10 unchanged sentences
Once adopted, these regulations will add to the legal and technical framework for exploitation of the polymetallic nodules in the NORI, TOML and Marawa contract areas.
−Removed: Section 1, paragraph 15 of the 1994 Agreement relating to the Implementation of Part XI of UNCLOS allows a member state whose national intends to apply for approval of a plan of work for exploitation to notify the ISA of such intention.
+Added: Section 1, paragraph 15 of the 1994 Agreement Relating to the Implementation of Part XI of UNCLOS (the “1994 Agreement”) allows a member state whose national intends to apply for approval of a plan of work for exploitation to notify the ISA of such intention.
This notice obliges the ISA to complete the adoption of exploitation regulations within two years of the request made by the member state.
3 unchanged sentences
At its July 2023 session, the ISA released a road map for the finalization of the Mining Code, with a view to its adoption during the 30th session of the ISA in 2025.
−Removed: The road map included three scheduled ISA Council meetings through July 2024 to elaborate the Mining Code.
+Added: The road map included three scheduled ISA Council meetings through July 2024 to elaborate on the Mining Code.
The Mining Code was not completed at the July 2024 ISA Council meetings and during these meetings, the ISA agreed to continue the negotiations of the Mining Code with a continued view to its adoption during the 30th session of the ISA in 2025.
−Removed: The ISA Council has scheduled two ISA Council meetings in March and July 2025 to progress the Mining Code and has agreed to continue working inter-sessionally to advance the text Although we believe the ISA will adopt the Mining Code, there can be no assurances that the Mining Code will be adopted within this timeline, or at all, as a result of actions of ISA member States or otherwise.
−Removed: For example, at least 30 ISA member States out of the 169 ISA members have expressed reservations about the commercialization of seafloor mineral resources and have called for a ban, moratorium, or precautionary pause on the commercialization of these resources.
+Added: The ISA Council has scheduled two ISA Council meetings in March and July 2025 to progress the Mining Code and has agreed to continue working intersessionally to advance the text.
+Added: Although we believe the ISA will adopt the Mining Code, there can be no assurances that the Mining Code will be adopted within this timeline, or at all, as a result of actions of ISA member States or otherwise.
+Added: For example, at least 32 ISA member States out of the 169 ISA members have expressed reservations about the timing of commercialization of seafloor mineral resources and have called for a ban, moratorium, or precautionary pause on the commercialization of these resources.
In addition, although the Draft Regulations and several supporting standards and guidelines are at an advanced stage, there remains uncertainty regarding the final form that these will take, as well as the impact that such regulations, standards and guidelines will have on our ability to meet our objectives.
−Removed: As the ISA Council did not complete the adoption and elaboration of the Mining Code by the prescribed deadline of July 9, 2023, pursuant to Section 1, Paragraph 15(c) of the Annex to the 1994 Agreement relating to the implementation of Part XI of UNCLOS, if an application for a plan of work for exploitation is now submitted to the ISA, the ISA is nonetheless required to consider and provisionally approve such a plan of work based on:
+Added: As the ISA Council did not complete the adoption and elaboration of the Mining Code by the prescribed deadline of July 9, 2023, pursuant to Section 1, Paragraph 15(c) of the Annex to the 1994 Agreement, if an application for a plan of work for exploitation is now submitted to the ISA, the ISA is nonetheless required to consider and provisionally approve such a plan of work based on:
(i) the provisions of the UNCLOS;
−Removed: (ii) any rules, regulations and procedures that the ISA may have adopted provisionally, (iii) the basis of the norms contained in the UNCLOS and (iv) the terms and principles contained in the 1994 Agreement relating to the Implementation of Part XI, including the principle of non-discrimination among contractors.
−Removed: NORI intends to submit an application to the ISA for an exploitation contract, which will include a plan of work for exploitation for the NORI contract area and is expected to be completed and ready for filing prior to the next meeting of the ISA scheduled for March 2025.
−Removed: If the ISA has not adopted the final Mining Code by the time NORI submits this application, we believe that the ISA will review and provisionally approve the plan of work for exploitation included therein pursuant to Section 1, Paragraph 15(c) of the Annex to the 1994 Agreement relating to the implementation of Part XI of UNCLOS discussed above.
+Added: (ii) any rules, regulations and procedures that the ISA may have adopted provisionally, (iii) the basis of the norms contained in the UNCLOS and (iv) the terms and principles contained in the 1994 Agreement, including the principle of non-discrimination among contractors.
+Added: NORI intends to submit an application to the ISA for an exploitation contract, which will include a plan of work for exploitation for the NORI contract area, expected to be filed on June 27, 2025.
+Added: If the ISA has not adopted the final Mining Code by the time NORI submits this application, we believe that the ISA will review and provisionally approve the plan of work for exploitation included therein pursuant to Section 1, Paragraph 15(c) of the Annex to the 1994 Agreement discussed above.
The ISA released its road map to finalize the Mining Code at its July 2023 session and at its July 2024 session agreed to continue the negotiations of the Mining Code with a continued view to its adoption during the 30th session of the ISA in 2025, however, it has also stated that the commercial exploitation of mineral resources in the ISA’s jurisdictional area should not be carried out in the absence of RRPs relating to exploitation.
−Removed: In addition, there can be no assurances that the ISA will come to a consensus as to the interpretation of Section 1, Paragraph 15(c) of the Annex to the 1994 Agreement relating to the implementation of Part XI of UNCLOS.
+Added: In addition, there can be no assurances that the ISA will come to a consensus as to the interpretation of Section 1, Paragraph 15(c) of the Annex to the 1994 Agreement.
Although we believe the ISA will accept and consider an application for a plan of work for exploitation in the absence of the final Mining Code, there is no consensus within the ISA as to the process to be followed for its consideration of such an application, including the involvement of the ISA’s Legal and Technical Commission (LTC) and whether and how long the ISA could delay its consideration of an application past the proscribed 60-day period.
−Removed: As a result, and in light of some ISA Member States calling for a ban, moratorium or precautionary pause on the commercialization of seafloor mineral resources, there can be no assurance that the ISA will provisionally approve our plan of work for exploitation, within one year from submission thereof, or at all, or that such provisional approval would lead to the issuance of an exploitation contract with the ISA.
+Added: As a result, and to provide clarity on the application review process and timeline, the Republic of Nauru, in consultation with NORI, has formally requested that this issue be added to the agenda of the Council’s March 2025 meeting.
+Added: We expect that this will allow Council to discuss and approve the process to be confirmed prior to NORI’s expected application submission date of June 27, 2025.
+Added: In light of some ISA Member States calling for a ban, moratorium or precautionary pause on the commercialization of seafloor mineral resources, there can be no assurance that the ISA will provisionally approve our plan of work for exploitation, within one year from submission thereof, or at all, or that such provisional approval would lead to the issuance of an exploitation contract with the ISA.
On August 2, 2024, the ISA Assembly elected Leticia Carvalho of Brazil as the new Secretary-General of the ISA for the period 2025-2028.
2 unchanged sentences
As part of the application for an ISA Exploitation Contract, all contractors are required to complete baseline studies and an Environment and Social Impact Assessment (ESIA), culminating in an EIS, prior to collecting nodules at a commercial scale.
−Removed: The EIS would be accompanied by an EMMP which is expected to specify the objectives and purpose of all monitoring requirements, the components to be monitored, frequency of monitoring, methods of monitoring, analysis required in each monitoring component, monitoring data management and reporting.
+Added: The EIS would be accompanied by an Environmental Monitoring and Management Plan (EMMP) which is expected to specify the objectives and purpose of all monitoring requirements, the components to be monitored, frequency of monitoring, methods of monitoring, analysis required in each monitoring component, monitoring data management and reporting.
In order to move our exploration projects into commercial production, our wholly owned subsidiaries, NORI and TOML will each need to conclude an exploitation contract with the ISA, as will our partner, Marawa, in addition to obtaining related permits that may be required by our commercial partners.
11 unchanged sentences
Failure to maintain sponsorship, or secure new state sponsorship, will have a material impact on such subsidiary and on our overall business and operations.
−Removed: While the rates of payments are yet to be set by the ISA, the 1994 Agreement relating to the Implementation of Part XI of the UNCLOS prescribes a relevant framework that the rates of payments “shall be within the range of those prevailing in respect of land-based mining of the same or similar minerals in order to avoid giving deep seabed miners an artificial competitive advantage or imposing on them a competitive disadvantage.” The ISA has held workshops with stakeholders to discuss and seek comments on the potential financial regime for the collecting of polymetallic nodules in the CCZ.
+Added: While the rates of payments are yet to be set by the ISA, the 1994 Agreement prescribes a relevant framework that the rates of payments “shall be within the range of those prevailing in respect of land-based mining of the same or similar minerals in order to avoid giving deep seabed miners an artificial competitive advantage or imposing on them a competitive disadvantage.” The ISA has held workshops with stakeholders to discuss and seek comments on the potential financial regime for the collecting of polymetallic nodules in the CCZ.
There can be no assurance that the ISA will put in place a Mining Code in a timely manner or at all.
Such regulations may also impose burdensome obligations or restrictions on us, and/or may contain terms that do not enable us to develop our projects.
−Removed: There can be no assurance that we will be able to comply with the continued listing standards of Nasdaq.
−Removed: On September 10, 2021, our Common Shares and Public Warrants began trading on Nasdaq under the symbols “TMC” and “TMCWW,” respectively.
−Removed: If in the future Nasdaq delists our Common Shares from trading on its exchange for failure to meet the listing standards, we and our securityholders could face significant material adverse consequences including:
−Removed: • a limited availability of market quotations for our securities;
−Removed: • reduced liquidity for our securities;
−Removed: • a determination that our Common Shares are “penny stock” which will require brokers trading in our Common Shares to adhere to more stringent rules and possibly result in a reduced level of trading activity in the secondary trading market for our securities;
−Removed: • a limited amount of news and analyst coverage;
−Removed: • a decreased ability to issue additional securities or obtain additional financing in the future.
−Removed: The closing bid price of our Common Shares has been below the Nasdaq’s minimum $1.00 per share for extended periods of time in 2022 and into 2023.
−Removed: As a result, we received written notices from the Nasdaq in 2022 and 2023 notifying us that the closing bid price of the Common Shares over 30 consecutive trading days had fallen below the minimum $1.00 per share.
−Removed: Although we regained compliance with the Nasdaq’s minimum closing bid price, we may not be able to continue to meet this Nasdaq listing requirement.
−Removed: On August 12, 2024, the closing bid price of our Common Shares dropped below $1.00 per share to $0.965 per share.
−Removed: If the closing bid price of our Common Shares continues to be below $1.00 per share for a consecutive 30 trading days from August 12, 2024 or if the closing bid price of our Common Shares otherwise drops below $1.00 per share for a another consecutive 30 trading days, we expect to receive another notification from the Nasdaq to that effect.
−Removed: If this were to happen, in accordance with Nasdaq Listing Rule 5810(c)(3)(A), we expect to have 180 calendar days from the notice date to regain compliance.
−Removed: To regain compliance, the closing bid price of our Common Shares must be at least $1.00 per share for a minimum of 10 consecutive trading days.
−Removed: If we do not regain compliance in this 180-day period and we are not otherwise able to transfer our listing to another Nasdaq market and regain compliance with the $1.00 minimum closing bid price, the Nasdaq could delist our Common Shares and Public Warrants.
−Removed: In the event that our Common Shares and Public Warrants are delisted from Nasdaq and are not eligible for quotation or listing on another market or exchange, trading of our Common Shares and warrants could be conducted only in the over-the-counter market or on an electronic bulletin board established for unlisted securities such as the Pink Sheets or the OTC Bulletin Board.
−Removed: In such event, it could become more difficult to dispose of, or obtain accurate price quotations for, our Common Shares and Public Warrants, and there would likely also be a reduction in our coverage by securities analysts and the news media, which could cause the price of our Common Shares and Public Warrants to decline further.
+Added: In August 2024, as a result of a new process established by the LTC to identify contractors who may be at risk of non-compliance with obligations under their respective exploration contract, the ISA sent notifications of such potential risk of non-compliance to multiple contractors, including TOML and Marawa.
+Added: The LTC’s notification to TOML cited concerns, which relate mainly to the failure to conduct planned sampling campaigns, the need to submit digital data in the revised reporting templates, delays in surveys for environmental baseline development, and the delay in submission of its scoping report.
+Added: TOML is in the process of responding to the notification and is positioned to take corrective action if necessary.
+Added: The Company is confident that its response and corrective action(s) (if any) will be satisfactory to rectify the LTC’s concerns regarding TOML;
+Added: however, no assurances can be given that the LTC will be fully satisfied.
+Added: If the LTC deems TOML’s response insufficient or incomplete, or if TOML fails to respond, the LTC, in line with ISAB/29/LTC/5, may report TOML to Council for further consideration and action.
+Added: If TOML is deemed to have not remedied all issues raised by the LTC, there is a risk of non-compliance and the ISA suspending some or all rights granted under the exploration license, which could include halting exploration activities, and in severe cases, termination of the exploration contract, which could have a material and adverse effect on our future business prospects and financial condition.
+Added: The LTC’s notification to Marawa cited concerns, which relate mainly to the lack of expedition work, absence of study activities or data submission, failure to provide a detailed exploration strategy, delays in conducting planned research cruises, and insufficient analysis of biological samples.
+Added: If the LTC deems Marawa’s response insufficient or incomplete, or if Marawa fails to respond, the LTC, in line with ISAB/29/LTC/5, may report Marawa to Council for further consideration and action.
+Added: If Marawa is deemed to have not remedied all issues raised by the LTC, there is a risk of non-compliance and the ISA suspending some or all rights granted under the exploration license, which could include halting exploration activities, and in severe cases, termination of the exploration contract.
+Added: We are involved in litigation that may adversely affect us and may not be successful in our litigation related to non-performing Private Investment in Public Equity (“PIPE”) investors.
+Added: Due to the nature of our business, we may be subject to regulatory investigations, claims, lawsuits and other proceedings in the ordinary course of our business.
+Added: The results of these legal proceedings cannot be predicted with certainty due to the uncertainty inherent in litigation, including the effects of discovery of new evidence or advancement of new legal theories, the difficulty of predicting decisions of judges and juries and the possibility that decisions may be reversed on appeal.
+Added: We can provide no assurances that these matters will not have a material adverse effect on our business.
+Added: Following periods of volatility in the market, securities class-action litigation has often been instituted against companies.
+Added: On October 28, 2021, a shareholder filed a putative class action against us and certain executives in federal district court for the Eastern District of New York, captioned Caper v.
+Added: TMC The Metals Company Inc.
+Added: F/K/A Sustainable Opportunities Acquisition Corp., Gerard Barron and Scott Leonard.
+Added: The complaint alleges that all defendants violated Section 10(b) of the Exchange Act, and Rule 10b-5 promulgated thereunder, and Messrs.
+Added: Barron and Leonard violated Section 20(a) of the Exchange Act, by making false and/or misleading statements and/or failing to disclose information about our operations and prospects during the period from March 4, 2021 to October 5, 2021.
+Added: On November 15, 2021, a second complaint containing substantially the same allegations was filed, captioned Tran v.
+Added: TMC the Metals Company, Inc.
+Added: These cases have been consolidated.
+Added: On March 6, 2022, a lead plaintiff was selected.
+Added: An amended complaint was filed on May 12, 2022, reflecting substantially similar allegations, with the Plaintiff seeking to recover compensable damages caused by the alleged wrongdoings.
+Added: We deny any allegations of wrongdoing and filed and served the plaintiff a motion to dismiss on July 12, 2022 and intend to defend against this lawsuit.
+Added: On July 12, 2023, an oral hearing on the motion to dismiss was held.
+Added: The parties are currently awaiting a ruling.
+Added: On January 23, 2023, investors in the 2021 private placement from the Business Combination filed a lawsuit against us in the Commercial Division of New York Supreme Court, New York County, captioned Atalaya Special Purpose Investment Fund II LP et al.
+Added: Sustainable Opportunities Acquisition Corp.
+Added: n/k/a TMC The Metals Company Inc., Index No.
+Added: 650449/2023 (N.Y.
+Added: We filed a motion to dismiss on March 31, 2023, after which the plaintiffs filed an amended complaint on June 5, 2023.
+Added: The amended complaint alleges that we breached the representations and warranties in the plaintiffs’ private placement Subscription Agreements and breached the covenant of good faith and fair dealing.
+Added: The Plaintiffs are seeking to recover compensable damages caused by the alleged wrongdoings.
+Added: We deny any allegations of wrongdoing and filed a motion to dismiss the amended complaint on July 28, 2023.
+Added: On December 7, 2023, the Court granted our motion to dismiss the claim for breach of the covenant of good faith and fair dealing and denied our motion to dismiss the breach of the Subscription Agreement claim.
+Added: We filed a notice of appeal regarding the Court’s denial of our motion to dismiss the breach of the Subscription Agreement claim and the appeal was heard by the Court on November 8, 2024.
+Added: The parties are currently awaiting a ruling.
+Added: There is no assurance that we will be successful in our defense of this lawsuit or that insurance will be available or adequate to fund any settlement or judgment or the litigation costs of this action.
+Added: Such losses or range of possible losses cannot be reliably estimated.
+Added: We expected to receive approximately $330 million of proceeds in the private placement that closed on September 9, 2021 in connection with the Closing but only received $110.3 million (net of transactions costs).
+Added: On September 20, 2021, we commenced litigation in the New York Superior Court, New York County against two investors who failed to fund their commitments pursuant to subscription agreements entered into in connection with the expected financing.
+Added: These actions are captioned Sustainable Opportunities Acquisition Corp.
+Added: n/k/a TMC the metals company Inc.
+Added: Ethos Fund I, LP, Ethos GP, LLC, Ethos DeepGreen PIPE, LLC, and Ethos Manager, LLC, Index No.
+Added: 655527/2021 (N.Y.
+Added: Ct.) and Sustainable Opportunities Acquisition Corp.
+Added: n/k/a TMC the metals company Inc.
+Added: Ramas Capital Management, LLC, Ramas Energy Opportunities I, LP, Ramas Energy Opportunities I GP, LLC, and Ganesh Betanabhatla, Index No.
+Added: 655528/2021 (N.Y.
+Added: The operative complaints allege that the investors breached the relevant subscription agreement and that the investors’ affiliates tortiously interfered with the subscription agreements by causing the investor not to fund its contractual obligations.
+Added: We are seeking compensatory damages (plus interest), expenses, costs, and attorneys’ fees.
+Added: There can be no assurances, however, that we will be successful in our efforts against these investors.
+Added: On November 8, 2024, a shareholder filed a putative class action against us and certain executives in federal district court for the Central District of California, captioned Lin v.
+Added: TMC The Metals Company Inc., Gerard Barron, and Craig Shesky.
+Added: The complaint alleges that all defendants violated Section 10(b) of the Exchange Act and Rule 10b-5 promulgated thereunder, and Messrs.
+Added: Barron and Shesky violated Section 20(a) of the Exchange Act, by making false and/or misleading statements and/or failing to disclose information regarding the classification of the non-financial asset received from our partnership with Low Carbon Royalties Inc.
+Added: and the derecognition of the capitalized exploration contract related to NORI.
+Added: The alleged misstatements and omissions pertain to our initial classification of this non-financial asst as a gain on disposition (being a sale of future revenue) and subsequent reclassification thereof as a royalty liability (and re-capitalization of the exploration contract) and the restatement of our previously issued financial statements as a result thereof for the three months ended March 31, 2023, the six months ended June 30, 2023 and the nine months ended September 30, 2023 in March 2024.
+Added: The complaint purports to represent a class of shareholders who acquired our securities between May 12, 2023, and March 25, 2024, and seeks to recover compensable damages caused by the alleged wrongdoings.
+Added: We intend to defend against the lawsuit.
+Added: There can be no assurance, however, that we will be successful in our defense, or that insurance will be available or adequate to fund any settlement or judgment or the litigation costs of this action.
+Added: Due to the early stage of this litigation, such losses or range of possible losses cannot be reliably estimated.
UNREGISTERED SALES OF EQUITY SECURITIES AND USE OF PROCEEDS.
Issuer Purchases of Equity Securities
−Removed: We did not repurchase any of our equity securities during the three months ended June 30, 2024.
+Added: We did not repurchase any of our equity securities during the three months ended September 30, 2024.
DEFAULTS UPON SENIOR SECURITIES.
3 unchanged sentences
Compared sentence by sentence after normalising whitespace, quotation marks, case and digits, so re-formatting and restated figures do not read as changed language. Wording changes appear as one removal and one addition. The current filing and the prior one are authoritative.