−Removed: The first mortgage indentures for the Ohio Companies, Penn, MP, PE and WP constitute direct first liens on substantially all of the respective physical property, subject only to excepted encumbrances, as defined in the first mortgage indentures.
+Added: The first mortgage indentures for the Ohio Companies, FE PA, MP and PE constitute direct first liens on substantially all of the respective physical property, subject only to excepted encumbrances, as defined in the first mortgage indentures.
The outstanding debt under the FMBs of specific FE PA predecessors (WP and Penn) were assumed by FE PA in connection with the PA Consolidation.
−Removed: See Note 11, "Capitalization," of the Notes to Consolidated Financial Statements for information concerning financing encumbrances affecting certain of the Utilities’ properties.
+Added: See Note 12, "Capitalization," of the Notes to Consolidated Financial Statements for information concerning financing encumbrances affecting certain of the Electric Companies' properties.
FirstEnergy controls the following generation sources as of December 31, 2024, shown in the table below, and operates in the PJM Region.
−Removed: Except for the OVEC participation referenced in the footnotes to the table, the Regulated Distribution segment generating units are owned by MP.
−Removed: Plant (Location) Unit Total Corp / Other Regulated Distribution Total Corp / Other Regulated Distribution
+Added: Except for the OVEC participation referenced in the footnotes to the table, the Integrated segment generating units are owned by MP.
+Added: Plant (Location) Unit Total Corporate / Other Integrated Total Corporate / Other Integrated
Net Maximum Capacity (MW) Net Generation for the year ended December 31, 2024 (3)
(Thousand MWh)
−Removed: Super-critical Coal-fired:
−Removed: Harrison (Haywood, WV) 1-3 1,984 — 1,984 11,193 — 11,193
−Removed: Fort Martin (Maidsville, WV) 1-2 1,098 — 1,098 4,368 — 4,368
−Removed: 3,082 — 3,082 15,561 — 15,561
−Removed: Sub-critical and Other Coal-fired:
+Added: Harrison Power Station (Haywood, WV) 1-3 1,984 — 1,984 10,618 — 10,618
+Added: Fort Martin Power Station (Maidsville, WV) 1-2 1,098 — 1,098 3,860 — 3,860
OVEC (Cheshire, OH) (Madison, IN) (1)
1-11 78 67 11 350 301 49
+Added: 3,160 67 3,093 14,828 301 14,527
Pumped-storage Hydro:
−Removed: Bath County (Warm Springs, VA) (2)
+Added: Bath County Pumped Storage Station (Warm Springs, VA) (2)
1-6 487 — 487 990 — 990
+Added: Fort Martin Solar (Maidsville, WV) 19 — 19 28 — 28
+Added: Rivesville Solar (Rivesville, WV) 5 — 5 2 — 2
+Added: 24 — 24 30 — 30
Total 3,671 67 3,604 15,848 301 15,547
5 unchanged sentences
The WVPSC approved the construction of three of the five solar sites.
−Removed: The first solar generation site, located in Maidsville, West Virginia, was completed and placed in-service on January 8, 2024, representing 19 MWs of capacity.
−Removed: Construction of the remaining four sites is expected to be completed no later than the end of 2025.
−Removed: The remaining four sites are expected to provide 31 MWs of capacity.
+Added: The first solar generation site, Fort Martin Solar, located in Maidsville, West Virginia, was completed and placed in-service on January 8, 2024, representing 19 MWs of capacity.
+Added: The second solar generation site, Rivesville Solar, located in Rivesville, West Virginia, went into service on September 25, 2024.
+Added: Construction of the remaining three sites, once completed, are expected to provide 26 MWs of additional net maximum generation capacity.
As of December 31, 2024, FirstEnergy’s distribution and transmission circuit miles are located in PJM and were as follows:
6 unchanged sentences
(2) On January 1, 2024, FirstEnergy consolidated the Pennsylvania Companies into FE PA, making it a new, single operating entity.
−Removed: (3) On January 1, 2024, certain of WP's Pennsylvania-based transmission assets were transferred to KATCo
+Added: (3) On January 1, 2024, WP's Pennsylvania-based transmission assets of 115 kV and above were transferred to KATCo, while the remaining transmission assets below 115 kV continue to be held by FE PA.
LEGAL PROCEEDINGS
3 unchanged sentences
Compared sentence by sentence after normalising whitespace, quotation marks, case and digits, so re-formatting and restated figures do not read as changed language. Wording changes appear as one removal and one addition. The current filing and the prior one are authoritative.