Item 2. Properties
ITEM 2. PROPERTIES
Corporate Headquarters
The Company leases office space for its corporate headquarters in Las Colinas, Irving, Texas. In February 2023, the Company entered into a 52-month extension of the original lease from September 2017 and added additional office space. As part of the agreement the new lease term commenced and the Company received four months free rent upon completion of the finish out of the expansion space. The expansion was complete and the Company occupied the office space effective August 1, 2023. The Company makes tiered lease payments on the first of each month.
Administrative and Logistics Offices
DynaMéxico maintains administrative and logistics offices in Guamuchil and Mazatlan, Mexico, both of which are under month-to-month payment terms.
7
Table of Contents
Mining Project Location
The San Jose de Gracia mining project (“SJG Project”) is located on map sheet G13-A81 in the Culiacan mining district of Sinaloa State, Mexico, at Latitude 26 ̊ , 9’ N, Longitude 107 ̊, 53’ W, approximately 120 kilometers east northeast of the coastal city of Los Mochis. The property on which the SJG Project resides, straddles the border separating the Mexican States of Sinaloa and Chihuahua. The SJG Project is located in the south-western portion of the property, and is located entirely within the State of Sinaloa, as shown in the maps below.
DynaMéxico owns the San Jose de Gracia mineral concessions, which are comprised of 33 distinct concessions covering an aggregate of approximately 9,920 hectares. The concessions are held 100% by DynaMéxico and there are no royalty or other interests.
The property on which the SJG Project resides is located in and around the village of San Jose de Gracia, approximately 100 km northeast of Guamuchil, on the west side of Mexico. The village of San Jose de Gracia has a small airstrip and can be accessed by a small airplane, or alternatively, by a dirt mountain road. There are roads providing access to the property on which the SJG Project resides which are accessible throughout the year.
Local Resources and Infrastructure
Accommodations
The Village of San Jose de Gracia maintains a few stores which offer essential goods and services. The mine site area camp maintains facilities which can accommodate about 65 persons in 32 rooms. Contractors manage their own camps for their personnel. The Village of SJG has additional rooms via hotels and boarding houses. Out of a total workforce of 223 employees, 143 reside in San Jose de Gracia.
8
Table of Contents
Power
A power line to the San José de Gracia Project has been installed by the Comisión Federal de Electricidad, the only authorized power producer in Mexico. The power line was installed in March 2012 from the La Estancia area of the municipality of Sinaloa de Leyva, a distance of approximately 75 kilometers.
The power line is currently 220 volts maximum capacity, which supplies the plant, including the office and camp facilities at SJG, such as water pump, air conditioning, refrigeration, lights, internet, and fans, as well as local residential use. The SJG Project can produce its own diesel-generated power as a backup to the power grid in case of interruptions.
Offices – Camp Facilities
The SJG Project sources many of its supplies from nearby towns, Guamuchil, Los Mochis and Culiacan. There is a satellite dish installed at the SJG Project providing communications from the SJG Project. At the SJG Project, DynaMéxico maintains a camp staff, including geologists, field helpers, consultants, security, cooks and cleaners. Most of these employees come from the local community.
Mining Concessions
The San José de Gracia Property consists of the following 33 contiguous mining concessions which covers an area of approximately 9,920 hectares (24,513 acres):
Current Mining Concessions - San José de Gracia
Claim Name
Claim Number
Staking date
Expiry
Hectares
AMPL. SAN NICOLAS
183815
22/11/1988
21/11/2038
17.4234
AMPL. SANTA ROSA
163592
30/10/1978
29/10/2028
25.0000
BUENA VISTA
211087
31/03/2000
30/03/2050
17.9829
EL CASTILLO
214519
02/10/2001
01/10/2051
100.0000
EL REAL
212571
07/11/2000
07/11/2052
2038.0000
EL REAL 2
216301
30/04/2002
29/04/2052
280.1555
FINISTERRE FRACC. A
219001
28/01/2003
27/01/2053
18.7856
FINISTERRE FRACC. B
219002
28/01/2003
27/01/2053
174.2004
GUADALUPE
189470
05/12/1990
04/12/2040
7.0000
LA GRACIA I
215958
02/04/2002
01/04/2052
300.0000
LA GRACIA II
215959
02/04/2002
01/04/2052
230.0000
LA LIBERTAD
172433
15/12/1983
14/12/2033
97.0000
LA NUEVA AURORA
215119
08/02/2002
07/02/2052
89.3021
LA NUEVA ESPERANZA
226289
06/12/2005
05/12/2055
40.0000
LA UNION
176214
26/08/1985
25/08/2035
4.1098
LOS TRES AMIGOS
172216
27/10/1983
26/10/2033
23.0000
MINA GRANDE
163578
10/10/1978
09/10/2028
6.6588
NUEVO ROSARIO
184999
13/12/1989
12/12/2039
32.8781
PIEDRAS DE LUMBRE 2
215556
05/03/2002
04/03/2052
34.8493
PIEDRAS DE LUMBRE 3
218992
28/01/2003
27/01/2053
4.3098
PIEDRAS DE LUMBRE No.4
212349
29/09/2000
28/09/2050
0.2034
PIEDRAS DE LUMBRE UNO
215555
05/03/2002
04/03/2052
40.2754
SAN ANDRES
212143
31/08/2000
30/08/2050
385.0990
SAN JOSÉ
208537
24/11/1998
23/11/2048
27.0000
SAN MIGUEL
183504
26/10/1988
25/10/2038
7.0000
SAN NICOLAS
163913
14/12/1978
13/12/2028
55.5490
SAN SEBASTIAN
184473
08/11/1989
07/11/2039
40.0000
SANTA MARIA
218769
17/01/2003
16/01/2053
4.2030
SANTA ROSA
170557
13/05/1982
12/05/2032
31.4887
SANTO TOMAS
187348
13/08/1986
12/08/2036
312.0000
TRES AMIGOS 2
212142
31/08/2000
30/08/2050
54.4672
FINISTERRE 4
231166
18/01/2008
17/01/2058
2,142.1302
FRANCISCO ARTURO
230494
06/09/2007
27/03/2057
3,279.5600
TOTAL
9,920.0000
9
Table of Contents
Title to 32 of the 33 mining concessions is registered in the sole name of DynaMéxico. The one exception is the San Miguel concession. For the San Miguel concession, DynaMéxico has entered into transfer agreements with the registered owners of 50% of the concession title, and DynaMéxico has also entered into promise to sell and purchase agreements with registered owners of the balance of the concession title. Under Mexican law, such agreements require the consent or relinquishment of first rights of refusal from the registered owners of 100% of the concession title, in order to have legal effect and be eligible for registration before the Mines Recorders’ Office.
Under amendments to the Mining Act of Mexico that came into effect in December 2006, the classifications of Mining Exploration Concessions and Mining Exploitation Concessions were replaced by a single classification of Mining Concessions valid for a renewable term of 50 years, commencing from the initial issuance date. To be converted into Mining Concessions at the time these amendments came into effect, former mining exploration and mining exploitation concessions had to be in good standing at the time of conversion.
All of the SJG concessions were in good standing and consequently were converted to 50-year Mining Concessions in December 2006, at the time the amendments to the Mining Act came into effect. To renew the 50-year term, Mining Concessions must be in good standing at the time an application for renewal is filed, and an application for renewal must be filed within 5 years prior to expiration of the term.
To maintain Mining Concessions in good standing, the registered owner must (a) pay bi-annual mining duties in advance, by January 31 and July 31 each year, (b) file assessment work reports by May 30 each year, for the preceding year (some exceptions apply), and (c) by January 31 each year, file statistical reports on exploration / exploitation work conducted for the preceding year. The Company believes it is in good standing regarding all above noted obligations.
Notice of Commencement of Production Activities and Annual Production Reports must be filed annually by January 31 each year for those concessions where mineral ore extraction is taking place. As a general provision, registered owners of Mining Concessions must follow environmental and labor laws and regulations in order to maintain their Mining Concessions in good standing.
The following claim location map shows the location of each of the concessions and the legend presents various areas of mining and drilling.
10
Table of Contents
Surface Rights
In addition to the surface rights held by DynaMéxico pursuant to the Mining Act of México and its Regulations ( Ley Minera y su Reglamento ), the Company maintains access and surface rights for the SJG Project pursuant to a 20-year Land Lease Agreement. This lease agreement with the Santa Maria Ejido Community (the owners of the surface rights) is dated January 6, 2014 and continues through 2033. The lease agreement covers an area of 4,399 hectares surrounding the main mineral resource areas of SJG and provides for annual lease payments of $1,359,443 Pesos (adjusted for inflation). The 2024 payment was $5,296,950 pesos (approx. $288,000 USD).
The lease agreement provides the Company with surface access to the core resource areas of SJG (4,399 hectares), and allows for all permitted mining, pilot production and exploration activities.
Water Concession
The Company has secured the Water Rights Concession for the area surrounding SJG. The Director of Water Administration of the National Water Commission of México (CONAGUA) formally certified in writing the rights of DynaMéxico to legally “use”, exploit and extract 1,000,000 cubic meters of water per year from the DynaMéxico extraction infrastructure located within the perimeter of the mining concessions. CONAGUA determined that the DynaMéxico water rights are not subject to any water rights
11
Table of Contents
concession or any other water extraction restriction. Water extracted by DynaMéxico will be subject to applicable levies imposed by the Mexican tax authorities in accordance with current Mexican tax laws. The water concession provides sufficient water for current operations, and for the anticipated future needs of the project. The Company recycles water from the tailings pond back through the test milling circuit, then back to the tailings pond.
Royalties, Encumbrances and Environmental Liabilities
The SJG Property is not subject to any royalties or encumbrances, other than in accordance with our Revolving Credit Line, and there are no known environmental liabilities.
Required Permits for Exploration, Drilling and Mining
In respect of permit requirements for mineral exploration and mining in Mexico, the most relevant applicable laws, regulations and official technical norms are the Federal Mining Act (plus its regulations), the Federal Environmental Protection and Ecological Equilibrium Act (plus its regulations), the Federal Sustainable Forestry Development Act (plus its regulations), the Federal Explosives and Firearms Act, the National Waters Act and the Mexican Official Norm 120.
To carry out mineral exploration activities, holders of mining concessions in Mexico are required to file at the offices of the Federal Secretariat of the Environment and Natural Resources (“SEMARNAT”) a “Notice of Commencement of Exploration Activities” or “Preventive Exploration Notice” in accordance with the guidelines of the Mexican Official Norm 120 (“NOM- 120”).
If contemplated mineral exploration activities fall outside of the guidelines of the NOM-120 (e.g. exploration activities on rain forest areas), a “Change of Soil Use Permit Application” (“CSUP”) is required to be filed at SEMARNAT under the guidelines of the Federal Sustainable Forestry Development Act and its Regulations. To meet the requirements for issuance of a change of soil use permit, the applicant must file (together with the CSUP) a Technical Study (“Technical Justification Study”) to justify the change of soil use from forestry to mining, in order to demonstrate that biodiversity will not be compromised and that there will be no soil erosion or water quality deterioration on completion of the mineral exploration activities.
To carry out mining activities in Mexico, holders of mining concessions are required to file an “Environmental Impact Assessment Study” under the guidelines of the Federal Environmental Protection and Ecological Equilibrium Act and its Regulations, in order to evaluate the environmental impact of the contemplated mining activities.
If the use of explosives materials is required for execution of mineral exploration or mining activities, an Application for General Permit for Use, Consumption and Storage of Explosive (“GPCSE”) is required to be filed at the offices of the Secretariat of National Defense (“SEDENA”) under the guidelines of the Federal Explosives and Firearms Act. Under the Federal Mining Act, holders of mining concessions in Mexico have the right to the use of the water coming from the mining works. Certification of water rights and/or issuance of water rights concessions are required from the National Water Commission (“CONAGUA”) under the guidelines of the National Waters Act.
Fees or Bonding Requirements Necessary To Explore or Mine
As a pre-requisite for issuance of a CSUP, Article 118 of the Federal Sustainable Forestry Development Act provides the posting of a bond to the Mexican Forestry Fund for remediation, restoration and reforestation of the areas impacted by the mineral exploration activities.
As a pre-requisite for approval of Preventive Exploration Notice and Environmental Impact Assessment Study, the Federal Environmental Protection and Ecological Equilibrium Act and its Regulations require the posting of a bond to guarantee remediation and rehabilitation of the areas impacted by the mining activities.
Government Agencies Responsible For Any Applicable Permits
SEMARNAT is the office of the Federal Government of Mexico responsible for the review and issuance of a CSUP, the review of a Technical Justification Study and the filing of NOM-120. The Federal Attorney’s Office for the protection of the Environment is the enforcement branch of SEMARNAT responsible for the monitoring and enforcement of environmental laws and regulations. SEDENA is the office responsible for issuance of a GPCSE. CONAGUA is the office responsible for certification of water rights and issuance of water rights concessions.
12
Table of Contents
Time Frame to Obtain Any Permit or Approval To Explore or Mine
NOM-120 is a notice to SEMARNAT only and has no prescribed processing time. Processing time for review and approval of a CSUP Application and Technical Justification Study varies depending on the workload of the SEMARNAT regional office where application is filed, but a processing time of four months is typical.
Processing time for review and approval of an Environmental Impact Assessment Study varies depending on workload of SEMARNAT regional office where application is filed, but a processing time of six months is typical. Processing time for issuance of a GPCSE by SEDENA is approximately six months. Processing time for issuance of a Water Rights Concession by CONAGUA is approximately six months.
DynaMéxico Permits and Bonding Requirements
Exploration Permit: On June 28, 2010, DynaMéxico filed a Preventive Exploration Notice (Preventive Exploration Notice) at the office of SEMARNAT in connection with contemplated mineral exploration activities at the La Prieta, San Pablo, La Purísima, La Unión, Tres Amigos and La Ceceña areas of the SJG Project. On July 21, 2010, SEMARNAT approved, for a term of 36 months, the execution of the mineral exploration activities at SJG set out in the Preventive Exploration Notice, as it determined that such activities fall within the framework of the NOM-120, subject to the following conditions: (a) filing and approval by SEMARNAT of a CSUP with respect to SJG (see below), and (b) posting of a bond in the amount of $134,487 Pesos to guarantee remediation and rehabilitation measures following the conclusion of the mineral exploration activities.
Change of Soil Use Permit
On August 9, 2010, DynaMéxico filed at the offices of SEMARNAT a CSUP Application and Technical Justification Study to carry out certain mineral exploration activities set out in the Preventive Exploration Notice approved by SEMARNAT on July 21, 2010 (see above) at the La Prieta, San Pablo, La Purísima, La Unión, Tres Amigos and La Ceceña areas of SJG). On December 20, 2010, SEMARNAT approved the CSUP Application filed by DynaMéxico with respect to SJG and authorized DynaMéxico the execution of mineral exploration activities on 5,463 hectares of SJG for a term of 36 months, and it is continually renewed as required.
Water Rights Certification
On March 8, 2012 the Director of Water Administration of CONAGUA certified in writing the rights of DynaMéxico to use, exploit and extract 1,000,000 cubic meters of water per year from the Company’s extraction infrastructure located in SJG. CONAGUA determined that DynaMéxico’s water rights are not subject to any other water rights concession or any other water extraction restriction.
Bonding Requirements
Under the CSUP issued to DynaMéxico on December 20, 2010, SEMARNAT imposed upon DynaMéxico the obligation to post a bond in the amount of $116,911 Pesos for reforestation and remediation measures in SJG. The Company maintains a greenhouse of 10,000 trees which are used in the reforestation efforts as necessary.
Under Preventive Exploration Notice (Preventive Exploration Notice) approved by SEMARNAT on July 21, 2010, SEMARNAT imposed upon and DynaMéxico complied, the obligation to post a bond in the amount of $134,487 Pesos, to guarantee remediation and rehabilitation measures following the conclusion of the mineral exploration activities. As required by US Generally Accepted Accounting Principles (“US GAAP”) the Company also has an asset retirement obligation recorded as of December 31, 2024 for the net present value of the cost to dismantle and dispose the plant and remove the tailings pond.
DynaMéxico has sought and obtained all required environmental permits, temporary land occupation rights and consent letters from the regulatory agencies, local municipalities and the State of Sinaloa, in order to conduct its mining, production, exploration and drilling activities on the four main deposit areas at SJG. DynaMéxico will be required to obtain further permits in order to conduct drilling in these four areas and the other areas, and in order to carry out future mining, milling, and production activities, and will timely obtain such permits, as and when required.
HISTORY OF SAN JOSE DE GRACIA
Historical production at San José de Gracia dates from the 1800’s and totals approximately one million ounces of gold mined from high-grade quartz veins. Large-scale mining in the camp began in 1870 and ended in 1910 with the onset of the Mexican Revolution. The majority of the production came from the Anglo, Rosario and La Cruz Mines on the Purisima Ridge trend, and from the La
13
Table of Contents
Prieta Mine on the La Prieta trend (reference Fig. 2). The remainder of the production was derived from as many as 60 smaller mines throughout the 12 square kilometer area, including the Palos Chinos, San Pablo, Tres Amigos, La Ceceña, Los Hilos, Santa Rosa, Veta Tierra, La Union, Santa Eduwiges, La Mochomera and La Parilla Mines.
This table presents the historic reported gold production for San Jose de Gracia prior to 1970:
Area
Gold
Production (oz)
Gold
Grade (g/t)
Mined
Width (m)
Purisma Ridge Trend (includes the Anglo, Rosario, Jesus Maria and La Cruz Mines)
471,000
67.0
Unknown
La Prieta Trend (La Prieta Mine)
215,000
28.0
1.5 – 3 m
Other areas
300,000
Unknown
Unknown
It was not until the 1970’s when mining could resume at San José de Gracia, when the first road to SJG was opened, allowing Compañia Rosarito to begin producing gold from the Palos Chinos, San Pablo, Tres Amigos and La Union mines.
Recent Ownership of the Property
By 1977, the underlying owners of the mining concessions and subsequent vendors to Minera Finisterre SA de CV. (“Finisterre”) succeeded in acquiring control of most of the district, and installed a 70 ton per day flotation concentrator. Finisterre subsequently acquired the property through option agreements with the underlying vendors and continued some exploration work, although most of its financial resources were expended in erecting a larger, 200 ton per day concentrator.
Golden Hemlock Explorations Ltd., a Canadian company, obtained an option to acquire majority control of Finisterre and commenced work on the property in 1997. The actual exploration and development work was performed by Perforaciones Quest de Mexico (“PQM”), which was under contract to Finisterre, and whose efforts consisted primarily of core drilling, trenching and mapping. PQM completed a 63-hole, 6,000-meter core drilling program in 1997.
In 1998-1999, Pamicon Developments Ltd., a Canadian company, examined the results of the 1997 drilling program, including PQM’s technical work, in order to calculate possible mineral reserves, and to review the general status of the property.
During the first half of 1999, DynaResource, Inc. and its agents arranged to collect samples for metallurgical testing. In June of 2000, DynaResource formed its subsidiary DynaMexico, in order to acquire and consolidate ownership of the San Jose de Gracia Project. By December 2003, DynaMexico had completed the acquisition of and consolidation of 100% of the San Jose de Gracia Project from Golden Hemlock and Finisterre - with the sole exception of the San Miguel mining concession.
Infrastructure Improvements, Expansion and Increased Output
As part of its ongoing exploration and project advancement activities at San Jose de Gracia, the Company continues to upgrade the on-site infrastructure and processing facilities. Significant improvements have been made such that the condition of the equipment is new, relatively new or in good condition. The Company has four primary ball mills currently running 800 tons per 24-hour day at the end of 2024.
The Company’s exploration efforts at San Jose de Gracia are aimed at increasing the mineral resource base, with particular focus on gold. Since initiating on-site processing activities in January 2015, the Company has expanded its throughput capacity from an initial 75 tons per 24-hour operating day to 800 tons per day by year-end of 2024.
In accordance with SEC requirements for an exploration stage issuer under S-K 1300, the Company expenses all costs related to site operations, project improvements, and development activities. As a result these expenditures are not capitalized on the Company’s balance sheet. Through December 31, 2024, this treatment has resulted in a net operating loss carry-forward which may be used to offset future taxable earnings.
The Company is currently classified as an exploration stage issuer under Section 1300 of Regulation S-K. In accordance with SEC requirements all costs related to site operations, infrastructure improvements, and project expansion are expensed as incurred. As such these costs are not capitalized as assets on the Company’s balance sheet.
14
Table of Contents
ACCESSIBILITY, CLIMATE, LOCAL RESOURCES, INFRASTRUCTURE AND PHYSIOGRAPHY
Topography, Physiography, and Vegetation
The topography of the San José de Gracia district is generally rugged with elevations varying from 400 meters in the valley bottoms to over 1600 meters in the higher Sierra. A network of small roads and tracks winds around areas nearer the old workings at San José de Gracia. Access to the remainder of the large property at the current stage of development is difficult without the use of horse or helicopter.
The SJG Project can be accessed by road, from either the City of Culiacán or the City of Guamuchil. Either route goes through the small town of Sinaloa de Leyva, then from Sinaloa de Leyva by gravel mountainous road to the village of San José de Gracia (population 750), which covers approximately 90 kilometers and is roughly a five-hour trip.
The SJG Project can also be accessed by air. A gravel airstrip is located adjacent to the San Jose de Gracia Village. The airstrip is suitable for light aircraft and charter flights of 45 minutes duration are available from the cities of Los Mochis or Culiacán. Much of the labor for mining and production activities of DynaMéxico is provided by the local community of SJG.
Climate and Operating Season
The climate is semi-tropical with a rainy season dominating June and July. For some activities on the SJG project, operations may be suspended during the rainy season.
MINERAL PROCESSING AND METALLURGICAL TESTING
Bulk Sample, Hazen Process Development Metallurgical Report
Ore and existing mill tailings samples were collected prior to DynaMéxico’s acquisition and consolidation of San Jose de Gracia. The ore samples consisted of a bulk (about 500 kg) of stockpiled ore from the lower adit of the Tres Amigos mine (intercept of the Tres Amigos and Orange Tree veins). In addition, approximately 100 kg of ore as a bulk sample was taken from the surface at the Gossan Cap area. Three additional ore samples (approximately 5-15 kg each) were assembled from splits of the cores from several of the 1997 drilling program core holes to develop samples representing different ore types for testing. These included: 1) composite drill cores from Palos Chinos, 2) massive sulfide from the Tres Amigos vein and 3) disseminated, nonsurprise mineralized zones at the bottom of several Tres Amigos core holes. The logic was that major exploratory test work to define a metallurgical process would be done on the bulk sample from the adit at Tres Amigos and the other samples would have limited testing done at the selected metallurgical process conditions to verify the performance of the selected metallurgical process circuit on other types of San José mineralization. Finally, several bulk samples (50-100 kg) of existing tailings from the Rosarito mill and the old Rosarito mill were collected and used to conduct flotation, gravity, and limited leachability test work on the tailings.” Samples were shipped to the laboratory of Carbonyx Carbon Technologies in Plano, Texas where in 2000 and 2001 two separate preliminary test programs were conducted, one for the tailings, and the other for a portion of the bulk Tres Amigos ore. The Company developed a concept for the metallurgical processing to produce both gravity and flotation concentrates. The tests confirmed a metallurgical flow sheet to be utilized at San José to recover up to 90% of the feed gold into the concentrates. The above “in-house” testing established a preliminary flowsheet for a mill circuit for processing either primary ore or for reprocessing the existing tailings. Subsequently Hazen Research Laboratories of Golden, Colorado (“Hazen”) was engaged to provide independent verification of the in-house work and carry out additional optimization test work. Lockwood Greene Company and Mr. Henderson prepared and verified completion of the scope of work.
In summary, various interim reports and the final metallurgical report, the Official Hazen Test Report, (“Hazen Report”)” provided results as follows:
1. The initial gravity beneficiation/flotation test work on the Tres Amigos and Gossan Cap bulk ore samples were very encouraging with up to 80% recovery of the feed gold into the gravity concentrates while maintaining a minimum concentrate grade of 100 g Au/t ;
2. The existing tailings samples (feed grades of 3 -8 g Au/t) returned similar recovery results, but had to be cleaned to produce a final concentrate with > 100 g Au/t ;
3. The overall gold recoveries into the gravity cleaner concentrate still were in excess of 50% of the total feed gold;
4. Flotation tests on primary ore samples resulted in recoveries of 85 - 90% of the feed gold into the rougher concentrates, however, recoveries after cleaning (to get > 100 g Au/t grade) dropped to the 65-75% range.
15
Table of Contents
A combination circuit of a gravity pre-concentration stage with flotation on the gravity tailings indicated the potential to recover > 90% of the feed gold into the gravity concentrate, the rougher flotation and the cleaner flotation concentrates while maintaining a 100 g Au/t grade in all of the concentrates.
EXPLORATION
DynaResource uses a multiple phase method of exploration. The initial activity consists of surface mapping and sampling to identify areas of interest. The next phase is detailed mapping and systematic sampling. Mapping and sampling of mine workings are also performed to define potential areas for future work. Geological mapping and samples have been collected in the past and sent for laboratory analysis by the Company. The prospects are then catalogued and prioritized for drilling.
Exploration and Drilling Protocol
The Company’s internal controls are designed to provide reasonable assurance that information and processes utilized in assessing its exploration results and resource estimates are reasonable and in line with industry best practices. These internal controls include QA/QC in the collection, analysis, verification, storage, reporting and use of drillhole, assay, metallurgical and other technical and scientific information, including the following internal control protocols in place for exploration data:
1. Written procedures and guidelines to support preferred sampling methods and approaches, with periodic compliance reviews of adherence to such written procedures and guidelines;
2. Maintenance of a complete chain-of-custody, ensuring the traceability and integrity of the samples at all handling stages from collection, transportation, sample preparation and analysis to long-term sample storage;
3. Geological logs are checked and verified, and there is a physical sign-off to attest to the validation protocol required;
4. Quality control checks on collar and downhole survey data for errors or significant deviations;
5. Third-party fully certified labs are used for assays used in public disclosure or resource models;
6. Appropriate types of quality control samples are inserted into the sample stream at appropriate frequencies to assess analytical data quality;
7. Regular inspection of analytical and sample preparation facilities by appropriately experienced personnel;
8. QA/QC data are regularly verified to ensure that outliers, sample mix-ups, contamination, or laboratory biases during the sample preparation and analysis steps are correctly identified, mitigated or remediated. Changes to database entries are required to be documented;
9. Database upload and verification procedures to ensure the accuracy and integrity of the data being entered into the project database. These are typically performed using software data-checking routines. Changes to database entries are required to be documented. Data are subject to regular backups.
EXPLORATION PLANS FOR 2025
The Company plans to continue its exploration drilling program with dedicated geologists currently mapping underground updating the structure interpretation of the mine. Management and geologists will make decisions based on capital available, the drill results, corporate strategies and market conditions, surface mapping, sampling and target generation. The Company has contracted with a “Qualified Person” within the meaning of subpart 1300 of Regulation S-K to interpret the data collected for a formal mineral resource analysis.
ITEM 3. LEGA L PROCEEDINGS
From time to time, the Company is involved in legal matters in the ordinary course of its business. The Company intends to defend itself vigorously against any such claims. It is the Company’s policy to accrue for amounts related to lawsuits brought against it if it is probable that a liability has been incurred and an amount can be reasonably estimated. Although the outcome of such matters cannot be predicted with certainty and no assurances can be given with respect to such matters, the Company believes that the outcome of those ordinary course matters in which it is currently involved will not have a materially adverse effect on its results of operations, liquidity, or financial position.
2014 Arbitration Proceeding Filed by Goldgroup Resources Inc.
16
Table of Contents
On March 14, 2014, Goldgroup Resources, Inc. ("Goldgroup") filed for arbitration in the United States with the American Arbitration Association (“AAA”), seeking monetary and nonmonetary relief under an Earn In/Option Agreement. On August 25, 2016, the AAA issued a ruling in favor of Goldgroup against the Company and DynaMéxico (the “Arbitration Award”). On May 9, 2019, the United States District Court for the District of Colorado (the “Colorado U.S. District Court”) confirmed the Arbitration Award. The Company fulfilled its obligations under the Arbitration Award prior to the beginning of 2023. On March 5, 2024, the Colorado U.S. District Court issued an Order denying requests for additional relief by both the Company and Goldgroup and stating that the case is closed.
DynaResource de Mexico SA de CV Legal Update and Disclosure:
On March 3, 2023, Goldgroup Resources Inc. (“Goldgroup”) filed a formal notice with the México Federal Legal Authorities, which confirmed Goldgroup’s complete withdrawal of all legal claims in Mexico and under Mexican law against DynaResource de México SA de CV.
Goldgroup’s complete legal withdrawal is the result and culmination of 7 years of legal actions undertaken in Mexico by DynaMéxico. Accordingly, all matters before the courts in México with respect to DynaMéxico and Goldgroup Resources Inc. are fully resolved and are no longer subject to appeal.
Consequence of the México legal rulings and the Goldgroup legal withdrawal:
• The $48,280,808 USD damages award (dated October 05, 2015) in favor of DynaMéxico and against Goldgroup Resources Inc., confirmed by Mexican courts in 2019, is final, conclusive, and enforceable under Mexican law. Goldgroup Resources’ challenges to that award have been fully denied and the damages award is final.
• Goldgroup’s challenges to DynaMéxico’s share ownership have also been fully denied and consequently, under Mexican law, Goldgroup owns no shares in DynaMéxico.
Mercuria Energy Trading S.A vs Mineras de DynaResource S.A. de C.V.
In 2020, Mercuria Energy Trading, S.A. (“Mercuria”) initiated an arbitration proceeding against Mineras de DynaResource, S.A. de C.V. (“Mineras”), arising out of the earlier-terminated supply agreement between the parties. In January 2022, the arbitration panel awarded Mercuria the sum of US$1,822,674, plus interest at 2% over the quarterly compounded USD three- month LIBOR rate, from February 2020 forward. In August 2022, the panel also assessed costs of the arbitration proceeding against Mineras, in the aggregate amount of £ 376,233. DynaResource has accrued $1,000,000 for the arbitration award and related costs.
The Company notes the following: since Mineras is a company of Mexican nationality, under Mexican law Mineras has the right to legally oppose the recognition and enforcement of the award to Mercuria, the assessment of any costs, and any supplemental award.