−Removed: Luminant's asset fleet consists of power generation and battery ESS units in six ISOs/RTOs, with the location, ISO/RTO, technology, primary fuel type, net capacity and ownership interest for each generation facility shown in the table below:
−Removed: Facility Location ISO/RTO Technology Primary Fuel (a) Net Capacity (MW) (b) Ownership Interest (c)
+Added: Luminant's asset fleet as of December 31, 2022, all of which are 100% (fee simple) owned, consists of power generation and battery ESS units in six ISOs/RTOs, with the location, ISO/RTO, technology, primary fuel type and net capacity for each generation facility shown in the table below:
+Added: Facility Location ISO/RTO Technology Primary Fuel (a) Net Capacity (MW) (b)
Ennis Ennis, TX ERCOT CCGT Natural Gas 366
15 unchanged sentences
Comanche Peak Glen Rose, TX ERCOT Nuclear Nuclear 2,400
+Added: Brightside Live Oak County, TX ERCOT Solar Renewable 50
+Added: Emerald Grove Crane County, TX ERCOT Solar Renewable 108
Upton 2 Upton County, TX ERCOT Solar/Battery Renewable 180
+Added: DeCordova Granbury, TX ERCOT Battery Renewable 260
Total Texas Segment 18,141
1 unchanged sentence
Hanging Rock Ironton, OH PJM CCGT Natural Gas 1,430
−Removed: Facility Location ISO/RTO Technology Primary Fuel (a) Net Capacity (MW) (b) Ownership Interest (c)
Hopewell Hopewell, VA PJM CCGT Natural Gas 370
15 unchanged sentences
Masspower Indian Orchard, MA ISO-NE CCGT Natural Gas 281
+Added: Facility Location ISO/RTO Technology Primary Fuel (a) Net Capacity (MW) (b)
Milford Milford, CT ISO-NE CCGT Natural Gas 600
7 unchanged sentences
Baldwin Baldwin, IL MISO ST Coal 1,185
−Removed: Edwards Bartonville, IL MISO ST Coal 585 100%
+Added: Edwards (c) Bartonville, IL MISO ST Coal 585
Newton Newton, IL MISO ST Coal 615
−Removed: Joppa/EEI Joppa, IL MISO ST Coal 802 80%
−Removed: Joppa CT 1-3 Joppa, IL MISO CT Natural Gas 165 100%
−Removed: Joppa CT 4-5 Joppa, IL MISO CT Natural Gas 56 80%
Kincaid Kincaid, IL PJM ST Coal 1,108
Miami Fort 7 & 8 North Bend, OH PJM ST Coal 1,020
−Removed: Zimmer Moscow, OH PJM ST Coal 1,300 100%
Total Sunset Segment 5,163
1 unchanged sentence
(a) Renewable represents generation assets fueled by renewable sources including energy storage and solar, which do not have significant fuel costs.
−Removed: (b) Unit capabilities are based on winter capacity and are reflected at our net ownership interest.
+Added: (b) Approximate net generation capacity.
+Added: Actual net generation capacity may vary based on a number of factors, including ambient temperature.
We have not included units that have been retired or are out of operation.
−Removed: (c) Ownership interest of 100% indicates fee simple ownership of the facility.
−Removed: Ownership of less than 100% indicates the share of ownership in the facility held by the Company.
+Added: (c) Final day of operation was December 31, 2022.
+Added: Retired on January 1, 2023.
See Note 2 to the Financial Statements for discussion of our solar and battery energy storage projects currently under development and Note 3 to the Financial Statements for discussion of our retirement of certain generation facilities.
10 unchanged sentences
The Comanche Peak facility operated at a capacity factor of 94%, 96% and 97% in 2022, 2021 and 2020, respectively.
−Removed: We have contracts in place for all of our 2022 and 2023 nuclear fuel requirements.
+Added: We have contracts in place for all of our 2023 through 2025 nuclear fuel requirements.
We do not anticipate any significant difficulties in acquiring uranium and contracting for associated conversion, enrichment and fabrication services in the foreseeable future.
2 unchanged sentences
Additionally, we have near-term natural gas transportation agreements in place to ensure reliable fuel supply.
−Removed: Coal/Lignite — Our coal/lignite-fueled generation fleet is comprised of 10 generation facilities totaling 11,115 MW of generation capacity.
+Added: Coal/Lignite — Our coal/lignite-fueled generation fleet is comprised of eight generation facilities totaling 9,013 MW of generation capacity, including the 585 MW Edwards facility that was retired on January 1, 2023.
Maintenance outages at these units are scheduled during the spring or fall off-peak demand periods.
2 unchanged sentences
Compared sentence by sentence after normalising whitespace, quotation marks, case and digits, so re-formatting and restated figures do not read as changed language. Wording changes appear as one removal and one addition. The current filing and the prior one are authoritative.