Item 2. Management’s Discussion and Analysis
Item 2.
Management’s Discussion and Analysis of Financial Condition and Results of Operations.
Certain information contained in the following discussion and analysis, including information with respect to our plans, strategy, projections and expected timeline for our
business and related financing, includes forward-looking statements. Forward-looking statements are estimates based upon current information and involve a number of risks and uncertainties. Actual events or results may differ materially from the
results anticipated in these forward-looking statements as a result of a variety of factors.
You should read “Risk Factors” and “Cautionary Statement on Forward-Looking Statements” elsewhere in this Quarterly Report on Form 10-Q (“Quarterly Report”) and under similar
headings in the Annual Report on Form 10-K for the year ended December 31, 2020 (our “Annual Report”) for a discussion of important factors that could cause actual results to differ materially from the results described in or implied by the
forward-looking statements contained in the following discussion and analysis.
The following information should be read in conjunction with our unaudited condensed consolidated financial statements and accompanying notes included elsewhere in this
Quarterly Report. Our financial statements have been prepared in accordance with generally accepted accounting principles in the United States of America (“GAAP”). This information is intended to provide investors with an understanding of our
past performance and our current financial condition and is not necessarily indicative of our future performance. Please refer to “—Factors Impacting Comparability of Our Financial Results” for further discussion. Unless otherwise indicated,
dollar amounts are presented in thousands.
Unless the context otherwise requires, references to ‘‘Company,’’ ‘‘NFE,’’ ‘‘we,’’ ‘‘our,’’ ‘‘us’’ or similar terms refer to (i) prior to our conversion from a limited liability company to a
corporation, New Fortress Energy LLC and its subsidiaries and (ii) following the conversion from a limited liability company to a corporation, New Fortress Energy Inc. and its subsidiaries.
Overview
We are a global integrated gas-to-power infrastructure company that seeks to use natural gas to satisfy the world’s large and growing power needs. We deliver targeted energy solutions to
customers around the world, thereby reducing their energy costs and diversifying their energy resources, while also reducing pollution and generating compelling margins. Our near-term mission is to provide modern infrastructure solutions to
create cleaner, reliable energy while generating a positive economic impact worldwide. Our long-term mission is to become one of the world’s leading carbon emission-free independent power providing companies. We discuss this important goal in
more detail in the Annual Report, “Items 1 and 2: Business and Properties” under “Toward a Carbon-Free Future”.
On April 15, 2021, we completed the acquisitions of Hygo Energy Transition Ltd. (“Hygo”) and Golar LNG Partners LP (“GMLP”); referred to as the “Hygo Merger” and “GMLP Merger,” respectively and,
collectively, the “Mergers”. NFE paid $580 million in cash and issued 31,372,549 shares of Class A common stock to Hygo’s shareholders in connection with the Hygo Merger. NFE paid $3.55 per each common unit of GMLP outstanding and for each of the
outstanding membership interest of GMLP’s general partner, totaling $251 million. The Company also repaid certain outstanding debt facilities of GMLP in conjunction with closing the GMLP Merger.
As a result of the Mergers, we acquired one operating FSRU terminal in Sergipe, Brazil (the “Sergipe Facility”), a 50% interest in a 1.5GW power plant in Sergipe, Brazil (the “Sergipe Power
Plant”), as well as two other FSRU terminals in development in Pará, Brazil (the “Barcarena Facility”) and Santa Catarina, Brazil (the “Santa Catarina Facility”).
We acquired the Nanook , a newbuild FSRU moored and in service at the Sergipe Facility. In addition to the Nanook, the
we also acquired a fleet of six other FSRUs, six LNG carriers and an interest in a floating liquefaction vessel, the Hilli Episeyo (the “Hilli”), which receives, liquefies and stores LNG at sea and
transfers it to LNG carriers that berth while offshore, each of which are expected to help support our existing facilities and international project pipeline. The majority of the FSRUs are operating in Brazil, Kuwait, Indonesia, Jamaica and
Jordan under time charters, and uncontracted vessels are available for short term employment in the spot market.
Subsequent to the completion of the Mergers, our chief operating decision maker makes resource allocation decisions and assesses performance on the basis of two operating segments, Terminals and
Infrastructure and Ships.
Our Terminals and Infrastructure segment includes the entire production and delivery chain from natural gas procurement and liquefaction to logistics, shipping, facilities and conversion or
development of natural gas-fired power generation. We currently source LNG from long-term supply agreements with third party suppliers and from our own liquefaction facility in Miami, Florida. Leased vessels as well as the cost to operate our
vessels that are utilized in our terminal or logistics operations are included in this segment. The Terminals and Infrastructure segment includes all terminal operations in Jamaica, Puerto Rico and Brazil, including our interest in the Sergipe
Power Plant.
39
Table of Contents
Our Ships segment includes all vessels acquired in the Mergers which are leased to customers under long-term or spot arrangements, including the 25 year charter of Nanook with CELSE. The Company’s investment in Hilli LLC, owner and operator of the Hilli , is also included in the Ships segment. Over time, we expect to utilize these vessels in our own
terminal operations as charter agreements for these vessels expire.
Our Current Operations – Terminals and Infrastructure
Our management team has successfully employed our strategy to secure long-term contracts with significant customers in Jamaica and Puerto Rico, including Jamaica Public Service Company Limited
(“JPS”), the sole public utility in Jamaica, South Jamaica Power Company Limited (“SJPC”), an affiliate of JPS, Jamalco, a bauxite mining and alumina producer in Jamaica, and the Puerto Rico Electric Power Authority (“PREPA”), each of which is
described in more detail below. Our assets built to service these significant customers have been designed with capacity to service other customers.
We currently procure our LNG either by purchasing from a supplier or by manufacturing it in our Miami Facility. Our long-term goal is to develop the infrastructure necessary to supply our
existing and future customers with LNG produced primarily at our own facilities, including Fast LNG and our expanded delivery logistics chain in Northern Pennsylvania (the “Pennsylvania Facility”).
Montego Bay Facility
The Montego Bay Facility serves as our supply hub for the north side of Jamaica, providing natural gas to JPS to fuel the 145MW Bogue Power Plant in Montego Bay, Jamaica. Our Montego Bay Facility
commenced commercial operations in October 2016 and is capable of processing up to 740,000 gallons of LNG (61,000 MMBtu) per day and features approximately 7,000 cubic meters of onsite storage. The Montego Bay Facility also consists of an ISO
loading facility that can transport LNG to numerous on-island industrial users.
Old Harbour Facility
The Old Harbour Facility is an offshore facility consisting of an FSRU that is capable of processing approximately six million gallons of LNG (500,000 MMBtus) per day. The Old Harbour Facility
commenced commercial operations in June 2019 and supplies natural gas to the new 190MW Old Harbour power plant (the “Old Harbour Power Plant”) operated by SJPC. The Old Harbour Facility is also supplying natural gas to our dual-fired combined
heat and power facility in Clarendon, Jamaica (the “CHP Plant”). The CHP Plant supplies electricity to JPS under a long-term PPA. The CHP Plant also provides steam to Jamalco under a long-term take-or-pay SSA. In March 2020, the CHP Plant
commenced commercial operation under both the PPA and the SSA and began supplying power and steam to JPS and Jamalco, respectively. In August 2020, we began to deliver gas to Jamalco to utilize in their gas-fired boilers.
San Juan Facility
In July 2020, we finalized the development of the San Juan Facility. The San Juan Facility is near the San Juan Power Plant and serves as our supply hub for the San Juan Power Plant and other
industrial end-user customers in Puerto Rico. We have delivered natural gas used for the commissioning of PREPA’s power plant under the Fuel Sale and Purchase Agreement with PREPA since April 2020. In the third quarter of 2021, commission for
Units 5 & 6 of the San Juan Power Plant to operate on natural gas was substantially completed under the terms of our agreement with PREPA. See “—Other Matters” for additional information regarding our San Juan Facility.
Sergipe Power Plant and Sergipe Facility
As part of the Hygo Merger, we acquired a 50% interest in Centrais Elétricas de Sergipe Participações S.A. (“CELSEPAR”), which owns Centrais Elétricas de Sergipe S.A. (“CELSE”), the owner and
operator of the Sergipe Power Plant. The Sergipe Power Plant, a 1.5 GW combined cycle power plant, receives natural gas from the Sergipe Facility through a dedicated 8-kilometer pipeline. The Sergipe Power Plant is the largest natural gas-fired
thermal power station in South America and was built to provide electricity on demand, particularly during dry seasons when hydropower is unable to meet the growing demand for electricity in the region. CELSE has executed multiple PPAs pursuant
to which the Sergipe Power Plant is delivering power to 26 committed offtakers for a period of 25 years. In any period in which power is not being produced pursuant to the PPAs, we are able to sell merchant power into the electricity grid at spot
prices, subject to local regulatory approval.
We also acquired a 75% interest in Centrais Elétricas Barra dos Coqueiros S.A. (“CEBARRA”), which owns rights to expand the Sergipe Power Plant. These rights include 179 acres of land and
regulatory permits for an incremental 1.7GW of power generation. CEBARRA has obtained all permits and other rights necessary to participate in future government power auctions.
40
Table of Contents
The Sergipe Facility is capable of processing up
to 790,000 MMBtu/d and storing up to 170,000 cubic meters of LNG. The Sergipe Facility is expected to utilize approximately 230,000 MMBtu/d (30% of the facility’s maximum regasification capacity) to provide natural gas to the Sergipe Power
Plant, at full dispatch.
Miami Facility
Our Miami Facility began operations in April 2016. This facility has liquefaction capacity of approximately 100,000 gallons of LNG (8,300 MMBtu) per day and enables us to produce LNG for sales
directly to industrial end-users in southern Florida, including Florida East Coast Railway via our train loading facility, and other customers throughout the Caribbean using ISO containers.
Our Current Operations – Ships
Our Ships segment includes six FSRUs and five LNGCs which are leased to customers under long-term or spot arrangements, including a 25-year charter of Nanook
with CELSE. As these charter arrangements expire, we expect to use these vessels in our terminal operations and reflect such vessels in our Terminals and Infrastructure segment. We began to use one acquired LNGC in our terminal operations in the
third quarter of 2021, and the results of operations of this vessel are no longer included in the Ships segment.
The Company’s investment in Hilli LLC, owner and operator of the Hilli , is also included in the Ships segment. Hilli Corp, a wholly owned subsidiary of
Hilli LLC, has a Liquefication Tolling Agreement (“LTA”) with Perenco Cameroon S.A. and Société Nationale des Hydrocarbures under which the Hilli provides liquefaction services through July 2026. Under
the LTA, Hilli Corp receives a monthly tolling fee, consisting of a fixed element of hire and incremental tolling fees based on the price of Brent crude oil.
Our Development Projects
La Paz Facility
In July 2021 we began commercial operations at the Port of Pichilingue in Baja California Sur, Mexico (the “La Paz Facility”). Initially, we are supplying CFEnergia with natural gas to power
plants located in Punta Prieta and Coromuel for an estimated 250,000 gallons of LNG (20,700 MMBtu) per day, and we are in commercial discussions with CFEnergia to increase the volumes and extend the tenor of agreements to further their transition
to gas-fired power. Once fully operational, the La Paz Facility is expected to supply approximately an additional 270,000 gallons of LNG (22,300 MMBtu) per day under an intercompany GSA for approximately 100 MW of power supplied by gas-fired
modular power units which we have developed, own and will operate once fully operational, which may be increased to approximately 350,000 gallons (29,000 MMBtu) of LNG per day for up to 135 MW of power.
Puerto Sandino Facility
Construction of our LNG regasification facility and power plant in Puerto Sandino, Nicaragua (the “Puerto Sandino Facility”) is expected to be completed
in the fourth quarter of 2021 with commissioning of the power plant expected to begin in the first quarter of 2022. We have entered into a 25-year PPA with Nicaragua’s electricity distribution companies, and our 300 MW natural gas-fired power
plant will consume approximately 700,000 gallons of LNG (57,500 MMBtus) per day.
Suape Facility
On January 12, 2021, we acquired CH4 Energia Ltda., an entity that owns key permits and authorizations to develop an LNG terminal and up to 1.37GW of gas-fired power at the Port of Suape in
Brazil. On March 11, 2021, we acquired 100% of the outstanding shares of Pecém Energia S.A. (“Pecém”) and Energetica Camacari Muricy II S.A. (“Muricy”). These companies collectively hold certain 15-year power purchase agreements totaling 288 MW
for the development of the thermoelectric power plants in the State of Bahia, Brazil. We are seeking to obtain the necessary approvals from ANEEL and other relevant regulatory authorities in Brazil to transfer the site for the power purchase
agreements to the Port of Suape and update the technical characteristics to develop and construct an initial 288MW gas-fired power plant and LNG import terminal at the Port of Suape to provide LNG and natural gas to major energy consumers within
the port complex and across the greater Northeast region of Brazil (the “Suape Facility”).
Barcarena Facility
The Barcarena Facility will consist of an FSRU and associated infrastructure, including mooring and offshore and onshore pipelines. The Barcarena Facility will be capable of processing up to
790,000 MMBtu/d and storing up to 170,000 cubic meters of LNG. The Barcarena Facility is expected to utilize approximately 92,000 MMBtu/d (12% of the facility’s maximum regasification capacity) to service the Barcarena Power Plant upon
commencement of operations.
41
Table of Contents
As part of the Mergers, we acquired multiple 25-year PPAs to support the construction of a 605 MW combined cycle thermal power plant to be located in Pará, Brazil and to be supplied by the
Barcarena Facility (the “Barcarena Power Plant”). The Barcarena Power Plant will utilize LNG sourced and processed at the Barcarena Facility for the generation of electricity which will be distributed to the national electricity grid. The power
project is scheduled to deliver power to nine committed offtakers for 25 years beginning in 2025 in accordance with the PPA contracts awarded by the Brazilian government in October 2019.
Santa Catarina Facility
The Santa Catarina Facility will be located on the southern coast of Brazil and will consist of an FSRU with a processing capacity of approximately 790,000 MMBtu/d and LNG storage capacity of up
to 170,000 cubic meters. We are also developing a 31-kilometer, 20-inch pipeline that will connect the Santa Catarina Facility to the existing inland Transportadora Brasileira Gasoduto Bolivia-Brasil S.A. (“TBG”) pipeline via an interconnection
point in Garuva. The Santa Catarina Facility and associated pipeline are expected to have a total addressable market of 15 million gallons per day.
Sri Lanka Facility
In September 2021, we signed an agreement to acquire a 40% ownership stake in West Coast Power Limited (“WCP”), the owner of the 310 MW Yugadanvi Power Plant in Colombo, Sri Lanka. We plan to
develop an offshore LNG receiving, storage and regasification terminal to supply the Kerawalapitya Power Complex, where 310 MW of power is operational today and an additional 700 MW scheduled to be built, of which 350 MW is scheduled to be
operational by 2023. We expect to initially provide the equivalent of an estimated 1.2 million gallons of LNG per day (35,000 MMBtu/d), with the expectation of significant growth as new power plants become operational. Our agreement with WCP is
subject to certain conditions precedent, and we expect that these conditions will be finalized in the first half of 2022.
Fast LNG
We are currently developing a modular floating liquefaction facility to provide a low-cost supply of liquefied natural gas for our growing customer base. The “Fast LNG” design pairs advancements
in modular, midsize liquefaction technology with jack up rigs or similar floating infrastructure to enable a much lower cost and faster deployment schedule than today’s floating liquefaction vessels. A permanently moored FSU will serve as an LNG
storage facility alongside the floating liquefaction infrastructure, which can be deployed anywhere there is abundant and stranded natural gas.
Recent Developments
Cargo Sales
Since August 2021, LNG prices have increased materially. We have supply commitments to secure LNG volumes equal to approximately 100% of our expected needs for our Montego Bay Facility, Old
Harbour Facility, San Juan Facility, La Paz Facility and Puerto Sandino Facility for the next six years. Due to this significant increase in market pricing of LNG, we have used flexibility in our operations and supply portfolio to sell a portion
of these cargos in the market, and these sales have positively impacted our results for the third quarter of 2021. We expect to deliver these cargos in Q4 2021, and these cargo sales are expected to increase our revenues and results of operations
in the fourth quarter of 2021.
COVID-19 Pandemic
We are closely monitoring the impact of the novel coronavirus (“COVID-19”) pandemic on all aspects of
our operations and development projects, including our marine operations acquired in the Mergers. Customers in our Terminals and Infrastructure segment primarily operate under long-term
contracts, many of which contain fixed minimum volumes that must be purchased on a “take-or-pay” basis. We continue to invoice our customers for fixed minimum volumes even in cases when our customer’s consumption has decreased. We have not
changed our payment terms with these customers, and there has not been deterioration in the timing or volume of collections.
Many of the vessels acquired in the Mergers operate under long-term contracts with fixed payments. We are required to have adequate crewing aboard our vessels to fulfill the obligations under our
contracts, and we have implemented safety measures to ensure that we have healthy qualified officers and crew. We monitor local or international transport or quarantine restrictions limiting the ability to transfer crew members off vessels or
bring a new crew on board, and restrictions in availability of supplies needed on board due to disruptions to third-party suppliers or transportation alternatives, and we have not experienced significant disruptions in our operations due to these
measures or restrictions.
42
Table of Contents
Based on the essential nature of the services we provide to support power generation facilities, our operations and development projects have not currently been significantly impacted by
responses to the COVID-19 pandemic. We remain committed to prioritizing the health and well-being of our employees, customers, suppliers and other partners. We have implemented policies to screen employees, contractors, and vendors for COVID-19
symptoms upon entering our development projects, operations and office facilities. For the three months and nine months ended September 30, 2021, we have incurred approximately $0.2 million and $0.6 million, respectively, for safety measures
introduced into our operations and other responses to the COVID-19 pandemic.
W e are actively monitoring the spread of the
pandemic and the actions that governments and regulatory agencies are taking to fight the spread. We have not experienced significant disruptions in development projects, charter or terminal operations from the COVID-19 pandemic; however, there
are important uncertainties including the scope, severity and duration of the pandemic, the actions taken to contain the pandemic or mitigate its impact, and the direct and indirect economic effects of the pandemic and containment measures. We
do not currently expect these factors to have a significant impact on our results of operations, liquidity or financial position, or our development budgets or timelines.
Other Matters
On June 18, 2020, we received an order from FERC, which asked us to explain why our San Juan Facility is not subject to FERC’s jurisdiction under section 3 of the NGA. Because we do not believe
that the San Juan Facility is jurisdictional, we provided our reply to FERC on July 20, 2020 and requested that FERC act expeditiously. On March 19, 2021 FERC issued an order that the San Juan Facility does fall under FERC jurisdiction. FERC
directed us to file an application for authorization to operate the San Juan Facility within 180 days of the order, which is September 15, 2021, but also found that allowing operation of the San Juan Facility to continue during the pendency of an
application is in the public interest. FERC also concluded that no enforcement action against us is warranted, presuming we comply with the requirements of the order. Parties to the proceeding, including the Company, sought rehearing of the March
19, 2021 FERC order, and FERC denied all requests for rehearing in an order issued on July 15, 2021. We have filed petitions for review of FERC’s March 19 and July 15 orders with the United States Court of the Appeals for the District of Columbia
Circuit. To date, no other party has sought review of FERC’s orders. While our petitions for review are pending, and in order to comply with the FERC’s directive, on September 15, 2021 we filed an application for authorization to operate the San
Juan Facility.
43
Table of Contents
Results of Operations – Three and Nine Months Ended September 30, 2021 compared to Three and Nine Months Ended September 30, 2020
Segment performance is evaluated based on segment operating margin and the tables below presents our segment information for the three and nine months ended September 30, 2021 and 2020:
Three Months Ended September 30, 2021
(in thousands of $)
Terminals and Infrastructure⁽¹⁾
Ships⁽²⁾
Total Segment
Consolidation and Other⁽³⁾
Consolidated
Total revenues
$
349,140
$
116,050
$
465,190
$
(160,534
)
$
304,656
Cost of sales
206,131
-
206,131
(70,699
)
135,432
Vessel operating expenses
-
21,210
21,210
(5,909
)
15,301
Operations and maintenance
27,371
-
27,371
(7,227
)
20,144
Segment Operating Margin
$
115,638
$
94,840
$
210,478
$
(76,699
)
$
133,779
Nine Months Ended September 30, 2021
(in thousands of $)
Terminals and Infrastructure⁽¹⁾
Ships⁽²⁾
Total Segment
Consolidation and Other⁽³⁾
Consolidated
Total revenues
$
676,372
$
211,812
$
888,184
$
(214,005
)
$
674,179
Cost of sales
406,253
-
406,253
(72,720
)
333,533
Vessel operating expenses
-
41,385
41,385
(10,684
)
30,701
Operations and maintenance
67,266
-
67,266
(12,306
)
54,960
Segment Operating Margin
$
202,853
$
170,427
$
373,280
$
(118,295
)
$
254,985
⁽¹⁾ Terminals and Infrastructure includes the Company’s effective share of revenues, expenses and operating margin attributable to 50% ownership of CELSEPAR. The losses and earnings attributable to the investment
of $27,792 and $655 for the three and nine months ended September 30, 2021, respectively are reported in income (loss) from equity method investments on the condensed consolidated statements of operations. Terminals and Infrastructure does not
include the unrealized mark-to-market loss on derivative instruments of $2,316 for the three and nine months ended September 30, 2021 reported in Cost of sales.
⁽²⁾ Ships includes the Company’s effective share of revenues, expenses and operating margin attributable to 50% ownership of the Hilli Common Units. The earnings
attributable to the investment of $11,809 and $22,303 for the three months and nine months ended September 30, 2021, respectively are reported in income (loss) from equity method investments on the condensed consolidated statements of
operations and comprehensive loss.
⁽³⁾ Consolidation and Other adjust for the inclusion of the effective share of revenues, expenses and operating margin attributable to 50% ownership of CELSEPAR and Hilli Common Units in our segment measure
and exclusion of the unrealized mark-to-market gain or loss on derivative instruments.
Terminals and Infrastructure
(in thousands of $)
Three months
ended September
30, 2020
Nine months
ended September
30, 2020
Total revenues
$
136,858
$
305,954
Cost of sales
71,665
209,780
Vessel operating expenses
-
-
Operations and maintenance
13,802
31,785
Segment Operating Margin
$
51,391
$
64,389
Terminals and Infrastructure Segment
Three Months Ended September 30,
Nine Months Ended September 30,
(in thousands of $)
2021
2020
Change
2021
2020
Change
Total revenues
$
349,140
$
136,858
$
212,282
$
676,372
$
305,954
$
370,418
Cost of sales
206,131
71,665
134,466
406,253
209,780
196,473
Vessel operating expenses
-
-
-
-
-
-
Operations and maintenance
27,371
13,802
13,569
67,266
31,785
35,481
Segment Operating Margin
$
115,638
$
51,391
$
64,247
$
202,853
$
64,389
$
138,464
Total revenue
44
Table of Contents
Total revenue for the Terminals and Infrastructure Segment increased $212,282 and $370,418 for the three and nine months ended September 30, 2021 as compared to the three months and nine months
ended September 30, 2020, respectively. The increase was primarily driven by increases in revenue from the sale of cargos of LNG to third parties outside of our terminal operations and the inclusion of incremental revenue in our segment measure
from CELSEPAR after the completion of the Mergers. Our contracts with customers in this segment are primarily priced based on the Henry Hub index, and there have been significant increases in this price index in 2021, positively impacting our
revenue. The average Henry Hub index pricing used to invoice our customers increased by 103% and 69% for the three and nine months ended September 2021 as compared to the three and nine months ended September 30, 2020, respectively. Additionally,
we recognized additional revenue from more volumes sold to the San Juan Power Plant in Puerto Rico.
Revenue from cargo sales outside of our terminal operations was $32,605 for the three and nine months ended September 30, 2021; there were no comparable transactions in the three and nine months
ended September 30, 2020.
The Old Harbour Facility sold additional volumes in the three and nine months ended September 30, 2021 as compared to the three and nine months ended September 30, 2020, including volumes
utilized in the CHP Plant which commenced commercial operations during March 2020. Increases in revenue were further impacted by substantial increases to natural gas pricing.
•
For the three months ended September 30, 2021, we recognized $62,488 of revenue from volumes sold at the Old Harbour Facility, as compared to $50,064 for the three months ended September 30, 2020, driven
primarily by an increase in the Henry Hub index used to invoice our customers when compared to the third quarter of 2020. Volumes consumed at the Old Harbour Power Plant increased by 6.2 million gallons (0.6 TBtu), partially offset by a
decrease of 1.5 million gallons (0.2 TBtu) in consumption by Jamalco’s boilers. The Jamalco refinery experienced a fire in August 2021, and no gas volumes have been consumed by their boilers since this event. Volumes delivered to the Old
Harbour Power Plant increased to 33.1 million gallons (2.8 TBtu) in the three months ended September 30, 2021 from 26.9 million gallons (2.2 TBtu) in the three months ended September 30, 2020. Volumes delivered to the CHP Plant and
Jamalco’s boilers decreased to 27.1 million gallons (2.2 TBtu) in the three months ended September 30, 2021 from 28.6 million gallons (2.4 TBtu) in the three months ended September 30, 2020.
•
For the nine months ended September 30, 2021, we recognized $170,402 of revenue from volumes sold at the Old Harbour Facility, as compared to $129,313 for the nine months ended September 30, 2020, primarily
driven by an increase in the Henry Hub index used to invoice our customers and additional volumes consumed at the Old Harbour Power Plant, CHP Plant and Jamalco’s boilers, which began consuming gas in August 2020. Volumes delivered to the
Old Harbour Power Plant increased by 13.5 million gallons (1.2 TBtu) to 91.9 million gallons (7.7 TBtu) in the nine months ended September 30, 2021 from 78.4 million gallons (6.5 TBtu) in the nine months ended September 30, 2020. Volumes
delivered to the CHP Plant and Jamalco’s boilers increased by 18.9 million gallons (1.5 TBtu) to 81.3 million gallons (6.7 TBtu) in the nine months ended September 30, 2021 from 62.4 million gallons (5.2 TBtu) in the nine months ended
September 30, 2020.
•
Revenue from the delivery of power and steam, which began during March 2020, under our contracts with JPS and Jamalco was $7,237 and $21,567 for the three and nine months ended September 30, 2021,
respectively, as compared to $7,280 and $15,957 in revenue for the three and nine months ended September 30, 2020, respectively. After the fire at the Jamalco refinery, we did not deliver any steam to Jamalco. However, steam revenue was
consistent in the third quarter of 2021 with previous periods as our contract with Jamalco has take-or-pay provisions that allow us to invoice for minimum volumes.
Revenue was also impacted by operations at our Montego Bay Facility.
•
Sales at the Montego Bay Facility increased by $4,298 from $23,515 for the three months ended September 30, 2020 to $27,813 for the three months ended September 30, 2021. The increase in sales at the
Montego Bay Facility was due to an increase in the Henry Hub index used to invoice our customers compared to the third quarter of 2020. Volumes delivered at the Montego Bay Facility remained relatively consistent for the three months
ended September 30, 2021 as compared to the three months ended September 30, 2020, decreasing by 0.1 million gallons (0.0 TBtu) from 23.9 million gallons (2.0 TBtu) during the three months ended September 30, 2020 to 23.8 million gallons
(2.0 TBtu) during the three months ended September 30, 2021.
•
Sales at the Montego Bay Facility increased by $10,103 from $69,072 for the nine months ended September 30, 2020 to $79,175 for the nine months ended September 30, 2021. The increase in sales at the Montego
Bay Facility was primarily due to an increase in the Henry Hub index used to invoice our customers compared to the first nine months of 2020. Volumes delivered at the Montego Bay Facility increased by 1.9 million gallons (0.2 TBtu) from
70.5 million gallons (5.9 TBtu) during the nine months ended September 30, 2020 to 72.4 million gallons (6.1 TBtu) during the nine months ended September 30, 2021.
45
Table of Contents
We also recognize revenue from development services for the construction, installation and commissioning of equipment to transform customers’ facilities to operate utilizing natural gas or to
allow customers to receive power or other outputs from our power generation facilities. Such services are provided under certain long-term contracts to supply these customers with natural gas or outputs from our natural gas-fired facilities.
Natural gas delivered to the San Juan Power Plant was recognized as revenue from development services, until commissioning of Units 5 & 6 of the San Juan Power Plant to operate on natural gas was substantially completed in the third quarter
of 2021. After this point, all natural gas delivered to the San Juan Power Plant was recognized as operating revenue.
•
Sales at the San Juan Power Plant increased by $24,087 from $51,974 for the three months ended September 30, 2020 to $76,061 for the three months ended September 30, 2021. The increase was driven by
additional volumes consumed at the San Juan Power Plant. Volumes delivered to the San Juan Power Plant increased by 13.0 million gallons (1.0 TBtu) to 71.6 million gallons (5.8 TBtu) in the three months ended September 30, 2021 from 58.6
million gallons (4.8 TBtu) in the three months ended September 30, 2020.
•
Sales at the San Juan Power Plant increased by $108,263 from $68,458 for the nine months ended September 30, 2020 to $176,721 for the nine months ended September 30, 2021. The increase was driven by
additional volumes consumed at the San Juan Power Plant, as our San Juan Facility was not completed until July 2020. Volumes delivered to the San Juan Power Plant increased by 88.0 million gallons (7.1 TBtu) to 165.9 million gallons
(13.5 TBtu) in the nine months ended September 30, 2021 from 77.9 million gallons (6.4 TBtu) in the nine months ended September 30, 2020.
Subsequent to the acquisition of our interest in the Sergipe Facility as part of the Mergers, our share of revenue from our investment in CELSEPAR was $134,523 and $166,292 for the three and nine
months ended September 30, 2021, respectively, which was primarily comprised of fixed capacity payments received under our PPAs. Revenue recognized from the operation of the Sergipe Power Plant was significantly increased in the third quarter of
2021 by emergency dispatch due to poor hydrological conditions in Brazil during the third quarter. Our proportionate share of revenue from the Sergipe Facility is included in this discussion as such revenue is included in our segment measure; in
our consolidated statement of operations and comprehensive loss, we report the results from our investment in CELSEPAR as Income (loss) from equity method investments.
Cost of sales
Cost of sales includes the procurement of feedgas or LNG, as well as shipping and logistics costs to deliver LNG or natural gas to our facilities, power generation facilities or to our customers.
Our LNG and natural gas supply are purchased from third parties or converted in our Miami Facility. Costs to convert natural gas to LNG, including labor, depreciation and other direct costs to operate our Miami Facility are also included in Cost
of sales.
Cost of sales increased $134,466 and $196,473 for the three and nine months ended September 30, 2021, respectively, as compared to the three and nine months ended September 30, 2020,
respectively.
•
Cost of LNG purchased from third parties for sale to our customers or delivered for commissioning of our customer’s assets in Puerto Rico increased $44,581 for the three months ended September 30, 2021,
respectively as compared to the three months ended September 30, 2020. The increase was primarily attributable to a 15% increase in volumes delivered compared to the three months ended September 30, 2020 and an increase in LNG cost. The
weighted-average cost of LNG purchased from third parties increased from $0.37 per gallon ($4.44 per MMBtu) for the three months ended September 30, 2020 to $0.58 per gallon ($6.98 per MMBtu) for the three months ended September 30, 2021.
•
Cost of LNG purchased from third parties for sale to our customers or delivered for commissioning of our customer’s assets in Puerto Rico increased $87,852 for the nine months ended September 30, 2021,
respectively as compared to the nine months ended September 30, 2020. The increase was primarily attributable to a 42% increase in volumes delivered compared to the nine months ended September 30, 2020 and an increase in LNG cost. The
weighted-average cost of LNG purchased from third parties increased from $0.51 per gallon ($6.13 per MMBtu) for the nine months ended September 30, 2020 to $0.54 per gallon ($6.58 per MMBtu) for the nine months ended September 30, 2021.
•
Cost of LNG from the sale of cargos in the market were $18,191 for the three and nine months ended September 30, 2021 as compared to $0 for the three and nine months ended September 30, 2020. Since August
2021, due to the significant increase in market pricing of LNG, we have used flexibility in our operations and supply portfolio to sell a portion of our committed cargos in the market. The weighted-average cost of LNG from the sale of a
portion of our cargos was $0.69 per gallon ($8.33 per MMBTU) for the three and nine months ended September 30, 2021.
46
Table of Contents
•
Subsequent to the acquisition of an interest in the Sergipe Facility as part of the Mergers, our share of Cost of sales from our investment in CELSEPAR was $73,015 and $75,042 for the three and nine months
ended September 30, 2021, respectively, which was comprised of LNG costs to fuel the power plant and costs of power to fulfill requirements under the PPAs.
The weighted-average cost of our LNG inventory balance to be used in our Jamaican and Puerto Rican operations as of September 30, 2021 and December 31, 2020 was $0.64 per gallon ($7.71 per MMBtu)
and $0.40 per gallon ($4.81 per MMBtu), respectively.
Charter costs decreased Cost of sales by $2,901 for the three months ended September 30, 2021. As a result of the Mergers, we have effectively settled our charter agreement for the Freeze , one of the acquired vessels, and as such, the decrease in charter costs was attributable to the lower costs associated with the Freeze .
Charter costs increased Cost of sales by $3,441 for the nine months ended September 30, 2021, respectively. The increase was attributable to an additional vessel in our fleet associated with our
San Juan Facility after our assets were placed in service in the third quarter of 2020, as well as an additional vessel lease that we assumed as part of the Mergers. These increases were partially offset by lower costs associated with the Freeze .
Operations and maintenance
Operations and maintenance includes costs of operating our Facilities, exclusive of costs to convert that are reflected in Cost of sales. Operations and maintenance increased $13,569 and $35,481
for the three and nine months ended September 30, 2021, respectively, as compared to the three and nine months ended September 30, 2020.
•
Subsequent to acquisition of an interest in the Sergipe Facility as part of the Mergers, our share of Operations and maintenance from our investment in CELSEPAR was $7,227 and $12,306 for the three and nine
months ended September 30, 2021, respectively, which was primarily comprised of costs related to the operation and services agreement for the Nanook , insurance costs and costs for connecting to
the transmission system.
•
The increase for the three months ended September 30, 2021 as compared to the three months ended September 30, 2020 was primarily the result of costs of operating the San Juan Facility and CHP Plant and
higher payroll costs, maintenance costs, insurance costs and port fees; these additional costs were $8,878.
•
The increase for the nine months ended September 30, 2021 as compared to the nine months ended September 30, 2020 was primarily the result of San Juan Facility and the CHP Facility that were still in
development during a portion of the nine months ended September 30, 2020. Operations and maintenance increased by the costs of operating the San Juan Facility and CHP Plant of $10,732. We also incurred $13,092 of payroll costs,
maintenance costs, insurance costs and port fees.
Ships Segment
Three Months
Nine Months
(in thousands of $)
Ended September
30, 2021
Ended September
30, 2021
Total revenues
$
116,050
$
211,812
Vessel operating expenses
21,210
41,385
Segment Operating Margin
$
94,840
$
170,427
Prior to the completion of the Mergers, we reported our results of operations in a single segment; all
the assets and operations that comprise the Ships segment were acquired in the Mergers, and as such, there are no results of operations prior to the completion of the Mergers during the
second quarter of 2021, and the results of operations for the Ships segment for the nine months ended September 30, 2021 represents five and a half months of operations .
Revenue in the Ships segment is comprised of operating lease revenue under time charters, fees for repositioning vessels as well as the reimbursement of certain vessel operating costs. We have
also recognized revenue related to the interest portion of lease payments and the operating and service agreements in connection with the sales-type lease of the Nanook .
47
Table of Contents
Subsequent to the completion of the Mergers, five of the FSRUs and one LNGCs were on hire under long-term charter agreements for the full period. Two LNGCs were operating in the spot market for a
portion of the period subsequent to the completion of the Mergers through June 30, 2021. In the third quarter, one of these LNGCs, the Grand, began to be utilized in our terminal and logistics
operations, and as such, the results of operations of the Grand are included in the Terminals and Infrastructure segment in the third quarter of 2021. The Spirit
and the Mazo continue to be in cold lay-up, and no vessel charter revenue was generated from these vessels.
Two of the vessels acquired in the Mergers, the Celsius and the Penguin , have participated in a pooling
arrangement, which we refer to as the Cool Pool. Under this arrangement, the pool manager markets participating vessels in the LNG shipping spot market, and the vessel owner continues to be fully responsible for the manning and technical
management of their respective vessels. Revenue for charters of our vessels in the Cool Pool is presented on a gross basis in revenue, and our allocation of our share of the net revenues earned from the other pool participants’ vessels, which may
be either income or expense depending on the results of all pool participants, is reflected on a net basis within Vessel operating expenses. The Penguin exited the Cool Pool in the third quarter of 2021,
and we have chartered this vessel to a third party outside of the Cool Pool.
For the three and nine months ended September 30, 2021, revenue recognized in the Ships segment
included $11,607 and $21,288 of interest income for the Nanook sales-type
lease and $1,491 and $2,656 of revenue for operating services, respectively, provided to CELSE. As all operations of the Ships segment were acquired in the Mergers, the results of operations for the Nanook for the nine months ended September 30, 2021 represents
five and a half months of operations .
Our segment measure includes our proportionate share of the results of operations of the Hilli . Our share of
revenue from our investment in Hilli LLC was $26,011 and $47,758 for the three and nine months ended September 30, 2021, respectively, which was primarily comprised of fees received under the long-term tolling arrangement. The Hilli maintained 100% commercial uptime during the period subsequent to the Mergers.
Vessel operating expenses
Vessel operating expenses include direct costs associated with operating a vessel, such as crewing, repairs and maintenance, insurance, stores, lube oils, communication
expenses and management fees . We also recognize voyage expenses within Vessel operating expenses, which principally consist of fuel consumed before or after the term of time charter or when the vessel
is off hire. Under time charters, the majority of voyage expenses are paid by customers. To the extent that these costs are a fixed amount specified in the charter, which is not dependent upon redelivery
location , the estimated voyage expenses are recognized over the term of the time charter.
For the three and nine months ended September 30, 2021, we recognized $21,210 and $41,385, respectively, in Vessel operating expenses. As all operations of the Ships
segment were acquired in the Mergers, Vessel operating expenses for the nine months ended September 30, 2021 represents five and a half months of operations of each of the acquired vessels.
48
Table of Contents
Other operating results
Three Months Ended September 30,
Nine Months Ended September 30,
(in thousands of $)
2021
2020
Change
2021
2020
Change
Selling, general and administrative
$
46,802
$
26,821
$
19,981
$
124,954
$
87,273
$
37,681
Transaction and integration costs
1,848
4,028
(2,180
)
42,564
4,028
38,536
Contract termination charges and loss on mitigation sales
-
-
-
-
124,114
(124,114
)
Depreciation and amortization
31,194
9,489
21,705
68,080
22,363
45,717
Total operating expenses
250,721
125,805
124,916
654,792
479,343
175,449
Operating income (loss)
53,935
11,053
42,882
19,387
(173,389
)
192,776
Interest expense
57,595
19,813
37,782
107,757
50,901
56,856
Other (income) expense, net
(5,400
)
2,569
(7,969
)
(13,458
)
4,179
(17,637
)
Loss on extinguishment of debt, net
-
23,505
(23,505
)
-
33,062
(33,062
)
Net income (loss) before income from equity method investments and income taxes
1,740
(34,834
)
36,574
(74,912
)
(261,531
)
186,619
(Loss) income from equity method investments
(15,983
)
-
(15,983
)
22,958
-
22,958
Tax provision
3,526
1,836
1,690
7,058
1,949
5,109
Net loss
$
(17,769
)
$
(36,670
)
$
18,901
$
(59,012
)
$
(263,480
)
$
204,468
Selling, general and administrative
Selling, general and administrative includes compensation expenses for our corporate employees, employee travel costs, insurance, professional fees for our advisors and screening costs associated
with development activities for projects that are in initial stages and development is not yet probable.
Selling, general and administrative increased $19,981 for the three months ended September 30, 2021, as compared to the three months ended September 30, 2020. The increase was primarily
attributable to $10,558 of higher payroll costs associated with increased headcount for the three months ended September 30, 2021. Contributing to the increase was higher lease expense, insurance and IT, screening expenses, management fees,
professional services, and other costs attributable to our expanded operations of $6,076.
Selling, general and administrative increased $37,681 for the nine months ended September 30, 2021, as compared to the nine months ended September 30, 2020. The increase was primarily
attributable to $21,451 of higher payroll costs associated with increased headcount for the nine months ended September 30, 2021. Contributing to the increase was higher lease expense, insurance and IT, screening expenses, management fees,
professional services, and other costs attributable to our expanded operations of $14,875.
Transaction and integration costs
Transaction and integration costs decreased $2,180 and increased $38,536 for the three and nine months ended September 30, 2021, as compared to the three and nine months ended September 30, 2020,
respectively. For the three months ended September 30, 2021, we incurred $1,848 in connection with the Mergers, which consisted primarily of financial advisory, legal, accounting and consulting costs.
For the nine months ended September 30, 2021, we incurred $42,564 for transaction and integration costs. As part of arranging financing for the Mergers, we incurred $15,000 in bridge financing
commitment fees. We issued the 2026 Notes to pay for a portion of the consideration for the Mergers and did not utilize the commitments under the bridge financing, and as such, the fees were expensed with the termination of the bridge financing
commitment letter in the second quarter of 2021. We also incurred $3,978 of costs related to the settlement of a contractual indemnification obligation under a pre-existing lease arrangement prior to the GMLP Merger. The remaining transaction and
integration costs were incurred in connection with the Mergers, which consisted primarily of financial advisory, legal, accounting and consulting costs.
For the three and nine months ended September 30, 2020, we incurred $4,028 of third-party fees associated with a new credit agreement that was accounted for as a modification.
Contract termination charges and loss on mitigation sales
49
Table of Contents
Loss on mitigation sales for the three and nine months ended September 30, 2020 was $0 and $124,114, respectively. In June 2020, we executed an agreement to terminate our obligation to purchase
LNG from our supplier for the remainder of 2020 in exchange for a payment of $105,000, and we recognized this cancellation charge during the three months ended June 30, 2020. We terminated our obligation in the second quarter of 2020 to both take
advantage of the low pricing in the open market and to align future deliveries of LNG with our expected needs. Additionally, in the second quarter of 2020, we experienced lower than expected consumption by some of our customers, primarily as a
result of unplanned maintenance at one of our customer’s facilities in Jamaica. As a result, we were unable to utilize a firm cargo purchased under our LNG supply agreement, incurring a loss of $18,906 on the sale of this cargo that was
recognized during the second quarter of 2020. We did not have such transactions during the three and nine months ended September 30, 2021.
Depreciation and amortization
Depreciation and amortization increased $21,705 and $45,717 for the three and nine months ended September 30, 2021, respectively, as compared to the three and nine months ended September 30,
2020. The increase was primarily due to the following:
•
Subsequent to the completion of the Mergers, our results of operations include depreciation expense primarily for the vessels acquired. We recognized $13,691 and $25,100 of incremental depreciation expense
for the acquired vessels during the three and nine months ended September 30, 2021 as compared to the same periods in the prior year;
•
Amortization of the value recorded for favorable and unfavorable contracts acquired in the Mergers of $6,779 and $12,128 for the three and nine months ended September 30, 2021, respectively;
•
Increase in depreciation of $427 and $5,229 for the San Juan Facility that went into service in July 2020 for the three and nine months ended September 30, 2021, respectively; and
•
Increase in depreciation of $2,297 for the CHP Plant that went into service in March 2020 for the nine months ended September 30, 2021.
Interest expense
Interest expense increased by $37,782 and $56,856 for the three and nine months ended September 30, 2021, respectively, as compared to the three and nine months ended September 30, 2020. The
increase was primarily due to an increase in total principal outstanding due to the issuance of the 2025 Notes in September 2020, the 2026 Notes in April 2021, draws on the Revolving Facility in the second and third quarters of 2021, borrowings
under the Vessel Term Loan Facility and the CHP Facility (all defined below); principal outstanding on outstanding facilities was $3,888,894 as of September 30, 2021 as compared to total outstanding debt of $1,000,000 as of September 30, 2020.
In conjunction with the Mergers, we assumed outstanding debentures issued by a subsidiary of Hygo and the outstanding debt of variable interest entities (“VIEs”) that are now consolidated in our
financial statements, totaling $630,563 as of the acquisition date. Although we have no control over the funding arrangements of these entities, we are the primary beneficiary of these VIEs and therefore these loan facilities are presented as
part of the condensed consolidated financial statements.
Upon assumption of the debt held by VIEs, we recognized the liabilities assumed at fair value and amortization of the discount from carrying value has been recorded as additional interest
expense. For the three months and nine months ended September 30, 2021, we recognized additional interest expense attributable to assumed debt of $15,263 and $8,628, respectively.
Other (income) expense, net
Other (income) expense, net increased by $7,969 and $17,637 for the three and nine months ended September 30, 2021, respectively, as compared to the three and nine months ended September 30,
2020. The increase was primarily due to the following::
•
Gains in investments in equity securities compared to losses in the same periods in 2020, contributing $7,335 and $9,640 for the three and nine months ended September 30, 2021, respectively;
•
Increase from the reduction in losses resulting from the fair value of derivative liabilities and equity agreement associated with payments due to sellers in asset acquisitions of $2,737 and $3,156, for the
three and nine months ended September 30, 2021, respectively; and
50
Table of Contents
•
Changes in the fair value of the cross-currency interest rate swap and the interest rate swaps acquired in connection with the Mergers, resulting in expense of $4,278 and additional income of $2,081, for
the three and nine months ended September 30, 2021, respectively.
Loss on extinguishment of debt, net
Loss on extinguishment of debt for the three and nine months ended September 30, 2020 was $23,505 and $33,062, respectively, as a result of the extinguishment of previous credit facilities in
January 2020 and September 2020. We did not have such transactions during the three and nine months ended September 30, 2021.
Tax provision
We recognized a tax provision for the three and nine months ended September 30, 2021 of $3,526 and $7,058, respectively, compared to tax provision of $1,836 and $1,949 for the three and nine
months ended September 30, 2020, respectively. The increases to the tax provision and effective tax rate for both the three and nine months ended September 30, 2021 was primarily driven by an increase in pre-tax income in certain profitable
non-U.S. operations and the inclusion of operations of certain jurisdictions of acquired business. For the nine months ended September 30, 2021, these increases in tax expense were partially offset by the release of a valuation allowance in a
foreign jurisdiction resulting in a discrete benefit of $1,800.
Income from equity method investments
During the period after the completion of the Mergers, we recognized losses and income from our investments in Hilli and CELSEPAR of $(15,983) and $22,958 for the three and nine months ended
September 30, 2021, respectively. Our proportionate share of the losses and earnings of $(7,101) and $37,614, respectively, were offset by amortization of basis differences through our equity earnings of $8,882 and $14,656 for the three and nine
months ended September 30, 2021, respectively. During the period after the Mergers, our share of earnings from CELSEPAR was significantly impacted by a foreign currency remeasurement loss of $17,709 for the three months ended September 30, 2021
and a gain of $8,067 for the nine months ended September 30, 2021, primarily as a result of the remeasurement of the Nanook finance lease obligation.
Factors Impacting Comparability of Our Financial Results
Our historical results of operations and cash flows are not indicative of results of operations and cash flows to be expected in the future, principally for the following reasons:
•
Our historical financial results include the results of operations of Hygo and
GMLP only since the completion of the Mergers in April 2021 and do not include all integration and transaction costs expected to be incurred associated with these acquisitions. Upon
completion of the Mergers, we acquired a fleet of seven FSRUs, six LNG carriers and an interest in a floating liquefaction vessel. We also acquired the Sergipe Facility, a 50% interest in the Sergipe Power Plant, as well as the
Barcarena Facility and the Santa Catarina Facility that are currently in development. The results of operations of Hygo and GMLP began to be included in our financial statements upon the closing of the acquisitions on April 15, 2021.
Our results of operations in 2021 will also include transaction costs associated with these acquisitions as well as costs incurred to integrate the operations of Hygo and GMLP into our business, which may be significant.
•
Our historical financial results do not include significant projects that have
recently been completed or are near completion. Our results of operations for the three and nine months ended September 30, 2021 include our Montego Bay Facility, Old Harbour
Facility, San Juan Facility, certain industrial end-users and our Miami Facility. We are finalizing development of our La Paz Facility and Puerto Sandino Facility, and our current results do not include revenue and operating results
from these projects. Our current results also exclude other developments, including the Suape Facility, the Barcarena Facility, the Santa Catarina Facility and the Ireland Facility.
51
Table of Contents
•
Our historical financial results do not reflect new LNG supply agreements that
will lower the cost of our LNG supply through 2030. We currently purchase the majority of our supply of LNG from third parties, sourcing approximately 97% of our LNG volumes from
third parties for the three and nine months ended September 30, 2021, respectively, a significant portion of which is under an LNG supply agreement signed in 2018. During 2020 and 2021, we also entered into LNG supply agreements for the
purchase of approximately 601 TBtu of LNG at a price indexed to Henry Hub from 2021 and 2030, resulting in expected pricing below the pricing in our previous long-term supply agreement. We have now secured supply for LNG volumes equal
to approximately 100% of our expected needs for our Montego Bay Facility, Old Harbour Facility, San Juan Facility, La Paz Facility and Puerto Sandino Facility for the next six years.
We also anticipate that the deployment of Fast LNG floating liquefaction facilities will significantly lower the cost of our LNG supply and reduce our dependence on third party suppliers.
Since August 2021, LNG prices have increased materially. Due to this significant increase in market pricing of LNG, we have used flexibility in our operations and supply portfolio to sell a portion of our
committed cargos in the market with delivery in Q4 2021, and these cargo sales are expected to increase our revenues and results of operations in the fourth quarter of 2021.
Liquidity and Capital Resources
We believe we will have sufficient liquidity from proceeds from recent borrowings, access to additional capital sources and cash flow from operations to fund our capital expenditures and
working capital needs for the next 12 months. We expect to fund our current operations and continued development of additional facilities through cash on hand, borrowings under our debt facilities and cash generated from operations. We may also
elect to generate additional liquidity through future debt or equity issuances to fund developments and transactions. We have historically funded our developments through proceeds from our IPO and debt and equity financing, most recently as
follows:
•
In January 2020, we borrowed $800,000 under a credit agreement, and repaid our prior term loan facility in full.
•
In September 2020, we issued $1,000,000 of 2025 Notes and repaid all other outstanding debt. No principal payments are due on the 2025 Notes until maturity in 2025.
•
In December 2020, we received proceeds of $263,125 from the issuance of $250,000 of additional notes on the same terms as the 2025 Notes (subsequent to this issuance, these additional notes are included in
the definition of 2025 Notes herein).
•
In December 2020, we issued 5,882,352 shares of Class A common stock and received proceeds of $290,771, net of $1,221 in issuance costs.
•
In April 2021, we issued $1,500,000 of 2026 Notes; we also entered into the $200,000 Revolving Facility that has a term of approximately five years.
•
In August 2021, we entered into the CHP Facility (defined below) and initially drew $100,000, which may be increased to $285,000.
•
In September 2021, Golar Partners Operating LLC, our indirect subsidiary, closed on the Vessel Term Loan Facility (defined below). Under this facility, we borrowed an initial amount of $430,000, which may be increased to $725,000,
subject to satisfaction of certain conditions including the provision of security in relation to additional vessels.
We have assumed total committed expenditures for all completed and existing projects to be approximately
$1,663 million, with approximately $1,154 million having already been spent through September 30, 2021. This estimate represents the committed expenditures necessary to complete the La Paz Facility, Puerto Sandino Facility, the Suape
Facility, the Barcarena Facility and the Santa Catarina Facility, as well committed expenditures to serve new industrial end-users. We expect to be able to fund all such committed projects with a combination of cash on hand, cash flows from
operations, proceeds from the financing of the CHP Plant and borrowings under our Revolving Facility. We may also enter into other financing arrangements to generate proceeds to fund our developments. Through September 30, 2021, we have spent
approximately $ 128 million to develop the Pennsylvania Facility. Approximately $22 million of construction and development costs have been expensed as we have not issued a final notice to
proceed to our engineering, procurement and construction contractors. Cost for land, as well as engineering and equipment that could be deployed to other facilities and associated financing costs of approximately $106 million, has been
capitalized, and to date, we have repurposed approximately $17 million of engineering and equipment to our Fast LNG project.
52
Table of Contents
Cash Flows
The following table summarizes the changes to our cash flows for the nine months ended September 30, 2021 and 2020, respectively:
Nine Months Ended September 30,
(in thousands)
2021
2020
Change
Cash flows from:
Operating activities
$
(139,687
)
$
(115,710
)
$
(23,977
)
Investing activities
(2,031,158
)
(115,704
)
(1,915,454
)
Financing activities
1,874,149
291,816
1,582,333
Net (decrease) increase in cash, cash equivalents, and restricted cash
$
(296,696
)
$
60,402
$
(357,098
)
Cash used in operating activities
Our cash flow used in operating activities was $139,687 for the nine months ended September 30, 2021, which increased by $23,977 from $115,710 for the nine months ended September 30, 2020. Our
net loss for the nine months ended September 30, 2021, when adjusted for non-cash items, decreased by $111,484 from the nine months ended September 30, 2020. The reduction to the net loss was offset by changes in working capital accounts,
primarily significant increases in receivables, inventory and accrued liabilities, including costs attributable to the Mergers.
Cash used in investing activities
Our cash flow used in investing activities was $2,031,158 for the nine months ended September 30, 2021, which increased by $1,915,454 from $115,704 for the nine months ended September 30, 2020.
Cash used for the Mergers, net of cash acquired was $1,586,042. Cash outflows for investing activities during the nine months ended September 30, 2021 were also used for continued development of the Puerto Sandino Facility, Suape Facility,
Barcarena Facility, Santa Catarina Facility, as well as our Fast LNG solution.
During the nine months ended September 30, 2020, we completed the CHP Plant and were in the final stages of development of the San Juan Facility, and as such, we incurred lower cash outflows
for investing activities for the nine months ended September 30, 2020.
Cash provided by financing activities
Our cash flow provided by financing activities was $1,874,149 for the nine months ended September 30,
2021, which increased by $1,582,333 from cash provided by financing activities of $291,816 for the nine months ended September 30, 2020. Cash provided by financing activities during the nine months ended September 30, 2021 was due to proceeds
received from the borrowings under the 2026 Notes of $1,500,000, the draw of $200,000 on the Revolving Facility, and the draw of $430,000 million on the Vessel Term Loan Facility. The proceeds received were further offset by financing fees paid
in connection with the borrowings, tax payments for equity compensation made on behalf of employees and dividends paid for the nine months ended September
30, 2021.
Cash flow provided by financing activities during the nine months ended September 30, 2020 were primarily consisted of proceeds received from the borrowings under the 2025 Notes of $1,000,000 and
the borrowings under our previous credit agreement of $800,000, partially offset by an original issue discount of $20,000 and financing fees. Additionally, the remaining proceeds from secured bonds issued in Jamaica of $52,144 were received
during the first quarter of 2020. A portion of these proceeds was used to fund the repayment of our previous credit agreement of $800,000, the senior secured and unsecured bonds that had been issued in Jamaica of $183,600, and our previous term
loan facility of $506,402.
Long-Term Debt and Preferred Stock
2025 Notes
On September 2, 2020, we issued $1,000,000 of 6.75% senior secured notes in a private offering pursuant to Rule 144A under the Securities Act (the “2025 Notes”). Interest is payable
semi-annually in arrears on March 15 and September 15 of each year, commencing on March 15, 2021; no principal payments are due until maturity on September 15, 2025. We may redeem the 2025 Notes, in whole or in part, at any time prior to
maturity, subject to certain make-whole premiums.
The 2025 Notes are guaranteed, jointly and severally, by certain of our subsidiaries, in addition to other collateral. The 2025 Notes may limit our ability to incur additional indebtedness or
issue certain preferred shares, make certain payments, and sell or transfer certain assets subject to certain financial covenants and qualifications. The 2025 Notes also provide for customary events of default and prepayment provisions.
53
Table of Contents
We used a portion of the net cash proceeds received from the 2025 Notes, together with cash on hand, to repay in full the outstanding principal and interest under previously existing credit
agreements and secured and unsecured bonds, including related premiums, costs and expenses.
In connection with the issuance of the 2025 Notes, we incurred $17,937 in origination, structuring and other fees. Issuance costs of $13,909 were deferred as a reduction of the principal
balance of the 2025 Notes on the condensed consolidated balance sheets; unamortized deferred financing costs related to lenders in the previously credit agreement that participated in the 2025 Notes were $6,501 and such unamortized costs were
also included as a reduction of the principal balance of the 2025 Notes and will be amortized over the remaining term of the 2025 Notes. As a portion of the repayment of the previous credit agreement was a modification, in the third quarter of
2020, the Company recorded $4,028 of third-party fees as an expense in the condensed consolidated statements of operations and comprehensive loss.
On December 17, 2020, we issued $250,000 of additional notes on the same terms as the 2025 Notes in a private offering pursuant to Rule 144A under the Securities Act (subsequent to this
issuance, these additional notes are included in the definition of 2025 Notes herein). Proceeds received included a premium of $13,125, which was offset by additional financing costs incurred of $4,566. As of September 30, 2021 and December 31,
2020, remaining unamortized deferred financing costs for the 2025 Notes was $9,323 and $10,439, respectively.
2026 Notes
On April 12, 2021, we issued $1,500,000 of 6.50% senior secured notes in a private offering pursuant to Rule 144A under the Securities Act (the “2026 Notes”) at an issue price equal to 100% of
principal. Interest is payable semi-annually in arrears on March 31 and September 30 of each year, commencing on September 30, 2021; no principal payments are due until maturity on September 30, 2026. We may redeem the 2026 Notes, in whole or
in part, at any time prior to maturity, subject to certain make-whole premiums.
The 2026 Notes are guaranteed on a senior secured basis by each domestic subsidiary and foreign subsidiary that is a guarantor under the existing 2025 Notes, and the 2026 Notes are secured by
substantially the same collateral as our existing first lien obligations under the 2025 Notes.
We used the net proceeds from this offering to fund the cash consideration for the GMLP Merger and pay related fees and expenses. In connection with the issuance of the 2026 Notes, we incurred
$24,588 in origination, structuring and other fees, which was deferred as a reduction of the principal balance of the 2026 Notes on the condensed consolidated balance sheets. As of September 30, 2021, total remaining unamortized deferred
financing costs for the 2026 Notes was $22,362.
Vessel Term Loan Facility
On September 18, 2021, Golar Partners Operating LLC, an indirect subsidiary of NFE, closed a senior secured amortizing term loan facility (the “Vessel Term Loan Facility”). Under this facility,
the Company borrowed an initial amount of $430,000, which may be increased to $725,000, subject to satisfaction of certain conditions including the provision of security in relation to additional vessels.
Loans under the Vessel Term Loan Facility bear interest at a rate of LIBOR plus a margin of 3 percent. The Vessel Term Loan Facility shall be repaid in quarterly installments of $15,357, with
the final repayment date in September 2024. Quarterly principal payments will be increased to reflect any upsize of the Vessel Term Loan Facility to reflect a straight-line amortization profile over the remaining term.
Obligations under the Vessel Term Loan Facility are guaranteed by GMLP and certain of GMLP’s subsidiaries. Lenders have been granted a security interest covering three floating storage and
regasification vessels and four liquified natural gas carriers, and the issued and outstanding shares of capital stock of certain GMLP subsidiaries have been pledged as security.
The Company may prepay outstanding indebtedness without penalty, and certain events, such as (i) total loss; (ii) minimum security value; (iii) the sale or transfer of certain vessels; or (iv)
the termination of the charter over the Hilli, will require a mandatory prepayment.
54
Table of Contents
The Vessel Term Loan Facility contains customary representations and warranties and customary affirmative and negative covenants, including financial covenants, chartering restrictions,
restrictions on indebtedness, liens, investments, mergers, dispositions, prepayment of other indebtedness and dividends and other distributions. Financial covenants include requirements that GMLP and Golar Partners Operating LLC maintain a
certain amount of Free Liquid Assets, that the EBITDA to Consolidated Debt Service and the Net Debt to EBITDA ratios are no less than 1.15:1 and no greater than 6.50:1, respectively, and that Consolidated Net Worth is greater than $250,000,
each as defined in the Vessel Term Loan Facility. The Company was in compliance with these covenants as of September 30, 2021.
In connection with the closing the Vessel Term Loan Facility, we incurred $6,229 in origination, structuring and other fees, which were deferred as a reduction of the principal balance of the
Vessel Term Loan Facility on the condensed consolidated balance sheets. As of September 30, 2021, total remaining unamortized deferred financing costs for the Vessel Term Loan Facility was $6,161.
Debenture Loan
As part of the Mergers, we assumed non-convertible Brazilian debentures issued by NFE Brasil , our indirect subsidiary, in the aggregate principal amount of BRL 255.6 million ($45
million) due September 2024, bearing interest at a rate equal to the one-day interbank deposit futures rate in Brazil plus 2.65% (the “Debenture Loan”). The Debenture Loan was recognized at fair value of $44,566 on the date of the Mergers, and
the discount recognized in purchase accounting will result in additional interest expense until maturity. Interest and principal is payable on the Debenture Loan semi-annually on September 13 and March 13.
The Debenture Loan is fully and unconditionally guaranteed by 100% of the shares issued by NFE Brasil owned by our consolidated subsidiary, LNG Power Ltd.
CHP Facility
On August 3, 2021, NFE South Power Holdings Limited, a wholly owned subsidiary of NFE, entered into a financing agreement (“CHP Facility”). We initially drew $100,000 under the CHP Facility, and
the CHP Facility is secured by our combined heat and power plant in Clarendon, Jamaica. We incurred $3,651 in origination, structuring and other fees associated with entry into the CHP Facility, which was deferred as a reduction of the principal
balance of the CHP Facility on the condensed consolidated balance sheets. As of September 30, 2021, the remaining unamortized deferred financing costs for the CHP Facility was $3,636.
Revolving Facility
On April 15, 2021, we entered into a $200,000 senior secured revolving facility (the “Revolving Facility”). The proceeds of the Revolving Facility may be used for working capital and other general corporate purposes
(including permitted acquisitions and other investments). Letters of credit issued under the $100,000 letter of credit sub-facility may be used for general corporate purposes. The Revolving Facility will mature in 2026, with the potential for us
to extend the maturity date once in a one-year increment.
Borrowings under the Revolving Facility bear interest at a per annum rate equal to LIBOR plus 2.50% if the usage under the Revolving Facility is equal to or less than 50% of the commitments under the Revolving
Facility and LIBOR plus 2.75% if the usage under the Revolving Facility is in excess of 50% of the commitments under the Revolving Facility, subject in each case to a 0.00% LIBOR floor. Borrowings under the Revolving Facility may be prepaid, at
our option, at any time without premium.
The obligations under the Revolving Facility are guaranteed by each domestic subsidiary and foreign subsidiary that is a guarantor under the existing 2025 Notes, and the Revolving Facility is secured by substantially
the same collateral as our existing first lien obligations under the 2025 Notes. The Revolving Facility contains usual and customary representations and warranties, and usual and customary affirmative and negative covenants. Financial
covenants include requirements to maintain Debt to Capitalization Ratio of less than 0.7:1.0, and for quarters in which the Revolving Facility is greater than 50% drawn, the Debt to Annualized EBITDA Ratio must be less than 5.0:1.0 for fiscal
quarters ending December 31, 2021 until September 30, 2023 and less than 4.0:1.0 for the fiscal quarter ended December 31, 2023 (each as defined in the Revolving Facility). The Company was in compliance with these covenants as of September 30,
2021.
We incurred $3,974 in origination, structuring and other fees, associated with entry into the Revolving Facility. These costs have been capitalized within Other non-current assets on the condensed consolidated
balance sheets. As of September 30, 2021, total remaining unamortized deferred financing costs for the Revolving Facility was $3,658.
During the second and third quarters of 2021, the Company drew $152,500 and $47,500 on the Revolving Facility, respectively. During the third quarter of 2021, the Company repaid the amounts
outstanding on the Revolving Facility, and as of September 30, 2021, no amounts remain outstanding.
55
Table of Contents
SPV Leasebacks and Loans
We assumed sale leaseback arrangements for four vessels as part of the Mergers. The counterparty to each of the sale leaseback arrangements is a special purpose vehicle (“SPV”) wholly owned by
financial institutions. The sale leasebacks with SPVs were funded by loan facilities obtained by the SPV. Although we have no control over the funding arrangements of these entities, we are the primary beneficiary of the SPVs and consolidate the
SPVs. Therefore, the effects of the sale leaseback arrangements are eliminated upon consolidation of the SPVs and only the outstanding loan facilities are presented as part of our condensed consolidated financial statements. The SPVs service the
loan facilities through payments made by us under the sale leaseback arrangements.
The SPV loans and the sale leaseback arrangements assumed in the Mergers contain certain operating and financing restrictions and covenants that require: (a) certain subsidiaries to maintain a
minimum level of liquidity of $30,000 and consolidated net worth of $123,950, (b) certain subsidiaries to maintain a minimum debt service coverage ratio of 1.20:1, (c) certain subsidiaries to not exceed a maximum net debt to EBITDA ratio of
6.5:1, (d) certain subsidiaries to maintain a minimum percentage of the vessel values over the relevant outstanding loan facility balances of either 110% and 120%, (e) certain subsidiaries to maintain a ratio of liabilities to total assets of
less than 0.70:1. As of September 30, 2021, the Company was in compliance with all covenants under debt and lease agreements.
Eskimo Leaseback and Credit Facility
As part of the Mergers, we have assumed obligations under a sale and leaseback of the Eskimo with Sea 23 Leasing Co. Limited of China
Merchants Bank Leasing (the “Eskimo Leaseback”). Payments are due monthly in 120 installments of $1,069 along with amounts owed for interest of LIBOR plus 3.85%, with a balloon payment of $128,250 due upon maturity.
Sea 23 Leasing Co. Limited , the owner of the Eskimo , has a long-term loan facility that is denominated in USD, has a loan term of ten years and bears interest at a rate of LIBOR plus a margin of 2.66% (the “Eskimo SPV Facility”). As of the acquisition
date of GMLP, the outstanding principal balance was $160,520, and we recognized the fair value of this facility of $158,072 on the date of the Mergers. The discount recognized in purchase accounting will
result in additional interest expense until maturity.
Nanook Leaseback and Credit Facility
As part of the Mergers, we have assumed obligations under a sale and leaseback of the Nanook with Compass Shipping 23 Corporation Limited (the “Nanook Leaseback”). Payments
are due quarterly in 48 installments of $2,943 along with amounts owed for interest due based on LIBOR plus 3.5%, with a balloon payment of approximately $94,000 upon maturity.
Compass Shipping 23 Corporation Limited, the owner of the Nanook , has a long-term loan facility that is denominated in USD, has a loan term of twelve years, bears interest at
a fixed rate of 2.7% (the “Nanook SPV Facility”) and is repayable in a balloon payment on maturity. As of the acquisition date, the outstanding principal balance was $202,249, and we recognized the fair value of this facility of $201,484 on the
date of the Mergers. The discount recognized in purchase accounting will result in additional interest expense until maturity.
Penguin Leaseback and Credit Facility
As part of the Mergers, we have assumed obligations under a sale and leaseback of the Penguin with Oriental LNG 02 Limited (the “Penguin Leaseback”). Payments are due
quarterly in 24 installments of $1,890 along with amounts owed for interest due based on LIBOR plus 3.6%, with a balloon payment of approximately $63,000 upon maturity.
Oriental Fleet LNG 02 Limited, the owner of the Penguin , has a long-term loan facility that is denominated in USD, is repayable in quarterly installments over a term of
approximately six years and bears interest at LIBOR plus a margin of 1.7%. The SPV also has amounts payable to its parent. As of the acquisition date, the outstanding principal balance was $104,882, and we recognized the fair value of this
facility and the amount due to the parent of $105,126 on the date of the Mergers. The premium recognized in purchase accounting will result in a reduction to interest expense until maturity.
Celsius Leaseback and Credit Facility
As part of the Mergers, we have assumed obligations under a sale and leaseback of the Celsius with Noble Celsius Shipping Limited (the “Celsius Leaseback”). Payments are due
quarterly in 28 installments of $2,679 in addition to amounts owed for interest based on LIBOR plus 3.9%, with a balloon payment of approximately $45,000 upon maturity.
Noble Celsius Shipping Limited, the owner of the Celsius , has a long-term loan facility that is denominated in USD, $76,179 of which is repayable in quarterly installments
over a term of approximately seven years with a balloon payment of $37,179 at maturity and bears interest at LIBOR plus a margin of 1.8%. The SPV has another facility with its parent for the remaining principal of $45,200, which is due as a
balloon payment upon maturity in March 2023 and bears interest at a fixed rate of 4.0%. As of the acquisition date, the total outstanding principal balance was $121,379, and we recognized the fair value of these facilities of $121,308 on the
date of the Mergers. The discount recognized in purchase accounting will result in additional interest expense until maturity.
56
Table of Contents
Series A Preferred Units
The 8.75% Series A Cumulative Redeemable Preferred Units issued by GMLP (the “Series A Preferred Units”) remained outstanding following the GMLP Merger and were recognized as non-controlling interest on the condensed
consolidated balance sheets. Distributions on the Series A Preferred Units are payable out of amounts legally available therefor at a rate equal to 8.75% per annum of the stated liquidation preference. In the event of a liquidation, dissolution
or winding up, whether voluntary or involuntary, holders of Series A Preferred Units will have the right to receive a liquidation preference of $25.00 per unit plus an amount equal to all accumulated and unpaid distributions thereon to the date
of payment, whether declared or not. At any time on or after October 31, 2022, the Series A Preferred Units may be redeemed, in whole or in part, at a redemption price of $25.00 per unit plus an amount equal to all accumulated and unpaid
distributions thereon on the date of redemption, whether declared or not.
Debt obligations of equity method investees
We account for the investments in CELSEPAR and Hilli LLC acquired in the Mergers under the equity method of accounting. The debt obligations of these entities are not reported separately in our consolidated
financial statements, and the following discussion summarizes the key terms of each entity’s obligations.
Sergipe Debt Financing
To finance construction of the Sergipe Facility and the Sergipe Power Plant, CELSE signed financing agreements with amounts made available by banks and multilateral organizations throughout 2018 (the “CELSE
Facility”). As of September 30, 2021, amounts outstanding and the effective interest rates under the CELSE Facility were as set forth below. Principal and interest payments are due each October and April. The CELSE Facility matures in April 2032.
Credit facility ( Real and USD in millions)
Amount
Outstanding
Effective
interest rate
IFC
R$
927.7($171.4)
10.2
%
Inter-American Development Bank
R$
766.9($141.7)
10.0
%
IDB Invest (1)
$
37.4
5.6
%
IDB China Fund
$
49.2
5.6
%
CELSE also issued debentures in the aggregate principal amount of R$3,370.0 million (net proceeds of $897.2 million as of the issuance date), due April 2032, bearing interest at a fixed rate of 9.85% (the “CELSE
Debentures”). As of September 30, 2021, the balance of the CELSE Debentures was R$3,324.02 million ($614.0 million as of September 30, 2021). Interest is payable on the CELSE Debentures semi-annually on each April 15 and October 15, beginning on
October 15, 2018. The CELSE Debentures are amortized and repaid in 24 consecutive semi-annual installments on each of April 15 and October 15, that commenced on October 15, 2020.
The indenture governing the CELSE Debentures contains covenants that: (i) requires CELSE to maintain a historical debt service coverage ratio for a twelve month period on or after March 31, 2021 of no less than 1.10
to 1.00; (ii) prohibit certain restricted payments; (iii) limit the ability of CELSE from creating any liens or incurring additional indebtedness; (iv) prohibit certain fundamental changes; (v) limit the ability of CELSE to transfer or purchase
assets; (vi) prohibit certain affiliate transactions; (vii) limit the ability of CELSE to make change orders or give other directions under the documents related to the construction and operation of the project in certain circumstances; (viii)
limit the ability of CELSE to enter into additional contracts; (ix) limit CELSE’s operating expenses and capital expenditures; and (x) prohibit CELSE from transferring, purchasing or otherwise acquiring any portion of the CELSE Debentures, other
than pursuant to the exercise of the put option.
On July 2, 2021, CELSE successfully completed a consent solicitation to amend certain provisions of the financing documents to permit CELSE to incur certain debt related to the working capital facility described
below and to release certain existing security over the variable revenues to be received by CELSE under its power purchase agreements.
CELSEPAR has entered into a Standby Guarantee and Credit Facility Agreement with GE Capital EFS Financing, Inc. (“GE Capital”), as lender, and Ebrasil Energia Ltda. (“Ebrasil”)
and NFE Power Brasil Participações S.A (“NFE Brazil”), each as sponsor (the “GE Credit Facility”). Pursuant to the GE Credit Facility, GE Capital agreed to provide $120,000 in credit support in respect of CELSEPAR’s obligation to make certain
contingent equity contributions to CELSE. Amounts disbursed under the GE Credit Facility accrue interest at a fixed rate of LIBOR plus a margin of 11.4% and are payable on May 30 and November 30 each year, beginning on May 30, 2020. All interest
due to date has been capitalized into the principal balance, and there have been no principal payments paid to date. The GE Credit Facility matures on November 30, 2024. The GE Credit Facility includes covenants and events of default that are
customary for similar transactions.
57
Table of Contents
On July 9, 2021, CELSE and CELSEPAR entered into a working capital facility for the posting of certain letters of credit in favor of the supplier of LNG and the financing of LNG costs to satisfy dispatch requirements
prior to receiving related variable revenues. The working capital facility is in an aggregate amount of up to $200.0 million (or its equivalent in Reais). The facility has a term of 12 months, renewable for equal periods by mutual agreement of
the parties. Amounts disbursed under the working capital facility accrue interest at a rate of (i) DI Rate + 3.50% per year in respect of a bank credit bill, (ii) 2.50% per year for standby letters of credit, (iii) DI Rate + 3.50% per year in
respect of any import financing (FINIMP) modality, and (iv) DI Rate + 3.50% per year for any bank loan. The DI Rate is made by reference to Libor+, according to the pricing at the time of request. On July 9, 2021, a standby letter of credit was
issued under this facility for the benefit of CELSE pursuant to the working capital facility in an amount of $31.1 million with an expiration date of September 15, 2021. The standby letter of credit is guaranteed, jointly but not severally, by
CELSE’s shareholders, NFE and Electricidade do Brasil S.A.—Ebrasil.
Golar Hilli Leaseback
As part of the Mergers, we acquired an investment in Hilli LLC; Golar Hilli Corporation (“Hilli Corp”), is a direct subsidiary of Hilli LLC. and is a party to a Memorandum of Agreement with Fortune Lianjiang Shipping
S.A., a subsidiary of China State Shipbuilding Corporation (“Fortune”), pursuant to which Hilli Corp has sold to and leased back from Fortune the Hilli under a 10-year bareboat charter agreement (the
“Hilli Leaseback”). Under the Hilli Facility, Hilli Corp pays Fortune equal quarterly principal payments plus interest based on LIBOR plus a margin of 4.15%. Our 50% share of Hilli Corp’s indebtedness
of $729,000 amounted to $364,500 as of September 30, 2021.
As part of the Mergers, we have assumed a guarantee of 50% of the outstanding principal and interest amounts payable by Hilli Corp under the Hilli Leaseback. We also assumed a guarantee of the letter of credit (“LOC
Guarantee”) issued by a financial institution in the event of Hilli Corp’s underperformance or non-performance under its tolling agreement. Certain of our subsidiaries are required to comply with the following covenants and ratios: (i) free
liquid assets of at least $30 million throughout the Hilli Leaseback period; (ii) a maximum net debt to EBITDA ratio for the previous 12 months of 6.5:1; and (iii) a consolidated tangible net worth of $123,950.
Letter of Credit Facility
On July 16, 2021, the Company entered into an uncommitted letter of credit and reimbursement agreement with a bank for the issuance of letters of credit for an aggregate amount of up to $75,000. Outstanding letters
of credit are subject to a fee of 1.75% to be paid quarterly, and interest is payable on the principal amounts of unreimbursed letter of credit draws under the facility at a rate of the higher of the bank’s prime rate or the Federal Funds
Effective Rate plus 0.50% and a margin of 1.75%. We are using this uncommitted letter of credit and reimbursement agreement to reduce the cash collateral required under existing letters of credit releasing restricted cash. A portion of our
restricted cash balance supports existing letters of credit, and this uncommitted letter of credit and reimbursement agreement has replaced these letters of credit and released restricted cash, enhancing our ability to manage the working capital
needs of the business.
Off Balance Sheet Arrangements
As of September 30, 2021 and December 31, 2020, we had no off-balance sheet arrangements that may have a current or future material effect on our consolidated financial position or operating
results.
Contractual Obligations
We are committed to make cash payments in the future pursuant to certain contracts. The following table summarizes certain contractual obligations in place as of December 31, 2020:
(in thousands)
Total
Less than 1
year
Years 2 to 3
Year 4 to 5
More than 5
years
Long-term debt obligations
$
1,675,203
$
87,703
$
168,750
$
1,418,750
$
-
Purchase obligations
2,490,347
376,096
724,588
724,090
665,573
Lease obligations
191,991
47,135
56,066
36,006
52,784
Total
$
4,357,541
$
510,934
$
949,404
$
2,178,846
$
718,357
58
Table of Contents
Long-term debt obligations
For information on our long-term debt obligations, see “—Liquidity and Capital Resources—Long-Term Debt.” The amounts included in the table above are based on the total debt balance, scheduled
maturities, and interest rates in effect as of December 31, 2020.
Purchase obligations
The Company is party to contractual purchase commitments for the purchase, production and transportation of LNG and natural gas, as well as engineering, procurement and construction agreements
to develop our terminals and related infrastructure. Our commitments to purchase LNG and natural gas are principally take-or-pay contracts, which require the purchase of minimum quantities of LNG and natural gas, and these commitments are
designed to assure sources of supply and are not expected to be in excess of normal requirements. For purchase commitments priced based upon an index such as Henry Hub, the amounts shown in the table above are based on the spot price of that
index as of December 31, 2020.
In 2020, we entered into four LNG supply agreements for the purchase of 415 TBtu of LNG at a price indexed to Henry Hub from 2021 and 2030. Between 2022 and 2025, the total annual commitment
under these agreements is approximately 68 TBtu per year, reducing to approximately 28 TBtu per year from 2026 to 2029. In 2021, we amended one of these supply agreements to increase our total commitment through 2030 to 601 TBtus at a price
indexed to Henry Hub. The amounts disclosed above also include the commitment to purchase 12 firm cargoes in 2021 under a supply contract executed in December 2018.
Lease obligations
Future minimum lease payments under non-cancellable lease agreements, inclusive of fixed lease payments for renewal periods we are reasonably certain will be exercised, are included in the
above table. Fixed lease payments for short-term leases are also included in the table above. Our lease obligations are primarily related to LNG vessel time charters, marine port leases, ISO tank leases, office space and a land lease.
The Company currently has seven vessels under time charter leases with non-cancellable terms ranging from three months to four years. The lease commitments in the table above include only the
lease component of these arrangements due over the non-cancellable term and does not include any operating services.
We have leases for port space and a land site for the development of our facilities. Terms for leases of
port space range from 20 to 25 years. The land site lease is held with an affiliate of the Company and has a remaining term of approximately five years with an automatic renewal term of
five years for up to an additional 20 years.
During 2020, we executed multiple lease agreements for the use of ISO tanks, and we began to receive these ISO tanks and the lease terms commenced during the second quarter of 2021. The lease
term for each of these leases is five years, and expected payments under these lease agreements have been included in the above table.
Office space includes a space shared with affiliated companies in New York with lease terms up to 38 months and an office space in downtown Miami with a lease term of 84 months.
Summary of Critical Accounting Estimates
The preparation of consolidated financial statements in conformity with GAAP requires management to make certain estimates and assumptions that affect the amounts reported in the consolidated
financial statements and the accompanying notes. Changes in facts and circumstances or additional information may result in revised estimates, and actual results may differ from these estimates. Management evaluates its estimates and related
assumptions regularly and will continue to do so as we further grow our business. We believe that the accounting policies discussed below are critical to understanding our historical and future performance, as these policies relate to the more
significant areas involving management’s judgments and estimates.
59
Table of Contents
Revenue recognition
Terminals and infrastructure
Within the Terminals and Infrastructure segment, our contracts with customers may contain one or several performance obligations usually consisting of the sale of LNG, natural gas, power and
steam, which are outputs from our natural gas-fueled infrastructure. The transaction price for each of these contracts is structured using similar inputs and factors regardless of the output delivered to the customer. The customers consume the
benefit of the natural gas, power and steam when they are delivered to the customer’s power generation facilities or interconnection facility. Natural gas, power and steam qualify as a series with revenue being recognized over time using an
output method, based on the quantity of natural gas, power or steam that the customer has consumed. LNG is typically delivered in containers transported by truck to customer sites. Revenue from sales of LNG delivered by truck is recognized at
the point in time at which physical possession and the risks and rewards of ownership transfer to the customer, either when the containers are shipped or delivered to the customers’ storage facilities, depending on the terms of the contract.
Because the nature, timing and uncertainty of revenue and cash flows are substantially the same for LNG, natural gas, power and steam, we have presented Operating revenue on an aggregated basis.
We have concluded that variable consideration included in its agreements meets the exception for allocating variable consideration. As such, the variable consideration for these contracts is
allocated to each distinct unit of LNG, natural gas, power or steam delivered and recognized when that distinct unit is delivered to the customer.
Our contracts with customers to supply natural gas or LNG may contain a lease of equipment, which may be accounted for as a finance or operating lease. For operating leases, we have concluded
that the predominant component of the transaction is the sale of natural gas or LNG and has elected not to separate the lease component. The lease component of such operating leases is recognized as Operating revenue in the condensed
consolidated statements of operations and comprehensive loss. We allocate consideration in agreements containing finance leases between lease and non-lease components based on the relative fair value of each component. The fair value of the
lease component is estimated based on the estimated standalone selling price of the same or similar equipment leased to the customer. We estimate the fair value of the non-lease component by forecasting volumes and pricing of gas to be
delivered to the customer over the lease term.
The current and non-current portion of finance leases are recorded within Prepaid expenses and other current assets and Finance leases, net on the condensed consolidated balance sheets,
respectively. For finance leases accounted for as sales-type leases, the profit from the sale of equipment is recognized upon lease commencement in Other revenue in the condensed consolidated statements of operations and comprehensive loss. The
lease payments for finance leases are segregated into principal and interest components similar to a loan. Interest income is recognized on an effective interest method over the lease term and included in Other revenue in the condensed
consolidated statements of operations and comprehensive loss. The principal component of the lease payment is reflected as a reduction to the net investment in the lease.
In addition to the revenue recognized from the finance lease components of agreements with customers, Other revenue includes revenue recognized from the construction, installation and
commissioning of equipment, inclusive of natural gas delivered for the commissioning process, to transform customers’ facilities to operate utilizing natural gas or to allow customers to receive power or other outputs from our natural gas-fueled
power generation facilities. Revenue from these development services is recognized over time as we transfer control of the asset to the customer or based on the quantity of natural gas consumed as part of commissioning the customer’s facilities
until such time that the customer has declared such conversion services have been completed. If the customer is not able to obtain control over the asset under construction until such services are completed, revenue is recognized when the
services are completed and the customer has control of the infrastructure. Such agreements may also include a significant financing component, and we recognize revenue for the interest income component over the term of the financing as Other
revenue.
The timing of revenue recognition, billings and cash collections results in receivables, contract assets and contract liabilities. Receivables represent unconditional rights to consideration;
unbilled amounts typically result from sales under long-term contracts when revenue recognized exceeds the amount billed to the customer. Contract assets are comprised of the transaction price allocated to completed performance obligations that
will be billed to customers in subsequent periods. Both unbilled receivables and contract assets are recognized within Prepaid expenses and other current assets, net and Other non-current assets, net on the condensed consolidated balance sheets.
Contract liabilities consist of deferred revenue and are recognized within Other current liabilities on the condensed consolidated balance sheets.
Shipping and handling costs are not considered to be separate performance obligations. All such shipping and handling activities are performed prior to the customer obtaining control of the LNG
or natural gas.
We collect sales taxes from our customers based on sales of taxable products and remits such collections to the appropriate taxing authority. We have elected to present sales tax collections in
the condensed consolidated statements of operations and comprehensive loss on a net basis and, accordingly, such taxes are excluded from reported revenues.
We elected the practical expedient under which we do not adjust consideration for the effects of a significant financing component for those contracts where we expect at contract inception that
the period between transferring goods to the customer and receiving payment from the customer will be one year or less.
60
Table of Contents
Ships
Charter contracts for the use of the FSRUs and LNG carriers acquired as part of the Mergers are leases as the contracts convey the right to obtain substantially all of the economic benefits from
the use of the asset and allow the customer to direct the use of that asset.
At inception, we make an assessment on whether the charter contract is an operating lease or a finance lease. In making the classification assessment, we estimate the residual value of the
underlying asset at the end of the lease term with reference to broker valuations. None of the vessel lease contracts contain residual value guarantees. Renewal periods and termination options are included in the lease term if we believe such
options are reasonably certain to be exercised by the lessee. Generally, lease accounting commences when the asset is made available to the customer, however, where the contract contains specific customer acceptance testing conditions, the lease
will not commence until the asset has successfully passed the acceptance test. We assess leases for modifications when there is a change to the terms and conditions of the contract that results in a change in the scope or the consideration of the
lease.
For charter contracts that are determined to be finance leases accounted for as sales-type leases, the profit from the sale of the vessel is recognized upon lease commencement in Other revenue in
the condensed consolidated statements of operations and comprehensive loss. The lease payments for finance leases are segregated into principal and interest components similar to a loan. Interest income is recognized on an effective interest
method over the lease term and included in Other revenue in the condensed consolidated statements of operations and comprehensive loss. The principal component of the lease payment is reflected as a reduction to the net investment in the lease.
Revenue related to operating and service agreements in connection with charter contracts accounted for as sales-type leases are recognized over the term of the charter as the service is provided within Vessel charter revenue in the condensed
consolidated statements of operations and comprehensive loss.
Revenues include fixed minimum lease payments under charters accounted for as operating leases and fees for repositioning vessels. Revenues generated from charters contracts are recorded over the
term of the charter on a straight-line basis as service is provided and is included in Vessel charter revenue in the condensed consolidated statements of operations and comprehensive loss. Fixed revenue includes fixed payments (including
in-substance fixed payments that are unavoidable) and variable payments based on a rate or index. For operating leases, we have elected the practical expedient to combine service revenue and operating lease income as the timing and pattern of
transfer of the components are the same. Variable lease payments are recognized in the period in which the circumstances on which the variable lease payments are based occur.
Repositioning fees are included in Vessel charter revenues and are recognized at the end of the charter when the fee becomes fixed and determinable. However, where there is a fixed amount
specified in the charter, which is not dependent upon redelivery location, the fee will be recognized evenly over the term of the charter.
Costs directly associated with the execution of the lease or costs incurred after lease inception but prior to the commencement of the lease that directly relate to preparing the asset for the
contract are capitalized and amortized in Vessel operating expenses in the condensed consolidated statements of operations and comprehensive loss over the lease term.
The Company’s LNG carriers may participate in a LNG carrier pool collaborative arrangement with Golar LNG Limited, referred to as the Cool Pool. The Cool Pool allows the pool participants to
optimize the operation of the pool vessels through improved scheduling ability, cost efficiencies and common marketing. Under the Pool Agreement, the Pool Manager is responsible, as agent, for the marketing and chartering of the participating
vessels and paying certain voyage costs such as port call expenses and brokers’ commissions in relation to employment contracts, with each of the Pool Participants continuing to be fully responsible for fulfilling the performance obligations in
the contract.
The Company is primarily responsible for fulfilling the performance obligations in the time charters of
vessels owned by the Company, and the Company is the principal in such time charters. Revenue and expenses for charters of our vessels that participate in the Cool Pool are presented on a gross basis within Vessel charter revenues and Vessel
operating expenses, respectively, in the condensed consolidated statements of operations and comprehensive loss. Our allocation of our share of the net revenues earned from the other pool
participants’ vessels, which may be either income or expense depending on the results of all pool participants, is reflected on a net basis within Vessel operating expenses in the condensed consolidated statements of operations and
comprehensive loss.
61
Table of Contents
Impairment of long-lived assets
We perform a recoverability assessment of long-lived assets whenever events or changes in circumstances indicate that the carrying amount of an asset may not be recoverable. Indicators may
include, but are not limited to, adverse changes in the regulatory environment in a jurisdiction where we operate, unfavorable events impacting the supply chain for LNG to our operations, a decision to discontinue the development of a
long-lived asset, early termination of a significant customer contract, or the introduction of newer technology. We exercise judgment in determining if any of these events represent an impairment indicator requiring a recoverability assessment.
Our business model requires investments in infrastructure often concurrently with our customer’s investments in power generation or other assets to utilize LNG. Our costs to transport and store
LNG are based upon our customer’s contractual commitments once their assets are fully operational. We expect revenue under these contracts to exceed construction and operational costs, based on the expected term and revenue of these contracts.
Additionally, our infrastructure assets are strategically located to provide critical inputs to our committed customer’s operations and our locations allow us to expand to additional opportunities within existing markets. These projects are
subject to risks related to successful completion, including those related to government approvals, site identification, financing, construction permitting and contract compliance.
Our long-term, take-or pay contracts to deliver natural gas or LNG to our customers also limit our exposure to fluctuations in natural gas and LNG as our pricing is largely based on the Henry
Hub index plus a contractual spread. Based on the long-term nature of our contracts and the market value of the underlying assets, changes in the price of LNG do not indicate that a recoverability assessment of our assets is necessary. Further,
we plan to utilize our own liquefaction facilities to manufacture our own LNG at attractive prices, secure LNG to supply our expanding operations and reduce our exposure to future LNG price variations in the long term, including Fast LNG and
our expanded delivery logistics chain in the Pennsylvania Facility.
We have also considered the impacts of the ongoing COVID-19 pandemic, including the restrictions that governments may put in place and the resulting direct and indirect economic impacts on our
current operations and expected development budgets and timelines. We primarily operate under long-term contracts with customers, including long-term charter contracts acquired in the Mergers and many of which contain fixed minimum volumes that
must be purchased on a “take-or-pay” basis, even in cases when our customer’s consumption has decreased. We have not changed our payment terms with customers, and there has not been any deterioration in the timing or volume of collections.
Based on the essential nature of the services we provide to support power generation facilities, our operations and development projects have not been significantly impacted by responses to the
COVID-19 pandemic to date. We will continue to monitor this uncertain situation and local responses in jurisdictions where we do business to determine if there are any indicators that a recoverability assessment for our assets should be
performed.
The COVID-19 pandemic has also significantly impacted energy markets, and the price of oil traded at historic low prices in 2020. Future expansion of our business is dependent upon LNG being a
competitive source of energy and available at a lower cost than the cost to deliver other alternative energy sources, such as diesel or other distillate fuels. Although LNG is currently trading at historical high prices, we believe that over the
long-term LNG and natural gas will remain a competitive fuel source for customers.
We have considered that the market price of LNG can vary widely, including decreases throughout 2019
and 2020 and dramatic increases in the third quarter of 2021. Our extensive and growing portfolio of downstream terminals and infrastructure, together with our locked-in gas supply, provides
powerful flexibility to serve customer needs and participate in the opportunities created by market disruptions. During periods of declining LNG prices in 2019 and 2020, we executed four long-term LNG supply
agreements in 2020 at prices that are expected to be significantly lower our supply contract executed in 2018. Further, we took advantage of the lower market pricing of LNG to supply our operations for the second half of 2020. We also
executed an additional addendum to one of our supply agreements in 2021 to continue to secure 100% of our LNG supply needs for our Montego Bay Facility, Old Harbour Facility, San Juan Facility, La
Paz Facility and Puerto Sandino Facility through 2030. During dramatic increases of LNG prices in recent months, we have been able to take advantage of flexibility in our operations and supply portfolio to sell a portion of our committed cargos in the market with delivery in Q4 2021, and these cargo sales are expected to increase our revenues and
results of operations in the fourth quarter of 2021.
When performing a recoverability assessment, the Company measures whether the estimated future undiscounted net cash flows expected to be generated by the asset exceeds its carrying value. In
the event that an asset does not meet the recoverability test, the carrying value of the asset will be adjusted to fair value resulting in an impairment charge. Management develops the assumptions used in the recoverability assessment based on
active contracts, current and future expectations of the global demand for LNG and natural gas, as well as information received from third party industry sources.
Share-based compensation
We estimate the fair value of RSUs and performance stock units (“PSUs”) granted to employees and non-employees on the grant date based on the closing price of the underlying shares on the grant
date and other fair value adjustments to account for a post-vesting holding period. These fair value adjustments were estimated based on the Finnerty model.
62
Table of Contents
As of September 30, 2021, management determined that it was not probable that the performance condition for our outstanding PSUs would be met. For these awards, compensation cost and the number
of PSUs ultimately earned remains variable and compensation cost for these awards is recorded once achievement of the performance conditions becomes probable through the requisite service period. A cumulative adjustment to share-based
compensation expense is recorded in the period that achievement of performance conditions becomes probable.
Business combinations and goodwill
We evaluate each purchase transaction to determine whether the acquired assets meet the definition of a business. If substantially all of the fair value of gross assets acquired is concentrated
in a single identifiable asset or group of similar identifiable assets, then the set of transferred assets and activities is not a business. If not, for an acquisition to be considered a business, it would have to include an input and a
substantive process that together significantly contribute to the ability to create outputs. A substantive process is not ancillary or minor, cannot be replaced without significant costs, effort or delay or is otherwise considered unique or
scarce. To qualify as a business without outputs, the acquired assets would require an organized workforce with the necessary skills, knowledge and experience that performs a substantive process.
For acquisitions that are not deemed to be businesses, the assets acquired are recognized based on their cost to us as the acquirer, and no gain or loss is recognized. The cost of assets acquired
in a group is allocated to individual assets within the group based on their relative fair values and no goodwill is recognized. Transaction costs related to acquisition of assets are included in the cost basis of the assets acquired.
We account for acquisitions that qualify as business combinations by applying the acquisition method. Transaction costs related to the acquisition of a business are expensed as incurred and
excluded from the fair value of consideration transferred. Under the acquisition method of accounting, the identifiable assets acquired, liabilities assumed and noncontrolling interests in an acquired entity are recognized and measured at their
estimated fair values. The excess of the fair value of consideration transferred over the fair values of identifiable assets acquired, liabilities assumed and noncontrolling interests in an acquired entity, net of fair value of any previously
held interest in the acquired entity, is recorded as goodwill.
The Company performs valuations of assets acquired, liabilities assumed and noncontrolling interests in
an acquired entity and allocates the purchase price to its respective assets, liabilities and noncontrolling interests. Determining the fair value of assets acquired, liabilities assumed and noncontrolling interests in an acquired entity
requires management to use significant judgment and estimates, including the selection of appropriate valuation methodologies, estimates of projected revenues, costs and cash flows, and discount rates. The Company estimated the fair value of the vessels acquired in the Mergers using a combination of the income approach and the cost approach, which determines
the replacement costs for the assets, adjusting for age and condition. Management’s estimates of fair value are based upon assumptions believed to be reasonable, but which are inherently uncertain and unpredictable. As a result, actual results
may differ from these estimates. During the measurement period, the Company may record adjustments to acquired assets, liabilities assumed and noncontrolling interests, with corresponding offsets to goodwill. Upon the conclusion of a
measurement period, any subsequent adjustments are recorded to earnings.
We use estimates, assumptions and judgments when assessing the recoverability of goodwill. We test for impairment on an annual basis, or more frequently if a significant event of circumstance
indicates the carrying amounts may not be recoverable. The assessment of goodwill for impairment may initially be performed based on qualitative factors to determine if it is more likely than not that the fair value of the reporting unit to which
the goodwill is assigned is less than the carrying value. If so, a quantitative assessment is performed to determine if an impairment has occurred and to measure the impairment loss.
Recent Accounting Standards
For descriptions of recently issued accounting standards, see “Note 3. Adoption of new and revised standards” to our notes to condensed consolidated financial statements included elsewhere in
this Quarterly Report.