Company Overview and Formation
−Removed: NextDecade Corporation, a Delaware corporation, is a Houston-based energy company primarily engaged in construction and development activities related to the liquefaction of natural gas and sale of LNG and the capture and storage of CO 2 emissions.
+Added: NextDecade Corporation, a Delaware corporation, is a Houston-based energy company primarily engaged in construction and development activities related to the liquefaction of natural gas and sale of LNG.
We are constructing and developing a natural gas liquefaction and export facility located in the Rio Grande Valley near Brownsville, Texas (the “Rio Grande LNG Facility”).
−Removed: The Rio Grande LNG Facility has received Federal Energy Regulatory Commission (“FERC”) approval and Department of Energy (“DOE”) FTA and non-FTA authorizations for the construction of up to five liquefaction trains and LNG exports totaling up to 27 million tonnes per annum (“MTPA”).
−Removed: Please see "Rio Grande LNG Facility Activity - Governmental Permits, Approvals and Authorizations" for more information regarding our FERC permit.
−Removed: The Rio Grande LNG Facility has three liquefaction trains and related infrastructure ("Phase 1") under construction and liquefaction trains 4 and 5 are currently being commercialized.
−Removed: We are also developing and beginning the permitting process for expansion trains 6 through 8 at the Rio Grande LNG Facility and developing a potential carbon capture and storage (“CCS”) project at the Rio Grande LNG Facility.
+Added: The first five liquefaction trains and related infrastructure (together, "Phase 1", "Train 4", and "Train 5") at the Rio Grande LNG Facility are currently under construction.
+Added: We are also developing and advancing the permitting process for expansion Trains 6 through 8 and exploring a potential carbon capture and storage ("CCS") project at the Rio Grande LNG Facility.
+Added: We are focused on constructing and operating the Rio Grande LNG Facility safely, efficiently, on schedule, and on budget.
+Added: We seek to deliver secure, affordable, and cleaner energy through the development and operation of liquefaction capacity at the Rio Grande LNG Facility.
We were incorporated in Delaware on May 21, 2014, and were formed for the purpose of acquiring, through a merger, share exchange, asset acquisition, stock purchase, recapitalization, reorganization, or other similar business combination, one or more businesses or entities.
1 unchanged sentence
Prior to the merger with NextDecade LLC, we had no operations and our assets consisted of cash proceeds received in connection with our initial public offering.
−Removed: We are focused on constructing and operating the Rio Grande LNG Facility safely, efficiently, on schedule, and on budget.
−Removed: We seek to deliver secure, economically attractive, and sustainable energy solutions through the development and operation of liquefaction and CCS infrastructure.
Our common stock trades on the Nasdaq Capital Market (“Nasdaq”) under the symbol “NEXT.”
1 unchanged sentence
Liquefaction Facilities Overview
−Removed: Through our partially owned subsidiary, Rio Grande LNG, LLC ("Rio Grande"), we are constructing and developing the Rio Grande LNG Facility on the north shore of the Brownsville Ship Channel.
−Removed: The site is located on 984 acres of land which has been leased long-term and includes 15 thousand feet of frontage on the Brownsville Ship Channel.
−Removed: We believe the site is advantaged due to its proximity to abundant natural gas resources in the Permian Basin and Eagle Ford Shale, access to an uncongested waterway for vessel loading, and location in a region that has historically been subject to fewer and less severe weather events relative to other locations along the US Gulf Coast.
−Removed: The Rio Grande LNG Facility has been approved by the FERC and authorized by the DOE to export up to 27 MTPA of LNG from up to five liquefaction trains.
−Removed: Please see "Rio Grande LNG Facility Activity - Governmental Permits, Approvals and Authorizations" for more information regarding our FERC permit.
−Removed: Phase 1 at the Rio Grande LNG Facility is under construction, Trains 4 and 5 are currently being commercialized, and we are developing and beginning the permitting process for Trains 6 through 8.
−Removed: In July 2023, Rio Grande commenced construction on Phase 1 of the Rio Grande LNG Facility following a positive final investment decision (“FID”) and the closing of project financing by Rio Grande, which owns Phase 1 of the Rio Grande LNG Facility.
+Added: We are constructing and developing the Rio Grande LNG Facility on the north shore of the Brownsville Ship Channel in south Texas.
+Added: The site is located on approximately 1,000 acres of land which has been leased long-term and includes 15,000 feet of frontage on the Brownsville Ship Channel.
+Added: We believe the site is advantaged due to its proximity to abundant natural gas resources in the Permian Basin and Eagle Ford Shale, access to an uncongested waterway for vessel loading, location in a region that has historically been subject to fewer and less severe weather events relative to other locations along the U.S.
+Added: Gulf Coast, access to a large, skilled local labor force, and strong geotechnical conditions requiring less piling for soil stabilization.
+Added: Trains 1 through 5 at the Rio Grande LNG Facility are under construction, and we are developing and advancing the permitting process for Trains 6 through 8.
+Added: There is sufficient space at the Rio Grande LNG Facility site for up to 10 liquefaction trains.
+Added: Construction commenced on Phase 1 at the Rio Grande LNG Facility in July 2023, on Train 4 in September 2025, and on Train 5 in October 2025, in each case following a positive final investment decision ("FID") and the closing of project financing by the Company's subsidiaries.
Construction will be completed by Bechtel Energy Inc.
−Removed: (“Bechtel”) under fully wrapped, lump-sum turnkey engineering, procurement, and construction (“EPC”) contracts, and the facility will utilize Air Products and Chemicals, Inc.
−Removed: (“APCI”) liquefaction technology, which is the predominant liquefaction technology utilized globally.
−Removed: Pursuant to a joint venture agreement with equity partners for ownership of Rio Grande, we expect to receive up to approximately 20.8% of distributions of available cash generated from Phase 1 operations, provided that a majority of the cash distributions to which we are otherwise entitled will be paid for any distribution period only after our equity partners receive an agreed distribution threshold in respect of such distribution period and certain other deficit payments from prior distribution periods, if any, are made.
−Removed: Phase 1 LNG Sale and Purchase Agreements
−Removed: Rio Grande has entered into long-term LNG Sale and Purchase Agreements (“SPAs”) with nine creditworthy counterparties for aggregate volumes of approximately 16.15 MTPA of LNG, which is over 90% of the expected Phase 1 nameplate LNG production capacity.
+Added: (“Bechtel”) under fully wrapped, lump-sum turnkey engineering, procurement, and construction (“EPC”) contracts, and the facility will utilize Honeywell AP-C3MR liquefaction technology, which is a predominant liquefaction technology utilized globally.
+Added: The combined scope of Phase 1, Train 4, and Train 5 includes five liquefaction trains with a total expected LNG production capacity of approximately 30 million tonnes per annum ("MTPA"), four 180,000 cubic meter full containment LNG storage tanks, two jetty berthing structures designed to load LNG carriers up to 216,000 cubic meters in capacity, and associated site infrastructure and common facilities including feed gas pretreatment facilities, electric and water utilities, ground flares, roads, levees surrounding the site, and warehouses, administrative, operations control room, and maintenance buildings.
+Added: LNG Sale and Purchase Agreements for Trains 1 through 5
+Added: We have entered into long-term LNG Sale and Purchase Agreements ("SPAs") with 14 creditworthy counterparties for aggregate volumes of approximately 25.3 MTPA of LNG from Trains 1 through 5 at the Rio Grande LNG Facility.
The SPAs have a weighted average term of 19.5 years.
−Removed: Under these SPAs, the
−Removed: customers will purchase LNG from Rio Grande for a price consisting of a fixed fee per MMBtu of LNG plus a variable fee per MMBtu of LNG, with the variable fees structured to cover the expected cost of natural gas plus fuel and other sourcing costs to produce LNG.
+Added: Under these SPAs, the customers will purchase LNG from the Rio Grande LNG Facility for a price consisting of a fixed fee per MMBtu of LNG plus a variable fee per MMBtu of LNG, with the variable fees structured to cover the expected cost of natural gas plus fuel and other sourcing costs to produce LNG.
In certain circumstances, customers may elect to cancel or suspend deliveries of LNG cargoes, in which case the customers would still be required to pay the fixed fee with respect to cargoes that are not delivered.
2 unchanged sentences
however, the commencement of the term of each SPA is tied to a specified train.
−Removed: These SPAs help create a stable foundation of predictable, long-term cash flows to Rio Grande.
−Removed: We believe our SPAs are attractive to our customers for several reasons, including long-term reliable supply, volumes to support growing demand for LNG and to replace customers' contracts with legacy LNG suppliers, diversification of supply portfolios in terms of geography, price indexation, delivery points, and/or tenor, flexibility of volumes with no destination restrictions, and the ability of our LNG to help our customers achieve their environmental, social and governance (“ESG”) goals.
Each of these SPAs is currently effective, and deliveries of LNG under these SPAs will commence on the respective Date of First Commercial Delivery (“DFCD”), which is primarily tied to the substantial completion or guaranteed substantial completion dates of specific trains as defined in each SPA.
−Removed: In aggregate, the approximately 14.65 MTPA of Phase 1 Henry Hub-linked SPAs have average fixed fees, unadjusted for inflation, totaling approximately $1.8 billion expected to be paid annually.
+Added: Of the SPAs for Trains 1 through 5, approximately 23.75 MTPA are linked to Henry Hub and have average fixed fees, unadjusted for inflation, totaling approximately $3.0 billion expected to be paid annually.
Marketing of Uncontracted Volumes
−Removed: Rio Grande expects to sell any commissioning LNG volumes and operational LNG volumes in excess of SPA volumes into the LNG market through spot, short-term, and medium-term agreements.
−Removed: Rio Grande has entered into certain time charter agreements and expects to enter into additional time charter agreements with vessel owners to provide shipping capacity for LNG sales related to its existing delivered ex-ship SPA, commissioning volumes, and expected portfolio volumes.
+Added: We expect to sell any commissioning LNG volumes and operational LNG volumes in excess of SPA volumes ("portfolio volumes") into the LNG market through spot, short-term, and medium-term agreements.
+Added: We have entered into certain time charter agreements and expect to enter into additional time charter agreements with vessel owners to provide shipping capacity for LNG sales
+Added: related to our 1.0 MTPA delivered ex-ship SPA, expected commissioning volumes, and expected portfolio volumes.
+Added: We may subcharter vessels with third parties from time to time to manage our shipping needs relative to chartered capacity.
Engineering, Procurement and Construction ( “ EPC ”)
−Removed: Rio Grande entered into fully wrapped, lump-sum turnkey contracts with Bechtel, a well-established and reputable LNG engineering and construction firm, for the engineering, procurement, and construction of Phase 1, and one of our wholly-owned subsidiaries entered into a corresponding contract in regards to Train 4 at the Rio Grande LNG Facility, under which Bechtel has generally guaranteed cost, performance, and schedule.
−Removed: Under the Phase 1 and Train 4 EPC contracts, Bechtel is responsible for the engineering, procurement, construction, commissioning, and startup of liquefaction trains and their respective related infrastructure.
−Removed: On July 12, 2023, Rio Grande issued final notice to proceed to Bechtel under the EPC contracts for Phase 1.
−Removed: Total expected capital costs for Phase 1 are estimated to be approximately $18.0 billion, including EPC costs, estimated owner’s costs, contingencies, and financing costs, and including amounts spent prior to FID under limited notices to proceed.
+Added: We have entered into fully wrapped, lump-sum turnkey contracts with Bechtel, a well-established and reputable LNG engineering and construction firm, for the engineering, procurement, and construction of Phase 1, Train 4, and Train 5 at the Rio Grande LNG Facility, under which Bechtel has generally guaranteed cost, performance, and schedule.
+Added: Under these EPC contracts, Bechtel is responsible for the engineering, procurement, construction, commissioning, and startup of liquefaction trains and their respective related infrastructure.
+Added: On July 12, 2023, we issued final notice to proceed to Bechtel under the EPC contracts for Phase 1.
+Added: Total expected capital costs for Phase 1 are estimated to be approximately $18.0 billion, including estimated EPC costs, owner’s costs, contingencies, and financing costs, and including amounts spent prior to FID under limited notices to proceed.
+Added: On September 9, 2025, we issued final notice to proceed to Bechtel under the EPC contract for Train 4.
+Added: Total expected capital costs for Train 4 are estimated to be approximately $6.7 billion, including estimated EPC costs, owner's costs, contingencies, financing costs, and other costs, including a payment to be made at the commencement of operations to the trains in commercial operation at such date for Train 4's proportionate share of the capital costs of the common facilities it will access, net of the capital cost of any common facilities constructed under the Train 4 EPC contract.
+Added: On October 16, 2025, we issued final notice to proceed to Bechtel under the EPC contract for Train 5.
+Added: Total expected capital costs for Train 5 are estimated to be approximately $6.7 billion, including estimated EPC costs, owner's costs, contingencies, financing costs, and other costs, including a payment to be made at the commencement of operations to the trains in commercial operation at such date for Train 5's proportionate share of the capital costs of the common facilities it will access, net of the capital cost of any common facilities constructed under the Train 5 EPC contract.
Natural Gas Transportation and Supply
1 unchanged sentence
We expect to enter into gas supply arrangements with a wide range of suppliers, and we also expect to leverage trading platforms and exchanges to lock in natural gas supply prices and/or hedge risk.
−Removed: Rio Grande has executed agreements for transportation of natural gas to the Rio Grande LNG Facility on both a firm and interruptible basis to support commissioning and operations and provide the ability to purchase natural gas supplies at the Agua Dulce Hub, giving Rio Grande access to prolific gas production from the Permian Basin and Eagle Ford Shale and providing significant flexibility to obtain competitively priced natural gas feedstock.
−Removed: We believe our proximity to major reserve basins and shale plays, increasing pipeline capacity in the area, a significant amount of natural gas production and infrastructure development, as well as our existing contracts and discussions with some of the largest regional operators, represent key elements of a comprehensive and effective feed gas strategy.
−Removed: Final Investment Decision on Train 4 and Train 5 at the Rio Grande LNG Facility
−Removed: We expect to make a positive final investment decision and commence construction of Trains 4 and 5 and related infrastructure at the Rio Grande LNG Facility, subject to, among other things, maintaining requisite governmental approvals, finalizing and entering into EPC contracts, entering into appropriate commercial arrangements, and obtaining adequate financing to construct each train and related infrastructure.
−Removed: The Company has finalized an EPC contract with Bechtel for Train 4 and related infrastructure.
−Removed: Pricing under the EPC Contract for Train 4 was valid through December 31, 2024, and a pricing refresh is in process and is expected to be completed in 2025.
−Removed: The Company continues to advance commercial discussions with multiple potential counterparties and expects to finalize commercial arrangements for Train 4 in the coming months to support a positive FID on Train 4.
−Removed: The Company entered into an LNG SPA with ADNOC for the sale of 1.9 MTPA of LNG from Train 4, as well as a non-binding Heads of Agreement (HoA) with Aramco for a 20-year SPA for the sale of 1.2 MTPA of LNG from Train 4.
−Removed: The Company is working with Aramco to finalize a binding SPA.
−Removed: Additionally, an affiliate of TotalEnergies SE ("TotalEnergies") has an LNG purchase option of 1.5 MTPA for Train 4, and the Company expects TotalEnergies to exercise the option.
−Removed: The Company expects to finance construction of Train 4 and associated infrastructure utilizing a combination of debt and equity funding.
−Removed: The Company expects to enter into bank facilities for the debt portion of the funding.
−Removed: In connection with consummating the Rio Grande Phase 1 equity joint venture, the Company's equity partners each have options to invest in Train 4 equity, which, if exercised, would provide approximately 60% of the equity funding required for Train 4.
−Removed: Inclusive of these options, NextDecade currently expects to fund 40% of the equity commitments for Train 4, and to have an initial economic interest of 40% in Train 4, increasing to 60% after its equity partners achieve certain returns on their investments in Train 4.
−Removed: The Company expects to make a positive FID on Train 4 after commercial and financing arrangements are finalized.
−Removed: The Company is also progressing the development and commercialization of Train 5.
−Removed: TotalEnergies holds an LNG purchase option for 1.5 MTPA for Train 5, and the Rio Grande Phase 1 equity partners have options to invest in Train 5 equity which are identical to their options to participate in Train 4 equity.
+Added: We have entered into agreements for transportation of natural gas to the Rio Grande LNG Facility on both a firm and interruptible basis to support commissioning and operations and provide the ability to purchase natural gas supplies at the Agua Dulce Hub and other physical access points, giving us access to prolific gas production from the Permian Basin, Eagle Ford Shale, and additional basins, and providing significant flexibility to obtain competitively priced natural gas feedstock.
+Added: We believe our proximity to major reserve basins and shale plays, increasing pipeline capacity in the area, a significant amount of natural gas production and infrastructure investment, as well as our existing contacts and discussions with some of the largest regional operators, represent key elements of a comprehensive and effective feed gas strategy.
+Added: NextDecade Economic Interest in Trains 1 Through 5
+Added: Pursuant to a joint venture agreement with equity partners for ownership of Phase 1 at the Rio Grande LNG Facility, we expect to receive up to approximately 20.8% of distributions of available cash generated from Phase 1 operations, provided that a majority of the cash distributions to which we are otherwise entitled will be paid for any distribution period only after our equity partners receive an agreed distribution threshold in respect of such distribution period and certain other deficit payments from prior distribution periods, if any, are made.
+Added: Pursuant to a joint venture agreement with equity partners for ownership of Train 4 at the Rio Grande LNG Facility, we expect to receive 40% of distributions of available cash generated from Train 4 operations, which will increase to 60% when the equity partners receive a certain return on their investments in Train 4.
+Added: Pursuant to a joint venture agreement with equity partners for ownership of Train 5 at the Rio Grande LNG Facility, we expect to receive 50% of distributions of available cash generated from Train 5 operations, which will increase to 70% when the equity partners receive a certain return on their investments in Train 5.
Development of Additional Liquefaction Capacity
−Removed: The Company is developing and beginning the permitting process for additional liquefaction capacity at the Rio Grande LNG Facility site beyond Trains 1 through 5.
−Removed: Trains 6 through 8 are wholly owned by NextDecade and are cumulatively expected to increase the Company's total liquefaction capacity by approximately 18 MTPA once constructed and placed into operation.
+Added: We are developing and advancing the permitting process for Trains 6 through 8 at the Rio Grande LNG Facility site, which are currently wholly owned by NextDecade and are cumulatively expected to increase the Company's total liquefaction capacity by approximately 18 MTPA once constructed and placed into operation.
Train 6 is being developed inside the existing levee at the Rio Grande LNG Facility site and adjacent to Trains 1 through 5.
−Removed: The Company expects to pre-file an application with FERC for Train 6 in 2025 and a full application with FERC in early 2026.
−Removed: Trains 7 and 8 are being developed on the site outside of the existing levee.
+Added: In November 2025, we initiated the pre-filing process with FERC for expansion at the Rio Grande LNG Facility that includes Train 6 and
+Added: an additional marine berth, and we expect to file a full application for this expansion with FERC in mid-2026.
+Added: We are evaluating multiple areas on the site for the development of Trains 7 and 8 and expect to advance the development of these trains throughout 2026.
+Added: There is sufficient space at the Rio Grande LNG Facility site for up to 10 liquefaction trains.
Governmental Permits, Approvals and Authorizations
3 unchanged sentences
Federal law has bifurcated regulatory jurisdiction of LNG export activities.
−Removed: The FERC has jurisdiction to authorize the siting, construction and operation of LNG export facilities.
−Removed: The DOE has jurisdiction over the import and export of the natural gas commodity, including natural gas in the form of LNG.
+Added: The Federal Energy Regulatory Commission ("FERC") has jurisdiction to authorize the siting, construction and operation of LNG export facilities.
+Added: The Department of Energy (“DOE”) has jurisdiction over the import and export of the natural gas commodity, including natural gas in the form of LNG.
The FERC also has jurisdiction over the siting, construction and operation of interstate natural gas pipelines under Section 7 of the NGA and regulates interstate pipelines’ rates and terms and conditions of service under Sections 4 and 5 of the NGA.
13 unchanged sentences
In 2018, the FERC and the PHMSA entered into a separate Memorandum of Understanding that establishes the process and timeline by which the PHMSA should determine whether an LNG facility will meet the PHMSA’s LNG safety siting standards.
−Removed: We have obtained all major permits required to build the Rio Grande LNG Facility and export LNG, including FERC approval and DOE FTA and non-FTA authorizations for the construction of up to five liquefaction trains and LNG exports totaling up to 27 MTPA.
−Removed: On November 22, 2019, we received the Order from FERC authorizing the siting, construction and operation of the Rio Grande LNG Facility.
−Removed: On August 13, 2020, the FERC approved the change of the design for the Rio Grande LNG Facility from six trains to five trains.
−Removed: On September 22, 2021, Rio Grande received the U.S.
−Removed: Army Corps of Engineers Permit issued under CWA Section 404/RHA – Section 10.
−Removed: On September 7, 2016, Rio Grande obtained an authorization for export of LNG to countries with which the U.S.
−Removed: has a Free Trade Agreement (“FTA”) on its own behalf and as an agent for others for a term of 30 years.
−Removed: On February 10, 2020, the DOE issued its “Opinion and Order Granting Long-Term Authorization to Export Liquefied Natural Gas to Non-Free Trade Agreement Nations to Rio Grande" in DOE/FE Order No.
−Removed: In addition, on October 21, 2020, the DOE issued its Order Extending Export Term for Authorization to Non-Free Trade Agreement Nations through December 31, 2050.
−Removed: Following receipt of the FERC Order, two requests for re-hearing were filed.
−Removed: One of those requests for rehearing also requested that the FERC stay the Order.
−Removed: On January 23, 2020, the FERC issued its Order on Rehearing and Stay in which the FERC rejected all challenges presented in the requests for rehearing and the request for stay of the Order.
−Removed: The parties who filed the requests for re-hearing petitioned the U.S.
−Removed: Court of Appeals for the District of Columbia (“D.C.
−Removed: Circuit”) to review the Order and the order denying rehearing.
−Removed: On August 3, 2021, the D.C.
−Removed: Circuit denied all the arguments raised in the challenges, except for two technical issues dealing with environmental justice and GHG emissions, which were remanded to the FERC for further consideration.
−Removed: Circuit did so without vacatur, and accordingly, the Rio Grande LNG Facility's authorization from the FERC remained legally valid and enforceable.
−Removed: On April 21, 2023, FERC issued its order responding to the D.C.
−Removed: Circuit’s 2021 remand of the FERC Order, reaffirming its prior finding that the siting, construction, and operation of the Rio Grande LNG Facility is not inconsistent with the public interest (“Remand Order”).
−Removed: Parties sought rehearing of the Remand Order, which FERC denied by operation of law on June 22, 2023, and subsequently issued a substantive order on the merits upholding the conclusions in the Remand Order, and its reaffirmation of the FERC Order.
−Removed: On August 17, 2023, parties petitioned the D.C.
−Removed: Circuit for review of the Remand Order.
−Removed: On November 24, 2023, a motion was filed with FERC to stay construction of the Rio Grande LNG Facility, which FERC denied on January 24, 2024.
−Removed: On February 2, 2024, parties filed a motion of the D.C Circuit to stay construction of the Rio Grande LNG Facility.
−Removed: On March 1, 2024, the motion to stay was denied by the D.C.
−Removed: On August 6, 2024, the D.C.
−Removed: Circuit issued a decision vacating FERC's reauthorization of the Rio Grande LNG Facility and remanding the case to FERC again on the grounds that FERC should have issued a supplemental EIS related to environmental justice issues during its remand process, as well as with regard to FERC's consideration of the CCS proposal we had filed in November 2021.
−Removed: We withdrew our FERC application for the CCS facilities on August 30, 2024.
−Removed: On September 13, 2024, FERC issued notice of its intent to prepare a supplemental EIS in response to the D.C.
−Removed: Circuit's decision vacating the Remand Order.
−Removed: The notice set forth a schedule providing for issuance of a draft of the supplemental EIS in March 2025, the final supplemental EIS by the end of July 2025, and issuance of a final order by November 20, 2025.
−Removed: FERC has continued to act on our implementation filings and to authorize construction activities.
−Removed: On October 21, 2024, the Company filed a petition for rehearing and rehearing en banc with the D.C.
−Removed: On December 9, 2024, petitioners in the case and FERC filed responses to the Company's request for rehearing, and the Court's decision is pending.
−Removed: Circuit's decision will not be effective until the Court has issued its mandate, which is not expected to occur until the appeals process has been completed.
−Removed: The Company expects to take all available legal and regulatory actions, including but not limited to appellate actions and other strategies, to ensure that construction on Phase 1 will continue and that necessary regulatory approvals are maintained to enable the FID of Trains 4 and 5 at the Rio Grande LNG Facility.
−Removed: NEXT Carbon Solutions
−Removed: NEXT Carbon Solutions (“NCS”) is developing a potential end-to-end carbon capture and storage (“CCS”) project at the Rio Grande LNG Facility, focused on post-combustion carbon capture.
−Removed: The potential CCS project at the Rio Grande LNG Facility is in early development, and the Company is exploring subsurface and technology options for the project as well as potential avenues for commercialization.
−Removed: The Company expects that development of the CCS project at the Rio Grande LNG Facility may lead to CCS project opportunities at third-party industrial facilities in the future.
+Added: We have obtained all major permits required to build and export LNG from the first five liquefaction trains and related infrastructure at the Rio Grande LNG Facility, including FERC approval and Department of Energy FTA and non-FTA export authorizations.
+Added: In March 2025, the U.S.
+Added: Court of Appeals for the District of Columbia (the "D.C.
+Added: Circuit Court") issued a revision to its August 2024 decision regarding our FERC order, resulting in a remand without vacatur of the FERC order for the first five liquefaction trains at the Rio Grande LNG Facility.
+Added: Pursuant to the remand, FERC was to consider the issue of a supplemental Environmental Impact Statement (“SEIS”) in view of several executive orders issued since January 20, 2025.
+Added: In March 2025, the FERC issued a draft SEIS for the first five liquefaction trains at the Rio Grande LNG Facility.
+Added: In July 2025, the FERC issued a final SEIS for the first five liquefaction trains at the Rio Grande LNG Facility.
+Added: In August 2025, the FERC issued a final order on remand (“Remand Order”) reaffirming its authorization for the siting, construction, and operation of the first five liquefaction trains at the Rio Grande LNG Facility.
+Added: In September 2025, a request for rehearing of the Remand Order was filed by certain intervenors and on October 30, 2025, the rehearing request was deemed denied by operation of law, rendering the Remand Order no longer appealable to FERC.
+Added: In December 2025, the intervenors that filed a request for rehearing with FERC petitioned the D.C.
+Added: Circuit Court to review the Remand Order, and their request remains pending.
Corporate and Other Activities
−Removed: We are required to maintain corporate and general and administrative functions to serve our business activities described above, including construction of Phase 1 at the Rio Grande LNG Facility, the development of Train 4, Train 5, and additional liquefaction expansion capacity, and the development of a potential CCS project at the Rio Grande LNG Facility.
+Added: We are required to maintain corporate and general and administrative functions to serve our business activities described above, including construction of Trains 1 through 5 at the Rio Grande LNG Facility, the development of Trains 6 through 8, and evaluating the potential development of a CCS project at the Rio Grande LNG Facility.
We are subject to a high degree of competition in all aspects of our business.
2 unchanged sentences
In this market, we will compete with a variety of companies, such as independent, technology-driven companies, state-owned companies, and other independent oil and natural gas companies and utilities.
−Removed: Many of these competitors have longer operating histories, more development experience, greater name recognition, greater access to the LNG market, more employees, and substantially greater financial, technical and marketing resources than we currently possess.
−Removed: NEXT Carbon Solutions will compete with other providers of CCS services, including traditional original end manufacturers, EPC firms and midstream transportation and storage companies in offering CCS solutions.
−Removed: Our competitors in the CCS space may have longer operating histories, more development experience, greater name recognition, greater access to the CCS market, more employees and substantially greater financial, technical and marketing resources than we currently possess.
+Added: Many of these competitors have longer operating histories, more
+Added: development experience, greater name recognition, greater access to the LNG market, more employees, and substantially greater financial, technical and marketing resources than we currently possess.
As of December 31, 2025, we had 360 full-time employees.
11 unchanged sentences