−Removed: We do not own any real estate
−Removed: or other physical properties materially important to our operations.
−Removed: We currently maintain our executive offices at 1601 Bryan
−Removed: Street, Suite 4141, Dallas, Texas 75201.
−Removed: The cost for our use of this space is included in the $10,000 per month fee we will pay
−Removed: to an affiliate of our Sponsor for office space, administrative and support services, commencing on the date that our securities
−Removed: are first listed on the NYSE.
−Removed: Upon completion of our initial business combination or our liquidation, we will cease paying these
−Removed: monthly fees.
−Removed: LEGAL PROCEEDINGS
−Removed: To the knowledge of our management,
−Removed: there is no material litigation currently pending or contemplated against us, any of our officers or directors in their capacity
−Removed: as such or against any of our property.
−Removed: MINE SAFETY DISCLOSURES
−Removed: Not applicable.
+Added: NORI Contract Area
+Added: The information that follows relating to the NORI Contract Area of the CCZ is derived, for the most part, from, and in some instances is an extract from, the NORI Technical Report Summary prepared in compliance with the SEC Mining Rules.
+Added: Portions of the following information are based on assumptions, qualifications and procedures which are not fully described herein.
+Added: Reference should be made to the full text of the NORI Technical Report Summary, which has been filed as Exhibit 96.1 to this Annual Report on Form 10-K.
+Added: The NORI Technical Report Summary is incorporated herein by reference and made a part hereof.
+Added: In the event that we determine that any modifying factors, estimates and other scientific and technical information in the report materially change, we may update or file a new technical report in the future.
+Added: The NORI Contract Area is an exploration stage property.
+Added: Location of the NORI Area and access
+Added: The NORI Contract Area is located within the CCZ of the northeast Pacific Ocean.
+Added: The CCZ is located in international waters between Hawaii and Mexico.
+Added: The western-end of the CCZ is approximately 1,000 km south of the Hawaiian island group.
+Added: From here, the CCZ extends almost 5,000 km east-northeast, in an approximately 600 km wide trend, with the eastern limits approximately 2,000 km west of southern Mexico.
+Added: The region is well-located to ship nodules to the American continent or across the Pacific to Asian markets.
+Added: The NORI Contract Area comprises four separate blocks (A, B, C and D) in the CCZ with a combined area of 74,830 km 2 .
+Added: NORI Contract Area extents
+Added: DD — Decimal degrees, UTM — Universal Transverse Mercator map projection
+Added: As the CCZ deposit does not include any habitable land and is not near coastal waters, there is no requirement to negotiate access rights from landowners for seafloor collection operations.
+Added: All personnel and material will be transported to the project area by ship.
+Added: See Section 3 of the NORI Technical Report Summary for further specific information of the location of the NORI Contract Area.
+Added: Tenements and permits
+Added: See Business-Government Regulations-The NORI Exploration Contract, Business-Government Regulations-The NORI Sponsorship Agreement and Business-Government Regulations- International Seabed Authority above for information related to tenements and permits in the NORI Contract Area.
+Added: NORI obligations and sponsorship
+Added: See Business-Government Regulations-The NORI Exploration Contract, Business-Government Regulations-The NORI Sponsorship Agreement above for information related to this agreement in the NORI Contract Area.
+Added: Royalties and taxes
+Added: See Business -Government Regulations-Royalties and taxes above for information with respect to our obligations for royalties and taxes in the NORI Contract Area.
+Added: History of previous exploration activities in the NORI Contract Area
+Added: Prior to the implementation of UNCLOS, many offshore exploration campaigns were completed by international organizations and consortia.
+Added: A number of at-sea trial collection operations were successfully carried out in the CCZ in the 1970s to test potential collection concepts.
+Added: These system tests evaluated the performance of self-propelled and several towed collection devices, along with submersible pumps and airlift technology for lifting the nodules from the deep ocean floor to the support vessel.
+Added: Certain pioneer investors include those entities that carried out substantial exploration in the CCZ prior to the entry into force of UNCLOS, as well as those entities that inherited such exploration data.
+Added: NORI Area D was originally explored by Arbeitsgemeinschaft Meerestechnisch Rohstoffe (“AMR”).
+Added: AMR subsequently joined Ocean Management Inc.
+Added: The OMI consortium comprised Inco Ltd (Canada), AMR (Federal Republic of Germany), SEDCO Inc.
+Added: (US), and Deep Ocean Mining Co.
+Added: OMI completed a successful trial collection operation in 1978.
+Added: Hydraulic pumps, an air lift system, and towed collectors were tested in approximately 4,500 m of water.
+Added: Approximately 800 tonnes of nodules were recovered.
+Added: Kennecott consortium (now a division of Rio Tinto) first became seriously interested in seafloor polymetallic nodules in 1962 (Agarwal et al.
+Added: In the 1970s, Kennecott developed and tested components and subsystems of a seafloor collection system, and also carried out significant polymetallic nodule metallurgical processing test work.
+Added: Using a different system to OMI, Ocean Mining Associates recovered approximately 500 tonnes of nodules during its trial collection in the 1970s.
+Added: Between 1969 and 1974, Deepsea Ventures Inc.
+Added: carried out 16 survey cruises of three to four weeks’ duration each, to define the extent of the polymetallic nodule deposit discovered by them in 1969 in the CCZ.
+Added: As reported by Deepsea Ventures Inc.:
+Added: “These activities included the taking of some 294 discrete samples, including the bulk dredging of some 164 tons of manganese nodules from some 263 dredge stations, 28 core stations and three grab sample stations, cutting of some 28 cores, approximately 1000 lineal miles of survey of seafloor recorded by television and still photography, etc.
+Added: As a result, the deposit of nodules identified with the discovery has been proved to extend generally throughout the entire area (American Society of International Law, 1975).”
+Added: Also active in the CCZ was the Ocean Minerals Company (“OMCO”), comprising Amoco Minerals Co.
+Added: (United States), Lockheed Missiles and Space Company Inc.
+Added: (United States), Billiton International Metals BV, and dredging company Bos Kalis Westminster (Netherlands).
+Added: In a program lasting 16 years, OMCO collected thousands of free-fall grab and box core samples of nodules from its claim area and carried out trial collection operations.
+Added: Lockheed’s design efforts resulted in over 80 patents, a seafloor production system that consisted of a remote-controlled collector and crusher, a seafloor to surface slurry riser system, the first industrial-scale dynamic positioning system for a vessel, and a metallurgical processing plant.
+Added: Upon making an application, the pioneer investors were required to submit sufficient data and information to enable designation of a reserved area based on the estimated commercial value.
+Added: These sample data provide the basis of a database held by the ISA and were used initially to define the areas of the NORI application.
+Added: See Section 5 of the NORI Technical Report Summary for further specific information of the history of previous exploration of the NORI Contract Area.
+Added: Geology and sampling
+Added: Seafloor polymetallic nodules occur in all oceans, but the CCZ hosts a relatively high abundance of high Ni and Cu grade nodules.
+Added: The CCZ seafloor forms part of the Abyssal Plains, which are the largest physiographic province on Earth.
+Added: The average depth of the seafloor in the Project Area is 3,800 to 4,200 m.
+Added: Overall, the seafloor slopes at approximately 0.57˚ (1 m per km) but the Abyssal Plains are traversed by ridges, with amplitude of 50 to 300 m (maximum 1,000 m) and wavelength of 1 to 10 km.
+Added: The Abyssal Plains are punctuated by extinct volcanoes rising 500 to 2,000 m above the seafloor.
+Added: Seafloor polymetallic nodules rest on the seafloor at the seawater — sediment interface.
+Added: Such nodules are composed of nuclei and concentric layers of manganese and iron hydroxides and are formed by precipitation of metals from the surrounding seawater and sediment pore waters.
+Added: Nickel, cobalt and copper are also precipitated and occur within the structure of the manganese and iron minerals.
+Added: Nodules are abundant in abyssal areas with oxygenated bottom waters and low sedimentation rates (less than 10 cm per thousand years).
+Added: Nodules generally range from about 1 to 12 cm in their longest dimension.
+Added: Nodules of 1 to 5 cm are typically the most common in NORI Area D, where they have been classified as Type 1 nodules.
+Added: The specific conditions of the CCZ (water depth, latitude, and seafloor sediment type) are considered to be the key controls for the formation of polymetallic nodules.
+Added: Information on the mineralization within NORI Area D comprises a combination of sampling undertaken by NORI as well as free-fall grab sampler (“FFG”) and box core sampler (“BC”) data supplied by the ISA at the time of the NORI application and also supplied by the ISA to NORI in 2012.
+Added: Additional regional data, assembled by the ISA as part of its Geological Model Project during 2008 to 2010 (“ISA 2010”), are available.
+Added: The data provide significant coverage over NORI Area D and indicate a high abundance of nodules in this region, as has been confirmed by NORI’s exploration.
+Added: During the 2018 NORI campaign, 91% of nodules sampled were situated at surface.
+Added: These include nodules on the surface and nodules with their top surfaces in the upper 1 cm of sediment.
+Added: A few nodules were found at depth;
+Added: most of these were usually clustered around the edges of the box core and are considered to have been pushed below surface by the box coring process.
+Added: Significant nodule abundance below surface was only recorded in one out of 45 samples.
+Added: The nodules vary in abundance, in some cases touching one another and covering more than 70% of the seafloor.
+Added: They can occur at any depth, but the highest concentrations have been found on abyssal plains between 4,000 and 6,000 mbsl.
+Added: Data analysis in Section 9 of the NORI Technical Report Summary shows that nodule abundance variability is significantly higher than metal grades, suggesting that abundance estimation will be the key variable in mineral resource estimation.
+Added: NORI completed offshore exploration campaigns in 2012, 2013, 2018, 2019 and 2020.
+Added: During these campaigns a variety of data was collected including:
+Added: ● bathymetric mapping of most of NORI Areas A, B and C and all of NORI Area D using a hull-mounted Kongsberg Simrad EM120 12 kHz, full-ocean depth multibeam echo-sounding system (MBES).
+Added: This system also provided backscatter data with which seafloor characteristics could be interpreted;
+Added: ● detailed seafloor survey work with an autonomous underwater vehicle (AUV), utilizing an MBES, Side Scan Sonar (SSS), Sub-Bottom Profiler (SBP), and camera payload;
+Added: ● a total of 252 box core samples collected using a 0.75 m 2 box corer, mainly on a 10 km by 10 km square grid were used for resource evaluation.
+Added: The nodules in the box cores were collected, and their characteristics measured and recorded in detail.
+Added: Samples of nodules were collected in duplicate and assayed at two reputable, well-qualified laboratories:
+Added: ALS and Bureau Veritas.
+Added: Certified reference material, and blank samples were inserted to provide additional levels of quality control.
+Added: No significant issues were identified with the assay results.
+Added: The backscatter data and the sidescan sonar and seafloor photography indicate strong continuity of nodule abundance across NORI Area D.
+Added: There is a clear relationship between nodule long axis length and nodule weight and therefore it is possible to estimate nodule abundance from photographs.
+Added: Several estimation techniques were tested, and methodologies were developed that are suitable for closely-packed (Type 1) and less closely-packed (Type 2 and 3) nodules.
+Added: For more information about the NORI exploration campaigns in 2012, 2013, 2018, 2019 and 2020, see Section 7 of the NORI Technical Report Summary.
+Added: Mineral resource estimate
+Added: The mineral resource was classified on the basis of the quality and uncertainty of the sample data and sample spacing, in accordance with the definitions of “inferred mineral resource,” “indicated mineral resource” and “measured mineral resource” under the SEC Mining Rules.
+Added: Mineral resources were estimated using a two-dimensional block model.
+Added: Estimates of nodule abundance and nickel, manganese, cobalt, and copper grades were performed using kriging.
+Added: A variety of methods was used to validate the estimates, including conditional simulation.
+Added: The estimates of nodule abundance were used to calculate the tonnage of the mineral resources.
+Added: The bathymetric mapping enabled the interpretation of parts of seafloor that are possibly too steep for recovery of nodules using the systems considered by the NORI Technical Report Summary.
+Added: Seafloor areas with slopes steeper than 6° were excised from the mineral resource estimate.
+Added: The measured mineral resource was assigned to the area within NORI Area D where box-core sampling was conducted on a nominal 7 km by 7 km spacing and infilled with estimates of nodule abundance from seafloor photography to a spacing of 3.5 km by 3.5 km.
+Added: The indicated mineral resource was assigned to the area within NORI Area D where box-core sampling was conducted on a nominal spacing of 7 km by 7 km or 10 km by 10 km but without additional photo-estimates of nodule abundance.
+Added: The inferred mineral resource was assigned to the areas of abyssal plain in the southeast corner of NORI Area D that are largely unsampled.
+Added: The volcanic high in the southeast corner was excluded from the mineral resource estimate due to the high level of uncertainty about nodule abundance and grades in this domain.
+Added: The mineral resource estimate for NORI Area D at a 4 kg/m 2 abundance cut-off is set forth below.
+Added: This cut-off is derived from the estimates of costs and revenues presented in the NORI Technical Report Summary, generalized as follows:
+Added: 1.7 Mt minimum annual tonnage mined;
+Added: $0.25 million/km 2 for offshore operating costs;
+Added: 1,036 km 2 collected area processed;
+Added: $95/dry tonne for transport costs;
+Added: $119/dry tonne for processing costs;
+Added: $15/dry tonne for corporate, general and administrative costs;
+Added: $33/dry tonne for ISA and state royalties;
+Added: 95% recovery of nickel at an assumed price of nickel metal $16,472/t;
+Added: 86% recovery of copper at an assumed price of $6,872/t copper metal;
+Added: 77% recovery of cobalt at an assumed price of $46,333/t cobalt metal;
+Added: and 99% recovery of manganese at an assumed price of $4.50/dmtu manganese in manganese silicate.
+Added: The method of calculation for the cut-off determines the minimum average nodule abundance needed during steady state operations such that the revenue minus costs (excluding capital) is greater than zero.
+Added: Revenue includes metal pricing and metallurgical processing recoveries, and the costs include the collection, transport, processing, corporate costs and royalties.
+Added: The estimated mineral resources were determined in 2021 as of December 31, 2020 and also reflect the estimated mineral resources as of December 31, 2021 as none of the mineral resources in these areas were depleted by mining or any other activities.
+Added: NORI December 31, 2021 and December 31, 2020 In-Situ Mineral Resource estimate for NORI Area D at 4 kg/m 2 abundance cut-off
+Added: (wet kg/m 2 )
+Added: Measured + Indicated
+Added: Tonnes are quoted on a wet basis and grades are quoted on a dry basis, which is common practice for bulk commodities.
+Added: Moisture content was estimated to be 24% w/w.
+Added: These estimates are presented on an undiluted basis without adjustment for resource recovery.
+Added: Due to the extremely low variance in the grades and the high metal content of the nodules, a cut-off based on abundance is appropriate for determining the limits of economic exploitation.
+Added: A cut-off of 4 kg/m 2 abundance was chosen for the NORI Contract Area, based on the estimates of costs and revenues presented in the initial assessment contained in the NORI Technical Report Summary.
+Added: The metal prices assumed in the calculation of the cut-off were:
+Added: nickel metal $16,472/t;
+Added: nickel in nickel sulfate $18,807/t Ni;
+Added: copper metal $6,872/t;
+Added: cobalt metal $46,333/t;
+Added: cobalt in cobalt sulfate $56,920/t Co;
+Added: manganese in manganese silicate $4.50/dmtu.
+Added: The price estimates are long term (2034 – 2046) forecasts provided in a report by CRU International Limited (CRU, October 23, 2020).
+Added: The Qualified Person considered that this timeframe is reasonable in view of the likely time required to bring the majority of the NORI mineral resources into production.
+Added: Sampling of NORI Area D at a spacing of 10 km by 10 km during the 2019 campaign confirmed that the nodules have low variability and high continuity.
+Added: The mineral resource estimate set forth above is 4 Mt Measured and 341 Mt indicated, and 11 Mt inferred mineral resources.
+Added: Taking into account the conversion of the majority of inferred to indicated mineral resources, the remaining inferred mineral resource has decreased by 26 Mt as a result of excluding the Volcanic High domain in the south-eastern corner of NORI Area D, due to uncertainty about the occurrence of nodules in this area.
+Added: The resource estimate is also slightly higher in abundance (5.4% higher), and nickel (6.1% higher), cobalt (5.4% higher) and manganese (2.2% higher) grades than the 2018 estimate.
+Added: Comparison of the area covered by inferred, indicated and measured mineral resource for the estimate and the same area in the 2018 model shows that nickel grade has increased by 6% (1.32% to 1.40% Ni) while abundance has increased by 6% (16.0 to 17.0 kg/m 2 ).
+Added: Mineral resource tonnage has increased by 10% (from 10 to 11 Mt) in the inferred area and 7% (from 320 to 341 Mt) in the indicated area.
+Added: The positive conversion rates arising from infilling the sampling grid with high-quality box core sample data (rather than extending the area sampled) are exceptionally high compared to the typical outcomes from infill sampling of terrestrial mineral deposits.
+Added: While the NORI Technical Report Summary focuses primarily on the exploration operations in NORI Area D, NORI holds another three areas in the CCZ under the same title.
+Added: These areas (NORI Areas A, B and C) are estimated to contain inferred mineral resources of 510 Mt (wet) at 1.28% Ni, 0.21% Co, 1.04% Cu, 28.3% Mn, at an average abundance of 11 kg (wet)/m 2 at a 4 kg/m 2 abundance cut-off (effective date of December 31, 2020).
+Added: The polymetallic nodule mineralization in NORI Areas A, B and C has similar characteristics to NORI Area D and it is reasonable to assume that the technology proposed in the NORI Technical Report Summary would be suitable for development of these additional areas.
+Added: The estimated mineral resources were determined in 2021 as of December 31, 2020 and also reflect the estimated mineral resources as of December 31, 2021 as none of the mineral resources in these areas were depleted by mining or any other activities.
+Added: NORI Area A, B and C December 31, 2021 and December 31, 2020 In-Situ Mineral Resource estimate at 4 kg/m 2 abundance cut-off
+Added: Nodule tonnage
+Added: (wet kg/m 2 )
+Added: Tonnes are quoted on a wet basis and grades are quoted on a dry basis, which is common practice for bulk commodities.
+Added: Moisture content was estimated to be 24% w/w.
+Added: These estimates are presented on an undiluted basis without adjustment for resource recovery.
+Added: Information concerning our mineral properties in the NORI Technical Report Summary and in this Annual Report on Form 10-K includes information that has been prepared in accordance with the requirements of the SEC Mining Rules set forth in subpart 1300 of Regulation S-K.
+Added: Under SEC standards, mineralization, such as mineral resources, may not be classified as a “reserve” unless the determination has been made that the mineralization could be economically and legally produced or extracted at the time of the reserve determination.
+Added: As used in this annual report, the terms “mineral resource,” “measured mineral resource,” “indicated mineral resource” and “inferred mineral resource” are defined and used in accordance with the SEC Mining Rules set forth in subpart 1300 of Regulation S-K.
+Added: You are specifically cautioned not to assume that any part or all of the mineral deposits in these categories will ever be converted into mineral reserves, as defined by the SEC.
+Added: You are cautioned that mineral resources do not have demonstrated economic value.
+Added: Inferred mineral resources have a high degree of uncertainty as to their existence as to whether they can be economically or legally mined.
+Added: It cannot be assumed that all or any part of an inferred mineral resource will ever be upgraded to a higher category.
+Added: A significant amount of exploration must be completed in order to determine whether an inferred mineral resource may be upgraded to a higher category.
+Added: About 97% of the NORI Area D resource is defined in the measured and indicated categories.
+Added: Therefore, you are cautioned not to assume that all or any part of an inferred mineral resource exists, that it can be economically or legally mined, or that it will ever be upgraded to a higher category.
+Added: Likewise, you are cautioned not to assume that all or any part of measured or indicated mineral resources will ever be upgraded to mineral reserves.
+Added: Development plan
+Added: NORI proposes to implement the project in multiple phases that will allow the seafloor collection systems to be tested (“Collector Test”) and then nodule collection to be gradually ramped up.
+Added: The phased approach will facilitate de-risking of the project for relatively low initial capital investment.
+Added: Additionally, this phased development will allow for an adaptive approach to environmental management providing learning at small-scale which would be applied as the development increases in scale.
+Added: The proposed seafloor development phases are as follows:
+Added: ● The Collector Test is designed to perform proof of concept for the methods of collecting and lifting the nodules while acquiring sufficient data to design a commercial system.
+Added: The Collector Test would use a converted sixth generation drillship, the Hidden Gem .
+Added: Nodules collected during the test would be stored on the Hidden Gem and brought to shore for use in large scale process pilot testing.
+Added: The test would not demonstrate the transshipment of nodules to a shore-based facility.
+Added: ● Project Zero would be an extension of the Collector Test using an upgrade of the Hidden Gem to produce a sufficient and continuous quantity of nodules to support a relatively small commercial operation of about 1.3 Mtpa (wet) nodules delivered to a shore-based facility.
+Added: This operation would demonstrate a more continuous collection operation at a larger scale than the Collector Test and would demonstrate the transshipment of nodules to a processing facility.
+Added: It would also allow for the implementation and testing of adaptive management systems to ensure environmental compliance.
+Added: ● Project One would increase production in a further three steps:
+Added: 1) introduction of a second converted drillship (Drill Ship 2) with a capacity of up to 3.6 Mtpa (wet), 2) a further upgrade of the Hidden Gem to up to 3.6 Mtpa (wet) and 3) construction of a new purpose-built production support vessel (Collector Ship 1) with capacity of up to 8.2 Mtpa (wet).
+Added: Project One would benefit from lessons learned on the Collector Test and Project Zero.
+Added: ● The processing of the polymetallic nodules would also be ramped up in phases:
+Added: ● In Project Zero, NORI proposes to toll-treat polymetallic nodules at existing RKEF smelters, utilizing excess industry capacity.
+Added: NORI advises there is significant interest from many parties in China to utilize RKEF plants which may become stranded as a result of the Indonesian government nickel laterite ore export ban restricting supply of the nickel laterite feedstock that they currently utilize.
+Added: These RKEF plants were originally built to convert nickel laterite to nickel pig iron and could be converted to smelt polymetallic nodules.
+Added: ● In Project One, a purpose-built process plant would be constructed, including pyrometallurgical and hydrometallurgical circuits.
+Added: Nodule production would be increased in phases by treatment in this new plant.
+Added: Collection methods
+Added: The main items of offshore infrastructure are the nodule collector vehicles, the riser, and three production support vessels (“PSV”):
+Added: Drill Ship 2;
+Added: and Collector Ship 1.
+Added: Collector Ship 1 is intended to be supported by a collector support vessel.
+Added: The nodules are intended to be collected from the seafloor by self-propelled, tracked, collector vehicles.
+Added: No rock cutting, digging, drill-and-blast, or other breakage will be required at the point of collection.
+Added: The collectors are intended to be remotely controlled and supplied with electric power via umbilical cables from the PSV.
+Added: The collectors are intended to traverse the seabed at a speed of approximately 0.5 m/s.
+Added: Suction dredge heads on each collector are expected to recover a dilute slurry of nodules, sediment, and water from the seafloor.
+Added: Each collector is expected to yield about 254 t/hr (dry) nodules.
+Added: A hopper on each vehicle is expected to separate sediment and excess water, which is expected to pass out of the hopper overflow, from the nodules, which is planned to be pumped as a higher concentration slurry via flexible hoses to a riser.
+Added: The riser is a steel pipe through which nodules are planned to be transferred to the surface by means of an airlift.
+Added: The riser is intended to consist of three main sections.
+Added: The lower section is expected to carry the two-phase slurry of nodules and water from the collectors to the airlift injection point.
+Added: The mid-section is expected to carry a three-phase mixture of slurry and air.
+Added: This section will also include two auxiliary pipes:
+Added: one to carry the compressed air for the airlift system, and one to return water from dewatering of the slurry to its subsea discharge point.
+Added: The upper section of riser is expected to have a larger diameter to account for the expansion of air in the airlift.
+Added: The airlift is intended to work by lowering the average density of the slurry inside the riser to a level lower than seawater.
+Added: The difference between the hydrostatic pressure of the seawater at depth and the pressure caused by the weight of the low-density three-phase slurry column inside the riser is expected to force the slurry column to rise.
+Added: The energy to achieve the lift is planned to be supplied by compressors housed on the PSV, which are planned to be capable of generating very high air pressures — up to 15 MPa.
+Added: The PSVs are planned to each support a RALS and its handling equipment, and to house the airlift compressors, collector vehicle control stations, and material handling equipment.
+Added: All power for offshore equipment, including the nodule collecting vehicles, is intended to be generated on the PSVs.
+Added: The PSVs are intended to be equipped with controllable thrusters and to be capable of dynamic positioning (DP), which should allow the vessels and risers to track the collectors.
+Added: The Collector Ship 1 PSV is expected to be similar in size to an Aframax or New Panamax class of tanker, displacing approximately 103,000 t, and housing a crew of around 120 personnel.
+Added: Nodules are planned to be discharged from the RALS to the PSVs, where they are expected to be dewatered and temporarily stored or transferred directly to a transport vessel.
+Added: A separate collector support vessel is expected to remain at sea to support Collector Ship 1.
+Added: It is expected to be configured as a subsea support platform, as commonly used in the oil industry, with a displacement of around 17,250 t.
+Added: The function of the collector support vessel will be to facilitate collector maintenance and repair.
+Added: The NORI Technical Report Summary assumes that transportation of nodules will be by chartered vessels, with deadweight capacities of 35,000 to 100,000 tonnes.
+Added: The vessels are expected to require dynamic positioning capability to enable them to be loaded at sea alongside the PSV.
+Added: Hydraulic offloading of the nodules from the PSV to the transport ships is assumed in the NORI Technical Report Summary, but future studies will confirm the offloading mechanism.
+Added: The overall nodule collector efficiency is estimated at 80%.
+Added: The recovery value is based upon test work conducted in the 1970s.
+Added: Nodule recovery efficiency is the product of nodule entrainment efficiency, subsea concentrator recovery, and dewatering system efficiency.
+Added: The estimate of dewatering recovery used in the NORI Technical Report Summary is higher than indicated by the 1970s test work because data that has come to light recently suggests the amount of breakup during lifting the nodules up the RALS may be significantly less than previously assumed (Kennecott (1978), DRT (2015)).
+Added: Expected Mineral Resource modifying factors
+Added: Modifying factors
+Added: Resource area efficiency
+Added: The resource area efficiency factor is defined as the width of the collector divided by the width of the collector path.
+Added: A 0.5 m undisturbed strip is to be left either side of the collector.
+Added: For a 12 m wide collector, the resource area efficiency is calculated as 12/13.
+Added: Collector pick-up efficiency
+Added: This is the percentage of nodule mass passed over by the collector that is picked-up up by the collector head.
+Added: Collector underflow efficiency
+Added: This is the percentage of nodule mass that is picked-up up that is passed to the collector underflow.
+Added: Nodule attrition
+Added: This is the percentage of mass of nodule lost through attrition from the seafloor to trans-shipment.
+Added: It is included in the trans-shipment efficiency.
+Added: Trans-shipment efficiency
+Added: This is the percentage of nodule mass transferred from the production vessel to trans-shipment.
+Added: Overall collector efficiency
+Added: This is the percentage of nodule mass passed over by the collector that is delivered to the transport vessel.
+Added: It includes losses in the pick-up, overflow, attrition and trans-shipment (90%*95%*100%*93%).
+Added: Overall resource recovery factor
+Added: Is the product of the resource area efficiency * collector pick-up efficiency * collector under flow efficiency * (1 — nodule attrition (%)), * trans-shipment efficiency (92%*90%*95%*100%*93%).
+Added: For more information on polymetallic nodule collection methods, see Section 13 of the NORI Technical Report Summary.
+Added: Mineral processing and metallurgical testing
+Added: A combined pyro-metallurgical and hydro-metallurgical flowsheet was evaluated for the initial assessment included in the NORI Technical Report Summary.
+Added: Similar flowsheets were investigated at various times over the last several decades.
+Added: NORI has undertaken bench-scale test-work and is in the process of completing pilot-scale testing of the proposed flowsheet.
+Added: This work has confirmed or improved the flowsheet that was initially developed from extensive information available in the literature.
+Added: For Project Zero, NORI proposes to toll treat polymetallic nodules at existing RKEF smelters.
+Added: During Project One, NORI proposes the progressive construction and expansion of a new pyrometallurgical and hydrometallurgical process plant for the recovery of battery-grade nickel and cobalt sulfate powder, copper cathode and manganese silicate, from polymetallic nodules.
+Added: This is expected to allow for the proportion of toll treatment to be reduced.
+Added: Four RKEF lines and two hydrometallurgical refineries are expected to be required to meet our expected production demand.
+Added: The pyrometallurgical front-end of the plant is expected to use RKEF lines that calcine and smelt the nodules to form an alloy.
+Added: The alloy is then expected to be sulphidized to form a matte and then partially converted in a Peirce-Smith converter operation to remove iron.
+Added: The matte from the sulphidation step is planned to then be sent to the hydrometallurgical refinery.
+Added: The pyrometallurgical process is expected to be similar to that successfully used to process some nickel laterite ores.
+Added: The hydrometallurgical refinery concept is based on a sulfuric acid leach flowsheet.
+Added: A two-stage leach would be used to produce copper cathode and a pregnant leach solution rich in nickel and cobalt, while low in copper.
+Added: Further processing of the pregnant leach solution is based on mixed-sulphide precipitate processing flowsheets employing solvent extraction.
+Added: The final production of battery-grade nickel and cobalt sulfates is expected to use crystallization.
+Added: The pyrometallurgical process is expected to generate a manganese silicate stream that we believe could be sold to the manganese industry and small converter slag stream that we believe could be sold for industrial applications.
+Added: No value has been ascribed to converter slag in the NORI Technical Report Summary.
+Added: The hydrometallurgical plant is expected to produce an ammonium sulfate by-product for sale to the fertilizer industry.
+Added: Thus, together with the ability to recycle other hydrometallurgical side-streams to the pyrometallurgical process, the flowsheet is planned to have neither tailings ponds nor permanent slag repositories and should not generate substantial waste streams.
+Added: The average targeted processing rate for the new processing plant at full capacity is expected to be 6.4 Mtpa of nodules (dry basis).
+Added: The location and host country of the processing operation has not yet been determined.
+Added: Engineering design has not yet been undertaken.
+Added: Expected metallurgical recoveries are summarized in the table below.
+Added: Hydrometallurgical products before recycle
+Added: Recycled residue
+Added: Overall recovery
+Added: In addition to the above base metals, 98.9% of the manganese contained in the feed is expected to be recovered in the manganese silicate product, containing 52.6% MnO.
+Added: Approximately 7.3 Mt of manganese silicate is expected to be produced per annum (from steady state operation from 2030 onwards).
+Added: For more information on mineral processing and metallurgical testing, see Section 14 of the NORI Technical Report Summary.
+Added: Environmental studies, permitting, community, or social impact
+Added: Historically, a significant amount of technical work has been undertaken within the CCZ by the contractors under the ISA and a significant body of information has been acquired during the past 40 years on the likely environmental impacts of collecting nodules from the seafloor.
+Added: NORI’s offshore exploration campaigns have included sampling to support environmental studies, collection of high-resolution imagery and environmental baseline studies.
+Added: Environmental compaigns in 2021 resulted in completion of the offshore environmental data collection required for the ESIA baseline studies.
+Added: NORI has commenced the ESIA process in support of an application for an exploitation contract for the commercial collection of deep-sea polymetallic nodules.
+Added: A comprehensive program of metocean and biological data acquisition is largely complete, required to characterize the baseline conditions at a designated Collector Test site and control sites in the NORI Contract Area.
+Added: NORI intends to manage the project under the governance of an Environmental Management System (“EMS”), which is to be developed in accordance with the international EMS standard, ISO 14001:2004.
+Added: The EMS will provide the overall framework for the environmental management and monitoring plans that will be required.
+Added: An EMMP will be required.
+Added: The plan will specify the objectives and purpose of all monitoring requirements, the components to be monitored, frequency of monitoring, methods of monitoring, analysis required in each monitoring component, monitoring data management and reporting.
+Added: The plan will be submitted to the ISA as part of the ISA Exploitation Contract application.
+Added: This plan will involve an ecosystem approach incorporating an adaptive management system.
+Added: The social impacts of the offshore operation are expected to be positive.
+Added: The CCZ is uninhabited by people, and there are no landowners associated with the CCZ.
+Added: No significant commercial fishing is carried out in the area.
+Added: The project is expected to provide a source of revenue to our sponsor country, Nauru, and the ISA.
+Added: The onshore environmental and social impacts have not yet been assessed because the process plant has not been designed in detail, and the location and host country (and hence regulatory regime) not confirmed.
+Added: The planned metallurgical process will not generate solid waste products, and the deleterious elements (for example, cadmium and arsenic) content of the nodules is very low, indicating that with careful management the environmental impacts of the processing operation could be very low.
+Added: For more information on environmental studies, permitting and social or community impact, see Section 17 of the NORI Technical Report Summary.
+Added: Economic analysis
+Added: We have developed in-house a financial model based on estimates of future cash flows derived from extraction of nodules from the NORI Area D project.
+Added: AMC reviewed the logic, input assumptions and integrity of the calculations and forecasts.
+Added: The financial model is for NORI Area D only, which is at a preliminary level of planning and design.
+Added: We do not believe there have been any material changes to this model since AMC’s review.
+Added: For the initial assessment, the offshore cost estimates were developed based upon the guidelines of the AACE (Association for the Advancement of Cost Engineering) International Recommended Practice No.
+Added: Based on engineering studies performed previously by Deep Reach Technology (DRT) for Deep Green Resources and the experience in trial mining of deep-sea nodules by DRT personnel, the cost estimate was considered to be a class 4.
+Added: Offshore capital costs were estimated to accuracy levels of -30% +40%.
+Added: Onshore capital costs were estimated according to an AACE Class 5 level of accuracy (–35% +50%).
+Added: A contingency of 25% was applied to the offshore and onshore capital cost estimates.
+Added: The collection plan considered in the NORI Technical Report Summary contemplates a 23-year production period.
+Added: The expected production period is within the expected duration of a NORI Area D ISA Exploitation Contract which would be thirty (30) years (with possible extensions by periods of ten (10) years) as outlined in the current draft of the regulations for exploitation of mineral resources in the CCZ (ISBA/25/C/WP.1).
+Added: After the initial 23-year period, substantial resources will remain in the other NORI Areas that could support future collection (combined inferred mineral resource in NORI Areas A, B and C of 510 Mt (wet) at 1.28% Ni, 0.21% Co, 1.04% Cu, 28.3% Mn, at an average abundance of 11 kg (wet)/m 2 ).
+Added: The proposed project schedule is shown in the Gantt chart in Figure 19.1 of the NORI Technical Report Summary.
+Added: In Project Zero, NORI expects to toll treat the nodules in third-party pyrometallurgical plants and sell the RKEF products into the alloy market.
+Added: This will be expected to generate revenue while the pyrometallurgical and hydrometallurgical facilities are planned to be built.
+Added: In Project One, NORI expects to stage the construction of its multiple pyrometallurgical and hydrometallurgical lines to flatten out capital expenditure requirements.
+Added: Nodule production is expected to be directed preferentially to the NORI pyrometallurgical plants as this is expected to be the lowest operating cost option.
+Added: Whenever these facilities are at maximum capacity (particularly during the ramp-up phase), the surplus nodules are expected to be sent for toll treatment.
+Added: NORI expects that it will ensure that its own hydrometallurgical refineries are filled up to maximum capacity, as this is expected to produce the highest value products.
+Added: Whenever its own hydrometallurgical refineries are at full capacity, NORI expects to sell the surplus product from its pyrometallurgical plant directly to the matte market.
+Added: While the matte is not as valuable as the refined products from the hydrometallurgical plant (nickel sulfate, cobalt sulfate, and copper cathode), it still provides a consistent revenue stream and assists for periods when the refineries are at full capacity.
+Added: Some of the alloy production from toll treatment of NORI nodules are expected to be shipped to the NORI hydrometallurgical plants to make use of spare capacity.
+Added: This will require the alloy from the third-party RKEF to be sulphidized prior to hydrometallurgical treatment.
+Added: Based on preliminary discussions with potential buyers, NORI believes that there is sufficient demand for the alloy and matte over the life of the project.
+Added: The analysis was performed on a 100% ownership basis and excludes consideration of financing costs and forward metal sales.
+Added: The analysis assumes the economic parameters listed in the table below.
+Added: Assumed Economic Inputs
+Added: Hydrometallurgical plant Ni recovery
+Added: Hydrometallurgical plant Cu recovery
+Added: Hydrometallurgical plant Co recovery
+Added: Pyrometallurgical plant Ni recovery
+Added: Pyrometallurgical plant Cu recovery
+Added: Pyrometallurgical plant Co recovery
+Added: Mn silicate grade
+Added: Cu cathode grade
+Added: Payability of Cu content in cathode
+Added: Nodule moisture content
+Added: Onshore tax rate
+Added: % of taxable income
+Added: Average offshore tax (to ISA)
+Added: % of taxable income
+Added: Commodity Prices
+Added: Project revenues will come from the following sources:
+Added: ● a nickel sulfate product;
+Added: ● a copper cathode product;
+Added: ● a cobalt sulfate product;
+Added: ● a manganese silicate product;
+Added: ● an ammonium sulfate product;
+Added: ● a nickel alloy product containing copper and cobalt;
+Added: ● a matte product from the NORI pyrometallurgical plants containing nickel, copper and cobalt, which would be sold to the matte market.
+Added: NORI has used the following payable percentages for the alloy:
+Added: 80% of in-situ value in the alloy;
+Added: 40% of in-situ value in the alloy;
+Added: 80% of in-situ value in the alloy.
+Added: The following estimates for treatment charges and refining charges for the alloy product were used in the NORI financial model:
+Added: ● a refining charge of $1,697/tonne of contained nickel in the alloy;
+Added: ● a refining charge of $800/tonne of contained nickel in the alloy;
+Added: ● a refining charge of $6,700/tonne of contained nickel in the alloy;
+Added: ● a treatment charge $300/tonne of alloy.
+Added: For the matte product, NORI has used a payables figure of 83% of the market metal price of nickel, copper and cobalt.
+Added: The metal recoveries for the matte and alloy are those from the pyrometallurgical plant, whilst the refined products (nickel sulfate, copper cathode and cobalt sulfate) are from the hydrometallurgical refinery metal recoveries.
+Added: The prices forecast by CRU and adopted for use in the economic analysis were derived from a report prepared by CRU dated October 23, 2020 and are listed in the table below.
+Added: The Qualified Person considered the metal price assumptions underpinning the analysis to be reasonable.
+Added: Commodity prices
+Added: Ni metal, LME cash (/t)
+Added: Ni Sulfate (/t)
+Added: SiMn, China import, 44% Mn (/dmtu)
+Added: Cu, Grade A cathode – LME cash (/t)
+Added: Co, EU Co 99.8% min (EXW) (/t)
+Added: Co Sulfate premium over Co metal (ex-China) (/t)
+Added: Production schedule
+Added: The production schedule on which the economic analysis is based was developed on an annual basis.
+Added: The Qualified Person cautioned that a prefeasibility study has not been undertaken and that the seafloor production schedule is preliminary in nature and should not be interpreted as a mineral reserve.
+Added: Approximately 96% of the mineral resource within NORI Area D is classified as indicated and a further 1% is classified as measured resource.
+Added: The life of mine (“LOM”) production sequence includes 6 Mt (wet) of nodules that are classified as inferred mineral resources.
+Added: This is approximately 2% of the total LOM production.
+Added: The production schedule assumes staged operation initially of the Hidden Gem , then Drill Ship 2 and finally Collector Vessel 1, as outlined in Section 16.1 of the NORI Technical Report Summary.
+Added: The nodule metal grades and nodule abundance varying annually according to the LOM schedule.
+Added: The grades and nodule abundance for the mine plan were derived from a preliminary production schedule developed by AMC as outlined in Section 16.7 of the NORI Technical Report Summary.
+Added: The higher abundance areas were targeted by the production schedule.
+Added: The metal grades and abundance used in the schedule (the “IA”) are compared to the averages (of all mineral resource categories) for NORI Area D in the table below.
+Added: Comparison of IA mine plan to Mineral Resource for NORI Area D
+Added: (all categories)
+Added: Tonnage (Mt wet)
+Added: Nodule abundance (kg/m 2 )
+Added: The production ramp-up discussed in Section 17 of the NORI Technical Report Summary was adopted for the production schedule.
+Added: The Qualified Person considered the assumptions underpinning the initial assessment and economic analysis to be reasonable.
+Added: Capital and operating costs
+Added: The capital cost estimates for the Project are summarized below.
+Added: Pre-project items include data gathering and studies that will occur prior to construction.
+Added: Offshore project costs include the procurement and integration of the PSVs, the collector support vessel, the fabrication of the collectors, and the RALS.
+Added: Onshore project costs consist principally of the construction of the minerals processing pyrometallurgical plant and hydrometallurgical refinery.
+Added: Sustaining costs are for both onshore and offshore assets, and closure costs are principally for rehabilitation of the onshore minerals processing site.
+Added: Cost estimate
+Added: Pre-project costs
+Added: Project costs
+Added: Offshore project costs
+Added: Onshore project costs
+Added: Total project costs
+Added: Sustaining capital costs (onshore and offshore)
+Added: Closure costs
+Added: Operating costs have been estimated at $1.8 billion per annum during steady state production (from 2030 onwards).
+Added: Expenditures of a total of $37.5 billion over the life of the project on operating costs is expected.
+Added: Onshore processing is the most significant operating cost.
+Added: Average operating cost estimates during steady state operation (from 2030 onwards)
+Added: Operating Cost
+Added: Cost (/t – wet
+Added: Cost (/t – dry
+Added: tonne nodules
+Added: ($ million pa)
+Added: For more information on capital and operating costs, see Section 18 of the NORI Technical Report Summary.
+Added: Cash flows analysis
+Added: The economic analysis set forth in Section 19 of the NORI Technical Report Summary presents a post-tax, real (uninflated) cash flows analysis.
+Added: The valuation date is January 1, 2021 and we do not believe there have been any material changes to the assumptions used in this valuation through the end of December 2021.
+Added: The analysis was performed on a 100% ownership basis and excludes consideration of financing costs and forward metal sales.
+Added: The initial assessment indicates a positive economic outcome.
+Added: Undiscounted post-tax net cash flows of $30.6 billion is expected.
+Added: An internal rate of return of 27% has been estimated from the financial model.
+Added: Discounted cash flow analysis of unleveraged real cash flows, discounting at 9% per annum, indicates a pre-tax project net present value (NPV) of $11.2 billion and a post-tax project NPV of $6.8 billion, which includes the LOM production of polymetallic nodules that are presently classified as inferred mineral resources, representing approximately 2% of the total LOM production.
+Added: Excluding the inferred mineral resources from the economic analysis, the post-tax project NPV is estimated at $6.7 billion, which is not a significant difference from the economic analysis that includes the inferred mineral resources.
+Added: The project reaches its lowest cumulative undiscounted cash flow figure of $4.0 billion in 2026.
+Added: Undiscounted payback period is 6.6 years after commencement of production.
+Added: The total cash flows are summarized below:
+Added: Cash flow item
+Added: Ammonium sulfate revenue
+Added: Total revenue
+Added: Pre-project capital
+Added: Offshore construction
+Added: Onshore construction
+Added: Offshore sustaining capital
+Added: Onshore sustaining capital
+Added: Closure costs
+Added: Total capital
+Added: Offshore operating costs
+Added: Shipping costs
+Added: Onshore operating costs
+Added: Corporate costs
+Added: Total operating costs
+Added: Taxes and royalties
+Added: Net undiscounted cash flow
+Added: Project revenues are expected to come from the following sources:
+Added: (a) a nickel sulfate product;
+Added: (b) a copper cathode product;
+Added: (c) a cobalt sulfate product;
+Added: (d) a manganese silicate product;
+Added: (e) an ammonium sulfate product;
+Added: (f) a nickel alloy product containing copper and cobalt;
+Added: and (g) a matte product from the NORI pyrometallurgical plants containing nickel, copper and cobalt which would be sold to the matte market.
+Added: The discounted cash flows and progressive NPVs are shown below:
+Added: The date of the investment decision is expected to be on or around June 30, 2023.
+Added: The analysis assumes NORI spending of $237 million on pre-project activities between 2021 (which were progressed in 2021) and 2024.
+Added: The future value of the project on June 30, 2023 (after the pre-project expenditure is sunk and time has elapsed) is expected to be $8.6 billion and the initial rate of return from that point is expected to be 29%.
+Added: The sensitivity of project economics to changes in the main variables was tested by selecting high and low values that represent a likely range of potential operating conditions.
+Added: The variables with the biggest negative impact on NPV are all metal prices, total OPEX, collector speed, nickel sulfate price and development capex.
+Added: In general, revenue drivers have the biggest impact, followed by OPEX variables and then CAPEX variables.
+Added: Tornado diagram of NPV sensitivity to variables
+Added: The initial assessment is preliminary in nature, and further planning, engineering studies, design, cost estimation and seafloor tests are required before mineral resources can be converted to mineral reserves.
+Added: There is no certainty that the proposals and results presented in the initial assessment will be realized.
+Added: A prefeasibility study has not yet been undertaken.
+Added: Mineral resources are not mineral reserves and do not have demonstrated economic viability.
+Added: The initial assessment included in the NORI Technical Report Summary indicates that the NORI Area mineral resource is potentially economic.
+Added: The Qualified Person recommended that further data gathering, analysis, design and cost estimation be undertaken to advance the project.
+Added: Internal controls and data verification
+Added: The original assay sheets for the individual samples collected by the pioneer investors from within the NORI Area are not available for auditing against the values in the database.
+Added: We, AMC and NORI have not had access to the original assay sheets for the individual samples that are within the CCZ, and the quality control procedures used by the laboratories and the ISA.
+Added: However, the consistency between the abundance and grade data collected by the pioneer investors, as presented in Section 9.1 of the NORI Technical Report Summary, supports the contention that the quality of the pioneer investor data is satisfactory.
+Added: It is also reasonable to infer that the pioneer investor data are of sufficient quality for resource estimation because the ISA is an independent agency with significant accountability under the UNCLOS.
+Added: Part of its mandate is the receipt and storage of seafloor sampling data suitable for the estimation of nodule resources and the legally binding award of licenses.
+Added: It is reasonable to assume that a reasonable level of care was applied by the ISA.
+Added: Data collected by NORI is well-documented and was subject to satisfactory quality assurance/quality control processes.
+Added: Documentation verified by the Qualified Person includes photographs, daily exploration reports, digital logging sheets and original assay reports.
+Added: In the opinion of the Qualified Person, the NORI data was of high quality and suitable for estimation of measured mineral resources.
+Added: Assaying of nodules collected by NORI in 2012, 2013, 2018, and 2019 confirm the mean grades of the historical grab samples and support the contention that the quality of the pioneer investor data is satisfactory for inclusion in resource estimation.
+Added: The main limitation with the pioneer investor data is the likelihood that some of the abundance values were too low, due to loss of nodules from the FFG.
+Added: Estimates of abundance that include pioneer investor data are therefore likely to be conservative.
+Added: For more information about quality control/quality assurance and data verification, see Section 8 and Section 9 of the NORI Technical Report Summary.
+Added: TOML Contract Area
+Added: The information that follows relating to the TOML Contract Area of the CCZ is derived, for the most part, from, and in some instances is an extract from, the TOML Technical Report Summary prepared in compliance with the SEC Mining Rules.
+Added: Portions of the following information are based on assumptions, qualifications and procedures which are not fully described herein.
+Added: Reference should be made to the full text of the TOML Technical Report Summary, which has been filed as exhibit 96.2 to this Annual Report on Form 10-K.
+Added: In the event that we determine that any of modifying factors, estimates and other scientific and technical information in the report materially change, we may update or file a new technical report in the future.
+Added: The TOML Contract Area is an exploration stage property.
+Added: Location of the TOML Contract Area and access
+Added: The TOML Area is located within the CCZ of the northeast Pacific Ocean.
+Added: The CCZ is located in international waters between Hawaii and Mexico.
+Added: The western-end of the CCZ is approximately 1,000 km south of the Hawaiian island group.
+Added: From here, the CCZ extends over 4,500 km east-northeast, in an approximately 600 km wide trend, with the eastern limits approximately 2,000 km west of southern Mexico.
+Added: The region is well-located to ship nodules to the American continent or across the Pacific to Asian markets.
+Added: The TOML Contract Area comprises six separate blocks (A through F) in the CCZ with a combined area of 74,713 km 2 .
+Added: TOML Contract Area extents
+Added: DD — Decimal degrees, UTM — Universal Transverse Mercator map projection
+Added: The CCZ lies between Hawaii and Mexico and is accessible by ship from various ports in the United States and South America.
+Added: As the CCZ deposit does not include any habitable land and is not near coastal waters, there is no requirement to negotiate access rights from landowners for seafloor collection operations.
+Added: All personnel and material will be transported to the project area by ship.
+Added: See Section 3 of the TOML Technical Report Summary for further specific information of the location of the TOML Contract Area.
+Added: Tenements and permits
+Added: See Business-Government Regulations-The TOML Exploration Contract, Business-Government Regulations-The TOML Sponsorship Agreement and Business-Government Regulations- International Seabed Authority above for information related to tenements and permits in the TOML Contract Area
+Added: TOML obligations and sponsorship
+Added: See Business-Government Regulations-The TOML Exploration Contract, Business-Government Regulations-The TOML Sponsorship Agreement above for information related to this agreement in the TOML Contract Area.
+Added: Royalties and taxes
+Added: See Business-Government Regulations-Royalties and taxes above for information with respect to our obligations for royalties and taxes in the TOML Contract Area.
+Added: History of previous exploration activities in the TOML Area
+Added: Prior to the implementation of UNCLOS, many offshore exploration campaigns were completed by international organizations and consortia.
+Added: A number of at-sea trial collection operations were successfully carried out in the CCZ in the 1970s to test potential collection concepts.
+Added: These system tests evaluated the performance of a self-propelled and several towed collection and collection devices, along with submersible pumps and airlift technology for lifting the nodules from the deep ocean floor to the support vessel.
+Added: Certain pioneer investors include those entities that carried out substantial exploration in the CCZ prior to the entry into force of UNCLOS, as well as those entities that inherited such exploration data.
+Added: Exploration and development efforts in the CCZ started in the 1960s by state sponsored groups from Russia, France, Japan, Eastern Europe, China, Korea and Germany.
+Added: Several commercial consortia also explored between the 1960s and the 1980s and in some instances their descendants are still involved to the present day.
+Added: No commercial collection operations have yet been established in the CCZ.
+Added: However, a variety of collectors, pick-up systems, and metallurgical processing flow sheets were tested, and several integrated “demonstration scale” systems operated in the CCZ for several months in the late 1970s.
+Added: Processing test-work has encompassed a variety of hydrometallurgical and pyrometallurgical flow sheets, usually with good results.
+Added: Six exploration groups are known to have surveyed areas within the TOML Contract Area and collected samples of polymetallic nodules.
+Added: Much of this work overlapped as it predated the signing of the Law of the Sea.
+Added: These include the Japanese group (DORD), the South Korean group (KORDI), the Russian Federation group (Yuzhmorgeologiya), the French group (Ifremer), the German group (FIGNR or BGR), and the consortium, Ocean Minerals Company (OMCO).
+Added: The timing and location (ISA, 2003) of the OMCO sampling is known but the results are not available outside of ISA published contour maps.
+Added: Virtually all the samples in the TOML tenement area were obtained by FFG samplers, although a few results from box corers (BC) were also included.
+Added: See Section 5 of the TOML Technical Report Summary for further specific information of the history of previous exploration of the TOML Contract Area.
+Added: Geology and sampling
+Added: Seafloor polymetallic nodules occur in all oceans but the CCZ hosts a relatively high abundance of nodules.
+Added: The CCZ seafloor forms part of the Abyssal Plains, which are the largest physiographic province on Earth.
+Added: This mineral field is essentially a single mineral deposit almost 5,000 km in length and up to 600 km wide.
+Added: The size and level of uniformity of mineralization is unmatched by any mineral deposit of similar value on land.
+Added: The mechanism of formation of the nodules is interpreted to be essentially identical across the
+Added: entire CCZ, with only minor local variations.
+Added: Consequently, there is relatively little difference between the size, shape or metal content of the nodules from one area to another.
+Added: Figure 6.9 to Figure 6.11 of the TOML Technical Report Summary illustrate the remarkable continuity of grades and abundances across the whole of the CCZ.
+Added: The morphological features of the seafloor are similar in the TOML and the NORI Areas, which all lie within the Abyssal Plains and are characterized by sub-parallel basaltic lava ridges called abyssal hills.
+Added: The Areas are punctuated by typically extinct volcanic knolls and seamounts and scattered sediment drifts in which few nodules are preserved at the seafloor.
+Added: Seafloor polymetallic nodules rest on the seafloor at the seawater — sediment interface.
+Added: Such nodules are composed of nuclei and concentric layers of manganese and iron hydroxides and are formed by precipitation of metals from the surrounding seawater and sediment pore waters.
+Added: Nickel, cobalt and copper are also precipitated and occur within the structure of the manganese and iron minerals.
+Added: The specific conditions of the CCZ (water depth, latitude, and seafloor sediment type) are considered to be the key controls for the formation of polymetallic nodules.
+Added: Nodules are typically 4 to 6 cm and up to 10 cm in diameter.
+Added: The exploration methods used to explore and delineate the mineral resources in the TOML and NORI areas were essentially the same.
+Added: Multibeam echo-sounding system (MBES) was used to determine the depth of water (bathymetry) and the acoustic reflectance (backscatter) of the seabed.
+Added: Nodule coverage was interpreted using the backscatter data.
+Added: Physical sampling of the nodules was carried out initially using FFG samplers and in more recent years by BC samplers which provide a better-quality sample.
+Added: Measurements of nodule abundance obtained from physical samples were supplemented with estimates of abundance made using the long-axis estimation (“LAE”) method and high-resolution photographs of the seafloor.
+Added: Data collected by TOML in 2013 and 2015 supports the historical data but also is of sufficient quantity and quality to allow estimation of an indicated mineral resource for five sub areas within TOML Areas B, C, D and F called B1, C1, D1, D2 and F1.
+Added: More detailed data collected by TOML has also allowed estimation of a measured mineral resource for a single sub area within TOML Area B.
+Added: The key data sets behind the inferred mineral resource estimate for TOML Areas A through E are surface samples obtained by free fall grab samplers, although a few results from box-corers were also included.
+Added: Free fall grab samplers are the standard sampling method as they are the most productive tool available.
+Added: They are believed to underestimate the actual abundance, as smaller nodules may escape some grabs during ascent and larger nodules around the edge of the sampler may be knocked or fall out during the sampling process.
+Added: This may introduce some conservatism to the inferred mineral resource estimates.
+Added: The key data behind the inferred mineral resource estimate for TOML Area F and the indicated and measured mineral resources are box-corers and measured photographs.
+Added: Box-corers take longer to collect than free fall grab samplers, but they are believed to have less bias.
+Added: Photos cover a much greater area than either free fall grabs or box-corers.
+Added: The weight of individual nodules can be accurately estimated from the length of their long or major axis;
+Added: a relationship first discovered in the 1970s.
+Added: Using the box-core samples as calibration devices, TOML was able to measure the size of nodules on several hundred photographs in Areas B and C.
+Added: Abundance is shown to be related both to nodule coverage in photos and to acoustic response (backscatter) from regional survey.
+Added: These data thus provide very detailed indications of nodule abundance and continuity.
+Added: Many of the records of the sampling procedures used by the pioneer contractors were not available to the Qualified Persons, but it is likely that all of the pioneer contractors followed similar procedures to that used by TOML.
+Added: Nodule abundance (wet kg/m 2 ) was derived by dividing the weight of recovered nodules by the surface area covered by the open jaws of the sampler or corer (typically 0.25 to 0.75 m 2 ).
+Added: A split of the nodules was dried, crushed and ground to enable grade determination via standard analytical methods (typically atomic absorption spectrometry, X-ray fluorescence or inductively coupled plasma methods), either on the vessel or back on shore.
+Added: Specific nodule chemical standards were used for instrument calibration.
+Added: TOML also present the results of field, submitted and laboratory duplicates of nodule samples.
+Added: Analysis of the data revealed that, as a consequence of their origin, nodule grades vary only slightly across the CCZ, with spatial continuity of the abundance, Mn, Ni, Co, and Cu grades often ranging from the order of several kilometers up to several tens of kilometers.
+Added: Nodule abundance is sometimes less continuous than grade, as it is also subject to local changes in net sedimentation (a consequence of seafloor slope, slumping, erosion and local currents).
+Added: For more information about the TOML exploration campaigns in 2013 and 2015, see Section 7 of the TOML Technical Report Summary.
+Added: Mineral resource estimate
+Added: The mineral resource was classified on the basis of the quality and uncertainty of the sample data and sample spacing, in accordance with the definitions of “inferred mineral resource,” “indicated mineral resource” and “measured mineral resource” under the SEC Mining Rules.
+Added: Estimation of tonnage and grade for the TOML Contract Area within the CCZ was undertaken using only sample data within the TOML Contract Area in the second quarter of 2016.
+Added: The estimates are based on the historical box-core and free fall-grab nodule sampling (262 samples) supplemented with recently acquired TOML nodule box core (113 samples) and photo-profile data (20,857 frames over 587 line km).
+Added: Only sample data within the TOML Contract Area was used to inform the estimates.
+Added: Six block models were constructed using the geostatistical modelling programs Gstat 1.1-3 and R 3.2.5, one for each TOML Exploration Area (A to F), in three passes.
+Added: The first pass used a parent block dimension of 1.75 km by 1.75 km and filled the areas defined as measured mineral resource.
+Added: The second pass for indicated mineral resource used a parent block size of 3.5 km by 3.5 km while the third pass for inferred mineral resource used a parent block size of 7.0 km by 7.0 km.
+Added: The modelling methodology used for estimating the mineral resource was determined through careful consideration of the scale of deposit, mechanism of nodule formation, geological controls and nature of the sampling method.
+Added: The approach involved estimating nodule abundance and grades into a two-dimensional block model with abundance used for calculating tonnage.
+Added: Abundance and grades were estimated using Ordinary Kriging (OK) with comparison (not reported) estimates using Inverse Distance Weighting (IDW) and nearest neighbor.
+Added: The modelling methodology is similar to the method applied by the ISA (2010) for its global estimate which was produced by a multi-disciplinary effort that involved recognized subject matter experts.
+Added: The historical nodule sample data is considered suitable for the purpose of estimating mineral resources to an inferred level of confidence.
+Added: The Qualified Person also considered that the combination of the TOML and historical nodule sample data (physical samples and photo based long axis estimates) combined with detailed backscatter, photo profiling and geological interpretation is sufficient to estimate polymetallic nodule indicated mineral resources and, in one small especially data rich area, measured mineral resources.
+Added: Inferred mineral resource classification was based on sampling by pioneer contractors on a nominal spacing of 20 km, the variation and uncertainty in the sample quality, and the likely presence of short-range variation to nodule abundance.
+Added: Indicated mineral resource classification was based on box core sampling by TOML on a nominal spacing of approximately 7 km by 7 km (including photo profiling in some cases at 7 km by 3 km), supplemented by sampling by pioneer contractors.
+Added: Measured mineral resource was based on box core sampling by TOML on a nominal spacing of approximately 7 km by 7 km plus photo-profiling on a nominal spacing of 3.5 km by 3.0 km, supplemented by sampling by pioneer contractors.
+Added: The mineral resource estimate for the TOML Contract Area, at a 4 kg/m 2 abundance cut-off, is set forth below.
+Added: The estimated mineral resources were determined in 2021, as of December 31, 2020, and also reflect the estimated mineral resources as of December 31, 2021 as none of the mineral resources in these areas were depleted by mining or any other activities.
+Added: Mineral Resource Estimate December 31, 2021 and December 31, 2020, In-Situ, for the TOML Contract Area within the CCZ at a 4 kg/m 2 nodule abundance cut-off
+Added: Mineral Resource Classification
+Added: (x10 6 wet t)*
+Added: (wet kg/m 2 )
+Added: Measured + Indicated
+Added: Tonnes are quoted on a wet basis and grades are quoted on a dry basis, which is common practice for bulk commodities.
+Added: Moisture content was estimated to be 28% w/w.
+Added: These estimates are presented on an undiluted basis without adjustment for resource recovery.
+Added: * Variations in totals are due to rounding of individual values.
+Added: Mn, Ni, Cu and Co assays on samples dried at 105˚C
+Added: The TOML Contract Area has sufficient samples of adequate quality to define a mineral resource for Mn, Ni, Cu and Co.
+Added: The estimate of abundance and hence tonnage for the inferred mineral resource for the TOML Contract Area may be biased low due to reliance on free fall grab samples in places.
+Added: The above mineral resource estimate (measured, indicated and inferred mineral resources), which was informed by data collected by TOML in 2013 and 2015, is presented in Table 11.9 of the TOML Technical Report Summary.
+Added: Due to the extremely low variance in the grades and the high metal content of the nodules, a cut-off based on abundance is appropriate for determining the limits of economic exploitation.
+Added: A cut-off of 4 kg/m 2 abundance was chosen for the TOML Contract Area, based on the estimates of costs and revenues presented in the initial assessment contained in the NORI Technical Report Summary, generalized as follows:
+Added: 1.7 Mt minimum annual tonnage mined;
+Added: $0.25 Million/km 2 for offshore operating costs;
+Added: 1,036 km 2 collected area processed;
+Added: $95/dry tonne for transport costs;
+Added: $119/dry tonne for processing costs;
+Added: $15/dry tonne for corporate, general and administrative costs;
+Added: $33/dry tonne for ISA and state royalties;
+Added: 95% recovery of nickel at an assumed price of nickel metal $16,472/t;
+Added: 86% recovery of copper at an assumed price of $6,872/t copper metal;
+Added: 77% recovery of cobalt at an assumed price of $46,333/t cobalt metal;
+Added: and 99% recovery of manganese at an assumed price of $4.50/dmtu manganese in manganese silicate.
+Added: The metal prices assumed in the calculation of the cut-off were:
+Added: nickel metal $16,472/t;
+Added: nickel in nickel sulfate $18,807/t Ni;
+Added: copper metal $6,872/t;
+Added: cobalt metal $46,333/t;
+Added: cobalt in cobalt sulfate $56,920/t Co;
+Added: manganese in manganese silicate $4.50/dmtu.
+Added: The price estimates are long term (2034 – 2046) forecasts provided in a report by CRU International Limited (CRU, 2020).
+Added: The Qualified Person considered that this timeframe is reasonable in view of the likely time required to bring the majority of the TOML mineral resources into production.
+Added: The initial inferred mineral resource for the TOML Contract Area was reported on March 20, 2013 by Golder Associates.
+Added: The changes in the above mineral resource estimate from 2013 for the TOML Contract Area are due to:
+Added: ● the inclusion of Areas E and F for the first time, and high abundances and grades in Area F;
+Added: ● additional nodule abundance sample information (from box core and photo profile) collected during the 2015 campaign;
+Added: ● setting the abundance estimates within the no nodule domain to zero in areas covered by MBES (TOML Areas B, C, D, E, F);
+Added: ● the use of ordinary kriging (rather than inverse distance weighting) supported by short-range variogram to estimate abundance;
+Added: ● changes in block model parent cell size related to improved sample spacing.
+Added: Comparison of the 2013 inferred mineral resource estimate and the above estimate shows that the additional data has increased the total mineral resource tonnage by 3%.
+Added: In the areas with the newest data (the indicated and measured areas), abundance and grades are all higher in the new model than the 2013 model.
+Added: These changes show that it is reasonable to expect that the majority of inferred mineral resources could be upgraded to indicated or measured resources with further exploration.
+Added: Information concerning our mineral properties in the TOML Technical Report Summary and in this Annual Report on Form 10-K includes information that has been prepared in accordance with the requirements of the SEC Mining Rules set forth in subpart 1300 of Regulation S-K.
+Added: Under SEC standards, mineralization, such as mineral resources, may not be classified as a “reserve” unless the determination has been made that the mineralization could be economically and legally produced or extracted at the time of the reserve determination.
+Added: As used in this Annual Report on Form 10-K, the terms “mineral resource,” “measured mineral resource,” “indicated mineral resource” and “inferred mineral resource” are defined and used in accordance with the SEC Mining Rules set forth in subpart 1300 of Regulation S-K.
+Added: You are specifically cautioned not to assume that any part or all of the mineral deposits in these categories will ever be converted into mineral reserves, as defined by the SEC.
+Added: You are cautioned that mineral resources do not have demonstrated economic value.
+Added: Inferred mineral resources have a high degree of uncertainty as to their existence as to whether they can be economically or legally mined.
+Added: Under the SEC Mining Rules, estimates of inferred mineral resources may not form the basis of an economic analysis.
+Added: It cannot be assumed that all or any part of an inferred mineral resource will ever be upgraded to a higher category.
+Added: A significant amount of exploration must be completed in order to determine whether an inferred mineral resource may be upgraded to a higher category.
+Added: Therefore, you are cautioned not to assume that all or any part of an inferred mineral resource exists, that it can be economically or legally mined, or that it will ever be upgraded to a higher category.
+Added: Likewise, you are cautioned not to assume that all or any part of measured or indicated mineral resources will ever be upgraded to mineral reserves.
+Added: Reasonable prospects for economic extraction
+Added: The morphological features of the seafloor are similar in the TOML and the NORI Areas, which all lie within the Abyssal Plains and are characterized by sub-parallel basaltic lava ridges called abyssal hills.
+Added: The Areas are punctuated by typically extinct volcanic knolls and seamounts and scattered sediment drifts in which few nodules are preserved at the seafloor.
+Added: The exploration methods used to explore and delineate the mineral resources in the TOML and NORI areas were essentially the same.
+Added: MBES was used to determine the depth of water (bathymetry) and the acoustic reflectance (backscatter) of the seabed.
+Added: Nodule coverage was interpreted using the backscatter data.
+Added: Physical sampling of the nodules was carried out initially using FFG samplers and in more recent years by BC samplers which provide a better- quality sample.
+Added: Measurements of nodule abundance obtained from physical samples were supplemented with estimates of abundance made using the LAE method and high- resolution photographs of the seafloor.
+Added: The sample preparation and assaying procedures used in the TOML and NORI Areas were essentially the same.
+Added: The pioneer investor data lacks some supporting information but all studies to date indicate that the pioneer investor data is reliable.
+Added: In both Areas, high standards of quality assurance/quality control were applied to the exploration programs that were carried out by TOML and NORI.
+Added: The assay data are supported by the results of certified reference materials, duplicate samples, blank samples, and duplicate analyses at a second laboratory.
+Added: Sample security was of a high standard and the Qualified Persons considered that there was negligible risk of interference with the samples.
+Added: The development plan for commercial development of polymetallic nodule deposits in the CCZ were studied as described in the NORI Technical Report Summary.
+Added: The commonality between the polymetallic nodule deposits in NORI Area D and the TOML Contract Area indicates that the methods proposed for the development of NORI Area D can reasonably be assumed to be equally relevant for future development in the TOML Contract Area.
+Added: Collection methods
+Added: Recovery and collection methods that could be employed for commercial development of polymetallic nodule deposits in the CCZ were studied as described in the NORI Technical Report Summary.
+Added: The commonality between the polymetallic nodule deposits in NORI Area D and the TOML Contract Area indicates that the methods proposed for the development of NORI Area D can reasonably be assumed to be equally relevant for future development in the TOML Contract Area.
+Added: This is discussed further in Section 11.9.4 of the TOML Technical Report Summary, which assessed the collection methods.
+Added: The main items of offshore infrastructure are the nodule collector vehicles, the riser, and three production support vessels (PSV).
+Added: The nodules are expected to be collected from the seafloor by self-propelled, tracked, collector vehicles.
+Added: No rock cutting, digging, drill-and-blast, or other breakage will be required at the point of collection.
+Added: The collectors are expected to be remotely controlled and supplied with electric power via umbilical cables from the PSV.
+Added: Suction dredge heads on each collector are expected to recover a dilute slurry of nodules, sediment, and water from the seafloor.
+Added: A hopper on each vehicle is expected to separate sediment and excess water, which is expected to pass out of the hopper overflow, from the nodules, which is expected to be pumped as a higher concentration slurry via flexible hoses to a riser.
+Added: The riser is a steel pipe through which nodules are expected to be transferred to the surface by means of an airlift.
+Added: The riser is expected to consist of three main sections.
+Added: The lower section is expected to carry the two-phase slurry of nodules and water from the collectors to the airlift injection point.
+Added: The mid-section is expected to carry a three-phase mixture of slurry and air.
+Added: This section is expected to also include two auxiliary pipes:
+Added: one to carry the compressed air for the airlift system, and one to return water from
+Added: dewatering of the slurry to its subsea discharge point.
+Added: The upper section of riser is expected to have a larger diameter to account for the expansion of air in the airlift.
+Added: The airlift works by lowering the average density of the slurry inside the riser to a level lower than seawater.
+Added: The difference between the hydrostatic pressure of the seawater at depth and the pressure caused by the weight of the low-density three-phase slurry column inside the riser forces the slurry column to rise.
+Added: The energy to achieve the lift is expected to be supplied by compressors housed on the PSV, which is expected to be capable of generating very high air pressures.
+Added: The PSVs are expected to each support a RALS and its handling equipment, and are expected to house the airlift compressors, collector vehicle control stations, and material handling equipment.
+Added: All power for offshore equipment, including the nodule collecting vehicles, is expected to be generated on the PSVs.
+Added: The PSVs are expected to be equipped with controllable thrusters and are expected to be capable of dynamic positioning (DP), which are expected to allow the vessels and risers to track the collectors.
+Added: Nodules are expected to be discharged from the RALS to the PSVs, where they are expected to be dewatered and temporarily stored or transferred directly to a transport vessel.
+Added: A preliminary assessment of the transportation fleet for transfer of nodules from the CCZ to an existing deep-water industrial port equipped with bulk offloading facilities was examined.
+Added: The TOML Technical Report Summary assumed that chartered vessels with 35,000 to 100,000 tonne deadweight capacities would be used to transport the dewatered nodules to the port of Lazaro Cardenas, Michoacan, Mexico, 960 nm from the NORI Area D reference site.
+Added: The vessels are expected to be converted bulk mineral carriers with dynamic positioning (DP) to allow tracking behind the production support vessels during operations.
+Added: The method of offloading, known as tandem offloading, is well established for offloading of oil production vessels in remote areas of the world.
+Added: Mineral processing and metallurgical testing
+Added: The polymetallic nodules in the TOML and NORI Areas have similar morphological, mineralogical, and grade characteristics.
+Added: As noted in Section 10 of the TOML Technical Report Summary, all published historical work indicates that processing of nodules is technically feasible.
+Added: The commonality between the polymetallic nodule deposits in NORI Area D and TOML Contract Area indicates that the methods proposed for the development of NORI Area D can reasonably be assumed to be equally relevant for future development in the TOML Contract Area.
+Added: This is discussed further in Section 11.9.5 of the TOML Technical Report Summary, which assessed the following mineral processing scenario.
+Added: The first part of the pyrometallurgical process is the RKEF process that is widely used in the nickel laterite industry.
+Added: The second pyrometallurgical step (sulphidization of the alloy produced in the first step to form a matte and then partially conversion in a Peirce-Smith converter to remove iron), while not widely practiced, also has commercial precedent at the Doniambo plant of Societe Le Nickel in New Caledonia.
+Added: Sulfuric acid leaching of matte from the pyrometallurgical process has precedent in the platinum group minerals (PGM) industry.
+Added: Although copper producers typically have a solvent extraction step before electrowinning of their copper, direct copper electrowinning is done in most PGM refineries, where nickel and cobalt are also significant pay-metals.
+Added: This is to maximize nickel recovery and minimize operating expenses.
+Added: The nickel and cobalt are expected to be purified using solvent extraction, ion exchange and precipitation, which are all commercially proven hydrometallurgical processes.
+Added: Battery grade nickel and cobalt sulfate are expected to then be crystallized from the purified solutions.
+Added: The pyrometallurgical process is expected to form two byproducts as well as the matte for the hydrometallurgical refinery:
+Added: ● an electric furnace slag containing silica and 53% MnO that is intended to be sold as feed to the Si-Mn industry;
+Added: ● a converter aisle slag that could be used for aggregate in road construction or other applications.
+Added: The hydrometallurgical refinery is expected to generate iron residues that would, for a stand-alone plant, require disposal.
+Added: However, these streams can be recycled back to the pyrometallurgical plant for re-treatment and recovery of entrained pay metals.
+Added: Selection of ammonia as a principal reagent in the hydrometallurgical refinery means that an additional by-product — ammonium sulfate — may be generated.
+Added: This could be sold into the fertilizer industry.
+Added: The copper cathode quality from direct electrowinning, without a solvent extraction step, is expected to be ≥ 99.9% Cu.
+Added: Quality of the matte produced in the pyrometallurgical plant will have an impact on this, including the potential carryover of impurities beyond values assumed for the purpose of the IA.
+Added: The production of battery-grade nickel and cobalt sulfates is targeted instead of nickel or cobalt cathodes or other intermediate products.
+Added: ● All parts of the proposed process have commercial precedents in similar or analogous industries, however not as a whole continuous flowsheet.
+Added: ● Pay-metals are recovered in the following forms:
+Added: ● Copper cathodes with an expected quality of ≥ 99.9% Cu.
+Added: ● Battery-grade nickel sulfate.
+Added: ● Battery-grade cobalt sulfate.
+Added: ● Rather than generating large waste streams, the process is expected to produce by-products including high manganese content furnace slag and ammonium sulfate.
+Added: The process assumptions used in this TOML Technical Report Summary will need to be verified as the project proceeds.
+Added: For more information on mineral processing and metallurgical testing, see Section 10 of the TOML Technical Report Summary.
+Added: Environmental studies, permitting, community, or social impact
+Added: Historically, a significant amount of technical work has been undertaken within the CCZ by contractors under the ISA and a significant body of information has been acquired during the past 40 years on the likely environmental impacts of collecting nodules from the seafloor.
+Added: TOML’s offshore exploration campaigns have included sampling to support environmental studies, collection of high-resolution imagery and environmental baseline studies.
+Added: A number of future campaigns are planned to collect data on ocean currents and water quality to assist plume modelling, environmental baseline studies, box core and multicorer sampling focused on benthic ecology and sediment characteristics.
+Added: The social impacts of the offshore operation are expected to be positive.
+Added: The CCZ is uninhabited by people, and there are no landowners associated with the TOML Areas.
+Added: No significant commercial fishing is carried out in the area.
+Added: The project is expected to provide a source of revenue to the sponsor country, Tonga, and to the ISA.
+Added: The onshore environmental and social impacts have not yet been assessed because the process plant has not been designed in detail, and the location and host country (and hence regulatory regime) not confirmed.
+Added: The planned metallurgical process is not expected to generate solid waste products.
+Added: For more information on environmental studies, permitting and social or community impact, see Section 17 of the TOML Technical Report Summary.
+Added: Internal controls and data verification
+Added: Data collected by TOML in 2013 and 2015 supports the historical data but also is of sufficient quantity and quality to allow estimation of an indicated mineral resource for five sub areas within TOML Areas B, C, D and F.
+Added: More detailed data collected by TOML
+Added: has also allowed estimation of a measured mineral resource for a single sub area within TOML Area B.
+Added: Chain of custody, sample security, Quality Assurance and Quality Control were documented in detail for the TOML data.
+Added: The database provided by the ISA contains multiple independent datasets that were independently collected and sampled using similar methods (FFG or BC sampling) but with slightly different equipment and were assayed by different laboratories.
+Added: Because the database contains multiple datasets the datasets can be compared with each other for the purpose of validating the internal consistency of the data.
+Added: Additionally, there are a number of published summaries of data that have not been provided to the ISA but show similar mean grades to the data within the TOML Exploration Area.
+Added: The sample data are supported by independent third-party data, have been reviewed by the ISA LTC during the process of granting licenses to the Pioneer Contractors, and are maintained by the independent ISA.
+Added: The database includes all data submitted to the ISA that were collected in the Reserved Areas of the CCZ.
+Added: The data were collected by parties completely independent of TOML or the previous owner of TOML and retained exclusively in the custody of the ISA prior to their transfer.
+Added: The data sets were also subject to third-party review by the ISA’s LTC, as part of the process of granting Pioneer Contractors Exploration Areas.
+Added: The original assay sheets from the laboratories for the individual nodule samples within the TOML Contract Area are not available.
+Added: Neither are the quality control procedures used by the laboratories and the ISA.
+Added: It is reasonable to infer that the historical data is of sufficient quality for an Inferred Mineral Resource estimate because:
+Added: ● The ISA is an independent agency with significant accountability under the Law of the Sea.
+Added: Part of its mandate is the receipt and storage of seafloor sampling data suitable for the estimation of nodule resources and the legally binding award of licenses.
+Added: It is reasonable to assume that a reasonable level of care was applied by the ISA.
+Added: ● Comparison of the six independent data sets from the CCZ shows a high level of consistency in abundance and grade and, conversely, provides no evidence of bias or systematic error in the TOML data.
+Added: ● Recent TOML nodule sampling confirms the existence, and abundance and grade continuity of the polymetallic nodules within the TOML Exploration Areas.
+Added: The Qualified Person considered that the combination of the TOML historical nodule sample data (physical samples and photo based long axis estimates) combined with detailed backscatter, photo profiling and geological interpretation is sufficient to estimate polymetallic nodule indicated mineral resources and, in one small especially data rich area, measured mineral resources.
+Added: The primary characteristic of the polymetallic nodule deposit that separates this deposit from typical terrestrial manganese, nickel and copper deposits is that the nodules themselves can be accurately mapped through photo-profiles and backscatter acoustic response.
+Added: The bulk of the polymetallic nodules sit on top of the seabed allowing them to be photographed.
+Added: However, in some areas such as TOML Area D some nodules are partially covered by sediment making it more difficult to detect the presence and abundance of the nodules.
+Added: The most accurate method for determining nodule abundance is through physical sampling by box-core or free fall-grab sampling.
+Added: However, these methods are costly and result in wide sample spacing.
+Added: Due to the fact that nodules are visible, photography can be used in many areas to estimate nodule abundance directly.
+Added: The two methods for doing this are estimating the nodule percent coverage (percent of exposed nodule surface area within the photo) and measuring each individual nodule long-axis and then using these measurements to calculate abundance using variants of the formula defined by Felix (1980).
+Added: The long-axis estimation (LAE) method is the most accurate and preferred method but comes at a cost in the time to manually process each photo — limiting the number of photos that can be used for estimating abundance.
+Added: The benefit of using photographs is being able to demonstrate continuity between physical sample location and accurately quantify nodule abundance.
+Added: TOML is developing an automated method of doing these measurements for future application.
+Added: The Qualified Person considered the abundance estimates derived from photographs to date from TOML Areas B and C, to be suitable for estimating nodule abundance for the mineral resource.
+Added: For more information about quality control/quality assurance and data verification, see Section 8 and Section 9 of the TOML Technical Report Summary.
Compared sentence by sentence after normalising whitespace, quotation marks, case and digits, so re-formatting and restated figures do not read as changed language. Wording changes appear as one removal and one addition. The current filing and the prior one are authoritative.