost support payments for gold and copper deliveries under the Milligan Stream Agreement in exchange for cash consideration of $24.5 million, 50,000 ounces of gold to be delivered in the future, and a free cash flow interest in Mount Milligan.
−Removed: Through approximately 2029, we will only provide cost support payments when the gold price is at or below $1,600 per ounce and the copper price is at or below $3.50 per pound.
−Removed: In such case, and only at Centerra’s election, we will provide cost support payments, in the case of gold, equal to the lower of either $415 or 66% of the gold spot price less $435 for each ounce of gold delivered, and in the case of copper, equal to 35% of the spot copper price for each pound of copper delivered.
−Removed: We will have the right to recover any such payments from future cash support payments beginning in approximately 2030 when metal prices are above $1,600 per ounce of gold and $3.50 per pound of copper.
−Removed: In addition, starting in approximately 2030, we will provide cost support payments, in the case of gold, equal to the lower of either $415 or 50% of the gold spot price less $435 for each ounce of gold delivered, and in the case of copper, equal to 35% of the spot copper price for each pound of copper delivered.
−Removed: Finally, starting in approximately 2036, we will provide cost support payments, in the case of gold, equal to the lower of either $615 or 66% of the gold spot price less $435 for each ounce of gold delivered, and in the case of copper, equal to 51% of the spot copper price for each pound of copper delivered.
+Added: On February 13, 2024, TCM, Centerra, and RGLD Gold entered into a Processing Cost Support Agreement (the “Cost Support Agreement”), whereby subject to certain conditions, RGLD Gold will provide cost support payments for gold and copper deliveries under the Milligan Stream Agreement in exchange for cash consideration of $24.5 million, 50,000 ounces of gold to be delivered in the future, and a free cash flow interest in Mount Milligan.
+Added: Through approximately 2029, RGLD Gold will only provide cost support payments when the gold price is at or below $1,600 per ounce and the copper price is at or below $3.50 per pound.
+Added: In such case, and only at Centerra’s election, RGLD Gold will provide cost support payments, in the case of gold, equal to the lower of either $415 or 66% of the gold spot price less $435 for each ounce of gold delivered, and in the case of copper, equal to 35% of the spot copper price for each pound of copper delivered.
+Added: RGLD Gold will have the right to recover any such payments from future cash support payments beginning in approximately 2030 when metal prices are above $1,600 per ounce of gold and $3.50 per pound of copper.
+Added: In addition, starting in approximately 2030, RGLD Gold will provide cost support payments, in the case of gold, equal to the lower of either $415 or 50% of the gold spot price less $435 for each ounce of gold delivered, and in the case of copper, equal to 35% of the spot copper price for each pound of copper delivered.
+Added: Finally, starting in approximately 2036, RGLD Gold will provide cost support payments, in the case of gold, equal to the lower of either $615 or 66% of the gold spot price less $435 for each ounce of gold delivered, and in the case of copper, equal to 51% of the spot copper price for each pound of copper delivered.
The Milligan Stream Agreement remains in place and is unaffected by the Cost Support Agreement.
−Removed: As of December 31, 2023, approximately 733,200 ounces of payable gold and 83.6 million pounds of payable copper have been delivered to us.
+Added: As of December 31, 2024, approximately 791,200 ounces of payable gold and 95.4 million pounds of payable copper have been delivered to RGLD Gold.
Property Description
5 unchanged sentences
All waste material is used in the construction of the TSF or in the case of the material being classified as potentially acid producing, stored within the TSF.
−Removed: The mining operation’s equipment fleet comprises two 30 cm electric blast hole drills, two 41 m 3 electric cable shovels, one 22 m 3 hydraulic excavator and two 19 m 3 front end loader and thirteen 229-tonne capacity haul trucks and two 181-tonne capacity haul trucks.
+Added: The mining operation’s equipment fleet comprises two 30 cm electric blast hole drills, two 41 m 3 electric cable shovels, one 22 m 3 hydraulic excavator and two 19 m 3 front end loaders and thirteen 229-tonne capacity haul trucks and two 181-tonne capacity haul trucks.
These major units are supplemented with a back-up equipment fleet of graders, track and rubber-tired dozers, backhoes, and water trucks.
−Removed: A 15-meter bench height is used for mining both ore and waste.
+Added: A 15m bench height is used for mining both ore and waste.
The Mount Milligan sulfide flotation concentrator was designed to process ore at a nominal rate of 60,000 tpd, producing a marketable concentrate of copper, gold, and silver.
16 unchanged sentences
To recover coarse metallic gold particles, approximately 20% of the rougher concentrate regrind hydrocyclone underflow is diverted to a centrifugal gravity concentrator.
−Removed: The reground concentrates undergo three stages of cleaning flotation to produce a final copper concentrate containing approximately 21.5% Cu and 30 to 40 g/t Au.
+Added: The reground concentrates undergo three stages of cleaning flotation to produce a final copper concentrate containing approximately 21.5% copper and 30 to 40 g/t gold.
The infrastructure at Mount Milligan includes a TSF and reclaim water ponds, an administrative building and change house, a workshop/warehouse, a permanent operations residence, a first aid station, an emergency vehicle storage, a laboratory, and sewage and water treatment facilities.
12 unchanged sentences
(“Placer Dome”) acquired the project from the joint-venture partners, resumed exploration drilling and completed a pre-feasibility study for the development of a 60,000 tpd open pit mine and flotation process plant.
−Removed: Barrick Gold Corporation (“Barrick”) purchased Placer Dome in 2006 and sold its Canadian assets to Goldcorp Inc.
+Added: Barrick purchased Placer Dome in 2006 and sold its Canadian assets to Goldcorp Inc.
(“Goldcorp”), who then in turn sold the project to Atlas Cromwell Ltd.
2 unchanged sentences
(“Terrane”) and initiated a comprehensive work program.
−Removed: In October 2010, TCM acquired the Mount Milligan development project through its acquisition of Terrane, entered a stream agreement with us and subsequently constructed the Mount Milligan mine, which commenced commercial production in February 2014.
+Added: In October 2010, TCM acquired the project through its acquisition of Terrane, entered a stream agreement with us and subsequently constructed the Mount Milligan mine, which commenced commercial production in February 2014.
In October 2016, TCM was acquired by a subsidiary of Centerra and, in connection with that acquisition, Terrane and certain other subsidiary entities of TCM were amalgamated into TCM.
8 unchanged sentences
Under the terms of the amendment, our 52.25% gold stream at Mount Milligan was amended to a 35% gold stream with a purchase price equal to the lesser of $435 per ounce, or the prevailing market price, and an 18.75% copper stream with a 15% of spot cash price.
−Removed: On February 13, 2024, we entered into the Cost Support Agreement described above to incentivize Centerra to continue to invest and maximize the value of the large mineral endowment at Mount Milligan.
Permitting and Encumbrances
−Removed: As of the 2022 Technical Report, Mount Milligan held or was in the process of obtaining all permits required for the operation of its business for the defined LOM.
+Added: As of the 2022 Technical Report, TCM held or was in the process of obtaining all permits required for the operation of Mount Milligan for the defined LOM.
Mount Milligan was designed to use surface water and groundwater sources for processing.
2 unchanged sentences
In February 2019, the British Columbia Environmental Assessment Office approved an amendment to the Mount Milligan environmental assessment certificate (EAC #M09-1) to permit access to additional sources of surface water and groundwater until November 30, 2021, which was subsequently extended in early 2021 to November 2023.
−Removed: In addition to accessing water from Rainbow Creek and Meadows Creek, Mount Milligan received temporary approvals to pump water from Philip Lake during a portion of the Spring run-off period.
−Removed: Mount Milligan continues to access ground water from the Lower Rainbow Valley wellfield as well as other groundwater wells near the TSF.
+Added: In addition to accessing water from Rainbow Creek and Meadows Creek, Mount Milligan received approvals to pump water from Philip Lake during a portion of the spring run-off period.
+Added: Mount Milligan continues to access groundwater from the Lower Rainbow Valley wellfield as well as other groundwater wells near the TSF.
The operation has received approval to draw groundwater from within a 6 km radius of the operation for the LOM.
On January 6, 2022, TCM received the approval of an amendment to EAC #M09-01 to utilize LOM surface water withdrawals external to the TSF during the open water season (April 1 to November 30) from either the Nation River as a single surface water source or Rainbow Creek and Philip Lake 1 as a combined surface water source.
−Removed: Following additional engineering studies, cost optimization, and hydrological analysis, TCM is seeking Water Sustainability Act license applications for the Rainbow Creek and Philip Creek option.
−Removed: This option, in addition to the currently permitted groundwater withdrawals, will be sufficient to maintain operations at current production targets for the approved LOM.
Property Geology
−Removed: The Mount Milligan deposits are categorized as silica-saturated alkalic Cu-Au porphyry deposits associated with alkaline monzodioritic-to-syenitic igneous rocks.
+Added: The Mount Milligan deposits are categorized as silica-saturated alkalic copper-gold porphyry deposits associated with alkaline monzodioritic-to-syenitic igneous rocks.
Two styles of mineralization have been identified.
−Removed: o Early-stage porphyry Au-Cu mineralization (and early-stage vein types) associated with composite monzonite porphyry stocks and related hydrothermal breccia, and narrower dyke and breccia complexes.
−Removed: o Late-stage structurally controlled high-gold low-copper mineralization (and intermediate- to late-stage vein types) that is associated with faults and fault breccias, crosscuts/overprints the earlier stage porphyry mineralization and is more spatially widespread.
−Removed: Mineral Resource and Mineral Reserves
−Removed: Table 1 Mount Milligan – Summary of Copper and Gold Mineral Resources at
−Removed: December 31, 2023, Based on $3.75 Cu and $1,800 Au (1),(2),(3),(4)
−Removed: Cut-Off Grade (5)
−Removed: Metallurgical Recovery
−Removed: Measured Mineral Resources
−Removed: Indicated Mineral Resources
−Removed: Measured + Indicated Mineral Resources
−Removed: Inferred Mineral Resources
−Removed: Reported mineral resource is as of December 31, 2023.
−Removed: Centerra reports resources pursuant to CIM Standards.
−Removed: SK1300 does not permit reciprocal recognition of mineral resources determined under the mining disclosure regime of another jurisdiction.
−Removed: The amounts, grades and recovery of mineral resources determined under SK1300 could vary from the disclosure set forth here.
−Removed: While the SK1300 definitions are substantially similar to those set forth in the CIM Standards, there are variations.
−Removed: Mineral resources are presented exclusive of mineral reserves.
−Removed: Our stream interest at Mount Milligan is 35% of payable gold and 18.75% of payable copper.
−Removed: The mineral resources listed are 100% of the mineral resources to which our stream interest applies.
−Removed: Mineral resources are reported at an $8.46 NSR per tonne cut-off using metal prices of $3.75 per pound copper and $1,800 per ounce gold, and an exchange rate of 1USD:1.30CAD.
−Removed: The open pit mineral resources are constrained by a pit shell and are reported based on a NSR cut-off of $8.46 NSR per tonne that takes into consideration metallurgical recoveries, concentrate grades, transportation costs, and smelter treatment charges in determining economic viability.
−Removed: Metallurgical recoveries for reporting mineral resources assume variable copper recoveries between 75% and 83% and gold recoveries between 55% and 65%.
−Removed: Copper equivalent is estimated to blocks according to variable gold and copper recoveries.
−Removed: Table 2 Mount Milligan – Summary of Copper and Gold Mineral Reserves at
−Removed: December 31, 2023, Based on $3.50 Cu and $1,500 Au (1),(2),(3)
−Removed: Cut-Off Grade (4)
−Removed: Metallurgical Recovery
−Removed: Proven Mineral Reserves
−Removed: Probable Mineral Reserves
−Removed: Total Mineral Reserves
−Removed: Reported mineral reserve is as of December 31, 2023.
−Removed: Centerra reports mineral reserves pursuant to CIM Standards.
−Removed: SK1300 does not permit reciprocal recognition of mineral reserves determined under the mining disclosure regime of another jurisdiction.
−Removed: The amounts, grades and recovery of reserves determined under SK1300 could vary from the disclosure set forth here.
−Removed: While the SK1300 definitions are substantially similar to those set forth in the CIM Standards, there are variations.
−Removed: Our stream interest at Mount Milligan is 35% of payable gold and 18.75% of payable copper.
−Removed: The mineral reserves listed are 100% of the mineral reserves to which our stream interest applies.
−Removed: The mineral reserves have been estimated based on a gold price of $1,500 per ounce, copper price of $3.50 per pound and an exchange rate of 1USD:1.30CAD.
−Removed: The open pit mineral reserves are estimated by Centerra based on an NSR cut-off of $8.65 per tonne that takes into consideration metallurgical recoveries, concentrate grades, transportation costs, and smelter treatment charges in determining economic viability.
−Removed: Metallurgical recoveries are estimated using regression curves based on operational and metallurgical test work data.
−Removed: Annual average copper recoveries range from 76.4% to 82.4%.
−Removed: Annual average gold recoveries range from 55.2% to 64.2%.
−Removed: Change in Mineral Resources and Mineral Reserves from Prior Year
−Removed: For Mount Milligan, mineral resources and mineral reserves increased as of December 31, 2023, as compared to mineral resources and mineral reserves as of December 31, 2022, due to changes in economic assumptions for resources and reserves reporting.
−Removed: Gold measured and indicated mineral resources increased from 1.7 million to 2.3 million ounces (34%) and copper increased from 695 million to 851 million pounds (22%).
−Removed: Gold proven and probable mineral reserves increased from 2.6 million to 2.8 million ounces (7%) and copper increased from 902 million to 962 million pounds (7%).
+Added: • Early-stage porphyry gold-copper mineralization (and early-stage vein types) associated with composite monzonite porphyry stocks and related hydrothermal breccia, and narrower dyke and breccia complexes.
+Added: • Late-stage structurally controlled high-gold low-copper mineralization (and intermediate- to late-stage vein types) that is associated with faults and fault breccias, crosscuts/overprints the earlier stage porphyry mineralization and is more spatially widespread.
Recent Developments
2 unchanged sentences
Gold and copper stream deliveries for the year ended December 31, 2024, relate to mine production during the approximate period August 2023 to July 2024.
−Removed: During this period Centerra reported production was impacted by mine sequencing and lower gold grades than planned when mining was occurring in an ore-waste transition zone, with this lower grade ore also impacting plant recoveries.
−Removed: The decrease in deliveries was also impacted by differences in timing of shipments and settlements during the periods.
−Removed: On October 31, 2023, Centerra reported that a full asset optimization review of Mount Milligan has been launched, which includes assessments of productivity and cost efficiency opportunities in concert with mine plan optimization.
−Removed: Centerra expects this review to identify and drive incremental operational improvements and is expected to be completed in 2024.
+Added: During this period Centerra reported the increase in production was primarily attributed to higher head grades and higher mill throughput.
+Added: The increase in deliveries was primarily due to higher gold grade.
+Added: Gold stream deliveries are based on a fixed payability factor of 97% and copper stream deliveries are based on a minimum payability factor of 95%.
On February 13, 2024, we entered into the Cost Support Agreement described above to incentivize Centerra to continue to invest and maximize the value of the large mineral endowment at Mount Milligan.
−Removed: The Cost Support Agreement is expected to provide a basis for a reserve increase and extension of the Mount Milligan mine life to 2035.
−Removed: Additionally, on February 14, 2024, Centerra provided 2024 production guidance for Mount Milligan of 180,000 to 200,000 ounces of gold and 55 to 65 million pounds of copper.
−Removed: The disclosures below regarding Pueblo Viejo are derived from the Technical Report on the Pueblo Viejo Mine, Sánchez Ramírez Province, Dominican Republic dated March 17, 2023 in accordance with NI 43-101 and CIM Standards, and the mineral resource and mineral reserve updates are derived from Barrick’s MD&A dated February 13, 2024 pursuant to NI 43-101.
−Removed: Royal Gold requested information prepared pursuant to SK1300 or access to the underlying technical data sufficient to prepare its own technical report summary, and the operator denied the request.
−Removed: The Pueblo Viejo mine is located in the province of Sánchez Ramírez, Dominican Republic, at 18.94°N latitude and 70.17°W longitude, approximately 100 km northwest of Santo Domingo, and is owned by a joint venture in which Barrick holds a 60% interest and is responsible for operations, and in which Newmont Corporation (“Newmont”) holds a 40% interest.
+Added: The Cost Support Agreement provided a basis for a reserve increase and extension of the Mount Milligan mine life to 2035 and may provide a basis for further extension of the mine life beyond 2035.
+Added: On October 31, 2024, Centerra reported that work continued on the site-wide optimization program, and notable achievements during the first nine months of 2024 include an improved safety record, increased availability and utilization of the haul fleet, and consistent ore supply which has led to increased mill throughput per operating day.
+Added: In addition, Centerra is progressing work on a preliminary economic assessment (“PEA”) to evaluate the substantial mineral resources at Mount Milligan with a goal to unlock additional value beyond its current 2035 mine life.
+Added: Centerra expects the PEA to be completed towards the end of the first half of 2025.
+Added: The disclosures below regarding Pueblo Viejo are derived from the Technical Report on the Pueblo Viejo Mine, Sánchez Ramírez Province, Dominican Republic dated March 17, 2023 in accordance with NI 43-101 and CIM Standards.
+Added: Royal Gold requested information prepared pursuant to S-K 1300 or access to the underlying technical data sufficient to prepare its own technical report summary, and the operator denied the request.
+Added: The Pueblo Viejo mine is located in the province of Sánchez Ramírez, Dominican Republic, at 18.94°N latitude and 70.17°W longitude, approximately 100 km northwest of Santo Domingo, and is owned by a joint venture in which Barrick holds a 60% interest and is responsible for operations, and in which Newmont holds a 40% interest.
Pueblo Viejo is accessed from Santo Domingo by traveling northwest on Autopista Duarte, Highway #1, approximately 77 km to Piedra Blanca and proceeding east for approximately 22.5 km on Highway #17 to the gatehouse for Pueblo Viejo.
6 unchanged sentences
Infrastructure to support the mining and processing operation is in place.
−Removed: The main road from Santo Domingo to within about 22.5 km of the mine site is a surfaced, four-lane, divided highway that is generally in good condition.
+Added: The main road from Santo Domingo to within about 22.5 km of the mine site is a paved, four-lane, divided highway that is generally in good condition.
Access from the divided highway to the site is via a two-lane, paved highway.
1 unchanged sentence
The Pueblo Viejo mine is supplied with electric power from two sources via two independent 230 kV transmission circuits.
−Removed: In 2013, Pueblo Viejo Dominicana Corporation (“PVDC”) commissioned a 218-megawatt (“MW”) Wartsila combined
−Removed: cycle reciprocating engine power plant, together with an approximately 72 km transmission line connecting the plant to the minesite.
+Added: In 2013, Pueblo Viejo Dominicana Corporation (“PVDC”) commissioned a 218-megawatt (“MW”) Wartsila combined cycle reciprocating engine power plant, together with an approximately 72 km transmission line connecting the plant to the minesite.
The power plant is located near the port city of San Pedro de Macoris on the south coast and provides the long-term power supply for the Pueblo Viejo mine.
25 unchanged sentences
Stream Agreement
−Removed: Under the Precious Metals Purchase and Sale Agreement dated August 5, 2015 between RGLD Gold and BGC Holdings Ltd.
−Removed: and Barrick, as amended, we own the right to purchase 7.5% of Barrick’s interest in the gold produced from the Pueblo Viejo mine until 990,000 ounces of gold have been delivered, and 3.75% thereafter.
+Added: Under the Precious Metals Purchase and Sale Agreement dated August 5, 2015 between RGLD Gold and BGC Holdings Ltd., and Barrick, as amended, RGLD Gold owns the right to purchase 7.5% of Barrick’s interest in the gold produced from the Pueblo Viejo mine until 990,000 ounces of gold have been delivered, and 3.75% thereafter.
The cash purchase price for gold is 30% of the spot price of gold per ounce delivered until 550,000 ounces of gold have been delivered, and 60% of the spot price of gold per ounce delivered thereafter.
−Removed: We also own the right to purchase 75% of Barrick’s interest in the silver produced from the Pueblo Viejo mine, subject to a fixed silver recovery of 70%, until 50 million ounces of silver have been delivered, and 37.5% thereafter.
+Added: RGLD Gold also owns the right to purchase 75% of Barrick’s interest in the silver produced from the Pueblo Viejo mine, subject to a fixed silver recovery of 70%, until 50 million ounces of silver have been delivered, and 37.5% thereafter.
The cash purchase price for silver is 30% of the spot price of silver per ounce delivered until 23.1 million ounces of silver have been delivered, and 60% of the spot price of silver per ounce delivered thereafter.
−Removed: As of December 31, 2023, approximately 342,800 ounces of payable gold and 12.2 million ounces of payable silver have been delivered to us.
+Added: As of December 31, 2024, approximately 369,300 ounces of payable gold and 13.1 million ounces of payable silver have been delivered to RGLD Gold.
+Added: As noted above, Barrick holds a 60% interest in the Pueblo Viejo mine, and RGLD Gold does not have the right to purchase gold or silver attributable to the remaining 40% not held by Barrick.
Property Description
Pueblo Viejo is a production stage property consisting of a conventional open pit surface mine and a complex processing circuit designed to process refractory gold-silver ore through pressure oxidation.
−Removed: Gold and silver are recovered through a CIL circuit and electrowinning.
−Removed: Barrick is in the final stages of completing a plant expansion and mine life extension
−Removed: project designed to increase throughput from 9 Mtpa to 14 Mtpa and allow the mine to maintain average annual gold production of approximately 800,000 ounces (100% basis) into the mid 2040’s.
+Added: Gold and silver are recovered through a carbon-in-leach (CIL) circuit and electrowinning.
+Added: Barrick is ramping up production after completing a plant expansion project designed to increase throughput from 9 Mtpa to 14 Mtpa and allow the mine to maintain average annual gold production of approximately 800,000 ounces (100% basis, including the 40% interest not held by Barrick).
+Added: Barrick is also working on a mine life extension that will extend the mine life to 2046.
The pit stages have been chosen to facilitate the early extraction of the most profitable ore.
1 unchanged sentence
Sulphur grade is important because the metallurgical aspects of the processing operation, the recoveries achieved, and the processing costs, all strongly depend on a very consistent, low-variability sulphur content in the plant feed.
−Removed: The Pueblo Viejo mine operates a conventional open pit, utilizing a truck and shovel mining operation mining on 10-meter high benches.
+Added: The Pueblo Viejo mine operates a conventional open pit, utilizing a truck and shovel mining operation mining on 10 m high benches.
It achieved commercial production in January 2013 and completed its ramp-up to full design capacity in 2014.
8 unchanged sentences
The existing autoclaves have been upgraded to increase the sulfur processing capacity of each autoclave through additional high-pressure cooling water and recycle flash capability using additional slurry pumping and thickening.
−Removed: The TSF is located in the El Llagal valley, located approximately 4 km south of the plant site.
−Removed: The Lower Llagal TSF, made up of one main dam and three saddle dams, will contain all of the waste rock generated over the life of the Pueblo Viejo mine as well as process tailings up to 2028.
−Removed: In addition to solids storage, the Lower Llagal TSF is sized to provide storage for an operating pond and for extreme precipitation events.
−Removed: In conjunction with the plant expansion project, Barrick is currently in the design and permitting stages to construct the new El Naranjo TSF, which is intended to extend the mine life to the mid-2040s.
+Added: The currently-operating Lower Llagal TSF, comprised of one main dam and three saddle dams, is located in the El Llagal valley, approximately 4 km south of the plant site.
+Added: In conjunction with the plant expansion project, Barrick is currently advancing work on the new El Naranjo TSF.
+Added: Barrick’s timeline for commissioning of the El Naranjo TSF is by late 2029, and Barrick expects the facility to provide storage capacity for 8 additional years beyond the current mine life, which is expected to be to 2046.
Age and Condition of Infrastructure
The mine initiated pre-stripping in 2010 and the mill was commissioned in 2012.
−Removed: We do not have specific information about the physical condition of equipment and infrastructure at the site.
+Added: The plant expansion project was substantially completed in 2024.
+Added: However, various optimization projects remain ongoing to achieve the expected throughput and recovery rates.
+Added: Royal Gold does not have specific information about the physical condition of equipment and infrastructure at site.
The operator does not provide us with the operator’s book value or total cost detail for the property and associated plant and equipment.
6 unchanged sentences
In 2000, the Dominican Republic invited international bids for the leasing and mineral exploitation of the Pueblo Viejo mine site.
−Removed: In July 2001, PVDC (then known as Placer Dome Dominicana Corporation), an affiliate of
−Removed: Placer Dome, was awarded the bid.
−Removed: PVDC and the Dominican Republic subsequently negotiated the SLA for the Montenegro Fiscal Reserve, which was ratified by the Dominican National Congress and became effective on July 29, 2003.
+Added: In July 2001, PVDC (then known as Placer Dome Dominicana Corporation), an affiliate of Placer Dome, was awarded the bid.
+Added: PVDC and the Dominican Republic subsequently negotiated the SLA for the Montenegro Fiscal Reserve, which was ratified by the Dominican Republic National Congress and became effective on July 29, 2003.
In March 2006, Barrick acquired Placer Dome and in May 2006 amalgamated the companies.
2 unchanged sentences
In 2009, the Dominican Republic and PVDC agreed to amend the terms of the SLA.
−Removed: The amendment became effective on November 13, 2009 following its ratification by the Dominican National Congress.
+Added: The amendment became effective on November 13, 2009 following its ratification by the Dominican Republic National Congress.
The Pueblo Viejo mine achieved commercial production in January 2013.
22 unchanged sentences
In the second half of 2016, PVDC was contracted to act as an agent of the Dominican State to carry out activities for which the Dominican State is responsible under the SLA pursuant to the Environmental Management Plan of the State (Plan de Administración del Estado).
−Removed: The requisite environmental permits were received in November 2016 to carry out the first stage of the closure plan, which focuses on dewatering, buttressing, and improving the stability of the old Mejita tailings facility.
−Removed: Dewatering of the old Mejita tailings facility was completed in 2018, as well as the geotechnical investigation program.
−Removed: In 2020, the Environmental Management Plan of the State (Plan de Administración del Estado) achieved progress for the Mejita tailings cover component, with work occurring mainly at the north and central ponds.
−Removed: Progress was also
−Removed: made on the buttress excavation, with phase 1 now complete.
−Removed: In 2022, the PVDC plans to complete the buttress engineering design for phase 2 and then resume the buttress fill construction and tailings cover component.
+Added: The requisite environmental permits were received in November 2016 to carry out the first stage of the closure plan, and work has progressed since then on dewatering, buttressing, and covering the old Mejita TSF.
In addition to the mine operations, by means of the Second Amendment to the SLA, the Dominican government granted PVDC a power concession to generate electricity for consumption by the mine and the right to sell excess power.
Also, in March 2012, PVDC obtained an environmental permit for the Quisqueya 1 power plant and a power transmission line from San Pedro where the power plant is situated to the mine site.
−Removed: Barrick is currently completing work to advance studies for the construction of the new El Naranjo tailings impoundment facility, and permitting activities are underway.
−Removed: Barrick also reported that in 2021, PVDC’s activities at the Pueblo Viejo mine were, and continue to be, in compliance in all material respects with applicable corporate standards and environmental regulations.
+Added: Barrick is currently advancing work on the new El Naranjo TSF, and permitting activities are underway.
Property Geology
10 unchanged sentences
To the south, the Pueblo Viejo Member is overthrust by the Hatillo Limestone Formation, thought to be Cenomanian (93 Ma to 99 Ma), or possibly Albian (99 Ma to 112 Ma), in age.
−Removed: Mineral Resources and Mineral Reserves
−Removed: Table 1 Pueblo Viejo – Summary of Gold and Silver Mineral Resources at December 31, 2023,
−Removed: Based on $1,700 Au and $21 Ag (1),(2),(3)
−Removed: Cut-Off Grades (4)
−Removed: Metallurgical Recovery (5)
−Removed: Measured Mineral Resources
−Removed: Indicated Mineral Resources
−Removed: Measured + Indicated Mineral Resources
−Removed: Inferred Mineral Resources
−Removed: Reported mineral resource is as of December 31, 2023.
−Removed: Barrick reports mineral resources pursuant to the CIM Standards.
−Removed: SK1300 does not permit reciprocal recognition of mineral resources determined under the mining disclosure regime of another jurisdiction.
−Removed: The amounts, grades and recovery of mineral resources determined under SK1300 could vary from the disclosure set forth here.
−Removed: While the SK1300 definitions are substantially similar to those set forth in the CIM Standards, there are variations.
−Removed: Mineral resources are presented independent of mineral reserves.
−Removed: Our stream interest at Pueblo Viejo is 7.5% of payable gold until 990,000 ounces are delivered, 3.75% thereafter, and 75% of payable silver until 50 million ounces are delivered, and 37.5% thereafter.
−Removed: Mineral resources are disclosed on a 60% basis, as our stream agreement covers the 60% ownership share held by Barrick.
−Removed: Specific cut-off grades for mineral resource estimates for Pueblo Viejo have not been disclosed by the operator.
−Removed: Gold and silver metallurgical recovery assumptions for Pueblo Viejo have not been disclosed by the operator.
−Removed: Table 2 Pueblo Viejo – Summary of Gold and Silver Mineral Reserves at December 31, 2023,
−Removed: Based on $1,300 Au and $18 Ag (1),(2)
−Removed: Cut-Off Grades (3)
−Removed: Metallurgical Recovery (4)
−Removed: Proven Mineral Reserves
−Removed: Probable Mineral Reserves
−Removed: Total Mineral Reserves
−Removed: Reported mineral reserve is as of December 31, 2023.
−Removed: Barrick reports mineral reserves pursuant to CIM Standards.
−Removed: SK1300 does not permit reciprocal recognition of mineral reserves determined under the mining disclosure regime of another jurisdiction.
−Removed: The amounts, grades and recovery of mineral reserves determined under SK1300 could vary from the disclosure set forth here.
−Removed: While the SK1300 definitions are substantially similar to those set forth in the CIM Standards, there are variations.
−Removed: Our stream interest at Pueblo Viejo is 7.5% of payable gold until 990,000 ounces are delivered, 3.75% thereafter, and 75% of payable silver until 50 million ounces are delivered, and 37.5% thereafter.
−Removed: Mineral reserves are disclosed on a 60% basis, as our stream agreement covers the 60% ownership share held by Barrick.
−Removed: Specific cut-off grades for mineral reserve estimates for Pueblo Viejo have not been disclosed by Barrick.
−Removed: Gold and silver metallurgical recovery assumptions for Pueblo Viejo have not been disclosed by Barrick.
−Removed: Change in Mineral Resources and Mineral Reserves from Prior Year
−Removed: Between December 31, 2022 and December 31, 2023, measured and indicated gold mineral resources increased from 2.8 million to 3.5 million ounces (25%) and silver mineral resources increased from 15 million to 17 million ounces (13%).
−Removed: Proven and probable gold mineral reserves decreased from 12.3 million to 11.9 million ounces (3.3%) and silver mineral reserves decreased from 77 million to 74 million ounces (3.9%) net of mining depletion.
−Removed: This was primarily a result of mining depletion, offset by resource expansion due to ongoing exploration.
Recent Developments
Gold stream deliveries from Pueblo Viejo were approximately 26,500 ounces for the year ended December 31, 2024, compared to approximately 25,400 ounces for the year ended December 31, 2023.
−Removed: Gold production was impacted by lower ore grades processed due to mine sequencing, as well as lower mill throughput and lower mill recovery associated with the commissioning of the mill expansion.
−Removed: Silver stream deliveries were approximately 0.9 million ounces for the year ended December 31, 2023, compared to 1.2 million ounces for the year ended December 31, 2022.
+Added: The increase in gold production was primarily a result of increased throughput.
+Added: Deliveries are quarterly and typically occur 1 to 3 months after mine production.
+Added: Gold stream deliveries are based on a fixed payability factor of 99.9%.
+Added: Silver stream deliveries were approximately 859,900 ounces for the year ended December 31, 2024, compared to 907,000 ounces for the year ended December 31, 2023.
+Added: Silver stream deliveries are based on a fixed payability factor of 99.0%.
+Added: Deliveries are quarterly and typically occur 1 to 3 months after mine production.
During the year ended December 31, 2024, an additional 816,500 ounces of silver deliveries were deferred.
+Added: As of December 31, 2024, approximately 1.67 million ounces remain deferred.
The deferred ounces are the result of a mechanism in the stream agreement that allows for the deferral of deliveries in a period if Barrick’s share of silver production is insufficient to cover its stream delivery obligations.
−Removed: The stream agreement terms include a fixed 70% silver recovery rate.
−Removed: If actual recovery rates fall below the contractual 70% recovery rate, ounces may be deferred with deferred ounces to be delivered in future periods as silver recovery allows.
−Removed: As of December 31, 2023, approximately 854,000 ounces remain deferred.
−Removed: We expect that silver recoveries could remain highly variable and material deliveries of deferred silver ounces are not expected until the plant expansion project is complete and is running at full production levels.
−Removed: On February 14, 2024, Barrick provided an update on the plant expansion and mine life extension project at Pueblo Viejo.
−Removed: According to Barrick, construction and commissioning activities for the plant expansion were substantially completed by the end of 2023.
−Removed: Reconstruction of the ore stockpile feed conveyor is underway after a failure reported in the fourth quarter, and Barrick now expects this reconstruction to be completed in the second quarter of 2024, which will allow the plant to reach full throughput.
−Removed: Barrick further reported that the focus during the first quarter of 2024 will be on the continued
−Removed: stability and optimization of the flotation circuit.
−Removed: With respect to the mine life extension project, Barrick reported that the technical and social studies for additional tailings storage capacity at the El Naranjo facility continued to advance as planned.
−Removed: Geotechnical drilling and site investigations are ongoing and continue to support the feasibility study, due for completion in the third quarter of 2024.
−Removed: Barrick is expecting its share of gold production at Pueblo Viejo to be 420,000 to 490,000 ounces in 2024 (60% basis).
−Removed: The disclosures below regarding Cortez are derived from the Technical Report on the Cortez Complex dated March 18, 2022 pursuant to NI 43-101 and CIM Standards, and from Barrick’s Technical Report Summary dated February 23, 2023, and from Barrick’s MD&A dated February 13, 2024 pursuant to NI 43-101.
−Removed: Barrick provides us with non-public mineral resource and mineral reserve updates specific to our royalty area in accordance with CIM Standards.
−Removed: While Barrick has announced updated mineral resources and mineral reserves for Cortez in its February 13, 2024 MD&A, as of the date of this disclosure, we have not yet received updates specific to our royalty area.
−Removed: Royal Gold requested information prepared pursuant to SK1300 or access to underlying technical data sufficient to prepare its own technical report summary, and the operator denied the request.
+Added: The stream agreement terms include a fixed 70% silver recovery rate but permits the deferral of ounces if recovery rates fall below 52.5%.
+Added: On November 22, 2024, Barrick provided an update on the ramp-up of the plant expansion and a production outlook for Pueblo Viejo.
+Added: Barrick outlined several projects that are intended to achieve planned throughput and recoveries, and Barrick expects plant throughput to increase steadily from 2024 and reach the expanded 14 million tonne per year capacity in 2028.
+Added: As part of this throughput optimization, Barrick noted a planned 35-day impact to production in the first quarter of 2025 to complete a thickener optimization.
+Added: Barrick expects gold recovery to increase from approximately 80% at the end of 2024 to 90% by the end of 2026, and Barrick reported that a project to improve silver recovery is expected to be complete by the fourth quarter of 2025.
+Added: Barrick further reported that gold production is expected to increase steadily from approximately 600,000 ounces in 2024 to over 800,000 ounces in 2026 (100% basis).
+Added: Barrick did not provide forecasts for silver production.
+Added: In conjunction with the plant expansion project, Barrick reported that it is currently advancing the construction of the new El Naranjo TSF.
+Added: Barrick also reported that the timeline for commissioning the El Naranjo TSF is by late 2029, with the facility expected to provide storage capacity for eight additional years beyond the current mine life, which is expected to be to 2046.
+Added: On February 12, 2025, Barrick announced 2025 gold production guidance of 370,000 to 410,000 ounces for its 60% share of Pueblo Viejo.
+Added: The disclosures below regarding Cortez are derived from the Technical Report on the Cortez Complex dated March 18, 2022 pursuant to NI 43-101 and CIM Standards, and from Barrick’s Annual Information Form, dated March 15, 2024, and Management’s Discussion and Analysis, dated February 13, 2024, pursuant to NI 43-101.
+Added: Royal Gold requested information prepared pursuant to S-K 1300 or access to underlying technical data sufficient to prepare its own technical report summary, and the operator denied the request.
Cortez is a series of large open pit and underground mines, utilizing mill and heap leach processing, which are operated by Nevada Gold Mines LLC (“NGM”), a joint venture between Barrick and Newmont with respect to their Nevada operations.
2 unchanged sentences
Cortez is located in the high desert region of the Basin and Range physiographic province.
−Removed: The mean annual temperature is 51°F.
−Removed: Precipitation averages six inches per year, primarily derived from snow and summer thunderstorms.
+Added: The mean annual temperature is 11°C.
+Added: Precipitation averages 15 cm per year, primarily derived from snow and summer thunderstorms.
Infrastructure
1 unchanged sentence
The site is accessed by driving west from Elko on Interstate 80 approximately 75 km, and proceeding south on State Highway 306 approximately 56 km.
−Removed: Both US Interstate 80 and Nevada State Route 306 are paved roads.
+Added: Both US Interstate 80 and State Highway 306 are paved roads.
The Union Pacific Rail line runs parallel to US Interstate 80 to the north of Cortez.
Elko, the closest city to Cortez, is serviced by daily commercial airline flights to Salt Lake City, Utah.
−Removed: Electric power is provided to the Cortez site by NV Energy by an approximately 80 km long radial transmission line originating at their Falcon substation.
+Added: Electric power is provided to the Cortez site by NV Energy by an approximately 80 km long radial transmission line originating at its Falcon substation.
The incoming NV Energy line terminates at the Barrick owned Pipeline Substation.
1 unchanged sentence
an approximately 15 km extension to serve the Cortez Hills development and an approximately 5 km extension to serve the South Pipeline and Crossroads pits.
+Added: Wells Rural Electric Company provides power to Goldrush via a separate 120 kV power line.
Water for process use at Cortez Mill No.
16 unchanged sentences
For purposes of simplified disclosure, we have divided our royalty interests at the Cortez Complex into two zones:
−Removed: the Legacy Zone and the Cortez Complex Zone.
+Added: the Legacy Zone and the Cortez Complex Zone ("CC Zone").
The Legacy Zone is our largest royalty exposure at the Cortez Complex, representing an equivalent 9.4% GSR royalty rate over the Pipeline and Crossroads deposits.
The CC Zone includes an equivalent 1.6% GSR royalty over the Cortez Hills, Cortez Pits, Fourmile, and Goldrush deposits, a 2.2% GSR royalty rate over the Goldrush SE deposit, and a 0.45% GSR royalty rate over the Robertson deposit.
−Removed: NGM does not provide guidance or production results for the individual mines within the Cortez Complex, and each of the NGM partners provides consolidated guidance and results for their respective interests.
−Removed: We have typically provided, and expect to continue to provide, annual guidance for the total gold production subject to the Legacy Zone royalty interest.
+Added: NGM does not provide guidance or production results for the individual mines within the Cortez Complex, and both of the NGM partners provide consolidated guidance and results for their respective interests.
+Added: We have typically provided, and subject to approval by Barrick, expect to continue to provide, annual guidance for the total gold production subject to the Legacy Zone royalty interest.
This guidance includes overlapping contributions from the Pipeline and Crossroads deposits in certain areas and is not directly comparable to actual production from these deposits.
Table 1 Cortez Complex – Royal Gold Royalty Interests
+Added: Mine/Deposit/Area Mine Type Ore Process Simplified Royalty Rates Detailed Royal Gold Royalty Coverage and Rates
+Added: Approximate Blended
+Added: Legacy Royalties 2
+Added: Rio Tinto Royalty Idaho
+Added: Royalty Applicable Royalty Rate Royalty Rate Royalty Rate 8
+Added: Royalty Rate Approximate Blended Rate 3
+Added: Producing Pipeline Open Pit Heap leach, oxide mill, roaster, autoclave Legacy Zone 9.4% GSR1, GSR2 5% GSR 4
+Added: 8% GSR 1.2% GVR 7
+Added: GSR3 0.7125% GSR
+Added: NVR1 4.91% NVR
+Added: Crossroads Open Pit Heap leach, oxide mill, roaster GSR2 5% GSR 4
+Added: GSR3 0.7125% GSR
+Added: NVR1C 4.52% NVR 5
+Added: Cortez Hills Underground Oxide mill, roaster, autoclave CC Zone 1.6% 0.45% GSR
+Added: Cortez Pits Open Pit Oxide mill, heap leach, roaster
+Added: Development Fourmile Underground Roaster, autoclave
+Added: Goldrush Underground Roaster, autoclave
+Added: Goldrush SE Underground Roaster, autoclave 2.2% NVR2 1.0% NVR 6
+Added: Robertson Open Pit Oxide mill, heap leach 0.5%
+Added: _______________________________
Approximate equivalent royalty after blending the detailed royalty rates.
16 unchanged sentences
Idaho Royalty rates are rounded.
−Removed: We also own two additional royalties in the Cortez area where there is currently no production and no mineral resources or mineral reserves attributed to these royalty interests.
+Added: We also own two additional royalties in the Cortez area where there is currently no attributable production.
Royalty Agreements
4 unchanged sentences
Inc., Royal Gold and Royal Crescent;
−Removed: Second Amended Memorandum of Grant of Royalty dated December 8, 2000 between Cortez JV, Placer Dome U.S.
+Added: that Second Amended Memorandum of Grant of Royalty dated December 8, 2000 between Cortez JV, Placer Dome U.S.
Inc., Royal Gold and Royal Crescent;
39 unchanged sentences
2007-211323 in Eureka County;
−Removed: that General Warranty Deed with Reservation of Royalty (South) dated December 11, 2007 from The Thomas and Volina Connolly Family Trust to Barrick Gold U.S., recorded as Document No.
+Added: that General Warranty Deed with Reservation of Royalty (South) dated December 11, 2007 from The Thomas and Volina Connolly Family Trust to Barrick Gold U.S.,
+Added: recorded as Document No.
2007-211324 in Eureka County;
−Removed: as assigned by that Assignment of Mining Leases and Option Agreements
−Removed: dated January 7, 2014 between The Thomas and Volina Connolly Family Trust and Royal Gold, Inc., recorded as Document No.
+Added: as assigned by that Assignment of Mining Leases and Option Agreements dated January 7, 2014 between The Thomas and Volina Connolly Family Trust and Royal Gold, Inc., recorded as Document No.
2014-226564 in Eureka County;
22 unchanged sentences
NGM is operated by Barrick.
−Removed: The Cortez Complex comprises the Pipeline, Crossroads, Cortez Hills, Cortez Pits and Gold Acres open pit operations, the Cortez Hills underground mining operation, and the Goldrush, Fourmile and Robertson development projects.
+Added: The Cortez Complex comprises the Pipeline, Crossroads, Cortez Hills, Cortez Pits and Gold Acres open pit operations, the Cortez Hills and Goldrush underground mining operations, and the Fourmile and Robertson development projects.
The Fourmile project is 100% owned by Barrick and is not currently included in the NGM joint venture, but may be contributed to the joint venture if certain criteria are met in the future.
2 unchanged sentences
Two different mining methods are used at the underground operations, long-hole open stoping and drift-and-fill.
−Removed: Underground operations at Cortez Hills are based on an ore production rate of 3,500 tpd.
+Added: Underground operations at the Cortez Hills and Goldrush mines are based on ore production rates of 3,500 tpd and 6,000 tpd, respectively.
The gold-recovery process used at the Cortez Complex is determined by considering the grade and metallurgical character of the particular ore:
6 unchanged sentences
Plant throughput can reach up to 16,300 tpd depending on the hardness of the ore being processed.
−Removed: The Goldrush underground project is currently in development.
−Removed: The primary access is a set of twin declines developed to allow exploration and initial test stoping on the orebody.
−Removed: The primary method of extraction at the Goldrush mine is longhole open stoping.
+Added: The Goldrush underground mine is currently ramping up to full production levels after officially opening in early 2024.
+Added: The primary access is a set of twin declines and the primary method of extraction at the Goldrush mine is longhole open stoping.
The basic mining unit is a stope with the dimensions of 15 m (width) by 15 m (strike length) by 20 m (height).
−Removed: The stopes will be extracted on a transverse primary/secondary system with (where possible), a continuous mining front.
+Added: The stopes are extracted on a transverse primary/secondary system with (where possible), a continuous mining front.
Broken material is hauled from the mine using 63-tonne capacity haul trucks out of the mine declines.
2 unchanged sentences
Most of the Goldrush deposit contains typical double refractory roast-type ore (gold locked in sulfides and organic preg-robbing carbon present).
−Removed: All Goldrush samples showed a relatively high gold recovery in the bench-scale roast tests.
−Removed: Both the Carlin and Gold Quarry roasters at NGM’s Carlin Complex are capable of generating high gold recoveries from the Goldrush ore, and ore is expected to be trucked and processed at both facilities.
+Added: Both the Carlin and Gold Quarry roasters at NGM’s Carlin Complex are capable of generating high gold recoveries from the Goldrush ore, and ore is trucked and processed at both facilities.
Barrick has reported that development of the Robertson open pit project is proposed to be in alignment with the Cortez Complex open pit operations, using conventional drill and blast techniques and truck and shovel fleet.
31 unchanged sentences
The major environmental analysis documents (e.g.
−Removed: Environmental Assessment, EIS, Supplemental Environmental Impact Statement, Record of Decision (“ROD”), Finding of No Significant Impact and POOs that have been issued for the currently active areas of Cortez (i.e., Crossroads, Pipeline, and Cortez Hills).
+Added: Environmental Assessment, EIS, Supplemental Environmental Impact Statement, Record of Decision (“ROD”), Finding of No Significant Impact and POOs) have been issued for the currently active areas of Cortez (i.e., Crossroads, Pipeline, Goldrush and Cortez Hills).
+Added: The ROD for the Robertson project was received in November, 2024.
Reclamation of disturbed areas resulting from mining activities will follow the approved Reclamation Plan and will be completed in accordance with BLM and NDEP regulations that are intended to prevent unnecessary or undue degradation of public lands by operators authorized by the mining laws.
26 unchanged sentences
Gold at Robertson is present as native gold, with minor electrum, and all gold present is free-milling.
−Removed: Mineral Resources and Mineral Reserves
−Removed: Table 1 Cortez – Summary of Gold Mineral Resources at December 31, 2023,
−Removed: Based on $1,700 Au (1),(2),(3)
−Removed: Cut-Off Grade
−Removed: Metallurgical Recovery
−Removed: Measured Mineral Resources
−Removed: Indicated Mineral Resources
−Removed: Measured + Indicated Mineral Resources
−Removed: Inferred Mineral Resources
−Removed: Reported mineral resource is as of December 31, 2023.
−Removed: Barrick reports mineral resources pursuant to CIM Standards.
−Removed: SK1300 does not permit reciprocal recognition of mineral resources determined under the mining disclosure regime of another jurisdiction.
−Removed: The amounts, grades and recovery of mineral resources determined under SK1300 could vary from the disclosure set forth here.
−Removed: While the SK1300 definitions are substantially similar to those set forth in the CIM Standards, there are variations.
−Removed: Mineral resources are presented exclusive of mineral reserves.
−Removed: We control various royalty positions at Cortez, including (i) the overlapping royalties covering the Pipeline and Crossroads deposits (known as GSR1, GSR2, GSR3, NVR1 and NVR1C), which are equivalent to an approximate 8% gross smelter return royalty and cover (as of December 31, 2021) 5.2 million tonnes of measured and indicated mineral resources at an average grade of 1.33 gpt;
−Removed: (ii) NVR2 over a portion of the Goldrush property, which is a 1% NVR covering 0.9 million tonnes of indicated
−Removed: resource averaging 4.42 gpt and 2.1 million tonnes of inferred resources grading 4.67 gpt.;
−Removed: (iii) The Rio Tinto Royalty, which is an effective 1.2% gross royalty on the Cortez Complex (excluding the existing Robertson deposits) at gold prices above $900 per ounce;
−Removed: and (iv) the Idaho Royalty, which is an approximate 0.24% gross royalty covering areas including the Pipeline and Crossroads deposits, and an approximate 0.45% gross royalty covering areas including the Cortez Hills, Goldrush, Fourmile and Robertson deposits.
−Removed: Barrick has updated mineral resource reporting for Cortez as of December 31, 2022, but has not yet provided us with the breakdown by region.
−Removed: Our royalties for Cortez cover all metals, but Barrick reports only gold resources for Cortez.
−Removed: Specific cut-off grades for mineral resource estimates for Cortez have not been disclosed by Barrick.
−Removed: Metallurgical recovery assumptions for Cortez have not been disclosed by Barrick.
−Removed: Table 2 Cortez – Summary of Gold Mineral Reserves at December 31, 2023,
−Removed: Based on $1,300 Au and $18 Ag (1),(2)
−Removed: Cut-Off Grade
−Removed: Metallurgical Recovery
−Removed: Proven Mineral Reserves
−Removed: Probable Mineral Reserves
−Removed: Total Mineral Reserves
−Removed: Reported mineral reserve is as of December 31, 2023.
−Removed: Barrick reports mineral reserves pursuant to CIM Standards.
−Removed: SK1300 does not permit reciprocal recognition of mineral reserves determined under the mining disclosure regime of another jurisdiction.
−Removed: The amounts, grades and recovery of mineral reserves determined under SK1300 could vary from the disclosure set forth here.
−Removed: While the SK1300 definitions are substantially similar to those set forth in the CIM Standards, there are variations.
−Removed: We control various royalty positions at Cortez, including (i) the overlapping royalties covering the Pipeline and Crossroads deposits (known as GSR1, GSR2, GSR3, NVR1 and NVR1C), which are equivalent to an approximate 8% gross smelter return royalty and cover (as of December 31, 2021) 56.6 million tonnes of proven and probable reserves at an average grade of 1.65 gpt;
−Removed: (ii) NVR2 over a portion of the Goldrush property, which is a 1% NVR covering 4.9 million tonnes of probable reserves averaging 7.13 gpt;
−Removed: (iii) The Rio Tinto Royalty, which is an effective 1.2% gross royalty on the Cortez Complex (excluding the existing Robertson deposits) at gold prices above $900 per ounce;
−Removed: and (iv) the Idaho Royalty, which is an approximate 0.24% gross royalty covering areas including the Pipeline and Crossroads deposits, and an approximate 0.45% gross royalty covering areas including the Cortez Hills, Goldrush, Fourmile and Robertson deposits.
−Removed: Barrick has updated reserve reporting for Cortez, but has not yet provided us with the breakdown by region.
−Removed: Our royalties for Cortez cover all metals, but Barrick reports only gold reserves for the property.
−Removed: Specific cut-off grades for mineral reserve estimates for Cortez have not been disclosed by Barrick.
−Removed: Metallurgical recovery assumptions for Cortez have not been disclosed by Barrick.
−Removed: Change in Mineral Resources and Mineral Reserves from Prior Year
−Removed: From December 31, 2022 to December 31, 2023, measured and indicated gold mineral resources have increased from 5.2 million to 5.4 million ounces (3%) and proven and probable gold mineral reserves have decreased from 15.7 million to 14.7 million ounces (6%), primarily as a result of mining depletion, partially offset by reserves replacement.
Recent Developments
Production attributable to our royalty interests at the Cortez Complex for the year ended December 31, 2024, was approximately 720,200 ounces of gold, of which 209,200 ounces were attributable to the Legacy Zone, and 511,000 ounces were attributable to the CC Zone, compared to approximately 890,700 ounces of gold for the year ended December 31, 2023, of which 396,000 ounces were attributable to the Legacy Zone, and 494,700 ounces were attributable to the CC Zone.
−Removed: The increase was primarily due to the addition of new royalties in 2022 that increased royalty coverage over producing areas within the Cortez Complex.
−Removed: On December 11, 2023, Barrick reported that the ROD approving the plan of operations for the new Goldrush mine was issued by the BLM, approximately 6 months later than Barrick’s initial expectation.
−Removed: Barrick anticipates production to ramp up in 2024 after commissioning of the initial project infrastructure, and has forecasted gold production from Goldrush of 130,000 ounces in 2024, growing to approximately 400,000 ounces per year in 2028 (100% basis) .
−Removed: Further, on February 14, 2024, Barrick reported that production at the Cortez Complex in 2024 is expected to be lower in 2024 relative to 2023 primarily due to changes in the Crossroads resource model that are expected to reduce oxide mill feed.
−Removed: Barrick expects this reduction to be partially offset by a higher contribution from Goldrush, although the delay in receiving the ROD during 2023 has pushed some production at Goldrush from 2024 into 2025.
−Removed: Barrick is expecting gold production at the Cortez Complex to be 620,000 to 680,000 ounces in 2024 (100% basis).
−Removed: The disclosures below regarding Peñasquito are derived from the NI 43-101 Technical Report dated June 30, 2018 pursuant to NI 43-101 and CIM Standards, and the mineral resource and reserve updates are derived from Newmont’s 10-K dated December 31, 2022, pursuant to SK1300.
−Removed: Royal Gold requested information prepared in accordance with SK1300 or access to underlying technical data sufficient to prepare its own technical report summary, and the operator denied the request.
−Removed: The Peñasquito open pit mine and ore processing facilities are located approximately 200 km northeast of the city of Zacatecas and 27 km west of the town of Concepción del Oro, Zacatecas, Mexico, at 24.65°N latitude and 101.68°W longitude.
−Removed: The terrain is generally flat, with some rolling hills, and the prevailing elevation of the property is approximately 1,900 m above sea level.
−Removed: The climate is generally dry with precipitation being limited for the most part to a rainy season in the months of June and July.
−Removed: Annual precipitation for the area is approximately 700 mm.
−Removed: Infrastructure
−Removed: Infrastructure to support the mining and processing operation is in place and well established.
−Removed: There are two access routes to the site.
−Removed: The first is via a turnoff from Highway 54 onto the State La Pardita road, then onto the Mazapil to Cedros State road.
−Removed: The second access is via the Salaverna by-pass road from Highway 54 approximately 25 km south of Concepción del Oro.
−Removed: The Salaverna by-pass is a new, purpose-built gravel road that eliminates the steep
−Removed: switchback sections of cobblestone road just west of Concepción Del Oro and passes the town of Mazapil.
−Removed: From Mazapil, this is a well-maintained gravel road that accesses the main gate of the mine.
−Removed: The closest rail link is 100 km to the west.
−Removed: There is a private airport on site and commercial airports in the cities of Saltillo, Zacatecas and Monterrey.
−Removed: Travel from Monterrey/Saltillo is approximately 255 km, about three hours to site.
−Removed: Travel from Zacatecas is approximately 270 km, about 3.5 hours to site.
−Removed: Power is supplied from the 182 MW power purchase agreement with InterGen, delivered to the mine by the Mexican Federal Electricity Commission (Comisión Federal de Electricidad or CFE).
−Removed: CFE also continues to provide backup power supply for both planned and unplanned shutdowns from the InterGen power plant.
−Removed: Process and potable water for the Peñasquito mine is sourced from the Torres-Vergel well field located 6 km west of the Peñasquito Mine and an additional groundwater source within the Cedros basin named the Northern Well Field.
−Removed: The mine has received permits to pump up to 4 million m 3 of this water per year via eight water rights titles over the Torres and Vergel water well field and Northern Well field.
−Removed: Peñasquito continuously monitors the aquifers to ensure they remain sustainable, through a network of monitoring wells to measure water levels and water quality.
−Removed: A skilled labor force is available in the region and surrounding mining areas of Mexico.
−Removed: Fuel and supplies are sourced from nearby regional centers such as Monterrey, Monclova, Saltillo and Zacatecas and imports from the U.S.
−Removed: Site accommodations comprise a camp with full dining, laundry and recreational facilities.
−Removed: Area of Interest
−Removed: At Peñasquito, our royalty interest covers 20 mining concessions comprising 45,823 hectares covering the Chile Colorado and Peñasco open pit mines.
−Removed: Royalty Agreement
−Removed: Under the Termination of Property Rights Agreement dated May 5, 1999, between Kennecott Exploration Company, Minera Kennecott S.A.
−Removed: (together, “Kennecott”), Western Copper Holdings Ltd and Minera Western Copper S.A.
−Removed: de C.V., and assigned by Kennecott to Royal Gold in 2006 and as supplemented in 2012, we own a production payment equivalent to a 2.0% NSR royalty on all metal production from the Peñasquito open pit mine, located in the State of Zacatecas, Mexico, and operated by a subsidiary of Newmont.
−Removed: Property Description
−Removed: The Peñasquito mine is a production stage property comprised of two open pit surface mines and a complex flotation and pyrite leaching processing facility.
−Removed: The open pit operation is undertaken using a conventional truck-and-shovel fleet that consists of five rope shovels, three hydraulic shovels, 3 front-end loaders paired with 82 haul trucks with a 312-tonne payload capacity, and nine blasthole drills.
−Removed: The Peñasquito Operations currently consist of a sulfide plant that processes a maximum of 119,000 t/d of sulfide ore.
−Removed: The sulfide process plant design was based on a combination of metallurgical test work, previous study designs, and previous operating experience.
−Removed: The design is conventional to the gold industry and has no novel parameters.
−Removed: The sulfide plant consists of the following units:
−Removed: coarse ore stockpile;
−Removed: grinding (semi-autogenous grind (SAG) and ball) mills circuit;
−Removed: augmented feed circuit (cone crusher, pebble crusher and high-pressure grind roll (HPGR)) and carbon, lead and zinc flotation circuits.
−Removed: A pyrite leach process circuit treats the zinc rougher tailing from the concentrator for recovery of residual gold and silver.
−Removed: The process comprises pyrite rougher and cleaner flotation, pre-cleaner concentrate regrinding, pyrite thickening, and post-cleaner regrind, agitated tank leaching, counter-current decantation, Merrill-Crowe precipitation, precious metals refining and a cyanide detoxification circuit.
−Removed: The pyrite leach process circuit produces doré bars.
−Removed: The markets for the lead and zinc concentrates from the Peñasquito mine are worldwide with smelters located in Mexico, Canada, United States, Asia and Europe.
−Removed: All required project infrastructure, such as roadways, mine and administration buildings, process plant, explosives storage facility, fuel farm, truck shop, workshops and security, has been constructed and is operational.
−Removed: Age and Condition of Infrastructure
−Removed: Mine construction commenced in 2007.
−Removed: Sulfide processing plants were commissioned in 2009 and 2010.
−Removed: A pyrite leach project for leaching gold from pyrite tailings was completed in 2018.
−Removed: Royal Gold does not have specific information as to the physical condition or the age or condition of the equipment and infrastructure.
−Removed: The operator does not provide Royal Gold with the operator’s book value or total cost detail for the property and associated plant and equipment.
−Removed: Property History
−Removed: In 1568, Spanish explorers discovered gold-silver deposits at Concepcion del Oro, 30 km to the east of the Peñasquito operations.
−Removed: Since then, the Concepcion del Oro area has produced 1.5 million ounces of gold and 250 million ounces of silver.
−Removed: About the same time, the Spanish also worked at the project developing shallow shafts and pits.
−Removed: A summary of the known project owners over the mineral concessions covering the Peñasquito operations area are as follows:
−Removed: ● Minera Peñoles, 1950’s
−Removed: ● Minera Kennecott SA de CC, 1994-1998
−Removed: ● Western Copper Holdings Lts, 1998
−Removed: ● Minera Hochschilds S.A., 2000
−Removed: ● Western Copper, 2000-2003
−Removed: ● Western Silver Corporation, 2003-2006
−Removed: ● Goldcorp, 2006-2019
−Removed: ● Newmont, 2019-present
−Removed: Mine construction commenced in 2007.
−Removed: Initial concentrates were produced as part of the commissioning process in October 2009.
−Removed: A second sulfide processing line was commissioned in June 2010.
−Removed: A pyrite leach project for leaching gold from pyrite tailings was completed in November 2018.
−Removed: The property was acquired in April 2019 by Newmont upon the acquisition of Goldcorp.
−Removed: Permitting and Encumbrances
−Removed: Surface rights in the vicinity of the Peñasco and Chile Colorado open pits are held by three ejidos:
−Removed: Ejido Cedros, Ejido Mazapil and Ejido Cerro Gordo.
−Removed: Peñasquito has signed land use agreements with each ejidos, valid through 2035 and 2036, and the relevant private owners.
−Removed: In August 2020, Newmont and the Cedros General Assembly ratified the definitive agreement that was reached on April 22, 2020 and resolved all outstanding disputes between Peñasquito and the San Juan
−Removed: de Cedros community.
−Removed: In addition, easements have been granted in association with the La Pardita-Cedros Highway and the El Salero-Peñasquito powerline.
−Removed: Newmont holds the appropriate permits under local, State and Federal laws to allow mining operations.
−Removed: Key permits include:
−Removed: environmental impact assessment;
−Removed: land use change;
−Removed: environmental risk;
−Removed: waste management;
−Removed: concession title for groundwater extraction;
−Removed: waste water discharge permit;
−Removed: environmental license (Licencia Ambiental Única);
−Removed: explosives permit;
−Removed: and accident prevention program.
−Removed: Property Geology
−Removed: The Peñasquito operation consists of two deposits:
−Removed: the Peñasco deposit, centered on a diatreme breccia pipe;
−Removed: and the Chile Colorado deposit, comprised of mineralized sedimentary rocks adjacent to the Brecha Azul diatreme.
−Removed: The diatreme and sediments contain and are surrounded by disseminated, veinlet and vein-hosted sulfides and sulfosalts containing base metals, silver, and gold.
−Removed: Peñasco and Brecha Azul, which are funnel-shaped breccia pipes, flare upward and are filled with brecciated sedimentary and intrusive rocks, cut by intrusive dikes.
−Removed: The two diatremes are considered to represent breccia-pipe deposits developed as a result of Tertiary intrusion-related hydrothermal activity.
−Removed: Alteration mineral zoning, porphyry intrusion breccia clasts, and dikes all suggest the diatreme-hosted deposits represent distal mineralization some distance above an underlying quartz-feldspar porphyry system.
−Removed: The larger diatreme, Peñasco, has dimensions of 900 m by 800 m immediately beneath surface alluvial cover, and diatreme breccias extend to at least 1,000 m below surface.
−Removed: The Brecha Azul diatreme, which lies to the southeast of Peñasco, is about 500 m in diameter immediately below alluvium, and diatreme breccias also extend to at least 1,000 m below surface.
−Removed: Porphyritic intrusive rocks intersected in drilling beneath the breccias may connect the pipes at depth.
−Removed: Chile Colorado is a mineralized stock work located southwest of Brecha Azul in sediments of the Caracol Formation, with the geometry of approximately 600 m by 400 m immediately beneath surface alluvial cover, and it extends to at least 500 m below the surface.
−Removed: Polymetallic mineralization is hosted by the diatreme breccias, intrusive dikes, and surrounding siltstone and sandstone units of the Caracol Formation.
−Removed: The diatreme breccias are broadly classified into three units, in order of occurrence from top to bottom within the breccia column, which are determined by clast composition:
−Removed: ● Sediment-clast breccia;
−Removed: ● Mixed-clast breccia (sedimentary and igneous clasts);
−Removed: ● Intrusive-clast breccia.
−Removed: Mineralization consists of disseminations, veinlets and veins of various combinations of medium to coarse-grained pyrite, sphalerite, galena, and argentite (Ag 2 S).
−Removed: Sulfosalts of various compositions are also abundant in places, including bournonite (PbCuSbS 3 ), jamesonite (PbSb 2 S 4 ), tetrahedrite, polybasite (Ag,Cu) 16 (Sb,As) 2 S 11 , and pyrogyrite (Ag 3 SbS 3 ).
−Removed: Stibnite (Sb 2 S 3 ), rare hessite (AgTe), chalcopyrite, and molybdenite have also been identified.
−Removed: Telluride minerals are the main gold-bearing phase, with electrum and native gold also being identified.
−Removed: Mineral Resources and Mineral Reserves
−Removed: Table 1 Peñasquito – Summary of Gold, Silver, Lead, and Zinc Mineral Resources at December 31, 2022,
−Removed: Based on $1,600 Au, $23.00 Ag, $1.20 Pb, and $1.45 Zn (1),(2),(3)
−Removed: Cut-Off Grade
−Removed: Metallurgical Recovery
−Removed: Measured Mineral Resources
−Removed: Indicated Mineral Resources
−Removed: Measured + Indicated Mineral Resources
−Removed: Inferred Mineral Resources
−Removed: Reported mineral resource is as of December 31, 2022.
−Removed: Newmont reports mineral resources pursuant to SK1300.
−Removed: Mineral resources are presented exclusive of mineral reserves.
−Removed: Our interest at Peñasquito is a 2.0% NSR on all metals.
−Removed: The mineral resources listed are 100% of the mineral resources to which our royalty interest applies.
−Removed: Gold cut-off grade varies with level of silver, lead, and zinc credits.
−Removed: Specific cut-off grades have not been disclosed by the operator.
−Removed: Peñasquito mineral resources are presented assuming a 69% average metallurgical recovery for gold, 87% recovery for silver, 81% recovery for zinc, and 72% recovery for lead.
−Removed: Table 2 Peñasquito – Summary of Gold, Silver, Lead, and Zinc Mineral Reserves at December 31, 2022,
−Removed: Based on $1,400 Au, $20,00 Ag, $1.00 Pb, and $1.20 Zn (1),(2)
−Removed: Metallurgical Recovery
−Removed: Proven Mineral Reserves
−Removed: Probable Mineral Reserves
−Removed: Total Mineral Reserves
−Removed: Reported mineral reserve is as of December 31, 2022.
−Removed: Newmont reports mineral reserves pursuant to SK1300.
−Removed: Our interest at Peñasquito is a 2.0% NSR on all metals.
−Removed: The mineral reserves listed are 100% of the mineral reserves to which our royalty interest applies.
−Removed: Gold cut-off grade varies with level of silver, lead, and zinc credits.
−Removed: Specific cut-off grades have not been disclosed by the operator.
−Removed: Peñasquito mineral reserves are presented assuming a 69% average metallurgical recovery for gold, 86% recovery for silver, 81% recovery for zinc, and 72% recovery for lead.
−Removed: Change in Mineral Resources and Mineral Reserves from Prior Year
−Removed: The previous mineral resources and mineral reserves reported by Newmont were as of December 31, 2021.
−Removed: Compared to the previous statement, Newmont’s reported 2022 reserves and resources showed a decrease in mineral reserves primarily a result of mining depletion and an increase in mineral resources due to a positive revision at Peñasquito, as summarized in the following table.
−Removed: Proven and Probable Mineral Reserves
−Removed: Measured and Indicated Mineral Resources
−Removed: Au ounces (M)
−Removed: Ag ounces (M)
−Removed: Recent Developments
−Removed: During the year ended December 31, 2023, gold production reported for our royalty interest at Peñasquito was approximately 129,600 ounces;
−Removed: silver production was approximately 16.7 million ounces;
−Removed: lead production was approximately 107 million pounds;
−Removed: and zinc production was approximately 222 million pounds.
−Removed: During the year ended December 31, 2022, gold production reported for our royalty interest was approximately 573,000 ounces;
−Removed: silver production was approximately 29.7 million ounces;
−Removed: lead production was approximately 147 million pounds;
−Removed: and zinc production was approximately 373 million pounds.
−Removed: The decrease in production was primarily due to the strike from June 7, 2023 through October 13, 2023 at Peñasquito by the National Union of Mine and Metal Workers of the Mexican Republic ("the Union").
−Removed: On October 26, 2023, Newmont reported that a definitive agreement between Newmont and the Union was reached on October 13, 2023, ramp-up of operations had commenced, and that operations at Peñasquito were expected to reach full operating capacity by the end of the fourth quarter of 2023.
+Added: In its 2023 Annual Information Form issued in March 2024, Barrick reported that the Cortez open pit operation is expected to continue until 2034 and the underground operation until 2042, and the planned conversion of existing resources to reserves at Cortez has the potential to extend open pit and underground mining operations to at least 2038 and 2052, respectively.
+Added: On November 22, 2024, Barrick provided an update on various projects currently underway, as well as a production outlook for the Cortez Complex.
+Added: With respect to the near term, Barrick is expecting overall gold production from within the Cortez Complex to increase with the mining of ore in the Crossroads pit following waste stripping, as well as the continued ramp-up at the Goldrush underground mine, which is expected to produce 400,000 ounces of gold per year at full production levels.
+Added: Barrick is forecasting production from the Cortez Complex of over one million ounces in 2027, largely driven by these increases.
+Added: Relating to the longer-term potential within the Cortez Complex, Barrick reported several developments, including the receipt of the Record Of Decision for the Robertson Project in mid-November 2024, a significant increase in gold resources at the Fourmile Project after incorporating recent results from recent drilling, and further exploration progress at the Hanson target at Cortez Hills Underground and the Swift target to the west of the Pipeline deposit.
+Added: According to Barrick, a PEA for the Fourmile Project, which covers approximately one-third of the known orebody as defined by drilling to date, indicates the potential for gold production levels exceeding 500,000 ounces per year.
+Added: Barrick indicated that it intends to advance these projects with feasibility work ongoing for the Robertson open pit project, a pre-feasibility study planned to begin in 2025 at the Fourmile Project, and continued exploration at the Hanson and Swift targets.
+Added: On February 12, 2025, Barrick announced 2025 gold production guidance of approximately 680,000 to 765,000 ounces (100% basis) at the Cortez Complex.