6 unchanged sentences
and its consolidated subsidiaries.
−Removed: The unaudited condensed consolidated interim financial statements for the three months and nine months ended September 30, 2024 and 2023, respectively, present the financial position and results of operations of TMC the metals company Inc.
+Added: The unaudited condensed consolidated interim financial statements for the three months ended March 31, 2025 and 2024, respectively, present the financial position and results of operations of TMC the metals company Inc.
and its consolidated subsidiaries.
−Removed: We are a deep-sea minerals exploration company focused on the collection, processing and refining of polymetallic nodules found on the seafloor in international waters of the Clarion Clipperton Zone (“CCZ”), about 1,500 miles south-west of San Diego, California.
−Removed: The CCZ is a geological submarine fracture zone of abyssal plains and other formations in the Eastern Pacific Ocean, with a length of around 7,240 km (4,500 miles) that spans approximately 4,500,000 square kilometers (1,700,000 square miles).
−Removed: Polymetallic nodules are discrete rocks that sit unattached to the seafloor, occur in significant quantities in the CCZ and have high concentrations of nickel, manganese, cobalt and copper in a single rock.
−Removed: These four metals contained in the polymetallic nodules are critical for the transition to low carbon energy, as well as for infrastructure and development.
−Removed: Our resource definition work to date shows that nodules in our contract areas represent the world’s largest estimated undeveloped source of critical battery metals.
+Added: We are a deep-sea minerals exploration company focused on the collection, processing and refining of polymetallic nodules found on the seafloor in international waters of the Clarion Clipperton Zone (“CCZ”), with NORI Area D located approximately1,500 miles south-west of San Diego, California.
+Added: The CCZ is a geological submarine fracture zone of abyssal plains and other formations in the Eastern Pacific Ocean, with a length of around 7,240 kilometers (4,500 miles) that spans approximately 4,500,000 square kilometers (1,737,000 square miles).
+Added: Polymetallic nodules are discrete rocks that sit unattached to the seafloor, occur in significant quantities in the CCZ and have high concentrations of nickel, copper, cobalt and manganese in a single rock.
+Added: These four metals contained in the polymetallic nodules are critical for energy, defense, manufacturing and infrastructure.
+Added: Our resource definition work to date shows that nodules in our contract areas represent the world’s largest estimated undeveloped source of the four critical metals contained in nodules.
If we are able to collect polymetallic nodules from the seafloor on a commercial scale, we plan to use such nodules to produce three types of metal products:
−Removed: (i) feedstock for battery cathode precursors (nickel and cobalt sulfates, or intermediary nickel-copper-cobalt matte, or nickel-copper-cobalt alloy) for electric vehicles (“EV”) and renewable energy storage markets, (ii) copper cathode for EV wiring, energy transmission and other applications, and (iii) manganese silicate for manganese alloy production required for steel production.
+Added: (i) feedstock for battery cathode precursors (nickel, cobalt and manganese sulfates, or intermediate nickel-copper-cobalt matte or nickel-copper-cobalt alloy) for nickel-rich lithium-ion batteries, (ii) copper cathode for electric wiring, energy transmission and other applications and (iii) manganese silicate for manganese alloy production required for steel manufacturing.
Our mission is to build a carefully managed shared stock of metal (a “metal commons”) that can be used, recovered and reused for generations to come.
Significant quantities of newly mined metal are required because existing metal stocks are insufficient to meet rapidly rising demand.
−Removed: Exploration and exploitation of seafloor minerals in international waters is regulated by the International Seabed Authority (“ISA”), an intergovernmental organization established pursuant to the 1994 Agreement Relating to the Implementation of the United Nations Convention on the Law of the Sea (“UNCLOS”).
−Removed: The ISA grants contracts to sovereign states or to private contractors who are sponsored by a sovereign state.
−Removed: The ISA requires that a contractor must obtain and maintain sponsorship by a host nation that is a member of the ISA and signatory to UNCLOS, and such nation must maintain effective supervision and regulatory control over such sponsored contractor.
−Removed: The ISA has issued a total of 19 polymetallic nodule exploration contracts covering approximately 1.28 million square kilometers, or 0.4% of the global seafloor, 17 of which are in the CCZ.
−Removed: We hold exclusive exploration and commercial rights to three of the 17 polymetallic nodule contract areas in the CCZ;
−Removed: two based on ISA exploration contracts through our subsidiaries Nauru Ocean Resources Inc.
−Removed: (“NORI”) and Tonga Offshore Mining Limited (“TOML”), sponsored by the Republic of Nauru (“Nauru”) and the Kingdom of Tonga (“Tonga”), respectively, and exclusive commercial rights through our subsidiary, DeepGreen Engineering Pte.
−Removed: Ltd.’s (“DGE”), and its arrangement with Marawa Research and Exploration Limited (“Marawa”), a company owned and sponsored by the Republic of Kiribati (“Kiribati”).
−Removed: We have key strategic alliances with (i) Allseas, a leading global offshore contractor, which developed and tested a pilot collection system, and is now working to modify it into the first commercial production system and (ii) Glencore which holds offtake rights to 50% of the NORI nickel and copper production if produced from a DGE-owned or controlled facility.
−Removed: In addition, we have worked with an engineering firm Hatch Ltd.
+Added: We are still in the exploration phase and have not yet obtained an exploitation contract or a commercial recovery permit from any regulators.
+Added: Additionally, we do not yet hold the environmental or other permits required to construct and operate commercial-scale polymetallic nodule processing and refining facilities on land.
+Added: The International Seabed Authority (“ISA”), comprised of 169 countries and the European Union, established regulations over deep-sea mining activities of their nationals, pursuant to UNCLOS.
+Added: The ISA has adopted exploration regulations and issued 19 polymetallic nodule exploration contracts but has been unable to adopt the final exploitation regulations, standards and guidelines despite initiating work in 2014.
+Added: Almost 30 countries, including the United States, have not ratified UNCLOS and are not member states of the ISA.
+Added: To regulate deep-sea mining activities of its citizens in the high seas, the United States adopted the Deep Seabed Hard Mineral Resources Act of 1980, a U.S.
+Added: domestic statute administered by the U.S.
+Added: Department of Commerce through the National Oceanic and Atmospheric Administration, or NOAA.
+Added: NOAA implemented regulations for exploration licenses in 1981 and for commercial recovery permits in 1989.
+Added: We are increasingly focused on advancing our commercial production strategy under the U.S.-based DSHMRA regime.
+Added: In April 2025, our wholly owned subsidiary, The Metals Company USA, LLC, or TMC USA, submitted two exploration license applications (covering 199,895 square kilometers in the CCZ referred to as TMC USA-A and TMC USA-B) and one commercial recovery permit application (covering 25,160 square kilometers in the CCZ referred to as TMC USA-A_2) to NOAA.
+Added: These applications are estimated to hold approximately 1.635 billion wet tonnes of measured, indicated and inferred mineral resources.
+Added: Together, the resources are estimated to contain approximately 15.5 million tonnes of nickel, 12.8 million tonnes of copper, 2.0 million tonnes of cobalt, and 345 million tonnes of manganese.
+Added: These applications reflect our belief that DSHMRA provides a viable and robust regulatory path to commercial production, distinct from the ISA regime under UNCLOS, which has repeatedly delayed the adoption of the Mining Code.
+Added: We welcomed the recent Executive Order signed by President Trump on April 24, 2025, titled “Unleashing America’s Offshore Critical Minerals and Resources”, which directs the Commerce Secretary to implement an expedited permitting process under DSHMRA.
+Added: In addition to directing the International Development Finance Corporation, Export-Import Bank and Trade and Development Agency to identify tools to support this new industry, the Executive Order instructs the Departments of Defense and Energy to assess the use of the National Defense Stockpile for nodule-derived minerals and of entering into offtake agreements for the procurement of these minerals.
+Added: In addition, these departments are also directed to review and revise domestic processing capabilities for seabed mineral resources.
+Added: At the same time as we pursue the U.S.
+Added: pathway, we continue to preserve our rights under the ISA system.
+Added: While the ISA does not have jurisdiction over activities conducted under the regulatory authority of the United States, we maintain two ISA exploration contracts in the CCZ, one held by our subsidiary Nauru Ocean Resources Inc., or NORI, sponsored by the Republic of Nauru, and one held by Tonga Offshore Mining Limited, or TOML, sponsored by the Kingdom of Tonga.
+Added: The ISA has issued a total of 19 exploration contracts covering approximately 1.28 million square kilometers, 17 of which are located in the CCZ.
+Added: Currently, we are increasingly focused on pursuing commercial production through the U.S.
+Added: regulatory pathway under DSHMRA, following the April 2025 submission of TMC USA’s exploration license and commercial recovery permit applications to NOAA.
+Added: We do not believe pursuing licenses and permits with NOAA under DSHMRA affects our ISA exploration contracts.
+Added: We have key strategic partnerships with (i) Allseas, a leading global offshore contractor, which developed and tested a pilot collection system, and is now working to modify it into the first commercial production system, (ii) PAMCO, an experienced Japanese ferronickel producer, which is responsible for pre-feasibility and feasibility studies on nodule processing, and (iii) Glencore which holds offtake rights to 50% of the NORI nickel and copper production if produced from a DGE-owned or controlled facility.
+Added: In addition, we have worked with engineering firm Hatch Ltd.
(Hatch) and consultants Kingston Process Metallurgy Inc.
(KPM) to develop a near-zero solid waste flowsheet.
−Removed: The primary processing stages of the flowsheet from nodule to Ni-Cu-Co matte intermediate were demonstrated as part of our pilot plant program at FLSmidth and XPS’ facilities.
−Removed: The matte refining stages are being tested at SGS Lakefield.
+Added: The primary processing stages of the flowsheet from nodule to NiCuCo matte intermediate were demonstrated as part of our pilot plant program at FLSmidth and XPS’(Glencore subsidiary) facilities.
+Added: The matte refining stages have been tested at SGS Lakefield with positive results.
The near-zero solid waste flowsheet provides a design that is expected to serve as the basis for our onshore processing facilities.
−Removed: In November 2022, we entered into a non-binding Memorandum of Understanding (“MoU”) with Pacific Metals Co Ltd (PAMCO) of Japan pursuant to which PAMCO completed prefeasibility work assessing the prospect of processing nodules using their existing facilities.
−Removed: In November 2023, we entered into a binding MoU with PAMCO whereby they committed to completing a feasibility study (expected to be completed in the first half of 2025) to toll treat 1.3 million tonnes of wet polymetallic nodules per year at its Hachinohe, Japan smelting facility, provided we obtain an exploitation contract from the ISA as expected.
−Removed: The toll treatment is intended to take place on a dedicated Rotary Kiln Electric Arc Furnace (RKEF) processing line and produce two products:
−Removed: nickel-copper-cobalt alloy, an intermediate product used as feedstock to produce lithium-ion battery cathodes, and a manganese silicate product used to make silico-manganese alloy, a critical input into steel manufacturing.
We expect this partnership to progress to a definitive tolling agreement in 2025, subject to successful evaluation study outcomes and agreement to mutually acceptable commercial terms.
−Removed: There can be no assurance that we will enter into such definitive strategic alliance in a particular time period, or at all, or on terms similar to those set forth in the binding MoU, or that if such definitive tolling agreement is entered into by us or that the existing facility will be able to successfully process nodules in a particular time period, or at all.
−Removed: We are currently focused on preparing our application for a plan of work to the ISA for our first exploitation contract for the NORI contract area.
−Removed: Given that it is unlikely that the ISA Council would consider any application for a plan of work for exploitation before its next session in March 2025 and to ensure clarity on the submission process, consideration of the Application, and timeline, the Republic of Nauru, in consultation with NORI, has formally requested that this issue be added to the agenda of the Council’s March 2025 meeting.
−Removed: We expect that this will allow Council to discuss and approve the process to be confirmed prior to NORI’s expected application submission date of June 27, 2025.
−Removed: Based on the current timeline in the consolidated draft regulations issued February 2024, the ISA application review and approval process is expected to be approximately one year from the filing date.
−Removed: See “ Project and Regulatory Updates - ISA Developments ” below for a further discussion on recent developments at the ISA.
−Removed: To reach our objective and initiate commercial production, we are:
−Removed: (i) defining our resource and project economics, (ii) developing a commercial offshore nodule collection system, (iii) assessing the environmental and social impacts of offshore nodule collection, and (iv) developing onshore technology to process collected polymetallic nodules into a manganese silicate product, and an intermediate nickel-copper-cobalt alloy or matte product and/or end-products like nickel and cobalt sulfates, and copper cathode.
−Removed: We are still in the exploration phase and have not yet declared mineral reserves.
−Removed: In addition, we do not have the applicable environmental and other permits required to build and/or operate commercial scale polymetallic nodule processing and refining plants on land.
−Removed: Developments in the Third Quarter 2024
−Removed: Below are some of the major developments that occurred in the third quarter of 2024:
−Removed: TMC and PAMCO Achieve Breakthrough in Commercial-Scale Processing of Polymetallic Nodules, Successfully Producing Calcine
−Removed: In September 2024, we announced that we had successfully produced high temperature material (calcine) during the first phase of a commercial-scale campaign to process a 2,000-tonne sample of deep-seafloor polymetallic nodules at our partner PAMCO’s Hachinohe Rotary Kiln Electric-Arc Furnace facility in Hachinohe, Japan.
−Removed: Approximately 500 tonnes of calcine were produced and, in the coming months, PAMCO intends to commence the next phase of the processing trial by transferring the calcine material to its electric arc furnace for smelting into a high-grade nickel-copper-cobalt alloy and manganese silicate product.
−Removed: TMC CEO Testifies to U.S.
−Removed: House of Representatives on Benefits of Nodules
−Removed: In September 2024, our CEO Gerard Barron gave testimony during a meeting of the Critical Mineral Policy Working Group for the House Select Committee on the Chinese Communist Party to discuss the U.S.’ heavy reliance on Chinese imports of critical minerals and policy solutions to incentivize greater cooperation with allies to create alternative supplies.
−Removed: Mr Barron spoke to the potential of seafloor nodules to secure U.S.
−Removed: supplies of key minerals for the energy transition and defense sectors.
−Removed: Rebuttal to Publication
−Removed: In July 2024, Nature Geoscience published a paper claiming that seafloor nodules produce oxygen in the absence of sunlight.
−Removed: Since the paper’s publication, multiple rebuttals have been submitted to Nature warning of serious flaws with the paper’s methodology and claims, prompting calls for the paper to be retracted.
−Removed: Researchers at the University of Tokyo and University of Gothenburg are among the experts that have submitted pre-print rebuttals to the article’s author.
−Removed: Our own rebuttal, published September 19, 2024, notes selective reporting of data and omission of key evidence, including experiments that show oxygen increases without nodules, directly contradicting the authors’ claims.
−Removed: Developments Subsequent to September 30, 2024
+Added: To reach our objective and initiate commercial production, we are working to:
+Added: (i) define our resource and project economics, (ii) develop a commercial offshore nodule collection system, (iii) assess the environmental and social impacts of offshore nodule collection, and (iv) develop onshore technology to process collected polymetallic nodules into a manganese silicate product, and an intermediate nickel-copper-cobalt alloy or matte product and/or end-products like nickel and cobalt sulfates, and copper cathode.
+Added: We are also working towards a pre-feasibility study, which we are now updating to reflect the U.S.
+Added: regulatory pathway and a new set of requirements under DSHMRA.
+Added: Developments in the First Quarter 2025
+Added: Below are some of the major developments that occurred in the first quarter of 2025:
+Added: TMC and PAMCO Achieve Nodule Processing Milestone, Unlocking Critical Battery & Steelmaking Materials at Existing Facilities
+Added: On February 18, 2025, we announced that PAMCO had successfully smelted 450 tonnes of calcine into 35 tonnes of NiCuCo alloy and 320 tonnes of Mn silicate products, during a campaign to process a 2,000-tonne sample of deep-seafloor polymetallic nodules at our partner PAMCO’s Hachinohe Rotary Kiln Electric-Arc Furnace facility in Hachinohe, Japan, demonstrating the process at scale.
+Added: The process data and operational experience gathered during the processing trial will inform expected definitive processing agreements between the parties.
+Added: Extension of Credit Facility with ERAS Capital LLC and Gerard Barron
+Added: On March 26, 2025, we entered into the Third Amendment to the 2024 Credit Facility with the 2024 Lenders, to, among other things, increase the borrowing limit to $44 million in the aggregate ($22 million from each of the 2024 Lenders) and extend the maturity of the 2024 Credit Facility to June 30, 2026.
+Added: Extension of Allseas Working Capital Loan Agreement and Termination of Allseas 2023 Credit Facility
+Added: On March 24,2025, we entered into a Letter Agreement (the “Letter Agreement”) with Allseas Investments and Argentum Cedit Virtuti GCV, pursuant to which the repayment date under our working capital loan agreement (“Working Capital Loan Agreement”) with Allseas Investments dated September 9, 2024 was extended to September 30, 2025.
+Added: Additionally, under the Letter Agreement, we and Argentum Cedit Virtuti GCV agreed to cancel the unsecured credit facility established in 2023 with no outstanding amounts remaining, other than our obligation to pay the underutilization fee thereunder.
+Added: Exploring U.S.
+Added: Regulatory Pathway
+Added: On March 27, 2025, we announced that we initiated a pre-application consultation process with NOAA and the U.S.
+Added: Department of Commerce under the DSHMRA to consider a U.S.
+Added: regulatory pathway for the commercial recovery of deep-sea polymetallic nodules in the CCZ.
+Added: We believe this regulatory pathway offers a clear and predictable route to securing an exploration license and a commercial recovery permit for polymetallic nodules found in the CCZ.
+Added: We are in the initial planning stages of this strategy, however, and there are no assurances that we will be able to secure any exploration or commercial recovery rights under the DSHMRA in a timely manner, or at all.
+Added: Developments Subsequent to March 31, 2025
+Added: TMC USA Submits Application for Commercial Recovery of Deep-Sea Minerals Under U.S.
+Added: Seabed Mining Code
+Added: On April 29, 2025, we announced that TMC USA had submitted the first-ever application for a commercial recovery permit and two exploration licenses under the Deep Seabed Hard Mineral Resources Act of 1980 (DSHMRA), advancing the Company’s timeline ahead of its original June 27, 2025 application target.
+Added: The application area for the commercial recovery permit, TMC USA-A_2, covers a total combined area of 25,160 square kilometers in the Clarion Clipperton Zone which includes areas that contain the Company’s already indicated and measured resources.
+Added: TMC USA also submitted two exploration license applications:
+Added: TMC USA-A and TMC USA-B with a total combined area of 199,895 square kilometers.
+Added: The Company believes the TMC USA-A and USA-B exploration areas contain SEC SK 1300-compliant resources of 1.635 billion wet tonnes of polymetallic nodules supported by existing issued technical report summaries, with an additional estimated 500 million tonnes of potential exploration upside.
+Added: The resources are estimated to contain approximately 15.5 million tonnes of nickel, 12.8 million tonnes of copper, 2.0 million tonnes of cobalt, and 345 million tonnes of manganese.
+Added: TMC Welcomes U.S.
+Added: Executive Order to Expedite Permitting and Evaluate Offtake of Critical Minerals from Nodules in the High Seas
+Added: On April 25, 2025, we welcomed an Executive Order signed by President Trump to create a robust domestic supply for critical minerals derived from seabed resources.
+Added: The Executive Order, ‘Unleashing America’s Offshore Critical Minerals and Resources’, directs the Commerce Secretary to implement an expedited permitting process under the DSHMRA, a statute passed by Congress in 1980.
+Added: In addition to directing the International Development Finance Corporation, Export-Import Bank and Trade and Development Agency to identify tools to support this new industry, the order instructs the Departments of Defense and Energy to assess the use of the National Defense Stockpile for nodule-derived minerals and entering into offtake agreements for the procurement of these minerals.
+Added: These departments are also directed to review and revise domestic processing capabilities for seabed mineral resources and Defense Production Act authorities.
+Added: The executive order also issued a directive for a joint assessment, led by the Secretaries of Commerce, State, Interior, and Energy in coordination with U.S.
+Added: partners and allies, on the feasibility of an international seabed benefit-sharing mechanism.
TMC Announces Registered Direct Offering for $37 million
−Removed: On November 14, 2024, the Company entered into a securities purchase agreement with certain new and existing institutional investors for the sale of an aggregate of 17,500,000 common shares (the “Shares”) and accompanying Class B warrants (the “Class B Warrants”), in a registered direct offering.
−Removed: The offering price was $1.00 per Share, resulting in gross proceeds of $17.5 million ($16.5 million after associated fees), with each Share including an accompanying Class B Warrant to purchase 0.5 common shares.
−Removed: The Class B Warrants are exercisable immediately upon issuance at a price of $2.00 per share and expire five years from issuance.
−Removed: The Class B Warrants include customary anti-dilution protections and a repurchase feature, permitting the Company to repurchase the warrants for $0.0001 per Common Share underlying the Class B Warrants if the volume-weighted average price of the Company’s common shares exceeds $5.00 per share for each trading day in a consecutive 30-trading-day period.
−Removed: Extension and Increase of Credit Facility with ERAS Capital LLC and Gerard Barron
−Removed: On November 14, 2024, we entered into the Second Amendment to the credit facility with ERAS Capital LLC and Gerard Barron (the “2024 Lenders”), to increase the borrowing limit to $38 million in the aggregate ($19 million from each of the 2024 Lenders) and to extend the maturity of the credit facility to December 31, 2025.
−Removed: Termination of Marawa Service Agreement
−Removed: On November 14, 2024, DeepGreen Engineering Pte.
−Removed: (“DeepGreen”) issued a formal termination notice to Marawa Research and Exploration Limited, ending the Services Agreement dated October 1, 2013 (the “Agreement”), pursuant to DeepGreen’s right to terminate for convenience under the Agreement.
−Removed: The termination will take effect two months from the date of the notice, on January 14, 2025.
−Removed: The termination is not expected to have a material adverse effect on the Company’s financial position or operations, with non-material ongoing costs and no termination penalties applicable under the Agreement.
+Added: On May 12, 2025, the Company entered into a securities purchase agreement with certain new and existing investors, including an existing strategic investor, for the sale of an aggregate of 12,333,333 common shares (the "Shares") and accompanying Class C warrants (the "Class C Warrants"), in a registered direct offering.
+Added: The offering price was $3.00 per Share, resulting in gross proceeds of $37.0 million ($36.75 million after associated fees), with each Share including an accompanying Class C Warrant to purchase one common share.
+Added: The Class C Warrants are exercisable immediately upon issuance at a price of $4.50 per share and expire three years from issuance.
+Added: The Class C Warrants include customary anti-dilution protections and a repurchase feature, permitting the Company to repurchase the warrants for $0.0001 per Common Share underlying the Class C Warrants if the volume-weighted average price of the Company's common shares exceeds $7.00 per share for each trading day in a consecutive 20-trading-day period.
+Added: Rutger Bosland, Pioneering Engineer and Technical Lead on Development of TMC’s Nodule Collection System, Joins Company to Drive Commercial Readiness
+Added: On April 15, 2025, we announced that Rutger Bosland, the engineer and technical lead who oversaw the design, build, and successful test deployment of Allseas’ integrated nodule collection system, had joined the Company as Chief Innovation and Offshore Technology Officer (CIOTO).
+Added: Rutger will lead offshore innovation and efforts to scale our technologies for commercial production.
+Added: He brings world-class expertise in deep-sea mining, naval architecture, and offshore operations to TMC, having led a team of 80+ engineers in developing TMC’s nodule collection system, and Allseas’ program to scale-up nodule collection technology in preparation for TMC’s planned commercial operations.
Project and Regulatory Updates
−Removed: NORI Area D Project Developments
−Removed: On October 6, 2024, the first feed of Calcine was transported via conveyor to the furnace to commence the first smelting campaign at PAMCO’s facility in Hachinohe, Japan.
−Removed: Progress continues on the Environmental Impact Statement (EIS), Pre-Feasibility Study (PFS) which is nearing completion, and Plan of Work application documentation.
−Removed: Key activities during the third quarter 2024 included the substantial completion of the PFS, which has now entered the review and approval process.
−Removed: Our EIS team continued finalizing baseline reports to support the EIS workshop with subject-matter experts.
−Removed: We expect to issue an S-K 1300-compliant Technical Report Summary following the completion and approval of the PFS.
−Removed: ISA Developments
−Removed: As we previously disclosed, the ISA did not provisionally adopt and approve the final rules, regulations and procedures (“RRPs” or the “Mining Code”) for the exploitation of seafloor resources by the July 9, 2023 deadline.
−Removed: At its July 2024 session, the ISA completed a first reading of the consolidated text and requested the Secretariat produce a second consolidated text in 2024.
−Removed: The ISA agreed to continue the negotiations of the Mining Code with a continued view to its adoption during the 30 th session of the ISA in 2025.
−Removed: The ISA Council has scheduled two ISA Council meetings in March and July 2025 to progress the Mining Code and has agreed to continue working inter-sessionally to advance the text.
−Removed: Consistent with Nauru’s rights, as the sponsoring state of NORI, under UNCLOS and the 1994 agreement relating to the implementation of Part XI of UNCLOS, NORI reserves its right to submit a plan of work for exploitation, in the absence of the adoption of the final Mining Code pursuant to Section 1, Paragraph 15(c) of the Annex to the 1994 agreement relating to the implementation of Part XI of UNCLOS, the possibility of which was recognized in ISA Council decisions ISBA/28/C/24 and ISBA/28/C/25.
−Removed: There can be no assurances, however, that the ISA will provisionally approve our plan of work or that such provisional approval would lead to the issuance of an exploitation contract by the ISA.
−Removed: Exploration Contracts
−Removed: We currently hold exclusive exploration rights to certain polymetallic nodule areas in the CCZ through our subsidiaries NORI and TOML, sponsored by the Republic of Nauru and the Kingdom of Tonga, respectively, and exclusive commercial rights through our subsidiary’s (DGE) arrangement with Marawa, a company owned and sponsored by the Republic of Kiribati.
+Added: Project Developments
+Added: Progress continues on the Environmental Impact Statement (EIS) post the Impact Assessment workshop held in January 2025 and with the Pre-Feasibility Study (PFS) which will now require additional work to finalize, as a result of the change to permitting under DSHMRA, which is due to be completed in the third quarter of 2025.
+Added: Regulation of Mining of Deep-Sea Polymetallic Nodules by the United States
+Added: The Deep Seabed Hard Mineral Resources Act
+Added: The Deep Seabed Hard Mineral Resources Act of 1980, or DSHMRA, establishes a domestic legal regime for U.S.
+Added: citizens to explore for and commercially recover hard mineral resources from the seabed in areas beyond U.S.
+Added: national jurisdiction.
+Added: DSHMRA affirms that deep-sea mining is a lawful freedom of the high seas, subject to a duty of reasonable regard to the interests of other states in their exercise of those and other freedoms recognized by the general principles of international law, and provides a regulatory structure administered by NOAA, an agency under the U.S.
+Added: Department of Commerce.
+Added: NOAA’s implementing regulations detail the criteria and conditions for issuance of deep seabed exploration licenses and commercial recovery permits to U.S.
+Added: citizens, including any individual, corporation, or other entity organized under the laws of a U.S.
+Added: state or territory.
+Added: The purpose of DSHMRA is to promote the development of seabed minerals by U.S.
+Added: citizens while ensuring environmental protection, avoidance of conflict with other high seas uses, and consistency with international law.
+Added: Before any license or permit is issued, NOAA must determine that the proposed activities meet a series of statutory requirements, including that the activity:
+Added: (i) will not unreasonably interfere with the lawful use of the high seas by other states;
+Added: (ii) is consistent with U.S.
+Added: foreign policy and international obligations;
+Added: (iii) does not create a risk to international peace and security;
+Added: (iv) is not expected to result in significant adverse environmental effects;
+Added: and (v) does not pose undue risk to life or property at sea.
+Added: These findings reflect NOAA’s mandate of advancing U.S.
+Added: commercial interests in seabed minerals while minimizing environmental and diplomatic risk.
+Added: TMC’s wholly owned subsidiary, TMC USA, a US-registered company established in 2013, has submitted three applications to NOAA:
+Added: two for exploration licenses and one for a commercial recovery permit.
+Added: Exploration licenses under DSHMRA grant exclusive rights to conduct technical studies in a defined area and are issued for ten-year terms.
+Added: Commercial recovery permits authorize full-scale extraction for a period of 20 years subject to extension and are subject to enhanced environmental and operational requirements.
+Added: To date, NOAA has issued exploration licenses over four areas, of which two are active, however it has not issued any commercial recovery permits under DSHMRA as no U.S.
+Added: citizen had applied for a commercial recovery permit prior to TMC USA.
+Added: TMC USA initiated pre-application consultations with NOAA in the first quarter of 2025 and, following those discussions, submitted its applications in April 2025.
+Added: These are now under agency review.
+Added: Each application includes the full environmental, technical, financial, and operational data required under DSHMRA and the National Environmental Policy Act, or NEPA.
+Added: The NOAA review process includes a determination whether applications for exploration licenses are in full or substantial compliance with the applicable requirements under DSHMRA and its implementing regulations within 30 days of receipt and whether applications for a commercial recovery permit is complete within 60 days.
+Added: NOAA is then expected to proceed with a full review of the applications, including interagency consultation with other U.S.
+Added: government departments (including the Department of State, the Department of Defense, and the Environmental Protection Agency), preparation of an Environmental Impact Statement, or EIS, under NEPA, and a public comment period.
+Added: NOAA will determine whether to issue the requested licenses and permit, and if so, under what terms and conditions.
+Added: All licenses and permits issued under DSHMRA are subject to oversight, periodic reporting, and potential suspension or revocation for noncompliance or unforeseen environmental harm.
+Added: DSHMRA and its regulations do not include a statutory deadline for application review.
+Added: However, the Executive Order signed by President Trump on April 24, 2025, directs the Commerce Secretary to implement an expedited permitting process under DSHMRA.
+Added: NOAA issued four exploration licenses in 1984 to U.S.-sponsored consortia for polymetallic nodule exploration in the CCZ.
+Added: Two of these licenses (USA-1 and USA-4) remain active and are currently held by Lockheed Martin.
+Added: These licenses have been renewed until 2027 in accordance with DSHMRA’s statutory provisions, which require NOAA to grant extensions if the licensee has substantially complied with license terms.
+Added: We believe NOAA has historically adopted a cautious and science-based regulatory posture under DSHMRA, coordinating with other U.S.
+Added: federal agencies and supporting environmental studies to inform future decisions.
+Added: In the 1980s and 1990s, the United States entered into reciprocal recognition arrangements with other nations with similar domestic seabed mining laws, helping avoid overlapping claims prior to the establishment of the ISA.
+Added: Once the ISA became operational in the 1990s, most reciprocating states transitioned to the UNCLOS/ISA system.
+Added: The United States, however, remains outside that framework.
+Added: NOAA is not restricted under DSHMRA from issuing licenses or permits over areas that are also subject to ISA exploration or exploitation contracts.
+Added: In addition, DSHMRA requires that all mining vessels and at least one transport vessel are U.S.
+Added: TMC USA will ensure all vessels contracted for commercial recovery comply with relevant laws pertaining to vessel standards and crew safety.
+Added: DSHMRA also requires that recovered minerals be processed in the United States unless a waiver is granted, in which case the permittee is required to provide assurances that processed materials are returned to the United States.
+Added: We are currently evaluating U.S.-based vessel and processing options to satisfy this requirement as well as working with Japan and South Korea-based supply chain to ensure processed materials can be returned to the United States in case the permit to process outside the United States is granted for an initial period.
+Added: If necessary, we expect to seek a waiver based on the statutory criteria and applicable regulations.
+Added: We expect to become subject to additional U.S.
+Added: laws and regulations as development progresses and are in the early stages of analyzing their applicability and potential impact on our operations.
+Added: Existing ISA Exploration Contracts
+Added: We currently hold exploration rights to certain polymetallic nodule areas in the CCZ through our subsidiaries NORI and TOML, sponsored by the Republic of Nauru and the Kingdom of Tonga, respectively.
NORI, our wholly-owned subsidiary, holds exploration rights to four blocks (NORI Area A, B, C, and D, the “NORI Contract Area”) covering 74,830 square kilometers in the CCZ that were granted by the ISA in July 2011.
1 unchanged sentence
The D block of the NORI area (“NORI Area D”) is the seafloor parcel where we have performed the most resource definition and environmental work to date.
−Removed: NORI commissioned AMC Consulting Ltd, a leading mining consulting firm (AMC), to undertake a preliminary economic assessment (“PEA”) of the mineral resource contained in NORI Area D and to compile a technical report compliant with Canadian National Instrument (NI 43-101), which was completed in March 2021.
+Added: NORI commissioned AMC Consulting Ltd (“AMC”), a leading mining consulting firm, to undertake an Initial Economic Assessment of the mineral resource contained in NORI Area D and to compile a technical report compliant with Canadian National Instrument (NI 43-101), which was completed in March 2021.
AMC subsequently compiled the NORI Technical Report Summary, dated March 2021, which included an initial assessment and an economic analysis of NORI Area D prepared in accordance with the SEC’s Modernization of Property Disclosures for Mining Registrants set forth in subpart 1300 of Regulation S-K (the “SEC Mining Rules”).
−Removed: The NORI Technical Report Summary is filed as Exhibit 96.1 in our 2023 Annual Report on Form 10-K.
+Added: The NORI Technical Report Summary is filed as Exhibit 96.1 to this Annual Report.
+Added: See Item 2 entitled “Properties” included in this Annual Report for additional information about the 2021 economic analysis of NORI Area D.
TOML, our wholly-owned subsidiary which we acquired in March 2020, holds exploration rights to an area covering 74,713 square kilometers in the CCZ that were granted by the ISA in January 2012 (the “TOML Contract Area”).
1 unchanged sentence
The sponsorship agreement was updated on September 23, 2021.
−Removed: TOML commissioned a Technical Report Summary by AMC, dated March 2021, which is filed as Exhibit 96.2 in our 2023 Annual Report on Form 10-K.
−Removed: DGE, our wholly-owned subsidiary, entered into agreements with Marawa and Kiribati which provide DGE with exclusive exploration rights to an area covering 74,990 square kilometers in the CCZ (the “Marawa Contract Area”).
−Removed: The exploration contract between Marawa and the ISA (the “Marawa Exploration Contract”) was signed on January 19, 2015.
−Removed: To date, limited offshore marine resource definition activities in the Marawa Contract Area have occurred.
−Removed: We are collaborating with Marawa to assess the viability of any potential project in the Marawa Contract Area, although the timing of such assessment is uncertain.
−Removed: Marawa has delayed certain of its efforts in the Marawa Contract Area while it determines how it will move forward with additional assessment work.
+Added: TOML commissioned a Technical Report Summary by AMC, dated March 2021, which is filed as Exhibit 96.2 to this Annual Report.
Key Trends, Opportunities and Uncertainties
−Removed: We are currently a pre-revenue company and we do not anticipate earning revenues until such time as NORI receives an exploitation contract from the ISA and we are able to successfully collect and process polymetallic nodules into saleable products on a commercial scale.
−Removed: We believe that our performance and future success pose risks and challenges, including those related to:
−Removed: finalization of ISA regulations to allow for commercial exploitation, approval of an application for the ISA exploitation contract, development of environmental regulations associated with our business and development of our technologies to collect and process polymetallic nodules.
+Added: We are currently a pre-revenue company, and we do not anticipate earning revenues (other than potential service revenue) until one of our wholly-owned subsidiaries receives an exploitation contract or commercial recovery permit and we are able to successfully collect and process polymetallic nodules into saleable products on a commercial scale.
+Added: We believe that our performance and future success pose risks and challenges, including those related to the approval of an application for a commercial recovery permit, development of environmental terms, conditions and restrictions associated with our application and development of our technologies to collect and process polymetallic nodules.
These risks, as well as other risks, are discussed in the section entitled “ Risk Factors ” in Item 1A of Part I of the 2024 Annual Report on Form 10-K, as further updated and/or supplemented in subsequent filings with the SEC.
5 unchanged sentences
Components of Results of Operations
−Removed: We are an exploration-stage company with no revenue to date and a net loss of $20.5 million and $65.9 million for the three and nine months ended September 30, 2024, respectively, compared to a net loss of $12.5 million and $40.3 million in the same periods of 2023, respectively.
−Removed: We have an accumulated deficit of approximately $614.8 million from inception through September 30, 2024.
+Added: We are an exploration-stage company with no revenue to date and a net loss of $20.6 million for the three months ended March 31, 2025, compared to a net loss of $25.2 million in the same period of 2024.
+Added: We have an accumulated deficit of approximately $652.0 million from inception through March 31, 2025.
Our historical results may not be indicative of our future results for reasons that may be difficult to anticipate.
1 unchanged sentence
To date, we have not generated any revenue.
−Removed: We expect to generate revenue once NORI receives an exploitation contract from the ISA and we are able to successfully collect and process polymetallic nodules into saleable products on a commercial scale.
+Added: We expect to generate revenue once we receive a commercial recovery permit, and we are able to successfully collect and process polymetallic nodules into saleable products on a commercial scale.
Any revenue from initial production is difficult to predict.
1 unchanged sentence
We expense all costs relating to exploration and development of mineral claims.
−Removed: Such exploration and development costs include, but are not limited to, ISA contract management, geological, geochemical and geophysical studies, environmental baseline studies, process development and payments to Allseas for the pilot mining test system (“PMTS”).
+Added: Such exploration and development costs include, but are not limited to, regulatory approvals, exploration mineral title management, geological, geochemical and geophysical studies, environmental baseline studies and process development activities.
Our exploration expenses are impacted by the amount of exploration work conducted during each period.
−Removed: The acquisition cost of ISA polymetallic nodule exploration contracts will be charged to operations as amortization expense on a unit-of-production method based on proven and probable reserves should commercial production commence in the future.
+Added: The acquisition cost of polymetallic nodule mineral title will be charged to operations as amortization expense on a unit-of-production method based on proven and probable reserves should commercial production commence in the future.
General and Administrative Expenses
General and administrative (“G&A”) expenses consist primarily of compensation for employees, consultants and directors, including share-based compensation, consulting fees, investor relations expenses, expenses related to advertising and marketing functions, insurance costs, office and sundry expenses, professional fees (including legal, audit and tax fees), travel expenses and transfer and filing fees.
−Removed: Share-based compensation costs from the issuance of stock options and restricted share units (“RSUs”) is measured at the grant date based on the fair value of the award and is recognized over the related service period.
+Added: Share-based compensation costs from the issuance of stock options and restricted share units (“RSUs”) are measured at the grant date based on the fair value of the award and are recognized over the related service period.
Share-based compensation costs are charged to exploration expenses and general and administrative expenses depending on the function fulfilled by the holder of the award.
10 unchanged sentences
Results of Operations
−Removed: The following is a discussion of our results of operations for the three and nine months ended September 30, 2024 and 2023.
+Added: The following is a discussion of our results of operations for the three months ended March 31, 2025 and 2024.
Our accounting policies are described in Note 3 “Significant Accounting Policies” in our financial statements filed as part of the 2024 Annual Report on Form 10-K.
−Removed: Additionally, the unaudited condensed consolidated interim financial statement for the nine months ended September 30, 2023 have been revised to correct prior period errors as discussed in Note 22 “Quarterly Financial Data (Unaudited) Restatement of Previously Issued Financial Statements” to the consolidated financial statement included in Part II, Item 8 of our 2023 Annual Report on Form 10-K.
−Removed: Accordingly, the Management’s Discussion and Analysis of Financial Condition and Results of Operations reflect the effects of the revisions.
−Removed: Comparison of the Three and Nine Months Ended September 30, 2024 and 2023
+Added: Comparison of the Three Months Ended March 31, 2025 and 2024
For the Three Months Ended
−Removed: For the Nine Months Ended
(Dollar amounts in thousands, except as noted)
−Removed: September 30,
−Removed: September 30,
Exploration and evaluation expenses
4 unchanged sentences
Interest income
−Removed: Fees and interest on borrowings and credit facilities
−Removed: Net Loss for the period
−Removed: Three Months ended September 30, 2024 compared to Three Months ended September 30, 2023
−Removed: We reported a net loss of approximately $20.5 million in the third quarter of 2024, compared to a net loss of $12.5 million in the same period of 2023.
−Removed: The following explains the major reasons for the increase in the net loss in the third quarter of 2024.
+Added: Fees and interest on borrowings and credit facility
+Added: Loss for the period
+Added: Three Months ended March 31, 2025 compared to Three Months ended March 31, 2024
+Added: We reported a net loss of approximately $20.6 million in the first quarter of 2025, compared to a net loss of $25.2 million in the same period of 2024.
+Added: The following explains the major reasons for the decrease in the net loss in the first quarter of 2025.
Exploration and Evaluation Expenses
−Removed: Exploration and evaluation expenses for the three months ended September 30, 2024 were $11.8 million, compared to $7.9 million for the same period in 2023.
−Removed: The increase of $3.9 million was primarily due to an increase in share-based compensation of $1.8 million due to the amortization of the fair value of RSUs and options granted to the directors and officers in the second quarter of 2024, increase in mining, technological and process development of $1.0 million resulting from increased engineering work by Allseas and higher personnel costs of $1.0 million.
+Added: Exploration and evaluation expenses for the three months ended March 31, 2025 were $9.5 million, compared to $18.1 million for the same period in 2024.
+Added: The decrease of $8.6 million is primarily due to a decrease in mining, technological and process development of $8.6 million as the comparative quarter of 2024 included costs incurred on the transportation of nodules to PAMCO’s facility in Japan, resource definition costs incurred during Campaign 8 which was completed in the first quarter of 2024 and lower costs incurred on environmental and prefeasibility studies, partially offset by an increase in share-based compensation of $0.9 million due to the amortization of the fair value of RSUs and options granted to the officers in the second quarter of 2024.
General and Administrative Expenses
−Removed: G&A expenses for the three months ended September 30, 2024 were $8.1 million compared to $4.6 million for the same period in 2023.
−Removed: The increase of $3.5 million in G&A expenses was mainly due to an increase in share-based compensation of $1.8 million due to the amortization of the fair value of RSUs and options granted to the directors and officers in the second quarter of 2024, an increase in legal and consulting costs of $1.0 million and higher personnel costs of $0.5 million.
+Added: G&A expenses for the three months ended March 31, 2025 were $8.5 million compared to $6.6 million for the same period in 2024.
+Added: The increase of $1.9 million in G&A expenses was mainly to the result of an increase in share-based compensation of $2.2 million due to the amortization of the fair value of RSUs and options granted to the directors and officers in the second quarter of 2024, partially offset by a decrease of $0.3 million in legal costs in the first quarter of 2025.
Change in F air V alue of W arrants L iability
The change in fair value of warrants liability consists of the change in the fair value of the 9,500,000 Private Warrants.
−Removed: During the three months ended September 30, 2024, the fair value of warrants liability decreased reflecting the decline in both the price of the public warrants and price of the Company’s shares.
−Removed: Fees and Interest on Borrowings and Credit Facilities
−Removed: The interest charged on the Company’s short-term debt borrowings was $0.1 million in the third quarter of 2024 ($nil for the same period of 2023), while interest on drawn amounts on the Company’s credit facilities was $0.1 million and underutilization fees on these same facilities was $0.5 million in the third quarter of 2024 ($nil and $0.3 million over the same periods in 2023, respectively).
−Removed: Nine Months ended September 30, 2024 compared to Nine Months ended September 30, 2023
−Removed: We reported a net loss of $65.9 million in the first nine months of 2024, compared to a net loss of $40.3 million in the same period of 2023.
−Removed: The following explains the major reasons for the increase in the net loss in the first nine months of 2024.
−Removed: Exploration and Evaluation Expenses
−Removed: Exploration and evaluation expenses for the nine months ended September 30, 2024 were $42.3 million, compared to $23.2 million for the same period in 2023.
−Removed: The increase of $19.1 million was primarily due to an increase in mining, technological and process development of $13.3 million resulting from increased engineering work by Allseas, as well as expenses incurred on the transportation of nodules to PAMCO’s facility in Japan, higher personnel costs of $3.2 million and an increase in share-based compensation of $3.5 million due to the amortization of the fair value of RSUs and options granted to the directors and officers in the second quarter of 2024.
−Removed: This was partially offset by a decrease in environmental studies as the cost for Campaign 8 which commenced in the fourth quarter of 2023 was completed in the first quarter of 2024 and was lower than the cost of the environmental work in the first nine months of 2023 following the completion of the NORI pilot nodule collection system test .
−Removed: General and Administrative Expenses
−Removed: G&A expenses for the nine months ended September 30, 2024 were $22.6 million, compared to $16.0 million for the same period in 2023.
−Removed: The increase of $6.6 million in G&A expenses in the first nine months of 2024 was mainly the result of an increase in share-based compensation of $4.0 million due to the amortization of the fair value of RSUs and options granted to the directors and officers in the second quarter of 2024, higher personnel cost of $1.9 million and higher cost incurred on business development and advisory activities.
−Removed: This increase was partially offset by decreased legal and insurance costs incurred in the first half of 2024 compared to the same period in 2023.
−Removed: Change in Fair Value of Warrants Liability
−Removed: The change in fair value of warrants liability consists of the change in the fair value of the 9,500,000 Private Warrants.
−Removed: For the nine months ended September 30, 2024, the fair value of warrants liability decreased reflecting the decline in both the price of the public warrants and price of Company’s shares.
+Added: During the three months ended March 31, 2025, the fair value of warrants liability increased by 48% reflecting the increase in both the price of the public warrants and price of the Company’s shares.
Fees and Interest on Borrowings and Credit Facilities
−Removed: The interest charged on the Company’s short-term debt borrowings was $0.1 million in the first nine months of 2024 ($nil for the same period of 2023), while interest on drawn amounts on the Company’s credit facilities was $0.1 million and underutilization fees on these same facilities was $1.2 million in the first nine months of 2024 ($nil and $0.5 million over the same periods in 2023, respectively).
+Added: The interest charged on the Company’s short-term debt borrowings was $0.2 million in the first quarter of 2025 ($nil for the same period of 2024), while interest on drawn amounts on the Company’s credit facilities was $0.1 million and underutilization fees on these same facilities was $0.7 million in the first quarter of 2025 ($nil and $0.3 million over the same periods in 2024, respectively).
Liquidity and Capital Resources
Our primary sources of financing have come from private placements and public offerings of Common Shares and warrants, the issuance of convertible debentures and from credit facilities.
−Removed: As of September 30, 2024, we had cash on hand of $0.4 million.
+Added: As of March 31, 2025, we had cash on hand of $2.3 million.
In light of the significant deficit in expected funding following the closing of the Business Combination in September 2021, we adopted what we call a “capital-light” strategy whereby we removed any allocation of funds to capital expenditures that were not deemed necessary to support the submission of an application for an exploitation contract for the NORI contract area, and by negotiating the settlement of program expenditures with our equity whenever possible.
We have yet to generate any revenue from our business operations.
−Removed: We are an exploration-stage company and the recovery of our investment in mineral exploration contracts and attainment of profitable operations is dependent upon many factors including, among other things, the development of commercial production system for collecting polymetallic nodules from the seafloor as well as the development of our processing technology for the metallurgical treatment of such nodules, the establishment of mineable reserves, the demonstration of commercial and technical feasibility of seafloor polymetallic nodule collection and processing systems, metal prices, and securing ISA exploitation contracts or provisional approvals.
+Added: We are an exploration-stage company and the recovery of our investment in mineral exploration contracts and attainment of profitable operations is dependent upon many factors including, among other things, the development of commercial production system for collecting polymetallic nodules from the seafloor as well as the development of our processing technology for the metallurgical treatment of such nodules, the establishment of mineable reserves, the demonstration of commercial and technical feasibility of seafloor polymetallic nodule collection and processing systems, metal prices, and securing US exploration licenses and a commercial recovery permit and ISA exploitation contracts or provisional approvals.
While we have obtained financing in the past, there is no assurance that such financing will continue to be available on favorable terms, in sufficient amounts, or at all.
−Removed: We expect to incur significant expenses and operating losses for the foreseeable future, particularly as we advance towards our application to the ISA for an exploitation contract and preparation for potential commercialization.
−Removed: Based on our cash balance and availability of borrowing under our credit facility with a company related to Allseas, as we expect the credit facility will be amended, and credit facility with ERAS Capital LLC and Gerard Barron, when compared with our forecasted cash expenditures, we believe we will have sufficient funds to meet our obligations that become due within the next twelve months.
−Removed: Our estimates used in reaching this conclusion are based on information available as at the date of filing this Quarterly Report on Form 10-Q.
+Added: We expect to incur significant expenses and operating losses for the foreseeable future, as we advance our application to NOAA for exploration licenses and a commercial recovery permit and preparation for potential commercialization.
+Added: Based on our cash balance and availability of borrowing under our credit facility with ERAS Capital LLC and Gerard Barron, when compared with our forecasted cash expenditures, we believe we will have sufficient funds to meet our obligations that become due within the next twelve months.
+Added: Our estimates used in reaching this conclusion are based on information available as at the date of filing this Quarterly Report.
Accordingly, actual results could differ from these estimates and resulting variances may result in our need for additional funding in an amount greater or earlier than expected, due to changes in business conditions or other developments, including, but not limited to, deferral of approvals, capital and operating cost escalation, currently unrecognized technical and development challenges, our ability to pay certain vendors or suppliers in our Common Shares or changes in external business environment.
10 unchanged sentences
The offer and sales of the shares are made under our effective “shelf” registration statement on Form S-3 filed with the SEC on September 16, 2022, which the SEC declared effective on October 14, 2022.
−Removed: In the third quarter of 2024, we sold 1,617,000 Common Shares pursuant to the Sales Agreement at an average share price of $1.45 for net proceeds of $2.3 million, net of fees and commissions.
−Removed: On March 22, 2023, we entered into a Credit Facility with Argentum Cedit Virtuti GCV, the parent of Allseas Investments S.A.
−Removed: and an affiliate of Allseas, which was amended on July 31, 2023 and March 22, 2024, pursuant to which, we may borrow from the Lender up to $25 million in the aggregate, from time to time, subject to certain conditions.
−Removed: All amounts drawn under the Credit Facility will bear interest at the 6-month Secured Overnight Funding Rate (SOFR), 180-day average plus 4.0% per annum payable in cash semi-annually (or plus 5% if paid-in-kind at maturity, our election) on the first business day of each of June and January.
−Removed: We will pay an underutilization fee equal to 4.0% per annum payable semi-annually for any amounts that remain undrawn under the Credit Facility.
−Removed: We have the right to pre-pay the entire amount outstanding under the Credit Facility at any time, before the Credit Facility’s maturity of August 31, 2025.
−Removed: The Credit Facility also contains customary events of default.
−Removed: On August 16, 2024, the Company entered into the Third Amendment to the Credit Facility, to increase the borrowing limit of the Credit Facility to $27.5 million.
−Removed: Under the terms of the Third Amendment, the borrowing limit will return to $25 million upon certain financing events.
−Removed: As of the date of this Quarterly Report on Form 10-Q, no amounts have been drawn under this Credit Facility.
−Removed: On August 14, 2023, we entered into a securities purchase agreement for a Registered Direct Offering of our Common Shares and Class A Warrants, the final closing of which occurred on January 31, 2024.
+Added: No funds were raised from the Sales Agreement in the fourth quarter of 2024, while for the 2024 year, we sold 3,251,590 Common Shares for gross proceeds of $4.9 million under this offering.
+Added: On March 22, 2023, we entered into the 2023 Credit Facility with Argentum Cedit Virtuti GCV, the parent of Allseas Investments S.A.
+Added: and an affiliate of Allseas, which was amended on July 31, 2023 and March 22, 2024, pursuant to which, we were able to borrow from the Lender up to $25 million in the aggregate, from time to time, subject to certain conditions.
+Added: All amounts drawn under the 2023 Credit Facility bore interest at the 6-month SOFR, 180-day average plus 4.0% per annum payable in cash semi-annually (or plus 5% if paid-in-kind at maturity, at our election) on the first business day of each of June and January.
+Added: We agreed to pay an underutilization fee equal to 4.0% per annum payable semi-annually for any amounts that remain undrawn under the 2023 Credit Facility.
+Added: We had the right to pre-pay the entire amount outstanding under the 2023 Credit Facility at any time, before the 2023 Credit Facility’s stated maturity of August 31, 2025.
+Added: The 2023 Credit Facility also contained customary events of default.
+Added: No amounts had been drawn under the 2023 Credit Facility.
+Added: Pursuant to the Letter Agreement we entered into on March 24, 2025, we and Argentum Cedit Virtuti GCV agreed to cancel the 2023 Credit Facility with no outstanding amounts remaining, other than our obligation to pay the underutilization fee thereunder.
+Added: On August 14, 2023, we entered into a securities purchase agreement for a Registered Direct Offering of our Common Shares and Class A Warrants (the “2023 Offering”).
The purchase price for each Common Share and Class A Warrant to purchase 0.5 Common Shares was $2.00 per unit.
The exercise price to purchase one Common Share under the Class A Warrants is $3.00, subject to adjustment as provided in the warrant agreement.
−Removed: The aggregate gross proceeds from the Registered Direct Offering were approximately $24.9 million, before deducting fees payable to financial advisors and other offering expenses payable by the Company ($23.6 million net of fees).
−Removed: On March 22, 2024, we entered into an Unsecured Credit Facility with Gerard Barron, our Chief Executive Officer and Chairman, and ERAS Capital LLC, the family fund of our director, Andrei Karkar, pursuant to which, we may borrow from the 2024 Lenders up to $25,000,000 in the aggregate ($12,500,000 from each of the 2024 Lenders), from time to time (was initially $20,000,000 in the aggregate ($10,000,000 from each of the 2024 Lenders), subject to certain conditions.
−Removed: All amounts drawn under the 2024 Credit Facility will bear interest at the 6-month Secured Overnight Funding Rate (SOFR), 180-day average plus 4.0% per annum payable in cash semi-annually (or plus 5% if paid-in-kind at maturity, at our election) on the first business day of each of June and January.
+Added: No investor elected to exercise its right to purchase additional Common Shares and accompanying Class A Warrants on or before September 15, 2023 under the terms of the securities purchase agreement.
+Added: As of December 31, 2023, we had received gross proceeds of $15.9 million (approximately $14.6 million net of transaction fees) in the Registered Direct Offering.
+Added: We received the remaining $9 million of gross proceeds on January 31, 2024, from an investor affiliated with us.
+Added: As a result of the 2024 Purchase Agreement (as described below), the exercise price of the Class A Warrants was reset to $2.00 as the down round feature of the Class A Warrants agreement was triggered.
+Added: On March 22, 2024, we entered into the 2024 Credit Facility with Gerard Barron, our Chief Executive Officer and Chairman, and ERAS Capital LLC, the family fund of our director, Andrei Karkar, pursuant to which, we may borrow from the 2024 Lenders up to $20 million in the aggregate ($10 million from each of the 2024 Lenders), from time to time, subject to certain conditions.
+Added: All amounts drawn under the 2024 Credit Facility will bear interest at the 6-month SOFR, 180-day average plus 4.0% per annum payable in cash semi-annually (or plus 5% if paid-in-kind at maturity, at our election) on the first business day of each of June and January.
We will pay an underutilization fee equal to 4.0% per annum payable semi-annually for any amounts that remain undrawn under the 2024 Credit Facility.
1 unchanged sentence
The 2024 Credit Facility also contains customary events of default.
−Removed: The 2024 Credit Facility will terminate automatically if we or any of our subsidiaries raise at least $50,000,000 in the aggregate (i) through the issuance of any of our or our subsidiaries’ debt or equity securities, or (ii) in prepayments under an off-take agreement or similar commercial agreement.
+Added: The 2024 Credit Facility will terminate automatically if we or any of our subsidiaries raise at least $50 million in the aggregate (i) through the issuance of any of our or our subsidiaries’ debt or equity securities, or (ii) in prepayments under an off-take agreement or similar commercial agreement.
On August 13, 2024, we entered into the First Amendment to the 2024 Credit Facility to increase the borrowing limit to $25 million in the aggregate ($12.5 million from each of the 2024 Lenders).
1 unchanged sentence
On November 14, 2024, we entered into the Second Amendment to the 2024 Credit Facility with ERAS Capital LLC and Gerard Barron, to increase the borrowing limit to $38 million in the aggregate ($19 million from each of the 2024 Lenders) and to extend the maturity of the 2024 Credit Facility to December 31, 2025.
−Removed: As of the date of this Quarterly Report on Form 10-Q, there was $4.3 million drawn under the 2024 Credit Facility, including a draw of $0.1 million subsequent to September 30, 2024.
−Removed: On May 27, 2024, the Company entered into a short-term loan agreement with the Lender (Argentum Cedit Virtuti GCV), an affiliate of Allseas.
+Added: As per the Second Amendment, the rate of underutilization fee was retroactively increased from 4% to 6.5% on any undrawn amounts under the 2024 Credit Facility.
+Added: On January 30, 2025, we repaid $1.8 million from the drawn amount, leaving a balance of $2.5 million drawn under the 2024 Credit Facility, as of the date of this Annual Report.
+Added: With the January 2025 repayment, the borrowing limit on the 2024 Credit Facility was reduced to $36.2 million ($17.2 million from Gerard Barron and $19 million from ERAS Capital LLC).
+Added: On March 26, 2025, we entered into the Third Amendment to the 2024 Credit Facility with the 2024 Lenders, to, among other things, increase the borrowing limit to $44 million in the aggregate ($22 million from each of the 2024 Lenders) and extend the maturity of the 2024 Credit Facility to June 30, 2026.
+Added: On May 27, 2024, we entered into a short-term loan agreement with the Lender (Argentum Cedit Virtuti GCV), an affiliate of Allseas.
In accordance with the agreement, the Lender provided a short-term loan amounting to $2 million (the “Loan”) on May 30, 2024.
1 unchanged sentence
The Loan matured on September 10, 2024 (maturity date) and accrued interest at a rate of 8% per annum.
−Removed: On the maturity date, Company repaid the entire Loan amounting to $2 million and the accrued interest amounting to $46 thousand.
−Removed: On September 9, 2024, the Company entered into a working capital loan agreement (the “Working Capital Loan Agreement”) with Allseas Investments SA (the “Allseas Investments”), a company related to Allseas.
−Removed: In accordance with the Working Capital Loan Agreement, Allseas Investments provided a loan to the Company amounting to $5 million (the “Working Capital Loan”) on September 10, 2024, to be used towards general corporate purposes and the repayment of all outstanding amounts under the Short-Term Loan between the Company and the Lender.
+Added: On the maturity date, the Company repaid the entire Loan amounting to $2 million and the accrued interest amounting to $46 thousand.
+Added: On September 9, 2024, we entered into a Working Capital Loan Agreement with Allseas Investments, a company related to Allseas.
+Added: In accordance with the Working Capital Loan Agreement, Allseas Investments provided a loan to us amounting to $5 million (the “Working Capital Loan”) on September 10, 2024, to be used towards general corporate purposes and the repayment of all outstanding amounts under the Short-Term Loan between us and the Lender.
The Working Capital Loan is payable to the Lender on or before the earlier of (i) the occurrence of certain financing events and (ii) April 1, 2025 (the “Repayment Date”).
−Removed: The Working Capital Loan will bear interest based on the 6-month Secured Overnight Financing Rate, 180-day average plus a margin of 4.0% per annum and is payable in two installments on January 2, 2025, and the Repayment Date (or plus a margin of 5.0% if all interest payments are deferred to the Repayment Date, at the Company’s election).
−Removed: On October 18, 2024, the Company entered into the First Amendment to the Working Capital Loan Agreement with Allseas Investments, resulting in a further draw of $2.5 million by the Company and a total Working Capital Loan drawn amount of $7.5 million.
−Removed: On November 14, 2024, the Company entered into a securities purchase agreement with certain new and existing institutional investors for the sale of an aggregate of 17,500,000 common shares (the “Shares”) and accompanying Class B warrants (the “Class B Warrants”), in a registered direct offering.
+Added: The Working Capital Loan will bear interest based on the 6-month Secured Overnight Financing Rate, 180-day average plus a margin of 4.0% per annum and is payable in two installments on January 2, 2025, and the Repayment Date (or plus a margin of 5.0% if all interest payments are deferred to the Repayment Date, at our election).
+Added: On October 18, 2024, we entered into the First Amendment to the Working Capital Loan Agreement with Allseas Investments, resulting in a further draw of $2.5 million by us and a total Working Capital Loan drawn amount of $7.5 million.
+Added: On March 24, 2025, we entered into the Letter Agreement with Allseas Investments and Argentum Cedit Virtuti GCV, pursuant to which the repayment date under the Working Capital Loan Agreement was extended to September 30, 2025.
+Added: On November 14, 2024, we entered into a securities purchase agreement (the “2024 Purchase Agreement”) with certain new and existing institutional investors for the sale of an aggregate of 17,500,000 common shares (the “Shares”) and accompanying Class B warrants (the “Class B Warrants”), in a registered direct offering.
The offering price was $1.00 per Share, with each Share including an accompanying Class B Warrant to purchase 0.5 common shares.
The Class B Warrants are exercisable immediately upon issuance at a price of $2.00 per share and expire five years from issuance.
−Removed: The aggregate gross proceeds from the Registered Direct Offering were approximately $17.5 million, before deducting fees payable to financial advisors and other offering expenses payable by the Company ($16.5 million net of fees).
−Removed: The Class B Warrants include customary anti-dilution protections and a repurchase feature, permitting the Company to repurchase the warrants for $0.0001 per Common Share underlying the Class B Warrants if the volume-weighted average price of the Company’s common shares exceeds $5.00 per share for each trading day in a consecutive 30-trading-day period.
−Removed: We may receive up to approximately $281.8 million in aggregate gross proceeds from cash exercises of the Public Warrants and the Private Warrants, based on the per share exercise price of such warrants.
+Added: On November 26, 2024, we entered into the First Amendment to the 2024 Purchase Agreement, pursuant to which we agreed to sell and issue an additional 2,400,000 common shares and accompanying Class B Warrants to purchase 1,200,000 common shares to new investors on the same terms and conditions as initially offered.
+Added: Including the First Amendment to the 2024 Purchase Agreement, we agreed to sell and issue in aggregate 19,900,000 common shares and Class B Warrants to purchase 9,950,000 common shares.
+Added: Pursuant to the 2024 Purchase Agreement, we agreed not to issue any Common Shares or Common Share equivalents with an effective price of less than $1.00 per share until May 18, 2025.
+Added: As at December 31, 2024, we received gross proceeds of $14.9 million (net proceeds of $14.2 million, after offering expenses), with the final $5 million of gross proceeds received on February 6, 2025.
+Added: On May 12, 2025, we entered into a securities purchase agreement (the “2025 Purchase Agreement”) with certain new and existing investors, including an existing strategic investor, for the sale of an aggregate of 12,333,333 common shares and accompanying Class C Warrants, in a registered direct offering.
+Added: The offering price was $3.00 per Share, with each Share including an accompanying Class C Warrant to purchase one common share.
+Added: The Class C Warrants are exercisable immediately upon issuance at a price of $4.50 per share and expire three years from issuance.
+Added: We may receive up to approximately $314 million in aggregate gross proceeds from cash exercises of the Public Warrants, the Private Warrants, the Class A Warrants and the Class B Warrants, based on the per share exercise price of such warrants.
However, the exercise price for the outstanding Public Warrants and Private Warrants is $11.50 per common share and there can be no assurance that such warrants will be in the money prior to their expiration, and as such, such warrants may expire worthless.
2 unchanged sentences
Furthermore, even if the warrants will be in the money, the holders of the warrants are not obligated to exercise their warrants, and we cannot predict whether holders of the warrants will choose to exercise all or any of their warrants.
−Removed: In addition, the exercise price to purchase one Common Share under the outstanding Class A Warrants is $3.00 (subject to customary adjustments).
−Removed: Upon the closing of the November 2024 Registered Direct Offering described above, the exercise price of the Class A Warrants will be adjusted downward pursuant to the terms of the Class A Warrants.
−Removed: There can be no assurance that such warrants will be exercised prior to their expiration, and as such, such warrants may expire, and we will not receive any proceeds from the excise thereof.
+Added: In addition, the exercise price to purchase one Common Share under the outstanding Class A Warrants and Class B Warrants is $2.00 (subject to customary adjustments) and there can be no assurance that such warrants will be exercised prior to their expiration, and as such, such warrants may expire, and we will not receive any proceeds from the exercise thereof.
Cash Flows Summary
1 unchanged sentence
For the Three Months Ended
−Removed: For the Nine Months Ended
−Removed: September 30,
−Removed: September 30,
Net cash used in operating activities
Net cash used in investing activities
−Removed: Net cash provided by financing activities
−Removed: (Decrease) Increase in cash
−Removed: Nine Months ended September 30, 2024 compared to Nine Months ended September 30, 2023
+Added: Net provided by financing activities
+Added: Decrease in cash
+Added: Three Months ended March 31, 2025 compared to Three Months ended March 31, 2024
Cash flows used in Operating Activities
−Removed: For the nine months ended September 30, 2024, major operating activities over this period involved Campaign 8, as well as advanced work on engineering and pre-feasibility studies as we advance towards our application to the ISA for a NORI exploitation contract and prepare for potential future commercial production.
−Removed: Net cash used in operating activities in the first nine months of 2024, amounted to $29.7 million, and consisted mainly of $13.0 million on various environmental work, $6.1 million on personnel costs, $3.9 million on legal, advisory and consulting, $1.9 million for sponsorship, training and stakeholder engagement support, $1.7 million spent on engineering and pre-feasibility studies, $1.5 million on communication and business development expenses, and additional payments of $1.6 million for various expenses.
−Removed: For the nine months ended September 30, 2023, operating activities focused mainly on the continuation of environmental work following the completion of the NORI integrated collector test, as well as progressing on engineering work and pre-feasibility studies on the project.
−Removed: Net cash used in operating activities in the first nine months of 2023, amounted to $44.4 million, and consisted mainly of $24.8 million on various environmental work, $7.5 million on personnel costs, $3.7 million on legal costs, $2.6 million for sponsorship, training, and stakeholder engagement support, $1.6 million spent on engineering and pre-feasibility studies, $1 million on communication and business development expenses and additional payments of $4.2 million for various expenses.
+Added: For the three months ended March 31, 2025, major operating activities included advanced work on pre-feasibility studies and work to advance our permit applications, resulting in net cash used in operating activities of $9.3 million.
+Added: This consisted of $3 million on various environmental work, $2.6 million on payroll costs, $1.5 million on stakeholder engagement, $1 million on legal and consulting fees and an additional $1.2 million for various expenses.
+Added: Net cash used in operating activities in the first three months of 2024, amounted to $11.9 million, and included costs on the final stage of Campaign 8, as well as advanced work on engineering and pre-feasibility studies.
Cash flows used in Investing Activities
−Removed: Net cash provided by investing activities for the nine months ended September 30, 2024 was $0.5 million for the purchase of equipment and software development.
+Added: Net cash provided by investing activities for three months ended March 31, 2025 and 2024 represent the purchase of equipment and software development.
Cash flows provided by Financing Activities
−Removed: Net cash provided by financing activities for the nine months ended September 30, 2024 was $23.3 million, which comprised of proceeds received from the Registered Direct Offering announced in August 2023 of $9 million, proceeds from short term debt and credit facilities of $9.2 million, proceeds from shares issued from ATM of $4.9 million and proceeds from exercise of stock options and employee stock plans of $0.5 million while the 2023 first nine months results represent the cash received from the Registered Direct Offering of $14.9 million and cash received of $5 million on closing of our investment in Low Carbon Royalties.
+Added: Net cash provided by financing activities for the three months ended March 31, 2025 was $8.3 million, which comprised of proceeds received from the Registered Direct Offering announced in November 2024 of $5 million (less fees of $0.5 million), proceeds from shares issued from our ATM of $5.6 million and the repayment of short-term debt of $1.8 million, while the first three months of 2024 results represent the cash received from the 2023 Registered Direct Offering of $9 million (less fees of $0.1 million) and proceeds from the exercise of stock options of $0.2 million.
Contractual Obligations and Commitments
NORI Exploration Contract
−Removed: As part of the NORI Exploration Contract with the ISA, NORI submitted a periodic review report to the ISA in 2021, covering the 2017-2021 period.
−Removed: The periodic review report, which included a proposed work plan and estimated budget for 2022 to 2026, has been reviewed by and agreed with the ISA, and we are implementing this five-year plan.
−Removed: The cost of NORI’s estimated work plan for 2024 onwards is contingent on the ISA’s approval of the NORI contract area exploitation application.
−Removed: Should the approval of NORI’s exploitation application for the NORI contract area be delayed or rejected, NORI intends to revise its estimated future work plan in respect of its NORI Area.
+Added: As part of the NORI Exploration Contract with the ISA, NORI submitted a periodic review report to the ISA which included a five-year plan covering 2022 to 2026:
+Added: NORI is currently implementing its approved five-year plan.
+Added: The cost of the estimated work plan for 2025 onwards is dependent on NORI’s current five-year plan and any future approved exploration contract extension program of work.
Work plans are reviewed annually by us, agreed with the ISA and may be subject to change depending on our progress to date.
+Added: NORI’s exploration contract expires on July 21, 2026.
+Added: NORI is required to submit an application for extension no later than six months before the expiration of the contract.
+Added: NORI intends to submit an application for a five-year extension in 2025.
TOML Exploration Contract
−Removed: As part of the TOML Exploration Contract, TOML submitted a periodic review report to the ISA in 2021, covering the 2017-2021 period.
−Removed: The periodic review report included a summary of work completed over the five-year period and a program of activities and estimated budget for the next five-year period.
−Removed: On December 23, 2022, the ISA accepted TOML’s proposed program of activities for the 2022-2026 five-year period, which included an estimated five-year expenditure of up to $44 million.
+Added: As part of the TOML Exploration Contract with the ISA, TOML submitted a periodic review report to the ISA which included a five-year plan covering 2022 to 2026:
+Added: TOML is currently implementing its approved plan, which included an estimated five-year expenditure of up to $44 million.
The five-year estimated expenditure is indicative and subject to change, TOML will review the program regularly and TOML will inform the ISA of any changes through its annual reports.
−Removed: Marawa Services Agreement
−Removed: In 2013, DGE entered into the Marawa Services Agreement with Marawa which granted DGE exclusive rights to manage and carry out all exploration and exploitation in the Marawa Area.
−Removed: Under Marawa’s Exploration Contract with the ISA, Marawa submitted a periodic review report to the ISA that included a proposed work plan and estimated budget for the 2020-2024 five-year period.
−Removed: The five-year estimated expenditure is indicative and subject to change, Marawa will review the program regularly and Marawa will inform the ISA of any changes through its annual reports.
−Removed: Marawa is scheduled to submit a new periodic review in 2024, which will include a new work plan.
−Removed: To date, limited offshore marine resource definition activities in the Marawa Contract Area have occurred.
−Removed: We are collaborating with Marawa to assess the viability of any potential project in the Marawa Contract Area, although the timing of such assessment is unclear.
−Removed: Marawa has delayed certain of its efforts in the Marawa Contract Area while it determines how it will move forward with additional assessment work.
Regulatory Obligations Relating to Exploration Contracts
−Removed: Both TOML and NORI require sponsorship from their host sponsoring nations, Tonga and Nauru, respectively.
+Added: Under ISA requirements, both TOML and NORI require sponsorship from their host sponsoring nations, Tonga and Nauru, respectively.
Each company has been registered and incorporated within the applicable host nation’s jurisdiction.
3 unchanged sentences
Failure to obtain such new sponsorship would have a material impact on the operations of such subsidiary and us.
−Removed: On August 20, 2024, Nauru updated its Nauru Seabed Minerals Authority Act, to prepare its regulatory regime for the transition from exploration to exploitation.
Sponsorship Agreements
2 unchanged sentences
In addition, NORI will pay an administration fee each year to Nauru for such administration and sponsorship, which is subject to review and increase in the event NORI is granted an ISA exploitation contract.
−Removed: NORI has begun discussions with the Government of Nauru to renegotiate the existing sponsorship agreement and has also committed to ensuring NORI pays corporate income tax within Nauru, assuming our future operations are ultimately profitable.
+Added: NORI is in discussions with the Government of Nauru to renegotiate the existing sponsorship agreement and has also committed to ensuring NORI pays corporate income tax within Nauru, assuming our future operations are ultimately profitable.
On March 8, 2008, Tonga and TOML entered into the TOML Sponsorship Agreement formalizing certain obligations of the parties in relation to TOML’s exploration and potential exploitation of the TOML Area.
−Removed: On September 23, 2021, TOML and Tonga updated the TOML Sponsorship Agreement harmonizing the terms of its agreement with those held by NORI with Nauru.
+Added: On September 23, 2021, Tonga updated the TOML Sponsorship Agreement harmonizing the terms of its engagement with TOML with those held by NORI with Nauru.
TOML expects to renegotiate the existing sponsorship agreement with Tonga prior to entering into operations in the TOML Area and has committed to paying corporate income tax within Tonga, assuming our future operations are ultimately profitable.
7 unchanged sentences
Once in production, NORI is expected to pay Allseas a nodule collection and transshipment fee and, as Allseas scales up production to up to an estimated 3.0 million wet tonnes of nodules per year, it is expected that unit costs will be reduced.
−Removed: Following the successful completion of the NORI Area D pilot collection system trials in November 2022 and subsequent analysis of pilot data, the parties are reviewing Project Zero Offshore Nodule Collection System production targets, system design and cost estimates and enter into a binding Heads of Terms.
−Removed: The parties expect to further detail their relationship in a single definitive agreement using Work Planning and Budgeting procedure to allow for flexibility as the Allseas and NORI project team complete system engineering, upgrades and start commercial production.
−Removed: Subject to the necessary regulatory approvals, Allseas and NORI also intend to investigate acquiring a second production vessel similar to the Hidden Gem , another Samsung 10000, with the potential for an additional production rate of three million tonnes of wet nodules per year.
−Removed: There can be no assurances, however, that we will enter into a definitive agreement with Allseas contemplated by the non-binding term sheet in a particular time period, or at all, or on terms similar to those set forth in the non-binding term sheet, or that if such a definitive agreement is entered into by us that the proposed commercial systems and second production vessel will be successfully developed or operated in a particular time period, or at all.
−Removed: Through September 30, 2024, we have made the following payments to Allseas under the PMTA:
+Added: Following the successful completion of the NORI Area D pilot collection system trials in November 2022 and subsequent analysis of pilot data, the parties are reviewing Project Zero Offshore Nodule Collection System production targets, system design and cost estimates and intend to enter into a binding Heads of Terms by the end of 2025.
+Added: The parties expect to further detail their relationship in three separate definitive agreements for engineering, conversion/build and commercial operations phase, respectively.
+Added: Subject to the necessary regulatory approvals, Allseas and NORI also intend to investigate acquiring a second production vessel similar to the Hidden Gem , another Samsung 10000, with the potential for an additional production rate of three million tonnes of wet nodules per year and lower associated per tonne production cost.
+Added: There can be no assurances, however, that we will enter into definitive agreements with Allseas contemplated by the non-binding term sheet in a particular time period, or at all, or on terms similar to those set forth in the non-binding term sheet, or that if such definitive agreements are entered into by us that the proposed commercial systems and second production vessel will be successfully developed or operated in a particular time period, or at all.
+Added: Through March 31, 2025, we have made the following payments to Allseas under the PMTA:
(a) $10 million in cash in February 2020, (b) $10 million through the issuance of 3.2 million Common Shares valued at $3.11 per share in February 2020, (c) issued Allseas a warrant to purchase 11.6 million Common Shares at a nominal exercise price per share in March 2021, (d) $10 million in cash in October 2021, following the closing of the Business Combination and meeting certain progress targets on the PMTS and (e) on February 23, 2023 issued 10.85 million Common Shares to Allseas.
11 unchanged sentences
2023 Credit Facility
−Removed: As described above, on March 22, 2023, the Company entered into the 2023 Credit Facility with Argentum Cedit Virtuti GCV, an affiliate of Allseas, under which we may borrow up to $25.0 million pursuant to the terms and conditions of the Credit Facility, as amended, which has a maturity date of August 31, 2025.
−Removed: On August 16, 2024, the Company entered into the Third Amendment to the Credit Facility, to increase the borrowing limit of the Credit Facility to $27.5 million.
−Removed: Under the terms of the Third Amendment, upon closing of the November 2024 Registered Direct Offering discussed above, the borrowing limit will return to $25 million.
−Removed: The Credit Facility remained undrawn as at September 30, 2024.
+Added: As described above, on March 22, 2023, we entered into the 2023 Credit Facility with Argentum Cedit Virtuti GCV, an affiliate of Allseas, under which we may borrow up to $25 million pursuant to the terms and conditions of the 2023 Credit Facility, as amended, which has a maturity date of August 31, 2025.
+Added: On August 16, 2024, we entered into the Third Amendment to the 2023 Credit Facility, to increase the borrowing limit of the 2023 Credit Facility to $27.5 million.
+Added: Under the terms of the Third Amendment, upon closing of the November 2024 Registered Direct Offering discussed above, the borrowing limit returned to $25 million.
+Added: There was no outstanding balance under the 2023 Credit Facility as at December 31, 2024.
+Added: Pursuant to the Letter Agreement entered into on March 24, 2025, we agreed to cancel the 2023 Credit Facility with no outstanding amounts remaining, other than our obligation to pay Argentum Cedit Virtuti GCV the underutilization fee thereunder.
2024 Short-Term Loan and Working Capital Loan
−Removed: On May 27, 2024, the Company entered into a short-term loan agreement with Argentum Cedit Virtuti GCV whereby the Company borrowed $2 million (the “Loan”) on May 30, 2024.
+Added: On May 27, 2024, we entered into a short-term loan agreement with Argentum Cedit Virtuti GCV whereby we borrowed $2 million (the “Loan”) on May 30, 2024.
The Loan matured on September 10, 2024 (maturity date) and accrued interest at a rate of 8% per annum.
−Removed: On the maturity date, Company repaid the entire Loan amounting to $2 million and the accrued interest.
−Removed: On September 9, 2024, the Company entered into a working capital loan agreement (the “Working Capital Loan Agreement”) with Allseas Investments SA (the “Allseas Investments”), a company related to Allseas.
−Removed: In accordance with the Working Capital Loan Agreement, Allseas Investments provided a loan to the Company amounting to $5 million (the “Working Capital Loan”) on September 10, 2024, to be used towards general corporate purposes and the repayment of all outstanding amounts under the Short-Term Loan between the Company and the Lender.
−Removed: The Working Capital Loan is payable to the Lender on or before the earlier of (i) the occurrence of certain financing events and (ii) April 1, 2025 (the “Repayment Date”).
−Removed: The Working Capital Loan will bear interest based on the 6-month Secured Overnight Financing Rate, 180-day average plus a margin of 4.0% per annum and is payable in two installments on January 2, 2025, and the Repayment Date (or plus a margin of 5.0% if all interest payments are deferred to the Repayment Date, at the Company’s election).
−Removed: On October 18, 2024, the Company entered into the First Amendment to the Working Capital Loan Agreement with Allseas Investments, resulting in a further draw of $2.5 million by the Company and a total Working Capital Loan drawn amount of $7.5 million.
+Added: On the maturity date, we repaid the entire Loan amounting to $2 million and the accrued interest.
+Added: On September 9, 2024, we entered into a working capital loan agreement (the “Working Capital Loan Agreement”) with Allseas Investments, a company related to Allseas.
+Added: In accordance with the Working Capital Loan Agreement, Allseas Investments provided a loan to us amounting to $5 million (the “Working Capital Loan”) on September 10, 2024, to be used towards general corporate purposes and the repayment of all outstanding amounts under the Short-Term Loan between us and the Lender.
+Added: The Working Capital Loan is payable to the Lender on or before the earlier of (i) the occurrence of certain financing events and (ii) April 1, 2025 (the “Original Repayment Date”).
+Added: The Working Capital Loan will bear interest based on the 6-month Secured Overnight Financing Rate, 180-day average plus a margin of 4.0% per annum and is payable in two installments on January 2, 2025, and the Original Repayment Date (or plus a margin of 5.0% if all interest payments are deferred to the Original Repayment Date, at our election).
+Added: On October 18, 2024, we entered into the First Amendment to the Working Capital Loan Agreement with Allseas Investments, resulting in a further draw of $2.5 million by us and a total Working Capital Loan drawn amount of $7.5 million.
+Added: On March 24, 2025, we entered into a Letter Agreement with Allseas Investments and Argentum Cedit Virtuti GCV, pursuant to which the Original Repayment Date under the Working Capital Loan Agreement was extended to September 30, 2025, with principal and interest now repayable on that date.
2024 Credit Facility with ERAS Capital LLC and Gerard Barron
−Removed: On March 22, 2024, the Company entered into an Unsecured Credit Facility with Gerard Barron, our Chief Executive Officer and Chairman, and ERAS Capital LLC, the family fund of our director, Andrei Karkar, pursuant to which, we may borrow from the 2024 Lenders up to $25,000,000 in the aggregate ($12,500,000 from each of the 2024 Lenders), from time to time, subject to certain conditions.
−Removed: All amounts drawn under the 2024 Credit Facility will bear interest at the 6-month Secured Overnight Funding Rate (SOFR), 180-day average plus 4.0% per annum payable in cash semi-annually (or plus 5% if paid-in-kind at maturity, at our election) on the first business day of each of June and January.
+Added: On March 22, 2024, we entered into an Unsecured Credit Facility with Gerard Barron, our Chief Executive Officer and Chairman, and ERAS Capital LLC, the family fund of our director, Andrei Karkar, pursuant to which, we may borrow from the 2024 Lenders up to $20 million in the aggregate ($10 million from each of the 2024 Lenders), from time to time, subject to certain conditions.
+Added: All amounts drawn under the 2024 Credit Facility will bear interest at the 6-month SOFR, 180-day average plus 4.0% per annum payable in cash semi-annually (or plus 5% if paid-in-kind at maturity, at our election) on the first business day of each of June and January.
We will pay an underutilization fee equal to 4.0% per annum payable semi-annually for any amounts that remain undrawn under the 2024 Credit Facility.
1 unchanged sentence
The 2024 Credit Facility also contains customary events of default.
−Removed: The 2024 Credit Facility will terminate automatically if we or any of our subsidiaries raise at least USD $50,000,000 in the aggregate (i) through the issuance of any of our or our subsidiaries’ debt or equity securities, or (ii) in prepayments under an off-take agreement or similar commercial agreement.
−Removed: On August 13, 2024, the Company entered into the First Amendment to the 2024 Credit Facility with the 2024 Lenders, to increase the borrowing limit of the 2024 Credit Facility to $25 million in the aggregate ($12.5 million from each of the 2024 Lenders).
−Removed: On November 14, 2024, we entered into the Second Amendment to increase the borrowing limit to $38 million in the aggregate ($19 million from each of the 2024 Lenders) and to the 2024 Credit Facility with ERAS Capital LLC and Gerard Barron, to extend the maturity of the 2024 Credit Facility to December 31, 2025.
−Removed: In the three and nine months ended September 30, 2024, the Company drew $0.3 million and $4.2 million, respectively, from the 2024 Credit Facility.
+Added: The 2024 Credit Facility will terminate automatically if we or any of our subsidiaries raise at least $50 million in the aggregate (i) through the issuance of any of our or our subsidiaries’ debt or equity securities, or (ii) in prepayments under an off-take agreement or similar commercial agreement.
+Added: On August 13, 2024, we entered into the First Amendment to the 2024 Credit Facility with the 2024 Lenders, to increase the borrowing limit of the 2024 Credit Facility to $25 million in the aggregate ($12.5 million from each of the 2024 Lenders).
+Added: On November 14, 2024, we entered into the Second Amendment to increase the borrowing limit to $38 million in the aggregate ($19 million from each of the 2024 Lenders) to the 2024 Credit Facility with ERAS Capital LLC and Gerard Barron, and to extend the maturity of the 2024 Credit Facility to December 31, 2025.
+Added: As per the Second Amendment, the rate of underutilization fee was retroactively increased from March 22, 2024 to 6.5% on any undrawn amounts under the 2024 Credit Facility.
+Added: On March 26, 2025, we entered into the Third Amendment to, among other things, increase the borrowing limit to $44 million in the aggregate ($22 million from each of the 2024 Lenders) and extend the maturity of the 2024 Credit Facility to June 30, 2026.
+Added: As at March 31, 2025, we have drawn $2.5 million from the 2024 Credit Facility and incurred $0.2 million as interest expense.
+Added: Until March 31, 2025, we incurred $1.5 million, as underutilization fees, which would be payable only in the event the 2024 Credit Facility is not drawn down at the time such fees are payable.
+Added: Until March 31, 2025, we repaid interest amounting to $0.1 million, and underutilization fees amounting to $0.1 million to the 2024 Lenders.
+Added: On January 31, 2025, we repaid the drawn amount and outstanding interest on the 2024 Credit Facility amounting to $1.8 million and $0.1 million, respectively.
Off-Balance Sheet Arrangements
10 unchanged sentences
We are an “emerging growth company” as defined in Section 2(a) of the Securities Act and have elected to take advantage of the benefits of the extended transition period for new or revised financial accounting standards.
−Removed: Following the closing of the Business Combination, we expect to remain an emerging growth company at least through the end of the 2024 fiscal year and we expect to continue to take advantage of the benefits of the extended transition period at least through the end of the 2024 fiscal year, although we may decide to early adopt such new or revised accounting standards to the extent permitted by such standards.
+Added: For so long as we remain an emerging growth company, we may take advantage of certain exemptions from various reporting requirements and other burdens that are otherwise applicable generally to public companies.
+Added: We will cease to qualify as an emerging growth company on the date that is the earliest of:
+Added: (i) December 31, 2025, (ii) the last day of the fiscal year in which we have more than $1.235 billion in total annual gross revenues, (iii) the date on which we are deemed to be a “large accelerated filer” under the rules of the SEC, which means the market value of our common shares that is held by non-affiliates exceeds $700 million as of the prior June 30th, or (iv) the date on which we have issued more than $1.0 billion of non-convertible debt over the prior three-year period.
+Added: We may decide to early adopt such new or revised accounting standards to the extent permitted by such standards.
This may make it difficult or impossible to compare our financial results with the financial results of another public company that is either not an emerging growth company or is an emerging growth company that has chosen not to take advantage of the extended transition period exemptions because of the potential differences in accounting standards used.
Cautionary Statements Regarding the NORI Initial Assessment and TOML Mineral Resource Statement
−Removed: We have estimated the size and quality of our resource in the NORI and TOML Areas, as described below, in our SEC Regulation S-K (subpart 1300) compliant Technical Report Summary - Initial Assessment, of the NORI Property, Clarion-Clipperton Zone, Pacific Ocean dated March 17, 2021 ( “ NORI Initial Assessment ” ) and Technical Report Summary - TOML Mineral Resource, Clarion-Clipperton Zone, Pacific Ocean dated March 26, 2021 ( “ TOML Mineral Resource Statement ” ), respectively, prepared by AMC Consultants Ltd.
+Added: Except where otherwise stated, the scientific and technical information set forth in this Quarterly Report on Form 10-Q relating to the area under which our subsidiary NORI holds an exploration contract issued by the ISA (the “ NORI Area ” ) and the area under which our subsidiary TOML holds an exploration contract issued by the ISA (the “ TOML Area ” ) is based on technical reports (the “ Technical Reports ” ) prepared in accordance with the SEC rules set forth in subpart 1300 of Regulation S-K.
+Added: ● In respect of the NORI Area, the technical report entitled “ Technical Report Summary – Initial Assessment of the NORI Property, Clarion-Clipperton Zone ” dated as of March 17, 2021, or the NORI Initial Assessment, prepared by AMC Consultants Pty Ltd.
+Added: and other qualified persons, each a “ qualified person ” as defined in subpart 1300 of Regulation S-K;
+Added: ● In respect of the TOML Area, the technical report entitled “ Technical Report Summary – TOML Mineral Resource, Clarion Clipperton Zone, Pacific Ocean ” dated as of March 26, 2021, or the TOML Mineral Resource Statement, prepared by AMC Consultants Pty Ltd.
+Added: and other qualified persons, each a “ qualified person ” as defined in subpart 1300 of Regulation S-K.
We plan to continue to estimate our resources in the NORI and TOML Areas and develop the project economics.
2 unchanged sentences
however, due to the preliminary nature of project planning and design, and the untested nature of the specific seafloor production systems at a commercial scale, economic viability has not yet been demonstrated.
+Added: In addition, we have continued to define our resource in the NORI Area, with the goal to develop project economics to pre-feasibility level and are working towards a pre-feasibility study, which is nearing completion.
+Added: As part of our ongoing refinement of our business plans and resource definition work, we are now pursuing a low-capital asset expenditure ( “ CAPEX ” ) approach to our development and commercialization of operations for our NORI Area D project where we reuse existing production assets as opposed to the high-CAPEX approach, where the majority of offshore and onshore production assets would be newly built by us as assumed in the 2021 economic analysis included in the NORI Initial Assessment.
+Added: In addition, we are increasingly focused on advancing our commercial production strategy under the U.S.-based DSHMRA regime.
+Added: As a result of these changes and the general passage of time since the valuation date of January 1, 2021, the 2021 point-in-time economic analysis included in Section 19 of the NORI Initial Assessment and the estimated capital and operating costs set forth in Section 18 of the NORI Initial Assessment, including any references thereto throughout the NORI Initial Assessment, should no longer be relied upon or used by investors for any reason.
The NORI Initial Assessment and TOML Mineral Resource Statement do not include the conversion of mineral resources to mineral reserves.
2 unchanged sentences
You are also cautioned that mineral resources do not have demonstrated economic value.
−Removed: Information concerning our mineral properties in the NORI and TOML Technical Report Summaries and in this Quarterly Report on Form 10-Q includes information that has been prepared in accordance with the requirements of the SEC Mining Rules forth in subpart 1300 of Regulation S-K.
+Added: Information concerning our mineral properties in the NORI and TOML Technical Report Summaries and in this Quarterly Report on Form 10-Q includes information that has been prepared in accordance with the requirements of the SEC Mining Rules set forth in subpart 1300 of Regulation S-K.
Under SEC standards, mineralization, such as mineral resources, may not be classified as a “ reserve ” unless the determination has been made that the mineralization would be economically and legally produced or extracted at the time of the reserve determination.
6 unchanged sentences
Likewise, you are cautioned not to assume that all or any part of measured or indicated mineral resources will ever be upgraded to mineral reserves.
+Added: Further information on each of the polymetallic nodule areas in the CCZ and the Technical Reports referred to above can be found in the 2024 Annual Report on Form 10-K.
+Added: The information contained in this Quarterly Report in Form 10-Q regarding the NORI Area and the TOML Area has been derived from the Technical Reports, is subject to certain assumptions, qualifications and procedures described in the Technical Reports and is qualified in its entirety by the full text of the Technical Reports, each of which is filed as an exhibit to the 2024 Annual Report on Form 10-K.
Compared sentence by sentence after normalising whitespace, quotation marks, case and digits, so re-formatting and restated figures do not read as changed language. Wording changes appear as one removal and one addition. The current filing and the prior one are authoritative.