Item 7. Management’s Discussion and Analysis
Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations.
Introduction
The following discussion and analysis presents management’s view of our business, financial condition and overall performance and should be read in conjunction with our Consolidated Financial Statements and the accompanying notes in “Financial Statements and Supplementary Data.” This information is intended to provide investors with an understanding of our past performance, current financial condition and outlook for the future. Our discussion and analysis include the following subjects:
• Overview of Business
• Overview of Significant Events
• Liquidity and Capital Resources
• Contractual Obligations
• Results of Operations
• Summary of Critical Accounting Estimates
• Recent Accounting Standards
Overview of Business
NextDecade Corporation engages in construction and development activities related to the liquefaction and sale of LNG and the capture and storage of CO 2 emissions. We are constructing and developing a natural gas liquefaction and export facility located in the Rio Grande Valley in Brownsville, Texas (the “Rio Grande LNG Facility”), which currently has three liquefaction trains and related infrastructure (“Phase 1”) under construction, and two additional liquefaction trains in development. We are also developing a planned carbon capture and storage (“CCS”) project at the Rio Grande LNG Facility and other potential CCS projects that would be located at third-party industrial facilities through our NEXT Carbon Solutions business.
Overview of Significant Events
Development and Construction
• On July 12, 2023, the Company announced a positive FID to construct Phase 1 of the Rio Grande LNG Facility, and Rio Grande issued full notice to proceed (“NTP”) to Bechtel under the EPC contracts for Phase 1.
◦ Expected capital project costs total $18.0 billion and include EPC costs, owner’s costs and contingencies, dredging for the Brazos Island Harbor Channel Improvement Project, conservation of more than 4,000 acres of wetland, installation of utilities, and interest during construction and other financing costs..
• Under the EPC contracts with Bechtel, Phase 1 progress is tracked for Train 1, Train 2, and the common facilities on a combined basis and Train 3 on a separate basis. As of January 2024:
◦ The overall project completion percentage for Trains 1 and 2 and the common facilities of the Rio Grande LNG Facility was 14.3%, which is in line with the schedule under the EPC contract. Within this project completion percentage, engineering was 47.9% complete, procurement was 26.8% complete, and construction was 1.0% complete.
◦ The overall project completion percentage for Train 3 of the Rio Grande LNG Facility was 4.4%, based on preliminary schedules, which is also in line with the schedule under the EPC contract. Within this project completion percentage, engineering was 3.4% complete, procurement was 10.6% complete, and construction was 0.0% complete.
Strategic and Commercial
• In January 2023, Rio Grande entered into a 15-year LNG SPA with Itochu Corporation (“Itochu”) for the supply of 1.0 MTPA of LNG, indexed to Henry Hub and sold on a free-on-board (“FOB”) basis from the Rio Grande LNG Facility.
36
• In June 2023, Rio Grande entered into a 20-year LNG SPA with TotalEnergies SE (“TotalEnergies”) for the supply of 5.4 MTPA of LNG, indexed to Henry Hub and sold on an FOB basis from the Rio Grande LNG Facility.
• We have started the front-end engineering and design (“FEED”) and EPC contract processes with Bechtel for Train 4 and are progressing numerous discussions with potential buyers of LNG to provide commercial support for Train 4.
Financial
• In February 2023, we sold approximately 5.8 million shares of our common stock for gross proceeds of $35 million to HGC NEXT INV LLC and Ninteenth Investment Company.
• In June 2023, we entered into a common stock purchase agreement for three private placements with Global LNG North America Corp., an affiliate of TotalEnergies, pursuant to which we sold a total of approximately 44.9 million shares of our common stock for an aggregate purchase price of $219.4 million in three transactions occurring in June, July and September 2023.
• On July 12, 2023, in conjunction with the positive FID of Phase 1 of the Rio Grande LNG Facility, we and certain of our subsidiaries closed an approximately $18.4 billion project financing for Phase 1. This financing underscores the critical role that LNG and natural gas are expected to play in the global energy transition and included the closing of:
◦ A joint venture agreement which included approximately $5.9 billion of financial commitments from Global Infrastructure Partners (GIP), GIC, Mubadala Investment Company, and TotalEnergies;
◦ A commitment by the Company to invest approximately $283 million in Phase 1, which was completed in September 2023 and included $125 million of pre-FID capital investments and additional funds contributed from the proceeds of sales of the Company’s common stock to an affiliate of TotalEnergies;
◦ Senior secured non-recourse bank credit facilities of $11.6 billion with a 7-year maturity, consisting of $11.1 billion in construction term loans and a $500 million working capital facility; and
◦ An offering of $700 million senior secured non-recourse private placement notes, which will mature in July 2033 and will accrue interest at a fixed rate of 6.67%.
• We hold equity interests in the Phase 1 joint venture that entitle us to receive up to 20.8% of the distributions of available cash during operations.
• Rio Grande has entered into several transactions to refinance a portion of the Phase 1 bank facilities, including:
◦ In September 2023, Rio Grande entered into a credit agreement with a group of lenders for $356 million of senior secured loans to finance a portion of Phase 1. The senior secured loans were disbursed in one advance of $356 million on September 15, 2023, which resulted in a reduction in the commitments outstanding under Rio Grande’s existing bank credit facilities for Phase 1. These senior secured loans will mature in July 2033, accrue interest at a fixed rate of 6.72%, and rank pari passu to Rio Grande’s existing senior secured financings.
◦ In December 2023, Rio Grande entered into a credit agreement with a group of lenders for $251 million of senior secured loans to finance a portion of Phase 1. The senior secured loans were disbursed in one advance of $251 million on December 28, 2023, which resulted in a reduction in the commitments outstanding under Rio Grande’s existing bank credit facilities for Phase 1. These senior secured loans will be amortized over a period of approximately 18 years beginning in mid-2029, with a final maturity
37
in September 2047. These senior secured loans bear interest at a fixed rate of 7.11% and rank pari passu to Rio Grande’s existing senior secured financings.
◦ In February 2024, Rio Grande issued and sold $190 million of senior secured notes to finance a portion of Phase 1. The senior secured notes were issued on February 9, 2024 and resulted in a reduction in the commitments outstanding under Rio Grande's existing bank credit facilities for Phase 1. These senior secured notes will be amortized over a period of approximately 18 years beginning in mid-2029, with a final maturity in June 2047. The senior secured notes bear interest at a fixed rate of 6.85% and rank pari passu to Rio Grande's existing senior secured financings.
• As of December 2023, Rio Grande’s outstanding fixed-rate debt and executed interest rate swaps have reduced its exposure to movements in interest rates for approximately 84% of the debt currently projected to be incurred in support of Phase 1 construction.
• In January 2024, our wholly-owned subsidiary Next Decade LNG, LLC entered into a credit agreement that provides for a $50 million senior secured revolving credit facility with additional capacity of $12.5 million to cover interest. Borrowings under the revolving credit facility may be used for general corporate purposes, including development costs related to Train 4 at the Rio Grande LNG Facility. Borrowings bear interest at SOFR or the base rate plus an applicable margin as defined in the credit agreement. The revolving credit facility and interest term loan mature at the earlier of two years from the closing date or 10 business days after a positive FID on Train 4.
• Rio Grande has syndicated a portion of its bank credit facility commitments, resulting in a supporting lender group of approximately 40 international banks.
Rio Grande LNG Facility Activity
We are constructing the Rio Grande LNG Facility on the north shore of the Brownsville Ship Channel in south Texas through our partially owned subsidiary Rio Grande. The site is located on 984 acres of land which has been leased long-term and includes 15,000 feet of frontage on the Brownsville Ship Channel.
The Rio Grande LNG Facility has received all necessary approvals and authorizations required for construction, including those from the FERC.
In July 2023, construction commenced on Phase 1 of the Rio Grande LNG Facility following a positive FID and the closing of project financing by Rio Grande, which owns Phase 1 of the Rio Grande LNG Facility. Phase 1 includes three liquefaction trains with a total expected nameplate capacity of approximately 17.6 MTPA of LNG production, two 180,000 cubic meter full containment LNG storage tanks, two jetty berthing structures designed to load LNG carriers up to 216,000 cubic meters in capacity, and associated site infrastructure and common facilities including feed gas pretreatment facilities, electric and water utilities, two totally enclosed ground flares for the LNG tanks and marine facilities, two ground flares for the liquefaction trains, roads, levees surrounding the entire site, and warehouses, administrative, operations control room and maintenance buildings.
As of January 2024, progress on Trains 1 through 3 is in line with the schedule under the EPC Contracts. Recent construction activities have included the start of Train 1 foundation concrete pours, piling activity for the LNG tanks, and construction of the levee and marine offloading facility. Additionally, the civil works program has progressed via the deep soil mixing program, and meaningful progress has been made on the shoreline restoration program, with the majority of shoreline reclamation nearing completion, shoreline protection work has commenced. Bechtel has also made meaningful progress on purchase orders for Train 3.
LNG Sale and Purchase Agreements
In January 2023, Rio Grande entered into a 15-year LNG SPA with Itochu Corporation (“Itochu”) for the supply of 1.0 mtpa of LNG, indexed to Henry Hub and sold on a free-on-board (“FOB”) basis from the Rio Grande LNG Facility.
In June 2023, Rio Grande entered into a 20-year LNG SPA with TotalEnergies SE (“TotalEnergies”) for the supply of 5.4 mtpa of LNG, indexed to Henry Hub and sold on an FOB basis from the Rio Grande LNG Facility.
These SPAs, in addition to the other Phase 1 LNG SPAs previously in place, are currently effective, and deliveries of LNG under these SPAs will commence on the respective Date of First Commercial Delivery (“DFCD”), which is primarily tied to the substantial completion of guaranteed substantial completion dates of specific trains as defined in each SPA.
38
Engineering, Procurement and Construction ( “ EPC ”) Agreements
On July 12, 2023, Rio Grande issued final notice to proceed to Bechtel Energy Inc. under the EPC agreements for Phase 1. Total expected capital costs for Phase 1 are estimated to be approximately $18.0 billion, including estimated owner’s costs, contingencies, and financing costs, and including amounts spent prior to FID under limited notices to proceed.
NEXT Carbon Solutions
NEXT Carbon Solutions offers proposed end-to-end CCS solutions for industrial facilities. Leveraging our team’s engineering and project management experience, we have developed proprietary processes that are expected to lower the capital and operating costs of deploying CCS on industrial facilities. We expect to partner with customers to invest in the deployment of CCS to reduce and permanently store CO 2 emissions. We believe that integrating CCS with an industrial facility’s operations has the potential to increase the value of the industrial facility. Through proposed commercial agreements and investments, NEXT Carbon Solutions will seek to share in the value created from this integration.
Private Placements of Company Common Stock
In February 2023, we sold 5,835,277 shares of Company common stock for gross proceeds of $35 million to HGC NEXT INV LLC and Ninteenth Investment Company.
On June 13, 2023, we entered into a common stock purchase agreement for three private placements (the “TTE Private Placement”) with Global LNG North America Corp., an affiliate of TotalEnergies SE (the “TTE Purchaser”), pursuant to which we agreed to sell (i) 8,026,165 shares (the “Tranche 1 Shares”) of Company common stock at a purchase price of $4.9837 per share, for an aggregate purchase price of $40.0 million, (ii) promptly after conversion of the Convertible Preferred Stock, 22,072,103 shares (the “Tranche 2 Shares”) of Company common stock, at a purchase price of $4.9837 per share, for an aggregate purchase price of $110.0 million, and (iii) promptly after, and conditioned upon, receipt of approval of the Company’s stockholders, a number of shares of Company common stock such that, following the conversion of the Convertible Preferred Stock, the TTE Purchaser will own, when including the Tranche 1 Shares and Tranche 2 Shares, an aggregate of 17.5% of the Company common stock then-outstanding (the “Tranche 3 Shares”). On June 14, 2023, the Company closed the sale of the Tranche 1 Shares, and on July 26, we closed the sale of the Tranche 2 Shares. On September 8, 2023, we closed the sale of 14,802,055 shares of common stock (Tranche 3 Shares) for a purchase price of $69.4 million.
FID Equity Transactions
On July 12, 2023, in conjunction with the positive FID to construct Phase 1 of the Rio Grande LNG Facility, Rio Grande LNG Intermediate Super Holdings, LLC, an indirect subsidiary of the Company (the “NextDecade Member”) entered into an amended and restated limited liability company agreement (the “JV Agreement”) of Rio Grande LNG Intermediate Holdings, LLC (“Intermediate Holdings”), and the other members party thereto. The members of Intermediate Holdings, including the NextDecade Member and subsidiaries of Global Infrastructure Partners (GIP), GIC, Mubadala Investment Company (collectively with GIP and GIC, the “Financial Investors”), and TotalEnergies, committed to fund $6.2 billion in aggregate to Intermediate Holdings. The NextDecade Member committed to fund cash contributions of approximately $283 million to Intermediate Holdings, including approximately $125 million in contributions paid before FID. The NextDecade Member completed its remaining equity commitment in September 2023 utilizing proceeds from the sale of common stock to the TTE Purchaser as described above.
FID Debt Transactions
On July 12, 2023, Rio Grande entered into a Credit Agreement (the “CD Credit Agreement”) that provides for the following facilities:
• A construction/term loan in an amount up to $10.3 billion available to partially finance the design, engineering, development, procurement, construction, installation, testing, completion, ownership, operation and maintenance of Phase 1, to pay certain fees and expenses associated with the CD Credit Agreement and the loans made thereunder; and
• A revolving loan and letter of credit facility in an amount up to $500 million available to Rio Grande to finance certain working capital requirements of Rio Grande.
On July 12, 2023, Rio Grande entered into the TCF Credit Agreement (the “TCF Credit Agreement”) that provides for a construction/term loan facility in an aggregate amount up to $800 million available to Rio Grande to partially finance the design, engineering, development, procurement, construction, installation, testing, completion,
39
ownership, operation and maintenance of Phase 1 of the Rio Grande LNG Facility and to pay certain fees and expenses associated with the TCF Credit Agreement and the loans made thereunder. TotalEnergies Holdings SAS (“Total Holdings”) agreed to provide contingent support to the lenders under the TCF Credit Agreement pursuant to, and subject to the terms and conditions of, a support agreement entered into on July 12, 2023, pursuant to which Total Holdings agreed that it will pay past due amounts owing from Rio Grande under the TCF Credit Agreement upon demand.
On July 12, 2023, Rio Grande entered into a Note Purchase Agreement through which it sold $700 million of 6.67% Senior Secured Notes due 2033 (the “Notes”). The Notes were issued pursuant to an indenture between Rio Grande and Wilmington Trust, National Association as trustee and accrue interest that is payable semi-annually in arrears on March 30 and September 30 each year, beginning on September 30, 2023.
Conversion of Convertible Preferred Stock, Issuance of Common Stock
In connection with FID of Phase 1, the Company’s convertible preferred stock converted into approximately 59.5 million shares of common stock on July 26, 2023. Refer to Note 10 — Preferred Stock and Common Stock Warrants for further information.
Rio Grande Refinancings
On September 15, 2023, Rio Grande entered into a credit agreement with a group of lenders for $356 million of senior secured loans to finance a portion of Phase 1. The senior secured loans were disbursed in one advance for $356 million on September 15, 2023, which resulted in a reduction in the commitments outstanding under Rio Grande’s existing bank credit facilities for Phase 1. These senior secured loans will mature in July 2033, accrue interest at a fixed rate of 6.72%, and rank pari passu to Rio Grande’s existing senior secured financings.
In December 2023, Rio Grande entered into a credit agreement with a group of lenders for $251 million of senior secured loans to finance a portion of Phase 1. The senior secured loans were disbursed in one advance of $251 million on December 28, 2023, which resulted in a reduction in the commitments outstanding under Rio Grande’s existing bank credit facilities for Phase 1. These senior secured loans will be amortized over a period of approximately 18 years beginning in mid-2029, with a final maturity in September 2047. These senior secured loans bear interest at a fixed rate of 7.11% and rank pari passu to Rio Grande’s existing senior secured financings.
In February 2024, Rio Grande entered into a note purchase agreement through which it sold $190 million of senior secured notes to finance a portion of Phase 1. The senior secured notes were issued on February 9, 2024, and resulted in a reduction in the commitments outstanding under Rio Grande's existing bank credit facilities for Phase 1. These senior secured notes will be amortized over a period of approximately 18 years beginning in mid-2029, with a final maturity in June 2047. The senior secured notes bear interest at a fixed rate of 6.85% and rank pari passu to Rio Grande's existing senior secured financings.
Liquidity and Capital Resources
Following FID of Phase 1 and the project financing obtained by Rio Grande, NextDecade and Rio Grande operate with independent capital structures. Although our sources and uses are presented from a consolidated standpoint, certain restrictions under debt and equity agreements limit the ability of NextDecade and Rio Grande to use and distribute cash. Rio Grande is required to deposit all cash received under its debt agreements into restricted accounts. The usage or withdrawal of such cash is restricted to the payment of obligations related to Phase 1 and other restricted payments, and such cash and capital resources are not available to service the obligations of NextDecade.
Phase 1 FID Rio Grande Financing
In connection with the FID of Phase 1 of the Rio Grande LNG Facility, Rio Grande obtained approximately $6.2 billion in equity capital commitments, inclusive of commitments from the NextDecade Member, entered into senior secured non-recourse bank credit facilities of $11.6 billion, consisting of $11.1 billion in construction term loans and a $500 million working capital facility, and closed a $700 million senior secured non-recourse private notes offering. Rio Grande will utilize these capital resources to fund the approximately $18.0 billion total cost of Phase 1, including EPC cost, which was approximately $12.0 billion at FID, and to fund owner’s costs and contingencies, dredging for the Brazos Island Harbor Channel Improvement Project, conservation of more than 4,000 acres of wetland and wildlife habitat area and installation of utilities, and interest during construction and other financing costs.
Near Term Liquidity and Capital Resources of NextDecade Corporation
In connection with the FID of Phase 1, the Company, through NextDecade Member, its wholly owned subsidiary, committed to invest approximately $283 million, including $125 million of pre-FID capital investments, into construction of Phase 1 of the Rio Grande LNG Facility. As of September 30, 2023, the Company had funded its full equity commitment, utilizing proceeds of the sale of the third tranche of common stock to the TTE Purchaser.
40
Prior to the FID on Phase 1 of the Rio Grande LNG Facility, our primary cash needs historically were funding development activities in support of the Rio Grande LNG Facility and our CCS projects, which included payments of initial direct costs of the Rio Grande site lease and expenses in support of engineering and design activities, regulatory approvals and compliance, commercial and marketing activities and corporate overhead. We spent approximately $97.7 million on such development activities year-to-date through FID on July 12, 2023, which we funded through our cash on hand and proceeds from the issuances of equity and equity-based securities. Following the FID of Phase 1 of the Rio Grande LNG Facility, costs associated with the Phase 1 EPC contracts, Rio Grande site lease, and other Phase 1 related costs are being funded by debt and equity proceeds received by Rio Grande.
Because our businesses and assets are under construction or in development, we have not historically generated significant cash flow from operations, nor do we expect to do so until liquefaction trains at the Rio Grande LNG Facility begin operating or until we install CCS systems at third-party industrial facilities. We intend to fund development activities for the foreseeable future with cash and cash equivalents on hand, available capacity under our revolving credit facility, and through the sale of additional equity, equity-based or debt securities in us or in our subsidiaries. There can be no assurance that we will succeed in selling equity or equity-based securities or, if successful, that the capital we raise will not be expensive or dilutive to stockholders.
Our consolidated financial statements as of and for the year ended December 31, 2023 have been prepared on the basis that we will continue as a going concern, which contemplates the realization of assets and satisfaction of liabilities in the normal course of business. Based on our balance of cash and cash equivalents of $38.2 million at December 31, 2023, there is substantial doubt about our ability to continue as a going concern within one year after the date that our consolidated financial statements were issued. Our ability to continue as a going concern will depend on managing certain operating and overhead costs and our ability to raise capital through equity, equity-based or debt financings. The consolidated financial statements do not include any adjustments that might result from the outcome of this uncertainty, which could have a material adverse effect on our financial condition.
Our capital raising activities since January 1, 2023 have included the following:
• In February 2023, we sold 5,835,277 shares of Company common stock for $35.0 million.
• In June, July and September 2023, we sold 44,900,323 shares of Company common stock in the three tranches of the TTE Private Placement for approximately $219.4 million.
• In January 2024, NextDecade LLC executed a credit agreement that provides for a $50 million revolving credit facility that may be used for general corporate purposes and working capital requirements of NextDecade LLC and its subsidiaries, including development costs related to the fourth liquefaction train and related common facilities at the Rio Grande LNG Facility.
Long Term Liquidity and Capital Resources of NextDecade Corporation
We will not receive significant cash flows from Phase 1 of the Rio Grande LNG Facility until it is operational, and the commercial operation date for the first train of Phase 1 is expected to occur in late 2027 based on the schedule under the EPC contracts. Any future phases of development at the Rio Grande LNG Facility and CCS projects will similarly take an extended period of time to develop, construct and become operational and will require significant capital deployment.
We currently expect that the long-term capital requirements for future phases of development at the Rio Grande LNG Facility and any CCS projects will be financed predominantly through the proceeds from future debt, equity-based, and equity offerings by us or our subsidiaries. As a result, our business success will depend, to a significant extent, upon our ability to obtain financing required to fund future phases of development and construction at the Rio Grande LNG Facility and any CCS projects, to bring them into operation on a commercially viable basis and to finance any required increases in staffing, operating and expansion costs during that process. There can be no assurance that we will succeed in securing additional debt and/or equity financing in the future to fund future phases of development and construction at the Rio Grande LNG Facility or complete any CCS projects or, if successful, that the capital we raise will not be expensive or dilutive to stockholders. Additionally, if these types of financing are not available, we will be required to seek alternative sources of financing, which may not be available on terms acceptable to us, if at all.
41
Sources and Uses of Cash
The following table summarizes the sources and uses of our cash for the periods presented (in thousands):
Year Ended December 31,
2023 2022
Operating cash flows $ (73,620) $ (40,076)
Investing cash flows (1,752,800) (40,888)
Financing cash flows 2,058,109 118,201
Net increase in cash, cash equivalents and restricted cash 231,689 37,237
Cash and cash equivalents – beginning of period 62,789 25,552
Cash, cash equivalents and restricted cash – end of period $ 294,478 $ 62,789
Operating Cash Flows
Operating cash outflows during the years ended December 31, 2023 and 2022 were $73.6 million and $40.1 million, respectively. The increase in operating cash outflows in 2023 compared to 2022 was primarily due to an increase in employee costs and professional fees paid to consultants as we prepared for and achieved a positive FID in Phase 1 of the Rio Grande LNG Facility in July 2023.
Investing Cash Flows
Investing cash outflows during the years ended December 31, 2023 and 2022 were $1,752.8 million and $40.9 million, respectively. Investing cash outflows primarily consist of cash used in the construction and development of Phase 1 of the Rio Grande LNG Facility. The increase in investing cash outflows in 2023 compared to 2022 was primarily due to a positive FID in Phase 1 of the Rio Grande LNG Facility, the mobilization of the Bechtel workforce that began in July 2023 and subsequent progress payments made to Bechtel.
Financing Cash Flows
Financing cash inflows during the years ended December 31, 2023 and 2022 were $2,058.1 million and $118.2 million, respectively. Financing cash inflows during 2023 are primarily comprised of proceeds from the issuance of debt of $2,083.0 million, proceeds from the sale of equity in subsidiaries of $457.7 million and proceeds from the sale of Company common stock of $254.4 million. The cash inflows for 2023 were partially offset by debt and equity issuances costs of $494.3 million, repayment of debt of $233.0 million and shares repurchased related to share-based compensation of $9.6 million.
Contractual Obligations
We are committed to make cash payments in the future pursuant to certain of our contracts. The following table summarizes certain contractual obligations (in thousands) in place as of December 31, 2023:
Total 2024 2025-2026 2027-2028 Thereafter
Operating lease obligations $ 243,581 $ 8,029 $ 17,137 $ 19,174 $ 199,241
Other 2,800 2,800 — — —
Total $ 246,381 $ 10,829 $ 17,137 $ 19,174 $ 199,241
Operating lease obligations relate to the Rio Grande site lease and our office spaces in Houston, Texas and Singapore. A discussion of these obligations can be found at Note 6 — Leases of our Notes to Consolidated Financial Statements.
42
Results of Operations
The following table summarizes costs, expenses and other income for the years ended December 31, 2023 and 2022 (in thousands):
Year Ended December 31,
2023 2022 Change
Revenues $ — $ — $ —
General and administrative expense 111,468 49,093 62,375
Development expense, net 4,891 4,101 790
Lease expense 6,141 1,119 5,022
Depreciation expense 168 162 6
Operating loss (122,668) (54,475) (68,193)
Loss on common stock warrant liabilities (1,879) (5,747) 3,868
Derivative loss, net (44,803) — (44,803)
Interest expense, net of capitalized interest (50,285) — (50,285)
Loss on debt extinguishment (9,531) — (9,531)
Other income, net 7,526 151 7,375
Net loss attributable to NextDecade Corporation (221,640) (60,071) (161,569)
Less: net loss attributable to non-controlling interest (59,379) — (59,379)
Less: preferred stock dividends 20,484 24,282 (3,798)
Net loss attributable to common stockholders $ (182,745) $ (84,353) $ (98,392)
Our consolidated net loss was $182.7 million, or $(0.94) per common share (basic and diluted), for the year ended December 31, 2023 compared to a net loss of $84.4 million, or $(0.65) per common share (basic and diluted), for the year ended December 31, 2022. The $98.4 million increase in net loss was primarily a result of increases in general and administrative expense, derivative loss, net, interest expense, net of capitalized interest, and loss on debt extinguishment, discussed separately below.
General and administrative expenses during the year ended December 31, 2023 increased $62.4 million compared to the year ended December 31, 2022, primarily due to an increase in share-based compensation expense of $19.1 million and increases in employee costs and professional fees. The increase in share-based compensation expense for the year ended December 31, 2023 was primarily due to the recognition of compensation cost on restricted stock awards and units that vested at FID of Phase 1 of the Rio Grande LNG Facility. Employee costs and professional fees increased during 2023 as we prepared for and achieved a positive FID on Phase 1 of the Rio Grande LNG Facility.
Derivative loss, net during the year ended December 31, 2023 of $44.8 million is due to a decrease in forward SOFR rates from July 12, 2023 to December 31, 2023.
Interest expense, net of capitalized interest during the year ended December 31, 2023 of $50.3 million represents total interest cost on debt of $84.7 million, net of capitalized interest of $34.4 million.
Net loss attributable to non-controlling interest during the year ended December 31, 2023 of $59.4 million is due to the sale of equity in Intermediate Holdings in July 2023 and the non-controlling interests share of Intermediate Holdings net loss.
Summary of Critical Accounting Estimates
The preparation of our Condensed Consolidated Financial Statements in conformity with accounting principles generally accepted in the United States of America (“GAAP”) requires management to make certain estimates and assumptions that affect the amounts reported in the Consolidated Financial Statements and the accompanying notes. Management evaluates its estimates and related assumptions regularly, including those related to the value of properties, plant, and equipment, share-based compensation, common stock warrant liabilities, and income taxes. Changes in facts and circumstances or additional information may result in revised estimates, and actual results may differ from these estimates. Management considers the following to be its most critical accounting estimates that involve significant judgment.
43
Impairment of Long-Lived Assets
A long-lived asset, including an intangible asset, is evaluated for potential impairment whenever events or changes in circumstances indicate that its carrying value may not be recoverable. Recoverability generally is determined by comparing the carrying value of the asset to the expected undiscounted future cash flows of the asset. If the carrying value of the asset is not recoverable, the amount of impairment loss is measured as the excess, if any, of the carrying value of the asset over its estimated fair value. We use a variety of fair value measurement techniques when market information for the same or similar assets does not exist. Projections of future operating results and cash flows may vary significantly from results. Management reviews its estimates of cash flows on an ongoing basis using historical experience and other factors, including the current economic and commodity price environment.
Derivative Instruments
All derivative instruments, other than those that satisfy specific exceptions, are recorded at fair value. We record changes in the fair value of our derivative positions based on the value for which the derivative instrument could be exchanged between willing parties. If market quotes are not available to estimate fair value, management's best estimate of fair value is based on the quoted market price of derivatives with similar characteristics or determined through industry-standard valuation approaches. Such evaluation may involve significant judgment and the results are based on expected future events or conditions, particularly for those valuations using inputs unobservable in the market.
Our derivative instruments consist of interest rate swaps. We value our interest rate swaps using observable inputs including interest rate curves, risk adjusted discount rates, credit spreads and other relevant data.
Gains and losses on derivative instruments are recognized in earnings. The ultimate fair value of our derivative instruments is uncertain, and we believe that it is reasonably possible that a change in the estimated fair value could occur in the near future as interest rates change.
Share-based Compensation
The assumptions used in calculating the fair value of share-based payment awards represent our best estimates, but these estimates involve inherent uncertainties and the application of management’s judgment. As a result, if factors change and we use different assumptions, our share-based compensation expense could be materially different in the future.
For additional information regarding our share-based compensation, see Note 14 — Share-based Compensation of our Notes to Consolidated Financial Statements.
Valuation of Common Stock Warrant Liabilities
The fair value of Common Stock Warrant liabilities is determined using a Monte Carlo valuation model. Determining the appropriate fair value model and calculating the fair value of Common Stock Warrant requires considerable judgment. Any change in the estimates used may cause the value to be higher or lower than that reported. The estimated volatility of our Common Stock Warrants at the date of issuance, and at each subsequent reporting period, is based on our historical volatility. The risk-free interest rate is based on rates published by the government for bonds with maturity similar to the expected remaining life of the Common Stock Warrants at the valuation date. The expected life of the Common Stock Warrants is assumed to be equivalent to their remaining contractual term.
The Common Stock Warrants are not traded in an active market and the fair value is determined using valuation techniques. The estimates may be significantly different from those recorded in the consolidated financial statements because of the use of judgment and the inherent uncertainty in estimating the fair value of these instruments that are not quoted in an active market. All changes in the fair value are recorded in the consolidated statement of operations each reporting period.
For additional information regarding the valuation of Common Stock Warrant liabilities, see Note 10 — Preferred Stock and Common Stock Warrants of our Notes to Consolidated Financial Statements.
Income Taxes
Provisions for income taxes are based on taxes payable or refundable for the current year and deferred taxes on temporary differences between the tax basis of assets and liabilities and their reported amounts in the Consolidated Financial Statements. Deferred tax assets and liabilities are included in the Consolidated Financial Statements at currently enacted income tax rates applicable to the period in which the deferred tax assets and liabilities are expected to be realized or settled. As changes in tax laws or rates are enacted, deferred tax assets and liabilities are adjusted through the current period’s provision for income taxes. We routinely assess our deferred tax assets and reduce such assets by a valuation allowance if we deem it is more likely than not that some portion or all of the deferred tax assets will not be realized. This
44
assessment requires significant judgment and is based upon our assessment of our ability to generate future taxable income among other factors.
For additional information regarding the valuation of deferred tax assets, see Note 15 — Income Taxes of our Notes to Consolidated Financial Statements.
Recent Accounting Standards
The Company does not believe that any recently issued, but not yet effective, accounting standards, if currently adopted, would have a material effect on our Consolidated Financial Statements or related disclosures.
Item 7A. Quantitative and Qualitative Disclosures About Market Risk
We are a smaller reporting company as defined by Rule 12b-2 of the Securities Exchange Act of 1934, as amended, and are not required to provide the information under this item.