11 unchanged sentences
Temporary impediments to administrative activities supporting our operations also hampered our product deliveries and deployments.
+Added: In early 2022, spikes in COVID-19 cases in Shanghai resulted in the temporary shutdown of Gigafactory Shanghai, as well as parts of our supply chain.
Global trade conditions and consumer trends that originated during the pandemic continue to persist and may also have long-lasting adverse impact on us and our industries independently of the progress of the pandemic.
1 unchanged sentence
Similarly, increased demand for personal electronics has created a shortfall of semiconductors, which has caused challenges in our supply chain and production.
−Removed: In addition, labor shortages resulting from the pandemic may lead to increased difficulty in hiring and retaining manufacturing and service workers, as well as increased labor costs.
+Added: In addition, labor shortages resulting from the pandemic, including worker absenteeism, may lead to increased difficulty in hiring and retaining manufacturing and service workers, as well as increased labor costs.
Sustaining our production trajectory will require the ongoing readiness and solvency of our suppliers and vendors, a stable and motivated production workforce and government cooperation, including for travel and visa allowances.
−Removed: The contingencies inherent in the construction of, and ramp at, new facilities such as Gigafactory Shanghai, Gigafactory Berlin and Gigafactory Texas may be exacerbated by these challenges.
+Added: The contingencies inherent in the ramp at new facilities such as Gigafactory Berlin and Gigafactory Texas may be exacerbated by these challenges.
We cannot predict the duration or direction of current global trends or their sustained impact.
13 unchanged sentences
We may also experience similar future delays in launching and/or ramping production of our energy storage products and Solar Roof;
−Removed: new product versions or variants such as the recently updated Model S and Model X;
+Added: new product versions or variants such as the updated Model S and Model X;
new vehicles such as Tesla Semi, Cybertruck and the new Tesla Roadster;
−Removed: and future features and services such as new Autopilot or FSD features and the autonomous
−Removed: Tesla ride-hailing network.
+Added: and future features and services based on artificial intelligence, such as new Autopilot or FSD functionalities,
+Added: the autonomous Tesla ride-hailing network and robotics.
Likewise, we may encounter delays with the design, construction and regulatory or other approvals necessary to build and bring online future manufacturing facilities and products.
Any delay or other complication in ramping the production of our current products or the development, manufacture, launch and production ramp of our future products, features and services, or in doing so cost-effectively and with high quality, may harm our brand, business, prospects, financial condition and operating results.
+Added: Our suppliers may fail to deliver components according to schedules, prices, quality and volumes that are acceptable to us, or we may be unable to manage these components effectively.
+Added: Our products contain thousands of parts purchased globally from hundreds of suppliers, including single-source direct suppliers, which exposes us to multiple potential sources of component shortages.
+Added: Unexpected changes in business conditions, materials pricing, including inflation of raw material costs, labor issues, wars, trade policies, natural disasters such as the March 2011 earthquakes in Japan, health epidemics such as the global COVID-19 pandemic, trade and shipping disruptions, port congestions and other factors beyond our or our suppliers’
+Added: control could also affect these suppliers’
+Added: ability to deliver components to us or to remain solvent and operational.
+Added: For example, a global shortage of semiconductors has been reported since early 2021 and has caused challenges in the manufacturing industry and impacted our supply chain and production as well.
+Added: In addition, a spike in COVID-19 cases in Shanghai in early 2022 led to temporary manufacturing shutdowns of certain of our suppliers.
+Added: We have used alternative parts and programmed software to mitigate the challenges caused by these shortages, but there is no guarantee we may be able to continually do so as we scale production to meet our growth targets.
+Added: Additionally, if our suppliers do not accurately forecast and effectively allocate production or if they are not willing to allocate sufficient production to us, it may reduce our access to components and require us to search for new suppliers.
+Added: The unavailability of any component or supplier could result in production delays, idle manufacturing facilities, product design changes and loss of access to important technology and tools for producing and supporting our products, as well as impact our capacity expansion and our ability to fulfill our obligations under customer contracts.
+Added: Moreover, significant increases in our production, such as for Model 3 and Model Y, or product design changes by us have required and may in the future require us to procure additional components in a short amount of time.
+Added: Our suppliers may not be willing or able to sustainably meet our timelines or our cost, quality and volume needs, or to do so may cost us more, which may require us to replace them with other sources.
+Added: Finally, we have limited vehicle manufacturing experience outside of the Fremont Factory and Gigafactory Shanghai and we may experience issues increasing the level of localized procurement at Gigafactory Berlin and Gigafactory Texas.
+Added: While we believe that we will be able to secure additional or alternate sources or develop our own replacements for most of our components, there is no assurance that we will be able to do so quickly or at all.
+Added: Additionally, we may be unsuccessful in our continuous efforts to negotiate with existing suppliers to obtain cost reductions and avoid unfavorable changes to terms, source less expensive suppliers for certain parts and redesign certain parts to make them less expensive to produce, especially in light of the increases in materials pricing.
+Added: Any of these occurrences may harm our business, prospects, financial condition and operating results.
+Added: As the scale of our vehicle production increases, we will also need to accurately forecast, purchase, warehouse and transport components at high volumes to our manufacturing facilities and servicing locations internationally.
+Added: If we are unable to accurately match the timing and quantities of component purchases to our actual needs or successfully implement automation, inventory management and other systems to accommodate the increased complexity in our supply chain and parts management, we may incur unexpected production disruption, storage, transportation and write-off costs, which may harm our business and operating results.
+Added: We may be unable to meet our projected construction timelines, costs and production ramps at new factories, or we may experience difficulties in generating and maintaining demand for products manufactured there.
+Added: Our ability to increase production of our vehicles on a sustained basis, make them affordable globally by accessing local supply chains and workforces and streamline delivery logistics is dependent on the construction and ramp of our current and future factories.
+Added: The construction of and commencement and ramp of production at these factories are subject to a number of uncertainties inherent in all new manufacturing operations, including ongoing compliance with regulatory requirements, procurement and maintenance of construction, environmental and operational licenses and approvals for additional expansion, potential supply chain constraints, hiring, training and retention of qualified employees and the pace of bringing production equipment and processes online with the capability to manufacture high-quality units at scale.
+Added: Moreover, we will have to establish and ramp production of our proprietary battery cells and packs at our new factories, and we additionally intend to incorporate sequential design and manufacturing changes into vehicles manufactured at each new factory.
+Added: We have limited experience to date with developing and implementing manufacturing innovations outside of the Fremont Factory and Gigafactory Shanghai.
+Added: In particular, the majority of our design and engineering resources are currently located in California.
+Added: In order to meet our expectations for our new factories, we must expand and manage localized design and engineering talent and resources.
+Added: If we experience any issues or delays in meeting our projected timelines, costs, capital efficiency and production capacity for our new factories, expanding and managing teams to implement iterative design and production changes there, maintaining and complying with the terms of any debt financing that we obtain to fund them or generating and maintaining demand for the vehicles we manufacture there, our business, prospects, operating results and financial condition may be harmed.
We may be unable to grow our global product sales, delivery and installation capabilities and our servicing and vehicle charging networks, or we may be unable to accurately project and effectively manage our growth.
8 unchanged sentences
homes and workplaces and touchless deliveries, but there is no guarantee that such models will be scalable or be accepted globally.
−Removed: Likewise, as we ramp Solar Roof, we are working to substantially increase installation capabilities and decrease installation times.
−Removed: If we are not successful in matching such capabilities with actual production, or if we experience unforeseen production delays or inaccurately forecast demand for the Solar Roof, our business, financial condition and operating results may be harmed.
+Added: Likewise, as we ramp our energy products, we are working to substantially increase our production and installation capabilities.
+Added: If we experience production delays or inaccurately forecast demand, our business, financial condition and operating results may be harmed.
Moreover, because of our unique expertise with our vehicles, we recommend that our vehicles be serviced by us or by certain authorized professionals.
−Removed: If we experience delays in adding such servicing capacity or servicing our vehicles efficiently, or experience unforeseen issues with the reliability of our vehicles, particularly higher-volume and relatively newer additions to our fleet such as Model 3 and Model Y, it could overburden our servicing capabilities and parts inventory.
+Added: If we experience delays in adding servicing capacity or servicing our vehicles efficiently, or experience unforeseen issues with the reliability of our vehicles, particularly higher-volume additions to our fleet such as Model 3 and Model Y, it could overburden our servicing capabilities and parts inventory.
Similarly, the increasing number of Tesla vehicles also requires us to continue to rapidly increase the number of our Supercharger stations and connectors throughout the world.
3 unchanged sentences
If we fail to manage our growth effectively, it may harm our brand, business, prospects, financial condition and operating results.
+Added: We will need to maintain and significantly grow our access to battery cells, including through the development and manufacture of our own cells, and control our related costs.
+Added: We are dependent on the continued supply of lithium-ion battery cells for our vehicles and energy storage products, and we will require substantially more cells to grow our business according to our plans.
+Added: Currently, we rely on suppliers such as Panasonic and Contemporary Amperex Technology Co.
+Added: Limited (CATL) for these cells.
+Added: We have to date fully qualified only a very limited number of such suppliers and have limited flexibility in changing suppliers.
+Added: Any disruption in the supply of battery cells from our suppliers could limit production of our vehicles and energy storage products.
+Added: In the long term, we intend to supplement cells from our suppliers with cells manufactured by us, which we believe will be more efficient, manufacturable at greater volumes and more cost-effective than currently available cells.
+Added: However, our efforts to develop and manufacture such battery cells have required, and may continue to require, significant investments, and there can be no assurance that we will be able to achieve these targets in the timeframes that we have planned or at all.
+Added: If we are unable to do so, we may have to curtail our planned vehicle and energy storage product production or procure additional cells from suppliers at potentially greater costs, either of which may harm our business and operating results.
+Added: In addition, the cost and mass production of battery cells, whether manufactured by our suppliers or by us, depends in part upon the prices and availability of raw materials such as lithium, nickel, cobalt and/or other metals.
+Added: The prices for these materials fluctuate and their available supply may be unstable, depending on market conditions and global demand for these materials.
+Added: As a result of increased global production of electric vehicles and energy storage products, suppliers of these raw materials may be unable to meet our volume needs.
+Added: Additionally, our suppliers may not be willing or able to reliably meet our timelines or our cost and quality needs, which may require us to replace them with other sources.
+Added: Any reduced availability of these materials may impact our access to cells and our growth, and any increases in their prices may reduce our profitability if we cannot recoup such costs through increased prices.
+Added: Moreover, our inability to meet demand and any product price increases may harm our brand, growth, prospects and operating results.
Our future growth and success are dependent upon consumers’
12 unchanged sentences
Sales of vehicles in the automotive industry tend to be cyclical in many markets, which may expose us to further volatility.
−Removed: Our suppliers may fail to deliver components according to schedules, prices, quality and volumes that are acceptable to us, or we may be unable to manage these components effectively.
−Removed: Our products contain thousands of parts purchased globally from hundreds of suppliers, including single-source direct suppliers.
−Removed: This exposes us to multiple potential sources of component shortages, such as those that we experienced in 2012 and 2016 with our initial Model S and Model X ramps.
−Removed: Unexpected changes in business conditions, materials pricing, labor issues, wars, trade policies, natural disasters such as the March 2011 earthquakes in Japan, health epidemics such as the global COVID-19 pandemic, trade and shipping disruptions, port congestions and other factors beyond our or our suppliers’
−Removed: control could also affect these suppliers’
−Removed: ability to deliver components to us or to remain solvent and operational.
−Removed: For example, a global shortage of semiconductors has been reported since early 2021 and has caused challenges in the manufacturing industry and impacted our supply chain and production as well.
−Removed: We have used alternative parts and programmed software to mitigate the challenges caused by these shortages, but there is no guarantee we may be able to continually do so as we scale production to meet our growth targets.
−Removed: The unavailability of any component or supplier could result in production delays, idle manufacturing facilities, product design changes and loss of access to important technology and tools for producing and supporting our products, as well as impact our capacity expansion and our ability to fulfill our obligations under customer contracts.
−Removed: Moreover, significant increases in our production, such as for Model 3 and Model Y, or product design changes by us have required and may in the future require us to procure additional components in a short amount of time.
−Removed: Our suppliers may not be willing or able to sustainably meet our timelines or our cost, quality and volume needs, or to do so may cost us more, which may require us to replace them with other sources.
−Removed: Finally, we have limited vehicle manufacturing experience outside of the Fremont Factory and we may experience issues increasing the level of localized procurement at our Gigafactory Shanghai and at future factories such as Gigafactory Berlin and Gigafactory Texas.
−Removed: While we believe that we will be able to secure additional or alternate sources or develop our own replacements for most of our components, there is no assurance that we will be able to do so quickly or at all.
−Removed: Additionally, we may be unsuccessful in our continuous efforts to negotiate with existing suppliers to obtain cost reductions and avoid unfavorable changes to terms, source less expensive suppliers for certain parts and redesign certain parts to make them less expensive to produce, especially in light of the increases in materials pricing.
−Removed: Any of these occurrences may harm our business, prospects, financial condition and operating results.
−Removed: As the scale of our vehicle production increases, we will also need to accurately forecast, purchase, warehouse and transport components at high volumes to our manufacturing facilities and servicing locations internationally.
−Removed: If we are unable to accurately match the timing and quantities of component purchases to our actual needs or successfully implement automation, inventory management and other systems to accommodate the increased complexity in our supply chain and parts management, we may incur unexpected production disruption, storage, transportation and write-off costs, which may harm our business and operating results.
−Removed: We may be unable to meet our projected construction timelines, costs and production ramps at new factories, or we may experience difficulties in generating and maintaining demand for products manufactured there.
−Removed: Our ability to increase production of our vehicles on a sustained basis, make them affordable globally by accessing local supply chains and workforces and streamline delivery logistics is dependent on the construction and ramp of Gigafactory Shanghai, Gigafactory Berlin and Gigafactory Texas.
−Removed: The construction of and commencement and ramp of production at these factories are subject to a number of uncertainties inherent in all new manufacturing operations, including ongoing compliance with regulatory requirements, procurement and maintenance of construction, environmental and operational licenses and approvals for additional expansion, potential supply chain constraints, hiring, training and retention of qualified employees and the pace of bringing production equipment and processes online with the capability to manufacture high-quality units at scale.
−Removed: For example, we are currently constructing Gigafactory Berlin under conditional permits in anticipation of being granted final permits.
−Removed: Moreover, we will have to establish and ramp production of our proprietary battery cells and packs at our new factories, and we additionally intend to incorporate sequential design and manufacturing changes into vehicles manufactured at each new factory.
−Removed: We have limited experience to date with developing and implementing manufacturing innovations outside of the Fremont Factory, as we began production at Gigafactory Shanghai relatively recently.
−Removed: In particular, the majority of our design and engineering resources are currently located in California.
−Removed: In order to meet our expectations for our new factories, we must expand and manage localized design and engineering talent and resources.
−Removed: If we experience any issues or delays in meeting our projected timelines, costs, capital efficiency and production capacity for our new factories, expanding and managing teams to implement iterative design and production changes there, maintaining and complying with the terms of any debt financing that we obtain to fund them or generating and maintaining demand for the vehicles we manufacture there, our business, prospects, operating results and financial condition may be harmed.
−Removed: We will need to maintain and significantly grow our access to battery cells, including through the development and manufacture of our own cells, and control our related costs.
−Removed: We are dependent on the continued supply of lithium-ion battery cells for our vehicles and energy storage products, and we will require substantially more cells to grow our business according to our plans.
−Removed: Currently, we rely on suppliers such as Panasonic for these cells.
−Removed: However, we have to date fully qualified only a very limited number of such suppliers and have limited flexibility in
−Removed: changing suppliers.
−Removed: Any disruption in the supply of battery cells from our suppliers could limit production of our vehicles and energy storage products.
−Removed: In the long term, we intend to supplement cells from our suppliers with cells manufactured by us, which we believe will be more efficient, manufacturable at greater volumes and more cost-effective than currently available cells.
−Removed: However, our efforts to develop and manufacture such battery cells have required and may require significant investments, and there can be no assurance that we will be able to achieve these targets in the timeframes that we have planned or at all.
−Removed: If we are unable to do so, we may have to curtail our planned vehicle and energy storage product production or procure additional cells from suppliers at potentially greater costs, either of which may harm our business and operating results.
−Removed: In addition, the cost of battery cells, whether manufactured by our suppliers or by us, depends in part upon the prices and availability of raw materials such as lithium, nickel, cobalt and/or other metals.
−Removed: The prices for these materials fluctuate and their available supply may be unstable, depending on market conditions and global demand for these materials, including as a result of increased global production of electric vehicles and energy storage products.
−Removed: Any reduced availability of these materials may impact our access to cells and any increases in their prices may reduce our profitability if we cannot recoup the increased costs through increased vehicle prices.
−Removed: Moreover, any such attempts to increase product prices may harm our brand, prospects and operating results.
We face strong competition for our products and services from a growing list of established and new competitors.
8 unchanged sentences
Risks Related to Our Operations
−Removed: We may experience issues with lithium-ion cells or other components manufactured at Gigafactory Nevada, which may harm the production and profitability of our vehicle and energy storage products.
+Added: We may experience issues with lithium-ion cells or other components manufactured at Gigafactory Nevada and Gigafactory Shanghai, which may harm the production and profitability of our vehicle and energy storage products.
Our plan to grow the volume and profitability of our vehicles and energy storage products depends on significant lithium-ion battery cell production, including by our partner Panasonic at Gigafactory Nevada.
−Removed: Although Panasonic has a long track record of producing high-quality cells at significant volume at its factories in Japan, it has relatively limited experience with cell production at Gigafactory Nevada, which began in 2017.
−Removed: In addition, we produce several vehicle components, such as battery modules and packs incorporating the cells produced by Panasonic for Model 3 and Model Y and drive units (including to support Gigafactory Shanghai production), at Gigafactory Nevada, and we also manufacture energy storage products there.
+Added: In addition, we produce several vehicle components, such as battery modules and packs and drive units at Gigafactory Nevada and Gigafactory Shanghai, and we also manufacture energy storage products at Gigafactory Nevada.
In the past, some of the manufacturing lines for certain product components took longer than anticipated to ramp to their full capacity, and additional bottlenecks may arise in the future as we continue to increase the production rate and introduce new lines.
−Removed: If we or Panasonic are unable to or otherwise do not maintain and grow our respective operations at Gigafactory Nevada production, or if we are unable to do so cost-effectively or hire and retain highly-skilled personnel there, our ability to manufacture our products profitably would be limited, which may harm our business and operating results.
+Added: If we are unable to or otherwise do not maintain and grow our respective operations at Gigafactory Nevada and Gigafactory Shanghai production, or if we are unable to do so cost-effectively or hire and retain highly-skilled personnel there, our ability to manufacture our products profitably would be limited, which may harm our business and operating results.
Finally, the high volumes of lithium-ion cells and battery modules and packs manufactured at Gigafactory Nevada are stored and recycled at our various facilities.
4 unchanged sentences
We are subject to legal and regulatory requirements, political uncertainty and social, environmental and economic conditions in numerous jurisdictions, including markets in which we generate significant sales, over which we have little control and which are inherently unpredictable.
−Removed: Our operations in such jurisdictions, particularly as a company based in the U.S., create risks relating to
−Removed: conforming our products to regulatory and safety requirements and charging and other electric infrastructures;
+Added: Our operations in such jurisdictions, particularly as a company based in the U.S., create risks relating to conforming our products to regulatory and safety requirements and charging and other electric infrastructures;
organizing local operating entities;
35 unchanged sentences
Such attention includes frequent criticism, which is often exaggerated or unfounded, such as speculation regarding the sufficiency or stability of our management team.
−Removed: Any such negative perceptions, whether caused by us or not, may harm our business and make it more difficult to raise additional funds if needed.
+Added: negative perceptions, whether caused by us or not, may harm our business and make it more difficult to raise additional funds if needed.
We may be unable to effectively grow, or manage the compliance, residual value, financing and credit risks related to, our various financing programs.
−Removed: We offer financing arrangements for our vehicles in North America, Europe and Asia primarily through various financial institutions.
+Added: We offer financing arrangements for our vehicles in North America, Europe and Asia primarily ourselves and through various financial institutions.
We also currently offer vehicle financing arrangements directly through our local subsidiaries in certain markets.
18 unchanged sentences
Under this agreement, we are obligated to, among other things, meet employment targets as well as specified minimum numbers of personnel in the State of New York and in Buffalo, New York and spend or incur $5.00 billion in combined capital, operational expenses, costs of goods sold and other costs in the State of New York during a period that was initially 10 years beginning April 30, 2018.
−Removed: As we temporarily suspended most of our manufacturing operations at Gigafactory New York pursuant to a New York State executive order issued in March 2020 as a result of the COVID-19 pandemic, we were granted a one-year deferral of our obligation to be compliant with our applicable targets under such agreement on April 30, 2020, which was memorialized in an amendment to our agreement with the SUNY Foundation in July 2020.
−Removed: In April 2021, we were granted an additional deferral through December 31, 2021 which was memorialized in an amendment to our agreement with the SUNY Foundation in August 2021, as our operations at Gigafactory New York have not yet fully ramped due to a number of factors related to the pandemic.
+Added: As we temporarily suspended most of our manufacturing operations at Gigafactory New York pursuant to a New York State executive order issued in March 2020 as a result of the COVID-19 pandemic, we were granted a deferral of our obligation to be compliant with our applicable targets through December 31, 2021 in an amendment memorialized in August 2021.
+Added: As of March 31, 2022, we are currently in excess of such targets relating to investments and personnel in the State of New York and Buffalo.
While we expect to have and grow significant operations at Gigafactory New York and the surrounding Buffalo area, any failure by us in any year over the course of the term of the agreement to meet all applicable future obligations may result in our obligation to pay a “program payment”
4 unchanged sentences
In particular, we are highly dependent on the services of Elon Musk, Technoking of Tesla and our Chief Executive Officer.
−Removed: None of our key employees is bound by an employment agreement for any specific term and we may not be able to successfully attract and retain senior leadership necessary to grow our business.
−Removed: future success also depends upon our ability to attract, hire and retain a large number of engineering, manufacturing, marketing, sales and delivery, service, installation, technology and support personnel, especially to support our planned high-volume product sales, market and geographical expansion and technological innovations.
+Added: None of our key employees is bound by an employment agreement
+Added: for any specific term and we may not be able to successfully attract and retain senior leadership necessary to grow our business.
+Added: Our future success also depends upon our ability to attract, hire and retain a large number of engineering, manufacturing, marketing, sales and delivery, service, installation, technology and support personnel, especially to support our planned high-volume product sales, market and geographical expansion and technological innovations.
Recruiting efforts, particularly for senior employees, may be time-consuming, which may delay the execution of our plans.
14 unchanged sentences
Musk also currently serves as Chief Executive Officer and Chief Technical Officer of Space Exploration Technologies Corp., a developer and manufacturer of space launch vehicles, and is involved in other emerging technology ventures.
−Removed: We must manage risks relating to our information technology systems and the threat of intellectual property theft, data breaches and cyber-attacks.
−Removed: We must continue to expand and improve our information technology systems as our operations grow, such as product data management, procurement, inventory management, production planning and execution, sales, service and logistics, dealer management, financial, tax and regulatory compliance systems.
+Added: Our information technology systems or data, or those of our service providers or customers or users could be subject to cyber-attacks or other security incidents, which could result in data breaches, intellectual property theft, claims, litigation, regulatory investigations, significant liability, reputational damage and other adverse consequences.
+Added: We continue to expand our information technology systems as our operations grow, such as product data management, procurement, inventory management, production planning and execution, sales, service and logistics, dealer management, financial, tax and regulatory compliance systems.
This includes the implementation of new internally developed systems and the deployment of such systems in the U.S.
−Removed: We must also continue to maintain information technology measures designed to protect us against intellectual property theft, data breaches, sabotage and other external or internal cyber-attacks or misappropriation.
−Removed: However, the implementation, maintenance, segregation and improvement of these systems require significant management time, support and cost, and there are inherent risks associated with developing, improving and expanding our core systems as well as implementing new systems and updating current systems, including disruptions to the related areas of business operation.
+Added: While, we maintain information technology measures designed to protect us against intellectual property theft, data breaches, sabotage and other external or internal cyber-attacks or misappropriation, our systems and those of our service providers are potentially vulnerable to malware, ransomware, viruses, denial-of-service attacks, phishing attacks, social engineering, computer hacking, unauthorized access, exploitation of bugs, defects and vulnerabilities, breakdowns, damage, interruptions, system malfunctions, power outages, terrorism, acts of vandalism, security breaches, security incidents, inadvertent or intentional actions by employees or other third parties, and other cyber-attacks.
+Added: To the extent any security incident results in unauthorized access or damage to or acquisition, use, corruption, loss, destruction, alteration or dissemination of our data, including intellectual property and personal information, or our products or vehicles, or for it to be believed or reported that any of these occurred, it could disrupt our business, harm our reputation, compel us to comply with applicable data breach notification laws, subject us to time consuming, distracting and expensive litigation, regulatory investigation and oversight, mandatory corrective action, require us to verify the correctness of database contents, or otherwise subject us to liability under laws, regulations and contractual obligations, including those that protect the privacy and security of personal information.
+Added: This could result in increased costs to us and result in significant legal and financial exposure and/or reputational harm.
+Added: We also rely on service providers, and similar incidents relating to their information technology systems could also have a material adverse effect on our business.
+Added: There have been and may continue to be significant supply chain attacks.
+Added: Our service providers, including our workforce management software provider, have been subject to ransomware and other security incidents, and we cannot guarantee that our or our service providers’
+Added: systems have not been breached or that they do not contain exploitable defects, bugs, or vulnerabilities that could result in a security incident, or other disruption to, our or our service providers’
+Added: Our ability to monitor our service providers’
+Added: security measures is limited, and, in any event, malicious third parties may be able to circumvent those security measures.
+Added: Further, the implementation, maintenance, segregation and improvement of these systems require significant management time, support and cost, and there are inherent risks associated with developing, improving and expanding our core systems as well as implementing new systems and updating current systems, including disruptions to the related areas of business operation.
These risks may affect our ability to manage our data and inventory, procure parts or supplies or manufacture, sell, deliver and service products, adequately protect our intellectual property or achieve and maintain compliance with, or realize available benefits under, tax laws and other applicable regulations.
Moreover, if we do not successfully implement, maintain or expand these systems as planned, our operations may be disrupted, our ability to accurately and/or timely report our financial results could be impaired and deficiencies may arise in our internal control over financial reporting, which may impact our ability to certify our financial results.
−Removed: Moreover, our proprietary information or intellectual property could be compromised or misappropriated and our reputation may be adversely affected.
+Added: Moreover, our proprietary information, including intellectual property and personal information, could be compromised or misappropriated and our reputation may be adversely affected.
If these systems or their functionality do not operate as we expect them to, we may be required to expend significant resources to make corrections or find alternative sources for performing these functions.
5 unchanged sentences
functionality, user interface and performance characteristics or to gain access to data stored in or generated by our products.
−Removed: We encourage reporting of potential vulnerabilities in the security of our products through our security vulnerability reporting policy, and we aim to remedy any reported
−Removed: and verified vulnerability.
+Added: We encourage reporting of potential vulnerabilities in the security of our products through our security vulnerability reporting policy, and we aim to remedy any reported and verified vulnerability.
However, there can be no assurance that any vulnerabilities will not be exploited before they can be identified, or that our remediation efforts are or will be successful.
7 unchanged sentences
Although we work diligently to provide the best possible work environment for our employees, they may still decide to join or seek recognition to form a labor union, or we may be required to become a union signatory.
−Removed: From time to time, labor unions have engaged in campaigns to organize certain of our operations, as part of which such unions have filed unfair labor practice charges against us with the National Labor Relations Board (the "NLRB"), and they may do so in the future.
+Added: From time to time, labor unions have engaged in campaigns to organize certain of our operations, as part of which such unions have filed unfair labor practice charges against us with the National Labor Relations Board (the “NLRB”), and they may do so in the future.
In September 2019, an administrative law judge issued a recommended decision for Tesla on certain issues and against us on certain others.
6 unchanged sentences
As a manufacturing company, we must manage the risk of product recalls with respect to our products.
−Removed: Recalls for our vehicles have resulted from, for example, industry-wide issues with airbags from a particular supplier, concerns of corrosion in Model S and Model X power steering assist motor bolts, certain suspension failures in Model S and Model X, issues with Model S and Model X media control units and improper torqueing of bolts to internal specifications on Model 3 and Model Y.
+Added: Recalls for our vehicles have resulted from, for example, industry-wide issues with airbags from a particular supplier to concerns of corrosion in certain Model S and Model X power steering assist motor bolts;
+Added: suspension failures in certain Model S and Model X;
+Added: issues with certain Model S and Model X media control units;
+Added: torqueing of bolts to internal specifications on certain Model 3 and Model Y;
+Added: misalignment of the frunk latch assembly on certain Model S;
+Added: unavailability of the rearview camera display on certain Model 3;
+Added: side front-row curtain airbags on certain Model S and Model X that may not comply with performance standards;
+Added: and making a determination to disable a certain software functionality because it does not comply with performance standards ( e.g., Boombox) or traffic laws ( e.g.
+Added: , rolling stops).
In addition to recalls initiated by us for various causes, testing of or investigations into our products by government regulators or industry groups may compel us to initiate product recalls or may result in negative public perceptions about the safety of our products, even if we disagree with the defect determination or have data that shows the actual safety risk to be non-existent.
8 unchanged sentences
As part of our energy generation and storage system contracts, we may provide the customer with performance guarantees that guarantee that the underlying system will meet or exceed the minimum energy generation or other energy performance requirements specified in the contract.
−Removed: Under these performance guarantees, we generally bear the risk of electricity production or other performance shortfalls, even if they result from failures in components from third party manufacturers.
+Added: Under these performance guarantees, we generally bear the risk of electricity production or other performance shortfalls, including in some cases shortfalls caused by failures in components from third party manufacturers.
These risks are exacerbated in the event such manufacturers cease operations or fail to honor their warranties.
4 unchanged sentences
We may be subject, in the ordinary course of business, to losses resulting from products liability, accidents, acts of God and other claims against us, for which we may have no insurance coverage.
−Removed: As a general matter, we do not maintain as much insurance
−Removed: coverage as many other companies do, and in some cases, we do not maintain any at all.
+Added: As a general matter, we do not maintain as much insurance coverage as many other companies do, and in some cases, we do not maintain any at all.
Additionally, the policies that we do have may include significant deductibles or self-insured retentions, policy limitations and exclusions, and we cannot be certain that our insurance coverage will be sufficient to cover all future losses or claims against us.
A loss that is uninsured or which exceeds policy limits may require us to pay substantial amounts, which may harm our financial condition and operating results.
−Removed: There is no guarantee that we will have sufficient cash flow from our business to pay our indebtedness or that we will not incur additional indebtedness.
−Removed: As of September 30, 2021, we and our subsidiaries had outstanding $6.70 billion in aggregate principal amount of indebtedness (see Note 10, Debt , to the consolidated financial statements included elsewhere in this Quarterly Report on Form 10-Q).
−Removed: Our consolidated indebtedness may increase our vulnerability to any generally adverse economic and industry conditions.
−Removed: We and our subsidiaries may, subject to the limitations in the terms of our existing and future indebtedness, incur additional debt, secure existing or future debt or recapitalize our debt.
−Removed: Holders of convertible senior notes issued by us or our subsidiary may convert such notes at their option prior to the scheduled maturities of the respective convertible senior notes under certain circumstances pursuant to the terms of such notes.
−Removed: Upon conversion of the applicable convertible senior notes, we will be obligated to deliver cash and/or shares pursuant to the terms of such notes.
−Removed: For example, as our stock price has significantly increased, we have seen higher levels of early conversions of such “in-the-money”
−Removed: convertible senior notes.
−Removed: Moreover, holders of such convertible senior notes may have the right to require us to repurchase their notes upon the occurrence of a fundamental change pursuant to the terms of such notes.
−Removed: Our ability to make scheduled payments of the principal and interest on our indebtedness when due, to make payments upon conversion or repurchase demands with respect to our convertible senior notes or to refinance our indebtedness as we may need or desire, depends on our future performance, which is subject to economic, financial, competitive and other factors beyond our control.
−Removed: Our business may not continue to generate cash flow from operations in the future sufficient to satisfy our obligations under our existing indebtedness and any future indebtedness we may incur, and to make necessary capital expenditures.
−Removed: If we are unable to generate such cash flow, we may be required to adopt one or more alternatives, such as reducing or delaying investments or capital expenditures, selling assets, refinancing or obtaining additional equity capital on terms that may be onerous or highly dilutive.
−Removed: Our ability to refinance existing or future indebtedness will depend on the capital markets and our financial condition at such time.
−Removed: In addition, our ability to make payments may be limited by law, by regulatory authority or by agreements governing our future indebtedness.
−Removed: We may not be able to engage in these activities on desirable terms or at all, which may result in a default on our existing or future indebtedness and harm our financial condition and operating results.
Our debt agreements contain covenant restrictions that may limit our ability to operate our business.
6 unchanged sentences
Our business and our future plans for expansion are capital-intensive, and the specific timing of cash inflows and outflows may fluctuate substantially from period to period.
−Removed: We may need or want to raise additional funds through the issuance of equity, equity-related or debt securities or through obtaining credit from financial institutions to fund, together with our principal sources of liquidity, the costs of developing and manufacturing our current or future products, to pay any significant unplanned or accelerated expenses or for new significant strategic investments, or to refinance our significant consolidated indebtedness, even if not required to do so by the terms of such indebtedness.
+Added: We may need or want to raise additional funds through the issuance of equity, equity-related or debt securities or through obtaining credit from financial institutions to fund, together with our principal sources of liquidity, the costs of developing and manufacturing our current or future products, to pay any significant unplanned or accelerated expenses or
+Added: for new significant strategic investments, or to refinance our significant consolidated indebtedness, even if not required to do so by the terms of such indebtedness.
We cannot be certain that additional funds will be available to us on favorable terms when required, or at all.
5 unchanged sentences
Alternatively, as we ramp and mature the production of our products to higher levels, we may discontinue the use of already installed equipment in favor of different or additional equipment.
−Removed: useful life of any equipment that would be retired early as a result would be shortened, causing the depreciation on such equipment to be accelerated, and our results of operations may be harmed.
+Added: The useful life of any equipment that would be retired early as a result would be shortened, causing the depreciation on such equipment to be accelerated, and our results of operations may be harmed.
We hold and may acquire digital assets that may be subject to volatile market prices, impairment and unique risks of loss.
In January 2021, we updated our investment policy to provide us with more flexibility to further diversify and maximize returns on our cash that is not required to maintain adequate operating liquidity, allowing us to invest a portion of such cash in certain alternative reserve assets including digital assets, gold bullion, gold exchange-traded funds and other assets as specified in the future.
−Removed: Thereafter, we invested certain of such cash in bitcoin and also accepted bitcoin as a form of payment for sales of certain of our products in specified regions, subject to applicable laws, and suspended this practice in May 2021.
+Added: Thereafter, we invested certain of such cash in bitcoin.
We believe in the long-term potential of digital assets both as an investment and also as a liquid alternative to cash.
9 unchanged sentences
While we intend to take all reasonable measures to secure any digital assets, if such threats are realized or the measures or controls we create or implement to secure our digital assets fail, it could result in a partial or total misappropriation or loss of our digital assets, and our financial condition and operating results may be harmed.
+Added: There is no guarantee that we will have sufficient cash flow from our business to pay our indebtedness or that we will not incur additional indebtedness.
+Added: As of March 31, 2022, we and our subsidiaries had outstanding $3.45 billion in aggregate principal amount of indebtedness (see Note 10, Debt , to the consolidated financial statements included elsewhere in this Quarterly Report on Form 10-Q).
+Added: Our consolidated indebtedness may increase our vulnerability to any generally adverse economic and industry conditions.
+Added: We and our subsidiaries may, subject to the limitations in the terms of our existing and future indebtedness, incur additional debt, secure existing or future debt or recapitalize our debt.
+Added: Our ability to make scheduled payments of the principal and interest on our indebtedness when due, to make payments upon conversion or repurchase demands with respect to our convertible senior notes or to refinance our indebtedness as we may need or desire, depends on our future performance, which is subject to economic, financial, competitive and other factors beyond our control.
+Added: Our business may not continue to generate cash flow from operations in the future sufficient to satisfy our obligations under our existing indebtedness and any future indebtedness we may incur, and to make necessary capital expenditures.
+Added: If we are unable to generate such cash flow, we may be required to adopt one or more alternatives, such as reducing or delaying investments or capital expenditures, selling assets, refinancing or obtaining additional equity capital on terms that may be onerous or highly dilutive.
+Added: Our ability to refinance existing or future indebtedness will depend on the capital markets and our financial condition at such time.
+Added: In addition, our ability to make payments may be limited by law, by regulatory authority or by agreements governing our future indebtedness.
+Added: We may not be able to engage in these activities on desirable terms or at all, which may result in a default on our existing or future indebtedness and harm our financial condition and operating results.
We are exposed to fluctuations in currency exchange rates.
We transact business globally in multiple currencies and have foreign currency risks related to our revenue, costs of revenue, operating expenses and localized subsidiary debt denominated in currencies other than the U.S.
−Removed: dollar, currently primarily the Chinese yuan, euro, Norwegian krone and Canadian dollar.
+Added: dollar, currently primarily the Chinese yuan, euro, pound sterling and Norwegian krone.
To the extent we have significant revenues denominated in such foreign currencies, any strengthening of the U.S.
12 unchanged sentences
Accordingly, we may consider the entering into licensing agreements with respect to such rights, although no assurance can be given that such licenses can be obtained on acceptable terms or that litigation will not occur, and such licenses and associated litigation could significantly increase our operating expenses.
−Removed: In addition, if we are determined to have or believe there is a high likelihood that we have infringed upon a third party’s intellectual property rights, we may
−Removed: be required to cease making, selling or incorporating certain components or intellectual property into the goods and services we offer, to pay substantial damages and/or license royalties, to redesign our products and services and/or to establish and maintain alternative branding for our products and services.
+Added: In addition, if we are determined to have or believe there is a high likelihood that we have infringed upon a third party’s intellectual property rights, we may be required to cease making, selling or incorporating certain components or intellectual property into the goods and services we offer, to pay substantial damages and/or license royalties, to redesign our products and services and/or to establish and maintain alternative branding for our products and services.
In the event that we are required to take one or more such actions, our brand, business, financial condition and operating results may be harmed.
+Added: Increased scrutiny and changing expectations from stakeholders with respect to the Company’s ESG practices may result in additional costs or risks.
+Added: Companies across many industries are facing increasing scrutiny related to their ESG practices.
+Added: Investor advocacy groups, certain institutional investors, investment funds and other influential investors are also increasingly focused on ESG practices and in recent years have placed increasing importance on the non-financial impacts of their investments.
+Added: While our mission is to accelerate the world’s transition to sustainable energy, if our ESG practices do not meet investor or other industry stakeholder expectations, which continue to evolve, we may incur additional costs and our brand, ability to attract and retain qualified employees and business may be harmed.
Our operations could be adversely affected by events outside of our control, such as natural disasters, wars or health epidemics.
−Removed: We may be impacted by natural disasters, wars, health epidemics, weather conditions, power outages or other events outside of our control.
−Removed: For example, our current corporate headquarters, the Fremont Factory and Gigafactory Nevada are located in seismically active regions in Northern California and Nevada, and our Gigafactory Shanghai is located in a flood-prone area.
−Removed: Moreover, the area in which our Gigafactory Texas is being built experienced severe winter storms in the first quarter of 2021 that had a widespread impact on utilities and transportation.
−Removed: If major disasters such as earthquakes, floods or other events occur, or our information system or communication breaks down or operates improperly, our headquarters and production facilities may be seriously damaged, or we may have to stop or delay production and shipment of our products.
+Added: We may be impacted by natural disasters, wars, health epidemics, weather conditions, the long-term effects of climate change, power outages or other events outside of our control.
+Added: For example, our Fremont Factory and Gigafactory Nevada are located in seismically active regions in Northern California and Nevada, and our Gigafactory Shanghai is located in a flood-prone area.
+Added: Moreover, the area in which our Gigafactory Texas is located experienced severe winter storms in the first quarter of 2021 that had a widespread impact on utilities and transportation.
+Added: If major disasters such as earthquakes, floods or other climate-related events occur, or our information system or communication breaks down or operates improperly, our headquarters and production facilities may be seriously damaged, or we may have to stop or delay production and shipment of our products.
In addition, the global COVID-19 pandemic has impacted economic markets, manufacturing operations, supply chains, employment and consumer behavior in nearly every geographic region and industry across the world, and we have been, and may in the future be, adversely affected as a result.
+Added: Also, the broader consequences in the current conflict between Russia and Ukraine, which may include further embargoes, regional instability and geopolitical shifts;
+Added: airspace bans relating to certain routes, or strategic decisions to alter certain routes;
+Added: and potential retaliatory action by the Russian government against companies, and the extent of the conflict on our business and operating results cannot be predicted.
We may incur expenses or delays relating to such events outside of our control, which could have a material adverse impact on our business, operating results and financial condition.
3 unchanged sentences
and abroad, including certain tax exemptions, tax credits and rebates, may be reduced, eliminated or exhausted from time to time.
−Removed: For example, previously available incentives favoring electric vehicles in areas including Ontario, Canada, Germany, Hong Kong, Denmark and California have expired or were cancelled or temporarily unavailable, and in some cases were not eventually replaced or reinstituted, which may have negatively impacted sales.
+Added: For example, previously available incentives favoring electric vehicles in areas including Ontario, Canada, Netherlands, Italy, Hong Kong and California have expired or were cancelled or temporarily unavailable, and in some cases were not eventually replaced or reinstituted, which may have negatively impacted sales.
Certain government and economic incentives may also be implemented that provide disproportionate benefits to manufacturers who assemble domestically, have local suppliers or have other characteristics that may not apply to Tesla.
14 unchanged sentences
As we grow our manufacturing operations in additional regions, we are or will be subject to complex environmental, manufacturing, health and safety laws and regulations at numerous jurisdictional levels in the U.S., China, Germany and other locations abroad, including laws relating to the use, handling, storage, recycling, disposal and/or human exposure to hazardous materials, product material inputs and post-consumer products and with respect to constructing, expanding and maintaining our facilities.
−Removed: The costs of compliance, including remediations of any discovered issues and any changes to our operations mandated by new or amended laws, may be significant, and any failures to comply could result in significant expenses, delays or fines.
−Removed: as we have increased our employee headcount and operations, we are and may continue to be subject to increased scrutiny, including litigation and government investigations relating to allegations such as discrimination and workplace misconduct, that we will need to defend against.
+Added: New, or changes in, environmental and climate change laws, regulations or rules could also lead to increased costs of compliance, including remediations of any discovered issues, and changes to our operations, which may be significant, and any failures to comply could result in significant expenses, delays or fines.
+Added: In addition, as we have increased our employee headcount and operations, we are and may continue to be subject to increased scrutiny, including litigation and government investigations relating to
+Added: allegations such as discrimination and workplace misconduct, that we will need to defend against.
If we are unable to successfully defend ourselves in such litigation or government investigations, it may harm our brand, ability to attract and retain qualified employees, business and financial condition.
3 unchanged sentences
In particular, we offer in our vehicles Autopilot and FSD Capability features that today assist drivers with certain tedious and potentially dangerous aspects of road travel, but which currently require drivers to remain fully engaged in the driving operation.
−Removed: We are continuing to develop our FSD Capability technology with the goal of achieving fully self-driving capability in the future.
−Removed: There are a variety of international, federal and state regulations that may apply to the sale, registration and operation of fully self-driving vehicles, which include many existing vehicle standards that were not originally intended to apply to vehicles that may not have a driver.
−Removed: Such regulations continue to rapidly change, which increases the likelihood of a patchwork of complex or conflicting regulations, or may delay products or restrict self-driving features and availability, which could adversely affect our business.
+Added: We are continuing to develop our Autopilot and FSD Capability technology with the goal of achieving fully self-driving capability in the future.
+Added: There are a variety of international, federal and state regulations that may apply to the sale, registration and operation of fully self-driving vehicles, which include many existing vehicle standards that were not originally intended to apply to vehicles that may not have a human driver.
+Added: Such regulations continue to rapidly change, which increases the likelihood of a patchwork of complex or conflicting regulations, or may delay products or restrict self-driving features and their availability, which could adversely affect our business.
Finally, as a manufacturer, installer and service provider with respect to solar generation and energy storage systems, a supplier of electricity generated and stored by certain of the solar energy and energy storage systems we install for customers, and a provider of grid services through virtual power plant models, we are impacted by federal, state and local regulations and policies concerning electricity pricing, the interconnection of electricity generation and storage equipment with the electrical grid and the sale of electricity generated by third party-owned systems.
7 unchanged sentences
Similarly, the California Consumer Privacy Act imposes certain legal obligations on our use and processing of personal information related to California residents.
−Removed: Finally, new privacy and cybersecurity laws are coming into effect in China.
+Added: Finally, new privacy and cybersecurity laws have come into effect in China.
+Added: In addition to the risks related to general privacy regulation, we may also be subject to specific vehicle manufacturer obligations relating to cybersecurity, data privacy and data localization requirements which place additional risks to our international operations.
+Added: Risks and penalties could include ongoing audit requirements, data protection authority investigations, legal proceedings by international governmental entities or others resulting in mandated disclosure of sensitive data or other commercially unfavorable terms.
Notwithstanding our efforts to protect the security and integrity of our customers’
11 unchanged sentences
Musk’s statement on August 7, 2018 that he was considering taking Tesla private.
−Removed: Pursuant to the settlement, we, among other things, paid a civil penalty of $20 million, appointed an independent director as the chair of our board of directors,
−Removed: appointed two additional independent directors to our board of directors and made further enhancements to our disclosure controls and other corporate governance-related matters.
+Added: Pursuant to the settlement, we, among other things, paid a civil penalty of $20 million, appointed an independent director as the chair of our board of directors, appointed two additional independent directors to our board of directors and made further enhancements to our disclosure controls and other corporate governance-related matters.
On April 26, 2019, this settlement was amended to clarify certain of the previously-agreed disclosure procedures, which was subsequently approved by the Court.
30 unchanged sentences
We may provide from time to time guidance regarding our expected financial and business performance.
−Removed: Correctly identifying key factors affecting business conditions and predicting future events is inherently an uncertain process, and our guidance may not ultimately be accurate and has in the past been inaccurate in certain respects, such as the timing of new product manufacturing ramps.
+Added: Correctly identifying key factors affecting business conditions and predicting future events is inherently an uncertain process, and our guidance may not
+Added: ultimately be accurate and has in the past been inaccurate in certain respects, such as the timing of new product manufacturing ramps.
Our guidance is based on certain assumptions such as those relating to anticipated production and sales volumes (which generally are not linear throughout a given period), average sales prices, supplier and commodity costs and planned cost reductions.
−Removed: If our guidance
−Removed: varies from actual results due to our assumptions not being met or the impact on our financial performance that could occur as a result of various risks and uncertainties, the market value of our common stock could decline significantly.
+Added: If our guidance varies from actual results due to our assumptions not being met or the impact on our financial performance that could occur as a result of various risks and uncertainties, the market value of our common stock could decline significantly.
Transactions relating to our convertible senior notes may dilute the ownership interest of existing stockholders, or may otherwise depress the price of our common stock.
2 unchanged sentences
In addition, the existence of the convertible senior notes may encourage short selling by market participants because the conversion of such notes could be used to satisfy short positions, or the anticipated conversion of such notes into shares of our common stock could depress the price of our common stock.
−Removed: Moreover, in connection with certain of the convertible senior notes, we entered into convertible note hedge transactions, which are expected to reduce the potential dilution and/or offset potential cash payments we are required to make in excess of the principal amount upon conversion of the applicable notes.
−Removed: We also entered into warrant transactions with the hedge counterparties, which could separately have a dilutive effect on our common stock to the extent that the market price per share of our common stock exceeds the applicable strike price of the warrants on the applicable expiration dates.
−Removed: In addition, the hedge counterparties or their affiliates may enter into various transactions with respect to their hedge positions, which could also affect the market price of our common stock or the convertible senior notes.
If Elon Musk were forced to sell shares of our common stock that he has pledged to secure certain personal loan obligations, such sales could cause our stock price to decline.
9 unchanged sentences
Any of the foregoing provisions and terms that has the effect of delaying or deterring a change in control could limit the opportunity for our stockholders to receive a premium for their shares of our common stock, and could also affect the price that some investors are willing to pay for our common stock.
+Added: UNREGISTERED SALES OF EQUITY SECURITIES AND USE OF PROCEEDS
+Added: DEFAULTS UPON SENIOR SECURITIES
+Added: MINE SAFETY DISCLOSURES
+Added: Not applicable.
Compared sentence by sentence after normalising whitespace, quotation marks, case and digits, so re-formatting and restated figures do not read as changed language. Wording changes appear as one removal and one addition. The current filing and the prior one are authoritative.