Item 7. Management’s Discussion and Analysis
Item 7. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS
The following discussion of the financial condition and results of our operations should be read in conjunction with the financial statements and the notes to those statements appearing elsewhere in this Annual Report. Some of the information contained in this discussion and analysis or set forth elsewhere in this Annual Report, including information with respect to our plans and strategy for our business, includes forward-looking statements that involve risks and uncertainties. You should read the risk factors set forth in Item 1A of this Annual Report for a discussion of important factors that could cause actual results to differ materially from the results described in or implied by the forward-looking statements contained in the following discussion and analysis.
Overview
We are a deep-sea minerals exploration company focused on the collection, processing and refining of polymetallic nodules found on the seafloor in international waters of the CCZ, about 1,500 miles south-west of San Diego, California.
The CCZ is a geological submarine fracture zone of abyssal plains and other formations in the Eastern Pacific Ocean, with a length of around 7,240 kilometers (4,500 miles) that spans approximately 4,500,000 square kilometers (1,737,000 square miles). Polymetallic nodules are discrete rocks that sit unattached to the seafloor, occur in significant quantities in the CCZ and have high concentrations of nickel, copper, cobalt and manganese in a single rock. These four metals contained in the polymetallic nodules are critical for the transition to low carbon energy. Our resource definition work to date shows that nodules in our contract areas represent the world’s largest estimated undeveloped source of the four critical metals contained in nodules. If we are able to collect polymetallic nodules from the seafloor on a commercial scale, we plan to use such nodules to produce three types of metal products: (i) feedstock for battery cathode precursors (nickel, and cobalt sulfates, or intermediate nickel-copper-cobalt matte or nickel-copper-cobalt alloy) for EV and energy storage markets, (ii) copper cathode for electric wiring, energy transmission and other applications and (iii) manganese silicate for manganese alloy production required for steel production. Our mission is to build a carefully managed shared stock of metal (a “metal commons”) that can be used, recovered and reused for generations to come. Significant quantities of newly mined metal are required because existing metal stocks are insufficient to meet rapidly rising demand.
Exploration and exploitation of seafloor minerals in international waters is regulated by the ISA, an intergovernmental organization established pursuant to the 1994 Agreement Relating to the Implementation of the UNCLOS. The ISA grants contracts to sovereign states or to private contractors who are sponsored by a sovereign state. The ISA requires that a contractor obtain and maintain sponsorship by a host nation that is a member of the ISA and signatory to UNCLOS, and such nation must maintain effective supervision and regulatory control over such sponsored contractor. The ISA has issued a total of 19 polymetallic nodule exploration contracts covering approximately 1.28 million square kilometers, or 0.4% of the global seafloor, 17 of which are in the CCZ. We hold exclusive exploration and commercial rights to two of the 17 polymetallic nodule contract areas in the CCZ through our subsidiaries NORI and TOML, sponsored by Nauru and Tonga, respectively.
We have key strategic alliances with (i) Allseas, a leading global offshore contractor, which developed and tested a pilot collection system, and is now working to modify it into the first commercial production system and (ii) Glencore which holds offtake rights to 50% of the NORI nickel and copper production if produced from a DGE-owned or controlled facility. In addition, we have worked with engineering firm Hatch and consultants KPM to develop a near-zero solid waste flowsheet. The primary processing stages of the flowsheet from nodule to NiCuCo matte intermediate were demonstrated as part of our pilot plant program at FLSmidth and XPS’ facilities. The matte refining stages are being tested at SGS Lakefield. The near-zero solid waste flowsheet provides a design that is expected to serve as the basis for our onshore processing facilities. In November 2022, we entered into a non-binding MoU with Pacific Metals Co Ltd (PAMCO) of Japan pursuant to which PAMCO completed prefeasibility work assessing the prospect of processing nodules using their existing facilities. In November 2023, we entered into a binding MoU with PAMCO whereby they committed to completing a feasibility study (expected to be completed by mid-2025) to toll treat 1.3 million tonnes of wet polymetallic nodules per year at its Hachinohe, Japan smelting facility, provided we obtain an exploitation contract from the ISA. The toll treatment is intended to take place on a dedicated Rotary Kiln Electric Arc Furnace (“RKEF”) processing line and produce two products: nickel-copper-cobalt alloy, an intermediate product used as feedstock to produce lithium-ion battery cathodes, and a manganese silicate product used to make silico-manganese alloy, a critical input into steel manufacturing. We expect this partnership to progress to a definitive tolling agreement in 2025, subject to successful evaluation study outcomes and agreement to mutually acceptable commercial terms. There can be no assurance that we will enter into such definitive strategic alliance in a particular time period, or at all, or on terms similar to those set
99
Table of Contents
forth in the binding MoU, or that if such definitive tolling agreement is entered into by us or that the existing facility will be able to successfully process nodules in a particular time period, or at all.
We are currently focused on preparing our application for a plan of work to the ISA for our first exploitation contract for the NORI contract area. Given that it is unlikely that the ISA Council would consider any application for a plan of work for exploitation before its next session in March 2025 and to ensure clarity on the submission process, consideration of the Application, and timeline, the Republic of Nauru, in consultation with NORI, formally requested that this issue be added to the agenda of the Council’s March 2025 meeting. Nauru’s proposed agenda item was strongly opposed by Chile, and it is unlikely for there to be an agreed upon process until after an application is received. Based on the current timeline in the consolidated draft regulations issued February 2024, the ISA application review and approval process is expected to be approximately one year from the filing date. See “ Project and Regulatory Updates - ISA Developments ” below for a further discussion on recent developments at the ISA.
To reach our objective and initiate commercial production, we are: (i) defining our resource and project economics, (ii) developing a commercial offshore nodule collection system, (iii) assessing the environmental and social impacts of offshore nodule collection, and (iv) developing onshore technology to process collected polymetallic nodules into a manganese silicate product, and an intermediate nickel-copper-cobalt alloy or matte product and/or end-products like nickel and cobalt sulfates, and copper cathode. In addition, we are also in the initial stages of considering the possibility of a U.S.-based regulatory pathway with the U.S. National Oceanic and Atmospheric Administration (“NOAA”) and the U.S. Department of Commerce under the U.S. Deep Seabed Hard Mineral Resources Act (“DSHMRA”) for the commercial production of deep-sea polymetallic nodules in the CCZ.
We are still in the exploration phase and have not yet declared mineral reserves. In addition, we do not have the applicable environmental and other permits required to build and/or operate commercial scale polymetallic nodule processing and refining plants on land.
2024 Highlights
Below are a few of the developments that occurred in 2024.
Developments with our Projects
June 27, 2025 Submission Date for Subsidiary NORI’s ISA Application, and Expanded Company Strategy
NORI has set the date of June 27, 2025 for its expected submission of its ISA exploitation application. According to the ISA Council’s decisions ISBA/28/C/24 and ISBA/28/C/25, if NORI submits an application for a plan of work for exploitation before the RRPs have been adopted, the ISA Council at its next meeting, as a matter of priority, will consider the process for considering such an application. The ISA Council is not scheduled to meet again until March 2025 and we believe it is unlikely that the ISA Council would consider an application for a plan of work for exploitation before this session. In light of this, Nauru formally requested that the ISA clarify the submission and review process for such an application at the March 2025 meetings before NORI submits the Application and, therefore, has decided to submit the Application after the March 2025 meetings on June 27, 2025. At the March 2025 meetings, Nauru’s proposed agenda item was strongly opposed by Chile, and it is unlikely for there to be an agreed upon process until after an application is received.
Termination of Marawa Agreement
On November 14, 2024, DeepGreen Engineering Pte. Ltd. (“DeepGreen”) delivered a formal termination notice to Marawa Research and Exploration Limited, ending the Services Agreement dated October 1, 2013 (the “Agreement”), pursuant to DeepGreen’s right to terminate for convenience under the Agreement. The termination became effective on January 14, 2025, and we no longer have any exploration or other rights to the area of the CCZ that was covered by the Agreement. The termination is not expected to have a material adverse effect on our financial position or operations, with non-material ongoing costs and no termination penalties applicable under the Agreement.
100
Table of Contents
World-First Production of Nickel Sulfate from Deep-Seafloor Polymetallic Nodules
In April 2024, we announced that we had successfully produced the world’s first nickel sulfate derived exclusively from seafloor polymetallic nodules during pilot-scale nodule processing. In partnership with SGS Canada Inc, the testing was undertaken on samples of nickel-cobalt-copper matte produced by us in 2021 using our efficient flowsheet to process high-grade nickel matte directly to nickel sulfate without making nickel metal, while producing fertilizer byproducts instead of solid waste or tailings.
Extensive Submission of Deep-Sea Environmental Data to the ISA
In May 2024, we announced that our subsidiary NORI had made a second submission of key environmental data from all prior environmental baseline campaigns conducted in the NORI Area D exploration area up to January 2022 to DeepData, an open database of contractor data managed by the ISA. The submission of this batch of data includes an extensive set of geochemical and biological samples from across the water column.
World-First Cobalt Sulfate Produced from Deep-Seafloor Polymetallic Nodules
On June 12, 2024, we announced that we successfully produced the world’s first cobalt sulfate derived exclusively from seafloor polymetallic nodules. The cobalt sulfate was generated during bench-scale testing of our hydrometallurgical flowsheet design with SGS Canada Inc. Based on samples of nickel-cobalt-copper matte first produced by us in 2021, SGS tested our efficient flowsheet to process high-grade nickel-copper-cobalt matte directly to high-purity cobalt sulfate without making cobalt metal, while producing fertilizer byproducts instead of solid waste or tailings. The milestone followed the news in May 2024 of our successful production of nickel sulfate, a key raw material input used in the production of energy-dense EV batteries.
Third Annual Impact Report Published
On July 29, 2024, we published our third annual Impact Report to provide an update on key milestones achieved in our assessment of the environmental impacts of nodule collection including, what we believe, is the successful collection of sufficient quantities of environmental baseline and impact data to develop an Environmental Impact Statement and Environmental Mitigation and Management Plan (EMMP) for the world’s first deep-seafloor nodule collection project.
TMC and PAMCO Successfully Produce Calcine in Commercial-Scale Processing of Polymetallic Nodules
In September 2024, we announced that we had successfully produced high temperature material (calcine) during the first phase of a commercial-scale campaign to process a 2,000-tonne sample of deep-seafloor polymetallic nodules at our partner PAMCO’s Hachinohe Rotary Kiln Electric-Arc Furnace facility in Hachinohe, Japan. Approximately 500 tonnes of calcine were produced. On February 18, 2025, we announced that PAMCO had successfully smelted 450 tonnes of calcine into 35 tonnes of NiCuCo alloy and 320 tonnes of Mn silicate products.
ISA Developments
ISA Consolidated Draft Regulations
In February 2024, the ISA released the first consolidated draft regulations on exploitation of Mineral resources in the Area. The revised second consolidated text was released in November 2024. Negotiations on the revised second consolidated text began during part 1 of the ISA’s 30 th Session.
101
Table of Contents
Industry Developments
TMC Applauds U.S. Congressional Mandate for 2025 Defense Department Feasibility Study on Nodule Refining
On December 30, 2024, we welcomed the signing of legislation calling for financial support from the Defense Department’s Industrial Base Policy office to “assess the feasibility of improving domestic capabilities for refining polymetallic nodule-derived intermediates into high-purity nickel, cobalt sulfate, and copper.” The legislation, signed into law by President Biden on December 23, 2024, was led by the HASC and calls for the completion of a feasibility study by the end of 2025 for a nodule-derived intermediate refinery which would bring the U.S. closer to addressing the biggest vulnerability in its domestic battery supply chains – nickel refining – as identified in Executive Order 14017 from 2021. In addition, our U.S. subsidiary has an outstanding application seeking a $9 million grant under the Defense Production Act Title III program for feasibility work on a domestic refinery for nodule-derived intermediate products.
Responsible Use of Seafloor Resources Act (RUSRA)
In March 2024, legislation was introduced in the U.S. House of Representatives calling for the U.S. to “support international governance of seafloor resource exploration and responsible polymetallic nodule collection by allied partners”, and to “provide financial, diplomatic, or other forms of support for seafloor nodule collection, processing and refining.”
TMC CEO Testifies to U.S. House of Representatives on Benefits of Nodules
In September 2024, our CEO Gerard Barron gave testimony during a meeting of the Critical Mineral Policy Working Group for the House Select Committee on the Chinese Communist Party to discuss the U.S.’ heavy reliance on Chinese imports of critical minerals and policy solutions to incentivize greater cooperation with allies to create alternative supplies. Mr. Barron spoke to the potential of seafloor nodules to secure U.S. supplies of key minerals for the energy transition and defense sectors.
Rebuttal to Publication
In July 2024, Nature Geoscience published a paper claiming that seafloor nodules produce oxygen in the absence of sunlight. Since the paper’s publication, multiple rebuttals have been submitted to Nature warning of serious flaws with the paper’s methodology and claims, prompting calls for the paper to be retracted. Researchers at the University of Tokyo and University of Gothenburg are among the experts that have submitted pre-print rebuttals to the article’s author. Our own rebuttal, published September 19, 2024, notes selective reporting of data and omission of key evidence, including experiments that show oxygen levels increasing without nodules, directly contradicting the authors’ claims.
Financing
TMC Announces Registered Direct Offering
On November 14, 2024, we entered into a securities purchase agreement with certain new and existing institutional investors for the sale of an aggregate of 17,500,000 common shares (the “Shares”) and accompanying Class B warrants (the “Class B Warrants”), in a registered direct offering (the “2024 Registered Direct Offering”). The offering price was $1.00 per Share, resulting in initial gross proceeds of $17.5 million ($16.5 million after associated fees), with each Share including an accompanying Class B Warrant to purchase 0.5 common shares. The Class B Warrants are exercisable immediately upon issuance at a price of $2.00 per share and expire five years from issuance. On November 26, 2024, we entered into the First Amendment to the Securities Purchase Agreement, increasing the offering by an additional 2,400,000 common shares and accompanying Class B Warrants to purchase 1,200,000 common shares on the same terms and conditions. As a result, the total number of Shares and accompanying Class B Warrants issued in the registered direct offering increased to 19,900,000 Shares and Class B Warrants to purchase 9,950,000 common shares, bringing the aggregate gross proceeds to $19.9 million, all of which has been received, before deducting offering expenses. The Class B Warrants include customary anti-dilution protections and a repurchase feature, permitting us to repurchase the warrants for $0.0001 per Common Share underlying the Class B Warrants if the volume-weighted average price of our common shares exceeds $5.00 per share for each trading day in a consecutive 30-trading-day period.
102
Table of Contents
Amendment to 2023 Credit Facility with Allseas Affiliate
On March 22, 2023, we entered into a $25 million Unsecured Credit Facility (the “2023 Credit Facility”) with Argentum Cedit Virtuti GCV, the parent of Allseas Investments S.A. (“Allseas Investments”) and an affiliate of Allseas, which was amended on July 31, 2023. On March 22, 2024, we entered into the Second Amendment to the Unsecured Credit Facility with Argentum Cedit Virtuti GCV to further extend the 2023 Credit Facility to August 31, 2025 and to provide that the underutilization fee thereunder shall cease to be payable after the date on which we or the Lender gives notice of termination of the agreement On August 16, 2024, the Company entered into the Third Amendment to the 2023 Credit Facility, to increase the borrowing limit of the 2023 Credit Facility to $27.5 million. On November 14, 2024, as a result of the 2024 Registered Direct Offering the borrowing limit of the 2023 Credit Facility was returned to $25 million.
2024 Credit Facility with ERAS Capital LLC and Gerard Barron
On March 22, 2024, we entered into an Unsecured Credit Facility (the “2024 Credit Facility”) with Gerard Barron, our Chief Executive Officer and Chairman, and ERAS Capital LLC, the family fund of our director, Andrei Karkar (collectively, the “2024 Lenders”), pursuant to which, we may borrow from the 2024 Lenders up to $20 million in the aggregate ($10 million from each of the 2024 Lenders), from time to time, subject to certain conditions. All amounts drawn under the 2024 Credit Facility will bear interest at the 6-month Secured Overnight Funding Rate (“SOFR”), 180-day average plus 4.0% per annum payable in cash semi-annually (or plus 5% if paid-in-kind at maturity, at our election) on the first business day of each of June and January. We will pay an underutilization fee equal to 4.0% per annum payable semi-annually for any amounts that remain undrawn under the 2024 Credit Facility. We have the right to pre-pay the entire amount outstanding under the 2024 Credit Facility at any time, before the 2024 Credit Facility’s maturity of September 22, 2025. The 2024 Credit Facility also contains customary events of default. The 2024 Credit Facility will terminate automatically if we or any of our subsidiaries raise at least $50 million in the aggregate (i) through the issuance of any of our or our subsidiaries’ debt or equity securities, or (ii) in prepayments under an off-take agreement or similar commercial agreement. As of the date of this Annual Report, we have drawn $2.5 million from the 2024 Credit Facility. On August 13, 2024, we entered into the First Amendment to the 2024 Credit Facility with the 2024 Lenders to increase the borrowing limit of the 2024 Credit Facility to $25 million in the aggregate ($12.5 million from each of the 2024 Lenders). On November 14, 2024, we entered into the Second Amendment to the 2024 Credit Facility with the 2024 Lenders, to increase the borrowing limit to $38 million in the aggregate ($19 million from each of the 2024 Lenders) and to extend the maturity of the 2024 Credit Facility to December 31, 2025.
TMC Board Appointments
Steve Jurvetson Joins TMC’s Board of Directors as Vice Chairman and Special Advisor to the CEO
On April 10, 2024, renowned Silicon Valley investor Steve Jurvetson joined our board of directors as Vice Chairman and special advisor to the CEO. Mr. Jurvetson is an investor focused on founder-led, mission-driven companies at the cutting edge of disruptive technology and new industry formation. His investments include pioneering technology companies like Tesla, Planet Labs, SpaceX and Commonwealth Fusion Systems, and represent over $800 billion in aggregate value creation.
Prominent Sustainability Strategist Brendan May Joins TMC’s Board of Directors
On June 3, 2024, we announced the appointment of Brendan May to our Board of Directors. As a former Chief Executive of the Marine Stewardship Council (MSC) and European Chairman of the Rainforest Alliance, Mr. May has spent over two decades at the forefront of sustainability challenges in globally significant ecosystems. In 2010, he formed renowned global sustainability consultancy, Robertsbridge, whose counsel has been sought by leading companies and NGOs around the world.
Developments Subsequent to December 31, 2024
TMC and PAMCO Achieve Nodule Processing Milestone, Unlocking Critical Battery & Steelmaking Materials at Existing Facilities
On February 18, 2025, we announced that PAMCO had successfully smelted 450 tonnes of calcine into 35 tonnes of NiCuCo alloy and 320 tonnes of Mn silicate products, during a commercial-scale campaign to process a 2,000-tonne sample of deep-seafloor polymetallic nodules at our partner PAMCO’s Hachinohe Rotary Kiln Electric-Arc Furnace facility in Hachinohe, Japan, demonstrating
103
Table of Contents
the process at scale. The process data and operational experience gathered during the commercial-scale processing trial will inform expected definitive processing agreements between the parties.
Extension of Credit Facility with ERAS Capital LLC and Gerard Barron
On March 26, 2025, we entered into the Third Amendment to the 2024 Credit Facility with the 2024 Lenders, to, among other things, increase the borrowing limit to $44 million in the aggregate ($22 million from each of the 2024 Lenders) and extend the maturity of the 2024 Credit Facility to June 30, 2026.
Extension of Allseas Working Capital Loan Agreement and Termination of Allseas 2023 Credit Facility
On March 24,2025, we entered into a Letter Agreement (the “Letter Agreement”) with Allseas Investments and Argentum Cedit Virtuti GCV, pursuant to which the repayment date under our working capital loan agreement (“Working Capital Loan Agreement”) with Allseas Investments dated September 9, 2024 was extended to September 30, 2025.
Additionally, under the Letter Agreement, we and Argentum Cedit Virtuti GCV agreed to cancel the unsecured credit facility established in 2023 with no outstanding amounts remaining, other than our obligation to pay the underutilization fee thereunder.
Exploration of Potential U.S.-Based Regulatory Pathway
On March 27, 2025, we announced that we initiated a process with NOAA and the U.S. Department of Commerce under the DSHMRA to consider a U.S.-based regulatory pathway for the commercial production of deep-sea polymetallic nodules in the CCZ. We believe this regulatory pathway potentially offers a clear and predictable route to securing an exploration license and a commercial recover permit to polymetallic nodules found in the CCZ. We are in the initial planning stages of this strategy, however, and there are no assurances that we will be able to secure any exploration or commercial recovery rights under the DSHMRA in a timely manner, or at all.
Exploration Contracts
We currently hold exclusive exploration rights to certain polymetallic nodule areas in the CCZ through our subsidiaries NORI and TOML, sponsored by the Republic of Nauru and the Kingdom of Tonga, respectively.
NORI. NORI our wholly-owned subsidiary, holds exploration rights to four blocks (NORI Area A, B, C, and D, the “NORI Contract Area”) covering 74,830 square kilometers in the CCZ that were granted by the ISA in July 2011. NORI is sponsored by Nauru pursuant to a certificate of sponsorship signed by the Government of Nauru on April 11, 2011. The D block of the NORI area (“NORI Area D”) is the seafloor parcel where we have performed the most resource definition and environmental work to date. NORI commissioned AMC Consulting Ltd, a leading mining consulting firm, to undertake an Initial Economic Assessment of the mineral resource contained in NORI Area D and to compile a technical report compliant with Canadian National Instrument (NI 43-101), which was completed in March 2021. AMC subsequently compiled the NORI Technical Report Summary, dated March 2021, which included an initial assessment and an economic analysis of NORI Area D prepared in accordance with the SEC’s Modernization of Property Disclosures for Mining Registrants set forth in subpart 1300 of Regulation S-K (the “SEC Mining Rules”). The NORI Technical Report Summary is filed as Exhibit 96.1 to this Annual Report. See Item 2 entitled “ Properties ” included in this Annual Report for additional information about the 2021 economic analysis of NORI Area D.
TOML. TOML our wholly-owned subsidiary which we acquired in March 2020, holds exploration rights to an area covering 74,713 square kilometers in the CCZ that were granted by the ISA in January 2012 (the “TOML Contract Area”). On March 8, 2008, Tonga and TOML entered into a sponsorship agreement formalizing certain obligations of the parties in relation to TOML’s exploration application to the ISA (subsequently granted) for the TOML Contract Area. The sponsorship agreement was updated on September 23, 2021. TOML commissioned a Technical Report Summary by AMC, dated March 2021, which is filed as Exhibit 96.2 to this Annual Report.
104
Table of Contents
Key Trends, Opportunities and Uncertainties
We are currently a pre-revenue company, and we do not anticipate earning revenues (other than potential service revenue) until NORI receives an exploitation contract and we are able to successfully collect and process polymetallic nodules into saleable products on a commercial scale. We believe that our performance and future success pose risks and challenges, including those related to finalization of ISA regulations to allow for commercial exploitation, approval of an application for the ISA exploitation contract, development of environmental regulations associated with our business and development of our technologies to collect and process polymetallic nodules. These risks, as well as other risks, are discussed in Item 7A entitled “ Quantitative and Qualitative Disclosures About Market Risk ” and Item 1A entitled “ Risk Factors ” included in this Annual Report.
Impact of Climate Change
We are committed to adopting the Task Force on Climate-Related Financial Disclosures recommendations. In our Impact Report, we provided climate-related disclosure and shared how our vision is aligned with supporting the global energy transition and contributing to a circular metals economy. We recognize that climate change may have a meaningful impact on our financial performance over time, and we continue the process of assessing key risks and corresponding action plans to mitigate their negative impact of climate change on our operations.
Our climate related transition risks and opportunities are likely to be driven by changes in regulation, public policy, and technology as well as risk of business disruptions due to climate related events.
Regulatory risks
Regulations related to emissions limits, such as cap and trade schemes and carbon taxes, would likely increase our future cost of operations, energy purchase, and equipment selection in addition to costs associated with potential carbon tax and/or purchase of carbon offsets. It is difficult to estimate the impact of potential future regulations on future operations.
We are working on a plan for continuous reduction of emissions and aiming to develop operations with near zero emissions. When selecting the location of our onshore plant, one of our requirements is access to renewable energy as our metallurgical process will be the most energy intensive step in our operations. In addition, we are seeking to replace metallurgical coal used as reductant during calcining of nodules and have tested potential renewable alternatives. We are also identifying the best approach for decarbonizing our offshore operations. To date, we have not experienced any material impact to our business related to potential regulations but will continue to evaluate and monitor future developments.
Public policy risks
Awareness of climate change related impacts and commitments made by companies and governments to achieve net zero emissions, continues to grow. We support the ambition of the U.S. to achieve net zero greenhouse gas emissions by no later than 2050 and to reach half of all new vehicles sales to be EVs by 2030. We are committed to achieving zero emissions and are reviewing and designing technologies to achieve this goal. The location of our onshore plant will be key, and we will be working on science-based targets and scenario analysis.
To support the EV and battery storage value chain, we are seeking to close the emerging supply gap of the critical metals contained in nodules needed for the transition to renewable energy and adoption of EVs. We plan to take advantage of this opportunity to supply these potentially lower carbon critical metals, avoid deforestation, and help reduce the cost of batteries.
Technology risks
The timing and deployment of technologies to support the transition to a lower carbon economy can be uncertain. Investments in assets with long lifespans require the selection of not only the proper technology, but also the proper timing to retain the ability to adapt to future developments. There are also risks associated with the additional costs of lower emissions technology and transition to renewables. To mitigate this risk, we based our flowsheet development on existing proven technology, while retaining sufficient flexibility to be able to retrofit processes with new lower carbon technology as they become available.
105
Table of Contents
Physical risks
Our main activity currently consists of offshore exploration campaigns for research and testing purposes, and technology development at partner facilities. However, once a location is selected for our onshore metallurgical plant, we will assess the risks associated with hurricanes, floods, and extreme weather.
Impact of Global Inflation
The global inflation rate rose sharply in 2022, and stayed relatively high in 2023 and 2024, marine fuel prices and vessel day rates remained high and have increased our exploration expenses beyond what was originally expected. Additionally, we are experiencing higher offshore labor costs through our contractors.
As a pre-revenue company, persistent inflation may affect our ultimate cash requirements prior to our ability to begin commercial production.
Basis of Presentation
We currently conduct our business through one operating segment. As a pre-revenue company with no commercial operations, our activities to date have been limited. Our results are reported under Generally Accepted Accounting Principles in the United States (“U.S. GAAP”) and in U.S. dollars.
Components of Results of Operations
We are an exploration-stage company with no revenue to date and a net loss of $81.9 million for the year ended December 31, 2024, compared to a net loss of $73.8 million in the prior year. We have an accumulated deficit of approximately $631.4 million from inception through December 31, 2024.
Our historical results may not be indicative of our future results for reasons that may be difficult to anticipate. Accordingly, the drivers of our future financial results, as well as the components of such results, may not be comparable to our historical or projected results of operations.
Revenue
To date, we have not generated any revenue. We do not expect to generate revenue (other than potential service revenue) until NORI receives an exploitation contract and we are able to successfully collect and process polymetallic nodules into saleable products on a commercial scale. Any revenue from initial production is difficult to predict.
Exploration and Evaluation Expenses
We expense all costs relating to exploration and development of mineral claims. Such exploration and development costs include, but are not limited to, ISA contract management, geological, geochemical and geophysical studies, environmental baseline studies, process development and payments to Allseas for the PMTS. Our exploration expenses are impacted by the amount of exploration work conducted during each period. The acquisition cost of ISA polymetallic nodule exploration contracts will be charged to operations as amortization expense on a unit-of-production method based on proven and probable reserves should commercial production commence in the future.
General and Administrative Expenses
General and administrative (“G&A”) expenses consist primarily of compensation for employees, consultants and directors, including wages and salaries, share-based compensation, consulting fees, investor relations expenses, expenses related to advertising and marketing functions, insurance costs, office and sundry expenses, professional fees (including legal, audit and tax fees), travel expenses and transfer and filing fees.
106
Table of Contents
Share-based compensation costs from the issuance of stock options and restricted share units (“RSUs”) is measured at the grant date based on the fair value of the award and is recognized over the related service period. Share-based compensation costs are charged to exploration expenses and general and administrative expenses depending on the function fulfilled by the holder of the award. In instances where an award is issued for financing related services, the costs are included within equity as part of the financing costs. We recognize forfeiture of any awards as they occur.
Interest Income/Expense
Interest income consists primarily of interest income earned on our cash and cash equivalents.
Fees and Interest on Borrowings and Credit Facilities
Fees and interest on borrowings and credit facilities represent interest charged on our short-term debt and interest and underutilization fees associated with our credit facilities.
Foreign Exchange Loss
The foreign exchange income or loss for the periods primarily relates to our cash held in Canadian dollars and to the settlement of costs incurred in foreign currencies, depending on either the strengthening or weakening of the U.S. dollar.
Change in Fair Value of Warrants Liability
The change in fair value of warrants liabilities primarily consists of the change in the fair value of the 9,500,000 warrants issued to Sustainable Opportunities Holdings LLC concurrently with SOAC’s initial public offering (the “Private Warrants”). For accounting purposes, we were considered to have issued the Private Warrants as part of the Business Combination, and we are required to re-measure the fair value of our Private Warrants at the end of each reporting period.
Results of Operations
Comparison of the periods ended December 31, 2024 and 2023
For the Three Months Ended
For the Year Ended
(Dollar amounts in thousands,
December 31,
December 31,
except as noted)
2024
2023
% Change
2024
2023
% Change
Exploration and evaluation expenses
$
8,304
$
26,677
(69)
%
$
50,643
$
49,849
2
%
General and administrative expenses
8,044
6,582
22
%
30,644
22,540
36
%
Equity-accounted investment loss
29
96
(70)
%
226
571
(60)
%
Loss on termination of contract
199
—
N/A
199
—
N/A
Change in fair value of warrants liability
46
(228)
120
%
(1,057)
986
(207)
%
Foreign exchange (loss) gain
(1,782)
244
(830)
%
(1,186)
310
(483)
%
Interest income
(51)
(205)
(75)
%
(176)
(1,297)
(86)
%
Fees and interest on borrowings and credit facilities
1,224
252
386
%
2,602
781
233
%
Tax expense
48
41
17
%
48
41
17
%
Loss for the year, after tax
$
16,061
$
33,459
(52)
%
$
81,943
$
73,781
11
%
Full Year 2024 compared to Full Year 2023
Exploration and Evaluation Expenses
Exploration and evaluation expenses for the year ended December 31, 2024 were $50.6 million, or $0.8 million higher than the same period in 2023. The spending in 2024 as compared to the prior year reflects an increase of $7.5 million in mining, technological and process development mostly due to costs incurred for resource definition during Campaign 8, higher share-based compensation of $5.4 million primarily due to the amortization of the fair value of RSUs and options granted to officers in the second quarter of 2024. This was offset by lower spending on environmental studies as the cost for Campaign 8 which commenced in the fourth quarter of 2023
107
Table of Contents
was completed in the first quarter of 2024 and was lower than the cost of the environmental work in 2023 following the completion of the NORI pilot nodule collection system test.
General and Administrative (“G&A”) Expenses
G&A expenses for the year ended December 31, 2024 were $30.6 million compared to $22.5 million for the same period in 2023. The increase of $8.1 million in G&A expenses was mainly the result of an increase in share-based compensation of $5.7 million due to the amortization of the fair value of RSUs and options granted to directors and officers in the second quarter of 2024, higher consulting and advisory fees of $1.9 million and higher personnel costs of $0.8 million. This increase was partially offset by decreased travel and insurance costs incurred in 2024 compared to the same period in 2023.
Interest Income
During 2024, we earned interest of $0.2 million, as compared to $1.3 million in 2023, mainly from the investment of our cash on hand.
Change in Fair Value of Warrants Liability
The change in fair value of warrants liability primarily consists of the change in the fair value of the 9,500,000 Private Warrants. The credit recorded in 2024 reflects the decrease in the market price of our warrants.
Fees and Interest on Borrowings and Credit Facilities
The interest charged on our short-term debt borrowings was $0.2 million in the year ended December 31, 2024 ($nil for the same period of 2023), while interest on drawn amounts on our credit facilities was $0.3 million and underutilization fees on these same facilities was $2.1 million in the year ended December 31, 2024 ($nil and $0.8 million over the same period in 2023, respectively).
Liquidity and Capital Resources
Our primary sources of financing have come from private placements and public offerings of Common Shares and warrants, and the issuance of convertible debentures. As of December 31, 2024, we had cash on hand of $3.5 million.
In light of the significant deficit in expected funding following the closing of the Business Combination in September 2021, we adopted what we call a “capital-light” strategy whereby we removed any allocation of funds to capital expenditures that were not deemed necessary to support the submission of an application for an exploitation contract for the NORI Area D, and by negotiating the settlement of program expenditures with our equity whenever possible, and by utilizing existing assets for offshore and onshore production.
We have yet to generate any revenue from our business operations. We are an exploration-stage company and the recovery of our investment in mineral exploration contracts and attainment of profitable operations is dependent upon many factors including, among other things, the development of a commercial production system for collecting polymetallic nodules from the seafloor as well as the development of our processing technology for the metallurgical treatment of such nodules, the establishment of mineable reserves, the demonstration of commercial and technical feasibility of seafloor polymetallic nodule collection and processing systems, metal prices, and securing ISA exploitation contracts or provisional approvals. While we have obtained financing in the past, there is no assurance that such financing will continue to be available on favorable terms, in sufficient amounts, or at all.
We expect to incur significant expenses and operating losses for the foreseeable future, particularly as we advance towards our application to the ISA for an exploitation contract and preparation for potential commercialization. Based on our cash balance and availability of borrowing under our credit facility with ERAS Capital LLC and Gerard Barron, when compared with our forecasted cash expenditures, we believe we will have sufficient funds to meet our obligations that become due within the next twelve months. Our estimates used in reaching this conclusion are based on information available as at the date of filing this Annual Report. Accordingly, actual results could differ from these estimates and resulting variances may result in our need for additional funding in an amount greater or earlier than expected, due to changes in business conditions or other developments, including, but not limited to, deferral of approvals, capital and operating cost escalation, currently unrecognized technical and development challenges, our ability to pay certain vendors or suppliers in our Common Shares or changes in external business environment.
108
Table of Contents
In addition, we will however need and are seeking additional financing to fund our continued operations over time. These financings could include additional public or private equity, debt financings, equity-linked financings or other sources of financing, including through non-dilutive asset, royalty or project-based and/or asset-based financings. If these financing or other financing sources are not available, or if the terms of financing are less desirable than we expect, or if in insufficient amounts, we may be forced to delay our exploration and/or exploitation activities or further scale back our operations, which could have a material adverse impact on our business and financial prospects.
On September 16, 2022, we filed a registration statement on Form S-3 with the SEC, which the SEC declared effective on October 14, 2022, to sell up to $100 million of securities, which includes the $30 million that may be sold under the At-the-Market Equity Distribution Agreement discussed below and the Common Shares and shares underlying the Class A Warrants issued in the Registered Direct Offering. In addition, on November 30, 2023, we filed an additional registration statement on Form S-3 with the SEC, which the SEC declared effective on December 8, 2023, to sell up to an additional $100 million of securities. Securities that may be sold under the registration statements include common shares, preferred shares, debt securities, warrants and units. Any such offering, if it does occur, may happen in one or more transactions. Specific terms of any securities to be sold will be described in supplemental filings with the SEC.
On December 22, 2022, we entered into an At-the-Market Equity Distribution Agreement (the “Sales Agreement”) with Stifel, Nicolaus & Company, Incorporated (“Stifel”) and Wedbush Securities Inc., as sales agents, allowing us, from time to time, to issue and sell Common Shares with an aggregate offering price of up to $30 million. On December 21, 2023, we amended the Sales Agreement to remove Stifel as a sales agent. The offer and sales of the shares are made under our effective “shelf” registration statement on Form S-3 filed with the SEC on September 16, 2022, which the SEC declared effective on October 14, 2022. No funds were raised from the Sales Agreement in the fourth quarter of 2024, while for the 2024 year, we sold 3,251,590 Common Shares for gross proceeds of $4.9 million under this offering.
On March 22, 2023, we entered into the 2023 Credit Facility with Argentum Cedit Virtuti GCV, the parent of Allseas Investments S.A. and an affiliate of Allseas, which was amended on July 31, 2023 and March 22, 2024, pursuant to which, we were able to borrow from the Lender up to $25 million in the aggregate, from time to time, subject to certain conditions. All amounts drawn under the 2023 Credit Facility bore interest at the 6-month SOFR, 180-day average plus 4.0% per annum payable in cash semi-annually (or plus 5% if paid-in-kind at maturity, our election) on the first business day of each of June and January. We agreed to pay an underutilization fee equal to 4.0% per annum payable semi-annually for any amounts that remain undrawn under the 2023 Credit Facility. We had the right to pre-pay the entire amount outstanding under the 2023 Credit Facility at any time, before the 2023 Credit Facility’s stated maturity of August 31, 2025. The 2023 Credit Facility also contained customary events of default. No amounts had been drawn under the 2023 Credit Facility. Pursuant to the Letter Agreement we entered into on March 24, 2025, we and Argentum Cedit Virtuti GCV agreed to cancel the 2023 Credit Facility with no outstanding amounts remaining, other than our obligation to pay the underutilization fee thereunder.
On August 14, 2023, we entered into a securities purchase agreement for a Registered Direct Offering of our Common Shares and Class A Warrants (the “2023 Offering”). The purchase price for each Common Share and Class A Warrant to purchase 0.5 Common Shares was $2.00 per unit. The exercise price to purchase one Common Share under the Class A Warrants is $3.00, subject to adjustment as provided in the warrant agreement. No investor elected to exercise its right to purchase additional Common Shares and accompanying Class A Warrants on or before September 15, 2023 under the terms of the securities purchase agreement. As of December 31, 2023, we had received gross proceeds of $15.9 million (approximately $14.6 million net of transaction fees) in the Registered Direct Offering. We received the remaining $9 million of gross proceeds on January 31, 2024, from an investor affiliated with us. As a result of the 2024 Purchase Agreement (as described below), the exercise price of the Class A Warrants was reset to $2.00 as the down round feature of the Class A Warrants agreement was triggered.
On March 22, 2024, we entered into the 2024 Credit Facility with Gerard Barron, our Chief Executive Officer and Chairman, and ERAS Capital LLC, the family fund of our director, Andrei Karkar, pursuant to which, we may borrow from the 2024 Lenders up to $25 million in the aggregate ($12.5 million from each of the 2024 Lenders), from time to time (was initially $20 million in the aggregate ($10 million from each of the 2024 Lenders), subject to certain conditions. All amounts drawn under the 2024 Credit Facility will bear interest at the 6-month SOFR, 180-day average plus 4.0% per annum payable in cash semi-annually (or plus 5% if paid-in-kind at maturity, at our election) on the first business day of each of June and January. We will pay an underutilization fee equal to 4.0% per annum payable semi-annually for any amounts that remain undrawn under the 2024 Credit Facility. We have the right to pre-pay the entire amount outstanding under the 2024 Credit Facility at any time, before the 2024 Credit Facility’s maturity of December 31, 2025.
109
Table of Contents
The 2024 Credit Facility also contains customary events of default. The 2024 Credit Facility will terminate automatically if we or any of our subsidiaries raise at least $50 million in the aggregate (i) through the issuance of any of our or our subsidiaries’ debt or equity securities, or (ii) in prepayments under an off-take agreement or similar commercial agreement. On August 13, 2024, we entered into the First Amendment to the 2024 Credit Facility to increase the borrowing limit to $25 million in the aggregate ($12.5 million from each of the 2024 Lenders). Under the terms of the First Amendment, the borrowing limit was due to return to the initial $20 million in the aggregate ($10 million from each of the 2024 Lenders) upon certain financing events. On November 14, 2024, we entered into the Second Amendment to the 2024 Credit Facility with ERAS Capital LLC and Gerard Barron, to increase the borrowing limit to $38 million in the aggregate ($19 million from each of the 2024 Lenders) and to extend the maturity of the 2024 Credit Facility to December 31, 2025. As per the Second Amendment, the rate of underutilization fee was retroactively increased from 4% to 6.5% on any undrawn amounts under the 2024 Credit Facility. On January 30, 2025, we repaid $1.8 million from the drawn amount, leaving a balance of $2.5 million drawn under the 2024 Credit Facility, as of the date of this Annual Report. With the January 2025 repayment, the borrowing limit on the 2024 Credit Facility was reduced to $36.2 million ($17.2 million from Gerard Barron and $19 million from ERAS Capital LLC). On March 26, 2025, we entered into the Third Amendment to the 2024 Credit Facility with the 2024 Lenders, to, among other things, increase the borrowing limit to $44 million in the aggregate ($22 million from each of the 2024 Lenders) and extend the maturity of the 2024 Credit Facility to June 30, 2026.
On May 27, 2024, we entered into a short-term loan agreement with the Lender (Argentum Cedit Virtuti GCV), an affiliate of Allseas. In accordance with the agreement, the Lender provided a short-term loan amounting to $2 million (the “Loan”) on May 30, 2024. The Loan takes priority over the 2024 Credit Facility. The Loan matured on September 10, 2024 (maturity date) and accrued interest at a rate of 8% per annum. On the maturity date, Company repaid the entire Loan amounting to $2 million and the accrued interest amounting to $46 thousand.
On September 9, 2024, we entered into a Working Capital Loan Agreement with Allseas Investments, a company related to Allseas. In accordance with the Working Capital Loan Agreement, Allseas Investments provided a loan to us amounting to $5 million (the “Working Capital Loan”) on September 10, 2024, to be used towards general corporate purposes and the repayment of all outstanding amounts under the Short-Term Loan between us and the Lender. The Working Capital Loan is payable to the Lender on or before the earlier of (i) the occurrence of certain financing events and (ii) April 1, 2025 (the “Repayment Date”). The Working Capital Loan will bear interest based on the 6-month Secured Overnight Financing Rate, 180-day average plus a margin of 4.0% per annum and is payable in two installments on January 2, 2025, and the Repayment Date (or plus a margin of 5.0% if all interest payments are deferred to the Repayment Date, at our election). On October 18, 2024, we entered into the First Amendment to the Working Capital Loan Agreement with Allseas Investments, resulting in a further draw of $2.5 million by us and a total Working Capital Loan drawn amount of $7.5 million. On March 24, 2025, we entered into the Letter Agreement with Allseas Investments and Argentum Cedit Virtuti GCV, pursuant to which the repayment date under the Working Capital Loan Agreement was extended to September 30, 2025.
On November 14, 2024, we entered into a securities purchase agreement (the “2024 Purchase Agreement”) with certain new and existing institutional investors for the sale of an aggregate of 17,500,000 common shares (the “Shares”) and accompanying Class B warrants (the “Class B Warrants”), in a registered direct offering. The offering price was $1.00 per Share, with each Share including an accompanying Class B Warrant to purchase 0.5 common shares. The Class B Warrants are exercisable immediately upon issuance at a price of $2.00 per share and expire five years from issuance. On November 26, 2024, we entered into the First Amendment to the 2024 Purchase Agreement, pursuant to which we agreed to sell and issue an additional 2,400,000 common shares and accompanying Class B Warrants to purchase 1,200,000 common shares to new investors on the same terms and conditions as initially offered. Including the First Amendment to the 2024 Purchase Agreement, we agreed to sell and issue in aggregate 19,900,000 common shares and Class B Warrants to purchase 9,950,000 common shares. Pursuant to the 2024 Purchase Agreement, we agreed not to issue any Common Shares or Common Share equivalents with an effective price of less than $1.00 per share until May 18, 2025. As at December 31, 2024, we received gross proceeds of $14.9 million (net proceeds of $14.2 million, after offering expenses), with the final $5 million of gross proceeds received on February 6, 2025.
We may receive up to approximately $309.1 million in aggregate gross proceeds from cash exercises of the Public Warrants, the Private Warrants, the Class A Warrants and the Class B Warrants, based on the per share exercise price of such warrants. However, the exercise price for the outstanding Public Warrants and Private Warrants is $11.50 per common share and there can be no assurance that such warrants will be in the money prior to their expiration, and as such, such warrants may expire worthless. Based on the current trading price of our Common Shares we do not expect to receive any proceeds from the exercise of the Public Warrants and Private Warrants unless there is a significant increase in the price of our Common Shares. In certain circumstances, the Public Warrants and Private Warrants may be exercised on a cashless basis and the proceeds from the exercise of such warrants will decrease. Furthermore,
110
Table of Contents
even if the warrants will be in the money, the holders of the warrants are not obligated to exercise their warrants, and we cannot predict whether holders of the warrants will choose to exercise all or any of their warrants. In addition, the exercise price to purchase one Common Share under the outstanding Class A Warrants and Class B Warrants is $2.00 (subject to customary adjustments) and there can be no assurance that such warrants will be exercised prior to their expiration, and as such, such warrants may expire and we will not receive any proceeds from the excise thereof.
Cash Flows Summary
Comparison of the Periods Ended December 31, 2024 and December 31, 2023
The following table summarizes our sources and uses of cash for the three and twelve months ended December 31, 2024 and December 31, 2023.
Presented below is a summary of our operating, investing and financing cash flows:
For the Three Months Ended
For the Year Ended
(thousands)
December 31,
December 31,
2024
2023
2024
2023
Net cash (used in) operating activities
$
(13,791)
$
(15,214)
$
(43,468)
$
(59,573)
Net cash (used in) investing activities
$
(50)
$
(403)
$
(515)
$
(578)
Net cash (used in) provided by financing activities
$
17,373
$
(150)
$
40,686
$
20,066
Increase (decrease) in cash
$
3,532
$
(15,767)
$
(3,297)
$
(40,085)
Full Year 2024 compared to Full Year 2023
Cash flows used in Operating Activities
For the year ended December 31, 2024, major operating activities over this period involved Campaign 8, as well as advanced work on engineering and pre-feasibility studies as we advance towards our application to the ISA for a NORI exploitation contract and prepare for potential future commercial production. Net cash used in operating activities in the year ended December 31, 2024, amounted to $43.5 million, and consisted mainly of $14.7 million on Campaign 8 and various environmental work, $11.7 million on personnel costs, $9.2 million on legal, advisory and consulting, $2.4 million for sponsorship, training and stakeholder engagement support, $1.9 million spent on engineering and pre-feasibility studies, $1.7 million on communication and business development expenses, $0.9 million on and additional payments of $1.8 million for various expenses.
For the year ended December 31, 2023, operating activities focused mainly on the continuation of environmental work following the completion of the NORI integrated collector test, as well as progressing on engineering work and pre-feasibility studies on the project. Net cash used in operating activities in the year ended December 31, 2023, amounted to $59.6 million, and consisted mainly of $32.2 million on various environmental work, $9.3 million on personnel costs, $4.4 million on legal costs, $3.2 million for sponsorship, training, and stakeholder engagement support, $2.8 million spent on engineering and pre-feasibility studies, $1.9 million on communication and business development and additional payments of $5.8 million for various expenses.
Cash flows used in/provided by Investing Activities
Net cash used in investing activities in the year ended December 31, 2024 was $0.5 million, representing the purchase of equipment. In the comparative year ended December 31, 2023, cash used in investing activities was $0.6 million for the purchase of equipment.
Cash flows provided by Financing Activities
Net cash provided by financing activities for the year ended December 31, 2024 was $40.7 million, which comprised of net proceeds received from the Registered Direct Offering announced in November 2024 of $14.7 million, net proceeds of $8.8 million from the 2023 Offering, proceeds from short-term debt and credit facilities of $11.8 million, proceeds from shares issued from ATM of $4.9 million and proceeds from the exercise of stock options and employee stock plans of $0.5 million. The year ended December 31, 2023 represents
111
Table of Contents
mainly cash received from the Registered Direct Offering of $14.7 million and cash received of $5 million on closing of our investment in Low Carbon Royalties.
Contractual Obligations and Commitments
NORI Exploration Contract
As part of the NORI Exploration Contract with the ISA, NORI submitted a periodic review report to the ISA which included a five-year plan covering 2022 to 2026: NORI is currently implementing its approved five-year plan. The cost of the estimated work plan for 2025 onwards is dependent on the ISA’s approval of the NORI Area D exploitation application. Should the approval of NORI’s exploitation application for NORI Area D be delayed or rejected, NORI intends to revise its estimated future work plan in respect of its NORI Area. Work plans are reviewed annually by us, agreed with the ISA and may be subject to change depending on our progress to date. NORI’s exploration contract expires on July 21, 2026. NORI is required to submit an application for extension no later than six months before the expiration of the contract. NORI intends to submit an application for a five-year extension in 2025.
TOML Exploration Contract
As part of the TOML Exploration Contract with the ISA, TOML submitted a periodic review report to the ISA which included a five-year plan covering 2022 to 2026: TOML is currently implementing its approved plan, which included an estimated five-year expenditure of up to $44 million. The five-year estimated expenditure is indicative and subject to change, TOML will review the program regularly and TOML will inform the ISA of any changes through its annual reports.
Regulatory Obligations Relating to Exploration Contracts
Both TOML and NORI require sponsorship from their host sponsoring nations, Tonga and Nauru, respectively. Each company has been registered and incorporated within the applicable host nation’s jurisdiction. The ISA requires that a contractor must obtain and maintain sponsorship by a host nation that is a member of the ISA, and such state must maintain effective supervision and regulatory control over such sponsored contractor. Each of TOML and NORI is subject to the registration and incorporation requirements of these nations. In the event the sponsorship is otherwise terminated, such subsidiary will be required to obtain new sponsorship from another state that is a member of the ISA. Failure to obtain such new sponsorship would have a material impact on the operations of such subsidiary and us.
Sponsorship Agreements
On July 5, 2017, Nauru, the Nauru Seabed Minerals Authority and NORI entered into the NORI Sponsorship Agreement formalizing certain obligations of the parties in relation to NORI’s exploration and potential exploitation of the NORI Area. Upon reaching the minimum recovery level within the exploitation contract area, NORI will pay Nauru a seabed mineral recovery payment based on the polymetallic nodules recovered from the exploitation contract area. In addition, NORI will pay an administration fee each year to Nauru for such administration and sponsorship, which is subject to review and increase in the event NORI is granted an ISA exploitation contract. NORI has begun discussions with the Government of Nauru to renegotiate the existing sponsorship agreement and has also committed to ensuring NORI pays corporate income tax within Nauru, assuming our future operations are ultimately profitable.
On March 8, 2008, Tonga and TOML entered into the TOML Sponsorship Agreement formalizing certain obligations of the parties in relation to TOML’s exploration and potential exploitation of the TOML Area. On September 23, 2021, Tonga updated the TOML Sponsorship Agreement harmonizing the terms of its engagement with TOML with those held by NORI with Nauru. TOML expects to renegotiate the existing sponsorship agreement with Tonga prior to entering into operations in the TOML Area and has committed to paying corporate income tax within Tonga, assuming our future operations are ultimately profitable.
Allseas Agreements
On March 29, 2019, we entered into a strategic alliance with Allseas to develop a system to collect, lift and transport nodules from the seafloor to shore and agreed to enter into a nodule collection and shipping agreement whereby Allseas would provide commercial services for the collection of the first 200 million metric tonnes of polymetallic nodules on a cost plus 50% profit basis. In furtherance of this agreement, on July 8, 2019, we entered into a Pilot Mining Test Agreement with Allseas (“PMTA”), which was amended on five
112
Table of Contents
occasions through February 2023, to develop and deploy a PMTS, successful completion of which is a prerequisite for our application for an exploitation contract with the ISA. Under the PMTA, Allseas agreed to cover the development cost of the project in exchange for a payment from us upon successful completion of the pilot trial of the PMTS in NORI Area D.
On March 16, 2022, NORI and Allseas entered into a non-binding term sheet for the development and operation of a commercial nodule collection system. The pilot nodule collection system developed and tested by Allseas is expected to be upgraded to a commercial system with an expanded targeted production capacity of up to an estimated 3.0 million tonnes of wet nodules per year, to be delivered in stepped increments. NORI and Allseas intend to equally finance all costs related to developing and getting the first commercial system into production. Once in production, NORI is expected to pay Allseas a nodule collection and transshipment fee and, as Allseas scales up production to up to an estimated 3.0 million wet tonnes of nodules per year, it is expected that unit costs will be reduced. Following the successful completion of the NORI Area D pilot collection system trials in November 2022 and subsequent analysis of pilot data, the parties are reviewing Project Zero Offshore Nodule Collection System production targets, system design and cost estimates and intend to enter into a binding Heads of Terms by the end of 2024. The parties expect to further detail their relationship in three separate definitive agreements for engineering, conversion/build and commercial operations phase, respectively. Subject to the necessary regulatory approvals, Allseas and NORI also intend to investigate acquiring a second production vessel similar to the Hidden Gem , another Samsung 10000, with the potential for an additional production rate of three million tonnes of wet nodules per year and lower associated per tonne production cost. There can be no assurances, however, that we will enter into definitive agreements with Allseas contemplated by the non-binding term sheet in a particular time period, or at all, or on terms similar to those set forth in the non-binding term sheet, or that if such definitive agreements are entered into by us that the proposed commercial systems and second production vessel will be successfully developed or operated in a particular time period, or at all.
Through December 31, 2024, we have made the following payments to Allseas under the PMTA: (a) $10 million in cash in February 2020, (b) $10 million through the issuance of 3.2 million Common Shares valued at $3.11 per share in February 2020, (c) issued Allseas a warrant to purchase 11.6 million Common Shares at a nominal exercise price per share in March 2021, (d) $10 million in cash in October 2021, following the closing of the Business Combination and meeting certain progress targets on the PMTS and (e) on February 23, 2023 issued 10.85 million Common Shares to Allseas. On August 9, 2023, 11,578,620 common shares were issued to Allseas upon the exercise of the warrant that was granted to Allseas in March 2021, and receipt of the exercise fee of $115.8 thousand. The warrant vested and became exercisable on successful completion of the PMTS in November 2022.
On November 11, 2022, our board of directors approved the successful completion and testing of the PMTS in the NORI Area D and payment of the third milestone amounting to $10 million and additional costs owed to Allseas under the PMTA by issuing 10.85 million Common Shares to Allseas priced at $1.00 per share on February 23, 2023.
On August 1, 2023, we entered into an Exclusive Vessel Use Agreement with Allseas pursuant to which Allseas will give us exclusive use of the vessel (“ Hidden Gem ”) in support of the development of the Project Zero Offshore Nodule Collection System until the system is completed or December 31, 2026, whichever is earlier. In consideration of the exclusivity term, on August 14, 2023, we issued 4.15 million Common Shares to Allseas.
Offtake Agreement
On May 25, 2012, DGE and Glencore entered into a copper offtake agreement and a nickel offtake agreement. DGE has agreed to deliver to Glencore 50% of the annual quantity of copper and nickel produced by a DGE-owned facility from nodules derived from the NORI Area at London Metal Exchange referenced market pricing with allowances for product quality and delivery location. Either party may terminate the agreement upon a material breach or insolvency of the other party. Glencore may also terminate the agreement by giving twelve months’ notice.
Borrowing with Company Related to Allseas
2023 Credit Facility
As described above, on March 22, 2023, we entered into the 2023 Credit Facility with Argentum Cedit Virtuti GCV, an affiliate of Allseas, under which we may borrow up to $25.0 million pursuant to the terms and conditions of the 2023 Credit Facility, as amended, which has a maturity date of August 31, 2025. On August 16, 2024, we entered into the Third Amendment to the 2023 Credit Facility, to increase the borrowing limit of the 2023 Credit Facility to $27.5 million. Under the terms of the Third Amendment, upon closing of
113
Table of Contents
the November 2024 Registered Direct Offering discussed above, the borrowing limit returned to $25 million. There was no outstanding balance under the 2023 Credit Facility as at December 31, 2024. Pursuant to the Letter Agreement entered into on March 24, 2025, we agreed to cancel the 2023 Credit Facility with no outstanding amounts remaining, other than our obligation to pay Argentum Cedit Virtuti GCV the underutilization fee thereunder.
2024 Short-Term Loan and Working Capital Loan
On May 27, 2024, we entered into a short-term loan agreement with Argentum Cedit Virtuti GCV whereby we borrowed $2 million (the “Loan”) on May 30, 2024. The Loan matured on September 10, 2024 (maturity date) and accrued interest at a rate of 8% per annum. On the maturity date, we repaid the entire Loan amounting to $2 million and the accrued interest.
On September 9, 2024, we entered into a working capital loan agreement (the “Working Capital Loan Agreement”) with Allseas Investments, a company related to Allseas. In accordance with the Working Capital Loan Agreement, Allseas Investments provided a loan to us amounting to $5 million (the “Working Capital Loan”) on September 10, 2024, to be used towards general corporate purposes and the repayment of all outstanding amounts under the Short-Term Loan between us and the Lender. The Working Capital Loan is payable to the Lender on or before the earlier of (i) the occurrence of certain financing events and (ii) April 1, 2025 (the “Original Repayment Date”). The Working Capital Loan will bear interest based on the 6-month Secured Overnight Financing Rate, 180-day average plus a margin of 4.0% per annum and is payable in two installments on January 2, 2025, and the Original Repayment Date (or plus a margin of 5.0% if all interest payments are deferred to the Original Repayment Date, at our election). On October 18, 2024, we entered into the First Amendment to the Working Capital Loan Agreement with Allseas Investments, resulting in a further draw of $2.5 million by us and a total Working Capital Loan drawn amount of $7.5 million. On March 24, 2025, we entered into a Letter Agreement with Allseas Investments and Argentum Cedit Virtuti GCV, pursuant to which the Original Repayment Date under the Working Capital Loan Agreement was extended to September 30, 2025, with principal and interest now repayable on that date.
2024 Credit Facility with ERAS Capital LLC and Gerard Barron
On March 22, 2024, we entered into an Unsecured Credit Facility with Gerard Barron, our Chief Executive Officer and Chairman, and ERAS Capital LLC, the family fund of our director, Andrei Karkar, pursuant to which, we may borrow from the 2024 Lenders up to $25 million in the aggregate ($12.5 million from each of the 2024 Lenders), from time to time, subject to certain conditions. All amounts drawn under the 2024 Credit Facility will bear interest at the 6-month SOFR, 180-day average plus 4.0% per annum payable in cash semi-annually (or plus 5% if paid-in-kind at maturity, at our election) on the first business day of each of June and January. We will pay an underutilization fee equal to 4.0% per annum payable semi-annually for any amounts that remain undrawn under the 2024 Credit Facility. We have the right to pre-pay the entire amount outstanding under the 2024 Credit Facility at any time, before the 2024 Credit Facility’s maturity of December 31, 2025. The 2024 Credit Facility also contains customary events of default. The 2024 Credit Facility will terminate automatically if we or any of our subsidiaries raise at least $50 million in the aggregate (i) through the issuance of any of our or our subsidiaries’ debt or equity securities, or (ii) in prepayments under an off-take agreement or similar commercial agreement. On August 13, 2024, we entered into the First Amendment to the 2024 Credit Facility with the 2024 Lenders, to increase the borrowing limit of the 2024 Credit Facility to $25 million in the aggregate ($12.5 million from each of the 2024 Lenders). On November 14, 2024, we entered into the Second Amendment to increase the borrowing limit to $38 million in the aggregate ($19 million from each of the 2024 Lenders) to the 2024 Credit Facility with ERAS Capital LLC and Gerard Barron, and to extend the maturity of the 2024 Credit Facility to December 31, 2025. As per the Second Amendment, the rate of underutilization fee was retroactively increased from March 22, 2024 to 6.5% on any undrawn amounts under the 2024 Credit Facility. On March 26, 2025, we entered into the Third Amendment to, among other things,increase the borrowing limit to $44 million in the aggregate ($22 million from each of the 2024 Lenders) and extend the maturity of the 2024 Credit Facility to June 30, 2026.
During the year ended December 31, 2024, we have drawn $4.3 million from the 2024 Credit Facility and incurred $0.2 million as interest expense. During 2024, we incurred $1.1 million, as underutilization fees, which would be payable only in the event the 2024 Credit Facility is not drawn down at the time such fees are payable. During 2024, we repaid interest amounting to $25 thousand, and underutilization fees amounting to $0.1 million to the 2024 Lenders. On January 31, 2025, we repaid the drawn amount and outstanding interest on the 2024 Credit Facility amounting to $1.8 million and $0.1 million, respectively.
Off-balance sheet arrangements
We are not party to any off-balance sheet arrangements.
114
Table of Contents
Critical Accounting Policies and Significant Judgments and Estimates
Our financial statements have been prepared in accordance with U.S. GAAP. In the preparation of these financial statements, we are required to use judgment in making estimates and assumptions that affect the reported amounts of assets and liabilities and the disclosure of contingent assets and liabilities as of the date of the financial statements, as well as the reported expenses incurred during the reporting periods.
We consider an accounting judgment, estimate or assumption to be critical when (1) the estimate or assumption is complex in nature or requires a high degree of judgment and (2) the use of different judgments, estimates and assumptions could have a material impact on the consolidated financial statements. Our significant accounting policies are described in Note 2 to our audited consolidated financial statements included in this Annual Report. We have the critical accounting policies and estimates which are described below.
Value of Common Share-Based Payments
We recognize the cost of share-based awards granted to employees and directors based on the estimated grant-date fair value of the awards. We determine the fair value of stock options using the Black-Scholes option pricing model, which is impacted by the following assumptions:
● Fair Value of Common Shares on the Date of the Grant — We used the price of the most recent offerings of our Common Shares to assess the value of our shares on the date of the grant of incentive stock options.
● Expected Term — We used the term of the award when calculating the expected term due to insufficient historical exercise data.
● Expected Volatility — As our Common Shares were not actively traded, the volatility is based on a benchmark of comparable companies within the mining industry.
● Expected Dividend Yield — The dividend rate used is zero as we have never paid any cash dividends on our Common Shares and do not anticipate doing so in the foreseeable future.
● Risk-Free Interest Rate — The interest rates used are based on the implied yield available on Canadian Treasury zero-coupon issues with an equivalent remaining term equal to the expected life of the award.
This valuation approach involves the use of estimates, judgments and assumptions that are subjective, such as those regarding the probability of future events. Changes in these estimates and assumptions impact our valuation as of the valuation date and may have a material impact on the valuation of our Common Shares. Changes in these assumptions used to determine the fair value of incentive stock options, including the vesting timeline of granted stock options, could have a material impact on our loss and comprehensive loss.
Valuation of Warrants Liability
We re-measure the fair value of the Private Warrants at the end of each reporting period. The fair value of the Private Warrants is estimated using a Black-Scholes option pricing model whereby the expected volatility is estimated by using a blended volatility calculated by assigning equal weights to both implied volatility of our Public Warrants and the historical volatility of our common share price. The expected volatility was estimated using a binomial model based on consideration of the implied volatility from our Public Warrants, adjusted to account for the call feature of the Public Warrants at prices above $18.00 during 20 trading days within any 30-trading-day period and historical volatility of the share price of our Common Shares.
Evaluation of Going Concern
We assess quarterly whether we have the ability to meet its committed cash requirements for the next twelve months and continue to operate as a going concern. This assessment requires the use of forecasts of our business activities and related estimates of future cost obligations which can be subject to change. Changes in these assumptions could have a material impact on our assessment and related disclosures.
115
Table of Contents
Recent Accounting Pronouncements
See Note 5 to the audited consolidated financial statements included in this Annual Report for more information about recent accounting pronouncements, the timing of their adoption, and our assessment, to the extent we have made one, of their potential impact on our financial condition and our results of operations and cash flows.
Emerging Growth Company Status
Section 102(b)(1) of the Jumpstart Our Business Startups (“JOBS”) Act exempts emerging growth companies from being required to comply with new or revised financial accounting standards until private companies are required to comply with the new or revised financial accounting standards. The JOBS Act provides that a company can choose not to take advantage of the extended transition period and comply with the requirements that apply to non-emerging growth companies, and any such election to not take advantage of the extended transition period is irrevocable.
We are an “emerging growth company” as defined in Section 2(a) of the Securities Act and have elected to take advantage of the benefits of the extended transition period for new or revised financial accounting standards. Following the closing of the Business Combination, we expect to remain an emerging growth company at least through the end of the 2025 fiscal year and we expect to continue to take advantage of the benefits of the extended transition period at least through the end of the 2025 fiscal year, although we may decide to early adopt such new or revised accounting standards to the extent permitted by such standards. This may make it difficult or impossible to compare our financial results with the financial results of another public company that is either not an emerging growth company or is an emerging growth company that has chosen not to take advantage of the extended transition period exemptions because of the potential differences in accounting standards used.
116
Table of Contents