Item 2. Properties
ITEM 2. PROPERTIES
Our worldwide headquarters is located on a 35-acre complex in Atlanta, Georgia. The complex includes several office buildings which are used by Corporate employees and North America operating segment employees. In addition, the complex includes technical and engineering facilities along with a reception center.
We own or lease additional facilities, real estate and office space throughout the world, which we use for administrative, manufacturing, processing, packaging, storage, warehousing, distribution and retail operations. These properties are generally included in the geographic operating segment in which they are located, with the exception of facilities related to our consolidated bottling and distribution operations, which are included in the Bottling Investments operating segment, and Costa retail stores, which are included in the EMEA operating segment, regardless of geographic location.
The following table summarizes our principal production facilities, distribution and storage facilities, and retail stores by operating segment and Corporate as of December 31, 2025:
Principal Concentrate and/or Syrup Plants Principal Beverage Manufacturing/Bottling Plants Principal Distribution and Storage Facilities Principal Retail Stores
Owned Leased Owned Leased Owned Leased Owned Leased
EMEA 6 — 2 — — 7 — 1,379
Latin America 5 — — — 2 3 — —
North America 9 — 7 1 — 28 — —
Asia Pacific 6 1 1 — 1 3 — —
Bottling Investments — — 56 5 53 68 — —
Corporate 3 — — — — 5 — —
Total 29 1 66 6 56 114 — 1,379
Management believes that our Company’s facilities used for the production of our products are suitable and adequate, that they are being appropriately utilized in line with past experience, and that they have sufficient production capacity for their present intended purposes. The extent of utilization of our production facilities varies based upon seasonal demand for our products. However, management believes that, with the exception of certain dairy products that require specialized equipment, additional production can be achieved at the existing facilities by adding personnel and capital equipment or, at some facilities, by adding shifts of personnel or expanding the facilities. The Company is in the process of increasing our dairy production capacity. We continuously review our anticipated requirements for facilities and, on the basis of that review, may from time to time acquire or lease additional facilities and/or dispose of existing facilities.
Text extracted from the filing as submitted to EDGAR. Formatting, tables and exhibits are simplified for reading; the original document is authoritative for anything you rely on.