Item 2. Properties
ITEM 2. PROPERTIES
Our corporate headquarters are located in Boise, Idaho. In addition to our principal facilities described below, we own or lease numerous other facilities in locations throughout the world used for design, R&D, and sales and marketing activities. The following is a summary of our principal facilities as of September 1, 2022:
Location Principal Operations
Taiwan R&D, wafer fabrication, component assembly and test, module assembly and test
Singapore R&D, wafer fabrication, component assembly and test, module assembly and test
Japan R&D, wafer fabrication
United States R&D, wafer fabrication, reticle manufacturing
Malaysia Component assembly and test, module assembly and test
China Component assembly and test, module assembly and test
We generally utilize all of our manufacturing capacity; however, a portion of our MTU facility was underutilized for 2022, 2021, and 2020. Our MTU facility was sold in the first quarter of 2022.
To support expected memory demand in the second half of the decade, we will need to add new DRAM wafer capacity. Following the enactment of the CHIPS Act in 2022, we announced plans to invest in two leading-edge memory manufacturing fabs in the United States, contingent on CHIPS Act support through grants and investment tax credits. As part of this plan, in September 2022, we broke ground on a leading-edge memory manufacturing fab in Boise, Idaho. Construction of the fab is expected to begin in calendar 2023 with DRAM production targeted to start in calendar 2025. In addition, in October 2022, we announced plans to build a second leading-edge DRAM manufacturing fab in Clay, New York. We plan to start site preparation work in calendar 2023 and expect construction to begin in calendar 2024, with production anticipated to ramp in the latter half of the decade. We expect these new fabs to fulfill our requirements for additional wafer capacity starting in the second half of the decade and beyond, in line with industry demand trends.
We believe that our existing facilities are suitable and adequate for our present purposes. We do not identify or allocate assets by operating segment, other than goodwill. See “Part II – Item 8. Financial Statements and Supplementary Data – Notes to Consolidated Financial Statements – Lehi, Utah Fab and 3D XPoint” and “ – Geographic Information.”
40
Table of Contents
Text extracted from the filing as submitted to EDGAR. Formatting, tables and exhibits are simplified for reading; the original document is authoritative for anything you rely on.